srv1data1 jobjob past401dc1415 unlv arc dust …...4.install vendor furnished control panel for dust...
TRANSCRIPT
![Page 1: SRV1Data1 jobjob past401dc1415 unlv arc dust …...4.INSTALL VENDOR FURNISHED CONTROL PANEL FOR DUST COLLECTOR. PROVIDE ALL FIELD POWER AND CONTROL WIRING ... VACUUM PUMPS E55A L12-](https://reader035.vdocuments.us/reader035/viewer/2022071104/5fde705f62c283433854a446/html5/thumbnails/1.jpg)
![Page 2: SRV1Data1 jobjob past401dc1415 unlv arc dust …...4.INSTALL VENDOR FURNISHED CONTROL PANEL FOR DUST COLLECTOR. PROVIDE ALL FIELD POWER AND CONTROL WIRING ... VACUUM PUMPS E55A L12-](https://reader035.vdocuments.us/reader035/viewer/2022071104/5fde705f62c283433854a446/html5/thumbnails/2.jpg)
![Page 3: SRV1Data1 jobjob past401dc1415 unlv arc dust …...4.INSTALL VENDOR FURNISHED CONTROL PANEL FOR DUST COLLECTOR. PROVIDE ALL FIELD POWER AND CONTROL WIRING ... VACUUM PUMPS E55A L12-](https://reader035.vdocuments.us/reader035/viewer/2022071104/5fde705f62c283433854a446/html5/thumbnails/3.jpg)
E0.02
ONE-LINE
DIAGRAM
ONE-LINE DIAGRAM
1. REMOVE PANELBOARD AND ALL ASSOCIATED BRANCH CIRCUITS
COMPLETE. REFER TO ELECTRICAL DEMOLITION PLANS FOR
ADDITIONAL INFORMATION.
2. PROVIDE NEW PANEL BOARD AND FEEDER AS SHOWN
3. PROVIDE NEW CIRCUIT BREAKER AND ALL REQUIRED MOUNTING
HARDWARE IN AVAILABLE SPACE. NEW CIRCUIT BREAKER SHALL
MATCH WITH EXISTING SIMILAR DEVICES IN THE DIST BOARD IN ALL
RESPECT.
4. INSTALL VENDOR FURNISHED CONTROL PANEL FOR DUST
COLLECTOR. PROVIDE ALL FIELD POWER AND CONTROL WIRING
BETWEEN CONTROL PANEL AND THE EQUIPMENT. VERIFY ALL WITH
DUST COLLECTOR EQUIPMENT INSTALLER.
5. LEAVE CIRCUIT BREAKER IN "OFF" POSITION AND MARK AS "SPARE"
6. PROVIDE MOMENTARY CONTACT EMERGENCY SHUT-OFF
PUSHBUTTON EQUAL TO EATON M22M-DRP-R. INSTALL IN A
SURFACE MOUNTED DIE CAST BOX. PROVIDE NAMEPLATE WITH
WHITE LETTERS ON RED BACKGROUND. READING "EMERGENCY
STOP".
KEY NOTES:
#
Approved By
File Name:
Drawn By
Date:
Checked By
Consultant Project No.
-
DRAWING TITLE :
REVISIONS :
04/12/16
SEAL:
CONSULTANT:
NO. DATE ISSUE
PR
OJE
CT
:
SIGMA'S Project No.
