sr. area affected division number of consumers nocapacity
TRANSCRIPT
Sr. No.
Area Affected Division Number of Consumers Affected
NoCapacity of Distribution
Transformer (in KVA).
Whether Planned or Unplanned Outage
From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage Remarks
1 GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, ZEENAT BARI‐MORI GATE, KASHMIRI GATE‐MORI GATE, CHABI GANJ‐MORI GATE, GOVT OF N C T OFFICE‐KASHMERE GATE, RAILWAY COLONY‐KASHMERE GATE, KUCHA JAGLLA‐KUCHA ALAM
CCK 952 1980 KVA UNPLANNED 22‐03‐2018 01:45:35 22‐03‐2018 02:44:46 0:59 0.00006556 MUs
2 AJMERI GATE‐CHANDNI CHOWK, MOSQUE‐LAL KUAN BAZAR, LALKUAN BAZAR‐FRASH KHANA, NAYA BAZAR‐CHANDNI CHOWK, KHARI BAWLI‐NAYA BANS‐ LAHORI GATE, BLOCK T‐NAYA BAZAR
CCK 5354 3960 KVA UNPLANNED 17‐03‐2018 03:55:00 17‐03‐2018 05:03:00 1:7 0.00046528 MUs
3 AJMERI GATE‐CHANDNI CHOWK, MOSQUE‐LAL KUAN BAZAR, LALKUAN BAZAR‐FRASH KHANA, NAYA BAZAR‐CHANDNI CHOWK, KHARI BAWLI‐NAYA BANS‐ LAHORI GATE, BLOCK T‐NAYA BAZAR
CCK 5354 3960 KVA UNPLANNED 25‐03‐2018 04:25:04 25‐03‐2018 05:23:00 0:57 0.0004275 MUs
4 NAI SARAK‐JOGIWARA, KATRA NAWAB‐CHANDNI CHOWK, NAI SARAK‐KATRA ASRAFI, ROSHAN PURA‐CHANDNI CHOWK, NAYA BAZAR‐CHANDNI CHOWK, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, MAIN BAZAR‐KHUSH DIL, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
CCK 975 3960 KVA UNPLANNED 29‐03‐2018 03:20:06 29‐03‐2018 04:19:00 0:58 0.00032222 MUs
5 FATEHPURI MASJID‐CHANDNI CHOWK, FATEHPURI‐KUCHA HASIRAM, NAYA BAZAR‐CHANDNI CHOWK, FATEHPURI‐KHARI BAOLI, BLOCK T‐NAYA BAZAR
CCK 4227 4950 KVA UNPLANNED 29‐03‐2018 13:47:06 29‐03‐2018 14:50:00 1:2 0.00091278 MUs
6 NAI SARAK‐KATRA ASRAFI, TOWN HALL‐KUCHA NATWA CCK 134 990 KVA UNPLANNED 12‐03‐2018 10:50:38 12‐03‐2018 11:34:00 0:43 0.00011944 MUs7 BARA MORE SARAI‐CHANDNI CHOWK, DARYA GANJ, GURUDWARA SISGANJ ROAD‐CHANDNI CHOWK, RED FORT‐
CHANDNI CHOWK‐RED FORT, LAJPAT RAI MARKET‐CHANDNI CHOWK, BHAGIRATH PLACE‐CHANDNI CHOWK, MOR SARAY COLONY‐CHANDNI CHOWK
CCK 2061 4360 KVA UNPLANNED 17‐03‐2018 05:00:00 17‐03‐2018 06:15:50 1:15 0 MUs
8 NAI SARAK‐KATRA ASRAFI, TOWN HALL‐KUCHA NATWA CCK 134 990 KVA UNPLANNED 21‐03‐2018 15:08:52 21‐03‐2018 15:57:05 0:48 0.00005333 MUs9 RED FORT‐CHANDNI CHOWK‐RED FORT, DARYA GANJ, LAJPAT RAI MARKET‐CHANDNI CHOWK, GURUDWARA SISGANJ
ROAD‐CHANDNI CHOWK, BARA MORE SARAI‐CHANDNI CHOWK, BHAGIRATH PLACE‐CHANDNI CHOWK, MOR SARAY COLONY‐CHANDNI CHOWK
CCK 2062 4360 KVA UNPLANNED 25‐03‐2018 04:25:05 25‐03‐2018 06:05:00 1:39 0 MUs
10 GURUDWARA SISGANJ ROAD‐CHANDNI CHOWK, MOR SARAY COLONY‐CHANDNI CHOWK CCK 442 400 KVA UNPLANNED 25‐03‐2018 12:47:41 25‐03‐2018 13:23:43 0:36 0.00002 MUs11 NAI SARAK‐KATRA ASRAFI, GHANTA GHAR‐KATRA ASRAFI CCK 216 990 KVA UNPLANNED 30‐03‐2018 12:34:00 30‐03‐2018 13:21:11 0:47 0.00005222 MUs12 DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK B,
JHILMIL INDUSTRIAL AREA‐JHILMIL COLONYDGN 423 2880 KVA UNPLANNED 04‐03‐2018 12:09:00 04‐03‐2018 12:40:00 0:31 0.00128306 MUs
13 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 9 630 KVA UNPLANNED 06‐03‐2018 10:56:48 06‐03‐2018 11:31:08 0:34 0.00002833 MUs14 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 9 630 KVA UNPLANNED 11‐03‐2018 08:46:09 11‐03‐2018 09:17:35 0:31 0.00003444 MUs15 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 15 990 KVA UNPLANNED 11‐03‐2018 08:47:52 11‐03‐2018 09:19:54 0:32 0.00003556 MUs16 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR,
BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DGN 1242 2880 KVA UNPLANNED 14‐03‐2018 05:02:00 14‐03‐2018 05:50:14 0:48 0.00037333 MUs
17 DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA, BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 47 990 KVA UNPLANNED 03‐03‐2018 20:16:10 03‐03‐2018 20:47:17 0:31 0.00008611 MUs18 DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA, BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 32 990 KVA UNPLANNED 03‐03‐2018 21:54:17 03‐03‐2018 22:29:47 0:35 0.00009722 MUs19 BLOCK J & K‐POCKET J&K DGN 43 400 KVA UNPLANNED 04‐03‐2018 08:40:00 04‐03‐2018 09:43:27 1:3 0.000035 MUs20 DELHI JAL BOARD‐POCKET I, BLOCK J & K‐POCKET J&K DGN 1108 1660 KVA UNPLANNED 07‐03‐2018 09:45:38 07‐03‐2018 10:40:00 0:54 0.00087 MUs21 DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA, BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 58 1980 KVA UNPLANNED 10‐03‐2018 00:27:00 10‐03‐2018 01:23:35 0:56 0.00038889 MUs22 MCD SCHOOL‐SUNDER NAGRI DGN, J.J.C.‐NEW SIMAPURI, BLOCK C‐NEW SIMAPURI, BLOCK A‐OLD SIMAPURI, BLOCK A‐
NEW SIMAPURI, M.C.P. SCHOOL‐POCKET O, BLOCK B‐DILSHAD COLONY, BLOCK E‐JHILMIL‐TAHIRPUR, BLOCK D‐DILSHAD COLONY, JJC‐DILSHAD COLONY, BLOCK 8‐SUNDER NAGRI DGN, CHURCH‐JHILMIL‐TAHIRPUR, RAJIV GANDHI SUPER STC HOSPITAL‐JHILMIL‐TAHIRPUR, BLOCK A‐PREM NAGAR DGN, BLOCK P‐JHILMIL‐TAHIRPUR, BLOCK C‐ MOD PRIMARY SCHOOL‐JHILMIL‐TAHIRPUR, BLOCK A‐DILSHAD COLONY, BLOCK B‐NEW SIMAPURI, BLOCK D‐NEW SIMAPURI, BLOCK K‐LEPROSY COLONY, J.J.C.‐SUNDER NAGRI DGN, BLOCK B‐PREM NAGAR DGN, NEAR JIVAN CLINIC‐DILSHAD COLONY, SHANTI KUSTH ASHRAM‐RAJIV NAGAR DGN, DDA FLATS‐RAJIV NAGAR DGN, DDA FLATS‐BLOCK A, BLOCK F‐OLD SIMAPURI, MCD PRIMARY SCHOOL‐NEW SIMAPURI, BLOCK E‐NEW SIMAPURI, BLOCK F‐DILSHAD COLONY, BLOCK A‐RAJIV NAGAR DGN, GANDHI KUSTH ASHARAM‐LEPROSY COLONY
DGN 7684 6120 KVA UNPLANNED 13‐03‐2018 13:48:46 13‐03‐2018 14:30:00 0:41 0.00062639 MUs
23 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PETROL PUMP‐POCKET C, SIYARAM‐GHISA, LIG/MIG RES/NON COMM AREA‐JEEVAN SARITA, DELHI JAL BOARD‐POCKET I, HANSRAJ SCHOOL‐POCKET H, MUKHRJI SCHOOL‐POCKET L, DDA FLATS‐POCKET SG, SIDDHARTH INTER NATIONAL SCHOOL‐POCKET B, THE BOILER COMPONENTS S M F G COMPANY‐POCKET B, LIG FLATS‐POCKET F & E, BLOCK E‐ INDUSTRIAL FACTORY‐POCKET C, JHUALI JOHOPARI (J J C)‐POCKET C, GURUDWARA‐POCKET C, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
DGN 2078 3640 KVA UNPLANNED 16‐03‐2018 11:45:29 16‐03‐2018 13:06:00 1:20 0.00297778 MUs
24 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PETROL PUMP‐POCKET C, SIYARAM‐GHISA, LIG/MIG RES/NON COMM AREA‐JEEVAN SARITA, DELHI JAL BOARD‐POCKET I, HANSRAJ SCHOOL‐POCKET H, MUKHRJI SCHOOL‐POCKET L, DDA FLATS‐POCKET SG, SIDDHARTH INTER NATIONAL SCHOOL‐POCKET B, THE BOILER COMPONENTS S M F G COMPANY‐POCKET B, LIG FLATS‐POCKET F & E, BLOCK E‐ INDUSTRIAL FACTORY‐POCKET C, JHUALI JOHOPARI (J J C)‐POCKET C, GURUDWARA‐POCKET C, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
DGN 2078 3640 KVA UNPLANNED 17‐03‐2018 09:05:00 17‐03‐2018 10:02:00 0:56 0.00155556 MUs
25 BLOCK E‐OLD SIMAPURI, BLOCK F‐OLD SIMAPURI, BLOCK A‐OLD SIMAPURI, BLOCK B‐OLD SIMAPURI DGN 2296 630 KVA UNPLANNED 17‐03‐2018 12:30:00 17‐03‐2018 13:52:41 1:22 0.00159444 MUs26 BLOCK J & K‐POCKET J&K DGN 42 400 KVA UNPLANNED 17‐03‐2018 15:03:55 17‐03‐2018 15:30:00 0:26 0.00001444 MUs27 HARGOBIND ENCLAVE‐ANAND VIHAR, SANSAR COMPOUND‐DILSHAD GARDEN, BLOCK S‐HARGOBIND ENCLAVE,
FACTORY‐DILSHAD GARDEN, DAMODER PARK‐DILSHAD GARDENDGN 109 990 KVA UNPLANNED 17‐03‐2018 16:51:05 17‐03‐2018 17:37:59 0:46 0.00019167 MUs
28 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, SANSAR COMPOUND‐DILSHAD GARDEN, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DGN 631 4860 KVA UNPLANNED 22‐03‐2018 20:07:37 22‐03‐2018 20:49:00 0:41 0.00077444 MUs
29 GORAKH PARK WEST‐SILAMPUR, BLOCK A‐PRATAP PURA DGN 193 990 KVA UNPLANNED 16‐03‐2018 09:20:00 16‐03‐2018 10:07:10 0:47 0.00002611 MUs30 SUBHASH PARK EXTN.‐GORAKH PARK DGN 330 990 KVA UNPLANNED 18‐03‐2018 08:27:52 18‐03‐2018 09:30:00 1:2 0.00003444 MUs31 SUBHASH PARK‐GORAKH PARK, GORAKH PARK WEST‐SILAMPUR, NEW JAFFRABAD‐GORAKH PARK DGN 1936 1980 KVA UNPLANNED 18‐03‐2018 19:46:31 18‐03‐2018 20:30:00 0:43 0 MUs32 YOUTH HOSTEL BUILDING‐FEROJ SHAH KOTLA STADIUM, MANEK BHAVAN‐ THE INDIAN INSTITUTE OF PUBLIC
ADMINISTRATION‐FEROJ SHAH KOTLA STADIUM, MANEK BHAVAN‐ LOK SAMITI‐FEROJ SHAH KOTLA STADIUM, MANEK BHAVAN‐ INSTITUTE FOR STUDIES IN INDUSTRIAL DEVELOPMENT‐FEROJ SHAH KOTLA STADIUM, LIG/MIG RES/NON COMM AREA‐FEROJ SHAH KOTLA STADIUM
