Page 1: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

1

Draft St. Mary WS PPLan – October 12 2011

St. Mary

Page 2: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

2

Draft St. Mary WS PPLan – October 12 2011

1 Introduction

Saint Mary is a parish located in the northeast section of Jamaica. With a population of

121,353, it is one of Jamaica's smallest parishes, located in the county of Middlesex. Its

chief town and capital is Port Maria, located on the coast.

St. Mary is located at latitude 18°09'N, longitude 77°03'W. It is bordered by Portland in the east, St. Ann in the west, and parts of St. Catherine and St. Andrew in the south.

The parish covers an area of 610 km², making it Jamaica's fifth smallest parish. The terrain is mountainous, rising up to almost 4000 feet at the highest point, but there are no distinctive mountain ranges. The climate is varied, like most parishes on the island. The eastern section of the parish has shale rock and an intricate surface draining pattern, while the western section is limestone with predominantly underground rivers.

There are three main rivers in Saint Mary, the Rio Nuevo, Wag Water River and White River.

National Water Commission (NWC) produces some 180 million gallons (0.82 million cubic

metres (MCM)) of water per month in St. Mary (included is the import from St Ann Bogue

of 41 million gallons (0.19 M C M)) from eighteen (18) surface sources. The average billed

consumption by volume is approximately 55 million gallons per month which translates to

an average non-revenue water (NRW) of 125 million gallons per month i.e. 65% of

production. This unacceptable high level of NRW has had a negative impact on the level of

service provided to our valued customers of the parish and on its financial performance of

NWC.

NWC now provides water to some 81.6% of the population in St. Mary, which is an

improvement over that in 2001 when the level of coverage was 60%. The reliability of

service to those who are served by NWC is estimated to average 18.4 hours per day.

A Water Supply Parish Plan (WSPP) has been prepared for the parish and is presented in

this document. The WSPP for the parish will involve an expenditure of $10,119.07 Bn over

the next twenty years in carrying out a number of water supply rehabilitation and upgrading

works. A substantial portion of the proposed works is aimed at addressing the unacceptable

high level of NRW through mains replacement in our distribution systems of aged,

encrusted and undersized water supply infrastructure and improvement in water supply

pressure & flow management. The plan is to increase water supply coverage for the parish to

86% of the parish population by end 2030 and service reliability to 22.5 hours per day

during the corresponding period.

Page 3: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

3

Draft St. Mary WS PPLan – October 12 2011

2 Existing Water Supply System

2.1 Water Resource

Surface Water

100% of the water abstracted in the parish is obtained from surface sources. The following

are the main surface sources in the parish:

Iterboreale Spring

Pottinger Spring

Sand Hill Spring

White River

2.2 Water Supply Systems

The combined reliable yield from these surface sources are 6 mgd. The output from these

sources range from 5 mgd during the dry period and increases to 6.5 mgd during the wet

period.

The water supply network throughout the parish dates back to the 1950’s. These aged

infrastructure are now undersized due to the expansions of developments within the parish,

these challenges have contributed to unacceptable level of service there. Information on the

water supply network is summarized in table 2.1 below.

Figure 2.1 – St. Mary Water Supply

Page 4: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

4

Draft St. Mary WS PPLan – October 12 2011

Table 2.1 – Summary Information on St. Mary Pipe Network (information obtained from

GIS unit)

Pipe

Diameter

(inches)

Approximate

Length/m

Portion of

the

Network

Average

Age

Comments

< 2 77,330 12.24 >35 Encrusted 1.5 in pipes

2 193,581 30.65 >35 Corroded and encrusted

4 223,886 35.46 >50 Corroded, AC pipes

6 56,516 8.95 >50 Corroded, AC pipes

8 13,227 2.10 >45 Corroded, CI pipes

10 4,832 0.77 >35 Steel pipes corroded

12 44,229 7.00 >35 AC pipes & Some CI pipes

>12 17,820 2.82 15 16-inch in good condition

Page 5: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

5

Draft St. Mary WS PPLan – October 12 2011

3 NON-REVENUE WATER LEVELS

Set out in figure 3.1 is the annual water balance for St. Mary. This was derived from the

water balance which was prepared for each of the water supply systems in the parish. The

water balances are based on flow measurements that were conducted at sections of the water

supply network and examinations of customer and records.

NWC water production facilities provide approximately 10.15 M cubic meters of water per

year to the water supply network in St. Mary i.e. 2,232 M gallons per year. Physical losses

amount to 6.4 M cubic meters (1,407 M gallons) per year. This represents 63.05% of the

amount produced.

Revenue water in the parish is only 3.43 M cubic meters which is only 33.8% of the water

produced.

It would be noted that 8,760 M cubic meters of water is attributed to unauthorized

consumption (i.e. 0.000863% of production). This is largely due to illegal connections to

some of the cross country transmission pipelines to obtain water for informal settlements (eg

Annotto Bay).

Figure 3.1 – Water Balance for St. Mary

Page 6: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

6

Draft St. Mary WS PPLan – October 12 2011

4 Water Requirement

4.1 Parish Population

General

In 2001 the population in St. Mary was 120,389, which was a 0.05% increase over the 119,790 in

1991. Based on an annual population growth rate of 0.025%, it is estimated that the population

in the parish in 2010 is 121,353 persons.

There were 24077 households in 2001 of which 14,446 had piped water (61%). There are now

19,800 customer accounts of which some 17622 are domestic accounts. Based on this

information, it is estimated there was a 20% increase in the number of dwellings with piped

since 2001, an average annual increase of 2%. It is estimated that 81.6% of the population of the

parish now has piped water population data for systems.

Demand Centres

The enumeration districts (EDs) that were used in the 2001 population census was used to

establish priority areas that will be targeted to be provided with water supply. EDs with

Page 7: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

7

Draft St. Mary WS PPLan – October 12 2011

population densities in excess of 150 persons per square kilometres were grouped to form these

demand centres.

Figure 4.1 – Demand Centres

EnumerationDistrict (ED)- Population Data

Pipeline

Pump Station

Subdivision

WATER DEMAND CENTRESLight Blue Shaded EDs-Pop > 150p/sq Km-Priority given to fully supply

TYPES OF DATA

As far as possible, each demand centre (DC) is linked to a water supply system. It is related to a

water distribution system that now serves it or has the potential to serve by it.

Set out in table 4.1 is information showing the population in each DC, indicating estimates for

2010, 2015, 2030.

Page 8: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

8

Draft St. Mary WS PPLan – October 12 2011

Page 9: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

9

Draft St. Mary WS PPLan – October 12 2011

The current water supply situation in St .Mary is that, overall, there is deficit of water in the

parish to meet the water requirement, even with the existing technical losses (leaks, tank

overflows, etc). The average daily water production in the parish is 6.8 million gallons; the

average day water consumption (domestic, commercial, institutional, etc), which is based

on 82% supply coverage, is estimated to be 1.9 million gallons and the technical water

losses is estimated to be 1.85 million gallons per day. Based on average water

consumption, there is an estimated deficit of some 0.4 million gallons per day.

Page 10: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

10

Draft St. Mary WS PPLan – October 12 2011

Water Supply Improvement Plans

4.1 Set Up and Detailed Audit of the St. Mary Water Supply System

The level of NRW in the parish is unacceptably high. As shown in the sections above, the

overall NRW.

In order to proceed with the audit of the network and to obtain reliable and accurate

information on users and consumption, the following activities is required to be implemented

within the Parish during the Audit Phase:

Technical Area:

• Network survey to define and locate pipes (material and size) & fittings (valves, PRV, fire hydrants) to draw up the network inventory. Then all the information gathered on

Page 11: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

11

Draft St. Mary WS PPLan – October 12 2011

site will be transferred in Geographic Information System (GIS) following the NWC specifications.

• Investigation of all the NWC facilities (production facilities, reservoirs and pumping stations). All defects and anomalies detected and remedial works for repairs and/or upgrading have must be clearly stated for every facility.

• Flow & pressure measurements as well as level measurement of reservoirs at production facilities, on the trunk mains and various off-takes.

• Leak detection campaign on the entire network and mapping of leaks detected to further decide for pipe section replacement.

• Establishment and set-up of network models complying with the network operation and measurements carried out.

• Network partition into District Metering Area (DMA) to monitor flows and NRW control with definition of equipment (valves and bulk meters) to be installed.

• Setting-up of pressure management program including evaluation of existing pressure zones and Pressure Reducing Valves (PRV) and definition new pressure areas with location for new equipment.

Commercial Area:

• “Door to Door” Consumer survey audits to ascertain specific elements of the water supply among the residential & commercial users: to locate the NWC users (mapping under GIS), to check the status and condition of water meters installed on site, to gather other relevant information regarding the supply and to find out illegal connections.

• CS analysis to check the reliability and accuracy of the NWC database, to analyze trends of consumption and users and to establish the initial billable consumption.

• Consumption profiles measuring campaign to analyze the apparent losses engendered by the customer metering policies and thereof to optimize the invoicing /revenues of NWC by defining new metering policies for domestic and commercial users.

• Specific investigation on site to check the discrepancies between the CS database and the field, mainly for the temporary and permanent disconnected accounts as well as for the accounts with zero/low consumption.

4.2 Cost of Audit

The total cost to undertake the proposed set up and audit of the St. Elizabeth water supply

system is $92M. A breakdown is provided in the table below.

Page 12: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

12

Draft St. Mary WS PPLan – October 12 2011

Activity Estimated

Cost ($M)

1 Network Survey (including leak

detection/Pressure Survey and

Management

20

2 Establishment of DMA 50

3 Customer Mapping and audits 10

Sub-Total 80

4 Administrative and Other Cost 12

TOTAL 92

4.3 Expected Benefits

The detailed audit of the St. Mary Water Supply system will provide information that will

be used to help in defining detailed NRW reduction intervention activities. The results of

the audit will be used to target the most critical sections of the parish water supply system

that require attention and assist in scheduling of the required works.

The information will be used to populate the asset database for the parish which will form

a critical part of the asset management system (AMS) that will be established for St.

Elizabeth. A fully functional AMS will be a valuable operational tool that can be used to

sustain the benefits that will be derived from the various projects and activities that are set

out in this document.

5.0 Water Supply Improvement Plans

Introduction

It is planned to undertake a number of water supply improvement works in St. Mary to address

supply deficiencies and to improve overall operational efficiencies. The planned works will

focus on reducing the high level of technical losses (estimated to be in excess of 65% of

production), largely due to the aged water supply infrastructure; strengthening the transfer

capacities of critical water transmission mains, to enable transfer of water within and between

water supply systems and facilitating supply flexibility between water supply systems; and

water supply extensions to areas that are not now been served.

A comprehensive audit of the water supply systems in parish will be undertaken early stages

in order to identify optimal steps that should be taken to deliver early gains in the reduction of

Page 13: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

13

Draft St. Mary WS PPLan – October 12 2011

NRW. This will include establishing district metered areas (DMAs) and setting up monitoring

systems.

