Page 1: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and
Page 2: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

STAFF REVIEW AND RECOMMENDATIONS

PUBLIC HEARING

SEPTEMBER 30,2020

PRELIMINARY PLAT: MOSSY HAVEN 2

LEGAL DESCRIPTION: SEC 20, T17N, ROIW, SEWARD MERIDIAN AK

PETITIONERS: CHARLIE & DELISA RENIDEO

SURVEYOR/ENGINEER: KEYSTONE SURVEYING/PIONEER ENGINEERING INC.

ACRES: 8.62 + PARCELS: 4

REVIEWED BY: AMY OTTO-BUCHANAN CASE#: 2020-121

REQUEST: The request is to create four lots from Tract A, Mossy Haven, Plat No. 2019-120, to be knownas MOSSY HAVEN 2, containing 8.62 acres +/-. The plat is located north of W. Edlund Road, south ofS. JCnik-Goose Bay Road, and directly west of S. Weeping Birch Street; within the NE Va Section 20,Township 17 North, Range 01 West, Seward Meridian, Alaska.

This case was continued from the September 16,2020 hearing.

EXHIBITS

Vicinity Map and Aerial PhotosGeotechnical ReportAGENCY COMMENTS

Department of Public Works Operations & MaintenanceUtilities

EXHIBIT A-4 pgsEXHIBIT B-6 pgs

EXHIBIT C-lpgEXHIBIT D-2 pgs

DISCUSSION: Proposed Lots 4-6 are 1.38 acres, 1.14 acres, and 1.06 acres respectively. Tract A-1 is5.03 acres in size. All lots have the required frontage onto S. Weeping Birch Street. Flood Hazard Area isshown on the plat.

Soils Report: A soils report was submitted (Exhibit B), pursuant to MSB 43.20.281(A)(1). BillKlebesadel, PE, Pioneering Engineering Inc., notes three testholes were excavated on May 21, 2019, to adepth of 6' to 13.5' depth. The testholes showed approximately one to two feet of topsoil overlaying sandsand gravels. Clay and gravel was discovered in a pocket at the bottom of testhole #3, but was not enoughto appreciably affect water infiltration. Groundwater was encountered at varying depths in all threetestholes. Testhole logs and location map is attached. Currently, Lot 4 contains 10,000 sf of contiguoususeable septic area and 10,000 sf of buildable area. Lots 5 & 6 and Tract A-1 will need fill or regrading tocreate the useable septic area {sqq Recommendation #5).

Access: Legal and physical access to the proposed lots are required pursuant to MSB 43.20.100 AccessRequired, MSB 43.20.120 Legal Access and MSB 43.20.140 Physical Access. Pursuant to MSB 43.20.320Frontage, each lot has the required frontage.

Mossy Hvn 22020-121 09/16/2020

Page 1 of3

Page 3: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

Comments: Department of Public Works Operations & Maintenance (Exhibit C) notes created useableareas for Lots 5 & 6 and Tract A-1 will need to be shown (see Recommendation #5). S. Weeping BirchStreet on the north side of W. Edlund Road is classified as a Collector. ADOT&PF has plans to connect S.Weeping Birch Street to S. KGB Road. Direct residential access to S. Weeping Birch Street should belimited per SCM A06.1 (see Recommendation #6, which recommends a common access point at thecommon lot line of Lot 4 and Lot 5). Staff does not recommend limiting access to Tract A-1 to the commonlot line with Lot 6, as Tract A-1 may be further subdivided in the future. This will allow for a commonaccess driveway directly across from W. Jones Drive in the future.

Utilities: (Exhibit D) MTA requests the 30' MEA easement be a 30' T&E easement. Enstar has nocomments or recommendations. MEA and GCI did not respond.

At the time of staff report write-up, there were no responses to the Request for Comments fi*om USAGE;ADF&G; Community Council Knik-Fairview; Fire Service Area #130 Central mat-Su; Road Service Area#14 Fairview; MSB Emergency Services, Community Development, Capital Projects Department,Assessments, Development Services Division or Pre-Design Division; MEA or GCI.

CONCLUSION: The abbreviated plat of Mossy Haven 2 is consistent with AS 29.40.070 PlattingRegulations and MSB 43.15.025(B) Abbreviated Plats. There were no objections fi:om any federal or stateagencies. Borough departments, or utilities. There were no objections to the plat firom the public in responseto the Notice of Public Hearing. Legal and physical access is provided, consistent with MSB 43.20.100Access Required, MSB 43.20.120 Legal Access and MSB 43.20.140 Physical Access. Frontage for thesubdivision exists, pursuant to MSB 43.20.320 Frontage. A soils report was submitted, pursuant to MSB43.20.28 l(A)(l)(i)(i).

FINDINGS for PRELIMINARY PLAT

1. The plat of Mossy Haven 2 is consistent with AS 29.40.070 Platting Regulations and MSB 43.15.025(B)Abbreviated Plats.

2. At the time of staff report write-up, there were no responses to the Request for Comments from USAGE;ADF&G; Community Council Knik-Fairview; Fire Service Area #130 Central mat-Su; Road ServiceArea #14 Fairview; MSB Emergency Services, Community Development, Capital Projects Department,Assessments, Development Services Division or Pre-Design Division; MEA or GCI.

