star oil muleba driveway
TRANSCRIPT
APPENDIX B
Sr.
No.
Description of Works /
EquipmentsContractor / Supplier AMOUNTS PHASE I PHASE II
1 Preliminaries 41,430,730 41,430,730 0
2
Driveway, Canopy
foundation, Trench & Insland
Construction
0 #REF! #REF!
3Pipeline, DU's & UST's
Installation19,687,883 19,687,883 0
4 Electricals 0 0 0
5 Canopy Construction 0 #REF! #REF!
7 Prefabricated Building 14,080,000 14,080,000 0
8Chain Link Fencing
Construction0 0 0
9Underground Storage Tank
Installation0 0 0
10Diesel Generator Set Cage
Construction0 0 0
11Oil Water Seperator
Construction26,388,340 26,388,340 0
12 Sewer Pits Construction 0 0 0
13 Equipments 32,450,000 32,450,000 0
14Transportation of UST's from
Point A to B0 0 0
TSH TSH TSH
134,036,952 #REF! #REF!
0 #REF! #REF!
158,163,604 #REF! #REF!
105,442 #REF! #REF!
Sr.
No.
Description of Equipments /
MaterialsContractor / Supplier
1 Tank steel Plates
2Fabrication of Tanks &
Repairs19,500,000 19,500,000 0
3Dispensing Pumps
(Refurbished)10,000,000 10,000,000 0
4 Canopy Materials
5 15 KVA Generator 0 0 0
6 Air Compressor 0 0 0
7 Air Pressure gauge 0 0 0
8 Car wash equipment
9 Wheel alignment equipment
10 Lube display stand 0 0 0
11 Night drop cash safe 0 0 0
12 Hoists29,500,000 29,500,000 0
2,950,000 2,950,000 0
32,450,000 32,450,000 0
1 Architectural Charges 4% of the Project cost 0 #REF! #REF!
2 Structural Consultant 4% of the Project cost 0 #REF! #REF!
Sub Total 0 #REF! #REF!
Contingency (10%) 0 #REF! #REF!
158,163,604 #REF! #REF!
105,442 #REF! #REF!
Note :
Total Installation Cost =
Add 10% contingencies
Total cost of Installation in US $ (including 18% VAT)
Total cost of Installation in TSH (including 18% VAT)
1. All the rates in the estimates are non negotiated. Rates for many items have been considered based on
the earlier negotiations done for other jobs and these rates need revision.
Cost of Installation for Proposed New RO at Maji ya Chai
Considering TSH. 1500 = 1 US $ approx. Capex required
Architect/Consultancy Expenses
Total Capital expenditure required =
Cost of Equipments to be procured for Proposed New RO at Maji ya Chai
Total Equipment Cost =
Add 10% contingencies
Total cost of Equipments (excluding VAT)
S.N
oShort Text Description Quantity Units Rate
Estimated
Amount(Tshs)Remarks
1 Building permitsBuilding Permit follow up costs at the
Municipal (city) authorities 1 Item 0As per local statutory
regulations
2 Project display boardErection of project display board. As
per local statutory regulations 1 Item 0As per local statutory
regulations
3Covering site using C.G.I
sheets
Built in cost including covering of site
using C.G.I. sheets. As per local
statutory regulations
162 RM 0As per local statutory
regulations
4Safety provision during
connstruction
Provision for safety by vendor,during
construction 1 Item 0As per local statutory
regulations
5
Mobilization, clearance and
demolition works, shifting of
UST's from the current
position plus demobilization
Mobilization, Site Clearance &
Demolition plus demobilization works
if necessary. Item includes hiring of
special equipments and labour cost
1 Item 0
6Environmental Impact
Assessment (Provision)1 Item 0
7Geotechnical Survey Report
(Provision)1 Item 0
8 Fire Cerificates (Provision) 1 Item 0
9NAMC Site Visit prior to
certification of EIA (Provision) 1 Item 0
10 EWURA Approval (Provision) 1 Item 0
11 Architectural Charges 1 Item 18,825,875
12 Structural Consultant 1 Item 18,825,875
TOTAL 37,664,299.9
VAT @ 18% -
TOTAL with VAT 37,664,299.9 CONTINGENCY @ 10% 3,766,430.0
GRAND TOTAL 41,430,729.9
Cost of Installation for Proposed New RO at Maji ya Chai
S.No Short Text ITEM DESCRIPTION: UNIT QTY RATE (TZS) AMOUNT (TZS) TRENCHES
1Mobilization &
demobilisation, site clearance
Mobilization, Site Clearance & cutting of trees works if
necessary. Item includes hiring of equipments and
labour cost.
Item 1.0 -
2
Earthwork in cutting of
ordinary soil upto 150mm
depth
Earthwork in cutting in all kinds of soil/murrum in the
plot area,upto a maximum depth of 150 mm, including
removal and disposal of unsuitable excavated earth and
other material away within 100 m from site as directed
by Gapco Engineer in Charge
M3 244.2 -
3
Filling of excavated soil upto
300mm depth incl
compaction using roller
Filling of good quality excavated soil available at site by
spreading in layers not more than 300
mm,dressing,levelling to the required slopes, watering,
compacting with10 M Tonne static road roller/ ramming
to achieve 95% modified Proctor density including the
initial compaction of original ground level. as per
specifications and directions of the site -incharge.(Rate
to include proctor density test,compaction &
consolidation test)
M3 262.5 -
4
Filling using GSB/Murrum- 1
layer of 150mm.
Filling of good quality granular material/murrum
brought from outside,as per Gapco specifications,by
spreading in layers not more than 150
mm,dressing,levelling to the required slopes, watering,
compacting with10 M Tonne static road roller/ ramming
to achieve 95% modified Proctor density including the
initial compaction of original ground level. as per
specifications and directions of the site -incharge.(Rate
to include proctor density test,compaction &
consolidation test)
M3 131.3 -
5
P&L 3 layers of WBM-100mm
each compacted Providing & Laying of Water Bound Macadam(WBM) in
3 layers of 100 mm each,watered,rolled and compacted
to the deisred thickness.Compact each layer with 10T
pneumatic roller to achieve the maximum dry density
to the required standard for improving the bearing
capacity of the driveway subgrade as explained by EIC.
M2 2,625.0 -
6
Excavation of the canopy
foundation
Excavation in ordinary soil for making trenches for
canopy foundation as per standard drawing no.
2006/01/S007 provided by Gapco and disposal of
excavated materials away from the station as per Local
Authorities.
M3 12.0 -
7
S&F reinforcement in RCC-
8mm onwardsProviding cold twisted HYSD steel bars of approved
make of BS std. for RCC work including straightening,
cutting, bending, binding and placing in position of
8mm and above dia and M.S. round bars dia.
kg 218.2 -
10
S&F wooden formwork for
the canopy foundationSupply and fixing of wooden formwork using good
quality wood, suitable for this purpose, for casting of
canopy foundation as per the dimensions in the
standard drawing no. 2006/01/S007 and as advised by
the Gapco Engineer in Charge.
M2 14.2 -
11
S&F 20mm Dia. Bolts to the
canopy foundation Supply and fix 20mm diameter MS Anchor bolts to the
conopy foundation of the column trench as per
standard canopy trench drawing no. 2006/01/S007 .
EA 18.0 -
12P&L Cement Concrete 1:2:4
mix in foundation
Providing & Laying Concrete Cement in 1:2:4 nominal
mix for the construction of canopy foundation, finish to
the desired shape and necessary compaction and
curing as per the standard drawing no. 2006/01/S007
provided (Provision for the pipeline for storm water to
be provided). Item includes labour, tools, material plus
the curing process on the structure as per requirement
but excludes cost of formwork and reinforcement
M3 6.4 -
13
Excavation in WBM &
Ordinary soil for pump Island
Excavation in WBM & ordinary soil for making trenches
for pump island as per standard drawing no. STD -
017A provided by Gapco and disposal of excavated
materials away from the station as per Local
Authorities.
M3 5.9 -
14
S&F wooden formwork as per
Pump Island requirementSupply and fixing of wooden formwork using good
quality wood, suitable for the pump island construction
and cast the pump island as per the dimensions in the
standard drawing no. STD - 017A and as advised by
the Gapco Engineer in Charge.
M2 11.7 -
15P&L PCC 1:4:8 mix on pump
Island 100mm thick
Providing & Laying Plain Concrete Cement in 1:4:8
nominal mix for the construction of pump island,
including necessary form work and finish to the desired
shape and necessary compaction as per the standard
drawing no. STD - 017A (there should be a provision
for the pipelines on the Island). Item includes labour,
tools, material plus the curing process on the structure
as per requirement
M3 2.7 -
16
Excavation for pipeline
trench upto 800mm depth
Excavation in ordinary soil for making trenches for
pipeline as per standard drawing no. STD/2009/1/FPD-
001 provided by Gapco and disposal of excavated
materials away from the station as per Local
Authorities.