DRG 119 1390 KVA UNPLANNED 05‐03‐2018 10:54:37 05‐03‐2018 11:30:00 0:35 0.00058333 MUs
33 PATODI HOUSE‐CHANDNI CHOWK, LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK C‐AMAR COLONY, LIG/MIG RES/NON COMM AREA‐VIKRAM NAGAR, GHAROLI KONDLI, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, DDA POLICE QTRS.‐AHATA KEDARA, GANDHI SAMADHI‐RAJ GHAT, BLOCK B‐SADAR BAZAR ‐ RAM NAGAR, SHAHDARA JLM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, MAUJ PUR COMPLEX 1, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐VIVEK VIHAR, BHAGAT NAGAR‐DAYALPUR, JHANDEWALAN FATTED FACTORY COMPLEX, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK M‐SHIV VIHAR, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, PART II‐
BLOCK E‐BLDGNAMERASTRIYA VIRJANAND ANDH KANYA MAHAVIDYALAYA, BLOCK B‐MOTHER DAIRY, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, YAMUNA FLOOD PLAINS‐DARYAGANJ YAMUNA FLOOD PLAINS, BLOCK A‐JHANDEWALAN, INDIRA GANDHI STADIUM‐AJMERI GATE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, DARYA GANJ, JAFFRABAD‐MAUJ PUR, BLOCK F‐SHIV VIHAR, ISBT‐ISBT ANAND VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG
DRG 2089 3170 KVA UNPLANNED 06‐03‐2018 17:24:38 06‐03‐2018 18:53:06 1:28 0.00176 MUs
34 DARYA GANJ DRG 1930 2970 KVA UNPLANNED 06‐03‐2018 18:29:00 06‐03‐2018 19:00:01 0:31 0.00008611 MUs35 PKT B‐CHITRAKOOT, LIG/MIG RES/NON COMM AREA‐RAJ GHAT, SHAHDARA JLM, GHAROLI KONDLI, DR. AMBEDKAR
STADIUM‐FEROJ SHAH KOTLA STADIUM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐VIVEK VIHAR, ISBT‐ISBT ANAND VIHAR, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, INDIRA GANDHI STADIUM‐AJMERI GATE, BLOCK B‐MOTHER DAIRY, BLOCK C‐AMAR COLONY, GANDHI SAMADHI‐RAJ GHAT
DRG 44 700 KVA UNPLANNED 11‐03‐2018 19:39:00 11‐03‐2018 21:19:00 1:40 0.00030556 MUs
36 ANNA NAGAR‐ D.T.C. BUS DEPOT‐IPGCL, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐IPGCL, IP STATE‐PRAGATI MAIDAN, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DRG 315 800 KVA UNPLANNED 13‐03‐2018 13:56:45 13‐03‐2018 15:08:00 1:11 0.00001972 MUs
37 PKT B‐CHITRAKOOT, LIG/MIG RES/NON COMM AREA‐RAJ GHAT, SHAHDARA JLM, GHAROLI KONDLI, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐VIVEK VIHAR, ISBT‐ISBT ANAND VIHAR, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, INDIRA GANDHI STADIUM‐AJMERI GATE, BLOCK B‐MOTHER DAIRY, BLOCK C‐AMAR COLONY, GANDHI SAMADHI‐RAJ GHAT
DRG 44 700 KVA UNPLANNED 21‐03‐2018 21:22:35 21‐03‐2018 22:22:00 0:59 0.00022944 MUs
38 DARYA GANJ, CHANDANI MAHAL‐CHANDNI CHOWK, PATODI HOUSE‐CHANDNI CHOWK, MTNL TELEPHONE EXCHANGE‐PATODI HOUSE
DRG 1718 1980 KVA UNPLANNED 09‐03‐2018 22:04:00 09‐03‐2018 23:00:00 0:56 0.00046667 MUs
39 KUCHA PATI RAM‐CHANDNI CHOWK, CHAWRI BAZAR‐CHANDNI CHOWK, DAV PUBLIC SCHOOL‐KALA MASZID, BINDRABAN UDYOG‐KUCHA PATI RAM
DRG 2488 2970 KVA UNPLANNED 10‐03‐2018 10:11:00 10‐03‐2018 11:00:00 0:49 0.00039472 MUs
40 DARYA GANJ, GEETA COLONY, KAMLA MARKET‐AJMERI GATE, KUCHA PATI RAM‐CHANDNI CHOWK, CHAWRI BAZAR‐CHANDNI CHOWK, DAV PUBLIC SCHOOL‐KALA MASZID, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI POLICE BHAVAN‐PAHARI BHOJLA, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
DRG 1374 2970 KVA UNPLANNED 10‐03‐2018 11:19:00 10‐03‐2018 12:17:00 0:58 0.000725 MUs
41 GEETA COLONY, KAMLA MARKET‐AJMERI GATE, KUCHA PATI RAM‐CHANDNI CHOWK, CHAWRI BAZAR‐CHANDNI CHOWK, SITARAM BAZAR‐CHANDNI CHOWK, DAV PUBLIC SCHOOL‐KALA MASZID, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI POLICE BHAVAN‐PAHARI BHOJLA, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA SONIA VIHAR
DRG 1374 2970 KVA UNPLANNED 10‐03‐2018 13:25:00 10‐03‐2018 14:36:00 1:10 0.00058333 MUs
42 KAMLA MARKET‐AJMERI GATE, NEW DELHI RAILWAY STATION‐PAHAR GANJ DRG, GOVT.GIRLS SENIOR SECONDARY SCHOOL‐KAMLA MARKET, SARYODHAY GARLS SCHOOL‐KAMLA MARKET, SMT. GIRDHARI LAL C.D. PRASUTI HOSPITAL‐KAMLA MARKET, BINDRABAN UDYOG‐KUCHA PATI RAM
DRG 454 1620 KVA UNPLANNED 04‐03‐2018 08:56:00 04‐03‐2018 09:55:00 0:58 0.00051556 MUs
43 GOVIND BALLABH PANT HASPITAL‐LN JPN COLONY, UNIVERSITY GRANT COMMISSION‐ITO, SOC SCHOOL‐CONNAUGHT PLACE DRG, MATA SUNDARI SCHOOL‐ROUSE AVENUE, MEER DARD H.S.‐ROUSE AVENUE, DEMOLISHED AREA‐ROUSE AVENUE
DRG 397 1620 KVA UNPLANNED 20‐03‐2018 19:16:34 20‐03‐2018 20:45:00 1:28 0.0022 MUs
44 GEETA COLONY, GOVT. GIRLS SENIOR SECONDARY SCHOOL‐TURKMAN GATE, COMMUNITY CENTRE‐JAMA MASZID, CHRISTAN COLONY‐KHABAS PURA, CHANDANI MAHAL‐CHANDNI CHOWK, PATODI HOUSE‐CHANDNI CHOWK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
DRG 3730 2290 KVA UNPLANNED 24‐03‐2018 05:36:53 24‐03‐2018 06:34:00 0:57 0.00096583 MUs
45 SHAHDARA JLM, NEW VISWAS NAGAR‐SHAHDARA, VISHWAS NAGAR‐SHAHDARA JLM 1131 4010 KVA UNPLANNED 04‐03‐2018 17:36:36 04‐03‐2018 18:10:00 0:33 0.00061417 MUs46 VISHWAS NAGAR‐SHAHDARA, KASTURBA NAGAR‐SHAHDARA, MAHARAM NAGAR‐SHAHDARA, AMBEDKAR NAGAR‐
SHAHDARAJLM 1048 3600 KVA UNPLANNED 05‐03‐2018 00:10:36 05‐03‐2018 01:05:00 0:54 0.0006 MUs
47 VISHWAS NAGAR EXTN.‐SHAHDARA, VISHWAS NAGAR, EAST ROHTASH NAGAR‐SHAHDARA JLM 2893 5220 KVA UNPLANNED 08‐03‐2018 10:07:00 08‐03‐2018 10:45:00 0:38 0.00054889 MUs48 EAST ROHTASH NAGAR‐SHAHDARA, VISHWAS NAGAR, VISHWAS NAGAR EXTN.‐SHAHDARA JLM 1036 5220 KVA UNPLANNED 09‐03‐2018 02:43:00 09‐03‐2018 04:03:00 1:19 0.00030722 MUs49 SHAHDARA JLM, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, NEW VISWAS NAGAR‐
SHAHDARA, VISHWAS NAGAR‐SHAHDARA, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
JLM 1436 4010 KVA UNPLANNED 15‐03‐2018 10:15:00 15‐03‐2018 11:29:14 1:14 0.00205556 MUs
50 BLOCK_B‐VIVEK VIHAR PHASE II, NAYA VISHWAS NAGAR‐SHAHDARA, NEW VISWAS NAGAR‐SHAHDARA, VISHWAS NAGAR‐SHAHDARA, KASTURBA NAGAR‐SHAHDARA, AMBEDKAR NAGAR‐SHAHDARA, JAWALA NAGAR‐SHAHDARA, SURAJMAL VIHAR‐VIVEK VIHAR, DDA MIG FLATS‐VIVEK VIHAR PHASE II
JLM 2595 8550 KVA UNPLANNED 15‐03‐2018 15:28:37 15‐03‐2018 16:28:00 0:59 0.00136028 MUs
51 BHAGAT NAGAR‐DAYALPUR, VISHWAS NAGAR‐SHAHDARA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, SHAHDARA JLM, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, NEW VISWAS NAGAR‐SHAHDARA, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
JLM 1436 4010 KVA UNPLANNED 16‐03‐2018 10:09:00 16‐03‐2018 10:52:43 0:43 0.001075 MUs
52 EAST ROHTASH NAGAR‐SHAHDARA, VISHWAS NAGAR, VISHWAS NAGAR EXTN.‐SHAHDARA JLM 2893 5220 KVA UNPLANNED 16‐03‐2018 10:38:00 16‐03‐2018 11:30:00 0:51 0.00085 MUs53 EAST ROHTASH NAGAR‐SHAHDARA, VISHWAS NAGAR, VISHWAS NAGAR EXTN.‐SHAHDARA JLM 2893 5220 KVA UNPLANNED 20‐03‐2018 06:41:33 20‐03‐2018 07:26:00 0:44 0.00022 MUs54 VISHWAS NAGAR EXTN.‐SHAHDARA, VISHWAS NAGAR, EAST ROHTASH NAGAR‐SHAHDARA JLM 2909 5220 KVA UNPLANNED 31‐03‐2018 18:44:11 31‐03‐2018 19:28:17 0:44 0.00055 MUs55 SHAHDARA JLM JLM 7 800 KVA UNPLANNED 11‐03‐2018 06:02:00 11‐03‐2018 07:15:09 1:13 0 MUs56 JAGRITI ENCLAVE‐ANAND VIHAR JLM 177 990 KVA UNPLANNED 17‐03‐2018 12:50:00 17‐03‐2018 13:37:09 0:47 0.00006528 MUs57 BLOCK F‐PANDAV NAGAR, SAMASPUR‐PANDAV NAGAR, BLOCK C‐PANDAV NAGAR, MAHARAM NAGAR‐SHAHDARA,
PRIYA ENCLAVE‐ANAND VIHAR, DAYA NAND VIHAR‐ANAND VIHAR, HARGOBIND ENCLAVE‐ANAND VIHAR, KIRAN VIHAR‐ANAND VIHAR, SURYA NIKETAN‐RISHAB VIHAR, BAHUBALI ENCLAVE‐ANAND VIHAR, SHANTI VIHAR‐ANAND VIHAR, SHARAD VIHAR‐ANAND VIHAR, SHYAM ENCLAVE‐ANAND VIHAR, PANDAV NAGAR MVR‐SHAKARPUR MVR, JAWALA NAGAR‐SHAHDARA SHANTI VIHAR‐KARKAR DUMA DDA FLATS‐KARKAR DUMA
JLM 1224 6210 KVA UNPLANNED 22‐03‐2018 12:18:36 22‐03‐2018 13:24:00 1:5 0.00148056 MUs
58 SHAHDARA JLM JLM 7 800 KVA UNPLANNED 23‐03‐2018 07:43:36 23‐03‐2018 08:41:00 0:57 0 MUs
59 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, ANAND VIHAR BLOCK C, BLOCK D‐ANAND VIHAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
JLM 656 990 KVA UNPLANNED 31‐03‐2018 11:28:30 31‐03‐2018 12:14:43 0:46 0 MUs