3. There were no objections from any federal or state agencies, or Borough departments.4. There were no objections fi om the public in response to the Notice of Public Hearing.5. A soils report was submitted, pursuant to MSB 43.20.28l(A)(l)(i)(i). Lots 5 & 6 and Tract A-1 will

require fill or regrading to meet the requirement of 10,000 sf of contiguous useable septic area.6. Frontage for the subdivision exists pursuant to MSB 43.20.320 Frontage.7. Legal and physical access is provided, consistent with MSB 43.20.100 Access Required, MSB

43.20.120 Legal Access and MSB 43.20.140 Physical Access.

Mossy Hvn 2 Page 2 of 32020-121 09/16/2020

Page 4: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

RECOMMENDATION FOR APPROVAL OF PRELIMINARY PLAT

Staff recommends approval with the following conditions and findings:

1. Taxes and special assessments must be paid in full for the year of recording, pursuant to MSB43.15.053(F) and AS 40.15.020. Pay taxes and special assessments (LIDs), by CERTIFIED FUNDSOR CASH.

2. Provide updated Certificate to Plat executed within seven (7) days of recording of plat and submitBeneficiary Affidavit for any holders of a beneficial interest.

3. Pay postage and advertising fees.4. Show all easements of record on final plat.5. Provide an updated soils report, once the fill or regrading of Lot 5, Lot 6 and Tract A-1 are complete.6. Provide Plat Note that Lot 4 and Lot 5 will share a common driveway access at the common lot line.7. Submit recording fees, payable to Department of Natural Resources (DNR).8. Submit final plat in full compliance with Title 43.

Mossy Hvn 2 Page 3 of 32020-121 09/16/2020

Page 5: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

8

A10

AS

1

TRACTS F-'6879)

TR 1

KNIKATNU

TR G-1.GO0

LISSARD(7833)

W-1BUSSARD

SURVEY

(1005)

TR 2

SO* SECllON UNE ESMT

3* SCniTTH *UI46-^SMTtt. 1/.

A7W JONES PR

FH12(

SUBJECT

PROPERTY

7231)

Lot '6

Lot 5

PH,3,4 .2) (7083)

Lot A5V.

V)

10C'COW8

7(7231)

W MOOSE PARK PR

(79^(7065)

11

1MOOSE

W EDLUND RD

B-1 (796B

I (1)

1(1033)

VICINITY MAPFOR PROPOSED MOSSY HAVEN 2

LOCATED WITHIN

SECTION 20, T17N, ROIW, SEWARD MERIDIAN,

ALASKA

WASILLA 13 MAP11c

(1033)

12

Page 6: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

/

wood Cree

WA12

. . .. ... V. -II -

'i \f-

fn f-yf.

YA7AT'1W

Page 7: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

JV^

f.WA'1'2-

VN

>? »\sl

WTJ i / y /

\

/cPjSl\

XK!

■\ 4 /

i.W

:r i ^

<!^ VJ.Vr v^'

X V§iv

Vi.

tr■\-^ - . -"yir- -«

VTTT

•■ A V.

'X

—V <tb,-jX^ A " ' ■• x n-v.h'v\;

-V \.270>_^\'d, ' .lA

' »»'V»

•=®> % Y'li.

•V. V

o ICH

3

O"

a:

V. sRiFRL&,W ^^5o.

Page 8: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

wmr2

r

-

mmo

Ha

willl^HBInill IIB§h hiII

11

Page 9: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

Pioneer Engineering LLCProfessional, Reliable, Local

August 12, 2020

RE: Usable Area ReportT17N RIW Section 20

Mossy Haven 2 Subdivision

Fred Wagner, PLSPlatting Officer, Mat-Su Borough350 E. Dahlia Ave.

Palmer, AK 99645

Dear Mr. Wagner,

Introduction: Working on behalf of the owners and in coordination with Keystone Surveying,Pioneer Engineering LLC performed a soils investigation for the above-referenced proposedsubdivision. The project plans to create 3 lots and 1 tract from Tract A. The lots will beapproximately 1 acre each and the tract will be approximately 5 acres.

Topographv; The parent tract slopes downhill to the north. There are gradual slopes across theparcel but none exceed 25% or 10' in height. Total elevation difference across the parcel isapproximately four feet.

Test Holes: Three applicable test holes were excavated on 5-21-19. The test holes were 6'-13.5' deep and were sited to best represent the various soil conditions of the future parcels. Thetest holes showed approximately one to two feet of topsoil overlaying sands & gravels. Clay &gravel was discovered in a pocket at the bottom of test hole #3, but was not enough toappreciably affect water infiltration into the ground. Hence, no gradation or percolation test wasperformed. Groundwater was encountered at varying depths in all three of the test holes. Thetest hole logs are attached.

Useable Area: The proposed lots have limitations on areas defined be MSB Code as ''useableseptic area or useable building area". For instance, septic areas will be limited by lot lines,shallow groundwater, and various setback requirements. In regards to "building area" lot lineand various setbacks will be the limiting factors.