M3 67.2 -
17
S&F 12mm reinforcement to
the pipeline trench
Supply, cut, bend and fix by binding wire, 12mm
diameter MS reinforcements to the pipeline trench
base, walls and covers as per standard trench drawing
no. STD/2009/1/FPD-001
kg 996.8 -
18
S&F wooden formwork for
the pipeline trench
Supply and fix wooden formwork using good quality
wood, suitable for this purpose, for casting of pipeline
trench as per the dimensions in the standard drawing
no. STD/2009/1/FPD-001 and as advised by the Gapco
Engineer in Charge.
M2 126.0 -
SITE DEVELOPMENT & BASE COURSE
CANOPY FOUNDATION CONSTRUCTION
PIPE TRENCH CONSTRUCTION
PUMP ISLAND CONSTRUCTION
GAPCO TANZANIA LIMITEDSCHEDULE OF QUANTITIES FOR MAJOR DRIVE WAY REPAIR WORK
19P&L Cement Concrete 1:2:4
mix in foundation
Providing & Laying Concrete Cement in 1:2:4 nominal
mix for the construction of pipeline trench foundation,
finish to the desired shape and necessary compaction
and curing as per the standard drawing no.
2006/01/S007 provided. Item includes labour, tools,
material plus the curing process on the structure as per
requirement but excludes cost of formwork and
reinforcement
M3 12.6 -
20Backfill using river sand on
excavated trenches
Backfill using clean river sand to the pipeline ducts
trench and under pump Island cavity to the required
standard.M
3 18.9 -
21P&F Precast pipeline trench
covers
Providing & fixing precast pipeline trench covers of
size 450mmX500mmX100mm thick in Reinforced
Cement Concrete of 1:2:4 nominal mix as per Standard
Gapco pipe duct drawing no. STD/2009/1/FPD-
001,complete including all necessary labour & material.
M3 6.3 -
- PIPELINES & CHAMBERS
SUBTOTAL
22S&L 150mm PVC pipe for
storm water capture
Supplying and Laying 150mm PVC class B pipe from
the canopy foundation structure to the periphery
drainage duct as per standard drawing provided by
Gapco. Item includes labour and material
M 45.0 -
23S&L 100mm PVC pipe for
electrical works
Supplying and Laying 100mm PVC class B pipe from
the chamber just before the pump islands, to the two
pump islands as per standard drawing provided by
Gapco. Item includes labour and material
M 50.0 -
24
Excavation for electrical
chambers pitsExcavation in ordinary soil for making trenches for
electrical chambers as per standard drawing provided
by Gapco and disposal of excavated materials away
from the station as per Local Authorities.
M3 9.8 -
25P&L PCC 1:4:8 mix in
pipeline trenches
Providing & Laying Plain Concrete Cement in 1:4:8
nominal mix in the electrical chamber base, including
necessary form work and finish to the desired shape
and necessary compaction as per the standard drawing
no. STD - 015. Item includes labour, tools, material
plus the curing process on the structure as per
requirement
M3 1.5 -
26Construct electrical pull out
chambers-Walls
Construction of Electrical Pull out chambers with
230mm thick solid concrete block walls as per the
standard Gapco drawing No.STD 015 and allocations as
directions given by the Engineer in-charge. Item
including cost of all material and labour.
M2 28.0 -
27Construct electrical pull out
chambers-Concrete
Casting of Electrical Pull out chamber beams in 1:2:4
nominal mix as per the standard Gapco drawing
No.STD 015 and allocations as directed by the Engineer
in-charge. Item including cost of all material and
labour.
M2 1.3 -
28Plastering internal wall of
electrical chamberPlastering internal walls of electrical chamber with
15mm thick cement/sand plaster of 1:3M
2 29.8 -
29S&F of electrical chamber
cover as per drawing
Supply andf fixing of Heavy duty electrical covers as
per std drg.No.STD 015, including cost of all material
and labour.
EA 5.0 -
30
Excavation for storm water
chambers pitsExcavation in ordinary soil for making trenches for
storm water chambers as per standard drawing
provided by Gapco and disposal of excavated materials
away from the station as per Local Authorities.
M3 12.0 -
31P&L PCC 1:4:8 mix in storm
water chamber base
Providing & Laying Plain Concrete Cement in 1:4:8
nominal mix in the base of storm water chambers,
including necessary form work and finish to the desired
shape and necessary compaction as per the standard
drawing no. STD - 017A (there should be a provision
for the pipelines on the Island). Item includes labour,
tools, material plus the curing process on the structure
as per requirement
M3 1.8 -
32Construct storm water
chambers
Construction of storm water chambers with 230mm
thick solid concrete block walls as per directions given
by the Engineer in-charge. Item including cost of all
material and labour.
M2 24.0 -
33Construct storm water
chambers
Casting of storm water pull out chamber beams in
1:2:4 nominal mix as per directions given by Engineer
in-charge. Item including cost of all material and
labour.
M3 1.1 -
34Plastering internal walls of
storm water chambers
Plastering internal walls of storm water chamber with
15mm thick cement/sand plaster of 1:3 nominal mix. M2 30.8 -
35S&F of storm water chamber
cover as per drawing
Supply and fix of Heavy duty storm water covers as per
directions given by EIC, item includes cost of all
material and labour.
EA 3.0 -
36
Excavation of the kerbstone
areaExcavation in WBM & ordinary soil for making trenches
for kerbstone as per standard drawing no. STD - 013
provided by Gapco and disposal of excavated materials
away from the station as per Local Authorities.
M3 15.6 -
37P&L PCC 1:4:8 mix in kerb
stone base
Providing & Laying Plain Concrete Cement in 1:4:8
nominal mix in the base of kerb stones, including
necessary form work and finish to the desired shape
and necessary compaction as per the standard drawing
no. STD - 017A (there should be a provision for the
pipelines on the Island). Item includes labour, tools,
material plus the curing process on the structure as per
requirement
M3 8.9 -
38Precast & Supply kerbstone
as per drawing
Precast and supply of kerbstones in Reinforced
Concrete Cement of 1:2:4 mix and 12mm
reinforcement as per Standard kerbstone drawing no.
STD - 013 provided by Gapco. The shape of the
kerbstone periphery should be considered and supply
accordingly. Item includes labour, transport and
material.
M 130.0 -
39Backfill using local excavated
materials
Backfill using local excavated material to the kerbstone
rear and front cavity after construction of the
kerbstones.M
3 11.6 -
43
Excavation for the entry/exit
& side drainExcavation in ordinary soil for making trenches for the
entrance, front and towards the road drainage as per
standard drawing of fuel duct and provided by Gapco
and disposal of excavated materials away from the
station as per Local Authorities.
M3 57.6 -
44
S&F 12mm reinforcement to
the drainage
Supply, cut, bend and fix by binding wire, 12mm
diameter MS reinforcements to the entrance, front and
final drainage towards the road as per standard column
trench drawing.
kg 996.8 -
45
S&F wooden formwork for
the main drainage system
Supply and fixing of wooden formwork using good
quality wood, suitable for this purpose, for casting of
the main drainage system (Entrance, front and final
one to the road) as per the dimensions in the standard
drawing and as advised by the Gapco Engineer in
Charge.
M2 108.0 -
KERBSTONE CONSTRUCTION
DRAINAGE CONSTRUCTION
46P&L PCC 1:4:8 mix in the
foundation-front drains
Providing & laying Plain Cement concrete in 1:4:8
nominal mix for the construction storm water base, and
walls, including necessary false work and finish to the
desired shape and necessary compaction as per the
standard drawing provided (Provision for the pipeline
for storm water to be provided). Item includes labour,
tools, material plus the curing process on the structure
as per requirement.
M3 21.6 -
47P&L CC 1:2:4 mix in
foundation-front drains
Providng & Laying Cement Concrete in 1:2:4 nominal
mix for the construction of Entrance/Exit storm water
drains base and walls, including necessary form work
and finish to the desired shape and necessary
compaction as per the standard drawing provided. Item
includes labour, tools, material plus the curing process
on the structure as per requirement
M3 5.4 -
48S&F steel gratings for front
drain-bars
Supply, cut, bend and fix 25mm, diameter MS
reinforcements for steel gratings to be placed on top of
the standard constructed drain trench at the
entrance/exit. The steel gratings should be as per
standard drawing provided by Gapco. Item includes,
labour, transport and material.
kg 750.8 -
49S&F steel gratings for front
drains-Angle sections
Supply, cut, bend and fix 40X40X3mm thick, MS
Angles for steel gratings to be placed on top of the
standard constructed drain trench at the entrance/exit.
