standard operating procedure (sop) for the transportation ... guidelines... · waste producer,...

25
Standard Operating Procedure (SOP) for the Transportation of Wastes outside the Emirate of Abu Dhabi CWM.SOP.PR/02 This Document is the property of Center of Waste Management – Abu Dhabi, and cannot be used nor given to outside party without prior authorization

Upload: others

Post on 07-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

freed

Standard Operating Procedure (SOP) for

the Transportation of Wastes outside the

Emirate of Abu Dhabi

CWM.SOP.PR/02

This Document is the property of Center of Waste Management – Abu Dhabi, and cannot be used nor given to

outside party without prior authorization

Page 2: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

SOP for the transportation of wastes outside the Emirate of Abu Dhabi CWM.SOP.PR/02

Issue/Revision (1/0) Page 4 of 11

DEFINITIONS

Trip: Is defined as a one vehicle trip for transportation of waste by land to other

Emirate inside UAE regardless of the tonnage to be transported, which shall not exceed

the capacity as per the vehicle registration card.

Shipment: Is defined as one container for shipment of waste by sea freight outside UAE

to other country regardless of the tonnage to be shipped.

Permit: Special onetime use permit per trip OR shipment granted by Tadweer for

exporting waste outside Emirate of Abu Dhabi.

Page 3: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

SOP for the transportation of wastes outside the Emirate of Abu Dhabi CWM.SOP.PR/02

Issue/Revision (1/0) Page 5 of 11

Table of Contents Authorization Matrix ............................................................................................................................... 2

Version & Change History ....................................................................................................................... 3

Definitions ............................................................................................................................................... 4

1. Purpose ................................................................................................................................... 6

2. Scope ....................................................................................................................................... 6

3. Obtaining a permit for transportation of NHW outside the Emirate of Abu Dhabi ............ 7

4. Obtaining a permit for transportation of HW outside the Emirate of Abu Dhabi ............... 7

5. Obtaining a permit for Exportation of HW outside the UAE ................................................ 7

6. Registration of entity located outside Abu Dhabi in BOLISATY System ............................... 8

7. Fee structure ........................................................................................................................... 8

8. Tadweer’s approval ................................................................................................................ 9

9. Document Control .................................................................................................................. 9

10. References ........................................................................................................................ 10

11. Annexures ......................................................................................................................... 11

Page 4: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

SOP for the transportation of wastes outside the Emirate of Abu Dhabi CWM.SOP.PR/02

Issue/Revision (1/0) Page 6 of 11

1. Purpose This SOP has been developed by Tadweer, in order to set the requirements for issuance to Waste Transporters (WT) permit(s) to transport/export waste outside the Emirate of Abu Dhabi for treatment, recycling and / or further processing, under certain conditions and subject to Tadweer’s final approval. This SOP will be reviewed periodically and the changed version will be published on Tadweer official webpage and all concerned parties will be notified accordingly.

2. Scope This document applies ONLY to WTs that have a valid Tadweer License for collection and transportation of specific type (s) of waste (s) in the Emirate of Abu Dhabi, which must be consistent with the type of waste(s) required to be transported outside the boundaries of the Emirate of Abu Dhabi.

2.1 Non-Hazardous Wastes (NHW)

This SOP addresses key requirements for the transportation of NHW to other

Emirates in the case of no existing facilities are available for handling such

waste in the Emirate of Abu Dhabi (refer to Annexure 5 for list of existing

facilities and equivalent types of wastes served by facilities in Emirate of Abu

Dhabi);

The NHW allowed for transportation shall be compliant with Tadweer Waste

classification (Annexure 4).