60 VIVEK VIHAR BLOCK C, BLOCK D‐VIVEK VIHAR JLM 681 1890 KVA UNPLANNED 25‐03‐2018 00:48:00 25‐03‐2018 01:35:55 0:47 0.00084861 MUs61 BLOCK 9‐GANDHI NAGAR, SHYAM COLONY‐KAILASH NAGAR SOUTH, BLOCK 9‐GANDHI NAGAR KRN 3237 3600 KVA UNPLANNED 11‐03‐2018 11:24:00 11‐03‐2018 12:52:00 1:28 0.00251778 MUs62 KHUREJI KHAS‐SWASTHYA VIHAR, GOVIND PURA OLD‐SWASTHYA VIHAR, RADHE SHYAM PARK EXTN.‐SWASTHYA
VIHAR, OLD BRIJPURI‐SWASTHYA VIHAR, BLOCK A‐BALDEV PARK EAST, NEW GOVIND PURA‐JAGATPURI, NAI SARAK‐KATRA ASRAFI, BLOCK F‐BALDEV PARK EAST, CHANDER NAGAR BLOCK F‐GOPAL PARK, BLOCK E‐ANARKALI COLONY NORTH, BLOCK 16‐GEETA COLONY, BLOCK 18‐GEETA COLONY, BLOCK 15‐GEETA COLONY, BLOCK B‐SOUTH ANARKALI COLONY, SHIVPURI‐JAGATPURI, RASHID MARKET‐JAGATPURI, BALDEV PARK‐JAGATPURI, BLOCK D‐BALDEV PARK EAST, BLOCK K‐JAGATPURI, BLOCK A‐ANARKALI COLONY NORTH, BLOCK D‐SOUTH ANARKALI COLONY
KRN 11813 6210 KVA UNPLANNED 12‐03‐2018 15:25:00 12‐03‐2018 15:50:00 0:24 0.00030667 MUs
63 KAILASH NAGAR, BLOCK D‐AJIT NAGAR, DHARAM PURA‐KAILASH NAGAR, BLOCK 9‐DHARAM PURA, BLOCK 9‐KAILASH NAGAR, AJIT NAGAR‐KAILASH NAGAR, DHRAM PURA‐KAILASH NAGAR, BLOCK 9‐GANDHI NAGAR
KRN 5202 2970 KVA UNPLANNED 04‐03‐2018 02:24:36 04‐03‐2018 02:59:06 0:34 0.00022667 MUs
64 SUBHASH MOHALLA‐SEELAMPUR KRN 57 630 KVA UNPLANNED 08‐03‐2018 11:17:54 08‐03‐2018 12:00:00 0:42 0.000035 MUs65 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK 10‐GANDHI NAGAR, BLOCK 9‐GANDHI
NAGAR, SHYAM COLONY‐KAILASH NAGAR SOUTH, BLOCK 9‐SUBHASH MOHALLA_I, BLOCK 9‐RAGHUBARPURA, MAHILA COLONY‐SEELAMPUR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, GANDHI NAGAR‐KAILASH NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, BLOCK 9‐GANDHI NAGAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KRN 6009 5940 KVA UNPLANNED 22‐03‐2018 08:00:35 22‐03‐2018 08:30:00 0:29 0.00011278 MUs
66 OLD SEELAMPUR, RAGHUBARPURA NO 2‐SEELAMPUR KRN 3677 3240 KVA UNPLANNED 27‐03‐2018 11:23:03 27‐03‐2018 12:26:00 1:2 0.00165333 MUs67 DHARAM PURA‐KAILASH NAGAR, BLOCK 9‐SUBHASH MOHALLA_I, RAGUWARPURA‐SUBHASH MOHALLA II,
RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK 10‐RAM NAGAR, BLOCK 9‐KAILASH NAGAR, GANDHI NAGAR‐KAILASH NAGAR, BLOCK 9‐GANDHI NAGAR
KRN 2495 1620 KVA UNPLANNED 29‐03‐2018 00:35:07 29‐03‐2018 01:25:00 0:49 0.00020417 MUs
68 AZAD NAGAR EAST, WEST AZAD NAGAR KRN 184 990 KVA UNPLANNED 05‐03‐2018 12:00:55 05‐03‐2018 12:40:22 0:39 0.00002167 MUs69 BLOCK B‐KANTI NAGAR NORTH BLOCK B, BLOCK A‐KANTI NAGAR NORTH BLOCK A, BLOCK C‐KANTI NAGAR NORTH
BLOCK C, AZAD NAGAR EAST, WEST AZAD NAGAR, KANTI NAGAR SOUTH‐AZAD NAGAR, SHANKAR NAGAR WEST‐AZAD NAGAR, BLOCK X‐RAJGARH COLONY, BLOCK A‐KRISHNA NAGAR, BLOCK F‐KRISHNA NAGAR, BLOCK D‐KRISHNA NAGAR, BLOCK E‐KRISHNA NAGAR, JHEEL‐JHEEL KHURENJA, BLOCK K‐JAGATPURI, SHANKAR NAGAR‐AZAD NAGAR
KRN 12800 10800 KVA UNPLANNED 11‐03‐2018 07:44:00 11‐03‐2018 09:15:00 1:31 0.00070778 MUs
70 WEST AZAD NAGAR KRN 604 990 KVA UNPLANNED 20‐03‐2018 11:45:09 20‐03‐2018 12:05:28 0:20 0.00001111 MUs71 BLOCK B‐KANTI NAGAR NORTH BLOCK B, BLOCK A‐KANTI NAGAR NORTH BLOCK A, BLOCK C‐KANTI NAGAR NORTH
BLOCK C, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KRN 3762 2610 KVA UNPLANNED 21‐03‐2018 01:04:34 21‐03‐2018 02:15:27 1:10 0.00110833 MUs
72 AZAD NAGAR EAST, BLOCK E‐KRISHNA NAGAR KRN 103 990 KVA UNPLANNED 01‐03‐2018 09:53:57 01‐03‐2018 10:25:33 0:31 0.00004306 MUs73 BLOCK E‐KRISHNA NAGAR, JHEEL‐JHEEL KHURENJA, SHANKAR NAGAR WEST‐AZAD NAGAR, AZAD NAGAR EAST, BLOCK
C‐KANTI NAGAR NORTH BLOCK C, BLOCK K‐JAGATPURI, BLOCK B‐KANTI NAGAR NORTH BLOCK B, SHANKAR NAGAR‐AZAD NAGAR, BLOCK A‐KRISHNA NAGAR, BLOCK X‐RAJGARH COLONY, WEST AZAD NAGAR, KANTI NAGAR SOUTH‐AZAD NAGAR, BLOCK A‐KANTI NAGAR NORTH BLOCK A, BLOCK F‐KRISHNA NAGAR, BLOCK D‐KRISHNA NAGAR
KRN 12815 10800 KVA UNPLANNED 20‐03‐2018 09:28:33 20‐03‐2018 10:40:00 1:11 0.00059167 MUs
74 BLOCK F‐KRISHNA NAGAR KRN 204 990 KVA UNPLANNED 20‐03‐2018 15:03:37 20‐03‐2018 15:27:48 0:24 0.00001333 MUs75 BLOCK B‐KRISHNA NAGAR EAST, BLOCK A‐KRISHNA NAGAR EAST, BLOCK H‐KRISHNA NAGAR, BLOCK F‐KRISHNA
NAGAR, BLOCK J‐KRISHNA NAGAR EAST, BLOCK J‐KRISHNA NAGAR EAST, KRISHNA NAGAR EAST BLOCK D‐RADHEPURI, KRISHNA NAGAR EAST BLOCK B‐RADHEPURI, JHEEL‐KRISHNA NAGAR BLOCK B
KRN 3253 2970 KVA UNPLANNED 22‐03‐2018 12:02:37 22‐03‐2018 12:43:00 0:40 0.00061111 MUs
76 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK E‐BHAGIRATHI VIHAR, BLOCK D‐OLD MUSTAFABAD, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK F‐BHAGIRATHI VIHAR, BLOCK F‐INDIRA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK D‐BHAGIRATHI VIHAR, BLOCK A‐MAN SINGH NAGAR, BLOCK M‐SHIV VIHAR, BLOCK C‐MAN SINGH NAGAR, BLOCK E‐BRIJ PURI, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐BHAGIRATHI VIHAR, BLOCK B‐MAN SINGH NAGAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐OLD MUSTAFABAD, BLOCK G‐BHAGIRATHI VIHAR, BLOCK F‐SHIV VIHAR, BLOCK C‐BRIJ PURI, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B BLOCK B BHAGIRATHI VIHAR
KWN 7951 2520 KVA UNPLANNED 07‐03‐2018 08:09:38 07‐03‐2018 09:04:00 0:54 0.00003 MUs
77 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐TUKMIRPUR, BLOCK F‐NEHRU VIHAR, BLOCK C‐TUKMIRPUR, BLOCK B‐NEW CHAUHAN PUR, BLOCK D‐OLD MUSTAFABAD, BLOCK Z‐NEHRU VIHAR, BLOCK M‐NEHRU VIHAR, BLOCK T‐NEHRU VIHAR, BLOCK B‐HARIJAN BASTI, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, OLD MUSTAFABAD‐ BLOCK C‐DAYALPUR, BLOCK A‐RAMA GARDEN, PKT M‐BLOCK D, BLOCK N‐SHIV VIHAR, BLOCK G‐NEHRU VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DEEKSHA MAHILA COLLAGE‐DAYALPUR EXTN., BLOCK E‐DAYALPUR, BLOCK T‐NEHRU VIHAR, BLOCK A‐NEHRU VIHAR, BHAGAT NAGAR‐DAYALPUR, FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, BLOCK H‐OLD MUSTAFABAD, BLOCK B‐NEW CHAUHAN PUR, BLOCK D‐TUKMIRPUR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK A‐NEHRU VIHAR, BLOCK B‐NEHRU VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐HARIJAN BASTI, BLOCK M‐OLD MUSTAFABAD, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐OLD MUSTAFABAD, BLOCK T‐OLD MUSTAFABAD, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐
KWN 10444 6890 KVA UNPLANNED 10‐03‐2018 12:00:00 10‐03‐2018 13:20:28 1:20 0.00157778 MUs
78 BLOCK C‐GOKUL PURI, BLOCK D‐GOKUL PURI, BLOCK B‐GOKUL PURI, BLOCK A‐GOKUL PURI, PKT C‐BLOCK C, BLOCK B‐GANGA VIHAR, PKT G‐BLOCK A, BLOCK F‐GANGA VIHAR, BLOCK E‐GANGA VIHAR, PKT G‐BLOCK C, PKT A‐BLOCK C, PKT B‐BLOCK C, PKT A‐BLOCK A, PKT B‐BLOCK A, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR
KWN 7153 3240 KVA UNPLANNED 12‐03‐2018 01:22:00 12‐03‐2018 02:18:00 0:56 0.00116667 MUs
79 BLOCK C‐MAHALAXMI ENCLAVE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK D‐OLD MUSTAFABAD, BLOCK Z‐NEHRU VIHAR, BLOCK M‐NEHRU VIHAR, BLOCK T‐NEHRU VIHAR, BLOCK B‐GOVIND VIHAR, BLOCK A‐SHASTRI PARK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, OLD MUSTAFABAD‐ BLOCK C‐DAYALPUR, BLOCK N‐SHIV VIHAR, BLOCK F‐INDIRA VIHAR, MAUJ PUR COMPLEX 1, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A‐BABU NAGAR, BLOCK T‐NEHRU VIHAR, BLOCK C‐GOVIND VIHAR, BLOCK C‐GHONDA, NORTH GHONDA, BHAGAT NAGAR‐DAYALPUR, GHONDA PATTI CHAUHAN, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK M‐SHIV VIHAR, BLOCK H‐OLD MUSTAFABAD, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK M‐OLD MUSTAFABAD, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐OLD MUSTAFABAD, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
KWN 11616 6880 KVA UNPLANNED 18‐03‐2018 07:28:30 18‐03‐2018 08:27:00 0:58 0.00135333 MUs
80 PKT R‐BLOCK D, BLOCK D‐OLD MUSTAFABAD, BLOCK B‐OLD MUSTAFABAD, BLOCK M‐OLD MUSTAFABAD, BLOCK M‐NEHRU VIHAR, BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK K‐KARAWAL NAGAR (DEHROTI), PKT M‐BLOCK D, BLOCK A1‐MUNGA NAGAR
KWN 6147 4230 KVA UNPLANNED 19‐03‐2018 13:52:00 19‐03‐2018 15:30:00 1:37 0.00269444 MUs