Currently, proposed Lot 4 will contain 10,000 square feet of usable building area and at least10,000 square feet of usable septic area without additional work. However, Lots 5 & 6 and TractA-1 will need to be filled or re-graded to create the useable septic area.

Based on the available soils & water table information, topography, MSB Title 43 Codedefinitions, and my observations at the site, each lot can have at least 10,000 square feet ofusable building area and at least 10,000 square feet of contiguous usable septic area asrequired by MSB 43,20.281 AREA.

EXHIBIT B

Page 10: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

Pioneer Engineering LLCProfessional, Reliable, Local

If you have any questions, please do not hesitate to contact me. Thank you for your time.

Sincerely,

Bill Klebesadel, P.E.

Owner/Principal Engineer,Pioneer Engineering LLC16547 E Smith Road

Palmer, AK 99645

907-863-2455

7 >\ /.w Av? ' ^

Page 11: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

SOIL LOG

Job Number: 2019-GLO-003

Project Location: Mossy Haven

Logged By: Steve Wil^n

TEST HOLE NO. 1

Date: 5-21-19

Depth

(feet) Description

0

1Topsoil (OL)

2

3 Sand (SP)

4

5

Groundwater @ 4'

6

Sand (SP)

7

Bottom of test hole

8

9

10

11

12

13

14

15

16

17

18

19

20

21

^ -I.

V* A

TEST HOLE LOCATION:

See test hole map

COMMENTS:

Soils can support a conventional onsite wastewatersystem.

This soil log was prepared for the sole purpose of

determining the feasibility of constructing an

onsite wastewater disposal system at the locationof the test hole. Soil type ratings are based on

visual observation and have not been verified

with laboratory analyses. These soils have not

been analyzed for structural stability or for any

purpose other than wastewater absorption fieldconstruction. Anyone relying on this information

for any use other than wastewater absorption

field development shall do so at their own risk.

Pioneer Engineering LLC

Page 12: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

SOIL LOG

Job Number: 2019-GLO-003

Project Location: Mossy Haven

Logged By: Steve Wilson

TEST HOLE NO. 2

Date: 5-21-19

Depth

(feet) Description

0

iTopsoil (OL)

2

3 Sand (SP)

4

5

Groundwater @ 4'

6

Gravel (GP)

7

Bottom of test hole

8

9

10

11

12

13-

14

15

16

17

18

19

20

21

/

7-10-19,.' .X. .

TEST HOLE LOCATION:

See test hole map

COMMENTS:

Soils can support a conventional onsite wastewater

system.

This soil log was prepared for the sole purpose ofdetermining the feasibility of constructing an

onsite wastewater disposal system at the locationof the test hole. Soil type ratings are based on

visual observation and have not been verified

with laboratory analyses. These soils have not

been analyzed for structural stability or for anypurpose other than wastewater absorption field

eonstruction. Anyone relying on this information

for any use other than wastewater absorption

field development shall do so at their own risk.

Pioneer Engineering LLC

Page 13: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

SOIL LOG

Job Number: 2019-GLO-003

Project Location: Mossy Haven

Logged By: Steve Wilson

TEST HOLE NO. 3

Date: 5-21-19

Depth

(feet) Description

0

1Topsoil (OL)

2

3

4

5

6Gravelly sand (SW)

7

8

9

10

Groundwater @ 9'

11Blue clay/gravel

12

Bottom of test hole

13

14

15

16

17

18

19

20

21

1\

TEST HOLE LOCATION:

See test hole map

COMMENTS:

Soils can support a conventional onsite wastewatersystem.

This soil log was prepared for the sole purpose of

determining the feasibility of constructing an

onsite wastewater disposal system at the location

of the test hole. Soil type ratings are based on

visual observation and have not been verified

with laboratory analyses. These soils have not

been analyzed for structural stability or for any

purpose other than wastewater absorption fieldconstruction. Anyone relying on this information

for any use other than wastewater absorption

field development shall do so at their own risk.

Pioneer Engineering LLC

Page 14: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

MOSSY HAVEN 2

TEST HOLE MAP

rOJNO S 1/^ ALUHINUH CAP WNKNT03' A30VC GROUND - GOOD CIWDITION

APPROXIUATE BASE

j FLOOD ELEVATION- 264"

N89-58"19*E 63«.08' (T)SO'SECnON

33" SECTIDnIu

EASEFCNT

E EASELCNT

33' SECTION LINE EASEMWT'.

CENTERUNErOmOOD CREEK

APPROXIHATE

Flimi HAZMID AREAPn FEM NAPPING

MOOSE PARK PHASE

PLAT » 20",3-9FDUND 5/8" REBARVITH PLAS^nC CAP, ,-mjND 5/(J* REBAR

VITH PLASTIC CAP

LS 7064

S89*55'07*E 535.26'

TEST HOLE #1AIWOMHATE EASE

FLOOO EEVATION

263" ^ -w. JONES drive: ^t " STRACT A-1

5.03 ocres

219107 sq ft jOlSSSEmtfiii

3 .JdfiOSE PARK PHASE III. I^IplAT # 2013-97

N9CrO0'O0*E

34i.46'

LQX 61.06 acres46217 sq ft

N9croo'oo*ERCEL 2

SOSITTJA SORCOGH

"uLTmOjN ^ERIAL MO.