Proposed Projects and Cost

Page 14: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

14

Draft St. Mary WS PPLan – October 12 2011

6. Addressing the Supply Deficiencies

Set Up and Detailed Audit of the St. Mary Water Supply System

6.0 Implementation and Phasing of Improvement Works

The planned development and improvement works for the Parish will be phased and

implemented as follows:

Implementation of the planned works is estimated to cost some $ 10.12Bn and will include 3

components:

� Component A

» West St. Mary -

� Component B

Eastern St. Mary

� Component C » White River

Component A

West St. Mary

Scope of Works: (Boscobel, Epping, Hamilton Mt, Mango Valley, Mason Hall, Pottinger

Spring, Reef Point, Trinity, NE Project, Source Meters, Sand Hill)

� Upgrading & Construction of New Treatment Plants � Redesign and rehabilitation of Intake Works � Construction of storage tank � Additional stand-by Generating capacity � New High – lift motors � Replacement of pipelines and all appurtenances (Control Valves PRV, meters etc)

Component B

Eastern St. Mary

Scope of Works: (Annotto Bay, Castleton, Iterboreale, Nutsfield, Palmetto Grove,

Platsfield, Highgate, Martha Hall, Sue River, Rock Spring)

� Upgrading & Construction of New Treatment Plants � Redesign and rehabilitation of Intake Works � Construction of storage tank � Additional stand-by Generating capacity � New High – lift motors

Page 15: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

15

Draft St. Mary WS PPLan – October 12 2011

� Replacement of pipelines and all appurtenances (Control Valves PRV, meters etc)

Component C

White River

Scope of Works: (Derry Hazzard, Gayle Spring, Guys Hill, Lucky Hill, White

River)

� Upgrading & Construction of New Treatment Plants � Redesign and rehabilitation of Intake Works � Construction of storage tank � Additional stand-by Generating capacity � New High – lift motors � Replacement of pipelines and all appurtenances (Control Valves PRV, meters etc)

4.3.1 Cost for Improvements - Summary

Item

No.

Proposed Projects Budget Cost

in $JM 1.0 Network Improvement and Upgrade:

Transmission 146.4 Km and distribution 106 km Pipeline Replacement, Pressure Management – Gate Values, PRVS, PSVs etc.

5,831.56

2.0 Reduction of Commercial Losses : Customer Survey: Reconciliation/Auditing, Billing & Collection, Customer Meter Installation. Etc.

21

3.0 Improvement & Upgrade to Water Production Sources : New/Upgrade to new surface and or ground water Sources, inclusive Booster/Pumping Stations etc.

2,274

4.0

Construction of Booster/Pumping Station Booster/Pumping Stations etc.

43

5.0 Storage Facilities : Water Storage Tanks & Accessories Overflow Values, Level Sensors etc.

248

6.0 Automation & Operation Efficiency Improvements : Supply & Installation of Systems Control, Telemetry, SCADA System etc.

15

Page 16: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

16

Draft St. Mary WS PPLan – October 12 2011

Sub-Total - Works

8,432.56

7.0 Consultancy Engineering Designs: Consultancy Engineering Designs and Construction Supervision Services ~ 20%

1,686.51

Budget : Grand Total

$10,119.07

5 Water Supply Improvement Plans

Page 17: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

17

Draft St. Mary WS PPLan – October 12 2011

Component A-West St. Mary

(Boscobel, Hamilton Mt, Mango Valley, Mason Hall, Pottinger Spring, Reef point, Trinity,

NE projects, Source metering and Sand Hill)

Component A includes the construction, rehabilitation of relift stations and Treatment plants, the laying of new pipeline & the upgrading of the existing distribution lines, the installation of new storage tanks, the rehabilitation of existing storage tanks and Non-revenue water reduction. These projects are expected to improve supply to the western region of the parish and eliminate the deficit of 0.6 MGD. The details are as follows: The Bogue - St Ann water supply will be diverted to meet the needs of Ocho Rios, a new 6mgd water treatment plant (NE project) will be constructed at the Rio Nuveo River to serve Port Maria and environs. As a result of the additional water, supply coverage will be increased for the Hamilton Mt, Mason Hall, Mango Valley, Sand Hill and Trinity systems. The Projects for Epping and Reef Point were conceived to resolve reliability issues with the existing pipeline due to landslides.

Boscobel

System Description

The Boscobel Water Supply System is supplied by water from the Bogue Water Supply. The

Bogue system is the major source which supplies the North Coast.

Service Area

Some of the communities supplied by this system include Boscobel Housing Scheme

Water Requirement

The current combined population in the housing scheme that is served by the Boscobel system

is estimated to be 3,000 persons and this is expected to increase to 3,240 persons by 2030. There

is a current supply surplus of 0.2 mgd and this is expected to increase to 0.25 mgd in the

maximum day if the level of technical losses remains at current levels.

Page 18: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

18

Draft St. Mary WS PPLan – October 12 2011

Addressing the Supply Deficiencies

Efforts will be made to reduce the level of technical losses (overflowing tank) on this Water

Supply system and to rehabilitate the existing storage tank and associated flow control devices.

The 100,000 gallon water storage tank at Boscobel is in a very bad condition and leaks.

• Construction of a new 100,000 gals storage tank

• Installation of two 4-inch float valves (to reduce incidents of overflow)

• Installation of a stand by pumping unit (to improve system reliability)

• Installation of pressure switch (improvement in the operational efficiency)

Cost for Improvements

The estimated total cost for the improvement works is $ 14.4 M as shown below

Activity Qnty Cost

Rehabilitation of the existing 100,000 gals tank 1 7,500,000.00

Installation of two 4-inch float valves 2 1,000,000.00

Installation of a stand by pumping unit 1 3,000,000.00

Installation of pressure switch 1 500,000.00

Sub Total 12,000,000.00

Engineering and other cost@20% 2,400,000.00

Grand Total 14,400,000.00

Pottinger Spring & Epping

System Description

The Pottinger Spring Water Supply System is supplied by water from Pottinger Spring.

Page 19: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

19

Draft St. Mary WS PPLan – October 12 2011

Service Area

Some of the communities supplied by this system include Stewart Mountain, Richards Pen, Retreat, Content, Planter Hall, Lanquedoc.

Water Requirement

The current combined population in the distribution system that is served by the Pottinger

Spring system is estimated to be 7,362 persons and this is expected to increase to 7,462 persons

by 2030. There is a current supply surplus of 0.3 mgd.

Addressing the Supply Deficiencies

Efforts will be made to reduce the level of technical losses on this Water Supply system, replace

a section of the 12-inch pipeline and rehabilitation of the four filters to:

• Relocation of 400 ft of 12-inch pipeline (reliability of the pipeline)

• Rehabilitation of walls of four filters and replace sand medium (filter size 4 ft x 10 ft) (filters have lost their efficiency )

Cost for Improvements

The estimated total cost for the improvement works is $ 102.96 m M as shown below

Activity Qnty Cost

Rehabilitation of the four filters 4 80,000,000.00

To lay 400 ft of 12-inch DI pipeline 1 5,800,000.00

Sub Total 85,800,000.00

Engineering and other cost@20% 17,160,000.00

Grand Total 102,960,000.00

Page 20: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

20

Draft St. Mary WS PPLan – October 12 2011

Hamilton Mt

System Description

The Hamilton Mt Water Supply System is supplied by water from the Bogue Water Supply. The

Bogue system is the major source which supplies the North Coast. The Bogue system will be

replaced by the North Eastern Watre Supply project at Rio Nuevo.

Service Area

Some of the communities supplied by this system include Hamilton Mountain, Geddes

Mountain, Pond Side and Africa

Water Requirement

The current combined population in the housing scheme that is served by the Hamilton Mt

system is estimated to be 2500 persons and this is expected to increase to 2,624 persons by 2030.

There are deficiencies with the system as the NWC’s customers receive water on a regulated

basis. These communities requirement 0.12 mgd to be supplied adequately.

Addressing the Supply Deficiencies

Efforts will be made to reduce the level of technical losses on this Water Supply system and to rehabilitate the existing storage tank and associated flow control devices:

• Construction of 1.2 km of 6-inch DI pipeline from Ocrabessa to Hamilton Mountain Station,

• rehabilitation of the storage tank,

• upgrading of the pumping unit.( Eden Park – independent pumping main 0.5 km of 4-inch pipeline and installation of 10 hp pumping unit -$13 m (60 gpm @ 260 ft)

Cost for Improvements

The estimated total cost for the improvement works is $ 40.87 M as shown below

Activity Qnty Cost

Construction of 1.2 km of 6-inch DI pipeline from

Ocrabessa to Hamilton Mountain Station @17,700 per m

1.2 21,100,000.00

Page 21: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

21

Draft St. Mary WS PPLan – October 12 2011

Rehabilitation of the storage tank 1 1,000,000.00

upgrading of the pumping unit.( Eden Park – independent pumping main 0.5 km of 4-inch pipeline and installation of 10 hp pumping unit -$12 m (60 gpm @ 260 ft)

1 12,000,000.00

Sub Total 34,060,000.00

Engineering and other cost@20% 6,812,000.00

Grand Total 40,872,000.00

Mango Valley

System Description

The Mango Valley Water Supply System is supplied by water from the Bogue Water Supply.

The Bogue system is the major source which supplies the North Coast. This system will be

replaced by the North Eastern Water Supply.

Service Area

Some of the communities supplied by this system include Mango Valley, Fellowship Hall and Pondside

Water Requirement

The current combined population in the communities that are served by the Mango Valley

Phase 2 system is estimated to be 3,000 persons and this is expected to increase to 3,240 persons

by 2030. These communities are presently without water and the required water demand is

0.14 mgd.

Addressing the Supply Deficiencies

With the extension of the Mango Valley system and the new North Eastern water treatment

plant; this area will be served with the expected increased water supply:

Installation of a pumping unit and 50,000 galls sump at Pondside,3Km of 8 inch DI transmission main, delivering to a 250,000 gall tank sited at Fellowship Hall and Gravity feeding to Fellowship Hall, Pondside and Upper Mango Valley through 4Km of 4 inch distribution main.

Page 22: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

22

Draft St. Mary WS PPLan – October 12 2011

Cost for Improvements

The estimated total cost for the improvement works is $204.67 M as shown below

Activity Qnty Cost

50,000 & 250,000 gals tank 1 42,000,000.00

3Km of 8 inch DI transmission main 3 51,000,000.00

Installation of a pumping unit 1 5,000,000.00

4Km of 4 inch distribution main 4 68,000,000.00

Civil Works etc 4,560,000.00

Sub Total 170,560,000.00

Engineering and other cost@20% 34,112,000.00

Grand Total 204,672,000.00

Mason Hall

System Description

The Mason Hall Water Supply System is supplied by water from the Bogue Water Supply. The

Bogue system is the major source which supplies the North Coast. This system will be replaced

by the North Eastern Water Supply.

Service Area

Some of the communities supplied by this system include: Days Mountain, Airy Hill, Bariffe Hall, Salmon Hill, Kid Land, Marson Town, Coloraine Street, Bandro Hill, Mason Hall, Fire Fly, Villa Road, and Wentworth.

Water Requirement

The current combined population in the communities that are served by the Mango Valley

Phase 2 system is estimated to be 5,780 persons and this is expected to increase to 5,880 persons

Page 23: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

23

Draft St. Mary WS PPLan – October 12 2011

by 2030. These communities are presently without water and the required water demand is 0.4

mgd.