81 PKT C‐BLOCK B, BLOCK U‐SHIV VIHAR, BLOCK H‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK K‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR, BLOCK S‐SHIV VIHAR, BLOCK O‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, PKT A‐BLOCK B, PKT B‐BLOCK B, PKT D‐BLOCK B, BLOCK J‐SHIV VIHAR
KWN 3344 0 KVA UNPLANNED 07‐03‐2018 10:47:39 07‐03‐2018 11:27:00 0:39 0.000195 MUs
82 BLOCK K‐WEST KARAWAL NAGAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK K‐KARAWAL NAGAR (DEHROTI), BLOCK B‐HARIJAN BASTI
KWN 719 1980 KVA UNPLANNED 24‐03‐2018 17:25:00 24‐03‐2018 18:23:00 0:58 0.00136944 MUs
83 BLOCK K‐WEST KARAWAL NAGAR KWN 85 990 KVA UNPLANNED 28‐03‐2018 18:06:25 28‐03‐2018 18:38:56 0:32 0.00004444 MUs84 LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK A‐SHRI RAM COLONY, BLOCK D‐SHRI RAM COLONY,
LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 3395 2060 KVA UNPLANNED 02‐03‐2018 04:11:35 02‐03‐2018 05:30:00 1:18 0.00039 MUs
85 BLOCK 4B‐SADAT PUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK A‐SADAT PUR, BLOCK C1‐SADAT PUR, BLOCK 3A‐SADAT PUR, BLOCK B‐DAYALPUR, BLOCK 3C‐SADAT PUR, DEEKSHA MAHILA COLLAGE‐DAYALPUR EXTN., PKT G‐BLOCK A, PKT E‐BLOCK A, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK 2C‐SADAT PUR, PKT C3‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, BLOCK U‐SHIV VIHAR, BLOCK 5C‐SADAT PUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., BLOCK F‐SADAT PUR, BLOCK F‐SHIV VIHAR, PKT F‐BLOCK A, BLOCK B‐NEW CHAUHAN PUR, PKT 1‐BLOCK A, PKT C1‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, PKT F‐BLOCK B, BLOCK 3B‐SADAT PUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, PKT E‐BLOCK B, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK E‐DAYALPUR, PKT B‐BLOCK A, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., PKT 2A‐BLOCK A, PKT A‐BLOCK B, BLOCK A‐NEHRU VIHAR, BHAGAT NAGAR‐DAYALPUR, PKT EA‐BLOCK B, BLOCK 1D‐SADAT PUR, PKT C2‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK M‐SHIV VIHAR, BLOCK 6C‐SADAT PUR, BLOCK 4C‐SADAT
KWN 5840 4360 KVA UNPLANNED 06‐03‐2018 11:45:00 06‐03‐2018 12:40:00 0:54 0.001425 MUs
86 BLOCK C‐TUKMIRPUR, BLOCK D‐KHAJURI KHAS, BLOCK B‐CHANDU NAGAR, CLOCK C‐BIHARIPUR, BLOCK D‐SHERPUR, BLOCK C‐SHERPUR, BLOCK D‐TUKMIRPUR, CHAUHAN PATTI‐VIJAY VIHAR
KWN 913 1620 KVA UNPLANNED 07‐03‐2018 15:49:38 07‐03‐2018 16:34:00 0:44 0.00145444 MUs
87 GURU ANGAD NAGAR EAST‐SWASTHYA VIHAR, BLOCK D‐NEHRU VIHAR, BLOCK C‐BRIJ PURI, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK C‐KHAJURI KHAS, BLOCK A‐KHAJURI KHAS, BLOCK B‐CHANDU NAGAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK J‐KHAJURI KHAS, LIG/MIG RES/NON COMM AREA‐BLOCK B, BLOCK F‐KHAJURI KHAS EXTN., BLOCK G‐KHAJURI KHAS EXTN., BLOCK H‐KHAJURI KHAS EXTN., BLOCK I‐KHAJURI KHAS EXTN., BLOCK D‐BRIJ PURI, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 5039 4000 KVA UNPLANNED 10‐03‐2018 21:14:00 10‐03‐2018 22:03:00 0:49 0.00074861 MUs
88 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐TUKMIRPUR, BLOCK F‐NEHRU VIHAR, BLOCK C‐TUKMIRPUR, BLOCK B‐NEW CHAUHAN PUR, BLOCK D‐OLD MUSTAFABAD, BLOCK Z‐NEHRU VIHAR, BLOCK M‐NEHRU VIHAR, BLOCK T‐NEHRU VIHAR, BLOCK B‐HARIJAN BASTI, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, OLD MUSTAFABAD‐ BLOCK C‐DAYALPUR, BLOCK A‐RAMA GARDEN, PKT M‐BLOCK D, BLOCK N‐SHIV VIHAR, BLOCK G‐NEHRU VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DEEKSHA MAHILA COLLAGE‐DAYALPUR EXTN., BLOCK E‐DAYALPUR, BLOCK T‐NEHRU VIHAR, BLOCK A‐NEHRU VIHAR, BHAGAT NAGAR‐DAYALPUR, FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, BLOCK H‐OLD MUSTAFABAD, BLOCK B‐NEW CHAUHAN PUR, BLOCK D‐TUKMIRPUR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK A‐NEHRU VIHAR, BLOCK B‐NEHRU VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐HARIJAN BASTI, BLOCK M‐OLD MUSTAFABAD, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐OLD MUSTAFABAD, BLOCK T‐OLD MUSTAFABAD, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐
KWN 10484 6890 KVA UNPLANNED 19‐03‐2018 16:02:32 19‐03‐2018 17:00:00 0:57 0 MUs
89 GURU ANGAD NAGAR EAST‐SWASTHYA VIHAR, BLOCK D‐NEHRU VIHAR, BLOCK C‐BRIJ PURI, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK C‐KHAJURI KHAS, BLOCK A‐KHAJURI KHAS, BLOCK B‐CHANDU NAGAR, MUSTAFABAD‐MUNGA NAGAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK J‐KHAJURI KHAS, LIG/MIG RES/NON COMM AREA‐BLOCK B, BLOCK F‐KHAJURI KHAS EXTN., BLOCK G‐KHAJURI KHAS EXTN., BLOCK H‐KHAJURI KHAS EXTN., BLOCK I‐KHAJURI KHAS EXTN., BLOCK D‐BRIJ PURI, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
KWN 6060 4000 KVA UNPLANNED 21‐03‐2018 12:20:34 21‐03‐2018 13:17:39 0:57 0.00064917 MUs
90 LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, CHAUHAN PATTI‐VIJAY VIHAR KWN 183 400 KVA UNPLANNED 21‐03‐2018 12:44:34 21‐03‐2018 13:05:57 0:21 0.00004083 MUs91 BLOCK G‐NEHRU VIHAR KWN 11 630 KVA UNPLANNED 28‐03‐2018 12:26:02 28‐03‐2018 12:57:36 0:31 0 MUs92 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, INDUSTRIAL AREA‐PATPAR GANJ INDUSTRIAL
AREA, MADHU VIHAR‐INDRAPRASTHA EXTENSION, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, SCHOOL‐MOTHER DAIRY, RETREAT APARTMENT‐MOTHER DAIRY, AKASH BHARTI APPARTMENT‐MOTHER DAIRY, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA SONIA VIHAR
LNR 554 2920 KVA UNPLANNED 10‐03‐2018 00:33:00 10‐03‐2018 01:32:00 0:58 0.00012889 MUs
93 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK A‐CHANDER VIHAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, RAMA KRISHNA VIHAR APARTMENT‐MADHU VIHAR, SAHYADRI APARTMENT‐MADHU VIHAR, PHARMA APARTMENT‐MADHU VIHAR, MATRI APPARTMENT‐MOTHER DAIRY, MEENA APPARTMENT‐MOTHER DAIRY, BLOCK E‐MADHU VIHAR, BLOCK B‐MANDAWALI VILLAGE, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
LNR 3428 7440 KVA UNPLANNED 17‐03‐2018 00:31:00 17‐03‐2018 02:29:00 1:58 0.00216333 MUs
94 PHASE I‐MAYUR VIHAR, OXFORD APPARTMENT‐VINOD NAGAR, NAVA KUNJ APARTMENT‐MOTHER DAIRY, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 428 6410 KVA UNPLANNED 31‐03‐2018 04:37:09 31‐03‐2018 05:54:00 1:16 0.00118222 MUs
95 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐GURU ANGAD NAGAR WEST, BLOCK D‐HARIJAN BASTI, BANK ENCLAVE‐LAKSHMI NAGAR, BLOCK C‐LALITA PARK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, KRISHAN KUNJ‐LAKSHMI NAGAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, BLOCK F‐VISHWAKARMA PARK, GYAN KUNJ‐WEST GURU ANGAD NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK B‐GURU ANGAD NAGAR WEST, BLOCK B‐KUNDAN NAGAR, BLOCK F‐LALITA PARK, MOHAN PARK‐WEST GURU ANGAD NAGAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KUNDAN NAGAR‐LAKSHMI NAGAR, BLOCK F‐GURU ANGAD NAGAR WEST, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK K‐JAGAT RAM PARK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐LALITA PARK, BLOCK F‐SHIV VIHAR, BLOCK A‐GURU RAMDAS NAGAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
LNR 11454 5580 KVA UNPLANNED 07‐03‐2018 05:37:38 07‐03‐2018 07:23:39 1:46 0.00103056 MUs
96 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, GYAN KUNJ‐WEST GURU ANGAD NAGAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 490 990 KVA UNPLANNED 10‐03‐2018 14:55:00 10‐03‐2018 15:26:01 0:31 0.00008611 MUs
97 BLOCK F‐VISHWAKARMA PARK, BLOCK J‐VISHWAKARMA PARK, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, RAMESH PARK‐LAKSHMI NAGAR, VISHWAKARMA PARK‐LAKSHMI NAGAR, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, BANK ENCLAVE‐LAKSHMI NAGAR, RAMESH PARK‐NARAYAN NAGAR, KISHAN KUNJ‐SHASTRI NAGAR, YAMUNA FLOOD PLAINS‐LAXMI NAGAR YAMUNA FLOOD PLAINS, VISHWAKARMA PARK‐KISHAN KUNJ, KRISHNA KUNJ‐LAKSHMI NAGAR
LNR 5564 4730 KVA UNPLANNED 16‐03‐2018 15:33:00 16‐03‐2018 17:05:00 1:31 0.00042972 MUs
98 BLOCK B‐KUNDAN NAGAR, BLOCK F‐VISHWAKARMA PARK, BLOCK J‐VISHWAKARMA PARK, BLOCK A‐GURU RAMDAS NAGAR, GEETA COLONY, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, KUNDAN NAGAR‐LAKSHMI NAGAR, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, BANK ENCLAVE‐LAKSHMI NAGAR, KRISHAN KUNJ‐LAKSHMI NAGAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA SONIA VIHAR