-5C-P.V:r.

300K 1126, PAGE 292

36936

OSE PARK PHASE

PLAT # 2011-108TEST HOLE #2 LOT 5

1.14 acres49869 sq ft

N90-00WE

(T^-W-rWOOSe PARK DRIVE SLOT 438 acres86 sq ft

"fiLUPUU-TEST HOLE #3 396.35"

NBffAB'ATt 42935' (T)

r—SE PARK PHASE

Ut # 2011-85

#2019-120MOSSY HA'.EI

PRESCRIPTIVERIWTS DNL1L,^ BOUNDART LDC

ZXZ

V. EDLUND RD.

—W:-eBLUNO-W:

3-1

OOSE PARK PHASE 6

019-98nUffl 5/8* REBAR VITH PLASTIC CAP LS 7064 -0,44' SOUTHEPLY OF TEIW.NUS OF BOUNDARY UNEICLD FOR VESTERLY SUBDIVISION LUC WLY

SSY HA'.EM "fLAT #2019-120

S83-55'27> 516.46'l5'lmLJiTl&® JJ20' vne ROAD W. cut leaf birch AVE.

j

N89'55'27"E 132I.84

MK K1

Page 15: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

Amv Otto-Buchanan

From: Jamie Taylor

Sent: Tuesday, September 8, 2020 9:28 AM

To: Amy Otto-BuchananSubject: RE: RFC Mossy Haven 2 2020-121

Show where useable area will be created on lots 5 & 6 and Tract A-1.

Weeping Birch Street on the north side of Ediund Road is classified as a Collector. DOT has plans to connect WeepingBirch Street to KGB. Direct residential access to Weeping Birch Street should be limited per SCM A06.1.

Jamie Taylor, PE

Civil Engineer

Matanuska-Susitna Borough

Department of Public Works

Operations & Maintenance

t: 907-861-7765 c: 907-355-9810

[email protected]

http://www.matsugov.us/

From: Amy Otto-Buchanan <Amy.Otto-Buchanan(5)matsugov.us>

Sent: Wednesday, August 26,2020 10:04 AM

To: adam.dubour(a)alaska.gov; [email protected]; [email protected]; John Aschenbrenner

<[email protected]>; George McKee <[email protected]>; [email protected];

[email protected]; [email protected]; [email protected]; Fire Code <[email protected]>; JIN Irsik<[email protected]>; Eric Phillips <[email protected]>; Jude Bilafer <[email protected]>; CindyCorey <[email protected]>; Terry Dolan <[email protected]>; Jim Jenson

<[email protected]>; Jamie Taylor <[email protected]>; Charlyn Spannagel

<[email protected]>; Planning <[email protected]>; Joseph Metzger

<[email protected]>; Alex Strawn <[email protected]>; Fred Wagner

<[email protected]>; Permit Center <[email protected]>; Mark Whisenhunt

<[email protected]>; Theresa Taranto <[email protected]>; Andy Dean

<[email protected]>; [email protected]; [email protected];

[email protected]; 'Cassie Acres' <[email protected]>;

[email protected]; 'OSP Design Group' <[email protected]>

Subject: RFC Mossy Haven 2 2020-121

The following contains a link for Mossy Haven 2. Comments are due by September 10,2020. Please let me know if youhave any questions. Thanks, A.

https://matsugovus-mv.sharepoint.eom/:f:/g/personal/amv otto-

buchanan matsugov us/Etc/\J40Ue IFmutYUOgBTNUB-piYiqfgoHT4ESPcP6INAw?e=zjZMal

Please open in Chrome or copy & paste. Opening in Microsoft Edge creates viewing issues.

Amy Otto-Buchanan

1 EXHIBIT c

Page 16: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

Platting Technician

amv.otto-buchanan(5)matsugov.us

861-7872

Page 17: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

Ai^Otto-Buchanan

From: Holly Sparrow <[email protected]>

Sent: Thursday, August 27, 2020 8:08 AMTo: Amy Otto-Buchanan

Subject: RE: RFC Mossy Haven 2 2020-121

[EXTERNAL EMAIL - CAUTION: Do not open unexpected attachments or links.]Good morning,

MIA has reviewed the plat for Mossy Haven. MIA would like to request the 30' MEA easement to be a 30' T&Eeasement.

Thank you for the opportunity to comment.

Holly Sparrow, Right of Way Agent

MIA I 1740 S. Chugach Street ] Palmer, Alaska 99645

office: 907-761-2599 I www.mtasoiutions.com

Life. Technology. Together.