The steel gratings should be as per standard drawing
provided by Gapco. Item includes, labour, transport
and material.
M 50.0 -
50Backfill using river sand on
excavated trenches
Backfill using sand river on the drainage trench as per
required standard - - -
51S&L river sand 50mm thick
on the paved area
Supplying and Laying river sand to a level of 50mm
thick, level the bed as a preparation before applying
the paver blocks complete as per Gapco standards.M
3 60.0 -
52
S&F 100X200X80mm paving
blocks
Supply & Fix 100x200x80mm Paving blocks complete
with filling clean river sand cussion of 50mm thick
compacted to receive pavers for the forecourt area as
per standard drawing STD - 013.
M2 1,200.0 -
53S&A Asphalt (AC14) in the
driveway-Base course
Supply & Apply Asphalt Concrete Base in Driveway
(AC14) 50mm thick on top of the already laid WBM
layer,using 80/100 grade of bitumen including tack
coat @ 1.2 kg/sqm after surface preparation and rolling
to desired grade and slope, complete as per Gapco
standards.
M2 - -
S&A Asphalt (AC14) in the
driveway-Wearing course
Supply & Apply Asphalt Concrete Wearing Course in
Driveway (AC14) 30mm thick on top of the already laid
WBM layer,using 80/100 grade of bitumen including
tack coat @ 1.2 kg/sqm after surface preparation and
rolling to desired grade and slope, complete as per
Gapco standards.
M3 - -
PAVERS & ASPHALT APPLICATION
54Painting kerbstone & pump
Island black/yellow
Painting of kerbstone and pump island with alternating
strips of 500mm black and yellow Gloss Enamel paints
as per standard Gapco pattern.M
2 99.0 -
TOTAL -
VAT @ 18% - TOTAL with VAT -
CONTINGENCY @ 10% - GRAND TOTAL -
PAINTING
S.No Short Text ITEM DESCRIPTION: UNIT QTY RATE (TZS) AMOUNT (TZS)PIPE WORK
1S&L 40 mm dia Class B pipe CS
seamless
Supplying, laying and installation of 40 mm diameter pipeline
using API 5L Grade B Schedule 40 Carbon Steel Seamless
pipe for suction from the UG Tank manhole to the approved
pump island as per instructions from engineer in charge.
M 245 38,000.00 9,310,000.00
2S&F 75mm dia CS class B schedule
filling pipes
Supplying ,fabricating and fixing of the 75mm (3") carbon
steel black pipes class B schedule for filling point from
allocated decanation points to the US Tanks.M 23.00 45,000.00 1,035,000.00
3 S&F 40 mm Angular Check valveSupplying and fixing new 1.5 inches(40 mm dia) Angle Check
Valve for Suction lines at the Tank Manhole chamber,as
directed by the Engineer in Charge.
EA 7 220,000.00 1,540,000.00
4Doping using 2 bituminous primer &
2 asphalt on pipes
Doping the already laid lines for suction and
vent(underground portion only),using two coats of
bituminous primer & two coats of plastic asphalt of Robialac
or approved make to achieve an overall finished thickness of
3mm minimum.This activity to be carried out as per EIC
instructions
M2 61.25 21,500.00 1,316,875.00
5Disconnect & Hydrotest pipes at
50psi
Disconnecting all pipe connections and hydrotesting of the
already laid pipelines,applying a minimum pressure of 50 psi
for atleast one hour,as per the satisfaction of the Engineer in
Charge.The job includes cleaning and removing of the water
from the pip
EA 7.00 75,000.00 525,000.00
6 Do card board blasting on pipes
Card Board blasting of the hydrotested lines,as per the
standard procedure.The job includes cost of all labour and
material to carry out the activities complete as per the
directions of the EIC.
EA 7.00 120,000.00 840,000.00
7Excavate & Disposal soil for
c/barrier pits 400X400X500mm
Excavation/cutting and disposal of ordinary soil/concrete for
crash barrier pits/trenches of 400mmX400mm not exceeding
500mm deep starting from drive way level.M
3 0.96 7,500.00 7,200.00
8Apply vibrated in-situ PCC1:2:4
after installation of C/Barrier
Providing & Laying Plain Concrete Cement in 1:4:8 nominal
mix, including necessary form work and finish to the desired
shape and necessary compaction as per the standard crash
barrrier drawing. Item includes labour, tools, material plus
the curing process on the structure as per requirement
M3 0.96 500,000.00 480,000.00
9S&F 75mm CS black pipes Class A
for crash barrier member
Supplying ,fabricating and fixing of the 75mm (3") carbon
steel black pipes class A schedule for crash barrier members,
including all necessary cutting/bending of members to shape
and size, threading, welding (wherever required) as per
standards and painting with one coat of red oxide primer and
two coats of gloss enamel paint on the exposed surfaces.
M 27.60 40,000.00 1,104,000.00
10S&F 75mm CS black elbow Class A
for crash barrier member
Supplying, fabricating and fixing of the 75mm elbows for
joining vertical and horizontal members of the proposed crash
barrier, including all necessary cutting/bending of members
to shape and size, threading, welding (wherever required) as
per standards and painting with one coat of red oxide primer
and two coats of gloss enamel paint on the exposed surfaces.
EA 24.00 13,500.00 324,000.00
11S&F Locking arrangement for
Fill/Dip pipes
Supplying and fixing of standard locking arrangement for the
fill and dip pipes openings, including all necessary threading,
welding (wherever required) as per standards and painting
with one coat of red oxide primer and two coats of gloss
enamel paint on the exposed surfaces.
EA 3.00 80,000.00 240,000.00
12Supply Dip sticks as per tank
configurationEA 0.00 0.00
DU INSTALLATION
13S&F Angle Sections for Pump base
frame
Supplying and Fabricating Rolled angle sections (equivalent to
ISA 65X65X6mm) for MPD base frame as per standard
drawing,including necessary labour and material for the
completion of the job. EA 7 85000
595,000.00
14S&F 12 mm dia,250 mm long Rawl
bolts
Supplying and fixing 12 mm diameter and 250 mm long Rawl
bolts to the base of MPD foundation as per standard drawing,
including necessary material and labour to complete the job. EA 28 4500
126,000.00
15 P&L 1:3 thick cement sand plaster
Providing and laying 12 mm thick 1:3 cement sand plaster on
the concrete block masonary of the pump islands,as per the
directions of Engineer in Charge. M2
7 15000105,000.00
16 Install DU including all connections
Installation of supplied Dispensers units including the cost for
labour using crane/forklift of sufficient capacity and fixing of
the bolts as per the footprint of the dispensing unit,as per the
standard drawing and as directed by the Engineer incharge.
EA 7.00 50,000.00 350,000.00
TOTAL 17,898,075.00
VAT @ 18% 0.00TOTAL with VAT 17,898,075.00
CONTINGENCY @ 10% 1,789,807.50GRAND TOTAL 19,687,882.50
GAPCO TANZANIA LIMITED
SCHEDULE OF QUANTITIES FOR PIPELINE & DISPENSING UNIT INSTALLATION WORKS
S.No. Short text ITEM DESCRIPTIONSUnit QTY RATE (TZS) AMOUNT (TZS)
A
1
S&L 16mm sqr 4 core Amoured
copper cable
Supplying & Laying of 16 mm sq, 4 core armoured copper
cable of approved make. Wire between contactor which is
out of the DB to the DB. Item includes all labour and
material for laying of the cable on the walls, inside the
supplied trunks as directed by Gapco Engineer in Charge.
M 15.00 -
2
S&L 6mm sqr, single core copper
wire
Supplying & Laying of 6 mm sq, single core flexible
copper cable of approved make. (Wire from equipment to
Earthpits)Item includes all labour and material for laying
of the cable on the walls, inside the supplied trunks as
directed by Gapco Engineer in Charge.
M 200.00 -
3
S&L 2.5mm sqr cable Twin with
Earth
Supplying & Laying of 2.5 mm sq, 3 core semi flexible
(Twin & Earth) copper cable of approved make for
extension of DU cables from old panel to new DB of AVR.
Item includes all labour and material for laying of the
cable on the walls, inside the supplied trunks
M 245.00 -
4
S&L 2.5mmsr 4 core Amoured
cable
Supplying & Laying of 2.5 mm sq, 4core armoured copper
cable of approved make. (Wire from DB to all
pumps)Item includes all labour and material for laying of
the cable on the walls, inside the supplied truncks, inside
the existing conduits as directed by Gapco Engineer in
Charge.
