st croix river crossing s.p. 8221-82045 contractor information meeting 15 may 2013 river spans

74
St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Upload: makena-grosvenor

Post on 01-Apr-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

St Croix River CrossingS.P. 8221-82045

Contractor Information Meeting15 May 2013

River Spans

Page 2: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

General Arrangement

Page 3: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Main Span

3360' single structural unit Expansion joints at Pier 7 and East Abutment 600' extradose spans Twin wall pier legs to address time dependent and thermal effects

Page 4: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Towers

Page 5: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tower Sections

Page 6: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tower Sections

Page 7: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Main Span - ReinforcingReinforcing Grade Generally grade 60, except: Verticals on crossbeam – Gr 75 Deck level stay anchor blocks Gr 75

Corrosion Protection Generally epoxy coated except: Pier 8 legs for 10' below knuckle – SS Deck top slab reinforcing – SS

Page 8: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Main Span - ConcreteConcrete – Substructure and Towers Generally 6000 psi @ 28 days, except: Towers 24' below to 3' above crossbeam

8000 psi @ 56 days

Concrete - Deck Generally 8000 psi @ 56 days, except: First 8 precast deck segments 9000 psi @ 180 days

Page 9: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tower – Leg Reinforcing

Page 10: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tower Reinfrocing

Page 11: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tower Reinforcing

Page 12: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tower Reinforcing

Page 13: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tower - Crossbeam

Page 14: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tower – Crossbeam PT

Page 15: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tower - Crossbeam PT

Page 16: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tower - Crossbeam PT

Page 17: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tower Crossbeam Node PT

Page 18: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tower Crossbeam Node Reinforcing

Page 19: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tower Crossbeam Node Reinforcing

Page 20: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Pylon Crossbeam Node

Page 21: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Pylon Crossbeam Node

Page 22: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

CIP Pier Table

Page 23: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Upper Tower

Page 24: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tower - Anchor Box

Page 25: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tower Anchor Box

Page 26: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Stay Cables Parallel Strand Stay Cable System All stays 76 – 0.62" stays Working at higher load than cable stays (0.52 fpu) Live end in tower Testing requirements per 6th Edition of PTI

Recommendations for Stay Cable Design Testing and Installation

Internal dampers required at lower end Damping required – 2.5% log dec – confirm by testing

Page 27: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Pier 13 General Arrangement

Page 28: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Typical Deck Section

Page 29: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Deck Section at Stay Anchorage

Page 30: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Typical Deck Section

Page 31: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Deck Section at Transition

Page 32: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tower 8 Deck Segmentation

Page 33: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tower 9, 10 and 11 Deck Segmentation

Page 34: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tower 12 Deck Segmentation

Page 35: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Span 14 Deck Segmentation

Page 36: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Segments

Weights• 7.5' segments ≤ 140 tons• 8.5' segments ≤ 130 tons• Typical 10' segments ≤ 165 tons• 10 ' stay anchor segments ≤ 180 tons

Page 37: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tower 8, 9, 10, and 11 Tendon Layout

Page 38: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Tendon Layout Span 14

Page 39: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Bottom Tendons – Span 14

Page 40: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Continuity Tendons Span 8

Page 41: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Typical Continuity Tendons

Page 42: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Continuity Tendons Spans 13 and 14

Page 43: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Typical Future PT

Page 44: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Typical Deck Segments

Page 45: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Typical Bulkhead

Page 46: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Typical Segment Reinforcing

Page 47: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Blisters

Page 48: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Transverse Deck PT

Page 49: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Belvederes

Page 50: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Belvederes - PT

Page 51: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Belvederes

Page 52: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Belvederes – Reinforcing

Page 53: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

St Croix River CrossingS.P. 8221-82045

Contractor Information Meeting15 May 2013

River Span - Construction

Page 54: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Pier Table Construction

Page 55: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Pier Table Construction

Page 56: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Pier Table Construction

Page 57: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Global Construction Scheme

Page 58: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Deck Erection Pier 8

Page 59: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Segment Lifter

Max segment weight 180 tons Lifting frame weight 145 tons Stressing platform 17 tons Transporter 33 tons, 7 axles at 4'-3"

Page 60: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Segment Lifter

Page 61: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Deck Erection Pier 8

Page 62: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Deck Erection Pier 8

Page 63: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Deck Erection Pier 8

Page 64: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Deck Erection Pier 8

Page 65: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Deck Erection Pier 8

Page 66: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Deck Erection Pier 13 to East Abutment

Page 67: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Sequence Pier 13 to East Abutment

Page 68: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Deck Erection Pier 13 to East Abutment

Page 69: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Sequence Pier 13 to East Abutment

Page 70: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Sequence Pier 13 to East Abutment

Page 71: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Longitudinal Infill

Page 72: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Longitudinal Infill

Page 73: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Stay Strut Erection

Page 74: St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans

Stay Strut Erection