LNR 6978 2970 KVA UNPLANNED 16‐03‐2018 15:36:00 16‐03‐2018 17:05:00 1:28 0.00122222 MUs
99 YAMUNA FLOOD PLAINS‐LAXMI NAGAR YAMUNA FLOOD PLAINS, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐GURU ANGAD NAGAR WEST, BLOCK D‐HARIJAN BASTI, LAKSHMI NAGAR BLOCK J&K, BLOCK N‐VISHWAKARMA PARK, BLOCK J & K‐NARAYAN NAGAR, RAMESH PARK‐LAKSHMI NAGAR, RAMESH PARK‐NARAYAN NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK M‐JAGAT RAM PARK, BLOCK N‐SHIV VIHAR, BLOCK J‐LALITA PARK, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, BLOCK C‐LALITA PARK, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK B‐GURU ANGAD NAGAR WEST, MOHAN PARK‐WEST GURU ANGAD NAGAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK F‐GURU ANGAD NAGAR WEST, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK N‐JAGAT RAM PARK, BLOCK R‐LALITA PARK, BLOCK D‐LALITA PARK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GURU ANGAD NAGAR EAST‐SWASTHYA VIHAR, PUSTA‐LALITA PARK, BLOCK F‐SHIV VIHAR, LAXMI NAGAR COMMERCIAL COPLEX‐SWASTHYA VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
LNR 9476 5580 KVA UNPLANNED 19‐03‐2018 00:37:31 19‐03‐2018 01:30:00 0:52 0.00056333 MUs
100 BLOCK A‐SHAKARPUR KHAS, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK S‐SCHOOL BLOCK, GANESH NAGAR‐SHAKARPUR, BLOCK S1‐SCHOOL BLOCK, BLOCK D‐LALITA PARK, VISHWAKARMA PARK‐LAKSHMI NAGAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, YAMUNA FLOOD PLAINS‐LAXMI NAGAR YAMUNA FLOOD PLAINS, NEHRU ENCLAVE‐SCHOOL BLOCK, DELHI DEVELOPMENT AUTHORITY‐SCHOOL BLOCK, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA SONIA VIHAR
LNR 1910 2060 KVA UNPLANNED 25‐03‐2018 02:22:04 25‐03‐2018 03:10:00 0:47 0.00066583 MUs
101 BLOCK B‐PREET VIHAR, BLOCK D‐PREET VIHAR LNR 53 630 KVA UNPLANNED 31‐03‐2018 14:40:00 31‐03‐2018 15:20:00 0:40 0.00011111 MUs102 LIG/MIG RES/NON COMM AREA‐MOTHER DAIRY, MADHU VIHAR‐INDRAPRASTHA EXTENSION, NARVANA
APPARTMENT‐MADHU VIHAR, BLOCK E‐MADHU VIHARLNR 780 4500 KVA UNPLANNED 08‐03‐2018 16:52:40 08‐03‐2018 18:38:48 1:46 0.00197278 MUs
103 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK A‐CHANDER VIHAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, RAMA KRISHNA VIHAR APARTMENT‐MADHU VIHAR, SAHYADRI APARTMENT‐MADHU VIHAR, PHARMA APARTMENT‐MADHU VIHAR, MATRI APPARTMENT‐MOTHER DAIRY, MEENA APPARTMENT‐MOTHER DAIRY, BLOCK E‐MADHU VIHAR, BLOCK B‐MANDAWALI VILLAGE, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
LNR 3428 7440 KVA UNPLANNED 17‐03‐2018 22:12:30 17‐03‐2018 22:34:00 0:21 0.00014 MUs
104 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, MADHU VIHAR‐INDRAPRASTHA EXTENSION, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, NEELKANTH APARTMENT‐MADHU VIHAR, PARSHWA VIHAR APPARTMENT‐MADHU VIHAR, JAIN MANDIR‐MADHU VIHAR, TRILOK APPARTMENT‐MADHU VIHAR, FRIENDS APARTMENT‐MADHU VIHAR, VIDHISA APPARTMENT‐MADHU VIHAR, RAMA KRISHNA VIHAR APARTMENT‐MADHU VIHAR, RAJDHANI NIKUNJ APARTMENT‐MADHU VIHAR, NARVANA APPARTMENT‐MADHU VIHAR, BLOCK E‐MADHU VIHAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR LIG/MIG RES/NON COMM AREA SONIA VIHAR
LNR 1109 4290 KVA UNPLANNED 24‐03‐2018 13:21:06 24‐03‐2018 14:37:00 1:15 0.00054167 MUs
105 BLOCK B‐JOSHI COLONY, MANDAWALI FAZALPUR BLOCK B‐JOSHI COLONY, BLOCK A‐JOSHI COLONY, MANDAWALI FAZALPUR BLOCK A‐JOSHI COLONY, J.J. COLONY‐MOTHER DAIRY, HASANPUR DEPOT BLOCK A‐MOTHER DAIRY, TAKSHILA APARTMENT‐MOTHER DAIRY
LNR 1725 1790 KVA UNPLANNED 31‐03‐2018 03:53:09 31‐03‐2018 04:40:00 0:46 0.00046 MUs
106 INDUSTRIAL AREA‐PATPAR GANJ INDUSTRIAL AREA, BLOCK B‐JOSHI COLONY, MANDAWALI FAZALPUR BLOCK B‐JOSHI COLONY, BLOCK A‐JOSHI COLONY, MANDAWALI FAZALPUR BLOCK A‐JOSHI COLONY, J.J. COLONY‐MOTHER DAIRY, HASANPUR DEPOT BLOCK A‐MOTHER DAIRY, TAKSHILA APARTMENT‐MOTHER DAIRY
LNR 1725 1790 KVA UNPLANNED 31‐03‐2018 05:52:09 31‐03‐2018 06:50:00 0:57 0.00057 MUs
107 INDUSTRIAL AREA‐PATPAR GANJ INDUSTRIAL AREA, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, BHARAT GAS‐GAZIPUR VILLAGE, TELCO LTD.‐GAZIPUR VILLAGE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 213 400 KVA UNPLANNED 31‐03‐2018 14:55:00 31‐03‐2018 15:30:00 0:35 0.00009722 MUs
108 MAYUR PLACE‐MAYUR VIHAR MVR 3 800 KVA UNPLANNED 20‐03‐2018 07:02:33 20‐03‐2018 07:15:00 0:12 0 MUs109 SHASHI GARDEN‐MAYUR VIHAR, ACHARYA NIKETAN‐SHASHI GARDEN, PATPAR GANJ‐SHASHI GARDEN, KOTLA‐MAYUR
VIHAR, MAYUR VIHAR PHASE II, PATPARGANJ‐SHASHI GARDENMVR 4212 4710 KVA UNPLANNED 20‐03‐2018 13:12:33 20‐03‐2018 14:56:02 1:43 0.0028325 MUs
110 BLOCK 10‐KHICHRIPUR RESETTLEMENT COLONY BLOCK 5, BLOCK 7‐KHICHRIPUR RESETTLEMENT COLONY BLOCK 7, BLOCK 3‐KHICHARIPUR BLOCK 1, BLOCK 9‐KHICHRIPUR RESETTLEMENT COLONY BLOCK 9, KALYAN VAS‐KALYAN PURI, BLOCK C‐VINOD NAGAR EAST, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, KHICHARIPUR‐GAZIPUR, BLOCK C‐VINOD NAGAR EAST, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
MVR 4488 2650 KVA UNPLANNED 03‐03‐2018 05:47:35 03‐03‐2018 06:30:00 0:42 0 MUs
111 PKT A‐MAYUR VIHAR PHASE II, PKT E‐MAYUR VIHAR PHASE II, PKT D‐MAYUR VIHAR PHASE II, BLOCK G‐VINOD NAGAR EAST, BLOCK E‐VINOD NAGAR EAST, BLOCK F‐VINOD NAGAR EAST, KALYAN VAS‐KALYAN PURI, BLOCK C‐VINOD NAGAR EAST, MAYUR VIHAR PHASE II
MVR 3042 3550 KVA UNPLANNED 08‐03‐2018 16:04:41 08‐03‐2018 16:45:00 0:40 0.0004 MUs
112 BLOCK 14‐TRILOKPURI PHASE II, BLOCK 23‐TRILOKPURI PHASE II, PKT B‐MAYUR VIHAR PHASE II, PKT F‐MAYUR VIHAR PHASE II, PKT A‐MAYUR VIHAR PHASE II, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, MAYUR VIHAR PHASE II, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
MVR 1816 2460 KVA UNPLANNED 10‐03‐2018 23:34:00 11‐03‐2018 00:11:00 0:36 0.00022 MUs
113 BHARTI COLONY‐NIRMAN VIHAR, BLOCK B‐GAZIPUR DAIRY FARM, BLOCK E‐GAZIPUR DAIRY FARM, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, GAZIPUR DAIRY FARM, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐GAZIPUR VILLAGE, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, SHANGHTA HOUSE STORE‐GAZIPUR DAIRY FARM, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
MVR 746 1890 KVA UNPLANNED 13‐03‐2018 14:05:00 13‐03‐2018 15:03:00 0:58 0.00062833 MUs
114 PKT B‐MAYUR VIHAR PHASE II, BLOCK 15‐KALYAN PURI, BLOCK 19‐KALYAN PURI, BLOCK B‐GAZIPUR DAIRY FARM, BLOCK A‐GAZIPUR DAIRY FARM, BLOCK C‐GAZIPUR DAIRY FARM, BLOCK D‐GAZIPUR DAIRY FARM, BLOCK 18‐KALYAN PURI, GAZIPUR DAIRY FARM
MVR 2730 2290 KVA UNPLANNED 22‐03‐2018 06:37:35 22‐03‐2018 07:26:26 0:48 0.00004 MUs
115 BLOCK B‐GAZIPUR DAIRY FARM, GAZIPUR DAIRY FARM, BLOCK 19‐KALYAN PURI, BLOCK A‐GAZIPUR DAIRY FARM, BLOCK 18‐KALYAN PURI, BLOCK C‐GAZIPUR DAIRY FARM, BLOCK 15‐KALYAN PURI, PKT B‐MAYUR VIHAR PHASE II, BLOCK D‐GAZIPUR DAIRY FARM
MVR 2978 2290 KVA UNPLANNED 23‐03‐2018 08:14:36 23‐03‐2018 09:56:00 1:41 0.00053306 MUs
116 PKT A‐MAYUR VIHAR PHASE II, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
MVR 708 630 KVA UNPLANNED 23‐03‐2018 09:03:50 23‐03‐2018 09:32:55 0:29 0.00008056 MUs
117 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK 7‐KHICHRIPUR RESETTLEMENT COLONY BLOCK 7, GAZIPUR DAIRY FARM, BLOCK 10‐KHICHRIPUR RESETTLEMENT COLONY BLOCK 5, BLOCK 20‐HIMMATPURI, BLOCK C‐GAZIPUR DAIRY FARM, BLOCK 3‐KHICHARIPUR BLOCK 1, PHASE I‐MAYUR VIHAR, BLOCK 6‐KHICHRIPUR RESETTLEMENT COLONY, KHICHARIPUR‐GAZIPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK 8‐KHICHRIPUR RESETTLEMENT COLONY BLOCK 8, BLOCK 18‐KALYAN PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT B‐MAYUR VIHAR PHASE II, BLOCK 21‐HIMMATPURI, BLOCK 18‐KALYAN PURI, BLOCK A‐VINOD NAGAR EAST, KHICHRIPUR RESETTLEMENT COLONY‐KHICHARIPUR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐GAZIPUR DAIRY FARM, KHICHRIPUR RESETTLEMENT COLONY‐KHICHARIPUR, BLOCK M‐SHIV VIHAR, HIMMATPURI‐MAYUR VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK 12‐KALYAN PURI, BLOCK 1‐KALYAN PURI, BLOCK D‐GAZIPUR DAIRY FARM, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 9‐KHICHRIPUR