From: Amy Otto-Buchanan <[email protected]>

Sent: Wednesday, August 26,2020 10:04 AM

To: [email protected]; [email protected]; [email protected]; John Aschenbrenner

<[email protected]>; George McKee <[email protected]>; [email protected];

[email protected]; [email protected]; [email protected]; Fire Code <[email protected]>; Jill Irsik

<[email protected]>; Eric Phillips <[email protected]>; Jude Bilafer <[email protected]>; Cindy

Corey <[email protected]>; Terry Dolan <[email protected]>; Jim Jenson

<[email protected]>; Jamie Taylor <[email protected]>; Charlyn Spannagel

<[email protected]>; Planning <[email protected]>; Joseph Metzger

<[email protected]>; AlexStrawn <[email protected]>; Fred Wagner

<[email protected]>; Permit Center <[email protected]>; Mark Whisenhunt

<[email protected]>; Theresa Taranto <[email protected]>; Andy Dean

<[email protected]>; [email protected]; Right of Way Dept. <[email protected]>;[email protected]; 'Cassie Acres' <[email protected]>;

[email protected]; 'OSP Design Group' <[email protected]>

Subject: RFC Mossy Haven 2 2020-121

CAUTION: This email originated from outside your organization. Exercise caution when opening attachmentsor clicking links, especially from unknown senders.

1 EXHIBIT D

Page 18: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

The following contains a link for Mossy Haven 2. Comments are due by September 10,2020. Please let me know if youhave any questions. Thanks, A.

https://matsugovus-mv.sharepoint.eom/:f:/g/personal/amv otto-

buchanan matsugov us/EtcAJ40Ue IFmutYUOgBTNUB-piYiqfgoHT4ESPcP6INAw?e=ziZMqi

Please open in Chrome or copy & paste. Opening in Microsoft Edge creates viewing issues.

Amy Otto-Buchanan

Platting Technician

amv.otto-buchananOmatsugov.us

861-7872

Page 19: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

ENSTAR

Natural Gas Company

ENSTAR Natural Gas CompanyA DIVISION OF SEMCO ENERGY

Engineering Department, Right of Way Section401 E. International Airport Road

P. 0. Box 190288

Anchorage, Alaska 99519-0288(907) 277-5551

FAX (907) 334-7798

September 11, 2020

Matanuska-Susitna Borough, Platting Division350 East Dahlia Avenue

Palmer, AK 99645-6488

To whom it may concern:

ENSTAR Natural gas company has reviewed the following Preliminary plat and has nocomments or recommendations.

• Mossy Haven 2(MSB Case #2020-121)

If you have any questions, please feel free to contact Skylar Shaw at 334-7911 or by email atskylar.shaw(@enstamaturalgas.com.

Sincerely,

Andrew Fraiser

Supervisor of ROW and PermittingENSTAR Natural Gas Company

Page 20: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and
Page 21: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

STAFF REVIEW AND RECOMMENDATIONS

PUBLIC HEARING

SEPTEMBER 30,2020

ABBREVIATED PLAT:

LEGAL DESCRIPTION:

PETITIONER:

VALLEY WAY

SEC 33, T18N, R2E, SEWARD MERIDIAN, AK

CLINTON MELIN FOR CM MECHANICAL, INC. AND

GORDON & SIMONE FLETCHER

SURVEYOR/ENGINEER: HANSON LAND SOLUTIONS

ACRES: 0.53

REVIEWED BY:

PARCELS: 2

PEGGY HORTON CASE: 2020-130

REOUEST

The request is to resubdivide Lots 10 & 11, Block 1, Roland Snodgrass, Plat 6-215, into twonew lots to be known as Valley Way, containing .53 acres +/-. Located northeast of theintersection of E. Blueberry Ave. and S. Valley Way within the City of Palmer; lying withinthe NW!4 Section 33, Township 18 North, Range 2 East, Seward Meridian, Alaska.

EXHIBITS

Vicinity Maps Exhibit A

As-Built Exhibit B

COMMENTS

MSB DPW Exhibit C

City of Palmer Exhibit D

AKRR Exhibit E

Enstar Exhibit F

MTA Exhibit G

DISCUSSION

Location: This property is located within the City of Palmer and is served by municipal sewerand water systems.

Access: The City of Palmer maintains S. Valley Way and E. Blueberry Ave, which providelegal and physical road access to the proposed lots.

2020-130 9/30/2020 Page 1 of 3

Page 22: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

Topography & As-Built: The surveyor's as-built is shown on the preliminary plat.Topography was not required due to the aggregate amount of change to the property lines beingless than 2,000 sq. ft.

Comments: MSB DPW had no comment (Exhibit C).

City of Palmer had no comments except to state the proposed lots are located within the AirportInfluence Area (Exhibit D). Staff notes there are no setback requirements for this property asnoted in City of Palmer Municipal Code 17.32.064.

Alaska Railroad has no general objection; they do have a clarification that they would like tosee made on the plat (Exhibit E) Valley Way runs within the ARRC ROW but is not a plattedroadway. It is allowed to run within the ARRC ROW via the terms of ARRC Blanket pemirt#8282 which ARRC has issued to the City of Palmer. ARRC would like to see a plat note tothat effect on the plat (Recommendation #4).

Enstar has no comments or recommendations (Exhibit F). MTA has no comments(ExhibitG).

FINDINGS of FACT:

1. The proposed preliminary plat for Valley Way is consistent with AS 29.40.070Preliminary Plats, MSB 43.15.025 Abbreviated Plats.

