sr. no. description page no....sr. no. description page no. 1 contact details 1 2 introduction 2 3...
TRANSCRIPT
![Page 1: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/1.jpg)
![Page 2: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/2.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
Sr. No. Description Page No.
1 CONTACT DETAILS 1
2 INTRODUCTION 2
3 LIST OF DIRECTORS 9
4 CLIENT LIST 10
5 PROJECT HIGHLIGHTS 17
6
IN-HOUSE PILOT PLANT FACILITY
29
7 QUALITY POLICY & VISION 30
8 ACHIEVEMENTS / ACCREDITATIONS 31
9 TESTIMONIALS 32
![Page 3: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/3.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
1. CONTACT DETAILS
Company Details & Organization of Company
a) Name : Goldfinch Engineering Systems Private Limited. (Formerly Waste Encare (India) Pvt. Ltd)
b) Address : Plot No. A – 288, Road No. 16 Z,
Thane Industrial Area, MIDC, Opp. Agricultural bus stop
(Wagle Estate), Thane (W) - 400 604. ,
Maharashtra, India.
c) Telephone : 91- 022 - 2580 1529 / 46 / 21/ 55
d) Email : [email protected]
Visit us on : www.goldfinchengg.com
e) Constitution of
Company : Private Limited
f) Year of
Establishment : October 1983
![Page 4: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/4.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
2. INTRODUCTION
Goldfinch has been providing cost effective solutions in the field of wastewater treatment sector
since 1983. Core technical competence & professional approach ensured a steady growth in
customer base, resources & revenue. Goldfinch capabilities are demonstrated through
successful completion of various type of waste water treatment & recycle projects. Today
Goldfinch is a very prominent name in the field of waste water & water treatment offering a one
stop solution. Goldfinch is executing wastewater treatment projects not only in India but
abroad as well. Well defined working philosophy, is the backbone of Goldfinch's growth.
In-house manufacturing facility for Multiple Effects Evaporators / Heat Exchangers /
Pressure vessels.
Authorized Distributor for LG Chem RO MEMBRANES and DEERFOS ULTRA FILTRATION
(UF) MEMBRANES and Membrane Bio-Reactor (MBR) (By Kaico Deer, Korea)
During last few years we have been making conscious efforts to add value to the water
and wastewater treatment sector by sourcing and developing state-of-art technologies.
A few examples would be:
Advanced High Rate Nitrification-Denitrification (with collaboration of Japanese
technology developer)
Use of specially developed fouling resistant RO membranes in wastewater
recycle
Innovative use of Nano-Filtration membranes to minimize the treatment cost and
recovery of product (Product from South Korea)
Forward Osmosis (in co-operation with Aquaporin, Denmark) to optimize the
concentration of wastewater to lower energy input costs.
![Page 5: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/5.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
2.1 History
Goldfinch was started as a partnership company by the name of M/s. Perfect Labs in 1983. The
company was promoted by Mr. Anand Apte who is a qualified Chemical Engineer from Laxminarayan
Institute of Technology (LIT – Batch 1974). The company was converted to M/s Perfect Labs Pvt. Ltd.
in 1988. The company later grew steadily in resources, Services, Volumes & Revenues. The name of
Perfect Labs Pvt. Ltd. was changed to M/s Waste Encare India Pvt. Ltd. (WEIPL) in year 1998 with Mr.
Anand Apte as its Managing Director. The company changed its name to Goldfinch Engineering
Systems Private Limited in the year 2012 for a better Brand building.
Goldfinch’s professional, ethical, technical & flexible approach to troubleshooting & service providing
helped it to win over clients from all sectors of industry.
Goldfinch has spread its wings & network to incorporate a variety of services like Turnkey Projects,
Detail Engineering & Project Management Services, Environmental studies, preparation of EIA report
etc. & Environmental Monitoring. Goldfinch has developed a full- fledged MoEF approved laboratory
& R & D Centre for its Analysis & Research & Development Activities.
Goldfinch since inception has given priority to quality & customer service and is a noted service
provider in the field of wastewater Engineering. Goldfinch's list of clients is only a glimpse of the
Company's achievements.