2.2 Hazardous Wastes (HW)

This SOP addresses key requirements for the transportation of HW to other

Emirates in the case of no existing facilities are available for handling such

waste in the Emirate of Abu Dhabi (refer to Annexure 5 for list of existing

facilities and equivalent types of wastes served by facilities in Emirate of Abu

Dhabi);

Additionally, this SOP addresses the requirements for exportation of HW

outside UAE given that there are no alternative facilities available for handling

such waste in the United Arab Emirates OR there is a shortage in capacity of

the current available facilities;

The HW allowed for transportation shall be compliant with Tadweer Waste

classification (Annexure 4).

Page 5: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

SOP for the transportation of wastes outside the Emirate of Abu Dhabi CWM.SOP.PR/02

Issue/Revision (1/0) Page 7 of 11

3. Obtaining a permit for transportation of NHW outside the Emirate of Abu Dhabi Any WT wishing to get approval on temporarily and conditionally transporting NHW outside the Emirate of Abu Dhabi for the purpose of recycling, treating or further processing given that there is no available adequate arrangement to do the needful within the Emirate of Abu Dhabi shall fulfil the following requirements:

Have a valid Tadweer License for collection and transportation of the NHW type (s) to be transported;

Waste receiving facilities located outside AD, shall register in BOLISATY system (E-manifestation) as described in section 8 of this document.

Have a valid Contract with the waste receiving Facility;

Submit application for transportation of waste outside AD (Annexure 1)and;

Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system.

4. Obtaining a permit for transportation of HW outside the Emirate of Abu Dhabi Any WT wishing to get approval on temporarily and conditionally transporting Hazardous waste outside the Emirate of Abu Dhabi for the purpose of recycling, treating or further processing given that there is no available adequate arrangement to do the needful within the Emirate of Abu Dhabi shall fulfil the following requirements:

Have a valid Tadweer License for collection and transportation of the HW type(s) to be transported;

Waste receiving facilities located outside AD, shall register in BOLISATY system as described in section 6 of this document;

Have a valid Contract with the waste receiving Facility;

Submit application for transportation of waste outside AD (Annexure 1);

Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system;

NOC from the receiving Emirate / Municipality for waste transported outside AD to other Emirate within UAE;

Lab test report for the waste (max validity of 3 month);and

Current dated Waste Photos.

5. Obtaining a permit for Exportation of HW outside the UAE Any WT wishing to get approval on temporarily and conditionally exporting of HW outside UAE for the purpose of recycling, treating or further processing given that there is no available adequate arrangement to do the needful within UAE shall fulfil the following requirements:

Page 6: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

SOP for the transportation of wastes outside the Emirate of Abu Dhabi CWM.SOP.PR/02

Issue/Revision (1/0) Page 8 of 11

Have a valid Tadweer License for collection and transportation of specific type (s) of Hazardous waste (s);

Have a valid Contract with the waste receiving Facility outside UAE;

Submit application for transportation of waste outside AD as per (Annexure 1);

Waste Producer and transporter shall complete the E-manifest through BOLISATY system;

Waste receiving facilities located outside AD, shall register in BOLISATY system as described in section 6 of this document.

Permit from Ministry of Climate Change and Environment (MOCCE) for export of hazardous waste outside UAE in accordance to Basel Convention as per waste type.

Lab test report for the waste (max validity of 3 month);

Updated Waste Photos; and

Having storage facility licensed by Tadweer as per SOP for Licensing of Hazardous waste Service provider in the Emirate of Abu Dhabi No.CWM.SOP.PR/01.

6. Registration of entity located outside Abu Dhabi in BOLISATY System

The following shall be fulfilled for Tadweer to register a facility located outside the Emirate of Abu Dhabi in BOLISATY system:

6.1 Facilities located in UAE

Completion of registration form (Annexure 3);

A copy of commercial license;

A copy of permit from the concerned authority (if applicable).

6.2 Facilities located outside UAE

Tadweer’s licensed Transporter will be defined as a waste receiving facility at BOLISATY system and shall be authorised to complete the manifest (Waste receiving facility). However the waste transporter is responsible to submit (upload) a receipt of the subject waste from the facility outside UAE.