2. There were no objections from any borough departments, outside agencies, or the public.

3. City of Palmer maintains the access roads, S. Valley Way and E. Blueberry Ave.

4. Access exists pursuant to MSB 43.20.320 Frontage, MSB 43.20.120 Legal Access, and43.20.140 Physical Access.

5. Alaska Railroad Corporation (ARRC) requested a plat note indicating S. Valley Way is anallowed right-of-way within the ARRC right-of-way via a permit with the City of Palmer.

6. There is a 25' encroachment, access and use easement on proposed Lot 1.

7. City of Palmer code 17.32.064 states there are no building setbacks for this property andthe Community Development Department stated the proposed lots are located within theAirport Influence Area.

RECOMMENDATIONS for CONDITIONS OF APPROVAL:

Staff recommends approval of the preliminary plat of Valley Way, contingent upon:

1. Pay mailing and advertising fee.

2020-130 9/20/2020 Page 2 of 2

Page 23: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

2. Place a plat note that Valley Way is allowed to run within the Alaska Railroad Corporation(ARRC) right-of-way via the terms of ARRC Blanket Permit #8283 which ARRC hasissued to the City of Palmer.

3. Provide updated Certificate to Plat executed within 7 days of plat recordation per MSB43.15.053(E) and submit Beneficiary Acknowledgement, if applicable.

4. Taxes and special assessments must be paid in full through the year of recording, per MSB43.15.053(F) and AS 40.15.020. Pay taxes and special assessments (LIDs) by certifiedfunds or cash.

5. Submit recording fees; payable to DNR.

6. Submit final plat in full compliance with Title 43.

2020-130 9/30/2020 Page 3 of 3

Page 24: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

W CARIBOU AVE

32A-

15IffiAA

31(lU)l5301914

2920ACO

134

28>-

12 ■(tT38f

1Tlk<6

1 26237

J 252498

17

16

TRACT A

(4979)

W BEAVER AVE

212

203

194

18cf 17•5

167

158

149

1310

1211

AVE

7A

8KLINE

TR A

(5010)

11 109>:^f)3 26 5 4 3 2 1

121314^5,6I718192C2122 7 8 9101112 9101112^

12

13

14

15

5 4 3 2

(PA21

B34

B35

■H3n"^B45~

^B28327

W AUKLET AVE

FISHERSCORNER

TR A(7734)

5-1I

A-T

E AUKLET AVE" CO 2 1

1012

6 5 4 3

2

SMM

§131

'^^2 f-i /2

§113

ZiO4

W (-zbB-1E-CO

5

6

CtSa 7O

E BEAVER AVE

:s«i8:

B22 821bT^

SMITH EXTY2K ADD

1(5053)

17

19 20

16

15'

14

—1

12

CO

E AUKLET AVE/ PALUER'HI^AY

(675

315 TR A

W ARCTIC AVEC43l^ 015

18

17

1615

13

12

10-1

014E ARCTIC AVE

W BIRCH Wt

012togiBirEsi

1•tnnfi

t

piRf

B7B6

D26SNODGR^-, ,

10

(B^-4) D24

D27

r52MYI■nn

<34)1BS-NER

" 12

° ib'^I'rf39

58

61 ° On/ r» 1

E BIRCH AVE

10

W COTTONWOOD AVE

UR

12

10

8-1

7-1'5670)

W CEDAR AVE

1(6868)fO(£

WrtlMn'.V«I»>WA*i

1-A(4439)

'022

112-2

14-1 C23-2 Z312-T1

4 V10-1 p- 5

6B. 8NBA

DGRi; S RSI88 80786', 7

i\~5^ 0 T g'j

D3

E r.nTTONWOOD AVE

(II021

DENEKE PARK

E CEDAR AVEI—rr-i

PALMER P

1

UBUC SAFETY2

(3085)

VICINITY MAPFOR PROPOSED VALLEY WAY

LnCATED WITHINSECTION 33, T18N, R2E

SEWARD MERICIAN, ALASKA

E DOGWOOD AVE

041

DAHLIAA

(1159)DENALIISQUARLOFFICE ICONDOS

(6819)

PALMER 5 MAP

EXHIBIT A-/

E DAHLIA AVE

cfJan1

i4

D25

E D

Page 25: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

V

IE ARCTIC AV^E

B I R-Cfl

im

1 r EXHIBIT

Matanuska Susitna BoroughPermit Center A

Thil ffup ii sMIy for infonnabeAal purpesat enty. Tha Bofpugh makaaacprass or imoNM warranhaa with raipact to via e^aractar, Mcoon,oapabiidaa of iha map or the eunaomry of uia map for any ptrtlcuiar pgrpcOayend IhoM oft^rtalfy inltndaO by Via Boreugn For tn^rmaMn ragarOtfig (

Page 26: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

ROLAND

SHOD GRASS

SUBDIVISION

(6-215)

SU- $! Xt

LEGEND

HJO

fIDE

-»u.rf

®

SET PIASTIC CAP

ON H'*30* RE

BAR

N74'58'll'w 255.65' UEASUREI) DATA

61. OCX

HMOH

UNO scu/nore

309 E. rmoMC

hun. lUSM 99M9

(»n)4«-77»

nR£ HYDRANT

• ANCHOR GUY

•iy

UlltJTY PW.E

UTILITY POLE WITH LUMtNABfE'.

