SITE VERIFICATION DOCUMENT
SINGLE SITE VERIFICATION
SITE ID:12345BTS ID: 12345BTS Type:Macro / MicroBS Name:Citra Graha M-L-RTCluster Name:CBDDate:May 1, 2013Version:V1.1
RADIO NETWORK PLANNING & OPTIMIZATION
2013Contents1. LEGEND & TOOLS INFORMATION2. SITE MAP3. SITE PLANNING INFORMATION4. SITE AUDIT RESULT5. TEST RESULT OF FUNCTIONABILITY6. DRIVE TEST COVERAGE VERIFICATION7. BENCHMARKING TEST8. SUMMARY KPI ACHIEVEMENT9. SINGLE SITE VERIFICATION ACCEPTANCE
1. LEGEND & TOOLS INFORMATION1. a. RSRP LEGEND (5 Varian Range Yg Sama)
Following are important points, should be considered while analyzing field testing. No external Omni antenna was used during Drive Test. Car penetration loss adds an additional loss to the link.
1. b. SINR LEGEND (5 Varian Range Yg Sama)
Following are important points, should be considered while analyzing field testing. No external Omni antenna was used during Drive Test. Car penetration loss adds an additional loss to the link.
1. c. TOOLS USEDThe tools that had been used during the field measurement procedure were: Hardware:UE E398s HuaweiGPS Receiver Software:Huawei Genex Probe V3R5Huawei Genex Assistant V3R5Mapinfo
2. SITE MAP
3. SITE PLANNING INFORMATIONRADIO SPECIFICATIONS
Network InformationCell 0Cell 1Cell 2
Antenna Azimuth0120240
Mechanical Down Tilt1289
Embedded Electrical Down Tilt222
Additional Electrical Down Tilt000
Antenna TypeSL 124 16ASL 124 16ASL 124 16A
Antenna Height666666
Antenna Hieght Collo ApssX XXXXX
CELL CONFIGURATIONS
Network InformationCell 0Cell 1Cell 2
eNodeB ID202202202
PCI101102103
TAC333333
DL EARFCN391503915039150
RB Used100100100
BS Power (dBm)494949
DRIVE TEST RESULT
PCIPlanned valueActual valueOk or Not
Cell 0101101OK
Cell 1102102OK
Cell 2103103OK
AzimuthPlanned valueActual valueOk or Not
Cell 000OK
Cell 1110110OK
Cell 2240240OK
Mechanical TiltPlanned valueActual valueOk or Not
Cell 01212OK
Cell 188OK
Cell 299OK
4. SITE AUDIT RESULT2. 1. SITE INFORMATION.
Site Overview GPS Information
2. 2. Azimuth Measurement Top [In Degree].
Azimuth Cell 0 TOP (0) Azimuth Cell 1 TOP (120) Azimuth Cell 2 TOP (0)
2. 3. Azimuth Measurement Below [In Degree].
Azimuth Cell 0 BELOW (0) Azimuth Cell 1 BELOW (120) Azimuth Cell 2 BELOW (240)
2. 4. Antenna Height Measurement [In Meter].
Antenna Height Cell 0 TOP (18) Antenna Height Cell 1 TOP (18) Antenna Height Cell 2 TOP (18)
2. 5. Mechanical Tilting Measurement [In Degree].
Mech. Tilting Cell 0 (3 Deg) Mech. Tilting Cell 1 (3 Deg) Mech. Tilting Cell 2 (3 Deg)
5. TEST RESULT OF FUNCTIONAIBILITY5.1 ACCESSABILITY TEST (STATIC TEST)StaticAttempt TimesSuccess TimesRadio Access Success RateTarget RateOK or NOT
[number][number][%][%]
Cell 01010100>=XXOK
Cell 11010100>=XXOK
Cell 21010100>=XXOK
Accessability Cell 0 (100 %) Accessability Cell 1 (100 %) Accessability Cell 2 (100 %)
5.2 PING TEST (STATIC TEST)Ping TestDestinationPGWAverage LatencyTarget LatencyNumb. Packet SendNumb. Packet ReceivePacket LossTargetOK or NOK
[IP Target Server][ms][ms][number][number][%][%]
Cell 0FTP Server35