Addressing the Supply Deficiencies

With the extension of the Mason Hall system and the new North Eastern water treatment plant;

this area will be served with the expected increased water supply:

To install a 0.4MGD relift station at the Canoe Pond tank and lay 10900 ft of 8” DI pumping

main to a 1M storage tank at Salmon Hill and 2700 ft of 8”DI, 8600 ft of 6” DI, 15200 ft of 4”

DI, 9300 ft of 2 “PVC and 45000 ft of ½” PE distribution pipes.

Cost for Improvements

The estimated total cost for the improvement works is $ 516 M as shown below

Activity Qnty Cost

1,000,000 gals tank 1 120,000,000.00

To lay 13600 ft/4.1 km of 8” DI pumping main 4.1 91,037,000.00

To lay 8600 ft/2.6 km of 6” DI 2.6 45,760,000.00

To lay 2.8Km of 4 inch distribution main 4.6 78,200,000.00

To 2.8 km of 2-inch distribution main 2.8 33,600,000.00

Civil Works etc 61,403,000.00

Sub Total 430,000,000.00

Engineering and other cost@20% 86,000,000.00

Grand Total 516,000,000.00

Reef Point

System Description

The Reef Point Water Supply System is supplied by water from the Bogue Water Supply. The

Bogue system is the major source which supplies the North Coast. This system will be replaced

by the North Eastern Water Supply.

Page 24: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

24

Draft St. Mary WS PPLan – October 12 2011

Service Area

Some of the communities supplied by this system include: Port Maria, Frontier, Albion Mountain, Cambridge and Sandside.

Water Requirement

The current combined population in the communities that are served by the Mango Valley

Phase 2 system is estimated to be 8,765 persons and this is expected to increase to 9606 persons

by 2030. These communities are presently adequately served even though the water balance

shows a deficit of 0.7 mgd

Addressing the Supply Deficiencies

The relocation of this pipeline is to ensure that the system is more reliable and the new North

Eastern water system will ensure that the future demand will be met.

• Relocate 1800 ft of 12” Steel and DI pipeline from Reef Point to Casa Maria.

Cost for Improvements

The estimated total cost for the improvement works is $58.5 M as shown below

Activity Qnty Cost

To lay 1800 ft/ 0.6 km of 12” DI transmission main 0.6 48,750,000.00

Sub Total 48,750,000.00

Engineering and other cost@20% 9,750,000.00

Grand Total 58,500,000.00

Page 25: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

25

Draft St. Mary WS PPLan – October 12 2011

Sand Hill (Trinity System)

System Description

The Trinity Water Supply System is supplied by water from the Bogue Water Supply and Sand

Hill Water Supply. The Bogue system is the major source which supplies the North Coast. This

system will be replaced by the North Eastern Water Supply.

Service Area

Some of the communities supplied by this system include: Trinity, Albion Mountain, Cambridge, Sandside and Sandside Heights

Water Requirement

The current combined population in the communities that are served by the Mango Valley

Phase 2 system is estimated to be 2,000 persons and this is expected to increase to 2,192 persons

by 2030. These communities are presently served on a regulated basis and the required water

demand is 0.09 mgd.

Addressing the Supply Deficiencies

With the upgrading of the Trinity system and the new North Eastern water treatment plant; this

area will be served with the expected increased water supply: The high pressure pump will be

used to supply water on the high elevation side to a new 30,000 galls tank at Albion Mountain

and to the rehabilitated 50, 000 galls tank at Wentworth. A new low pressure pump is to be

installed at Trinity to supply the low elevation side to new 15,000 galls tanks at Cambridge and

Sandside. All tanks will be fitted with level controls and pressure switches. 5 km of 6-inch DI

pipes.

Cost for Improvements

The estimated total cost for the improvement works is $ 134.1 M as shown below

Activity Qnty Cost

Construct two 15,000 gals, 30,000 gals tanks and

rehabilitation of the 50,000 gals tank at Wentworth

1 11,200,000.00

New pumping unit for Sandside 4.1 5,000,000.00

Page 26: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

26

Draft St. Mary WS PPLan – October 12 2011

5 km of 6-inch DI pipes 5 88,000,000.00

Civil Works etc 7,550,000.00

Sub Total 111,750,000.00

Engineering and other cost@20% 22,350,000.00

Grand Total 134,100,000.00

North Eastern Water Supply(NE Water Supply)

System Description

The Bogue system will be replaced by the North Eastern Water Supply.

Service Area

Some of the communities supplied by this system include: Tower Isles, Caribbean Park,

White River, Jamaica Beach, Lower Balmoral (Mix with the Pottinger Spring & Whiter

River System) parts of Spring Valley, Rio Nuveo, Pampano Bay, Stewart Town, Boscobel,

Gulley Road, Spring Head, Jacks River, Ocrabessa, Galina, Cocks Street, Fernandez

Gardens, Port Maria, Went Worth, Serves the following stations: Trinity Relift, Boscobel

Relift, Gibraltar Relift, Canoe Pond Relift, Hamilton Relift, Frontier Relift, Farmer's height

Relift.

Water Requirement

The current combined population in the communities that will be served by the NE Water

Supply System is estimated to be 46,000 persons and this is expected to increase to 50,600

persons by 2030.

Addressing the Supply Deficiencies

To address the short fall on the Port Maria system, a new treatment plant will be constructed at the Rio

Nuevo River. The project entails the installation of 25 km of 400 mm, 25 km of 150 mm DI pipes from

Rio Nuevo to Port Maria, Installation of 8km of 600 mm & 8 km of 150 mm Di pipes from Ocho Rios to

Rio Nuevo. Construction of 3mgd/6 mgd water treatment plant at Retreat in St. Mary. Rehabilitation of

500,000 gals storage tank at Port Maria. There is a current supply deficit of 1.00 mgd and this is will

reduce to 0.7 mgd by just replacing the pipeline. The new 6 mgd plant that will be constructed

at Rio Nuevo is expected to realize a surplus of 1 mgd by 2030.

Page 27: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

27

Draft St. Mary WS PPLan – October 12 2011

Cost for Improvements

The estimated total cost for the improvement works is $ 516 M as shown below

Activity Qnty Cost

Rehabilitation of the 500,000 gals tank at Port Maria 1 1,000,000.00

Installation of 25 km of 400 mm DI 25 813,325,000.00

Installation of 25 km of 150 mm DI 25 437,500,000.00

Installation of 8 km of 600 mm DI 8 492,800,000.00

Installation of 8 km of 150 mm DI 8 140,800,000.00

Construction of the 6 mgd plant 6 1,305,000,000.00

Sub Total 3,190,000,000.00

Engineering and other cost@20% 638,000,000.00

Grand Total 3,828,000,000.00

Source Metering

System Description

The monthly production for the listed below systems are estimated resulting in inaccurate

information being submitted.

Service Area

Systems to be metered: Bogue-Port Maria, Bonny Gale, Castleton, Rock Spring, Pleasant Hill, Pembroke hall, Luna and Martha Hall

Page 28: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

28

Draft St. Mary WS PPLan – October 12 2011

Water Requirement

NA

Addressing the Supply Deficiencies

With the systems listed above being metered will result in the NWC accurately determine its

water deficiencies for the systems formulate a plan to correct these deficiencies.

Cost for Improvements

The estimated total cost for the improvement works is $ 516 M as shown below

Activity Qnty Cost

Metering of sources 10 4,000,000.00

Sub Total 4,000,000.00

Engineering and other cost@20% 800,000.00

Grand Total 4,800,000.00

Sand Hill

System Description

The Sand Hill Water System is supplied by water from the Sand Hill Water Supply. The Bogue

system is the major source which supplies the North Coast. This system will be replaced by the

North Eastern Water Supply.

Service Area

Some of the communities supplied by this system include: Church Street, Bailey's Vale, Free Hill, Oxford, Geddes Town, lawrence Street, Brown Street, Brimmer Hall, and Trinity Relift station

Water Requirement

The current combined population in the communities that are served by the Sand Hill system is

estimated to be 8,000 persons and this is expected to increase to 8,800 persons by 2030. These

Page 29: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

29

Draft St. Mary WS PPLan – October 12 2011

communities are presently served on a regulated basis and the required water demand is 0.36

mgd. With the Construction of the New Rio Nuevo Plant, the service coverage area for the Sand

Hill system will be reduced so as to ensure that its customers are served on a 24 hour basis.

Addressing the Supply Deficiencies

With the upgrading of the Sand Hill system and the new North Eastern water treatment plant;

this area will be served with the expected increased water supply: Flow control valves. 100% metering of source and customers, Replacement of 6 km of 6-inch GI to DI Main. Rehabilitation of the facility, Stand by pumping unit and the rehabilitation of the storage tank 30,000 gals. The service area will be reduced as a result of the NE Water Supply to only serve Geddes Town, Oxford and Free Hill.

Cost for Improvements

The estimated total cost for the improvement works is $ 137.160 M as shown below

Activity Qnty Cost

Rehabilitation of the 30,000 gals tank at Sand Hill 1 4,000,000.00

6 km of 6-inch DI pipes 6 105,000,000.00

Civil Works etc 5,300,000.00

Sub Total 114,300,000.00

Engineering and other cost@20% 22,860,000.00

Grand Total 137,160,000.00

Bonny Gate

System Description

The Bonny Gate System is supplied by water from the Bonny Gate Water Supply.

Service Area

Some of the communities supplied by this system include: Bonny Gate, Preston Hill & Preston Lands.

Page 30: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

30

Draft St. Mary WS PPLan – October 12 2011

Water Requirement

The current combined population in the communities that are served by the Bonny Gate system

is estimated to be 3,848 persons and this is expected to increase to 3,884 persons by 2030. These

communities are presently served on regulated basis. The water demand required for the

system is 0.4 mgd. The water balance shows a deficit of 0.23 mgd. This deficit will be corrected

by extracting 0.23 mgd from the Hunts Town/Wellington which has surplus supply.

Addressing the Supply Deficiencies

The deficit for this system will be addressed by the interconnection of the Bonny Gate and

Hunts Town Systems.

• 700 ft/0.3 km of 4-inch PVC pipes

• 4 km of 4-inch GI pipes

• Installation of 3 three flow control valves

Cost for Improvements

The estimated total cost for the improvement works is $90.12 M as shown below

Activity Qnty Cost

To lay 700 ft/0.3 km of 4-inch PVC pipes 0.3 5,100,000.00

To lay 4 km of 4-inch DI pipes 4 68,000,000.00

Installation of three Flow Control Valves 3 2,000,000.00

Sub Total 75,100,000.00

Engineering and other cost@20% 15,020,000.00

Grand Total 90,120,000.00

Page 31: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

31

Draft St. Mary WS PPLan – October 12 2011

Component B-Eastern St. Mary

(Annotto Bay, Castleton, Iterboreale, Luna, Nutsfiled, Palmetto Grove, Platsfield, Highgate,

Martha Hall, Sue River and Rock Spring)

Component B includes the construction, rehabilitation of relift stations and Treatment plants/well, the laying of new pipeline & the upgrading of the existing distribution lines, the installation of new storage tanks, the rehabilitation of existing storage tanks and Non-revenue water reduction. These projects are expected to improve supply to the eastern region of the parish. The water balance shows that there should be a surplus of 0.94 mgd, however the major systems such as Highgate, Iterboreale, Nutsfield and Plametto Grove are served on a regulated basis. A new well will be commissioned at Agualta Vale (well previously owned by Jamaica Producers) to boost the Highgate & Nutsfield systems and thus eliminate the extensive valve regulation for these areas. By correcting the technical losses most of these systems will result in surplus.