M 245.00 -
B -
5
S&F 63A 4 pole contactor Supplying & Fixing of 63 A, 4 pole contactor of approved
make for isolation of power. Item includes all labour and
material for installation and commissioning of the
contactor at specified location.
EA 1.00 -
S&F 63A 4 pole MCCB Supplying & Fixing of 63 A, 4 pole MCCB of approved
make for isolation of power. Item includes all labour and
material for installation and commissioning of the
contactor at specified location.
EA 1.00 -
6
S&F Electrical MS Box Supplying and Fixing an Electrical panel of approved
make. Item includes all labour and material for fixing of
the electrical Mild steel well painted box with safety sign
as directed by Gapco Engineer in Charge.
EA 1.00 -
7S&F 25mm dia Copper Electrode Supplying and Fixing a 25mm copper electrode of
approved make. Item includes labour and material of the
electrode supplied
EA 4.00 -
8
S&F 10A 230V Emergency
P/button
Supplying & Fixing of 10A, 230V 2NO + 2NC Mushroom
type Red colour emergency Stop push Button AC of
approved make. Item includes all labour and material for
installation and commissioning of the contactor at
specified location.
EA 1.00 -
9
S&F 32A, 300mA ELCB Supplying & Fixing of 32 A, tripping current of 300mA
Electrical Circuit Breaker of approved make. For small
AVR before AVR DB. Item includes all labour and material
for installation and commissioning of the MCB.
EA 1.00 -
10
S&F 100A 3 Phase Change Over
Switch
Supplying & Fixing of 100A, 3 Phase Change Over Switch
of approved make. Item includes all labour and material
for installation and commissioning of the Change Over
Switch.
EA 1.00 -
11
S&F 16A Single pole MCB Supplying & Fixing of 16A, single pole Menature Circuit
Breaker of approved make (wire from DB to AVR). Item
includes all labour and material for installation and
commissioning of the MCB.
EA 1.00 -
12
S&F 12 way main 3 Ph
distribution board
Supplying & Fixing of 3 phase 12 way Main Distribution
Board of approved make. Item includes all labour and
material for installation and connections/commissioning of
the Distribution board as per the satisfaction of Gapco
Engineer in Charge.
EA 1.00 -
13
S&F 12 way SP distribution board Supplying & Fixing of single phase 12 way AVS
Distribution Board 10KA of approved make. Item includes
all labour and material for installation and
connections/commissioning of the Distribution board as
per the satisfaction of Gapco Engineer in Charge.
EA 1.00 -
14
S&F RCD 100A Circuit Breaker Supplying and Fixing a 100A Residue Current Device
Circuit Breaker of approved make to isolate power in case
of any current leakge or short circuit. Item includes all
labour and material for installation and commissioning of
the contactor at specified location.
EA 1 -
C -
15
S&F 50mm by 50mm PVC Trunk Supplying & Fixing of 50mm x 50 mm PVC trunks for
concealing of cables. The trunk to be be fixed on wall and
the item includes cost of all labour and material for fixing
up the trunks.
M 4.00 -
16
S&F Rawl bolts M 10, 150 mm
long Supplying and fixing 10 mm diameter and 150 mm long
Rawl bolts to the base of Servomax AVR, including
necessary material and labour to complete the job.
EA 10.00 -
17
S&F 25mm ordinary cable glands Supplying & Fixing of 25 mm ordinary cable glands of
approved make to the provided/existing cables. Item
includes all labour and material for fixing of the cable
glands.
EA 20.00 -
18
S&F 25mm flame proof cable
glands
Supplying & Fixing of 25 mm flame proof cable glands of
approved make to the provided/existing cables. Item
includes all labour and material for fixing of the cable
glands.
EA 10.00 -
19S&F Fluorescent Lamp plus
fittings
Supplying & Fixing of Fluorescent lamps and fittings
complete. Item includes all labour and material for fixing
of the lamps.
EA 6.00 -
20
S&F Metal Halide 250W flood
lights plus frame
Supplying & Fixing of 250W Metal Halide Flood Lights with
a fixing frame mounted on the building wall of approved
make. Item includes all labour and material for fixing of
the cable glands.
EA 3.00 -
21
S&F Copper Flat Bar
25mmX3mm
supplying and Fixing Copper Flat Bar 25mmX3mm for the
improvement of earth resistance on the Earth pit. Item
includes all labour and material for fixing of the flat bar.
M 8.00 -
22
S&F 20A strip cable connectors Supplying & Fixing of 20 A strip cable connector of
approved make, to join the cable for extension of length.
Item includes all labour and material for fixing the of the
cable connectors as per standard practice and as per
satisfaction of Gapco Engineer in
EA
20.00 -
23S&F Earth Clamps & Funnel Supplying and Fixing Earth clamps and funnel to the Earth
pit. Item includes all labour and material for fixing of the
funnels.
EA 4.00 -
24
S&F Cable tags of Aluminium
sheet 75X50mm
Supplying & Fixing of Cable tags of Aluminium sheet
75mmX50mm to be able to distinguish cables entering to
the DB. Item includes all labour and material for
installation.
EA 16.00 -
25S&F 16mm dia Cable lugs Supplying & Fixing of 16 mm diameter cable lugs to the
provided/existing cables. Item includes all labour and
material for fixing the of the cable lugs.
EA 32.00 -
D -
26
Installation of supplied AVS-0P Installation & Commissioning of supplied AVS-0P at the
specified locations including all necessary labour and
material to fix the unit and connect it to the existing
cables, equipments and make it operational to the
satisfaction of Gapco Engineer in Charge
EA 1.00 -
27
Install 1 Phase AVR & connect to
DB
Installation & Commissioning of supplied AVR of various
capacity and connecting the same to the supplied DB.The
item includes all labour and material for testing of the unit
and commissioning it to the satisfaction of Gapco Engineer
in Charge
EA 1.00 -
E -
28P&P Epoxy weather proof paint
on Panel
Providing and Painting of Epoxy Weather paint in order to
safe guard the electrical panel. The paint recommended is
of Berger Paints. Item includes necessary curing of
concrete as per the standard Gapco specification
EA 1.00 -
29S&F 440 Volts danger display
board
Supply and Fix a displaying board for safety purpose,
written 440 Volts Danger on an appropriate place within
the unsafe area
EA 1.00 -
30
Construction of Earth Pits
(0.45X0.45X0.6m) plus cover
Construction of Earth pits of the following size
450mmX450mmX600mm with a removable top casted
cover. Item includes labour and material, and should be
placed as per Gapco standards
EA 4.00 -
31 Cutting of Concrete-All typesCutting all types of concrete in driveway/existing islands
and disposal of debris at a suitable place outside the
station following all local regulations for disposal.
M3 20.00 -
32Electrical Engineering
consultation
Electrical Engineering consultation services during project
execution
EA1
-
33 S&F yard light poles 7M high Yard Light poles and M/H lights, 7m high on the peripheryEA
4-
TOTAL 0.00
VAT @ 18% 0.00
TOTAL with VAT 0.00
CONTINGENCY @ 10%0.00
GRAND TOTAL 0.00
GAPCO TANZANIA LIMITED
Cable termination, Glanding, Lugs, Truncks etc
Contactors, Surge Arrestors, MCBs, DBs etc
Cables
I installation, Commissioning etc
Associated Civil/Mech jobs
SCHEDULE OF QUANTITIES FOR GENERAL ELECTRICAL WORKS
S.No Short Text ITEM DESCRIPTION: UNIT
CANOPY COLUMN CONSTRUCTION TRIPLE POLE
1Apply 25mm leveling grout at the
foundation column
Apply leveling grout 25mm thich on the concrete
foundation column as per standard drawing provided
by Gapco.