Currently Goldfinch is catering to all industrial sectors like Pharma & API’s, Agrochemical, FMCG’s,
Foods, Textiles, Speciality Chemicals & Organics, Construction, Engineering etc.
Goldfinch is executing wastewater treatment projects not only in India but abroad as well.
![Page 6: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/6.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
2.2 Business Operations:
Goldfinch has mainly three divisions in its business operations. All three divisions
have separate and dedicated teams headed by competent HODs for efficient
operations. All divisions are ably supported by MoEF accredited laboratory.
1) EPC (Engineering, Procurement & Construction) Division
For your wastewater treatment project Goldfinch can offer
Turnkey Solution:
(In house Design Engineering, Procurement, Manufacturing facility, Construction and
Commissioning) Multiple Effects Evaporators (MEE) & Zero Liquid Discharge (ZLD)
Projects
Biological treatment plants
Reverse Osmosis plant
Forward Osmosis plant
Services for Process and Detailed Engineering, Project Management and Consultancy (PMC)
Treatability Studies and Project Feasibility Reports
2) Regulatory Division
Preparation of Prefeasibility Report & Baseline Environment Monitoring
Preparation of Environmental Impact Assessment (EIA) Report
Environmental Monitoring
3) Technology Division
We source state-of-art technologies for adding value to the process by way of more effective and cost-
optimizing solution. Technology Collaborations are followed up by laboratory and pilot plant operations
for indigenizing and vetting the technology before it is launched for commercial applications. Some
examples are:
Forward Osmosis
High rate Nitrification
Small Biological Platform (SBP)
![Page 7: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/7.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
2.3 Infrastructure
Over the years Goldfinch has acquired an operational infrastructure which provides a strong base
to the services provided. Outline of the infrastructure which is specifically developed to meet
services oriented work is given below.
2.3.1 Technical Expertise
Human resources are obviously is at the heart of any successful organization. Our dedicated
personnel consist of highly qualified, result-oriented, experienced people. Goldfinch employs
about 26 technical people apart from the administration, accounts and other support staff.
Sr. No. Description No. of People
1) Technical / Engineering (Chemical, Electrical, Civil, Mechanical etc.)
26
2) Technical Support 5
3) Shop floor (Welder, Fitter, Electrician etc.)
10
4) Laboratory 7
5) Administration and Accounts 10
6) Casuals and Helping Staff 7
2.3.2 Engineering Office
Goldfinch has a comfortable, centrally located office in Thane. The office is equipped with all
modern amenities and gadgets to complete any design, drafting, and publishing work in-house. In
addition the state-of-art communication system facilitates immediate contact, interactions and
data communication either from field to office or with any client around the globe.
![Page 8: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/8.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
2.3.3 Laboratory
Our well-equipped State of Art laboratory is capable of conducting all major analytical tests on
air, water or solid samples. This laboratory also consists of bench scale equipment to carry out
treatability studies like physical separations, biological oxidation (aerobic and anaerobic),
chlorination, filtration, evaporation etc. to evaluate the design parameters.
Laboratory also possesses small pilot plants which can be transported to field to corroborate the
suitability of selected treatment scheme and design parameters before executing the full scale
plant.
![Page 9: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/9.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
2.3.4 In-house Own Manufacturing Facility
Our state of art manufacturing facility is well equipped to manufacture a range of equipment.
Pressure Vessels, Heat Exchangers, piping and skid mounted plants etc. The manufacturing facility is
spread over 10000 square feet.
![Page 10: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/10.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
2.3.5 Reference Library
Our reference library consists of reference books, journals, papers, articles, publications, reports and
other such comprehensive study material. Excellent references for environmental, chemical, civil,
mechanical, electrical engineering are available here.
![Page 11: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/11.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
3 LIST OF DIRECTORS
Sr. No.
Name Qualification Designation Work Experience
1. Mr. Anand Apte
B. Tech. (Chem. Engg.)
Managing Director
40 years’ experience in all kinds of environmental monitoring/projects and industrial safety.
