ss-25 action plan for april 21, 2017 ss-25 well site field ... · ss-25 action plan for april 22,...

133
SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement SoCalGas to take SS-25 A&B pressure reads (DOGGR directive) SoCalGas personnel onsite to support SS-25 activities

Upload: others

Post on 02-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for April 21, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

Page 2: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for April 22, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

Page 3: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for April 23, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

Page 4: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for April 24, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

Page 5: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for April 25, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities Activities That Require Approval Schlumberger to collect DTS temperature data on SS-25 Work To Commence on April 26, 2017: GM Volkmar Consulting, Krummrich Engineering, Ensign Well Services, Doby Hagar Trucking, and

Weatherford, to conduct a job walk in anticipation of moving a workover rig and associated equipment for SS-25 A

Page 6: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for April 26, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities GM Volkmar Consulting, Krummrich Engineering, Ensign Well Services, Doby Hagar Trucking, and

Weatherford, to conduct a job walk in anticipation of moving a workover rig and associated equipment for SS-25 A

Activities That Require Approval ISI to shoot fluid levels on SS-25, SS-25A and SS-25B

Geosyntec to conduct BMP inspection and maintenance as needed

Page 7: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for April 27, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities GM Volkmar Consulting, Krummrich Engineering, Ensign Well Services, Doby Hagar Trucking, and

Weatherford, to conduct a job walk in anticipation of moving a workover rig and associated equipment for SS-25 A

Page 8: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for April 28, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

Page 9: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for April 29, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

Page 10: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for April 30, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities Activities That Require Approval Work To Commence on May 1, 2017: U.C.I to conduct site preparation for pending rig work

Ensign to conduct site preparation for pending rig work

Krummrich Engineering to conduct site preparation for pending rig work

Page 11: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 1, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities Activities That Require Approval U.C.I to conduct site preparation for pending rig work

Ensign to conduct site preparation for pending rig work

Krummrich Engineering to conduct site preparation for pending rig work Work to Commence on May 2, 2017: Schlumberger to collect DTS temperature data on SS-25

Schlumberger to remove DTS line from SS-25B following data retrieval

T&T Crane to assist Schlumberger with removal of DTS line from SS-25B

Page 12: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 2, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities Activities That Require Approval U.C.I to conduct site preparation for pending rig work

Ensign to conduct site preparation for pending rig work

Krummrich Engineering to conduct site preparation for pending rig work Schlumberger to collect DTS temperature data on SS-25

Schlumberger to remove DTS line from SS-25B following data retrieval

T&T Crane to assist Schlumberger with removal of DTS line from SS-25B

Work to Commence on May 3, 2017: T&T Crane to move evidence trailer from SS-9 to PS-20 under direction/supervision of BLADE

Page 13: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 3, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities U.C.I to conduct site preparation for pending rig work

Ensign to conduct site preparation for pending rig work

Krummrich Engineering to conduct site preparation for pending rig work Schlumberger to collect DTS temperature data on SS-25

Schlumberger to remove DTS line from SS-25B following data retrieval

T&T Crane to assist Schlumberger with removal of DTS line from SS-25B

T&T Crane to move evidence trailer from SS-9 to PS-20 under direction/supervision of BLADE. CPUC and/or

DOGGR Aliso Incident engineer(s) to be present during move and sign off on evidence transfer protocol

Evidence trailer site camera set up and field of vision system validation test with CPUC Lead

ISI to shoot fluid levels on SS-25, SS-25A and SS-25B

Quality Ag to remove weeds and brush in anticipation of pending rig work (May 4, 2017) Activities That Require Approval AECOM to conduct SS-25 camera system inspection

Page 14: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 4, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities U.C.I to conduct site preparation for pending rig work

Ensign to conduct site preparation for pending rig work

Krummrich Engineering to conduct site preparation for pending rig work

T&T Crane to move evidence trailer from SS-9 to PS-20 under direction/supervision of BLADE. CPUC and/or

DOGGR Aliso Incident engineer(s) to be present during move and sign off on evidence transfer protocol

