STAKEHOLDER INTERACTION AT CLOSED SITES
Weldon Spring SiteWeldon Spring, Missouri
Kevin WidemanSr. Environmental Specialist
![Page 2: STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist](https://reader031.vdocuments.us/reader031/viewer/2022032701/56649c9b5503460f949597bc/html5/thumbnails/2.jpg)
INTRODUCTION
Weldon Spring is the site of a former chemical and radiological facility
This site included a manufacturing facility with disposal ponds on site
It also included a quarry that was used for disposal of waste
MoDOT has two highways, Routes D and Route 94 that traverse the area
MoDOT also has a maintenance lot next door to the disposal cell
![Page 3: STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist](https://reader031.vdocuments.us/reader031/viewer/2022032701/56649c9b5503460f949597bc/html5/thumbnails/3.jpg)
Weldon Spring Site
![Page 4: STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist](https://reader031.vdocuments.us/reader031/viewer/2022032701/56649c9b5503460f949597bc/html5/thumbnails/4.jpg)
Weldon Spring Chemical Plant
![Page 5: STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist](https://reader031.vdocuments.us/reader031/viewer/2022032701/56649c9b5503460f949597bc/html5/thumbnails/5.jpg)
The Site Today
![Page 6: STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist](https://reader031.vdocuments.us/reader031/viewer/2022032701/56649c9b5503460f949597bc/html5/thumbnails/6.jpg)
Weldon Spring SiteRoute D Culverts
Disposal Cell MoDOT
Maintenance Facility Route 94
Culvert
Quarry Miss
ouri
River
![Page 7: STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist](https://reader031.vdocuments.us/reader031/viewer/2022032701/56649c9b5503460f949597bc/html5/thumbnails/7.jpg)
MoDOT Areas Affected
![Page 8: STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist](https://reader031.vdocuments.us/reader031/viewer/2022032701/56649c9b5503460f949597bc/html5/thumbnails/8.jpg)
Route 94 Culvert
Installed by the army under 40 feet of fill
Consists of corrugated metal that is rusting
Culvert is contaminated Removal costs about $1
million Fix and leave in place
with future replacement when needed
60 inch X 225 feet
![Page 9: STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist](https://reader031.vdocuments.us/reader031/viewer/2022032701/56649c9b5503460f949597bc/html5/thumbnails/9.jpg)
Route 94 Immediate Repairs
Culvert before repairs Culvert after repairs on 8/25/10
![Page 10: STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist](https://reader031.vdocuments.us/reader031/viewer/2022032701/56649c9b5503460f949597bc/html5/thumbnails/10.jpg)
Route 94 Future Needs
After collapsed end was cut away
Water had undercut the end
Culvert still intact but will need replacement or lined in the future
![Page 11: STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist](https://reader031.vdocuments.us/reader031/viewer/2022032701/56649c9b5503460f949597bc/html5/thumbnails/11.jpg)
Route 94 Culvert Downstream
Fill is washed away from around the culvert
This section broke away
Isn’t necessary for integrity of the highway
DOE’s discretion on what to do with it
![Page 12: STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist](https://reader031.vdocuments.us/reader031/viewer/2022032701/56649c9b5503460f949597bc/html5/thumbnails/12.jpg)
Route D Culverts
Installed by Army Consists of corrugated
metal that was rusting Believed contamination
is under the culverts Removal and
replacement to be done next year
Cooperative coordination between DOE and MoDOT to replace
2 - 60 inch X 82 feet
![Page 13: STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist](https://reader031.vdocuments.us/reader031/viewer/2022032701/56649c9b5503460f949597bc/html5/thumbnails/13.jpg)
Route D Culverts
MoDOT’s contractor will uncover the culverts
DOE contractor will remove along with any contaminated soil
MoDOT will supply fill material
![Page 14: STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist](https://reader031.vdocuments.us/reader031/viewer/2022032701/56649c9b5503460f949597bc/html5/thumbnails/14.jpg)
Working Together
Missouri is the “Show Me State”
We need to see to accept
Several Missouri state agencies were involved
MoDOT, DOC, DNR, DNR Parks
DNR is the central contact
![Page 15: STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist](https://reader031.vdocuments.us/reader031/viewer/2022032701/56649c9b5503460f949597bc/html5/thumbnails/15.jpg)
Central Contact
One central state contact
Everyone was kept informed
Easier to work with DOE and for DOE to work with the agencies
MoDOT concerned with protecting our employees and the public
![Page 16: STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist](https://reader031.vdocuments.us/reader031/viewer/2022032701/56649c9b5503460f949597bc/html5/thumbnails/16.jpg)
Open Comunicaton
MoDOT assigned one central contact within the department
Maintenance people were briefed
Design and construction to coordinate future efforts
DOE provided educational opportunities for employees
![Page 17: STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist](https://reader031.vdocuments.us/reader031/viewer/2022032701/56649c9b5503460f949597bc/html5/thumbnails/17.jpg)
Future Route D Improvements
Widen Route D next spring
Culvert replacement will be coordinated
Route D will be shut down for two days
MoDOT’s contractor will remove the overburden
DOE will remove the culverts and any contaminated soil
MoDOT will replace the fill and culverts and finish the project
![Page 18: STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist](https://reader031.vdocuments.us/reader031/viewer/2022032701/56649c9b5503460f949597bc/html5/thumbnails/18.jpg)
Future Route D Improvements
Disposal of the culverts will be determined
If they are not contaminated they will be recycled
DOE has offered to be present at the pre bid meeting to answer any questions from contractors
![Page 19: STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist](https://reader031.vdocuments.us/reader031/viewer/2022032701/56649c9b5503460f949597bc/html5/thumbnails/19.jpg)
Future Route 94 Improvements
Route 94 cannot be shut down
Shoulders are being added to Route 94
Culvert replacement or repair will be coordinated with DOE
MoDOT will continue to work with DOE
![Page 20: STAKEHOLDER INTERACTION AT CLOSED SITES Weldon Spring Site Weldon Spring, Missouri Kevin Wideman Sr. Environmental Specialist](https://reader031.vdocuments.us/reader031/viewer/2022032701/56649c9b5503460f949597bc/html5/thumbnails/20.jpg)
Interpretive Center DOE’s interpretive center next door has
been a great educational tool to educate MoDOT employees