STAR Report  Time Meeting. March 18, 2014 Olga Evdokimov. Start of the 200GeV Run. Begun trigger setup work on Friday, the 14 th Set up three essential triggers for data taking and HFT commissioning Over the weekend – overall good beam conditions, tuned the base-line trigger set - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: STAR Report    Time Meeting

STAR Report Time Meeting

March 18, 2014

Olga Evdokimov

Page 2: STAR Report    Time Meeting

STAR

Start of the 200GeV Run

2 18 March, 2014

• Begun trigger setup work on Friday, the 14th

• Set up three essential triggers for data taking and HFT commissioning

• Over the weekend – overall good beam conditions, tuned the base-line trigger set

• Additional (physics-based) triggers are being set: , , e, HT

• Monday, the 17th - start elevating triggers to physics IDs

Page 3: STAR Report    Time Meeting

STAR

HFT Commissioning

3 18 March, 2014

The HFT is commissioning the three system PXL, IST and SSD Many pedestal runs collected for calibration by all subsystems. All three detectors are included in multiple tests runs in the past

few days.

STAR priorities for the 200 GeV run: beam stability first, lumi second.

Page 4: STAR Report    Time Meeting

STAR

Beam Event 3/18 @9:25

A few beam loss events prior to March 18th went without notable impact on STAR

We hoped that was a good indication of the protection bump success.

Pre-fire abort & quench today tripped (almost) all STAR systems

A major concern for STAR

4 18 March, 2014

Page 5: STAR Report    Time Meeting

STAR

Beam Event 3/18 @9:25

No obvious critical damage for most of the HFT One of the inner layer sensors lost half of the read out – under

investigation.

5 18 March, 2014

HFT

Before

After

Page 6: STAR Report    Time Meeting

STAR

Plan for Wed. Access

STAR would like to request restricted access Work plan:

MTD (4 people) • replace TDIG board• damage assessment from pre-fire abort

Gas system (4 people)• ED visitors inspecting the gas system

PXL (2 people)• temperature interlock installation

IST(1 person)• fiber swap for an RDO

BTOW (2 people)

6 18 March, 2014