Evidence trailer site camera set up and field of vision system validation test with CPUC Lead

Quality Ag to remove weeds and brush in anticipation of pending rig work AECOM to conduct SS-25 camera system inspection

Page 15: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 5, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities U.C.I to conduct site preparation for pending rig work

Ensign to conduct site preparation for pending rig work

T&T Crane to move evidence trailer from SS-9 to PS-20 under direction/supervision of BLADE. CPUC and/or

DOGGR Aliso Incident engineer(s) to be present during move and sign off on evidence transfer protocol

Evidence trailer site camera set up and field of vision system validation test with CPUC Lead

Quality Ag to remove weeds and brush in anticipation of pending rig work AECOM to conduct SS-25 camera system inspection Activities That Require Approval BCI to deliver office furniture to pods on site (May 6, 2017)

Page 16: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 6, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities U.C.I to conduct site preparation for pending rig work

Ensign to conduct site preparation for pending rig work

Quality Ag to remove weeds and brush in anticipation of pending rig work Activities That Require Approval BCI to deliver office furniture to pods on site

Page 17: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 7, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities U.C.I to conduct site preparation for pending rig work

Ensign to conduct site preparation for pending rig work

Activities That Require Approval BCI to deliver office furniture to pods on site

Texas Oil Laboratory to collect samples from SS-25A (work to commence on May 8, 2017)

Ensign, Cameron, BCI, Doby Hagar, Weatherford, Geo Fluids, and Onyx to initiate rig mobilization and set-up on SS-25A (work to commence on May 8, 2017)

Page 18: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 8, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities U.C.I to conduct site preparation for pending rig work

Ensign to conduct site preparation for pending rig work

Activities That Require Approval BCI to deliver office furniture to pods on site

Texas Oil Laboratory to collect samples from SS-25A

Ensign, Cameron, BCI, Doby Hagar, Weatherford, Geo Fluids, Onyx to initiate rig mobilization and set-up on SS-25 A

DOGGR District personnel onsite to observe SS-25 A activities

Co’s Traffic Control to provide logistical support for SS-25 A activities

Page 19: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 9, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities U.C.I to conduct site preparation for pending rig work

Texas Oil Laboratory to collect samples from SS-25A

Ensign, Cameron, BCI, Doby Hagar, Weatherford, Geo Fluids, Onyx and Krummrich Engineering to initiate rig

mobilization and set-up on SS-25 A

DOGGR District personnel onsite to observe SS-25 A activities

Co’s Traffic Control to provide logistical support for SS-25 A activities

Page 20: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 10, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities U.C.I to conduct site preparation for pending rig work

Texas Oil Laboratory to collect samples from SS-25A

Ensign, Cameron, BCI, Doby Hagar, Weatherford, Geo Fluids, Onyx and Krummrich Engineering to initiate rig

mobilization and set-up on SS-25 A

DOGGR District personnel onsite to observe SS-25 A activities

Co’s Traffic Control to provide logistical support for SS-25 A activities

Activities That Require Approval Geosyntec to provide site support in preparation of SS-25A monitoring point survey (May 9, 2017)

WM Survey to survey monitoring points for SS-25A

ISI to shoot fluid levels on SS-25, SS-25A and SS-25B

Page 21: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 11, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities U.C.I to conduct site preparation for pending rig work

Texas Oil Laboratory to collect samples from SS-25A

Ensign, Cameron, BCI, Doby Hagar, Weatherford, Geo Fluids, Onyx and Krummrich Engineering to initiate rig

mobilization and set-up on SS-25 A

DOGGR District personnel onsite to observe SS-25 A activities

Co’s Traffic Control to provide logistical support for SS-25 A activities

Activities That Require Approval Geosyntec to provide site support in preparation of SS-25A monitoring point survey

WM Survey to survey monitoring points for SS-25A

Generator Services Co Inc. to conduct maintenance of rig generator

Versa-Line to conduct a job walk for pending logging work

Pacific Petroleum to conduct portable restroom maintenance

Page 22: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 12, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory

Co’s Traffic Control to provide logistical support for SS-25 A activities

Activities That Require Approval Geosyntec, WM Survey, Generator Services Co Inc., Baker Hughes, Versa- Line, Schlumberger, Halliburton,

NOV Tubulars, Pacific Petroleum, ISI, and Argus to perform well work/provide support at SS-25 A

Page 23: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 13, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels

Co’s Traffic Control to provide logistical support for SS-25 A activities Activities That Require Approval Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 24: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 14, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels

Co’s Traffic Control to provide logistical support for SS-25 A activities Activities That Require Approval Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 25: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 14, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels

Co’s Traffic Control to provide logistical support for SS-25 A activities Activities That Require Approval Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 26: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 15, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 27: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 16, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 28: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 17, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Activities That Require Approval Agile 1 to provide wireline support at SS-25 A

GM Volkmar Consulting to provide rig work support at SS-25 A

Padilla Electric to provide rig work support at SS-25 A (support to commence on May 18, 2017)

Page 29: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 18, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 30: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 19, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 31: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 20, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Activities That Require Approval Western Wireline to provide rig support at SS-25 A

Page 32: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 21, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 33: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 22, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 34: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 23, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 35: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 24, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 36: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 25, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 37: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 26, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 38: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 27, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 39: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 28, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 40: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 29, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 41: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 30, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 42: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for May 31, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 43: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 01, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Activities That Require Approval Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 44: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 02, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 45: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 03, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 46: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 04, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 47: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 05, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 48: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 06, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 49: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 07, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road Activities That Require Approval EV Camera to advance video camera down SS-25 A

Page 50: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 08, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline - EV Camera

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 51: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 09, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline - EV Camera

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 52: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 10, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline - EV Camera

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 53: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 11, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline - EV Camera

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 54: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 12, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline - EV Camera

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 55: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 13, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline - EV Camera

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Activities That Require Approval BJ Services to provide cement pumping services at SS-25 A

Oilfield Safety Anchor Services to identify locations for rig anchors

Page 56: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 14, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline - EV Camera - BJ Services - Oilfield Safety Anchor Services

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 57: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 15, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline - EV Camera - BJ Services - Oilfield Safety Anchor Services

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Activities That Require Approval Scientific Drilling Incorporated to provide rig support

Welaco Wireline to provide rig support

Page 58: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 16, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline - EV Camera - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 59: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 17, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Texas Oil Laboratory - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Versa- Line - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - Argus - SC Fuels - Agile 1 - GM Volkmar Consulting - Padilla Electric - Western Wireline - EV Camera - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 60: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 18, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 61: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 19, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 62: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 20, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 63: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 21, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 64: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 22, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 65: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 23, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 66: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 24, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 67: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 25, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 68: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 26, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 69: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 27, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 70: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 28, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 71: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 29, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 72: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 29, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 73: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for June 30, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 74: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 1, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 75: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 2, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 76: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 3, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 77: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 4, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 78: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 5, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 79: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 6, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 80: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 7, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 81: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 8, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 82: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 9, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc.

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 83: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 10, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc.

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 84: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 11, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc.

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 85: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 12, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc.

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 86: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 13, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc.

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Activities That Require Approval American Integrated Services, Inc. (AIS) to assist with anchor preparation

Page 87: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 14, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 88: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 15, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Activities That Require Approval Trinity Safety Company to oversee confined space entry when work is performed in the SS-25 cellar and on the

wellhead (for Ensign)

Texas Oil Laboratory to sample fluid from tubing and casing when we move to SS-25 (tubing fluid sampling will

be a pre-rig activity)

Page 89: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 16, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS

The following companies to perform well work/provide support at SS-25: - Trinity Safety Company - Texas Oil Laboratory

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 90: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 17, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS

The following companies to perform well work/provide support at SS-25: - Trinity Safety Company - Texas Oil Laboratory

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 91: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 18, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS

The following companies to perform well work/provide support at SS-25: - Trinity Safety Company - Texas Oil Laboratory

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 92: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 19, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS

The following companies to perform well work/provide support at SS-25: - Trinity Safety Company - Texas Oil Laboratory

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 93: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 20, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS

The following companies to perform well work/provide support at SS-25: - Trinity Safety Company - Texas Oil Laboratory

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 94: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 20, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS

The following companies to perform well work/provide support at SS-25: - Trinity Safety Company - Texas Oil Laboratory

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 95: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 21, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS

The following companies to perform well work/provide support at SS-25: - Trinity Safety Company - Texas Oil Laboratory

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Activities That Require Approval Trinity Safety Company to monitor gas on and around SS-25 A rig

Page 96: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 22, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company

The following companies to perform well work/provide support at SS-25: - Trinity Safety Company - Texas Oil Laboratory

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 97: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 23, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company

The following companies to perform well work/provide support at SS-25: - Trinity Safety Company - Texas Oil Laboratory

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 98: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 24, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company

The following companies to perform well work/provide support at SS-25: - Trinity Safety Company - Texas Oil Laboratory

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Activities That Require Approval

UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 99: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 25, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company

The following companies to perform well work/provide support at SS-25: - Trinity Safety Company - Texas Oil Laboratory

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 100: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 26, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company

The following companies to perform well work/provide support at SS-25: - Trinity Safety Company - Texas Oil Laboratory

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 101: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 27, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company

The following companies to perform well work/provide support at SS-25: - Trinity Safety Company - Texas Oil Laboratory

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Activities That Require Approval

Capstone to provide site safety oversight and assistance

Page 102: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 28, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone

The following companies to perform well work/provide support at SS-25: - Trinity Safety Company - Texas Oil Laboratory - Capstone

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 103: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 29, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone

The following companies to perform well work/provide support at SS-25: - Trinity Safety Company - Texas Oil Laboratory - Capstone

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 104: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 29, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

Activities That Require Approval

T&T Truck and Crane Service to provide rig support at SS-25A and SS-25

Page 105: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 30, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone - T&T Truck and Crane

The following companies to perform well work/provide support at SS-25: - Trinity Safety Company - Texas Oil Laboratory - Capstone - T&T Truck and Crane

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 106: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 30, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

Activities That Require Approval

Argus to remove/install/or inspect scaffolding as needed

Page 107: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 31, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone - T&T Truck and Crane - Argus

The following companies to perform well work/provide support at SS-25: - Trinity Safety Company - Texas Oil Laboratory - Capstone - T&T Truck and Crane - Argus

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers Barney’s Electric Inc. to install a transmitter on the SS-25 access road

Page 108: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for July 31, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 109: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 1, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone - T&T Truck and Crane - Argus

The following companies to perform well work/provide support at SS-25: - Trinity Safety Company - Texas Oil Laboratory - Capstone - T&T Truck and Crane - Argus

Co’s Traffic Control to provide logistical support for SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 110: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 1, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews UCI to provide maintenance support on valve station W-4, located south of SS-25 access road Activities That Require Approval The following companies to perform well work/provide support at SS-25:

- Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS

Page 111: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 2, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 and SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone - T&T Truck and Crane - Argus - Trinity Safety Company - Texas Oil Laboratory - Capstone - T&T Truck and Crane - Argus

Co’s Traffic Control to provide logistical support for SS-25 and SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 112: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 3, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

Approved Activities ▪ SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

▪ SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

▪ SoCalGas personnel onsite to support SS-25 activities

▪ California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

▪ The following companies to perform well work/provide support at SS-25 and SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone - T&T Truck and Crane - Argus - Trinity Safety Company - Texas Oil Laboratory - Capstone - T&T Truck and Crane - Argus - AECOM (site safety coverage to begin on 8/2- approval granted by N. Sher/ M. Epuna on 8/1)

▪ Co’s Traffic Control to provide logistical support for SS-25 and SS-25 A activities ▪ Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

▪ UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 113: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 4, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 and SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone - T&T Truck and Crane - Argus - Trinity Safety Company - Texas Oil Laboratory - Capstone - T&T Truck and Crane - Argus - AECOM