M2
2
S&F 500X500X12 base plate plus
140X140X12 Base Stiffner as per
std drawing
Supply, fabricate and Fix 500x500x12mm base plate
reinforced by 140X140X12 Base Stiffner to be welded
to the base of HEA Column as per the standard
drawing provided by Gapco.
kg
3S&F 252X252 HEA Column as per
std drawing
Supply, fabricate and Fix 252X252 Column HEA as per
the standard drawing provided by Gapco. kg
CANOPY TRUSSES CONSTRUCTION TRIPLE POLE -
4 TRUSSES
1
S&F L50X50X6 for the Trusses
Fabrication & ErectionSupply, fabricate and fix angle iron 50X50X6mm for
the Trusses erection work as per the standard drawing
provided by Gapco. Item includes material, labour,
tools and transport costs
kg
2
S&F SHS 25X25X3 for the Trusses
Fabrication & ErectionSupply, fabricate and fix square hollow section BS
25X25X3mm for the Trusses erection work as per the
standard drawing provided by Gapco. Item includes
material, labour, tools and transport costs
kg
3S&F 252X252 HEA pieces for truss
support as per std drawing
Supply, fabricate and Fix 252X252 HEA pieces for truss
support as per the standard drawing no. PP
119/SE/MK5 provided by Gapco.
kg
CANOPY OVERHANG PURLINS CONSTRUCTION
TRIPLE POLE
1
S&F L50X50X6 for the Purlins
Fabrication & ErectionSupply, fabricate and fix angle iron BS 50X50X6mm for
the Purlins erection work as per the standard drawing
provided by Gapco. Item includes material, labour,
tools and transport costs
kg
2
S&F SHS 25X25X3 for the Purlins
Fabrication & ErectionSupply, fabricate and fix square hollow section BS
25X25X3mm for the Purlins erection work as per the
standard drawing provided by Gapco. Item includes
material, labour, tools and transport costs
kg
CANOPY OVERHAND FASCIA FRAME PURLINS
CONSTRUCTION TRIPLE POLE
1
S&F L50X50X6 for the Purlins
Fabrication & ErectionSupply, fabricate and fix angle iron BS 50X50X6mm for
the Purlins erection work as per the standard drawing
provided by Gapco. Item includes material, labour,
tools and transport costs
kg
2
S&F SHS 25X25X3 for the Purlins
Fabrication & ErectionSupply, fabricate and fix square hollow section BS
25X25X3mm for the Purlins erection work as per the
standard drawing provided by Gapco. Item includes
material, labour, tools and transport costs
kg
CANOPY WEB PURLINS CONSTRUCTION TRIPLE
POLE
1
S&F L50X50X6 for the Purlins
Fabrication & ErectionSupply, fabricate and fix angle iron BS 50X50X6mm for
the Purlins erection work as per the standard drawing
provided by Gapco. Item includes material, labour,
tools and transport costs
kg
2
S&F SHS 25X25X3 for the Purlins
Fabrication & ErectionSupply, fabricate and fix square hollow section BS
25X25X3mm for the Purlins erection work as per the
standard drawing provided by Gapco. Item includes
material, labour, tools and transport costs
kg
CANOPY WEB FASCIA FRAME PURLINS
CONSTRUCTION TRIPLE POLE
1
S&F L50X50X6 for the Purlins
Fabrication & ErectionSupply, fabricate and fix angle iron BS 50X50X6mm for
the Purlins erection work as per the standard drawing
provided by Gapco. Item includes material, labour,
tools and transport costs
kg
2
S&F SHS 25X25X3 for the Purlins
Fabrication & ErectionSupply, fabricate and fix square hollow section BS
25X25X3mm for the Purlins erection work as per the
standard drawing provided by Gapco. Item includes
material, labour, tools and transport costs
kg
CANOPY WEB BRACING CONSTRUCTION DOUBLE POLE
1
S&F L75X75X6 for the Bracing
Fabrication & ErectionSupply, fabricate and fix angle iron BS 75X75X6mm for
the Bracing erection work as per the standard drawing
provided by Gapco. Item includes material, labour,
tools and transport costs
kg
CANOPY ROOF, CEILING & FASCIA SHEET
INSTALLATION TRIPLE POLE
1
S&F Aluminium corrugated roofing
sheets 24 SWG as per drawing
Supply and fix aluminium corrugated roofing sheets 24
SWG as per the standard drawing provided by Gapco.
Item includes material, labour, tools and transport
costs
m
2
S&F Aluminium trough sheets IT6
for the Ceiling as per drawing
Supply and fix aluminium trough sheets IT6 for the
ceiling as per the standard drawing provided by Gapco.
Item includes material, labour, tools and transport
costs
m
3
S&F Aluminium Plain sheets for the
fascia as per drawing
Supply and fix aluminium plain sheets for the
fabrication of fascia as per the standard drawing
provided by Gapco. Item includes material, labour,
tools and transport costs
m
4
S&F Vinly Fascia sheet as per
drawing Supply and fix vinly Fascia sheet as per the standard
drawing provided by Gapco. Item includes material,
labour, tools and transport costs
m
CANOPY GUTTER INSTALLATION TRIPLE POLE
1
S&F Aluminium Gutter as per
drawing Supply and fix Alluminium Gutter as per the standard
drawing provided by Gapco. Item includes material,
labour, tools and transport costs
m
2S & F L50x50x6mm for the
fabrication and erection of gutter
frame
Supply, fabricate and fix L50x50x6mm for the erection
of gutter frame as per the drawing provided by Gapco kg
3S & F 16mm dia Round bars for the
fabrication and erection of gutter
frame
Supply, fabricate and fix 16mm dia Round bars for the
erection of gutter frame as per the drawing provided
by Gapco
kg
4S & F 10mm dia Round bars for the
fabrication and erection of gutter
frame
Supply, fabricate and fix 10mm dia Round bars for the
erection of gutter frame as per the drawing provided
by Gapco
kg
5
S&F 100mm dia Class B PVC Pipe as
per drawing
Supply and fix 100mm Class B PVC Pipe, for rain water
drainage as per the standard drawing provided by
Gapco. Item includes material, labour, tools and
transport costs
m
CANOPY CLADDING INSTALLATION TRIPLE
POLE
1
S&F Cladding 300X300X4850mm
long clading as per drawing Supply, fabricate and fix Cladding 300X300X4850mm
long, using 6mm thick plate and L50x50x6 as per the
standard drawing provided by Gapco. Item includes
material, labour, tools and transport costs
kg
CANOPY PAINTING WORKS TRIPLE POLE
1
S&A standard red oxide paint at all
steel structuresSupply and Apply standard 2 coats red oxide paint to
avoid rust to all steel structures. Application should be
done after doing a thorough surface preparation using
wire brush. as per instructions given by Gapco
supervisor. Item includes material, labour, tools and
transport costs
m2
2
S&A standard aluminium paint at all
steel structures
Supply and Apply standard aluminium paint to all steel
structures applying red oxide paint 2 coats as per
standard. Item includes material, labour, tools and
transport costs
m2
2
S&A black oil paint to columns
cladding
Supply and Apply 2 coats black oil paint to all steel
structures on top of red oxide paint 2 coats as per
standard. Item includes material, labour, tools and
transport costs
m2
CANOPY ELECTRICAL WORKS TRIPLE POLE
1S&I Electrical works under the
canopySupply and Install standard Electrical Works. Item
includes material, labour, tools and transport costsEA
TOTAL EXC VINLYTOTAL INC VINLY
18% VATTOTAL
CONTINGENCY @ 10%GRAND TOTAL
QTY RATE (TZS) AMOUNT (TZS)
3.0 -
91.5 -
750.0 -
1,053.0 -
141.4 -
82.5 -
864.0 -
523.0 -
486.0 -
282.7 -
1,728.0 -
1,060.2 -
432.0 -
272.8 -
1,098.3 -
900.0 -
900.0 -
120.0 -
120.0 -
72.0 -
229.5 -
81.0 -
111.0 -
18.0 -
477.0 -
72.0 -
72.0 -
18.0 -
- -
- - - - - -
S/NShort text Long Text/Description
UNIT QTY RATE AMOUNT
CONSTRUCTION OF SALES BUILDINGBUILDING BLOCK
1 Excavation of soil up to 450 mm depth
Excavation of soil to a maximum depth of 500mm at the
proposed location of a new sales prefabricated building and
disposal of debris away from the station as per local
authorities.
M3 43.57 0.00
2Construct a PCC 1:4:8 mix 100mm thick in
foundationVibrated in-situ plain concrete with 20mm aggregates in
foundation trenches (100mm thick PCC 1:4:8 mix)M
3 6.22 0.00
3 P&L 350mm cement block as per drawing
Providing and laying 350mm cement mortar block wall in
foundation trenches overlaying PCC layer,as per the details
provided in the drawing, to a maximum depth of 700mm
and bonded by 1:3 cement/sand mortor.
M2 63.14 0.00
4Backfill using river sand on excavated
trenchesBackfill using excavated local materials to the plinth trench
and the sides of the block wall as per required standard.M
3 44.20 0.00
5S&F wooden formwork for the foundation
floor
Supply and fixing of wooden formwork using good quality
wood, suitable for this purpose, for casting of the
foundation floor of the plinth as per the dimensions in the
standard drawing and as advised by the Gapco Engineer in
Charge.