MVR 8921 7090 KVA UNPLANNED 30‐03‐2018 12:02:08 30‐03‐2018 13:00:00 0:57 0.00133 MUs
118 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK 7‐KHICHRIPUR RESETTLEMENT COLONY BLOCK 7, GAZIPUR DAIRY FARM, BLOCK 10‐KHICHRIPUR RESETTLEMENT COLONY BLOCK 5, BLOCK 20‐HIMMATPURI, BLOCK C‐GAZIPUR DAIRY FARM, BLOCK 3‐KHICHARIPUR BLOCK 1, PHASE I‐MAYUR VIHAR, BLOCK 6‐KHICHRIPUR RESETTLEMENT COLONY, KHICHARIPUR‐GAZIPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK 8‐KHICHRIPUR RESETTLEMENT COLONY BLOCK 8, BLOCK 18‐KALYAN PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT B‐MAYUR VIHAR PHASE II, BLOCK 21‐HIMMATPURI, BLOCK 18‐KALYAN PURI, KHICHRIPUR RESETTLEMENT COLONY‐KHICHARIPUR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐GAZIPUR DAIRY FARM, KHICHRIPUR RESETTLEMENT COLONY‐KHICHARIPUR, BLOCK M‐SHIV VIHAR, HIMMATPURI‐MAYUR VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK 12‐KALYAN PURI, BLOCK 1‐KALYAN PURI, BLOCK D‐GAZIPUR DAIRY FARM, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 9‐KHICHRIPUR RESETTLEMENT COLONY BLOCK 9, BLOCK F‐SHIV VIHAR,
MVR 8921 7090 KVA UNPLANNED 30‐03‐2018 14:57:08 30‐03‐2018 15:55:00 0:57 0.00158333 MUs
119 BLOCK B‐GAZIPUR DAIRY FARM, GAZIPUR DAIRY FARM, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, SHANGHTA HOUSE STORE‐GAZIPUR DAIRY FARM, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
MVR 223 1890 KVA UNPLANNED 31‐03‐2018 14:28:00 31‐03‐2018 16:55:00 2:27 0.00310333 MUs
120 BLOCK 5‐TRILOKPURI PHASE I, BLOCK 6‐TRILOKPURI PHASE I, BLOCK 4‐TRILOKPURI PHASE I, BLOCK 3‐TRILOKPURI PHASE I, BLOCK 1‐TRILOKPURI PHASE I, PKT 3‐PHASE I, BLOCK 36‐HIMMATPURI, BLOCK 32‐HIMMATPURI, BLOCK 28‐HIMMATPURI, BLOCK 33‐HIMMATPURI, BLOCK 20‐HIMMATPURI, BLOCK 27‐HIMMATPURI, BLOCK 26‐HIMMATPURI, BLOCK 35‐HIMMATPURI, BLOCK 18‐KALYAN PURI, BLOCK 12‐KALYAN PURI, BLOCK 1‐KALYAN PURI, NEW JAFFRABAD‐GORAKH PARK, BLOCK H‐GHONDA PATTI, CL‐CHILLA SARDA BANGAR VILLAGE, TRILOKPURI PHASE I‐MAYUR VIHAR, MAYUR VIHAR EXTN., HIMMATPURI‐MAYUR VIHAR, BLOCK 18‐KALYAN PURI, JAFFRABAD‐MAUJ PUR, BLOCK D‐BHAJANPURA, BLOCK B‐GARI MANDU, GHONDA PATTI, NAVA KUNJ APARTMENT‐MOTHER DAIRY, KOTLA EXCT‐PHASE II HIMMAT PURI CHILLA VILLAGE
MVR 9994 7740 KVA UNPLANNED 10‐03‐2018 15:43:00 10‐03‐2018 17:15:00 1:31 0.001365 MUs
121 BLOCK 20‐KALYAN PURI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, KHICHRI PUR‐PHASE II, BLOCK 14‐KALYAN PURI, KHICHARIPUR‐GAZIPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK 15‐TRILOKPURI PHASE II, TRILOKPURI PHASE II‐MAYUR VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK 9‐TRILOKPURI PHASE I, KOTLA EXCT‐PHASE II, BLOCK 21‐HIMMATPURI, PATPARGANJ‐SHASHI GARDEN, BLOCK A‐PHASE I, BHAGAT NAGAR‐DAYALPUR, BLOCK 24‐TRILOKPURI PHASE II, KOTLA‐MAYUR VIHAR, BLOCK M‐SHIV VIHAR, SHASHI GARDEN‐MAYUR VIHAR, HIMMATPURI‐MAYUR VIHAR, BLOCK C‐VINOD NAGAR EAST, AMBEDKAR CAMP‐KALYAN PURI, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 16‐HIMMATPURI, BLOCK 14‐TRILOKPURI PHASE II, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK 25‐TRILOKPURI PHASE II, BLOCK 22‐HIMMATPURI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 23‐TRILOKPURI PHASE II, BLOCK 6‐TRILOKPURI PHASE I, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK 13‐TRILOKPURI PHASE II, PKT A‐BLOCK B
MVR 6127 3910 KVA UNPLANNED 12‐03‐2018 16:15:00 12‐03‐2018 17:14:00 0:58 0.000725 MUs
122 BLOCK 20‐KALYAN PURI, BLOCK 36‐HIMMATPURI, BLOCK 7‐TRILOKPURI PHASE I, BLOCK 10‐TRILOKPURI PHASE I, BLOCK 20‐HIMMATPURI, BLOCK 12‐TRILOKPURI PHASE I, MAYUR VIHAR PHASE II, BLOCK 1‐TRILOKPURI PHASE I, BLOCK 15‐TRILOKPURI PHASE II, BLOCK 18‐KALYAN PURI, BLOCK 21‐KALYAN PURI, BLOCK 5‐TRILOKPURI PHASE I, BLOCK 9‐TRILOKPURI PHASE I, BLOCK 26‐HIMMATPURI, BLOCK 21‐HIMMATPURI, BLOCK 3‐TRILOKPURI PHASE I, BLOCK 24‐TRILOKPURI PHASE II, BLOCK 19‐KALYAN PURI, BLOCK 18‐HIMMATPURI, HIMMATPURI‐MAYUR VIHAR, BLOCK 19‐HIMMATPURI, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 16‐HIMMATPURI, BLOCK 14‐TRILOKPURI PHASE II, BLOCK 17‐HIMMATPURI, BLOCK 11‐TRILOKPURI PHASE I, BLOCK 22‐HIMMATPURI, BLOCK 8‐TRILOKPURI PHASE I, BLOCK 23‐TRILOKPURI PHASE II, KALYAN PURI‐MAYUR VIHAR, BLOCK 6‐TRILOKPURI PHASE I, BLOCK 4‐TRILOKPURI PHASE I, BLOCK 35‐HIMMATPURI, BLOCK D‐SHRI RAM COLONY
MVR 9822 7150 KVA UNPLANNED 17‐03‐2018 19:14:30 17‐03‐2018 20:10:00 0:55 0.00163472 MUs
123 BANK OF BARODA‐SABOLI COLONY, SEWA DHAM‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI
NNG 124 1030 KVA UNPLANNED 01‐03‐2018 03:17:34 01‐03‐2018 03:55:00 0:37 0.00031861 MUs
124 SEWA DHAM‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY
NNG 124 1030 KVA UNPLANNED 05‐03‐2018 09:49:37 05‐03‐2018 10:28:00 0:38 0.00070722 MUs
125 SEWA DHAM‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY
NNG 124 1030 KVA UNPLANNED 05‐03‐2018 16:21:37 05‐03‐2018 16:52:00 0:30 0.000525 MUs
126 D.S.I.D.C. COMPLEX‐DTC DEPOT, KACHI MANDIR‐BLOCK E4, BLOCK E3‐KANSHIPUR, BLOCK A2‐NAND NAGARI, BLOCK A1‐NAND NAGARI, BLOCK A4‐NAND NAGARI, BLOCK A3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK D1, MCD SCHOOL‐BLOCK C3, BSES OFFICE‐BLOCK C2, BLOCK C1‐NAND NAGARI, BLOCK B5‐NAND NAGARI, BLOCK B6‐NAND NAGARI, BLOCK B4‐NAND NAGARI, BLOCK B2‐NAND NAGARI, BLOCK B1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK D2‐NAND NAGARI, GOVT. SCHOOL‐DTC DEPOT, KARMACHARI RAJYA BEEMA HOSPITAL‐DTC DEPOT, SULABH‐DTC DEPOT, DELHI JAL BOARD MIG FLATS‐POCKET A, AMIG FLATS‐POCKET A, BLOCK E2‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK D3, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK A3, SS SCHOOL‐BLOCK B5
NNG 10071 5570 KVA UNPLANNED 06‐03‐2018 09:10:38 06‐03‐2018 11:00:00 1:49 0.00290667 MUs
127 SEWA DHAM‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY
NNG 124 1030 KVA UNPLANNED 10‐03‐2018 16:52:00 10‐03‐2018 17:08:00 0:15 0.00029583 MUs
128 BLOCK A4‐NAND NAGARI, BLOCK A3‐NAND NAGARI, BLOCK C1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, GOVT. BOYS SCHOOL‐BLOCK A3
NNG 565 630 KVA UNPLANNED 11‐03‐2018 09:00:43 11‐03‐2018 09:38:31 0:37 0.0000925 MUs
129 SABOLI COLONY‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, J.R. COMPLEX‐SEWA DHAM, SEWA DHAM‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI
NNG 124 1030 KVA UNPLANNED 12‐03‐2018 13:04:44 12‐03‐2018 15:03:00 1:58 0.00006556 MUs
130 BLOCK B‐SUNDER NAGRI NNG, BLOCK H‐JJ COLONY, BLOCK C1‐NAND NAGARI, BLOCK E1‐BUNKAR VIHAR, GOVT.SARVODAY VIDHYALAYA‐BLOCK E5, BLOCK H‐PREM NAGAR NNG, BLOCK G3‐BUNKAR VIHAR, KACHI MANDIR‐BLOCK E4, BLOCK E1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK E3‐KANSHIPUR, BLOCK J‐SUNDER NAGRI, RAJIV GANDHI SUPER STC HOSPITAL‐GURU TEG BAHADUR ENCLAVE NNG, BLOCK E5‐NAND NAGARI, GOVT. BOYS SCHOOL‐BLOCK A3, BLOCK E2‐NAND NAGARI, BUNKAR BHAVAN‐PREM NAGAR NNG, BLOCK A3‐NAND NAGARI, BLOCK L‐SUNDER NAGRI, BLOCK B1‐NAND NAGARI, POCKET B‐GURU TEG BAHADUR ENCLAVE, L.I.G HOUSING NAND NAGARI‐PKT E, BLOCK F‐BUNKAR VIHAR, BLOCK E3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, POCKET A‐JJ COLONY, D.S.I.D.C. COMPLEX‐DTC DEPOT, AMIG FLATS‐POCKET A, BLOCK A4‐NAND NAGARI, BLOCK KK‐SUNDER NAGRI, BLOCK F1‐BUNKAR VIHAR, BHARAT MATA MANDIR‐JJ COLONY, CLASS ROOM MCD SCHOOL‐BUNKAR VIHAR, JANTA FLATS‐NAND NAGARI, BLOCK E‐BUNKAR VIHAR, BLOCK C‐SUNDER NAGRI NNG, BLOCK G4‐BUNKAR VIHAR, MCD PRIMARY SCHOOL BLOCK D3 DELHI JAL BOARD MIG FLATS POCKET A
NNG 13367 6920 KVA UNPLANNED 17‐03‐2018 13:31:00 17‐03‐2018 15:23:43 1:52 0.00189778 MUs
131 BLOCK A‐MANDOLI EXTN., BLOCK D‐MANDOLI EXTN. NNG 261 990 KVA UNPLANNED 20‐03‐2018 13:42:45 20‐03‐2018 14:30:00 0:47 0.00013056 MUs132 BLOCK A‐MANDOLI EXTN. NNG 427 990 KVA UNPLANNED 20‐03‐2018 13:44:26 20‐03‐2018 14:30:00 0:45 0.000125 MUs133 GURU TEG BAHADUR COMMUNITY CENTRE‐PKT E, L.I.G HOUSING NAND NAGARI‐PKT E, D.S.I.D.C. COMPLEX‐DTC