Co’s Traffic Control to provide logistical support for SS-25 and SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 114: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 5, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

Approved Activities ▪ SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

▪ SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

▪ SoCalGas personnel onsite to support SS-25 activities

▪ California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

▪ The following companies to perform well work/provide support at SS-25 and SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone - T&T Truck and Crane - Argus - Trinity Safety Company - Texas Oil Laboratory - Capstone - T&T Truck and Crane - Argus - AECOM

▪ Co’s Traffic Control to provide logistical support for SS-25 and SS-25 A activities ▪ Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

▪ UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 115: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 6, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

Approved Activities ▪ SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

▪ SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

▪ SoCalGas personnel onsite to support SS-25 activities

▪ California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

▪ The following companies to perform well work/provide support at SS-25 and SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone - T&T Truck and Crane - Argus - Trinity Safety Company - Texas Oil Laboratory - Capstone - T&T Truck and Crane - Argus - AECOM

▪ Co’s Traffic Control to provide logistical support for SS-25 and SS-25 A activities ▪ Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

▪ UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 116: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 6, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews Activities That Require Approval ▪ DI Drilling to provide rig support with directional logging

Page 117: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 7, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

Approved Activities SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

SoCalGas personnel onsite to support SS-25 activities

California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

The following companies to perform well work/provide support at SS-25 and SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone - T&T Truck and Crane - Argus - Trinity Safety Company - Texas Oil Laboratory - Capstone - T&T Truck and Crane - Argus - AECOM - DI Drilling

Co’s Traffic Control to provide logistical support for SS-25 and SS-25 A activities Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 118: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 8, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

Approved Activities ▪ SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

▪ SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

▪ SoCalGas personnel onsite to support SS-25 activities

▪ California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

▪ The following companies to perform well work/provide support at SS-25 and SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone - T&T Truck and Crane - Argus - Trinity Safety Company - Texas Oil Laboratory - Capstone - T&T Truck and Crane - Argus - AECOM - DI Drilling

▪ Co’s Traffic Control to provide logistical support for SS-25 and SS-25 A activities ▪ Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

▪ UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 119: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 9, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

Approved Activities ▪ SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

▪ SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

▪ SoCalGas personnel onsite to support SS-25 activities

▪ California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

▪ The following companies to perform well work/provide support at SS-25 and SS-25 A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone - T&T Truck and Crane - Argus - Trinity Safety Company - Texas Oil Laboratory - Capstone - T&T Truck and Crane - Argus - AECOM - DI Drilling

▪ Co’s Traffic Control to provide logistical support for SS-25 and SS-25 A activities ▪ Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

▪ UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 120: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 10, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

Approved Activities ▪ SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

▪ SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

▪ SoCalGas personnel onsite to support SS-25 activities

▪ California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

▪ The following companies to perform well work/provide support at SS-25 and SS-25A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone - T&T Truck and Crane - Argus - Trinity Safety Company - Texas Oil Laboratory - Capstone - T&T Truck and Crane - Argus - AECOM - DI Drilling

▪ Co’s Traffic Control to provide logistical support for SS-25 and SS-25 A activities ▪ Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

▪ UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 121: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 10, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

Activities That Require Approval ▪ Boots & Coots to provide site support at SS-25 and SS-25A

Page 122: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 11, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

Approved Activities ▪ SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

▪ SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

▪ SoCalGas personnel onsite to support SS-25 activities

▪ California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

▪ The following companies to perform well work/provide support at SS-25 and SS-25A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone - T&T Truck and Crane - Argus - Trinity Safety Company - Texas Oil Laboratory - Capstone - T&T Truck and Crane - Argus - AECOM - DI Drilling - Boots & Coots

▪ Co’s Traffic Control to provide logistical support for SS-25 and SS-25 A activities ▪ Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 123: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 11, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

▪ UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 124: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 12, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

Approved Activities ▪ SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

▪ SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

▪ SoCalGas personnel onsite to support SS-25 activities

▪ California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

▪ The following companies to perform well work/provide support at SS-25 and SS-25A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone - T&T Truck and Crane - Argus - Trinity Safety Company - Texas Oil Laboratory - Capstone - T&T Truck and Crane - Argus - AECOM - DI Drilling - Boots & Coots