2. Mr. Santosh V. Bhide
L.E.E (Power) Director– Business
Development
30 years’ experience in air & water pollution monitoring, Design, detailed engineering & Project management and Business Development
3. Mrs. Shubhangi A. Apte
B Sc. (Stat.) Director – Finance 27 years in administration and accounting.
4. Mrs. Pradnya S. Bhide
B.Sc. (Microbiology)
Director – Laboratory &
Quality Systems
20 years in analysis of wastewater, soil, Air emissions monitoring & analysis
MR for all Quality Systems
5. Mr. Shardul A. Apte
B.E.(Chem. Engg.)
Director – Design & Proposals
15 Years’ Experience in all kinds of environmental projects, designs and proposals
6. Mr. Harshad A. Apte
B.E.(Electrical) Director- Projects & Manufacturing
10 years in in planning, design, fabrication and manufacturing of ETP and related equipment
![Page 12: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/12.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
4 CLIENT LIST
Sr. No. Client Name & Location Year
Plant Capacity
(m3/ day)
Value of Project
(Rs. Lacs)
Value of Project
Including Civil (Rs. Lacs)
AGROCHEMICAL & PESTICIDES
Biological Treatment
1. Indofil Industries Ltd., Dahej 2009 200 80.0 150.0
2. Indofil Industries Ltd., Dahej 2015 500 600.0 600.0
3. Indofil Industries Ltd., Dahej 2010 400 90.0 150.0
4. Indofil Industries Ltd., Thane 2013 200 52.0 90.0
5. PI industries- Jambusor 2010 600 252.0 450.0
API, BULK DRUG & PHARMACEUTICALS
Multiple Effect Evaporator
6. Chemco International Private Limited, Tarapur
2017 25 80 120
7. Rubicon Research Ltd., Ambernath
2017 6 40 50
Biological Treatment
8. Nicholas Piramal Ltd. Thane 2005 500 50.00 50.0
9. Sekhsaria Chemicals Ltd., Dombivli
2007 100 95.0 95.0
10. Lupin Research park Pune 2008 250 125.0 125.0
11. Lupin Tarapur 2009 1100 65.0 150.0
12. Arch Pharma, Taloja 2011 8 37.0 40.0
13. Dr. Acharya Laboratories 2011 100 125.0 125.0
14. BEC Chemicals Pvt. Ltd. 2013 100 65.0 110.0
15. Anthem Biosciences, Bangalore 2014 150 310.0 500.0
16. Harman finochem – Aurangabad 2010 200 12.0 100.0
17. Aurolabs Pvt. Ltd. 2015 50 45.0 100.0
CHEMICAL’s
Multiple Effect Evaporator
18. Metropolitan Eximchem Ltd. 2016 40 120 155
19. Melog Speciality Chemicals Ltd. 2017 100 200 250
20. Eskay Dyestuff, Ghatkopar 2016 15 60 90
21. Reliance Chemical Products Ltd., Nigeria
2015 10 24.0 40.0
22. Union Park, Tarapur 2017 50 110 140
Biological Treatment
23. Kores India Ltd. Roha 2003 115 35.00 35.0
24. Innovassynth, Khopoli 2011 600 122.0 122.0
25. Heavy Water Board, Manuguru – Andhra Pradesh
2007 7 224.0 275.0
![Page 13: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/13.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
Sr. No. Client Name & Location Year
Plant Capacity
(m3/ day)
Value of Project
(Rs. Lacs)
Value of Project
Including Civil (Rs. Lacs)
26. Lona Industries Ltd., Rasayani 1998 1200 80.00 80.0
ENGINEERING
Zero Liquid Discharge
27. Emerson Climate Technologies Private Limited
2016 200 140 175
FOOD
Multiple Effect Evaporator
28. Liberty Oil Mills Ltd. 2014 10 30.0 30.0
Biological Treatment
29. Fine Organics Industries Pvt Ltd., Ambernath
2015 85 72.5 115.0
30. Lever Gist Brocades Pvt. Ltd., Lote, Chiplun
1998 200 98.00 98.0
31. Parle Biscuits Pvt. Ltd., Nashik 2007 - 70.0 100.0
