Road Construction

Stabilisasi Tanah untuk Perkerasaan Jalan

PT. CIS

• ROAD DEVELOPMENT

PT. CPP

• PLANTATION

PT. SIL

• OFF SHORE

PT. CAHAYA INTI SOLUSINDO

Trading

(PT. AAD)

Road Construction

(PT. CIS)

Replanting /

Estate By Design

(PT. CPP & PT CBR)

Heavy Equipment

Dept

ROTEC Aplications

ROTEC Soil Stabilizer can be applied to various road construction needs :

ROTEC Made in Indonesia

Residential PedestrianJogging TracksGolf cart Path

Air StripService RoadParking AreaInspection Road

MiningPlantation Factory Accessand many More

AirStrip

Residential Factory Access Pipeline Inspection Road

Mining Jogging Track

Plantation

Parking AreaGolf Carth path

Dusty Road Poor Road Condition

Common Pavement Problems

Crack Pumping Road

Soil Cement Pavement

Additives to stabilize and solidifies soil (stabilization & solidification) by means of Physics-Chemistry.

Form : Powder composed of inorganic minerals.

ROTEC is developed and tested for tropical climates.

Water coated soil particles -Soil can not bond with Cement

Normal Soil Condition

ROTEC fill the cavities of soil particles, Soil blends to cement perfectly.

Role of ROTEC

ROTECdecomposes water in the soil

Soil blends perfectly with cement

Soil particles are coated with ROTEC

soil

soil

Soil

Soil particlescoated with water

Soil particles

soil

Pavement Layer (Rigid & Flexible Pavement)

Hotmix 5cm

Base 20cm

SubBase30cm

• LPB CBR 20%, LPA CBR 50%• Longer time to construct• High cost

ROTEC proven superior in terms of quality, cost and time.

* Optional

Hotmix 3cm

ROTEC 20cm

• Faster to Construct• Cost-efficient• CBR up to 100% (Strong)• Water Resistant

Road Construction Comparison

Conventional Road Construction ROTEC Construction

PAVEMENT COMPARISSON

Load Distribution on Pavement

Analisa perhitungan Stabilisasi dengan metode Plaxis

PAVEMENT SURFACE OPTION

ROTEC CONCRETE ASPALT PAVING BLOCK

ROTEC PAVEMENT LAYERS

Soil Cement Water

COMPOSITION

ROTEC

Comparisson Sand-Gravel & ROTECSand – gravel Bond ROTEC

Sand – Gravel Bond

ROTEC ApplicationWater Resistant After Flood

Implementation Method

Initial Striping

Cut and Fill

Form & Improve

Mixing Cement & Soil

Rotec Sprinkling & Compacting

Finished Road

Finished Road

PROJECTS REFERENCE

PT GSM - Riau

Cut & Field + Forming

Compacting

Rotec Aplication process

Finished Road

Transportation

PT GPTR

CBR Testing

PKS PAJ - Jambi

Main entrance

PT PAJ

Work Progress

After Rotec application

Engine Room Access

Pilot Project at Papah, Sabah - Malaysia

Papah, sabah – Malaysia (3bln)

Recent Project

PT MJA Lokasi : Desa Random dan Senipah Kabupaten Passer.

Kalimantan Timur

Year of Construction 2011

PT MNS – 15 September 2016

Construction year 2011

Construction year 2011

PT MNS – 15 September 2016

Construction year 2011

PT MNS –– 15 September 2016

Construction year 2011

PT MNS – 15 September 2016

Construction year 2011

PT MNS – 15 September 2016

Construction year 2011

PT MNS – 15 September 2016

Pavement Surface (15 September 2016)

Construction year 2011

PT. Cahaya Inti Solusindo

Komp. Sentra Niaga Terpadu E2/18Pantai Indah Kapuk.

Jakarta 14470. INDONESIA

Tel : +62 21 56982874Fax: + 62 21 56982875