401DC1415
187 E
. W
arm
S
prings R
oad, S
uite A
Las V
egas, N
V 89119 (702) 315-4272
En
gin
ee
rin
g C
on
su
lta
nts
Sig
ma
M
ec
ha
nic
al
CONSTRUCTION
GR
AF
T L
AB
1
68
UN
LV
A
RC
B
UIL
DIN
G D
US
T C
OL
LE
CT
IO
N S
YS
TE
M
19.15.16 PLAN REVIEW COMMENTS
NR NRHG
350/3
EXISTING DIST BOARD 'LDB', 800A, 208Y/120V, 3PH, 4W, N-1, 22KAIC
800/3
480V
(E) XF, 225 KVA
208Y/120V
(E)
PNL
L1
150/3
(E)
NV ENERGY
XFMR
1600/3
EXISTING MAIN SWITCHBOARD MSB, 1600 AMP, 480Y/277V, 3-PH, 4-W, N-1, 50KAIC
ST GFP
(E)
(E)
PNL
L2
150/3
(E)
(E)
PNL
L3
(E)
PNL
L4
(E)
PNL
L5
100/3
(E)
100/3
(E)
100/3
(E)
150/3
(E)
150/3
(E) (E)
(E)
PNL
L6
(E)
PNL
L7
(E)
PNL
L8
100/3
(X)
(X)
PNL
L9
100/3
(E)
(E)
PNL
L10
100/3
(E)
PNL
H1
150/3
(E)
(E)
PNL
H2
100/3
(E)
(E)
PNL
H3
100/3
(E)
(E)
PNL
H4
100/3
(E)
(E)
MCC
200/3
(E)
CHILLER
350/3
(E)
80/3 80/3 80/3 80/3 80/3 80/3 80/3
G
60/3
(E) ATS2, 60A
225/3
(E) ATS1, 225A
225/3 60/3
(E)
PNL
EH1
(E)
PNL
EH2
480V
(E) XF, 15 KVA
208Y/120V
(E)
PNL
EL1
(E) 125KW/156.25KVA
1
(X)
(X)
PNL
L9B
1
(N) 80/3
(N) DUST COLLECTOR
25 HP
(N)
3#6,
1#8,
1"C
(N) 225/3
(N)
4#4/0,
1#4,
2-1/2"C
(N) PNL L11
(N) 225/3
(N)
4#4/0
1#4,
2-1/2"C
2
33
3
5
50/3
(E)
(E) (E) (E) (E) (E) (E) (E)
(X)
PNL
L9A
1
(X)
4
(N)
3#6,
1#8,
1"C
(E)
(E) (E) (E) (E) (E) (E) (E) (E) (E)
(E)
(E)
(E)
(E)
EMERGENCY
STOP
6
(N) PNL L9
2
(N)
2#12,
1#12,
3/4"C
100/3 N3R
STST
(E)
(N) 200/3
3
(N) 125/3
(N)
4#1
1#6,
2"C
3
EMERGENCY
STOP
6
(N)
2#12,
1#12,
3/4"C
(N) PNL L12
2
ST
EMERGENCY
STOP
6
(N)
2#12,
1#12,
3/4"C
(N)
4#3/0
1#6,
2-1/2"C
1
1
1
1
REARRANGED
DRAWING
1
(N) PNL L13
2
ST
EMERGENCY
STOP
(FUTURE)
1
![Page 4: SRV1Data1 jobjob past401dc1415 unlv arc dust …...4.INSTALL VENDOR FURNISHED CONTROL PANEL FOR DUST COLLECTOR. PROVIDE ALL FIELD POWER AND CONTROL WIRING ... VACUUM PUMPS E55A L12-](https://reader035.vdocuments.us/reader035/viewer/2022071104/5fde705f62c283433854a446/html5/thumbnails/4.jpg)
(N) PNL L11
1
SS
L11-34
L11- 35
L11- 11,13
L11-36
2
2
2
(N) PNL L9
1
2
(N) PNL L12
1
L9-2,4
E4
L9-5,7,9
E6
L9-30
L9-17,19,21
E10
L9-1,3
E2
L9-6,8,10
E7
L9-12,14,16
E9
L9-11,13,15
E8
E25
E13
L9-23,25,27
L9-36
E31
E26
L11-15,17
E47
(N) PNL L13
(E) AIR COMP
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
L11-33
2
L11-32
2
L11-31
2
L11-30
2
L11-28
2
L11-292
(E)
(E)
(E)
(E)
L11-37
L11-38
L11-39
(E)
(E)(E)
(E)
L11-1,3,5
E40
L11-14,16,18
E48
L11-20,22,24
E50
L9-45
L9-39
2
2
2
L9-46,48
2
L9-42,44
2
L9-50,52
2
(E) DIST BOARD "LDB"
(E) MAIN SERVICE "MSB"
E44
L11-2,4
E41
L11-7,9
E42
L11-6,8
E43
L11-19,21,23
E49
L11-10,12
E46
L11-25,27
E51
E18
E11
E14
L9-18
E15
L9-20
E16L9-24,26,28
L9-29,31
E17
E23
L9-37
PNL L9
PNL L11
5
5
(N) DUST COLLECTOR (DC-1)
CONTROL PANEL
1 3
(N) EXPLOSION ISOLATION VALVE(EIV-1)
CONTROL PANEL
4
L9-22
E27
L9-38
E28
L9-41E29
L9-40
E30
L9-43
E32
L9-47
MSB
1 6
L11- 26
E52
L9-40,42
(E)
2
DROP CORD
CR
L9-33
E19
CR
L9-32
E20
CR
L9-35
E21
CR
L9-34
E22
CR
(N) AIR COMP
E54
L12- 2,4,6
(N) VACUUM PUMPS
E55A
L12- 7,9,11
CNC
CONTROL
CABINET
VACUUM
PUMP
AIR
COMPRESSOR
E53
L12- 1,3,5
E55B
L12- 8,10,12
PNL L12
5
7
8
1
1,3
10
5,7
9
E2.01
ELECTRICAL
PLAN
ELECTRICAL PLAN
SCALE: 1/4" = 1'-0"
Approved By
File Name:
Drawn By
Date:
Checked By
Consultant Project No.
