Standard Operating Procedure – Rig Component Inspection Schedule
1. Purpose
The common thread throughout the SOP and HWD Policies and Procedures in general is
the identification of responsibilities. This manual is intended to clearly and concisely
identify the steps required by employees to complete any given operation in a manner
that is consistent with Horizontal Well Drillers standards. It will document progressive
steps required in sequence that are to be followed, an authorizing company department or
position, and an author that is to be consulted if there are questions in any portion of the
SOP standards.
2. Scope
ALL RIG PERSONNEL
3. Prerequisites
Personnel are required to wear proper personal protective equipment, follow job safety
rules, and have the appropriate experience and certifications to carry out their job
functions satisfactorily.
4. Responsibilities
TOOL PUSHER/DRILLER IS ULTIMATELY RESPONSIBLE FOR ENFORCEMENT
AND TO ENSURE THAT THIS PROCEDURE IS FOLLOWED TO STANDARD.
ALL RIG PERSONNEL MUST FOLLOW THIS STANDARD OPERATING
PROCEDURE.
5. Procedure
HWD follows the OEM’s guidelines using API RP 4G practices for inspection and
maintenance of load bearing and critical components. This document is a basic schedule
of inspections. For more specific inspection requirements and forms, reference the
OEM’s Supplemental Manual Maintenance and Inspection sections.
Horizontal Well Drillers
SOP #: 9.85
Revision #: 1
Implementation Date: 2015/11/24
Page #: 2 of 9 Last Reviewed/Update Date:
2015/11/24
SOP Owner: HWD Executive Management
Approval: HWD Executive Management
6. References
HWD Employee Handbook
7. Definitions
NA
Horizontal Well Drillers
SOP #: 9.85
Revision #: 1
Implementation Date: 2015/11/24
Page #: 3 of 9 Last Reviewed/Update Date:
2015/11/24
SOP Owner: HWD Executive Management
Approval: HWD Executive Management
Horizontal Well Drillers
SOP #: 9.85
Revision #: 1
Implementation Date: 2015/11/24
Page #: 4 of 9 Last Reviewed/Update Date:
2015/11/24
SOP Owner: HWD Executive Management
Approval: HWD Executive Management
Horizontal Well Drillers
SOP #: 9.85
Revision #: 1
Implementation Date: 2015/11/24
Page #: 5 of 9 Last Reviewed/Update Date:
2015/11/24
SOP Owner: HWD Executive Management
Approval: HWD Executive Management
Horizontal Well Drillers
SOP #: 9.85
Revision #: 1
Implementation Date: 2015/11/24
Page #: 6 of 9 Last Reviewed/Update Date:
2015/11/24
SOP Owner: HWD Executive Management
Approval: HWD Executive Management
Horizontal Well Drillers
SOP #: 9.85
Revision #: 1
Implementation Date: 2015/11/24
Page #: 7 of 9 Last Reviewed/Update Date:
2015/11/24
SOP Owner: HWD Executive Management
Approval: HWD Executive Management
Horizontal Well Drillers
SOP #: 9.85
Revision #: 1
Implementation Date: 2015/11/24
Page #: 8 of 9 Last Reviewed/Update Date:
2015/11/24
SOP Owner: HWD Executive Management
Approval: HWD Executive Management
Horizontal Well Drillers
SOP #: 9.85
Revision #: 1
Implementation Date: 2015/11/24
Page #: 9 of 9 Last Reviewed/Update Date:
2015/11/24
SOP Owner: HWD Executive Management
Approval: HWD Executive Management