32. Parle Candy, Nirmrana, Rajasthan
2011 80 90 125.0
33. Parle Biscuits Pvt. Ltd., Khopoli 2014 36.35 157.10 157.1
34. Parle Biscuits Pvt. Ltd., Neemrana
2014 160 137.80 137.8
35. Frito Lay India, Ranjangaon 2000 500 185.00 185.0
36. Liberty Oil Mills Ltd. 1999 350 55.00 55.0
FMCG
Biological Treatment
37. Reckitt Benkiser, Sitarganj 2011 150 150.0 150.0
38. P Z Cussons, Ikorodu, Nigeria 2014 400 80.0 150.0
PAINT’s
Biological Treatment
39. Kansai Nerolac Paints Ltd., Jainpur
2008 160 30.0 40.0
40. Kansai Nerolac Paints Ltd., Lote 2013 20 117.32 117.32
Zero Liquid Discharge (ZLD)
41. Kansai Nerolac Paints Ltd., Dahej 2017 140 300.0 500.0
TEXTILE & CETP’s
42. Dombivli CETP – Phase II, Dombivli
1998 1500 275.0 275.0
43. Dombivli Better Environment System Association – Phase I, Dombivli
1999 14000 600.0 600.0
44. Dombivli Better Environment System Association, Dombivli
2005 14000 600.0 600.0
45. Lote – CETP 2009 10000 64.0 2000.0
![Page 14: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/14.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
Sr. No. Client Name & Location Year
Plant Capacity
(m3/ day)
Value of Project
(Rs. Lacs)
Value of Project
Including Civil (Rs. Lacs)
46. Krishna Processor, Dombivali 2014 500 150.0 150.0
OTHER’s INDUSTRY
Biological Treatment
47. DCW Ltd., Sahupuram, Tamilnadu
1999 6000 50.00 50.0
48. Pawan Hans Helicopters Ltd. Santacruz
2002 180 32.0 32.0
49. B.G. Shirke Construction Technology Ltd. Mumbai
2006 2000 100.0 100.0
50. State Bank of India, Nerul 2007 140 45.0 45.0
TOTAL NO. OF PROJECTS FOR ALL CATAGORIES: Over 400
Ongoing Projects
Sr. No. Client Name &
Location Year
Plant Capacity (m3/ day)
Type of Project
Value of Project
(Rs. Lacs)
Value of Project
Including Civil
(Rs. Lacs)
51. Henkel Adhesives Pvt. Ltd., Kurkumbh
2017 150 Biological Treatment
500 850
52. PZ Cuzzons, Aba, Nigeria
2017 400 Biological Treatment
230 400
53. Union Park, Tarapur 2018 9 ATFD 40 45
54. PPG Asian Paints, Dahej
2018 100 Biological Treatment
150 250
55. Alkyl Amines Ltd., Kurkumbh
2018 12 Multiple Effect
Evaporator 60 85
56. Seya Industries, Tarapur
2017 225 Multiple Effect Evaporator
450 450
57. Seya Industries, Tarapur
2017 100 Biological Treatment
200 250
58. Parle Products, Chitoor 2018 40 Biological Treatment
125 200
59. Anuh Pharma, Tarapur 2018 100 ZLD 222 750
60. Ashu Organics Private Limited, Badlapur
2018 30 Multiple Effect
Evaporator 100 125
61. Rupa Organics Private Limited, Taloja
2018 30 Multiple Effect
Evaporator 100 125
62. ACPTPL (Detox India Private Limited, Ankleshwar)
2018 900
UF – RO 258 258
![Page 15: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/15.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
Sr. No. Client Name &
Location Year
Plant Capacity (m3/ day)
Type of Project
Value of Project
(Rs. Lacs)
Value of Project
Including Civil
(Rs. Lacs)
63. Alta Laboratories, Khopoli
2019 70 ZLD
203 400
ASSOCIATED WITH CONSULTANTS:
Mott MacDonald., Mumbai
TCE Consulting Engineers Ltd. Pune & Navi Mumbai
Jacobs H & G Pvt. Ltd. Navi Mumbai
Spectrum Pharma TECH Consultants Pvt. Ltd., Thane
Pharmadeep Turnkey Consultants & Engineers Pvt. Ltd., Thane
IPS Mehthalia, Mumbai
Econ Pollution control consultant, Mumbai
Shroff & Associates Consultant, Mumbai.