Annotto Bay

System Description

The Annotto Bay System is supplied by water from the Annotto Bay/Iterboreale Water Supply.

Service Area

Some of the communities supplied by this system include: Annotto Bay, Gibraltar H/S, Iterboreale H/S

Water Requirement

The current combined population in the communities that are served by the Annotto Bay

system is estimated to be 8,000 persons and this is expected to increase to 8,800 persons by 2030.

These communities are presently served on a 24 hr basis and the required water demand is 0.4

mgd, however, the elevated areas suffer from low water pressure during the day time. The

system is currently producing 0.6 mgd.

Page 32: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

32

Draft St. Mary WS PPLan – October 12 2011

Addressing the Supply Deficiencies

Efforts will be made to reduce the level of technical losses on this Water Supply system and to

rehabilitate and upgrade the water treatment capacities of the treatment plants. This system has

a surplus based on the water demand; by replacing the pipeline will reduced the NRW. The

proposed works will involve:

Replace 5 km of leaking AC pipes with 8 inch DI pipes, 9 km of 4-inch DI pipes and rehabilitate 50,000 Galls Tank (Annotto Bay).

Cost for Improvements

The estimated total cost for the improvement works is $ 330 M as shown below

Activity Qnty Cost

Rehabilitation of the 50,000 gals tank at Gibratlar 1 6,000,000.00

Replace 5 km of leaking AC pipes with 8 inch DI

pipes

5 111,020,000.00

9 km of 4-inch DI pipes 9 158,400,000.00

Civil Works etc

Sub Total 275,000,000.00

Engineering and other cost@20% 55,000,000.00

Grand Total 330,000,000.00

Castleton

System Description

The Castleton System is supplied by water from Georges Spring. This system is a gravity feed

system.

Page 33: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

33

Draft St. Mary WS PPLan – October 12 2011

Service Area

Some of the communities supplied by this system include: Castleton, Friendship Gap and Cleary Spring

Water Requirement

The current combined population in the Castleton communities that are served by the Georges

Spring 3,000 persons and this is expected to increase to 3200 persons by 2030. There is a current

supply surplus of 0.1 mgd and this is expected to reduce to a deficit 0.1 mgd.

Addressing the Supply Deficiencies

Efforts will be made to reduce the level of technical losses on this Water Supply system and to

rehabilitate and upgrade the water treatment capacities of the treatment plants. The proposed

works will involve:

• Replace 8 km of leaking 3’’ & 4’’ GI pipes with 6 & 4- inch DI pipes, construction of a

new 10,000 gals tank at Golden Valley and upgrade pumping unit.

• The construction of a small treatment 0.3 mgd plant along the Wag River.

Cost for Improvements

The estimated total cost for the improvement works is $ 216 M as shown below

Activity Qnty Cost

Construct 10,000 gals tank 1 2,000,000.00

To lay 3 km of 6 inch DI pipes 3 52,800,000.00

To lay 5 km of 4-inch DI pipes 5 85,000,000.00

Civil Works etc proposed tp from Wag River 50,000,000.00

Sub Total 180,000,000.00

Engineering and other cost@20% 36,000,000.00

Page 34: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

34

Draft St. Mary WS PPLan – October 12 2011

Grand Total 216,000,000.00

Iterboreale & Enfield

System Description

The Iterboreale & Enfield Systems are supplied by water from the Iterboreale Spring.

Service Area

Some of the communities supplied by this system include: Highgate, Richmond, Esher,, Lewis Store, Frazerwood, Clonmell, Stockholm park H/S Graham Heights, Harmony Hall, Belfield, Orange River H/S, Lower Esher, Haywood Hall, Pinacle, Lebanon H/S, Islington, Albany, Zion Hill, White Hall, Nutsfield, Lindon H/S,, Martin, Friendship, Robins Bay.

Water Requirement

The current combined population in the communities that are served by the Iterboreale system

is 30,000 persons and this is expected to increase to 32,000 persons by 2030. There is a current

supply surplus of 1 mgd and this is expected to reduce to a 0.9 mgd. However due to the excess

technical losses most of the customers are not being fed adequately.

Addressing the Supply Deficiencies

Efforts will be made to reduce the level of technical losses on this Water Supply system and to

rehabilitate and upgrade the water treatment capacities of the treatment plants. The proposed

works will involve:

• Upgrading of the pumping unit and the construction of three new storage tanks at Enfield (20,000 gals ), Dover (20,000 gals ) & Epsom (20,000 gals ). Replacement of 6 km of 4-ich CI/GI with the replacement of 4-inch DI.

• Repair to 200 metres of leaking intake wall

• Replace leaking 12” AC/CI Transmission main with 6.25 km 20,800 ft of 300mm DI pipeline. Procurement of the JP well 1 MGD

Page 35: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

35

Draft St. Mary WS PPLan – October 12 2011

Cost for Improvements

The estimated total cost for the improvement works is $ 216 M as shown below

Activity Qnty Cost

Construct three 20,000 gals tank 3 9,000,000.00

To lay 6 km of 4 inch DI pipes 6 102,000,000.00

Underpinning of 200 m of intake wall 1 20,000,000.00

Construct new well and 1 mgd treatment plant at Wag

River

1 217,500,000.00

6.25 km 20,800 ft of 300mm DI pipeline. 6.25 205,380,000.00

Sub Total 553,880,000.00

Engineering and other cost@20% 110,776,000.00

Grand Total 664,656,000.00

Nutsfield

System Description

The Nutsfiled System is supplied by water from the Iterboreale Spring.

Service Area

Some of the communities supplied by this system include: Haywood Hall, Pinacle, Lebanon H/S, Islington, Albany, Zion Hill, White Hall, Nutsfield, Lindon H/S,, Martin, Friendship, Robins Bay.

Water Requirement

The current combined population in the communities that are served by the Iterboreale system

is 15,000 persons and this is expected to increase to 16,000 persons by 2030. There is a current

supply surplus of 0.4 mgd and this is expected to reduce to a 0.3 mgd. However due to the

excess technical losses most of the customers are not being adequately fed and they are fed on a

regulated basis.

Page 36: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

36

Draft St. Mary WS PPLan – October 12 2011

Addressing the Supply Deficiencies

Efforts will be made to reduce the level of technical losses on this Water Supply system and to

rehabilitate and upgrade the water treatment capacities of the treatment plants. The proposed

works will involve:

Lay 5 Km of 8 inch DI, 4Km of 6 inch and 14Km of 4 inch DI distribution main in Islington. Also lay 2 Km of 10 inch high pressure steel pipe transmission main from Agualta Vale to Water Valley. Install 10” EM meter on transmission main at Agualta Vale.

Cost for Improvements

The estimated total cost for the improvement works is $ 606 M as shown below

Activity Qnty Cost

To lay 4 km of 6 inch DI pipes 4 70,400,000.00

To lay 5 km of 8 inch DI pipes 5 111,020,000.00

To lay 14 km of 4 inch DI pipes 14 246,400,000.00

To lay 2 km of 10 inch DI pipes 2 63,840,000.00

Civil works 13,360,000.00

Sub Total 505,000,000.0

Engineering and other cost@20% 101,000,000.00

Grand Total 606,000,000.00

Palmetto Grove

System Description

The Palmetto Grove System is supplied by water from the Palmetto Grove Spring.

Service Area

Some of the communities supplied by this system include: Dean Pen, Frazer’s Wood, Tresmolesworth, Old Road, Blue Gate, Kilnacholy

Page 37: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

37

Draft St. Mary WS PPLan – October 12 2011

Water Requirement

The current combined population in the communities that are served by the Iterboreale system

is 6,055 persons and this is expected to increase to 6,115 persons by 2030. There is a current

supply deficit of 0.33 mgd and this is expected to increase to a 0.34 mgd in the maximum day if

the level of technical losses remain at current levels.

Addressing the Supply Deficiencies

Efforts will be made to reduce the level of technical losses on this Water Supply system and to

rehabilitate and upgrade the water treatment capacities of the treatment plants. The proposed

works will involve:

Replace 5 km of leaking GI/CI pipes with 4 inch DI pipes and rehabilitate 20,000 Galls storage tank, replacement of undersized pumping unit. Rehabilitation of rapid sand filter medium to yield additional inflow

Cost for Improvements

The estimated total cost for the improvement works is $ 180 M as shown below

Activity Qnty Cost

Construct 20,000 gals tank 1 2,000,000.00

To lay 5 km of 4 inch DI pipes 5 85,000,000.00

Rehabilitation of filters 1 20,000,000.00

Expansion of the treatment plant 0.4 mgd 1 40,000,000.00

Civil works/pumping unit 3,000,000.00

Sub Total 150,000,000.00

Engineering and other cost@20% 30,000,000.00

Grand Total 180,000,000.00

Page 38: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

38

Draft St. Mary WS PPLan – October 12 2011

Platsfield

System Description

The Platsfiled System is supplied by water from the Platsfiled Spring.

Service Area

Some of the communities supplied by this system include: Clark, Mt. Vernon and Platsfield

Water Requirement

The current combined population in the communities that are served by the Iterboreale system

is 1,250 persons and this is expected to increase to 1,500 persons by 2030. This is a new system to

extend coverage to new customers. The water demand is expected to be 0.07 mgd. The yield

from the spring was estimated at 0.16 mgd.

Addressing the Supply Deficiencies

Efforts will be made to reduce the level of technical losses on this Water Supply system and to

rehabilitate and upgrade the water treatment capacities of the treatment plants. The proposed

works will involve:

Construction of a 2000 gals intake tank, the laying of 6600 ft of 4-inch PVC pipes, laying of 15600 ft of 4-inch DI pipes.

Cost for Improvements

The estimated total cost for the improvement works is $ 132 M as shown below

Activity Qnty Cost

Construct 2,000 gals intake 1 500,000.00

To lay 2 km of 4 inch PVC pipes 2 11,900,000.00

To lay 5 km of 4 inch DI pipes 5 85,000,000.00

Page 39: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

39

Draft St. Mary WS PPLan – October 12 2011

Civil works etc 12,600,000.00

Sub Total 110,000,000.00

Engineering and other cost@20% 22,000,000.00

Grand Total 132,000,000.00

Highgate

System Description

The Highgate System is supplied by water from the Iterboreale Spring.

Service Area

Some of the communities supplied by this system include: Highgate, Richmond, Esher,, Lewis Store, Frazerwood, Clonmell, Stockholm park H/S Graham Heights, Harmony Hall, Belfield, Orange River H/S

Water Requirement

The current combined population in the communities that are served by the Iterboreale system

is 16,000 persons and this is expected to increase to 17,000 persons by 2030. There is a current

supply surplus of 0.4 mgd and this is expected to reduce to a 0.3 mgd. However due to the

excess technical losses most of the customers are not being adequately fed and they are fed on a

regulated basis.