M2 30.12 0.00
6Casting PCC 1:2:4 mix on the plinth at
200mm thick
Casting Plain Cement Concrete in 1:2:4 norminal mix for
the plinth 200mm thick, including necessary false work and
finish to the desired shape and necessary compaction as
per the standard drawing provided. Item includes labour,
tools, material plus the curing process on the structure as
per requirement
M3 39.57 0.00
7 P&L 230mm cement block as per drawing
Providing and laying 230mm cement mortar block wall for
super structure of the building walls construction, as per
the details provided in the drawing, bonded by 1:3
cement/sand mortar.
M2 322.20 -
8S,C,B&F RB 16mm with 6mm strups on Ring
Beam
Supply, cut, bend and fix by binding wire round Bar 16mm
diameter MS reinforcements to the Ring Beam around the
entire building wall and strups of 6mm as per standard
drawing no. 2008/MB/MAY/A010.
Kg 579.47 -
9Apply RCC 300X230mm with 20mm
aggregate 1:2:4 mix
Vibrated in-situ reinforced concrete with 20mm aggregates
to the Ring Beam surrounding the walls 300X230mm
Reinforced Concrete Cement 1:2:4, and as per standard
drawing provided
M3 7.05 -
10S&F shuttering for the ring beam 300mm
thick
Supply and fixing of shuttering formwork using good quality
soft wood, suitable for this purpose, for casting of the ring
beam 300mm thick as per the dimensions in the standard
drawing and as advised by the Gapco Engineer in Charge.
M2 30.66 0.00
ROOFING
11S&F 50X75mm and erect rafters, purlings &
bracings
Supply and fixing of 50x75mm MS rafters and purlins plus
bracings, then erect to the required shape and size as per
standard drawing provided. Item includes labour, material
and transport
M 185.00 -
12 F&E fascia frame using SHS 30X30X1.2mm
Fabrication and erection of fascia frame including necessary
materials Square Hollow Section of 30X30X1.2mm size and
applying two coats of black gloss enamel on top of red
oxide primer.
Kg 162.00 -
13 S&F 28G CI sheets as per drawing
Supply and fixing of 28 gauge CI sheets and fixing on
purlins and rafters using self tapping screws and bitumen
washers, complete as per the standard drawing to be
provided.
M2 338.00 -
14 S&F 0.8mm soft wood fascia Supply and fixing of 0.8mm soft wood for the building
fascia to the required shape and size as per standard
drawing provided.
M2 27.00 -
WINDOWS & DOORS
15S&F windows made out of hard wood and as
per specification
Supply and fix Windows made out of hard wood frames,
well polished and as per size provided in the drawing, then
fitted with a 5mm thick plain glass with provision of
opening and closing easily. Item includes all material,
transport and labour
EA 6.0 0.00
16 S&F framed H/W Doors as per specification
Supply and fix framed hard wood Doors well finished and
polished as per size provided in the drawing. Item includes
all material, transport and labour cost
EA 6.0 0.00
17 S&F Door mortice locks Yalle or UnionSupply and fix Door Mortice Locks Yalle/Union Make
complete with fixation as per requirement.EA 6.0 0.00
PLUMBING SYSTEM AND SANITARY
APPLIANCES
18 S&F Eastern type toilet with fittingsSupply and fix new Eastern type Toilets complete with its
fittings. Item includes material, transport and labour cost EA 2.0 0.00
19 S&F hand washing basin with fittingsSupply and fix Hand Washing basin complete with its
fittings. Item includes material, transport and labour cost EA 3.0 0.00
20 S&F shower system complete with fittingsSupply and fix Shower system with new installation
materials make EX-UKEA 1 0.00
21 S&F tape corks complete with fittingsSupply and fix tape/bib Corks complete with installation
materials EX-UK. Item includes material, transport and
labour cost
EA 4 0.00
22S&F 150X150X6mm wall tiles BS1281 in
bathroom & toilet
Supply and fix 150x150x6mm glazed ceramic wall tiles with
cussion edges to BS 1281 fixed with white cement to the
bathroom and toilets 1.5m from the floor. Item includes
cement / sand 1:4 mix, adhesive and white grout. Item
includes material, transport and labour cost
M2 42 0.00
PLASTERING
GAPCO TANZANIA LIMITED
SCHEDULE OF QUANTITIES FOR SALES BUILDING CONSTRUCTION
Office Block Construction
23S&A 20mm thick cement/sand plater for
block wall
Supply and apply 20mm thick cement sand plaster for block
wall on all exposed surfaces, internal and external,
cement/sand 1:6 with mastciser to roof surface including
curing as per Gapco standards.
M2 357.70 0.00
24 S& Paint 2 coats of white gloss enamel paint
Painting using two coats of white gloss enamel paint of
Begger or other approved brand over a layer of primer of
similar apporved make on the plastered block masonry wall
over the exposed area.
M2 357.70 0.00
FINISHING WORKS
25S&F 50X50mm and erect purlings for ceiling
support
Supply and fixing of 50x50mm soft wood purlins, then erect
to the required shape and size as per standard drawing
provided in order for the same to be able to support the
ceiling board gypsum make. Item includes labour, all
material required and transport
M 185.00 -
26S&F gypsum board as per design given by
EIC
Supply and Fix Gypsum board, fixing on purlins with a
proper fastening and with right finishing material as per
design given by the Engineer In Charge. Item includes all
material required, transport and labour
M2 99.75 -
27Floor screeding with cement/sand 1:3 mix as
per specs given by EIC
Floor screeding to the building with cement/sand of 1:3
mixing ratio to the required finish to the satisfaction of
Engineer In Charge.
M2 99.75 -
28Apply 2 coats of white gloss paint over
primer 1 coat
Apply two Coats of White gloss paint over one coat of
primer on internal and external walls of the building. Item
includes all material, transport and labour chargesM
2 - -
29Apply 2 coats of gapco red paint plus Gapco
signage print
Apply two Coats of GAPCO Red paint over one coat of
primer on exposed parts of the building with Gapco
signage. Item includes all material, transport and labour
charges
M2 27.00 -
30F&E window and door grills with 10mm RB
plus painitng
Fabrication and erection of fixed window grills including
necessary materials (Round Bar 10mm size ) and applying
two coats of black gloss enamel on top of red oxide primer.
Item includes all material, transport and labour charges
Kg 142.00 -
TOTAL 0.00TOTAL with VAT 0.00
CONTINGENCY @ 10% 0.00GRAND TOTAL 0.00
Office Block Construction
S/N Short Description ITEM DESCRIPTION: UNIT QTY
Maji ya Chai , Arusha
A: Substructure1.0 Excavation
iExcavate soil to 800mm deep for
foundationExcavation in ordinary soil for making trenches for strip foundation not
exceeding 800mm deep starting from ground levelM
3 171.20
2.0 Concrete Works
iS&L PCC with 20mm aggregates at
1:4:8 mixSupply and Lay a Vibrated in-situ plain concrete with 20mm aggregates in
foundation trenches (100mm thick PCC 1:4:8 mix)M
3 21.40
3.0 Block wall
iP&L 350mm cement block as per
drawing
Providing and laying 350mm cement mortar block wall in foundation
trenches overlaying PCC layer,as per the details provided in the drawing,
to a maximum depth of 700mm and bonded by 1:3 cement/sand mortor.M
2 85.60
iiP&L 230mm cement block as per
drawing
Providing and laying 230mm cement mortar block wall in foundation
trenches overlaying PCC layer,as per the details provided in the drawing,
to a maximum depth of 300mm and bonded by 1:3 cement/sand mortor. M2 128.40
4.0 Backfilling
iBackfill the foundation with
excavated soil
Backfilling the foundation trenches around block masonary work using
excavated soil,including compaction using hand rammer and make up
levels on the ground.
M3 45.00
5.0 Steel workSupplying ,fabricating and fixing of the following,including all
necessary cutting of members to shape and
size,welding(wherever required) as per standards and painting
with one coat of red oxide primer and two coats of gloss enamel
paint
iS&F MS angles 65X65X6mm
embedded on wall
Supplying ,fabricating and fixing of the Ms angles of 65*65*6mm
embeded to the 230mm wall, including all necessary cutting of members
to shape and size,welding(wherever required) as per standards no. M 142.00
iiS&F MS flat bar 25*6mm of max. 1
m long tied on angle & chain
Supplying ,fabricating and fixing of the MS flat bar 25*6mm of max. 1 m
long to be tied with bolts between MS angles and chain link fencing,
including all necessary cutting of members to shape and
size,welding(wherever required) as per standards no. .
