8
Track Record
Client Project Type Brief Description Year SRM’s Responsibility Status
Esquel Group (Leisure
Garments)
ISO 14001:2004
Implementation
Consultancy services for implementation of Environment Management System
2000 Complete project in the production unit Completed
Universal Fabrics Ltd
ISO 9001:2000 Implementation
Consultancy services for implementation of Quality Assurance System
2000 Complete project for the main production unit in Mauritius
Completed
Association Hôteliers et
Restaurateurs de L'île Maurice
Solid Waste Management
System
Seminar on Solid Waste Management System for personnel & maintenance managers of over 20 beach resort hotels in Mauritius
2000 Training Seminar Completed
Green Cross Medical
Laboratory
ISO 9002:1994 Implementation
Consultancy services for implementation of a Quality Assurance System
2000 Complete project Completed
Esquel Group (Textile
Industries Ltd)
ISO 14001:2004
Implementation
Consultancy services for implementation of an Environment Management System
2001 Complete project Completed
Italpro Ltd
Environmental Impact
Assessment for Wine Factory
Complete EIA report preparation to granting of EIA licence for a proposed wine factory
2001
Complete Environmental Impact Assessment study
Completed
Pleasure Bay Ltd
Environmental planning of
proposed hotel in Rodrigues
Environmental planning and facilitation of licenses of a proposed 44 room hotel project in Rodrigues Island
2001 Complete study Completed
Montgomery Watson (UK)
Economic Impact
Assessment for Plaines Wilhems
Sewerage
Performed an Economic Impact Assessment of the Plaines Wilhems Sewerage Project
2001 Complete study Completed
9
Client Project Type Brief Description Year SRM’s Responsibility Status
Bonny Air Travel and Tours Ltd
ISO 9001:2000 Implementation
Consultancy services for the implementation of a Quality Assurance System
2001 Complete project in Mauritius Completed
PAD & Co Ltd ISO 9001:2000 Implementation
Consultancy services for the implementation of a Quality Assurance System
2001 Complete project in Mauritius Completed
Il Moro Di Venezia Ltee
ISO 9001:2000 Implementation
Consultancy services for the implementation of a Quality Assurance System
2001 Complete project in Mauritius Completed
Data Communica-tions Limited
ISO 9001:2000 Implementation
Consultancy services for the implementation of a Quality Assurance System
2001 Complete project in Mauritius Completed
Queenswear Ltd
ISO 9001:2000 Implementation
Consultancy services for the implementation of a Quality Assurance System
2001 Complete project in Mauritius Completed
Queenswear Ltd
ISO 14001:2004
Implementation
Consultancy services for the implementation of an Environment Management System
2001 Complete project in Mauritius Completed
National Renewables
Energy Laboratory,
USA
Feasibility report
Feasibility for Bagasse utilisation in Cogeneration
2001 Complete project
Completed
Ministry of Fisheries
Seaweed Farming in Rodrigues
Feasibility and site identification together with Environmental Impact Identification
2002 Part of the study Completed
Unicorn Ltd ISO 9001:2000 Implementation
Consultancy services for the implementation of a Quality Assurance System
2002 Complete project in Mauritius Completed
Prosimex Ltd ISO 9001:2000 Implementation
Consultancy services for the implementation of a Quality Assurance System
2002 Complete project in Mauritius Completed
10
Client Project Type Brief Description Year SRM Responsibility Status
Alpha Cleaning Ltd
ISO 9001:2000 Implementation
Consultancy services for the implementation of a Quality Assurance System
2002 Ongoing Project in Mauritius Completed
Southern Textile Ltd
ISO 14001:2004
Implementation
Consultancy services for the implementation of an Environment Management System
2002 Ongoing Project in Mauritius Completed
Cover Craft Flash Diagnosis
Diagnosis of the company’s strength and weaknesses and identification of direct technical assistance to improve performance
2002 Complete project in Mauritius Completed
Quad Printers Flash Diagnosis
Diagnosis of the company’s strength and weaknesses and identification of direct technical assistance to improve performance
2002 Complete project in Mauritius Completed
Fast Fit Flash Diagnosis
Diagnosis of the company’s strength and weaknesses and identification of direct technical assistance to improve performance
2002 Complete project in Mauritius Completed
Island Sports Flash Diagnosis
Diagnosis of the company’s strength and weaknesses and identification of direct technical assistance to improve performance
2002 Complete project in Mauritius Completed
Rodrigues Council of
Social Services
Survey on Domestic Electricity
Consumption
Opportunities for domestic energy savings in Rodrigues – Impact of the introduction of CFLs
2002 Ongoing project in Rodrigues Completed
United Nations Development Programme
PDF A application for
funding