MEMBERSHIP OF PROFESSIONAL BODIES
Thane Small Scale Industries Association (TISSA)
Thane Manufacturers Association (TMA)
SOFTWARES IN USE
HTRI (Heat Transfer Research INC) for Evaporators / Heat Exchangers designing.
Solid Works 2013 for 3 D fabrication, piping and structural drawings.
Auto CAD 2017 for 2D fabrication, piping and structural drawings.
RO Projection Software
AERMOD Cloud 6.0 using for air modeling.
Life Cycle Analysis (LCA) used for Environment Clearances.
![Page 16: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/16.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
5 PROJECT HIGHLIGHTS
1.0 SOLVENT STRIPPER AND MULTIPLE EFFECT EVAPORATOR FOR METROPOLITAN, DOMBIVALI – 40 M3 / DAY
This Multiple Effect Evaporator was designed for treating process effluent which was mix of organics and
high TDS of around 100000 ppm. The total wastewater was 40 m3 / day. The stripper was in place to
remove the low volatile organics and the Evaporator for concentrating the dissolved salts. The
precipitated salts were then centrifuged.
![Page 17: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/17.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
2.0 SOLVENT STRIPPER AND MULTIPLE EFFECT EVAPORATOR FOR MELOG, AMBERNATH – 100 M3 / DAY
This Multiple Effect Evaporator was designed for treating mix of process effluent and RO reject water which was mix of organics and high TDS of around 50000 ppm. The total wastewater was 100 m3 / day. The stripper was in place to remove the low volatile organics and the Evaporator for concentrating the dissolved salts. The precipitated salts were then centrifuged.
![Page 18: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/18.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
3.0 MULTIPLE EFFECT EVAPORATOR FOR CHEMCO, TARAPUR – 25 M3 / DAY
This Multiple Effect Evaporator was designed for treating process effluent which had high TDS of around 100000 ppm. The total wastewater was 25 m3 / day. The Evaporator was for concentrating the dissolved salts. The precipitated salts were then centrifuged.
![Page 19: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/19.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
4.0 ZERO LIQUID DISCHARGE (ZLD) FOR EMERSON, SATARA – 200 M3 / DAY
This plant was designed for achieving Zero liquid discharge for wastewater generated from engineering facility. The effluent was pretreated and then pumped through the Reverse Osmosis system designed for 200 m3 / d. The reject of the RO was then pumped to the Multiple Effect Evaporator. The Evaporator was for concentrating the dissolved salts. The precipitated salts were then centrifuged.
![Page 20: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/20.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
5.0 AGITATED THIN FILM DRYER (ATFD) FOR RUBICON, AMBERNATH – 1 M3 / DAY
This plant was designed for achieving Zero liquid discharge for wastewater generated from formulation unit. The effluent was treated biologically and then pumped through the Reverse Osmosis system designed for 20 m3 / d. The reject of the RO was then pumped to the Agitated Thin Film Dryer (ATFD). The ATFD was for complete drying of the concentrated salt using steam.
![Page 21: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/21.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
6.0 MULTIPLE EEEFECT EVAPORATOR FOR RELIANCE CHEMICAL, NIGERIA – 10 M3 / DAY
This Multiple Effect Evaporator was designed for treating process effluent which was generated from the
sulphonation plant. The total wastewater was 10 m3 / day. The Evaporator was for concentrating the
dissolved salts. The precipitated salts were then centrifuged.
![Page 22: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/22.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
7.0 ETP for PZ CUZZONS, IKORUDU, NIGERIA – 400 M3 / DAY
The ETP was designed with two stage aerobic system using state of art aeration technology.
![Page 23: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/23.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
8.0 ETP for LUPIN, TARAPUR, MAHARASHTRA – 1000 M3 / DAY
The ETP was designed with two stage aerobic system using state of art aeration technology.
The outlet water of the ETP is fed to the R.O and then the R.O reject is evaporated to the
achieve Zero Discharge. RO permeate is recycled for process.