Addressing the Supply Deficiencies

Efforts will be made to reduce the level of technical losses on this Water Supply system and to

rehabilitate and upgrade the water treatment capacities of the treatment plants. The proposed

works will involve:

Laying of 11.05 km of 12 inch DI pumping main, 4 Km of 8 inch, 16 Km of 6 inch and 14 Km of 4 inch DI distribution main in Highgate. Construction of a booster station at Orange

Page 40: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

40

Draft St. Mary WS PPLan – October 12 2011

Hill (multi stage pumping proposed1200 US gpm). Install 12” EM meter on transmission main at Agualta Vale.

Cost for Improvements

The estimated total cost for the improvement works is $ 1,192 M as shown below

Activity Qnty Cost

To lay 11.05 km of 12 inch DI pipes 11.05 360,230,000.00

To lay 4 km of 8 inch DI pipes 4 88,816,000.00

To lay 16 km of 6 inch DI pipes 16 281,600,000.00

To lay 14 km of 4 inch DI pipes 14 238,000,000.00

Construction of 1200 us gpm booster station 1 12,000,000.00

100,000 feeder tank 1 12,000,000.00

Civil works 1 1,000,000.00

Sub Total 993,646,000.00

Engineering and other cost@20% 198,730,000.00

Grand Total 1,192,377,000.00

Martha Hall

System Description

The Martha Hall System is supplied by water from the Martha Hall Spring.

Service Area

Some of the communities supplied by this system include: Mosquito Hole, Marlborough, Martha Hall, Hope Well, Bongo Town and Orange River

Water Requirement

The current combined population in the communities that are served by the Martha Hall system

is 187 persons and this is expected to increase to 191 persons by 2030. There is a current supply

Page 41: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

41

Draft St. Mary WS PPLan – October 12 2011

surplus of 0.014 mgd and this is expected to decrease to a 0.013 mgd in the maximum day if the

level of technical losses remain at current levels.

Addressing the Supply Deficiencies

Efforts will be made to reduce the level of technical losses on this Water Supply system and to rehabilitate and upgrade the water treatment capacities of the treatment plants. This system has aged pipeline infrastructure which require replacement. The proposed works will involve:

Replace leaking distribution system with 6000 ft of 4 inch DI pipes from Hopewell to Marlborough and 1000 ft of ½ PE pipes

Cost for Improvements

The estimated total cost for the improvement works is $ 31.52 M as shown below

Activity Qnty Cost

To lay 6000 ft/1.8 km of 4-inch DI pipes 1.8 30,600,000.00

Civil Works 300,000.00

Sub Total 30,900,000.00

Engineering and other cost@20% 618,000.00

Grand Total 31,518,000.00

Sue River

System Description

The Brainerd System is supplied by water from the Sue River Water Supply.

Service Area

Some of the communities supplied by this system include: Sue River and Brainard

Page 42: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

42

Draft St. Mary WS PPLan – October 12 2011

Water Requirement

The current combined population in the communities that are served by the Sue River system is

155 persons and this is expected to increase to 191 persons by 2030. There is a current supply

surplus of 0.002 mgd and this is expected to decrease to a 0.0019 mgd in the maximum day if

the level of technical losses remain at current levels.

Addressing the Supply Deficiencies

Efforts will be made to reduce the level of technical losses on this Water Supply system and to rehabilitate and upgrade the water treatment capacities of the treatment plants. This community is currently without piped water. The proposed works will involve:

To install 7300/2.2 km ft of 4 inch DI Transmission main and 1200 ft of ½ inch PE distribution pipes

Cost for Improvements

The estimated total cost for the improvement works is $ 45.12 M as shown below

Activity Qnty Cost

To lay 7300 ft/2.2 km of 4-inch DI pipes 2.2 37,400,000.00

Civil Works 200,000.00

Sub Total 37,600,000.00

Engineering and other cost@20% 7,520,000.00

Grand Total 45,120,000.00

Rock Spring

System Description

The Rock Spring system is supplied by water from the Rock Spring Water Supply.

Page 43: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

43

Draft St. Mary WS PPLan – October 12 2011

Service Area

Some of the communities supplied by this system include:

Water Requirement

The current combined population in the communities that are served by the Sue River system is

4,592 persons and this is expected to increase to 4,636 persons by 2030. There is a current supply

deficit of 0.0248 mgd and this is expected to increase to a 0.0251 mgd in the maximum day if the

level of technical losses remain at current levels.

Addressing the Supply Deficiencies

Efforts will be made to reduce the level of technical losses on this Water Supply system and to rehabilitate and upgrade the water treatment capacities of the treatment plants. The proposed works will involve:

Replace 2 km of leaking GI/CI pipes with 4 inch DI pipes. Rehabilitation of filter medium and intake

Cost for Improvements

The estimated total cost for the improvement works is $ 52.8 M as shown below

Activity Qnty Cost

To lay 2 km of 4-inch DI pipes 2 34,000,000.00

Rehabilitation of the Treatment Plant and filters 1 10,000,000.00

Sub Total 44,000,000.00

Engineering and other cost@20% 8,800,000.00

Grand Total 52,800,000.00

Component C-White River

Page 44: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

44

Draft St. Mary WS PPLan – October 12 2011

(Derry Hazzard, Gayle Spring, Guys Hill, Lucky Hill, White River & SCADA)

Component C includes the construction, rehabilitation of relift stations and Treatment plants by the laying of new pipeline & the upgrading of the existing distribution lines, the installation of new storage tanks, the rehabilitation of existing storage tanks and Non-revenue water reduction. These projects are expected to improve supply to the White River system for the parish. The water balance shows that there is a surplus of 1.105 mgd,

With the Upgrading of White River and the construction of the North Eastern Water supply, water from White River will be diverted to the Lucky Hill, Pembroke Hall, Gayle Spring and Guys Hill systems. The diversion will result in these systems being adequately served 24 hours per day.

Derry Hazzard

System Description

The Derry Hazzard System is supplied by water from the Hazzard Spring.

Service Area

Some of the communities supplied by this system include Derry & Hazzard Communities

Water Requirement

The current combined population in Derry Hazzard system that is served by the Hazzard

System is estimated to be 3000 persons and this is expected to increase to 3300 persons by 2030.

There is a current supply surplus of 0.001 mgd and this is expected to decrease to 0.0008 mgd in

the maximum day if the level of technical losses remain at current levels.

Addressing the Supply Deficiencies

Efforts will be made to reduce the level of technical losses by the construction of a 10,000 gallons

storage tank for pressure management controls:

• Construction of the 10,000 gals tank with 4-inch float valve and pressure switch.

Cost for Improvements

The estimated total cost for the improvement works is $ 3.6M as shown below.

Page 45: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

45

Draft St. Mary WS PPLan – October 12 2011

Activity Qnty Cost

Construction of the 10,000 gals tank 1 3,000,000.00

Sub Total 3,000,000.00

Engineering and other cost@20% 600,000.00

Grand Total 3,600,000.00

Gayle Spring & Lucky Hill

System Description

The Gayle System is supplied by water from the Gayle Spring system.

Service Area

Some of the communities supplied by this system include: Gayle Spring, Coombs Town, Governor’s Pen, Lucky Hill,Retirement, Aricadia H/S, parts of Saltrum, Barclay Town, Lower sections of Jeffrey Town, Lucky Hill, Coffee Walk

Water Requirement

The current combined population in the Gayle Spring & Lucky Hill system that is served by the

Gayle & Lucky Hill System is estimated to be 5889 persons and this is expected to increase to

5945 persons by 2030. There is a current supply deficit of 0.33 mgd and this is expected to

increase to 0.34 mgd in the maximum day if the level of technical losses remain at current levels.

Addressing the Supply Deficiencies

Efforts will be made to reduce the level of technical losses caused by the Leaking distribution line

at Governor’s Pen & inline pumping. Water will be diverted from the White River System to

correct the deficit problem. The proposed works will involve:

• Gayle Spring-Flow control valves. 100% metering of source and customers, Replacement of 1.7 km of 4-inch Pumping Main, 1.4 km of 4-inch DI pipeline for Labyrinth Road.

Page 46: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

46

Draft St. Mary WS PPLan – October 12 2011

Rehabilitation of the facility, Stand by pumping unit and the replacement of the storage tank 30,000 gals.

• Lucky Hill -Replace 4 km of leaking GI/CI pipes with 4 inch DI pipes and construct two 20,000 Galls Tank, undersized pumping unit, construction of a package plant.

Cost for Improvements

The estimated total cost for the improvement works is $ 270 M as shown below.

Activity Qnty Cost

Construction of two 20,000 & 30,000 gals tanks 1 8,000,000.00

Stand by pumping units 2 10,000,000.00

To lay 7.1 km of 4-inch DI pipes 7.1 120,000,000.00

Metering and flow control valve 1 2,000,000.00

Construction of a 0.3 mgd package plant at Lucky Hill 1 85,000,000.00

Sub total 225,000,000.00

Engineering and other cost@20% 45,000,000.00

Grand Total 270,000,000.00

Guys Hill

System Description

The Guys Hill System is supplied by water from the White River. There are two intakes Lime

Hall and White River associated with this system,.

Service Area

Some of the communities supplied by this system include: Guys Hill, Waterford, Decoy, Top Road, Jeffery Town, Windsor, Spring field.

Page 47: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

47

Draft St. Mary WS PPLan – October 12 2011

Water Requirement

The current combined population that is served by the Guys Hill is estimated to be 8000 persons

and this is expected to increase to 8800 persons by 2030. There is a current supply deficit of 0.26

mgd and this is expected to increase to 0.27 mgd in the maximum day if the level of technical

losses remain at current levels.

Addressing the Supply Deficiencies

Efforts will be made to reduce the level of technical losses on this Water Supply system and to

rehabilitate and upgrade the water treatment capacities of the treatment plants. The project will

involve lifting water from St. Mary White River System to Morris Hill Tank located at Guys

Hill. The proposed works will involve:

• Flow control valves. 100% metering of source and customers. Upgrading of the White River TP (St. Mary ) to supply an additional 0.3 MGD to the Morris Hill Tank at Guys Hill, construction of two relift stations for (multi-stage pumping), feeder 50,000 gals tank and the laying of 44,000 feet of 8-inch DI pipes.

The estimated total cost for the improvement works is $ 485 M as shown below.

Activity Qnty Cost

Construction of two 50,000 gals tank 1 8,000,000.00

Pumping units 2 10,000,000.00

To lay 13.5 km of 8-inch DI pipes 13.5 299,754,000.00

Metering and flow control valve 1 2,000,000.00

Construction of a 0.3 mgd package plant at Lucky Hill 1 85,000,000.00

Sub total 404,000,000.00

Engineering and other cost@20% 80,950,800.00

Grand Total 484,950,800.00

Page 48: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

48

Draft St. Mary WS PPLan – October 12 2011

White River

System Description

The White River System is supplied by water from the White River.