7. Fee structure

Please refer to the approved applicable fee structure for Hazardous waste as published on Tadweer’s licensing official webpage.

Page 7: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

SOP for the transportation of wastes outside the Emirate of Abu Dhabi CWM.SOP.PR/02

Issue/Revision (1/0) Page 9 of 11

8. Tadweer’s approval

Based on the above submissions and after Tadweer’s review, Tadweer will issue the waste producer Permit(s) for transportation of waste outside AD within 10 working days (Annexure 2) from submission of complete package of the required documents. The number of issued permit (s) will be equivalent to the approved number of trip(s)/shipment(s).

9. Document Control

The document considered uncontrolled when printed or not stamped CONTROLLED.

Page 8: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

SOP for the transportation of wastes outside the Emirate of Abu Dhabi CWM.SOP.PR/02

Issue/Revision (1/0) Page 10 of 11

10. References

1. Federal Law No (24) for the year 1999 on the Protection and the Development of the

Environment.

2. Federal Regulation for Handling Chemical Materials, Chemical Wastes and Medical

Wastes, issued by Cabinet Decree No. 37 of 2001.

3. Executive Committee Decree (2C24/2009) regarding imposing Tariff system on waste

producer at the Emirate of Abu Dhabi.

4. EAD Technical Guideline Document for Storage of hazardous Materials EAD-EQ-PCE-

TG-16.

5. Tadweer Technical Guideline 10, Inspection Management.

6. Tadweer Technical Guideline 11, Licensing Requirements for Transportation,

Treatment, and Recycling Facilities.

7. Tadweer/EAD “Waste classification Technical Guideline” No. (EAD-EQ-PR-TGD-01).

8. Tadweer/EAD “Waste Classification Policy” No (EAD-EQ-PR-P-01).

9. Tadweer/EAD “Waste Collection, Segregation, Transfer and Tracking Policy” No

(EAD-EQ-PR-P-04).

10. Tadweer/EAD “Waste Planning Policy” No (EAD-EQ-PR-P-02).

11. Tadweer/EAD “Waste Reuse, Recycling, Resource Recovery, Treatment and Disposal

Policy” EAD-EQ-PR-P-05).

12. Tadweer/EAD Licensing and Enforcement Policy for waste sector No. (EAD-EQ-PR-P-

03).

13. Technical Guideline on Duty of Care in Waste Management in the Emirate of Abu

Dhabi (EAD-EQ-PR-TG-xx).

14. Tadweer SOP for Licensing of Hazardous waste Service providers in the Emirate of

Abu Dhabi No CWM.SOP.PR/01.

Page 9: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

SOP for the transportation of wastes outside the Emirate of Abu Dhabi CWM.SOP.PR/02

Issue/Revision (1/0) Page 11 of 11

11. Annexures

Annexure 1: Application for the Transportation of Wastes outside the Emirate of Abu Dhabi.

Annexure 2: Permit for the Transportation of Wastes outside the Emirate of Abu Dhabi.

Annexure 3: Registration of entity located outside Abu Dhabi in BOLISATY system.

Annexure 4: Tadweer Waste Classification.

Annexure 5: Tadweer’s Licensed Hazardous and non-Hazardous waste Management facilities in the Emirate of Abu Dhabi.

Page 10: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

SoP for the Transportation of Wastes outside the Emirate of Abu Dhabi (CWM.SoP.PR/ 02)

Annexure 1

Application for the Transportation of Wastes outside the Emirate of Abu Dhabi

Page 11: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

2. Waste Transporter

3. Transportation info

4. Designated facility (DF)

5. Applicant's declaration and Signature

Company Name: Trade license No: Contact person:

For details of guidelines, Please refer to Tadweer website licensing.tadweer.ae & www.tadweer.ae websites

Mobile phone No: Site name/Address:

Date: Name of authorized person:

Signature:

Job title: Mobile phone No:

Trade license No:

Contact person:

Total waste quantity Required no of trips/Shipments

Mobile phone No:

Company Name (English):

1. Waste Info

. Please fill in Annex1 for waste info

Type of DF

Company Name (Arabic):

CAP101

Inside UAE, Emirate Outside UAE, Country City

Application Date………………….