-
DRAWING TITLE :
REVISIONS :
04/12/16
SEAL:
CONSULTANT:
NO. DATE ISSUE
PR
OJE
CT
:
SIGMA'S Project No.
401DC1415
187 E
. W
arm
S
prings R
oad, S
uite A
Las V
egas, N
V 89119 (702) 315-4272
En
gin
ee
rin
g C
on
su
lta
nts
Sig
ma
M
ec
ha
nic
al
CONSTRUCTION
GR
AF
T L
AB
1
68
UN
LV
A
RC
B
UIL
DIN
G D
US
T C
OL
LE
CT
IO
N S
YS
TE
M
19.15.16 PLAN REVIEW COMMENTS
NR NRHG
KEY NOTES :
1. REFER TO ONE-LINE DIAGRAM FOR ADDITIONAL
INFORMATION AND REQUIREMENTS.
2. CIRCUITS FOR EXISTING DEVICES SHOWN AS (E) SHALL BE
EXTENDED WITH LIKE SIZE CONDUIT AND WIRE AND
CONNECTED TO NEW PANEL AS SHOWN.
3. INSTALL VENDOR FURNISHED DUST COLLECTOR (DC-1)
CONTROL PANEL. PROVIDE ALL FIELD WIRING AND CONNECT
TO DC-1 AS REQUIRED BY MANUFACTURER.
4. INSTALL VENDOR FURNISHED EXPLOSION ISOLATION VALVE
(EIV-1) CONTROL PANEL. PROVIDE ALL FIELD WIRING AND
CONNECT TO EIV-1 AS REQUIRED BY MANUFACTURER.
5. EMERGENCY SHUT-OFF SWITCH. SEE ONE-LINE DIAGRAM
FOR ADDITIONAL INFORMATION.
6. ROUTE WIRING THRU DUST COLLECTOR CONTROL PANEL.
#
NOTES:
1. SEE EQUIPMENT ELECTRICAL REQUIREMENT SCHEDULE ON SHEET E0.02 FOR CONDUIT, WIRE AND CONNECTION
REQUIREMENTS FOR ALL SHOP EQUIPMENT.
2. CONTRACTOR SHALL VERIFY ALL ELECTRICAL REQUIREMENTS WITH ACTUAL EQUIPMENT NAMEPLATE PRIOR TO ANY
ROUGH-IN WORK.
SECURE TO STRUCTURE
STRUCTURE
CONDUIT TO
ANCHOR
OUTLET BOX WITH
SINGLE L5-20R RECEPTACLE
L5-20P PLUG
CONNECTOR BODY PER
EQUIPMENT SCHEDULE
DUSTIGHT STRAIN RELIEF
GRIP WITH ALUMINUM
FITTINGS AND GALVANIZED
STEEL MESH.
HUB COVER
CAST OUTLET BOX WITH
SECURE TO STRUCTURE
72" ABOVE FINISH FLOOR
STRUCTURE
CONDUIT TO
ANCHOR
DROP OUTLET DIAGRAM
NOT TO SCALE
1
3/C SO TYPE CORD
PER EQUIPMENT SCHEDULE
SECURE TO
STRUCTURE
CORD REEL
HUBBELL
HBL-45123R20
DUPLEX RECEPTACLE
(PART OF CORD REEL
ASSEMBLY)
NOT TO SCALE
2
DROP CORD REEL DIAGRAM -
AT WORK TABLES
SYMBOL ON PLANS
CR
SYMBOL ON PLANS
7. APPROXIMATE LOCATION OF UNDERGROUND CONDUIT
ROUTE. VERIFY EXACT LOCATION WITH OWNER
REPRESENTATIVE. EXCAVATION SHALL BE HAND DIG OR BY
SUCTION EXCAVATION ONLY.
8. ROUTE CONDUIT ATTACHED TO DUST COLLECTOR SUPPORT
SYSTEM AND EXTEND OVERHEAD TO DIST. BOARD "LDB".
9. PROVIDE 1-5/8" X 1-5/8" HOT DEEP GALVANIZED UNISTRUT
SUPPORT FOR PANEL AND WP RECEPTACLES.
10. PROVIDE INDUSTRIAL GRADE GFCI RECEPTACLES, HUBBELL
GFR8200SG, IN WP OUTLET BOX WITH HEAVY DUTY DIE CAST
IN-USE WP COVER.
REARRANGED
DRAWING
1
1
1
1
1