DEPOT, KACHI MANDIR‐BLOCK E4, BLOCK E3‐NAND NAGARI, BLOCK E1‐NAND NAGARI, BHARAT MATA MANDIR‐JJ COLONY, BLOCK E3‐KANSHIPUR, BLOCK A4‐NAND NAGARI, BLOCK A3‐NAND NAGARI, BLOCK C1‐NAND NAGARI, BLOCK B1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, JANTA FLATS‐NAND NAGARI, DELHI JAL BOARD MIG FLATS‐POCKET A, BLOCK E2‐NAND NAGARI, BLOCK E5‐NAND NAGARI, GOVT.SARVODAY VIDHYALAYA‐BLOCK E5, MCD PRIMARY SCHOOL‐BLOCK D3 GOVT BOYS SCHOOL‐BLOCK A3 MCD PRIMARY SCHOOL‐BLOCK A3
NNG 5798 2290 KVA UNPLANNED 31‐03‐2018 03:42:00 31‐03‐2018 05:00:00 1:18 0.00134333 MUs
134 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK E‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR, BLOCK E‐MEET NAGAR
NNG 1489 3280 KVA UNPLANNED 03‐03‐2018 17:54:38 03‐03‐2018 19:19:00 1:24 0.00214667 MUs
135 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3299 2610 KVA UNPLANNED 05‐03‐2018 04:45:36 05‐03‐2018 05:05:00 0:19 0.00053833 MUs
136 BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐NATHU PURA, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
NNG 7754 2610 KVA UNPLANNED 12‐03‐2018 11:09:00 12‐03‐2018 12:18:00 1:9 0.00055583 MUs
137 BLOCK A‐AMAR COLONY, BLOCK A‐MEET NAGAR NNG 621 0 KVA UNPLANNED 21‐03‐2018 18:44:51 21‐03‐2018 19:35:01 0:50 0.00069444 MUs138 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR
COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3349 2610 KVA UNPLANNED 28‐03‐2018 16:51:00 28‐03‐2018 17:27:00 0:36 0 MUs
139 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 587 630 KVA UNPLANNED 06‐03‐2018 15:32:06 06‐03‐2018 15:59:45 0:27 0.000075 MUs
140 BABARPUR WEST‐BABAR PUR NNG, BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR, PKT B‐CHITRAKOOT, DELHI JAL BOARD‐JYOTI NAGAR, BABA DA DARGA‐KARDAMPURI, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR
NNG 6408 4060 KVA UNPLANNED 12‐03‐2018 13:18:00 12‐03‐2018 14:30:00 1:12 0.0012 MUs
141 BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐NATHU PURA, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
NNG 5701 1620 KVA UNPLANNED 16‐03‐2018 11:46:29 16‐03‐2018 13:03:00 1:16 0.00259667 MUs
142 BLOCK B‐KABIR NAGAR NNG 201 990 KVA UNPLANNED 26‐03‐2018 15:45:29 26‐03‐2018 15:46:55 0:1 0.0000025 MUs143 NEW RATAN MARKET‐PANCHKUIAN ROAD RAILWAY COLONY, CHUNA MANDI‐PAHAR GANJ, PANCHKUIAN ROAD
RAILWAY COLONY‐PAHAR GANJ, RK ASHRAM METRO STATION‐PANCHKUIAN ROAD RAILWAY COLONY, BANGALA SAHIB ROAD‐PANCHKUIAN ROAD RAILWAY COLONY
PHG 569 630 KVA UNPLANNED 12‐03‐2018 13:08:55 12‐03‐2018 13:21:47 0:12 0.00001667 MUs
144 BLOCK L‐RAM NAGAR, MSC‐ARAM NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, SANT NIRANKARI SCHOOL‐MOTIA KHAN, SADAR BAZAR ‐ RAM NAGAR, DDA FLATS‐ MOTIAKHAN DUMP SCHEME‐MOTIA KHAN, DDA FLATS‐MOTIA KHAN, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK C‐AMAR NAGAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK K‐ARAM NAGAR, MANTOLA MOHALLA‐PAHAR GANJ, BAGICHI ALLUDDIN‐SADAR BAZAR, BLOCK M‐SHIV VIHAR, MOTIYA KHAN‐SHAHI IDGAH COLONY, BLOCK D‐MOTIA KHAN, MULTANI DHANDA‐SADAR BAZAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, S.R.T. NAGAR‐ARYA NAGAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK T‐SADAR BAZAR ‐ RAM NAGAR, BLOCK A‐AMAR NAGAR, YOG MAYA‐KILLA KADAM SHARIF, BLOCK L‐AMAR NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
PHG 10138 6840 KVA UNPLANNED 13‐03‐2018 07:26:45 13‐03‐2018 08:14:19 0:47 0.00131861 MUs
145 BLOCK I‐ARAM BAGH, GEETA COLONY, CHUNA MANDI‐PAHAR GANJ, MANTOLA MOHALLA‐PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ, MULTANI DHANDA‐SADAR BAZAR, S.R.T. NAGAR‐ARYA NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, TYPE III HOUSE‐CHUNA MANDI, SHEELA HOTEL‐ARYA NAGAR, ST. ANTONYS CHURCH SCHOOL‐ARYA NAGAR, SENIOR SECONDARY ENGINEER WORKSHOP N.R.OFFICE‐CHANDNI CHOWK CCK, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
PHG 5623 6570 KVA UNPLANNED 13‐03‐2018 18:34:45 13‐03‐2018 19:55:00 1:20 0.0014 MUs
146 CHUNA MANDI‐PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ, MULTANI DHANDA‐SADAR BAZAR, SHEELA HOTEL‐ARYA NAGAR, TYPE III HOUSE‐CHUNA MANDI, MANTOLA MOHALLA‐PAHAR GANJ, S.R.T. NAGAR‐ARYA NAGAR
PHG 1357 990 KVA UNPLANNED 14‐03‐2018 15:19:19 14‐03‐2018 15:34:24 0:15 0.0000625 MUs
147 BLOCK I‐ARAM BAGH, BLOCK III‐ARAM BAGH, BLOCK II‐ARAM BAGH, BLOCK B‐ARAM BAGH, DDA FLATS‐ MOTIAKHAN DUMP SCHEME‐MOTIA KHAN, GEETA COLONY, DDA FLATS‐MOTIA KHAN, CHUNA MANDI‐PAHAR GANJ, MANTOLA MOHALLA‐PAHAR GANJ, MULTANI DHANDA‐SADAR BAZAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, SANT NIRANKARI SCHOOL‐MOTIA KHAN, R.G. COMPLEX‐MOTIA KHAN, LIG/MIG RES/NON COMM AREA‐MOTIA KHAN, TYPE III HOUSE‐CHUNA MANDI, MIG FLATS‐CHUNA MANDI, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA SONIA VIHAR
PHG 4574 6570 KVA UNPLANNED 17‐03‐2018 01:06:00 17‐03‐2018 02:01:21 0:55 0.00030556 MUs
148 CHETAN BASTI‐ BLOCK J‐NEHRU NAGAR, MULTANI DHANDA‐SADAR BAZAR, S.R.T. NAGAR‐ARYA NAGAR, BLOCK A‐AMAR NAGAR, BLOCK L‐RAM NAGAR, SHEELA HOTEL‐ARYA NAGAR, ST. ANTONYS CHURCH SCHOOL‐ARYA NAGAR, BLOCK C‐AMAR NAGAR, BLOCK L‐AMAR NAGAR, SENIOR SECONDARY ENGINEER WORKSHOP N.R.OFFICE‐CHANDNI CHOWK CCK
PHG 6018 5940 KVA UNPLANNED 19‐03‐2018 09:52:32 19‐03‐2018 10:33:50 0:41 0.00086556 MUs
149 PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, KASERU WALAN‐PAHAR GANJ, BANGALA SAHIB ROAD‐PANCHKUIAN ROAD RAILWAY COLONY, PHASE I‐MAYUR VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, AMRIT KAUR MARKET‐PAHAR GANJ, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, MANTOLA MOHALLA‐PAHAR GANJ, PAHAR GANJ PHG, NEW RATAN MARKET‐PANCHKUIAN ROAD RAILWAY COLONY, BHAGAT NAGAR‐DAYALPUR, RK ASHRAM METRO STATION‐PANCHKUIAN ROAD RAILWAY COLONY, BLOCK M‐SHIV VIHAR, MULTANI DHANDA‐SADAR BAZAR, SHEELA HOTEL‐ARYA NAGAR, PKT R‐BLOCK D, ST. ANTONYS CHURCH SCHOOL‐ARYA NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, TYPE III HOUSE‐CHUNA MANDI, S.R.T. NAGAR‐ARYA NAGAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, CHUNA MANDI‐PAHAR GANJ, SENIOR SECONDARY ENGINEER WORKSHOP N.R.OFFICE‐CHANDNI CHOWK CCK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SHORA KOTHI‐PAHAR GANJ, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
PHG 6434 5660 KVA UNPLANNED 20‐03‐2018 04:08:33 20‐03‐2018 05:01:36 0:53 0.00064778 MUs
150 MANTOLA MOHALLA‐PAHAR GANJ PHG 194 990 KVA UNPLANNED 22‐03‐2018 15:29:16 22‐03‐2018 15:43:51 0:14 0.00005833 MUs151 DDA FLATS‐ MOTIAKHAN DUMP SCHEME‐MOTIA KHAN, SFS FLATS‐ MOTIAKHAN DUMP SCHEME‐MOTIA KHAN PHG 352 630 KVA UNPLANNED 28‐03‐2018 14:43:43 28‐03‐2018 14:59:38 0:15 0.00004167 MUs152 LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN
BASTI, SANT NIRANKARI SCHOOL‐MOTIA KHAN, DDA POLICE QTRS.‐AHATA KEDARA, DDA FLATS‐ MOTIAKHAN DUMP SCHEME‐MOTIA KHAN, LIG/MIG RES/NON COMM AREA‐MOTIA KHAN, BLOCK B‐SADAR BAZAR ‐ RAM NAGAR, DDA FLATS‐MOTIA KHAN, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK C‐AMAR NAGAR, MAUJ PUR COMPLEX 1, SFS FLATS‐ MOTIAKHAN DUMP SCHEME‐MOTIA KHAN, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, SHAHI IDGAH‐SADAR BAZAR ‐ P.P QUARTERS, BHAGAT NAGAR‐DAYALPUR, JHANDEWALAN FATTED FACTORY COMPLEX, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK M‐SHIV VIHAR, MOTIYA KHAN‐SHAHI IDGAH COLONY, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, PART II‐BLOCK E‐
BLDGNAMERASTRIYA VIRJANAND ANDH KANYA MAHAVIDYALAYA, BLOCK D‐MOTIA KHAN, MULTANI DHANDA‐SADAR BAZAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐JHANDEWALAN, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, DARYA GANJ, JAFFRABAD‐MAUJ PUR, BLOCK F‐SHIV VIHAR, R.G. COMPLEX‐MOTIA KHAN, JHILMIL INDUSTRIAL
PHG 2961 6570 KVA UNPLANNED 31‐03‐2018 02:38:09 31‐03‐2018 03:37:00 0:58 0.00077333 MUs
153 SADAR BAZAR ‐ RAM NAGAR PHG 290 630 KVA UNPLANNED 26‐03‐2018 11:51:04 26‐03‐2018 12:05:41 0:14 0.00001944 MUs154 LIG/MIG RES/NON COMM AREA‐ANAND PARBHAT, CHETAN BASTI‐ BLOCK J‐NEHRU NAGAR, PREM NAGAR‐BALJIT
NAGAR, BLOCK F‐PUNJABI BASTI, BLOCK T‐PANJABI BASTI, BLOCK F‐PUNJABI BASTI, S.K. TRANSPORT‐ANAND PARBHAT