Electrification of Agalega Island using biofuels
2002 Application for Funding Completed
11
Client Project Type Brief Description Year SRM Responsibility Status
NEDO, Japan Feasibility Report
Improved Bagasse Cogeneration in Mauritius for enhanced carbon savings
2002 Complete project Completed
Ministry of Fisheries
Assessment of Fish
Aggregation Devices in
Mauritius and Rodrigues
Survey of fishers and Economic/Environmental Impact Assessment of FAD technology
2003 Complete project Completed
British American
Tobacco PLC
ISO 9001:2000 Implementation
Consultancy services for the implementation of a Quality Assurance System
2003 Complete project Completed
British American
Tobacco PLC
ISO 14001:2004
Implementation
Consultancy services for the implementation of an Environment Management System
2003 Complete project Completed
South Pacific Applied
Geosciences Commission
(SOPAC), Fiji
Biomass Assessment
Regional Biomass Assessment for six pacific islands and preparation of a strategy for biomass resource management
2003 Complete project
Completed
Mauritius Telecom Group
ISO 9001:2000 Implementation
Consultancy services for the implementation of a Quality Assurance System in the following branches: - Mauritius Telecom Ltd
- Cellplus Ltd
- Telecom Plus Ltd
- Teleservices Ltd
- Mauritius Telecom
(Rodrigues) Ltd
2003 Complete project Completed
Pad & Co. Ltd Training and
Capacity Building
Employee Skills Enhancement Project 2003 Complete project Completed
12
Client Project Type Brief Description Year SRM Responsibility Status
Indian Oil (Mauritius) Ltd
Preliminary Environment Reports for 7
petroleum retail outlets
Mini-Environmental Impact Assessment together with traffic impact studies carried out at 7 locations namely at: - Chemin Grenier - Bonne Terre - Quatre Bornes - L’Amitie - Centre de Flacq - Terre Rouge - Petite Riviere
2004 Complete study Completed
State Insurance
Corporation Of Mauritius
ISO 9001:2000 Implementation
Consultancy services for the implementation of a Quality Assurance System
2004 Complete project in Mauritius Completed
Fortress Marketing Ltd Training Employee Skills
Enhancement project 2004 Complete project in Mauritius Completed
Pad & Co Ltd Training Needs Analysis
Assessment of the training needs of all staffs
2004 Complete project in Mauritius Completed
CEB Staff Association
Project concept development
Project concept development and environmental planning for proposed Camp de vacances in Rodrigues Island
2004 In collaboration with BSN Partnership (Architects)
Completed
Chemical House
Services to promote
regulatory compliance
Upgrading of the extraction system 2004 Complete project Completed
Ministry of Environment
Environment Information
System
Development of an Environment Information System for the Ministry of Environment in association with SMEC
2003/2004
Local coordination of the project which is implemented by SMEC International
Completed
Mauritius Chamber of Agriculture
Agricultural Diversification
Study
Strategic Environmental Assessment (SEA) of 3 production systems (potato, deer and palm)
2004
Strategic Environment Assessment by SRM within a larger team comprising of HLB Appavoo and Associates
Completed
13
Client Project Type Brief Description Year SRM Responsibility Status
Le Prince Maurice
HACCP implementation
Gap Analysis and identification of Hazard Analysis Critical Control Points
2004 Completed
Le Prince Maurice
Green Globe 21
Benchmarking for Green Globe Certification
2004
Environmental Impact Assessment and Environmental Planning
Completed
MMC International
Ltd
Environmental Impact
Assessment
Environmental Impact Assessment for proposed plant for the manufacture of tile adhesives
2004/05
Complete Study and Environmental Assessment report
Completed
British American Tobacco
ISO 9001:2000 and ISO
14001:2004
Maintenance and Monitoring of Management System (Quality and Environment)
2004/05 Whole project Completed
State Insurance
Corporation of Mauritius
ISO 9001:2000 Maintenance and upgrading of the Quality Management System
2005 Complete project Completed
SITAM (Majunga)
ISO 14001:2004
Gap Analysis
System Audit with respect to ISO 14001:2004
2005 Complete project Completed
SACIMEM (Antsirabe)
ISO 14001:2004
Gap Analysis
System Audit with respect to ISO 14001:2004
2005 Complete project Completed
Societe de l’Horizon
Environmental Impact
Assessment
Environmental Impact Assessment for the construction of 83 housing units on a beach side site in the North of Mauritius
2005
Complete Study and Environmental Impact Assessment report
Completed
Challeng’hair Ltd
Environmental Impact
Assessment
Environmental Impact Assessment for the construction and operation of a clinic for hair grafting at Trou aux Biches
2005
Complete Study and Environmental Impact Assessment report
Completed
Super Construction
Co. Ltd
Environmental Impact
Assessment
Environmental Impact Assessment for a luxury housing project at Grand Bay (beach property development)