Hazardous waste Non Hazardous waste

6. Other requirements

I Certify that the waste does not include any radioactive materials and that all the above mentioned information is complete and correct to the best of my knowledge. I also certify that the waste will be classi�ed, packaged, marked and labeled and in all respect in proper condition for transportation according to applicable UAE laws, regulations and best practices.

The following requirements shall be attached to the applicationAppendix1: Waste InfoAppendix 2: Lab test should be attached to this application (in case material is not in its original form)Appendix 3: Waste material data sheet (in case material is not in its original form)Appendix 4: Transportation scheduleAppendix 5: NOC from authorities of receiving emirates/CountryAppendix 6: Contract/agreement with receiving facilityAppendix 7: Contract/agreement between waste producer& waste transporterAppendix 8: Available MSDS should be attached to this application (in case material is in its original form)

Authorized Stamp

Land base (Other Emirate)

Vehicle Type Capacity Plate no. from Port Way of shipping CarrierA

Air/Sea (Other Country)

Sea

SeaSea

Sea

SeaSea

Application for Transportation of Wastes Outside Emirate Of Abu Dhabi

Storage facility Sanitary land�llChemical treatment Solidi�cation/StabilizationHazardous waste land�ll Thermal treatment Recycling

Evaporation Composting

Page 12: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

CAP101

Appendix 1: Waste Info

Producer's data Waste data

Producername Waste description as per tier 3SN

1

2

3

4

5

6

7

8

9

10

11

12

Trade license no.

MSDS Available Physical status Quantity

(KG)

Liquid

Solid

SemiSolid

Yes

No

NA

Yes

No

NA

Yes

No

NA

Yes

No

NA

Yes

No

NA

Yes

No

NA

Yes

No

NA

Yes

No

NA

Yes

No

NA

Yes

No

NA

Yes

No

NA

Yes

No

NA

Yes

No

NA

Yes

No

NA

Yes

No

NA

Liquid

Solid

SemiSolid

Liquid

Solid

SemiSolid

Liquid

Solid

SemiSolid

Liquid

Solid

SemiSolid

Liquid

Solid

SemiSolid

Liquid

Solid

SemiSolid

Liquid

Solid

SemiSolid

Liquid

Solid

SemiSolid

Liquid

Solid

SemiSolid

Liquid

Solid

SemiSolid

Liquid

Solid

SemiSolid

13

14

15

Liquid

Solid

SemiSolid

Liquid

Solid

SemiSolid

SemiSolid

Total

Liquid

Solid

List completed by

Signature Authorized Stamp

Page 13: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

CAP101

Appendix 2: Lab Test Requirements.*

Tadweer has the right to request additional lab testrequirements based on revision of the submitted application

For sludge

Parameter

PH

Organic Matter

Fixed solids % by weight

% by weight

% by weight% by weight

% by weight

% by weight% by weight

mg/L

mg/L

mg/Lmg/L

mg/L

mg/L

mg/Lmg/L

mg/L

Volatile solids

Total solidsMoisture content

Oil Content

Chloride

Cd

CrCu

Pd

Hg

Mo

NiSe

Zn

Unit

mg/L

As

For used oil

Parameter

Free oil

Water content

SedimentSulphur

Total metals

%

%

%%

ppm

Unit

For used chemicals

Parameter

PH

Volatile hydrocarbon

Water contentFlashpoint

%

%C

Unit

*

Page 14: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

CAP101

Appendix 3: Waste Material Data Sheet (WMDS)

1- Waste Producer's data

2. Waste data

For Pharmaceutical Waste ONLY

Company representative: Trade license No:

Company name:Address:

Phone No:

City:

Waste description as per tier 3

Physical status

Packaging

Waste description / waste sources

Main waste components (For mixed hazardous waste)

Packaging road signs (if applicable)

Special considerations (PPEs, Special handling requirements, speci�c safety measures……..etc.)