Service Area

Some of the communities supplied by this system include: Endeavour, Cascade, spring valley, St. Mary Country Club, parts of Balmoral, Charles Town, Tree Hills, Rock Cottage, Grass Lands, Industry Pen and Charles Town relift

Water Requirement

The current combined population that is served by the Guys Hill is estimated to be 8000 persons

and this is expected to increase to 8800 persons by 2030. There is a current supply deficit of 0.26

mgd and this is expected to increase to 0.27 mgd in the maximum day if the level of technical

losses remain at current levels.

Addressing the Supply Deficiencies

Efforts will be made to reduce the level of technical losses on this Water Supply system and to

rehabilitate and upgrade the water treatment capacities of the treatment plants. The project will

involve lifting water from St. Mary White River System to Morris Hill, Gayle Spring and Lucky

Hill. The proposed works will involve:

Relay 15 Km of transmission main with 12 inch DI pipes resulting in the Industry Pen pumping unit serving Phase 2 & 3 and the annex. Interconnections from the 12-inch main to serve Industry Pen Phase 1 and Three Hills community. Retiring of the Charles Town Pumping unit.

Install 3 additional filters of 0.5 MGD output and two settling tanks, upgrading of the Charles

Town pumping unit and a new 20,000 gals tank, upgrading of the Rose Street pumping unit and

new 20,000 gals tank, upgrading of the Industry Pen pumping unit &construction of a new

100,000 gals tank, new 25,000 gals storage tank for the Labyrinth system.

The estimated total cost for the improvement works is $ 1,132 M as shown below.

Activity Qnty Cost

Page 49: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

49

Draft St. Mary WS PPLan – October 12 2011

Construction of two 20,000, 25,000 & 100,000 gals

tank

4 50,000,000.00

Pumping units 1 20,000,000.00

Relay 15 Km of transmission main with 12 inch DI

pipes

15 489,000,000.00

Metering and flow control valve 1 5,000,000.00

Construction of a 1.5 mgd package plant at 1 326,250,000.00

Civil Works 1 53,250,000.00

Sub total 943,500,000.00

Engineering and other cost@20% 188,700,000.00

Grand Total 1,132,200,000.00

SCADA

System Description

This project entails the monitoring of all 15 water supply systems by remote monitoring.

Service Area

St Mary

Water Requirement

NA

Addressing the Supply Deficiencies

Efforts will be made to reduce the level of technical losses on this Water Supply system and to

rehabilitate and upgrade the water treatment capacities of the treatment plants. Remote

monitoring will eliminate the

The estimated total cost for the improvement works is $ 18 M as shown below.

Page 50: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

50

Draft St. Mary WS PPLan – October 12 2011

Activity Qnty Cost

Construction of a 0.3 mgd package plant at Lucky Hill 1 15,000,000.00

Sub total 15,000,000.00

Engineering and other cost@20% 3,000,000.00

Grand Total 18,000,000.00

Appendix

Page 51: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

51

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Eastern St. Mary-Annotto Bay 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : 2 Springs (Iterboreale / Annotto Bay ) 4. Names of Communities served : Highgate, Richmond, Esher, Haywood Hall, Pinacle, Lebanon H/S, Islington, Albany, Zion Hill, Lewis Store, Frazerwood, Clonmell, Stockholm park H/S Graham Heights, White Hall, Nutsfield, Lindon H/S, Annotto Bay, Gibraltar H/S, Iterboreale H/S, Martin, Friendship, Robins Bay, Harmony Hall, Belfield, Orange River H/S 4.1 Estimated Population : 27380 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : 5 Km of leaking 8 inch AC pipes and rotten and leaking 50, 000 Galls tank 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements: Replace 5 km of leaking AC pipes with 8 inch DI pipes, 9 km of 4-inch DI pipes and rehabilitate 50,000 Galls Tank (Annotto Bay). 7. Expected Benefits/ Impact of the proposed improvement: Reduced NRW, better management of the distribution network and decrease in mains repair 8. Project Budget Sum : JM$ 230 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

Page 52: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

52

Draft St. Mary WS PPLan – October 12 2011

1. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Eastern St. Mary-Annotto Bay

Page 53: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

53

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Boscobel Water Supply 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : Bogue WS 4. Names of Communities served : Boscobel Housing Scheme 4.1 Estimated Population : 3000 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : Over flowing, leaking tank and supply deficit along North Coast

6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements : Rehabilitation of the 100,000 gals tank with 4-inch float valve, pressure switch and stand by pumping unit. 7. Expected Benefits/ Impact of the proposed improvement: Reduced NRW, better management of the distribution network. 8. Project Budget Sum : JM$ 12 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

2. Cost/ Benefit : 2. Internal Rate of Return (IRR) :

Page 54: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

54

Draft St. Mary WS PPLan – October 12 2011

3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Boscobel Water Supply System

Page 55: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

55

Draft St. Mary WS PPLan – October 12 2011

Page 56: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

56

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Eastern St. Mary-Georges’ Spring (Castleton) 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : Seasonal Spring 4. Names of Communities served : Castleton, Friendship Gap and Cleary Spring 4.1 Estimated Population : 3000 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : Leaking distribution network, intake works and supply deficit

6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements : Replace 8 km of leaking 3’’ & 4’’ GI pipes with 6 & 4- inch DI pipes, construction of a new 10,000 gals tank at Golden Valley and upgrade pumping unit. Proposed treatment Plant at Wag River to address short fall 7. Expected Benefits/ Impact of the proposed improvement: Reduced NRW, better management of the distribution network and decrease in mains repair 8. Project Budget Sum : JM$ 179.6 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

3. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT

Page 57: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

57

Draft St. Mary WS PPLan – October 12 2011

9. Priority of Project : __ High __ Medium __ Low

Castleton Water Supply System

Page 58: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

58

Draft St. Mary WS PPLan – October 12 2011

Page 59: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

59

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Derry Hazzard Water Supply 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : Spring 4. Names of Communities served : Derry & Hazzard Communities 4.1 Estimated Population : 3000 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : inline pumping 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements: Construction of the 10,000 gals tank with 4-inch float valve and pressure switch. 7. Expected Benefits/ Impact of the proposed improvement: Reduced NRW, better management of the distribution network. 8. Project Budget Sum : JM$ 3 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

4. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Page 60: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

60

Draft St. Mary WS PPLan – October 12 2011

Derry Hazzard Water Supply

Page 61: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

61

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Pottinger Spring -Epping 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : Gravity Spring Source 4. Names of Communities served : Stewart Mountain, Richards Pen, Retreat, Content, Planter Hall, Lanquedoc 4.1 Estimated Population : 7362 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : The 12 “ Transmission main dislocates each time it rains heavily. This cuts off the water supply to Port Maria for at least four days while repairs are carried out. 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements : Relocate 400 ft of 12” Steel Pipeline from Epping to Pottinger Spring 7. Expected Benefits/ Impact of the proposed improvement: Reduced NRW and improved reliability of the distribution system 8. Project Budget Sum : JM$ 5.8

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

Page 62: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

62

Draft St. Mary WS PPLan – October 12 2011

5. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Page 63: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

63

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME

Page 64: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

64

Draft St. Mary WS PPLan – October 12 2011

SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Gayle Spring Water Supply 2. Parish: St. Mary 3. Description/ Outline of Water Supply Scheme (WSS) :Seasonal source with production of (dry period 0.45 MGD, wet period 0.66 MGD. 4. Names of Communities served : Gayle Spring, Coombs Town, Governor’s Pen 4.1 Estimated Population : 5889 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : Leaking distribution line at Governor’s Pen and rehabilitation of the facility (High NRW) & inline pumping. Supply deficit. 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements : Flow control valves. 100% metering of source and customers, Replacement of 1.7 km of 4-inch Pumping Main, 1.4 km of 4-inch DI pipeline for Labyrinth Road. Rehabilitation of the facility, Stand by pumping unit and the replacement of the storage tank 30,000 gals. Pipeline replacement to address supply deficit along with water from White River. 7. Expected Benefits/ Impact of the proposed improvement: A more reliable & Improved water supply system. 8. Project Budget Sum : JM$ 55 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

6. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Page 65: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

65

Draft St. Mary WS PPLan – October 12 2011

Gayle Spring Water Supply System

Page 66: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

66

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Guys Hill Water Supply 2. Parish: St. Catherine (areas served in St. Mary) 3. Description/ Outline of Water Supply Scheme (WSS) :Seasonal source with production of (dry period 0.5 mgd 4. Names of Communities served: Guys Hill, Waterford, Decoy, Top Road, Jeffery Town, Windsor, Spring field.

4.1 Estimated Population :12000

5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : The areas are served on a regulated basis receiving water once per week. Seasonal source . Supply deficit 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements : Flow control valves. 100% metering of source and customers. Upgrading of the White River TP (St. Mary ) to supply an additional 0.3 MGD to the Morris Hill Tank at Guys Hill, construction of two relift stations for (multi-stage pumping), feeder 50,000 gals tank and the laying of 44,000 feet of 8-inch DI pipes. Additional water from White River to address supply deficit. 7. Expected Benefits/ Impact of the proposed improvement: A more reliable & Improved water supply system resulting in customers receiving 24 hrs supply. 8. Project Budget Sum : JM$ 377 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

7. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

Page 67: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

67

Draft St. Mary WS PPLan – October 12 2011

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Guys Hill Water Supply System

Page 68: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

68

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

Page 69: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

69

Draft St. Mary WS PPLan – October 12 2011

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Hamilton Mountain WS 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : Bogue Source 4. Names of Communities served : Hamilton Mountain, Geddes Mountain, Pond Side and Africa 4.1 Estimated Population : 2500 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : Regulated area 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements: Construction of 1.2 km of 6-inch DI pipeline from Ocrabessa to Hamilton Mountain Station, rehabilitation of the storage tank, upgrading of the pumping unit.( Eden Park – independent pumping main 0.5 km of 4-inch pipeline and installation of 10 hp pumping unit -$13 m (60 gpm @ 260 ft) 7. Expected Benefits/ Impact of the proposed improvement: Reduced NRW and improved reliability of the distribution system 8. Project Budget Sum : JM$ 34.06 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

8. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT

Page 70: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

70

Draft St. Mary WS PPLan – October 12 2011

9. Priority of Project : __ High __ Medium __ Low

Hamilton Mountain Water Supply System

Page 71: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

71

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Eastern St. Mary - Highgate 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : 2 Springs (Iterboreale / Annotto Bay ) 4. Names of Communities served : Highgate, Richmond, Esher,, Lewis Store, Frazerwood, Clonmell, Stockholm park H/S Graham Heights, Harmony Hall, Belfield, Orange River H/S 4.1 Estimated Population : 27,350 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : Leaking and aged distribution and transmission CI and AC main in the Highgate community resulting in high NRW. Supply deficit. 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements: Laying of 11.05 km of 12 inch DI pumping main, 4 Km of 8 inch, 16 Km of 6 inch and 14 Km of 4 inch DI distribution main in Highgate. Construction of a booster station at Orange Hill (multi stage pumping proposed1200 US gpm). Install 12” EM meter on transmission main at Agualta Vale.Pipeline replacement to correct supply deficit. 7. Expected Benefits/ Impact of the proposed improvement: Reduced NRW, Improved efficiency and reliability of the network. 8. Project Budget Sum : JM$ 970.745 M