LIGHT'POLE

VALV

E, W

ATER (UNDER

GROUNOj

UANHOLE

Qss

UANH

OLE (SANITARY SE

WER)

PEDEST

AL. TE

LEPHON

E j'

;;-3

DRAI

NAGE

IN

LET (CURB)

I^ENCE

2S'

EWAOACHUEIIT,

.ACCESS. AND USE

EASEUEHT

ROLAND

SNODGRASS

SUBDIVISION

(6-215)

OVERHEAD ELECTRIC

y>y\. BU

ILDI

NG

' "^

/■■' ^/////// ''''/''/////

GR

AVEL

D

RIV

EWAY

i'^l

ASPH

ALT

ROAD

/DRI

»/EW

AYO

Jt

iOIC

St

CONC

RETE

SID

ETW

JC h

'. f

.JJ A

OK

St'

-

BL

UE

BE

RR

YS

AV

E.

.It ij

»»M

AIM

ST

ir T

USI

ICOW

S.J;

EO

-lJS

eD

ESU

HC

C

EMD

RA

IN

BY

: E

LEC

HE

CK

ED

: C

EHS

CA

IE11

.17:

1

-.2

0-

22.3

4:1*

.10'

RE

VIS

ION

D

ATE

09

-D2

-2D

SEP

- 2

2020

ReF

EA

CN

ceitu

ue

cR

i PL

AmN

f:y-2

.fS

HC

n

2 O

F 3

Page 27: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

Peggy Horton

From: Jamie TaylorSent: Tuesday, September 22, 2020 5:47 PMTo: MSB PlattingCc: Peggy HortonSubject: RE: Request for Comments for Valley Way Case #2020-130 Tech: PH

No comment.

Jamie Taylor, PE

Civil Engineer

Matanuska-Susitna Borough

Department of Public WorksOperations & Maintenance

t: 907-861-7765 c: 907-355-9810

iamie.tavlor(5)matsugov.us

http ://www. m atsu go v. us/

From: MSB Platting <Platting(5)matsugov.us>

Sent: Wednesday, September 2, 2020 9:01 AMTo: Adam J. Dubour ([email protected]) <[email protected]>; [email protected]; PamelaMelchert ([email protected]) <[email protected]>; Sarah Rennie ([email protected])<[email protected]>; Joan Patterson ([email protected]) <[email protected]>;[email protected]; Brad Hanson ([email protected]) <[email protected]>; John Aschenbrenner<[email protected]>; Jill Irsik <[email protected]>; Eric Phillips <[email protected]>; JudeBilafer<[email protected]>; Cindy Corey <[email protected]>; Debbie Bakic<[email protected]>; Terry Dolan <[email protected]>; Jim Jenson <[email protected]>;Jamie Taylor <[email protected]>; Charlyn Spannagel <[email protected]>; Planning<[email protected]>; Joseph Metzger <[email protected]>; Alex Strawn<[email protected]>; Fred Wagner <[email protected]>; Permit Center<[email protected]>; Mark Whisenhunt <[email protected]>; Theresa Taranto<[email protected]>; Andy Dean <[email protected]>; Stephen Mowers<[email protected]>; [email protected]; MTA ROW ([email protected]) <[email protected]>; Enstar ROW ([email protected]) <[email protected]>; GCI ROW ([email protected])<[email protected]>; [email protected]; [email protected]: Request for Comments for Valley Way Case #2020-130 Tech: PH

Good Morning,The link below will take you to a request for comments for a two-lot subdivision in the City ofPalmer. Lots are served by city water and sewer. No RSA. Please review and provide anycomments by September 21, 2020.https://matsuaovus-

mv.shareDoint.com/:f:/a/personal/Deaav horton matsuaov us/EpBkPa33dm5HrmOtT uGZLoBk-tHVLQr4oKfofRi0IPfaq?e=40hMah

EXHIBIT C

Page 28: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

DEPARTMENT OF COMMUNITY DEVELOPMENT

MEMORANDUM

TO: Fred Wagner, Chief of Platting

FROM: Joan E. Patterson, Administrative Assistant

DATE: September 18, 2020

SUBJECT: Valley Way

IZI Inside City Limits □ Outside City Limits

Brad HansonDirector

David MenesesBuilding Inspector

Beth SkowLibrary Director

We have distributed the abbreviated plat for the subject project and have received thefollowing comments from the following departments:

1. City Manager: No comment2. Building Inspector: No comment.3. Community Development: The proposed lots are located within the Airport Influence

Area.

4. Fire Chief: No comment.

5. Public Works: No comment.

6. Planning and Zoning Commission: No comment.

EXHIBIT D

Page 29: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

Peggy Horton

From: Douglas Stephens <[email protected]>Sent: Thursday, September 3, 2020 11:13 PMTo: MSB PlattingSubject: Re: Request for Comments for Valley Way Case #2020-130 Tech: PH

[EXTERNAL EMAIL - CAUTION: Do not open unexpected attachments or links.]Ms. Horton,

While the Alaska Railroad Corporation (ARRC) has no general objection to this subdivision there is oneclarification that we would like to see made on the plat.