Solid Liquid Semi solid

Loose (bulk)

1-

Hazard label: UN number:

2- 3- 4-

Packed Drums Bags Jerry cans other( )

Commercial name Active ingredient

For Hazardous Waste ONLY

Commercial name (if applicable) Active ingredient (if applicable)

Page 15: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

CAP101

Appendix 4: Transportation Schedule (within UAE)

Date Vehicle No. Capacity No of trips Total Weight

TotalTotal

Page 16: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

SoP for the Transportation of Wastes outside the Emirate of Abu Dhabi (CWM.SoP.PR/ 02)

Annexure 2

Permit for the Transportation of Wastes outside the Emirate of Abu Dhabi

Page 17: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

موقع وعنوان الجهة

Permit for transportation of waste outside Emirate of Abu DhabiPlease note that the Center for Waste Management -Abu Dhabi has no objection to allow the facility to dispose their waste according to the below data

-:

Issuance Date (DD-MMM-YY) : :

Permit No : :

Application No : :

Waste Category: :

Waste Quantity (Kg) :

DF Name

DF Location / Address :

Waste TransporterDetails

Company Name

Transportation Inside UAE داخل االمارات

Tadweer License No.

Terms and Conditions

•Permit will be canceled in the event of any scrape or modification, or in case it is not stamped and signed by Tadweer.•This permit is valid for 30 days (Thirty Days) from issuance date.

•.

•30)(

لنفایــات خــارج إمــارة ابوظبــي تصریــح نقــل ا

فئة النفایات

هذا التصریحتدویر

یلغى التصریح في حال وجود أي كشط أو تعدیل أو في حال لم یكن مختوم و موقع من

وسیلة نقل النفایات:

كمیة النفایات (كیلو غرام):

رقم المركبة المرخص لها:

رقم رخصة تدویر:

النقل

اسم الجهة

Authorized Vehicle Plate No. :

Mean of waste transportation :

Designated Facility Details (DF) بیانات الجهة المستقبلة للنفایات

Outside UAE خارج االمارات

Page 18: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

SoP for the Transportation of Wastes outside the Emirate of Abu Dhabi (CWM.SoP.PR/ 02 )

Annexure 3 Registration of entity located outside Abu

Dhabi in BOLISATY system

Page 19: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

Owner Name

City

Telephone

Owner Mobile No

PRO Mobile No

CAP-00 Dec, 0000

Information

in case there is more details regarding your waste, please attach it along with your application

Application NoDate

Registration of entity located outside Abu Dhabi in (Bolisaty) system

Waste Details

Materials Description

(Attached)

No

1

2

3

Brief Description of the used treatment technology(ies) »»

Date of Establishment

Adress

Page 20: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

SoP for the Transportation of Wastes outside the Emirate of Abu Dhabi (CWM.SoP.PR/ 02 )

Annexure 4Tadweer Waste Classification

Page 21: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

٣ ١ ٢

001

002

009

1

008

004

001

010

001

1

004

003

002

العبوات

امللوثة

ببقايا املواد

الخطرة

Page 22: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

Putrescible

Non putresciblenon-recyclable

Hazardous waste

Recyclable

TIER 1 TIER 2 TIER 3

001

002

009

1

008

004

001

010

001

1

004

003

002

-

Concrete Block

Excavated Material

containers wi-th hazardous

residues

Page 23: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

SoP for the Transportation of Wastes outside the Emirate of Abu Dhabi (CWM.SoP.PR/ 02 )

Annexure 5 Tadweer’s Licensed Hazardous and non-

Hazardous waste Management facilities in the Emirate of Abu Dhabi

Page 24: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

Tadweer’s Licensed Hazardous and non-Hazardous Waste Management Facilities in the Emirate of Abu Dhabi

1. Non Hazardous waste

SN Facility Type Contact Number Contractor Location Email Address

Green waste/ Animal manure

Tires

Plastic Waste (HD,LD,PP, PET etc.)

