Recent Activities
• Formal Comments:
– WEQ 2012 Annual Plan Item 6.a - Develop standards
to support PAP 10 - Standards Energy Usage
Information, Phase 2, Harmonization with CIM and
SEP 2.0
4 Free Template from www.brainybetty.com 4
Upcoming Activities• Ongoing Activities
– Review WEQ Recommendations, Interpretations, and Minor Corrections posted for Formal Comments
– Glossary Coordination with Retail Glossary Subcommittee
– Ongoing Cross Quadrant Review of: • Standards Requests• Minor Corrections • Clarifications /Interpretations
5 Free Template from www.brainybetty.com 5
NAESB/NERC Standards Coordination
NAESB WEQ Annual Plan NERC RSDP1.(c) Disturbance Control Standard (DCS) (BAL-002) Coordination with NERC
Subcommittee Complete: 2013
Project 2010-14.1 Phase 1 of Balancing Authority Reliability-based Controls: Reserves Status: BOT approval not listed
1.(e) Develop and or modify business practices related to support of NERC effort on the NERC Resources and Transmission Adequacy Subcommittee Complete: TBD
NERC Project 2009-05 Resource Adequacy Assessments
Status: Candidate for dismissal
1.(f) Develop, modify or delete business practices to support Time Error, Automatic Generation Control (AGC), and Inadvertent Accounting (BAL-005, and BAL-006) Subcommittee Complete: TBD
Project 2010-14.2 Phase 2 of Balancing Authority Reliability-based Controls: Time Error, AGC, and Inadvertent
Status: Candidate for dismissal
1.(g) Coordinate with NERC on changes to definition of Bulk Electric SystemSubcommittee Complete: 4th Q 2013
Project 2010-17 Definition of Bulk Electric System (Phase 2)Status: BOT approval
6 Free Template from www.brainybetty.com 6
NAESB/NERC Standards Coordination
NAESB WEQ Annual Plan NERC RSDP
3.(a)(ii) Review and correct WEQ-004 Coordinate Interchange Business Practice Standard as needed based on activities in NERC Subcommittee Completion: 2014
Project 2008-12, Coordinate Interchange Standards Revisions
Status: BOT approval 11/2013
7 Free Template from www.brainybetty.com 7
NAESB/NERC Standards Coordination
WEQ PROVISIONAL ITEMS
NAESB WEQ Annual Plan NERC RSDP
1.(a) Develop complementary standards that align with NERC Project 2008-01 Voltage and Reactive Planning and Control.Status: Provisional
NERC Project 2008-01 Voltage and Reactive Planning and Control
Status: BOT approval 11/2013
1.(b) Develop complementary standards that align with NERC Project 2010-4 Demand DataStatus: Provisional
NERC Project 2010-4 Demand Data
Status: BOT approval 11/2013
1.(c) Coordinate with NERC on the functional model glossary revisions NERC Project 2010-08 Functional Glossary Model RevisionsStatus: Provisional
Project 2010-08 Functional Glossary Model Revisions
Status: BOT approval not listed
1.(d) Coordinate with NERC on NERC Project 2012-05 ATC Revisions - Order 729Status: Provisional
Project 2012-05 ATC Revisions - Order 729
Status: BOT approval 11/2013
8 Free Template from www.brainybetty.com 8
NAESB/NERC Standards Coordination
NAESB WEQ Annual Plan NERC RSDP1.(e) Coordinate with NERC on NERC Project 2012-08 Glossary Updates.Status: Provisional
Project 2012-08 Glossary Updates
Status: BOT approval 11/2013
1.(f) Coordinate with NERC on NERC Project 2012-09 IRO ReviewStatus: Provisional
Project 2012-09 IRO Review
Status: BOT approval 02/2014
1.(g) Coordinate with NERC on NERC Project 2012-15 Flow Limited Paths
Project 2012-15 Flow Limited PathsStatus: BOT approval not listed
1.(h) Coordinate with NERC on Project 2013-02 Paragraph 81 (multiple phases)Status: Provisional
2013-02 Paragraph 81
Status: Phase 2 not a standalone project
1.(i) Coordinate with NERC on Project 2013-01 Cold Weather PreparednessStatus: Provisional