Valley Way runs within the ARRC ROW but is not a platted roadway. It is allowed to run within the ARRC ROWvia the terms of ARRC Blanker Permit #8283 which ARRC has issued to the City of Palmer.

ARRC would like to see a note to that affect on the plat.

Please feel free to contact me if you have any questions or wish to discuss this further.

Regards,

Douglas A. Stephens, PLS

ARRC Land Service Manager

From: MSB Platting <[email protected]>

Sent: Wednesday, September 2, 2020 9:01:27 AMTo: Adam J. Dubour ([email protected]); [email protected]; Pamela Melchert([email protected]); Sarah Rennie ([email protected]); Joan Patterson ([email protected]);[email protected]; Brad Hanson ([email protected]); John Aschenbrenner; Jill Irsik; Eric Phillips; JudeBilafer; Cindy Corey; Debbie Bakic; Terry Dolan; Jim Jenson; Jamie Taylor; Charlyn Spannagel; Planning; Joseph Metzger;Alex Strawn; Fred Wagner; Permit Center; Mark Whisenhunt; Theresa Taranto; Andy Dean; Stephen Nowers;[email protected]; MTA ROW ([email protected]); Enstar ROW ([email protected]); GCI ROW([email protected]); Douglas Stephens; Rachel MaddySubject: Request for Comments for Valley Way Case #2020-130 Tech: PH

CAUTION: This email originated from outside your organization. Exercise caution when opening attachmentsor clicking links, especially from unknown senders.

Good Morning,The link below will take you to a request for connnnents for a two-lot subdivision in the City ofPalmer. Lots are served by city water and sewer. No RSA. Please review and provide anycomments by September 21, 2020.

EXHIBIT E

Page 30: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

ENSmR

Natural Gas Company

ENSTAR Natural Gas CompanyA DIVISION OF SEMCO ENERGY

Engineering Department, Right of Way Section401 E. International Airport Road

P. 0. Box 190288

Anchorage, Alaska 99519-0288(907) 277-5551

FAX (907) 334-7798

September 21, 2020

Matanuska-Susitna Borough, Platting Division350 East Dahlia Avenue

Palmer, AK 99645-6488

To whom it may concern:

ENSTAR Natural gas company has reviewed the following Preliminary plat and has nocomments or recommendations.

• Valley Way(MSB Case #2020-130)

if you have any questions, please feel free to contact Skylar Shaw at 334-7911 or by email atskylar.shaw(@enstarnaturalgas.com.

Sincerely,

Andrew Fraiser

Supervisor of ROW and PermittingENSTAR Natural Gas Company

EXHIBIT F

Page 31: STAFF REVIEW AND RECOMMENDATIONS · 9/30/2020  · to appreciably affect water infiltration. Groundwater was encountered at varying depths in all three testholes. Testhole logs and

Peggjr Horton

From: Holly Sparrow <[email protected]>Sent: Wednesday, September 23, 2020 9:53 AMTo: MSB PlattingSubject: RE: Request for Comments for Valley Way Case #2020-130 Tech: PH

[EXTERNAL EMAIL - CAUTION: Do not open unexpected attachments or links.]Hello,

MIA has reviewed the plat for Valley Way. MIA has no comments.

Thank you for the opportunity to comment. Sorry for the deiay.

Holly Sparrow, Right of Way AgentMTA I 1740 S. Chugach Street | Palmer, Alaska 99645office: 907-761-2599 | www.mtasoiutions.com

Life. Technology, Together

From: MSB Piatting <[email protected]>

Sent: Wednesday, September 2, 2020 9:01 AMTo: Adam J. Dubour {[email protected]) <[email protected]>; [email protected]; PamelaMelchert ([email protected]) <[email protected]>; Sarah Rennie ([email protected])<[email protected]>; Joan Patterson ([email protected]) <[email protected]>;[email protected]; Brad Hanson ([email protected]) <[email protected]>; John Aschenbrenner<[email protected]>; Jill Irsik <[email protected]>; Eric Phillips <[email protected]>; JudeBilafer<[email protected]>; Cindy Corey <[email protected]>; Debbie Bakic<[email protected]>; Terry Doian <[email protected]>; Jim Jenson <[email protected]>;Jamie Taylor <[email protected]>; Charlyn Spannagel <[email protected]>; Planning<[email protected]>; Joseph Metzger <[email protected]>; Alex Strawn<[email protected]>; Fred Wagner <[email protected]>; Permit Center<[email protected]>; Mark Whisenhunt <[email protected]>; Theresa Taranto<[email protected]>; Andy Dean <[email protected]>; Stephen Nowers<[email protected]>; [email protected]; Right of Way Dept. <[email protected]>;Enstar ROW ([email protected]) <[email protected]>; GCI ROW ([email protected])<[email protected]>; [email protected]; [email protected]: Request for Comments for Valley Way Case #2020-130 Tech: PH

exhibit g