Construction and Demolition Waste

Paper

Compost plant Al Ain

Abu DhabiMafraq

Abu DhabiKhatim

Abu DhabiLiwa

[email protected]

[email protected]

[email protected]

[email protected]

Emirates EnvironmentTechnology (EET)

Abu Dhabi compost factor (Sedairah)

Abu Dhabi compost factor (Sedairah)

Abu Dhabi compost factor (Sedairah)

Compost plant

Compost plant

Compost plant

Tire Recycling

1

2

3

4

1

1

1

2

3

1

971+ (3) 704 4222

971+ (3) 732 2245

971+ (3) 732 2245

971+ (3) 732 2245

Abu Dhabi

Al Ain

Abu Dhabi

[email protected]

[email protected]

[email protected]

Al Dhafra Recycling factory

Star International WasteManagement

SAINT GOBAIN GYPROCEMIRATES

Crushing Plant

Crushing Plant

Recycling

971+ (2) 585 1050

971+ (3) 783 9866

971+ (2) 408 8613

Al Ain [email protected] Rubber Factory(OMNIX)

971+ (3) 784 7220

Plastic Recycling Al Ain [email protected] EnvironmentTechnology (EET)

971+ (3) 704 4222

Recycling Abu Dhabi [email protected] DHABI NATIONALPAPER MILL - L.L.C

971+ (2) 509 9200

Page 25: Standard Operating Procedure (SOP) for the Transportation ... Guidelines... · Waste Producer, transporter and receiving facility shall complete the E-manifest through BOLISATY system

Tadweer’s Licensed Hazardous and non-Hazardous Waste Management Facilities in the Emirate of Abu Dhabi

2. Hazardous Waste

SN Facility Type Contact Number Contractor Location Email Address

Used Oil (Engine/Hydraulic/Transformer oils)

Veterinary Waste

Pharmaceuticals

Oily waste water

Used oil processingplant Abu Dhabi [email protected] Oil1

1

1

2

3

4

1

2

971+ (2) 550 2291

Incinerator Al Ain [email protected] International971+ (3) 783 9866

Incinerator Al Ain [email protected] int.Waste Management.Llc971+ (3) 783 9866

Autoclaving Abu Dhabi [email protected] WASTE TREATMENT971+ (2) 627 2600

Chemical Treatment Abu Dhabi [email protected] MEDICAL WASTETREATMENT COMPANY - L L C971+ (2) 681 5815

Autoclaving Abu Dhabi [email protected] CLEANING EST.971+ (2) 644 4600

Incinerator Al Ain [email protected] Int.Waste Management 971+ (3) 783 9866

Solidi�cation Abu Dhabi [email protected] ENVIRONMENTAL SOLUTIONS971+ (2) 672 0703

1

2

Oil/water separation Abu Dhabi [email protected] MOUNTAINS CLEANING SERVICES ESTABLISHMENT971+ (2) 555 9954

Oil/water separation Abu Dhabi [email protected] ENVIRONMENTAL SOLUTIONS971+ (2) 672 0703

Acid/Base

1

2

Neutralization Abu Dhabi [email protected] SAIL ENGINEERING CORROSION SERVICES ESTABLISHMENT971+ (2) 626 0050

Neutralization Abu Dhabi [email protected] ENVIRONMENTAL SOLUTIONS971+ (2) 672 0703

2 Neutralization Abu Dhabi [email protected] MOUNTAINS CLEANING SERVICES ESTABLISHMENT971+ (2) 555 9954

Medical Waste