2005
Complete Study and Environmental Impact Assessment report
Completed
14
Client Project Type Brief Description Year SRM Responsibility Status
Soeur de Charite of Belle Rose
Preliminary Environment
Report
Preliminary Environment Report for the extension and renovation of a residential home for the elderly
2005 Complete Study and EIA report Completed
Les Entreprise Phi Ltee
Environmental Impact
Assessment
Environmental Impact Assessment for the construction of a residential complex of 82 Housing Units at Belle Rose
2005
Complete Study and Environmental Impact Assessment report
Completed
Caltex (Mauritius)
Ltd, St Julien
Environmental Impact
Assessment
Environmental Impact Assessment for the proposed petroleum retail outlet at St Julien
2005
Complete Study and Environmental Impact Assessment report
Completed
Caltex (Mauritius) Ltd, Mare
D’Australia
Environmental Impact
Assessment
Environmental Impact Assessment for the proposed petroleum retail outlet at Mare D’Australia
2005
Complete Study and Environmental Impact Assessment report
Completed
Pharmacy Seegobin
Feasibility Study
Feasibility and opportunity study of a new Pharmacy including survey of potential customers
2005 Completed project Completed
Texpull Ltd Preliminary
Environmental Report
Preliminary Environment Report for a textile knitting unit with 50 machines
2006 Complete Study and Preliminary Environment Report
Completed
Bonne Terre Home for the
Elderly
Preliminary Environmental
Report
Preliminary Environment Report for the renovation of a home for the elderly
2006 Complete Study and Preliminary Environment Report
Completed
Peche Mignon Ltee
Preliminary Environmental
Report
Preliminary Environment Report for a proposed bakery project at Tamarin
2006 Complete Study and Preliminary Environment Report
Completed
Caltex Curepipe
Preliminary Environmental
Report
Preliminary Environment Report for the complete renovation of the petroleum retail outlet at Curepipe
2006 Complete Study and Preliminary Environment Report
Completed
15
Client Project Type Brief Description Year SRM Responsibility Status
Solid Waste Recycling Co
Ltd
Preliminary Environmental
Report
Consultancy Services for the proposed investment project for large scale composting of organic waste including un-segregated municipal solid waste in Mauritius including Preliminary Environment Report and Marketing Plan
2006 Complete Study Completed
Admiral Court Ltd (Gleeds
Ltd)
Preliminary Environmental
Report
Preliminary Environment Report for the construction of a residential complex at Bain Boeuf
2006 Complete Study and Preliminary Environment Report
Completed
Paris Belle Epoque
(Gleeds Ltd)
Preliminary Environmental
Report
Preliminary Environmental Report for the proposed construction of 24 Housing Unit at Curepipe
2006 Complete Study and Preliminary Environment Report
Completed
Rocki Mtius Ltd
Preliminary Environmental
Report
Preliminary Environmental Report for proposed project for the setting up of an Art Glassmaking Factory & Shop at Trou aux Biches
2006 Complete Study and Preliminary Environment Report
Completed
Caltex La Vigie
Preliminary Environmental
Report
Preliminary Environmental Report for the proposed petroleum retail outlet at La Vigie on the Motorway
2006 Complete Study and Preliminary Environment Report
Completed
Acamus Ltd (Sotratech)
Environmental Impact
Assessment
Assistance for granting of Pioneer Status Certificate and Environmental Impact Assessment Report for the Production, Distribution, Combustion of Coal Water Slurry (CWS) including Post-Combustion Gas Cleaning by Avantime Ltd
2006
EIA Report and assistance until obtention of EIA license
Completed
16
Client Project Type Brief Description Year SRM Responsibility Status
Arcon Africa (Mauritius)
Environmental Impact
Assessment
Prepare and Submit Application for Investment Certificate to BOI of Mauritius for the proposed exclusive island project on Agalega Islands including Environmental Impact Assessment
2006
EIA Report and assistance until obtention of EIA license
Ongoing
AAMIL Consultants
Ltd
Application for Investment Certificate
Prepare and Submit Application for Investment Certificate to BOI of Mauritius concerning the proposed project Hotel in the South of Mauritius
2006 Complete Study Completed
Australe Ocean Indien
Ltd
Environmental Impact
Assessment
Environmental Impact Assessment for the construction of a beach hotel comprising of 34 rooms at Pointe aux Sables
2006 Complete study and EIA report Completed
Ayurvedic Village and Resorts Ltd
Environmental Impact
Assessment
Prepare and Submit Application for Investment Certificate to BOI of Mauritius concerning the proposed project Hotel including Environmental Impact Assessment
2006
EIA Report and assistance until obtention of EIA license
Ongoing
Ministry of Agro-Industry and Fisheries
Data Collection System