Page 72: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

72

Draft St. Mary WS PPLan – October 12 2011

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

9. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Eastern St. Mary Water Supply System - Highgate

Page 73: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

73

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA

Page 74: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

74

Draft St. Mary WS PPLan – October 12 2011

1. Name of Water Supply Scheme: Iterboreale- Enfield W/S 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : Spring Source 4. Names of Communities served :Dover, Enfield & Epsom 4.1 Estimated Population : 3,000 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : Inline pumping to the three areas and valve regulation. Supply deficit. 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements : Upgrading of the pumping unit and the construction of three new storage tanks at Enfield (20,000 gals ), Dover (20,000 gals ) & Epsom (20,000 gals ). Replacement of 6 km of 4-ich CI/GI with the replacement of 4-inch DI. Redesign system, pipeline replacement and increase water from Iterboreale to adequately supply communities. 7. Expected Benefits/ Impact of the proposed improvement: Increased water coverage for the above areas and a more reliable supply. 8. Project Budget Sum : JM$ 107.94 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

10. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Page 75: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

75

Draft St. Mary WS PPLan – October 12 2011

Iterboreale –Enfield Water Supply System

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

Page 76: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

76

Draft St. Mary WS PPLan – October 12 2011

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Iterboreale W/S 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : Spring Source 4. Names of Communities served : Highgate, Richmond, Esher,, Lewis Store, Frazerwood, Clonmell, Stockholm park H/S Graham Heights, Harmony Hall, Belfield, Orange River H/S, Lower Esher, Haywood Hall, Pinacle, Lebanon H/S, Islington, Albany, Zion Hill, White Hall, Nutsfield, Lindon H/S,, Martin, Friendship, Robins Bay. 4.1 Estimated Population : 30,000 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme: Leaking intake wall resulting in 0.3 MGD of water flowing to waste. Supply deficit 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements : Repair to intake wall – underpinning of approximately 200 metres of wall at the intake works to address supply deficit. 7. Expected Benefits/ Impact of the proposed improvement: Increased capacity at the plant 8. Project Budget Sum : JM$ 20 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

11. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Page 77: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

77

Draft St. Mary WS PPLan – October 12 2011

Iterboreale Water Supply – Intake Rehabilitation

Page 78: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

78

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Lucky Hill WS 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : Spring Source 4. Names of Communities served : Lucky Hill,Retirement, Aricadia H/S, parts of Saltrum, Barclay Town, Lower sections of

Jeffrey Town, Lucky Hill, Coffee Walk 4.1 Estimated Population : 4000 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme: Extensive Valve regulation for the areas. Upgrading of the system to a treatment plant due to extended periods of turbidity. Supply deficit.

6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements : Replace 4 km of leaking GI/CI pipes with 4 inch DI pipes and construct two 20,000 Galls Tank, undersized pumping unit, construction of a package plant. System to be integrated with Rose Street(White River) to augment supply 7. Expected Benefits/ Impact of the proposed improvement: Reduced NRW, better management of the distribution network and decrease in mains repairs 8. Project Budget Sum : JM$ 85 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

12. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

Page 79: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

79

Draft St. Mary WS PPLan – October 12 2011

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Lucky Hill Water Supply System

Page 80: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

80

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Bogue – Port Maria , Pottinger Spring and White River (Mango Valley Phase 2) 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : Gravity Spring and River sources 4. Names of Communities served : Mango Valley, Fellowship Hall and Pondside 4.1 Estimated Population : 2655 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : Lack of piped water in Upper Mango Valley, Pondside and Fellowship Hall 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements : Installation of a pumping unit and 50,000 galls sump at Pondside, 3Km of 8 inch DI transmission main, delivering to a 250,000 gall tank sited at Fellowship Hall and Gravity feeding to Fellowship Hall, Pondside and Upper Mango Valley through 4Km of 4 inch distribution main. 7. Expected Benefits/ Impact of the proposed improvement: Piped water supply and increased revenue 8. Project Budget Sum : JM$ 170.56 M

Page 81: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

81

Draft St. Mary WS PPLan – October 12 2011

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

13. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Mango Valley Phase 2

Page 82: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

82

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA

Page 83: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

83

Draft St. Mary WS PPLan – October 12 2011

1. Name of Water Supply Scheme: Martha Hall 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : Seasonal Spring 4. Names of Communities served : Mosquito Hole, Marlborough, Martha Hall, Hope Well, Bongo Town and Orange River 4.1 Estimated Population :1021 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme: Leaking, undersized 2 inch GI distribution lines. Supply deficit 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements :Replace leaking distribution system with 6000 ft of 4 inch DI pipes from Hopewell to Marlborough and 1000 ft of ½ PE pipes. Replacement of pipelines to correct supply shortage 7. Expected Benefits/ Impact of the proposed improvement: Reduced NRW and improved and more reliable Water Supply 8. Project Budget Sum : JM$ 30.9 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

14. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Martha Hall Water Supply System

Page 84: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

84

Draft St. Mary WS PPLan – October 12 2011

Page 85: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

85

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Mason Hall Water Supply 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : Based on the proposed BOOT project at Rio Nuevo river to harness 6 MGD, we are proposing constructing a relift station at Orocabessa and lift to Salmon Hill. 4. Names of Communities served : Days Mountain ,Airy Hill , Bariffe Hall, Salmon Hill, Kid Land, Marson Town, Coloraine Street, Bandro Hill, Mason Hall, Fire Fly, Villa Road, Wentworth 4.1 Estimated Population : 5780 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme: These communities presently do not have piped water. 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements: To install a 0.4MGD relift station at the Canoe Pond tank and lay 10900 ft of 8” DI pumping main to a 1M storage tank at Salmon Hill and 2700 ft of 8”DI, 8600 ft of 6” DI, 15200 ft of 4” DI, 9300 ft of 2 “PVC and 45000 ft of ½” PE distribution pipes.

7. Expected Benefits/ Impact of the proposed improvement: Increased water cover to Mason Hall Community (community presently without piped water)

8. Project Budget Sum : JM$ 430 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

15. Cost/ Benefit : 2. Internal Rate of Return (IRR) :

Page 86: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

86

Draft St. Mary WS PPLan – October 12 2011

3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Mason Hall Water Supply

Page 87: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

87

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA

1. Name of Water Supply Scheme: Eastern St. Mary - Nutsfield 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : 2 Springs (Iterboreale / Annotto Bay ) 4. Names of Communities served : Lower Esher, Haywood Hall, Pinacle, Lebanon H/S, Islington, Albany, Zion Hill, White Hall, Nutsfield, Lindon H/S,, Martin, Friendship, Robins Bay. 4.1 Estimated Population : 27,350 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : Leaking and aged distribution and transmission CI and AC main in the Islington community resulting in high NRW. Valve regulation due supply deficit. 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements: Lay 5 Km of 8 inch DI, 4Km of 6 inch and 14Km of 4 inch DI distribution main in Islington. Also lay 2Km of 10 inch high pressure steel pipe transmission main from Agualta Vale to Water Valley. Install 10” EM meter on transmission main at Agualta Vale. Pipeline replacement to address supply shortage. 7. Expected Benefits/ Impact of the proposed improvement: Reduced NRW, Improved efficiency and reliability of the network. 8. Project Budget Sum : JM$ 505 M

Page 88: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

88

Draft St. Mary WS PPLan – October 12 2011

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

16. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Eastern St. Mary – Nutsfield

Page 89: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

89

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA

Page 90: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

90

Draft St. Mary WS PPLan – October 12 2011

1. Name of Water Supply Scheme: Palmetto Grove 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : Spring Source 4. Names of Communities served : Dean Pen, Frazer’s Wood, Tresmolesworth, Old Road, Blue Gate, Kilnacholy 4.1 Estimated Population : 4000 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : 2.5 inch encrusted and leaking pipeline and filters require resanding . Supply deficit 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements: Replace 5 km of leaking GI/CI pipes with 4 inch DI pipes and rehabilitate 20,000 Galls storage tank, replacement of undersized pumping unit. Rehabilitation of rapid sand filter medium . Replacement of pipeline and upgrading of the plant intake to harness maximum supply. 7. Expected Benefits/ Impact of the proposed improvement: Reduced NRW, better management of the distribution network and decrease in mains repairs 8. Project Budget Sum : JM$ 150 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

17. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Page 91: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

91

Draft St. Mary WS PPLan – October 12 2011

Palmetto Grove Water Supply

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME

Page 92: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

92

Draft St. Mary WS PPLan – October 12 2011

SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Platsfield Water Supply 2. Parish: St. Mary

3. Description/Outline of Water Supply Scheme (WSS) : Gravity Spring Source 4. Names of Communities served : Clark, Mt. Vernon and Platsfield 4.1 Estimated Population : 1250 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme :new system as this area is without piped water 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements: Construction of a 2000 gals intake tank, the laying of 6600 ft of 4-inch PVC pipes, laying of 15600 ft of 4-inch DI pipes.

7. Expected Benefits/ Impact of the proposed improvement: 250 households will now have access to

piped water 8. Project Budget Sum : JM$ 110 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

18. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

Page 93: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

93

Draft St. Mary WS PPLan – October 12 2011

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Platsfield Water Supply

Page 94: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

94

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Pottinger Spring 2. Parish: St. Mary

3. Description/Outline of Water Supply Scheme (WSS) : Gravity Spring Source 4. Names of Communities served : Stewart Mountain, Richards Pen, Retreat, Content, Planter Hall, Lanquedoc 4.1 Estimated Population : 752 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : Four (4) Filters are in disrepair (Filter medium requires replacement) 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements : Rehabilitation of walls of four filters and replace sand medium (filter size 4 ft x 10 ft)

7. Expected Benefits/ Impact of the proposed improvement: Reduced NRW and improved reliability of the distribution system 8. Project Budget Sum : JM$ 80 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

Page 95: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

95

Draft St. Mary WS PPLan – October 12 2011

19. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Rehabilitation of the Pottinger Spring Filters

Page 96: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

96

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Bogue – Port Maria 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : Gravity Spring Source 4. Names of Communities served : Sport Maria, Frontier, Albion Mountain, Cambridge and Sandside 4.1 Estimated Population : 8765 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : Due to the relocation of the North Coast highway the 12 “ transmission main dislocates each time it rains heavily. This cuts off the water supply to Port Maria for at least four days while repairs are carried out. 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements: Relocate 1800 ft of 12” Steel and DI pipeline from Reef Point to Casa Maria. 7. Expected Benefits/ Impact of the proposed improvement: Reduced NRW and improved reliability of the distribution system 8. Project Budget Sum : JM$ 48.75 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

Page 97: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

97

Draft St. Mary WS PPLan – October 12 2011

20. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Reef Point to Casa Maria- Bogue to Port Maria Water Supply

Page 98: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

98

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Eastern St. Mary -Iterboreale

