Standards Review Subcommittee Update

February 19, 2013

Page 2: Standards Review Subcommittee Update February 19, 2013

2 Free Template from www.brainybetty.com 2

Meetings• Recent Meetings:

– November 13, 2012– December 10, 2012– February 11, 2013

• Upcoming Meetings– March 14, 2013 – April 22, 2013

Page 3: Standards Review Subcommittee Update February 19, 2013

3 Free Template from www.brainybetty.com 3

Recent Activities

• Formal Comments:

– WEQ 2012 Annual Plan Item 6.a - Develop standards

to support PAP 10 - Standards Energy Usage

Information, Phase 2, Harmonization with CIM and

SEP 2.0

Page 4: Standards Review Subcommittee Update February 19, 2013

4 Free Template from www.brainybetty.com 4

Upcoming Activities• Ongoing Activities

– Review WEQ Recommendations, Interpretations, and Minor Corrections posted for Formal Comments

– Glossary Coordination with Retail Glossary Subcommittee

– Ongoing Cross Quadrant Review of: • Standards Requests• Minor Corrections • Clarifications /Interpretations

Page 5: Standards Review Subcommittee Update February 19, 2013

5 Free Template from www.brainybetty.com 5

NAESB/NERC Standards Coordination

NAESB WEQ Annual Plan NERC RSDP1.(c) Disturbance Control Standard (DCS) (BAL-002) Coordination with NERC

Subcommittee Complete: 2013

Project 2010-14.1 Phase 1 of Balancing Authority Reliability-based Controls: Reserves Status: BOT approval not listed

1.(e) Develop and or modify business practices related to support of NERC effort on the NERC Resources and Transmission Adequacy Subcommittee Complete: TBD

NERC Project 2009-05 Resource Adequacy Assessments

Status: Candidate for dismissal

1.(f) Develop, modify or delete business practices to support Time Error, Automatic Generation Control (AGC), and Inadvertent Accounting (BAL-005, and BAL-006) Subcommittee Complete: TBD

Project 2010-14.2 Phase 2 of Balancing Authority Reliability-based Controls: Time Error, AGC, and Inadvertent

Status: Candidate for dismissal

1.(g) Coordinate with NERC on changes to definition of Bulk Electric SystemSubcommittee Complete: 4th Q 2013

Project 2010-17 Definition of Bulk Electric System (Phase 2)Status: BOT approval

Page 6: Standards Review Subcommittee Update February 19, 2013

6 Free Template from www.brainybetty.com 6

NAESB/NERC Standards Coordination

NAESB WEQ Annual Plan NERC RSDP

3.(a)(ii) Review and correct WEQ-004 Coordinate Interchange Business Practice Standard as needed based on activities in NERC Subcommittee Completion: 2014

Project 2008-12, Coordinate Interchange Standards Revisions

Status: BOT approval 11/2013

Page 7: Standards Review Subcommittee Update February 19, 2013

7 Free Template from www.brainybetty.com 7

NAESB/NERC Standards Coordination

WEQ PROVISIONAL ITEMS

NAESB WEQ Annual Plan NERC RSDP

1.(a) Develop complementary standards that align with NERC Project 2008-01 Voltage and Reactive Planning and Control.Status: Provisional

NERC Project 2008-01 Voltage and Reactive Planning and Control

Status: BOT approval 11/2013

1.(b) Develop complementary standards that align with NERC Project 2010-4 Demand DataStatus: Provisional

NERC Project 2010-4 Demand Data

Status: BOT approval 11/2013

1.(c) Coordinate with NERC on the functional model glossary revisions NERC Project 2010-08 Functional Glossary Model RevisionsStatus: Provisional

Project 2010-08 Functional Glossary Model Revisions

Status: BOT approval not listed

1.(d) Coordinate with NERC on NERC Project 2012-05 ATC Revisions - Order 729Status: Provisional

Project 2012-05 ATC Revisions - Order 729

Status: BOT approval 11/2013

Page 8: Standards Review Subcommittee Update February 19, 2013

8 Free Template from www.brainybetty.com 8

NAESB/NERC Standards Coordination

NAESB WEQ Annual Plan NERC RSDP1.(e) Coordinate with NERC on NERC Project 2012-08 Glossary Updates.Status: Provisional

Project 2012-08 Glossary Updates

Status: BOT approval 11/2013

1.(f) Coordinate with NERC on NERC Project 2012-09 IRO ReviewStatus: Provisional

Project 2012-09 IRO Review

Status: BOT approval 02/2014

1.(g) Coordinate with NERC on NERC Project 2012-15 Flow Limited Paths

Project 2012-15 Flow Limited PathsStatus: BOT approval not listed

1.(h) Coordinate with NERC on Project 2013-02 Paragraph 81 (multiple phases)Status: Provisional

2013-02 Paragraph 81

Status: Phase 2 not a standalone project

1.(i) Coordinate with NERC on Project 2013-01 Cold Weather PreparednessStatus: Provisional

on Project 2013-01 Cold Weather PreparednessStatus: BOT approval 11/2013

Page 9: Standards Review Subcommittee Update February 19, 2013

9 Free Template from www.brainybetty.com 9

Questions

?