▪ Co’s Traffic Control to provide logistical support for SS-25 and SS-25 A activities ▪ Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 125: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 12, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

▪ UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 126: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 13, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

Approved Activities ▪ SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

▪ SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

▪ SoCalGas personnel onsite to support SS-25 activities

▪ California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

▪ The following companies to perform well work/provide support at SS-25 and SS-25A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone - T&T Truck and Crane - Argus - Trinity Safety Company - Texas Oil Laboratory - Capstone - T&T Truck and Crane - Argus - AECOM - DI Drilling - Boots & Coots

▪ Co’s Traffic Control to provide logistical support for SS-25 and SS-25 A activities ▪ Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 127: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 13, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

▪ UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 128: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 14, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

Approved Activities ▪ SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

▪ SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

▪ SoCalGas personnel onsite to support SS-25 activities

▪ California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

▪ The following companies to perform well work/provide support at SS-25 and SS-25A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone - T&T Truck and Crane - Argus - Trinity Safety Company - Texas Oil Laboratory - Capstone - T&T Truck and Crane - Argus - AECOM - DI Drilling - Boots & Coots

▪ Co’s Traffic Control to provide logistical support for SS-25 and SS-25 A activities ▪ Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 129: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 14, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

▪ UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 130: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 15, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

Approved Activities ▪ SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

▪ SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

▪ SoCalGas personnel onsite to support SS-25 activities

▪ California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

▪ The following companies to perform well work/provide support at SS-25 and SS-25A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone - T&T Truck and Crane - Argus - Trinity Safety Company - Texas Oil Laboratory - Capstone - T&T Truck and Crane - Argus - AECOM - DI Drilling - Boots & Coots

▪ Co’s Traffic Control to provide logistical support for SS-25 and SS-25 A activities ▪ Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 131: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 15, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

▪ UCI to provide maintenance support on valve station W-4, located south of SS-25 access road

Page 132: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 16, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

Approved Activities ▪ SoCalGas to conduct daily leak survey by FLIR camera pursuant to AQMD Order for Abatement

▪ SoCalGas to take SS-25 A&B pressure reads (DOGGR directive)

▪ SoCalGas personnel onsite to support SS-25 activities

▪ California Public Utilities Commission, Safety & Enforcement Division (CPUC SED), Division of Oil, Gas and

Geothermal Resources (DOGGR) District personnel, DOGGR SED, and Blade Energy Partners (BLADE) onsite to observe SS-25 A activities

▪ The following companies to perform well work/provide support at SS-25 and SS-25A: - Ensign - Cameron - BCI - Doby Hagar - Weatherford - Geo Fluids - Onyx - Krummrich Engineering - U.C.I. - Geosyntec - WM Survey - Generator Services Co Inc. - Baker Hughes - Schlumberger - Halliburton - NOV Tubulars - Pacific Petroleum - ISI - SC Fuels - Padilla Electric - Western Wireline - BJ Services - Oilfield Safety Anchor Services - Scientific Drilling Incorporated - Welaco Wireline - Howard Supply - Blackjack Power Swivels - PROS, Inc. - AIS - Trinity Safety Company - Capstone - T&T Truck and Crane - Argus - Trinity Safety Company - Texas Oil Laboratory - Capstone - T&T Truck and Crane - Argus - AECOM - DI Drilling - Boots & Coots

▪ Co’s Traffic Control to provide logistical support for SS-25 and SS-25 A activities ▪ Exponent and Sigma3 personnel onsite to observe SS-25 A activities as third-party expert observers

Page 133: SS-25 Action Plan for April 21, 2017 SS-25 Well Site Field ... · SS-25 Action Plan for April 22, 2017 SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

SS-25 Action Plan for August 16, 2017

SS-25 Well Site Field Operations Supervisors: Chris Smith and Larry Andrews

▪ UCI to provide maintenance support on valve station W-4, located south of SS-25 access road