Page 99: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

99

Draft St. Mary WS PPLan – October 12 2011

2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : 2 Springs (Iterboreale / Annotto Bay) 4. Names of Communities served : Highgate, Richmond, Esher, Haywood Hall, Pinacle, Lebanon H/S, Islington, Albany, Zion Hill, Lewis Store, Frazerwood, Clonmell, Stockholm park H/S Graham Heights, White Hall, Nutsfield, Lindon H/S, Annotto Bay, Gibraltar H/S, Iterboreale H/S, Martin, Friendship, Robins Bay, Harmony Hall, Belfield, Orange River H/S 4.1 Estimated Population : 27,380 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : Leaking 12” AC/CI Transmission main between Iterboreale and Agualta Vale (Approx water loss 300 gpm).Supply shortage on system 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements : Replace leaking 12” AC/CI Transmission main with 6.25 km 20,800 ft of 300mm DI pipeline. Procurement of the JP well 1 MGD. Replacement of pipeline and new source to address shortfall. 7. Expected Benefits/ Impact of the proposed improvement: Reduction in NRW and increased water reaching the pumps at Agualta Vale for distribution to service area. 8. Project Budget Sum : JM$ 421 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

21. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Page 100: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

100

Draft St. Mary WS PPLan – October 12 2011

Iterboreale to Agualta Vale- Eastern St. Mary Water Supply

Page 101: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

101

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Rock Spring 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : Spring Source 4. Names of Communities served :Rock Spring, Zion Hill, Flint River 4.1 Estimated Population : 2000 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : 2.5 inch encrusted and leaking pipeline and filters require re-sanding . Supply shortage. 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements: Replace 2 km of leaking GI/CI pipes with 4 inch DI pipes. Rehabilitation of filter medium and intake. 7. Expected Benefits/ Impact of the proposed improvement: Reduced NRW, better management of the distribution network and decrease in mains repairs . Pipeline replacement to address shortfall. 8. Project Budget Sum : JM$ 34 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

22. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT

Page 102: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

102

Draft St. Mary WS PPLan – October 12 2011

9. Priority of Project : __ High __ Medium __ Low

Rock Spring Water Supply

Page 103: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

103

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Sand Hill Water Supply 2. Parish: St. Mary 3. Description/ Outline of Water Supply Scheme (WSS) :Seasonal source with production of (dry period .9 MGD, wet period 0.5 MGD. 4. Names of Communities served : Grey Street, Church Street, Bailey's Vale, Free Hill, Oxford, Geddes

Town, lawrence Street, Brown Street, Brimmer Hall, and Trinity Relift station

4.1 Estimated Population : 8000 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : Leaking distribution network (High NRW). Supply deficit

6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements : Flow control valves. 100% metering of source and customers, Replacement of 6 km of 6-inch GI to DI Main. Rehabilitation of the facility, Stand by pumping unit and the rehabilitation of the storage tank 30,000 gals to address shortfall. 7. Expected Benefits/ Impact of the proposed improvement: A more reliable & Improved water supply system.

8. Project Budget Sum : JM$ 114.3 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

23. Cost/ Benefit : 2. Internal Rate of Return (IRR) :

Page 104: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

104

Draft St. Mary WS PPLan – October 12 2011

3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Sand Hill Water Supply

Page 105: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

105

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Unmetered production sources 2. Parish: St Mary 3. Description/Outline of Water Supply Scheme (WSS) : Spring and River sources 4. Names of Communities served : Bogue-Port Maria, Bonny Gale, Castleton, Rock Spring, Pleasant Hill, Pembroke hall, Luna and Martha Hall 4.1 Estimated Population : 60,980 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : Unable to accurately determine production from these sources. 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements: Install 12” EM meter on the Bogue 16” trunk main at the St. Ann /St. Mary border. Install 2” EM meter at Luna and 4” EM meters at Bonny Gate, Castleton, Rock Spring, Pleasant Hill, Pembroke Hall and Martha Hall 7. Expected Benefits/ Impact of the proposed improvement: Accurate production figures

Page 106: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

106

Draft St. Mary WS PPLan – October 12 2011

8. Project Budget Sum : JM$ 4 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

24. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Page 107: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

107

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Sue River Water Supply (Brainerd Extension) 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : Seasonal River source with Treatment Plant 4. Names of Communities served : Sue River and Brainard 4.1 Estimated Population :155 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme :No existing piped water supply

Page 108: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

108

Draft St. Mary WS PPLan – October 12 2011

6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements : To install 7300 ft of 4 inch DI Transmission main and 1200 ft of ½ inch PE distribution pipes 7. Expected Benefits/ Impact of the proposed improvement: Improved water supply 8. Project Budget Sum : JM$ 37.6 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

25. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Sue River Water Supply Extension for St. Mary

Page 109: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

109

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

Page 110: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

110

Draft St. Mary WS PPLan – October 12 2011

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: Sand Hill and Bogue-Port Maria (Trinity System) 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : Relift Station with output of 130 us gpm 4. Names of Communities served : Trinity, Albion Mountain, Cambridge, Sandside and Sandside Heights 4.1 Estimated Population : 2000 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme: A high pressure pumping unit is used to regulate supply to a high elevation system and low elevation system with no storage tanks. 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements: The high pressure pump will be used to supply water on the high elevation side to a new 30,000 galls tank at Albion Mountain and to the rehabilitated 50, 000 galls tank at Wentworth. A new low pressure pump is to be installed at Trinity to supply the low elevation side to new 15,000 galls tanks at Cambridge and Sandside. All tanks will be fitted with level controls and pressure switches. 5 km of 6-inch DI pipes.

7. Expected Benefits/ Impact of the proposed improvement: Reduced NRW on both systems, continuous water supply to all areas and increased efficiency of each system. 8. Project Budget Sum : JM$ 111.75 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

26. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT

Page 111: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

111

Draft St. Mary WS PPLan – October 12 2011

9. Priority of Project : __ High __ Medium __ Low

Sand Hill and Bogue-Port Maria -Trinity Water Supply System

Page 112: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

112

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: White River W/S 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : River Source with Full Treatment Plant 4. Names of Communities served : Endeavour, Cascade, spring valley, St. Mary Country Club, parts of Balmoral, Charles Town, Tree Hills, Rock Cottage, Grass Lands, Industry Pen and Charles Town relift 4.1 Estimated Population : 6,610

5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : 15 Km of leaking 12 inch CI and DI transmission main 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements: Relay 15 Km of transmission main with 12 inch DI pipes resulting in the Industry Pen pumping unit serving Phase 2 & 3 and the annex. Interconnections from the 12-inch main to serve Industry Pen Phase 1 and Three Hills community. Retiring of the Charles Town Pumping unit. 7. Expected Benefits/ Impact of the proposed improvement: Reduced NRW and Increased Output and Efficiency 8. Project Budget Sum : JM$ 487.5 M

Page 113: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

113

Draft St. Mary WS PPLan – October 12 2011

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

27. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

White River Water Supply System

Page 114: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

114

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: White River W/S 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : River Source with Full Treatment Plant 4. Names of Communities served : Endeavour, Cascade, spring valley, St. Mary Country Club, parts of Balmoral, Charles Town, Tree Hills, Rock Cottage, Grass Lands, Industry Pen and Charles Town relift 4.1 Estimated Population : 6,610 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : Increase output from Treatment Plant by one (1.5) MGD, Valve regulation for the Charles Town, Industry Pen and Rose Street systems. Inline pumping for the Rose Street, Charles Town & Labyrinth systems. Supply deficit 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements: Install 3 additional filters of 0.5 MGD output and two settling tanks, upgrading of the Charles Town pumping unit and a new 20,000 gals tank, upgrading of the Rose Street pumping unit and new 20,000 gals tank, upgrading of the Industry Pen pumping unit &construction of a new 100,000 gals tank, new 25,000 gals storage tank for the Labyrinth system. Upgrading of the plant to address shortfall

Page 115: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

115

Draft St. Mary WS PPLan – October 12 2011

7. Expected Benefits/ Impact of the proposed improvement: Increased capacity of the plant and expanded service area of the system (Mason Hall, Guys Hill, Industry Pen & Rose Street-Halifax) 8. Project Budget Sum : JM$ 456 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

28. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

White River Water Supply

Page 116: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

116

Draft St. Mary WS PPLan – October 12 2011

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: North Eastern Water Supply Project (Ocho Rios to Port

Page 117: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

117

Draft St. Mary WS PPLan – October 12 2011

Maria) 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) : Proposed -River Source with Full Treatment Plant 4. Names of Communities served : Tower Isles, Caribbean Park, White River, Jamaica Beach, Lower Balmoral (Mix with the

Pottinger Spring & Whiter River System) parts of Spring Valley, Rio Nuveo, Pampano

Bay, Stewart Town, Boscobel, Gulley Road, Spring Head, Jacks River, Ocrabessa, Galina,

Cocks Street, Fernandez Gardens, Port Maria, Went Worth, Serves the following stations:

Trinity Relift, Boscobel Relift, Gibraltar Relift, Canoe Pond Relift, Hamilton Relift, Frontier

Relift, Farmer's height Relift.

4.1 Estimated Population : 46,000 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : The present system is unable to supply any new subdivision without impacting negatively on our existing customers

( lower water pressure to no water conditions) Supply deficit 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements: Installation of 25 km of 400 mm, 25 km of 150 mm DI pipes from Rio Nuevo to Port Maria, Installation of 8km of 600 mm & 8 km of 150 mm Di pipes from Ocho Rios to Rio Nuevo. Construction of 3mgd/6 mgd water treatment plant at Retreat in St. Mary. Rehabilitation of 500,000 gals storage tank at Port Maria. New plant to address shortfall. 7. Expected Benefits/ Impact of the proposed improvement :) Increased water coverage along the North Eastern Coastal areas. 8. Project Budget Sum : JM$ 3,181 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

29. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low

Page 118: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

118

Draft St. Mary WS PPLan – October 12 2011

North Eastern Water Supply System (Ocho Rios to Port Maria)

NATIONAL WATER COMMISSION PARISH PLAN DEVELOPMENT - WATER SUPPLY SCHEME SUMMARY PROJECT PROFILE

Page 119: St. Mary Parish Plan-Sept 14 2011 - Jamaica · 2 Draft St. Mary WS PPLan – October 12 2011 1 Introduction Saint Mary is a parish located in the northeast section of Jamaica. With

119

Draft St. Mary WS PPLan – October 12 2011

SECTION A - PROJECT DATA 1. Name of Water Supply Scheme: St. Mary Water Supply Project 2. Parish: St. Mary 3. Description/Outline of Water Supply Scheme (WSS) :16 systems with Proposed -River Source with Full Treatment Plant 4. Names of Communities served : ST. Mary 4.1 Estimated Population : 121,500 5. Description of Operational and Physical Problems/Challenges of the Water Supply Scheme : Unable to response quickly to system problems 6. Recommendation(s) for Improvement of WSS - Scope of Works/ Requirements : Installation of SCADA System for all systems 7. Expected Benefits/ Impact of the proposed improvement :) Increased water coverage along the North Eastern Coastal areas. 8. Project Budget Sum : JM$ 15 M

SECTION B - ECONOMIC/FINANCIAL ANALYSIS

30. Cost/ Benefit : 2. Internal Rate of Return (IRR) : 3. NPV :

SECTION C - SELECTION / PRIORITISATION OF PROJECT 9. Priority of Project : __ High __ Medium __ Low