M 72.00
iiiS&F Bolts and nuts, M8 50mm long
with 3mm thick washer
Supplying ,fabricating and fixing of the Bolts and nuts, M8 50mm long
with 3mm thick washer, including all necessary cutting of members to
shape and size,welding(wherever required) as per standards no. EA 216.00
ivS&F Chain link 50X50X2.5mm
galvanized
Supplying ,fabricating and fixing of the Chain link fabric of mesh size
50mm x 50 mm x 2.5 mm with galvanisation, including all necessary
cutting of members to shape and size,welding(wherever required) as per
standards no.
M2 214.00
v
Supplying ,fabricating and fixing of the Hinged gate and locking
system including necessary materials and applying two coats of
black gloss enamel on top of red oxide primer., including all
necessary cutting of members to shape and
size,welding(wherever required) as per standards no. a. Excavation
iExcavate ordinary soil to 800mm deepExcavation in ordinary soil for making trenches for strip foundation not
exceeding 800mm deep starting from ground levelM
3 0.30
b. Concrete Works
iS&L PCC with 20mm aggregates at 1:2:4 mixSupply and apply Vibrated in-situ plain concrete with 20mm aggregates in
foundation trenches (PCC 1:2:4 mix)M
3 0.30
c. Steel workSupplying ,fabricating and fixing of the following,including all
necessary cutting of members to shape and size,welding
(wherever required) as per standards and painting with one coat
of red oxide primer and two coats of gloss enamel paint.i S&F 75mm G.I Pipe Class B schedule75mm G.I Pipe, Class B schedule M 5.00
iiS&F square hollow sections
(25*25*2mm)
Square hollow sections (25*25*2mm)M 24.00
iiiS&F square hollow sections
(40*40*3mm)
Square hollow sections (40*40*3mm)EA 18.00
ivS&F steel padlock brackets plus
solex padlocks
Steel padlock brackets including heavyduty solex padlocksEA 2.00
6.0 Plaster and painting
iS&L 20mm thick plaster on block
masonary
Providing 20mm thick cement sand plaster for block masonry on all
exposed surfaces,internal and external,including curing as per Gapco
standards.
M2 171.20
iiPaint 2 coats of white gloss enamel
on platered wall
Painting using two coats of white gloss enamel paint of Begger or other
approved brand over a layer of primer of similar apporved make on the
plastered block masonry wall over the exposed area.M
2 171.20
Total
Add 10% contigencyGrand total (VAT Inclusive).
GAPCO TANZANIA LIMITEDSCHEDULE OF QUANTITIES FOR COMPOUND WALL CONSTRUCTION
RATE (TZS)ESTIMATED
COST (TZS)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000.000.00
GAPCO TANZANIA LIMITEDSCHEDULE OF QUANTITIES FOR COMPOUND WALL CONSTRUCTION
Sno Short Descrption Item Description Unit Qty Rate (Tsh) Amount (Tsh)
1Excavate soil for installing 15KL
UST
Excavation of soil for the purpose of UST tank installation and
disposal of all materials as per local authority.M
3 23.14 0.00
2Clean the external 15KL UST
surface using wire brush
Properly clean the external surface by wire brushing and sand
papering as preparation for doping the external surface of the
Tank.
M2 34.28 0.00
3Dope the external surface of the
15KL UST by bituminous paint
Doping the external surface of 15KL M.S tank with two coats
of bituminous primer & two coats of plastic asphalt make to
achieve overall dry thickness of 3mm.
M2 34.28 0.00
4Test the 15KL tank using water
at 0.36kg/cm2 pressure
Hydrostatic testing of the 15KL MS tank with water provided
by the contractor under a hydraulic pressure of 0.36 Kg/cm2
& disposal of water as directed by the Engineer in Charge. The
job includes issuing of necessary testing certificate s
EA 1.00 0.00
5Installation of the tanks in pit complete in all respects
as per the reference drawing No. STD - 002, including
the following activities;
a.Lower and place the tank to its
position
Lowering & placing in position with crane the 15KL
underground storage tank.EA 1.00 0.00
b.Back fill the side of the tank pit
using clean sand
Back filling out side tank pit using clean river sand material in
compacted layers of 300 mm eachM
3 23.14 0.00
c.Construct manhole chamber as
per standard
Construction of manhole chamber as per std drg.No.STD 002,
including cost of all material and labour.M
3 2.04 0.00
d.Plastering internal wall of the
chamber
Plastering internal walls of manhole chamber with 15mm thick
cement/sand plaster of 1:3M
2 6.80 0.00
e.Construct manhole cover as per
standard
Construction of manhole covers as per std drg.No.STD 006,
including cost of all material, painting and labour.EA 1.00 0.00
6S&L class B schedule GI pipe as
vent
Supplying, laying and installation complete with fittings , Class
B schedule GI Pipe for vent pipe. Item includes material,
painting and labour cost.
M 6.00 0.00
Subtotal 0.00
Sno Item Description Unit Qty Rate (Tsh) Amount (Tsh)
1Excavate soil for installing 20KL
UST
Excavation of soil for the purpose of UST tank installation and
disposal of all materials as per local authority.M
3 69.00 0.00
2Clean the external surface of the
20KL using wire brush
Properly clean the external surface by wire brushing and sand
papering as preparation for doping the external surface of the
Tank.
M2 106.40 0.00
3Dope the external surface of the
20KL by bituminous paint
Doping the external surface of 20KL M.S tank with two coats
of bituminous primer & two coats of plastic asphalt make to
achieve overall dry thickness of 3mm.
M2 106.40 0.00
4Test the 20KL tank using water
at 0.36kg/cm2 pressure
Hydrostatic testing of the 20KL MS tank with water provided
by the contractor under a hydraulic pressure of 0.36 Kg/cm2
& disposal of water as directed by the Engineer in Charge. The
job includes issuing of necessary testing certificate s
EA 2.00 0.00
5Installation of the tanks in pit complete in all respects
as per the reference drawing No. STD - 002, including
the following activities;
a.Lower and place the tank to its
position
Lowering & placing in position with crane the 20KL
underground storage tank.EA 2.00 0.00
b.Back fill the side of the tank pit
using clean sand
Back filling out side tank pit using clean river sand material in
compacted layers of 300 mm eachM
3 46.28 0.00
c.Construct manhole chamber as
per standard
Construction of manhole chamber as per std drg.No.STD 002,
including cost of all material and labour.M
3 4.08 0.00
d.Plastering internal wall of the
chamber
Plastering internal walls of manhole chamber with 15mm thick
cement/sand plaster of 1:3M
2 13.60 0.00
e.Construct manhole cover as per
standard
Construction of manhole covers as per std drg.No.STD 006,
including cost of all material, painting and labour.EA 2.00 0.00
6S&L class B schedule GI pipe as
vent
Supplying, laying and installation complete with fittings , Class
B schedule GI Pipe for vent pipe. Item includes material,
painting and labour cost.
M 12.00 0.00
Subtotal 0.00
TOTAL 0.00VAT @ 18% 0.00
TOTAL with VAT 0.00
CONTINGENCY @ 10% 0.00
0.00
Total cost to spend for the station 0.00
Tank under normal ground conditions
GAPCO TANZANIA LIMITED
A:15KL Underground tanks New installation
Tank under normal ground conditions
B: 20KL Underground tanks New installation
S/No Item Description Unit QTY Rate (TZS) Estimated
Amount (TZS) 1.0 Civil Works
1.1
Excavation in ordinary soil for making trenches for
strip foundation not exceeding 800mm deep starting
from ground level and disposal of excavated
materials away from the station as per Local
Authorities.
M3 4.50 -
1.2Vibrated in-situ plain concrete with 20mm
aggregates in foundation trenches (100mm thick
PCC 1:4:8 mix)
M3 1.50 -
1.3
Providing and laying 230mm concrete block wall in
foundation trenches overlaying PCC layer, as per the
details provided in the drawing, bonded by 1:3
cement/sand mortar.
M2 7.50 -
1.4
Providing and laying 150mm concrete block wall in
foundation trenches overlaying PCC layer, as per the
details provided in the drawing, bonded by 1:3
cement/sand mortar.
M2 15.00 -
1.5
Backfilling the foundation trenches around block
masonry work using excavated soil, including
compaction using hand rammer and make up levels
on the ground.
M3 1.20 -
1.6
Supplying and laying 200mm layer of approved
compacted hardcore overlaying compacted murrum
as per the details provided in the drawing to the
satisfaction of EIC.
M3 2.70 -
1.7
Supplying and laying 300mm layer of approved
compacted gravel (murrum) overlaying existing
compacted sub grade as per the details provided in
the drawing to the satisfaction of EIC.