![Page 24: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/24.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
9.0 ETP FOR INDOFIL, DAHEJ, GUJARAT – 500 M3 / DAY
This ETP was designed for treating agrochemical waste. The total wastewater was 500 m3 / day. The
bioreactor is operating and working successfully at a TDS of around 70000 ppm.
![Page 25: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/25.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
10.0 ZLD FOR HENKEL, KURKUMBH – 150 M3 / DAY
This ETP was designed for treating wastewater generated from metal coatings effluent. The total wastewater
was 150 m3 / day. The wastewater was first pretreated for the removal of metals and then biodegraded.
![Page 26: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/26.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
11.0 ETP for Parle Biscuits, Bahadurgarh, Haryana – 200 m3 / day
This ETP is designed to treat 200 m3 / day of wastewater. It has anaerobic followed by aerobic
technology. The gas generated from the anaerobic digestor is used as fuel. The treated water
from aerobic system is used for gardening.
![Page 27: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/27.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
11.0 Common Effluent Treatment Plant for M/s. Dombivli Better Environmental Systems
Association.
M/s. Dombivli Better Environmental Systems Association (DBESA) is working for the group of Textile
processing industries in the Dombivli MIDC area. DBESA has installed a full-fledged Common Effluent
Treatment Plant (ETP) to cater the needs of effluent generated from the Textile processing. The CETP is
treating 16000 m3 / day of wastewater to the MPCB standards.
![Page 28: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/28.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
12.0 ZERO DISCHARGE PROJECT FOR KANSAI NEROLAC PAINTS LTD., DAHEJ - 140 KLD
The Zero Discharge project was designed to treat the wastewater from paint manufacturing facility.
The wastewater was biologically treated and then pumped through the reverse Osmosis unit. The
reject of the Reverse Osmosis unit was then pumped to the Multiple Effect Evaporator for
concentrating the dissolved salts. The precipitated salts were then centrifuged.
![Page 29: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/29.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
6.0 IN-HOUSE PILOT PLANT FACILITY FORWORD OSMOSIS
NANO-FILTRATION PLANT
The pilot plant facilities are for carrying out various studies on wastewater for process
optimization and innovative solutions.
![Page 30: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/30.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
7.0 QUALITY POLICY & VISION
QUALITY POLICY
We, at Goldfinch, will provide products and services in environmental engineering and management that
meet or exceed the customer expectations. Satisfaction of identified customer requirements shall be achieved
through our total commitment to continual improvement in everything we do, effective use of quality
management system, review, realignment & up-gradation of resources, training of employees and offering
better & different technologies. It will be confirmed that the Quality Policy is understood by all employees
through effective communication.
VISION
Goldfinch considers that fighting pollution is not merely a commercial venture; in fact it serves to fulfill a
social obligation. Goldfinch aims to become a one-stop solution for environmental projects. This will be
achieved through - Well defined working philosophy, Assess to state-of-art technologies, reaching new
markets (both geographical and products), up-gradation of resources and effective training at all levels.
![Page 31: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/31.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
8.0 ACCREDITATIONS
Certified to Quality Management System ISO 9001:2015
Laboratory complies to safety standard OHSAS 18001: 2007
Approved as Standard Laboratory from Ministry of Environment & Forests, Government of
India (MoEF)
Quality Council of India (QCI-NABET) Accreditation as Environmental Impact Assessment (EIA)
Consultant
![Page 32: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/32.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT
9.0 TESTIMONIALS
Goldfinch meets the customer satisfaction as illustrated in some sample testimonials
![Page 33: Sr. No. Description Page No....Sr. No. Description Page No. 1 CONTACT DETAILS 1 2 INTRODUCTION 2 3 LIST OF DIRECTORS 9 4 CLIENT LIST 10 5 PROJECT HIGHLIGHTS 17 6 IN-HOUSE PILOT PLANT](https://reader033.vdocuments.us/reader033/viewer/2022052310/5f0a3dbc7e708231d42ab1ef/html5/thumbnails/33.jpg)
CELEBRATING 35 YEARS OF WATER & WASTEWATER MANAGEMENT