Implementation
Consultancy services for a study to set up a system of data collection, processing, analysis and monitoring for the FAD fishery
2007 Complete Study Completed
SATIM (Mauritius)
ISO 9001:2000 Implementation
Consultancy services for the implementation of a Quality Assurance System
2007 Complete project in Mauritius Completed
17
Client Project Type Brief Description Year SRM Responsibility Status
Alcodis Ltd Consultancy
services/ Environment Assessment
Assist in management of various environmental concerns at the Rose Belle ethanol plant
2007
Assessment of the various pollution sources and propose corrective measures
Completed
Alcodis Ltd ISO 14001:2004 Implementation
Consultancy services for the implementation of a Environmental Risk Management System
2007 Complete project Ongoing
Maurilait Production
Ltee
Environment Reporting
Consultancy services for assistance to participate in the Environmental Reporting Award of the Ministry of Environment
2007
Internal Audit and preparation of the
Environmental Report.
Completed
Total Mauritius Limited
Consultancy services/
Environment Assessment
Assistance to TOTAL MAURITIUS in connection with environmental implications of fuel switching for industrial client sites
2007
Assist Total Mauritius Limited in
fuel switch-over management on
client sites.
Completed
N. G Graphic and Stationery
Ltd
Consultancy services
Assistance in the obtention of stakeholder participation in the proposed hotel projects, Preparation of project documents to the BOI and relevant ministries, assistance in complying to LOI conditions
2007 Complete study Completed
Chilipoint Ltd Environmental
Impact Assessment
Environmental Impact Assessment for the operation of a beach hotel comprising of 39 rooms at Pointe aux Piments
2007 EIA Report and assistance until obtention of EIA license
Completed
Star Ecoenergy Ltd
Environmental Impact
Assessment
Preliminary design and Environmental Impact Assessment for used oil collection, storage, re-refining and combustion including post combustion gas cleaning.
2007 EIA Report and assistance until obtention of EIA license
Completed
One and Only Le Saint
Geran Hotel
Green Globe 21
Implementation
Consultancy Services for the implementation of an Environmental Management System based on Green Globe 21 standard
2007 Complete Project Ongoing
18
Client Project Type Brief Description Year SRM Responsibility Status
Sagar Hotels & Resorts Ltd
Environmental Impact
Assessment
Environmental Impact Assessment for the construction and operation of a beach restaurant attached to the Blue Ocean Park Hotel
2007 EIA Report and assistance until obtention of EIA license
Completed
Sagar Hotels & Resorts Ltd
Environmental Impact
Assessment
Environmental Impact Assessment for the creation of swimming zones and beach reprofiling in front of the Blue Ocean Park Hotel as well as the construction of a jetty
2007 EIA Report and assistance until obtention of EIA license
Completed
Apavou Immobilier
Ltee
Environmental Impact
Assessment
Environmental Impact Assessment for the extension of the Indian Resorts hotel at Le Morne
2007 EIA Report and assistance until obtention of EIA license
Completed
Green Hydrocarbons
(Mtius)
Environmental Impact
Assessment
Environmental Impact Assessment for the processing of waste plastic to hydrocarbon fuels
2007 EIA Report and assistance until obtention of EIA license
Ongoing
British American Tobacco PLC
Employee Redeployment
Programme Phase II
Follow up of ex-employees engaging in small businesses
2008
Implementation and follow up of financial and management system for the new businesses
Ongoing
Intertek (Mauritius) Limited
Market Study
Market Study for the Implementation of a Food and Environmental Testing Laboratory by Intertek (Mauritius) Ltd
2008
To conduct market study for Intertek Ltd in the food and environmental testing field in Mauritius
Completed
Constance Lemuria Resorts (Seychelles)
ISO 22000 Implementation
Implementation of a food safety management system based on ISO 22000
2008 Implementation of ISO 22000 standard Ongoing
Belle Riviere Estate Ltd
Social Impact Assessment
Social Impact Assessment for the 34 villas IRS project at Bel Ombre
2008 Preparation of the Social Impact Assessment Report
Completed
ACTIS Ltd Initial
Environment Review
Environment review at 3 project sites in the district of Riv du Rempart at Beau Sejour, Mon Loisir and Haute Rive
2008 Preparation of the Environment Audit Report
Completed
19
Client Project Type Brief Description Year SRM Responsibility Status
SOPHALCO Ltd
HACCP Implementation
Implementation of a food safety management system based on HACCP principles
2008 Implementation of food safety procedures in the company
Ongoing
Star Ecoenergy Ltd
Re-refining of Used Oil
Implementation of a facility for used oil collection, storage, re-refining and combustion including post combustion gas cleaning.