M3 4.05 -
1.8Vibrated in-situ plain mass concrete with 20mm
aggregates in cage floor (150mm thick PCC 1:2:4
mix)
M3 2.03 -
1.9
Cement sand plastering using 1:3 cement
motor on inside & outside of exposed parts of
the 150mm Block wall.
M2 30.00 -
1.10
Floor screeding to the cage with cement/sand
of 1:3 mixing ratio to the required finish to the
satisfaction of EIC.
M2 13.50 -
1.11
Apply two Coats of White gloss paint over one
coat of primer on internal and external walls of
the cage
M2 30.00 -
1.12
Apply two Coats of GAPCO Red paint over one
coat of zinc chromate primer on exposed parts
of the cage fascia.
M2 15.20 -
Subtotal -
2.0 MECHANICAL WORKS
2.1Supply and fix MS plates of 200X200X8mm
thick plates to be welded to the base of 80mm
dia black pipes.
EA 10.00 -
2.2Supply and fix 80mm dia Black pipes, Class A
schedule to carter for columns cage to hold roof
members.
M 36.00 -
2.3Supply and fix 25X25X1.2mm Square Hollow
Section for cage vertical members.M 168.00 -
2.4Supply and fix 50X75mm Rectangular Hollow
Section horizontal members for reinforcing the
cage.
M 42.00 -
2.5
Supply and fixing of 28 gauge CI sheets and
fixing on purlins and rafters using self tapping
screws and bitumen washers, complete as per
the standard drawing to be provided.
M2 28.60 -
2.6Supply and fixing of 50x75 mm MS rafters and
purlins to the required shape and size as per
drawing to be provided.
M 86.00 -
2.7
Fabrication and erection of fixed window grills
including necessary materials (SHS of
30X30X1.2mm size ) and applying two coats of
black gloss enamel on top of red oxide primer.
Kg 142.00 -
2.8
Supply and fixing of 0.8mm Aluminum plain
sheets for the cage fascia to the required shape
and size as per drawing to be provided.M
2 15.20 -
Subtotal -
Total cost to spend for the station -
SCHEDULE OF QUANTITIES FOR GENERATOR SET & COMPRESSOR CAGE CONSTRUCTION
GAPCO TANZANIA LIMITED
Page 23 GEN SHED MEASUREMENT SHEET
S/No Item Description Unit QTY Rate (TZS) Estimated
Amount (TZS)
1.0
Cutting of all types of concrete on driveway, take
out the debris and dispose away from the site as per
municipal regulations. Item includes labour, tools
and transport.
M2 160.00 20,000.00 3,200,000.00
1.0
Excavation in ordinary soil for levelling of forecourt
and u channel base not exceeding 500mm deep and
disposal of excavated materials away from the
station as per Local Authorities.M
3 80.00 15,000.00 1,200,000.00
2.0
Providing and laying 200mm thick hardcore prior to
driveway concrete paving, as per standard
specifications. M3 32.00 45,000.00 1,440,000.00
3.0
Providing and laying Vibrated in-situ reinforced
concrete with 20mm aggregates reinforced with BRC
142 for driveway paving and u channel base.
(150mm thick RCC 1:1.5:3 mix).
M3 24.00 485,000.00 11,640,000.00
4.0
Supply and Laying of precast RCC U-drainage
channles using 1:3 cement sand mortar. Size is
600X600X140mm plus an accumulating chamber
and cover as per standard specifications complete
with hauching at the ratio of 1:1.5:3.
M 45.00 45,000.00 2,025,000.00
5.0
Supply and fixing of wooden formwork using good
quality wood, suitable for this purpose, for driveway
paving and u channel base.M
2 55.00 15,000.00 825,000.00
SCHEDULE OF QUANTITIES FOR DRIVEWAY AND U CHANNEL DRAINS
STAR OIL TANZANIA LIMITED
Page 24 GEN SHED MEASUREMENT SHEET
S/No Item Description Unit QTY Rate (TZS) Estimated
Amount (TZS)
1.0
Excavation in ordinary soil for Septic tank
construction not exceeding 3000mm deep and
disposal of excavated materials away from the
station as per Local Authorities.
M3 19.89 -
2.0
Providing and laying 230mm cement mortar block
wall for septic tank walls construction, as per the
details provided in the standard drawing, bonded by
1:3 cement/sand mortar.
M2 34.36 -
3.0Vibrated in-situ reinforced concrete with 20mm
aggregates to the base, top of septic tank and baffle
wall. (100mm thick RCC 1:2:4 mix).
M3 2.88 -
4.0Supply, cut, bend and fix by binding wire 12mm
diameter MS reinforcements to the septick tank top
slab and baffle wall as per standard drawing.
Kg 71.20 -
5.0
Supply and fix 100mm PVC vent pipe covered
at the top with mosquito mesh fixed with a
20mm wide belt of ditto pipe made hot and
expanded and shrunk over vent pipe and
mosquito mesh.
Rm 5.00 -
6.0
Cement sand plastering to the internal, top and
chambers of the septic tank using 1:3 cement
motor as per EIC directives.
M2 49.32 -
7.0Supplying and fixing of 600X450mm heavy
duty CI cover complete with its frame.EA 4.00 -
Subtotal -
S/No Item Description Unit QTY Rate (TZS) Estimated
Amount (TZS)
1.0
Excavation in ordinary soil for soak pit construction
not exceeding 5000mm deep and disposal of
excavated materials away from the station as per
Local Authorities.
M3 35.44 -
2.0 Vibrated in-situ plain mass concrete with 20mm
aggregates to the soak pit foundation bottom base.
(150mm thick PCC 1:4:8 mix).
M3 0.91 -
3.0
Providing and laying 230mm cement mortar block
wall for pit walls construction, as per the details
provided in the drawing, bonded by 1:3
cement/sand mortar.
M2 47.10 -
4.0 Vibrated in-situ plain mass concrete with 20mm
aggregates to the top of soak pit block wall.
(100mm thick RCC 1:2:4 mix).
M3 0.91 -
5.0
Supply, cut, bend and fix by binding wire 12mm
diameter MS reinforcements to the soak pit top slab
as per standard drawing.Kg 60.00 -
6.0 Cement sand plastering using 1:3 cement
motor on top of soak pit RCC.M
2 6.29 -
A: SCHEDULE OF QUANTITIES FOR SEPTIC TANK CONSTRUCTION
GAPCO TANZANIA LIMITED
B: SCHEDULE OF QUANTITIES FOR SOAK PIT CONSTRUCTION
Page 25 GEN SHED MEASUREMENT SHEET
S.No Short Text Description
1
Transport 3 UST from DSM to
Arusha
Transport charges of the 3 Under ground Storage tanks,
1 off (15KL) and 2 off (20KL) from DSM to Arusha,
making sure tanks reach destination safely. Item
includes loading and off loading costs.
2
Transport Dispensing Units
Dar - Arusha
Transport charges of the 4 new pumps from Dar-es-
alaam to Arusha, making sure all pumps reach
destination safely. Item includes crating, loading and off
loading costs.TOTAL
VAT @ 18%
TOTAL with VAT
CONTINGENCY @ 10%
GRAND TOTAL
Quantity Units RateEstimated
Amount(Tshs)
1 EA 0
4 EA 0
0.00
0.00
0.00
0.00
0.00
FUEL PIPELINES AND DISPENSING UNITS INSTALLATION
S.No Short Text UNIT RATE (TZS)
PIPE WORK
1 S&L 40 mm dia Class B pipe CS seamless M 38,000.00
2 S&F 75mm dia CS class B schedule filling pipes M 60,000.00
3 S&F 40 mm Angular Check valve EA 300,000.00
4Doping using 2 bituminous primer & 2 asphalt on
pipesM
2 21,500.00
5 Disconnect & Hydrotest pipes at 50psi EA 200,000.00
6 Do card board blasting on pipes EA 150,000.00
7Excavate & Disposal soil for c/barrier pits
400X400X500mmM
3 15,000.00
8Apply vibrated in-situ PCC1:2:4 after installation
of C/BarrierM
3 500,000.00
9S&F 75mm CS black pipes Class A for crash
barrier memberM 55,000.00
10S&F 75mm CS black elbow Class A for crash
barrier memberEA 15,500.00
11 S&F Locking arrangement for Fill/Dip pipes EA 400,000.00
DU INSTALLATION
12 S&F Angle Sections for Pump base frame EA 145000
13 S&F 12 mm dia,250 mm long Rawl bolts EA 5200
14 P&L 1:3 thick cement sand plaster M2
15000
15 Install DU including all connections EA 50,000.00