2008 Facilitate implementation of the used oil re-refining facility
Ongoing
Ernst & Young Ltd Market Study
Market study and definition of the terms and conditions of a credit line dedicated to sustainable energy and environmental performance investments in Mauritius
2008
Identify all eco-industries acting in Mauritius in the waste, water and energy sectors and relevant regulatory texts
Completed
Participants from industry Energy Course Comprehensive Course
for Energy Managers 2008 Course Design and Delivery Completed
Participants from the solar water heating
industry
Renewable Energy Course
Solar Water Heating Technologies 2008 Course Design and
Delivery Completed
Participants from industry
Renewable Energy Course
Solar Photovoltaic Technology 2008 Course Design and
Delivery Completed
Participants from industry
and hotel
Risk Assessment
Risk Assessment as per OSHA 2005 2009 Course Design and
Delivery Ongoing
20
Client Project Type Brief Description Year SRM Responsibility Status
Var Investment Ltd
Environmental Impact Assessment
Environmental Impact Assessment for the construction of a beach hotel in Rodrigues
2009
Preparation of the Environmental Impact Assessment report
Ongoing
Tee sun Co Ltd (Palmar Group)
Energy Management
Consultancy services for Energy Cost Cutting through efficient lighting
2009 Energy Auditing and Project Management
Ongoing
Apavou Hotels Energy Management
Consultancy services for Energy Cost Cutting at the 5 Apavou Hotels in Mauritius (lighting energy efficiency, air conditioning energy efficiency and solar water heating systems)
2009 Energy Auditing and Project Management
Ongoing
Indian Ocean Real Estate Company (IOREC)
Traffic Impact Assessment
Traffic Impact Assessment (TIA) for the Construction of a Commercial Village at Riviere du Rempart and a business park at Beau Sejour
2009 Traffic count and TIA report Completed
Mauritius Commercial Bank Ltd (MCB)
Energy Management
Energy Cost Cutting at 15 branches of the Mauritius Commercial Bank Ltd.
2009 Energy Auditing and Project Management
Ongoing
Participants from industry
Energy Management
Electricity Cost Cutting through Energy Efficient Lighting Systems Course (1 day for 20 participants)
2009 Course Design and Delivery Completed
Apavou Hotels Environmental Impact Assessment
Environmental Impact Assessment for the Extension of Indian Resort & Spa for the Apavou Group
2009 Preparation of the Environmental Impact Assessment report
Ongoing
21
The CEO Dr Revin Panray Beeharry has extensive experience in the conduct of EIA studies. He has carried out a number of EIA and SEA studies in Mauritius and Rodrigues. Dr Beeharry is well versed in EIA regulations of Mauritius and the Indian Ocean Islands. He has served as lead trainer for the Commonwealth Secretariat sponsored training course on EIA assessment for Government officials of the Indian Ocean islands. Dr. Revin Panray Beeharry is a particularly competent project team leader. He has successfully completed a number of research and consultancy projects in Mauritius, Austria, Reunion, Rodrigues, Madagascar, Zimbabwe and United States of America. As a project manager, Dr. Beeharry has demonstrated his ability to manage tight budgets while having his team produce coherent results in the necessary timeframe. He has served organizations like the UNDP, UNESCO and UNCTAD. He has the ability to organise and analyse data to produce coherent and accessible communications. He has strong project leadership and management skills. Dr Beeharry has wide experience in scientific and engineering project development and management. Dr. Revin Panray Beeharry is well versed with a number of management system standards including the ISO 9001:2000, ISO 14001, Codex Alimentarus (HACCP), SA 8000 and other Safety, Health and Environmental Management Standards. He has the successfully managed the consultancy and training aspects of ISO 9001:2001 and ISO 14001 and Green Globe 21 implementation projects in a number of small, medium, and large enterprises including the Hotels and Resorts in Mauritius and Rodrigues island.