PNR 4544 4230 KVA UNPLANNED 07‐03‐2018 23:40:39 08‐03‐2018 00:36:00 0:55 0.00055 MUs
155 BLOCK T‐BALJIT NAGAR, BLOCK 24‐SARVODAYA KANYA VIDYALAYA, BLOCK 29‐WEST PATEL NAGAR, BLOCK 30‐WEST PATEL NAGAR, BLOCK L‐WEST PATEL NAGAR, BLOCK M‐WEST PATEL NAGAR, BLOCK N‐WEST PATEL NAGAR, BLOCK R‐WEST PATEL NAGAR, BLOCK S‐WEST PATEL NAGAR, BLOCK T‐WEST PATEL NAGAR, BLOCK P‐WEST PATEL NAGAR, BLOCK V‐WEST PATEL NAGAR, BLOCK E‐WEST PATEL NAGAR, BLOCK 15‐WEST PATEL NAGAR, BLOCK B‐WEST PATEL NAGAR, BLOCK D‐WEST PATEL NAGAR, BLOCK A‐WEST PATEL NAGAR, BLOCK Z‐WEST PATEL NAGAR, BLOCK 24‐WEST PATEL NAGAR
PNR 9083 5220 KVA UNPLANNED 14‐03‐2018 17:03:46 14‐03‐2018 17:50:00 0:46 0.00056222 MUs
156 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK_9B‐DEV NAGAR, BLOCK D‐HARIJAN BASTI, BAPA NAGAR‐ANAND PARBAT, BLOCK A‐PUNJABI BASTI, BLOCK B‐PUNJABI BASTI, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK_1‐DEV NAGAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK_10B‐DEV NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK 26B‐AJMAL KHAN PARK, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, THAKKAR BAPA NAGAR‐BLOCK 16, BLOCK_5B‐DEV NAGAR, BLOCK_14B‐DEV NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
PNR 5441 3960 KVA UNPLANNED 11‐03‐2018 10:13:00 11‐03‐2018 11:10:28 0:57 0.00188417 MUs
157 THAKKAR BAPA NAGAR‐BLOCK 16, BLOCK 26B‐AJMAL KHAN PARK, BLOCK_5B‐DEV NAGAR, BLOCK_9B‐DEV NAGAR, BLOCK_1‐DEV NAGAR, BLOCK_10B‐DEV NAGAR, GEETA COLONY, BLOCK A‐PUNJABI BASTI, BLOCK 12A‐KAROL BAGH, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, BAPA NAGAR‐ANAND PARBAT, BLOCK G‐DEV NAGAR, BLOCK_14B‐DEV NAGAR, BLOCK B‐PUNJABI BASTI, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
PNR 5456 3960 KVA UNPLANNED 19‐03‐2018 03:46:00 19‐03‐2018 04:44:00 0:58 0.00061222 MUs
158 BLOCK 1B‐DEV NAGAR, PHASE I‐DEV NAGAR, MATA RAMESHWARI NEHRU NAGAR‐DEV NAGAR, GEETA COLONY, MIG FLATS‐PRASAD NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, THAKKAR BAPA NAGAR‐DEV NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, ST.MICHAELS JUNIOR SCHOOL‐PRASAD NAGAR, BAPA NAGAR‐ANAND PARBAT, KHALSA NAGAR‐DEV NAGAR, BLOCK G‐DEV NAGAR, ANDHRA PUBLIC SCHOOL‐PRASAD NAGAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR LIG/MIG RES/NON COMM AREA SONIA VIHAR
PNR 4685 2970 KVA UNPLANNED 30‐03‐2018 16:04:09 30‐03‐2018 17:35:00 1:30 0.0029 MUs
159 ANAND PARBAT, THAN SINGH NAGAR‐ANAND PARBAT, KT COLONY‐VOLTAS LTD, RAMJAS NURSERY SCHOOL‐FARIDPURI, PROHIBITED AREA‐ANAND PARBAT, ARMY QTRS‐ANAND PARBAT, BABA FARID PURI‐PUNJABI BASTI, NAI BASTI‐ANAND PARBAT
PNR 4344 5260 KVA UNPLANNED 18‐03‐2018 23:21:31 19‐03‐2018 01:15:00 1:53 0.00147528 MUs
160 ANAND PARBAT PNR 125 990 KVA UNPLANNED 26‐03‐2018 14:16:28 26‐03‐2018 14:25:56 0:9 0.000025 MUs161 THAKKAR BAPA NAGAR‐BLOCK 16, BLOCK 24B‐AJMAL KHAN PARK, BLOCK 26B‐AJMAL KHAN PARK, BLOCK 25B‐AJMAL
KHAN PARK, BLOCK 27B‐AJMAL KHAN PARK, ANAND PARBAT, THAN SINGH NAGAR‐ANAND PARBAT, BLOCK A‐PUNJABI BASTI, BLOCK 51‐AJMAL KHAN PARK PNR, BLOCK 23B‐KAROL BAGH PNR, BLOCK B‐DEV NAGAR, BLOCK 196B‐DEV NAGAR, BABA FARID PURI‐PUNJABI BASTI, NAI BASTI‐ANAND PARBAT, BLOCK B‐PUNJABI BASTI
PNR 6785 6250 KVA UNPLANNED 27‐03‐2018 04:19:03 27‐03‐2018 05:17:00 0:57 0.00045917 MUs
162 BLOCK X‐WEST PATEL NAGAR, BLOCK 8‐WEST PATEL NAGAR, PATEL NAGAR POST OFFICE‐EAST PATEL NAGAR, BLOCK 24‐WEST PATEL NAGAR, BLOCK 32‐WEST PATEL NAGAR, BLOCK 14‐WEST PATEL NAGAR, BLOCK A‐WEST PATEL NAGAR, BLOCK E‐WEST PATEL NAGAR, BLOCK 25‐WEST PATEL NAGAR, BLOCK 2‐EAST PATEL NAGAR, P.G.D.A.V. SR. SCHOOL‐EAST PATEL NAGAR, BLOCK B‐PUNJABI BASTI, BLOCK 12‐WEST PATEL NAGAR, BLOCK 7‐WEST PATEL NAGAR, BLOCK Y‐WEST PATEL NAGAR, BLOCK Z‐WEST PATEL NAGAR, BLOCK 13‐WEST PATEL NAGAR, BLOCK 11‐EAST PATEL NAGAR, BLOCK 26‐WEST PATEL NAGAR, BLOCK 11‐WEST PATEL NAGAR, BABA FARID PURI‐PUNJABI BASTI, BLOCK 38‐WEST PATEL NAGAR, BLOCK B‐WEST PATEL NAGAR, DAYANAND MODEL SCHOOL(SECONDARY)‐WEST PATEL NAGAR, BLOCK 23‐WEST PATEL NAGAR, BLOCK 24‐SARVODAYA KANYA VIDYALAYA, BLOCK 2‐WEST PATEL NAGAR, BLOCK 3‐EAST PATEL NAGAR, BLOCK 1‐WEST PATEL NAGAR, BLOCK 15‐WEST PATEL NAGAR, BLOCK 3‐WEST PATEL NAGAR, BLOCK 4‐EAST PATEL NAGAR, BLOCK G‐COTTAGE, BLOCK C‐WEST PATEL NAGAR, THAKKAR BAPA NAGAR‐BLOCK 16, BLOCK 35‐WEST PATEL NAGAR, BLOCK 37‐WEST PATEL NAGAR, BLOCK 34‐WEST PATEL NAGAR, BLOCK 6‐WEST PATEL
PNR 6896 6210 KVA UNPLANNED 27‐03‐2018 16:55:03 27‐03‐2018 17:35:00 0:39 0.00144083 MUs
163 ANAND PARBAT, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, ARMY QTRS‐ANAND PARBAT, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
PNR 420 3960 KVA UNPLANNED 31‐03‐2018 01:05:10 31‐03‐2018 02:00:00 0:54 0.000525 MUs
164 MOHALLA SUBHASH NAGAR‐NAIWALA, BLOCK_37J‐BEADON PURA, BLOCK_47‐BEADON PURA, BLOCK_46‐BEADON PURA, BLOCK_35M‐BEADON PURA, BLOCK_24N‐BEADON PURA, BLOCK_23‐KRISHNA NAGAR, BLOCK_34P‐KRISHNA NAGAR, BLOCK_45‐KRISHNA NAGAR, BLOCK_12D‐KRISHNA NAGAR, BLOCK_31‐KRISHNA NAGAR, BLOCK_44O‐KRISHNA NAGAR, BLOCK_21K‐KRISHNA NAGAR, BLOCK_48‐KRISHNA NAGAR, BLOCK_39A‐NAIWALA, BLOCK T‐ASHOKA PAHARI
SRD 7029 5850 KVA UNPLANNED 17‐03‐2018 03:46:00 17‐03‐2018 04:55:00 1:9 0.00019167 MUs
165 BLOCK 5‐KAROL BAGH, BLOCK 15A‐KAROL BAGH SRD 41 990 KVA UNPLANNED 09‐03‐2018 11:00:09 09‐03‐2018 11:55:00 0:54 0.00006 MUs166 BLOCK_34P‐KRISHNA NAGAR, BLOCK_45‐KRISHNA NAGAR, BLOCK_12D‐KRISHNA NAGAR, BLOCK_31‐KRISHNA NAGAR,
BLOCK_44O‐KRISHNA NAGAR, BLOCK_21K‐KRISHNA NAGAR, BLOCK_48‐KRISHNA NAGAR, AJMAL KHAN PARK SRD‐KAROL BAGH SRD, BLOCK 1E‐JHANDEWALAN EXTENSION
SRD 185 990 KVA UNPLANNED 21‐03‐2018 16:25:34 21‐03‐2018 18:21:27 1:55 0.00405694 MUs
167 BLOCK_3H‐KRISHNA NAGAR, BLOCK_30B‐KRISHNA NAGAR SRD 147 990 KVA UNPLANNED 25‐03‐2018 15:08:09 25‐03‐2018 17:00:11 1:52 0.00018667 MUs pole damaged168 BLOCK 13‐KAROL BAGH, BLOCK 5‐KAROL BAGH SRD 73 990 KVA UNPLANNED 28‐03‐2018 12:00:48 28‐03‐2018 12:31:10 0:30 0.00004167 MUs169 BLOCK 13‐OLD RAJENDRA NAGAR SRD 150 990 KVA UNPLANNED 21‐03‐2018 11:27:11 21‐03‐2018 11:52:20 0:25 0 MUs170 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐KONDALI EXTN., BLOCK B‐AMBEDKAR
AWAS KALYAN SAMITI, BLOCK C‐RAJBIR COLONY, GHAROLI VILLAGE‐GHAROLI KONDLI, BLOCK B‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III, SEC C‐MAYUR VIHAR PHASE III, PKT A1‐MAYUR VIHAR PHASE III, SEC D‐MAYUR VIHAR PHASE III, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK E‐KONDALI VILLAGE, BLOCK C‐KONDALI VILLAGE, BLOCK A‐KONDALI EXTN., BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
VSE 4138 4310 KVA UNPLANNED 13‐03‐2018 16:54:46 13‐03‐2018 17:20:00 0:25 0.00007639 MUs
171 BLOCK B‐MAYUR VIHAR PHASE III, MAYUR VIHAR PHASE III, MAYUR VIHAR PHASE III, PKT A1‐MAYUR VIHAR PHASE III, PKT A3‐MAYUR VIHAR PHASE III, 3RD RD & PKT A 2‐MAYUR VIHAR PHASE III
VSE 2038 3320 KVA UNPLANNED 13‐03‐2018 19:22:46 13‐03‐2018 20:00:00 0:37 0.00020556 MUs
172 KONDALI VILLAGE‐GHAROLI KONDLI, BLOCK B‐AMBEDKAR AWAS KALYAN SAMITI, BLOCK C‐RAJBIR COLONY, GHAROLI VILLAGE‐GHAROLI KONDLI, BLOCK F‐KONDALI VILLAGE, BLOCK A‐KONDALI EXTN., BLOCK F‐SHIV VIHAR, PKT A‐BLOCK B
VSE 985 5490 KVA UNPLANNED 27‐03‐2018 14:51:03 27‐03‐2018 15:08:59 0:17 0.00039194 MUs
173 BLOCK A & B‐VASUNDHARA ENCLAVE VSE 1025 5210 KVA UNPLANNED 10‐03‐2018 13:37:00 10‐03‐2018 14:20:00 0:42 0.00086333 MUs174 SARASWATI KUNJ‐ EAST END APPARTMENT‐NEW ASHOK NAGAR VSE 860 3780 KVA UNPLANNED 23‐03‐2018 19:59:37 23‐03‐2018 20:44:00 0:44 0.00020778 MUs175 LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, BSES 66 KV GRID
S/STATION‐COMMUNITY CENTRE YAMUNA VIHAR, ARVIND NAGAR‐GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, SANT NIRANKARI BHAVAN‐GANGA VIHAR KWN, BLOCK B‐GARI MANDU, DDA POLICE QTRS.‐AHATA KEDARA, BLOCK D‐BHAJANPURA, BLOCK B‐SADAR BAZAR ‐ RAM NAGAR, KACHI COLONY‐JAGJEET NAGAR, BLOCK N‐NEW SILAMPURI PHASE I, BLOCK F‐BRAHM PURI, BLOCK C‐BHAJANPURA, BLOCK A‐GARI MANDU, BLOCK A‐GHONDA PATTI, JHUGI‐NEW SILAMPURI PHASE I, MAUJ PUR COMPLEX 1, BLOCK H‐GHONDA PATTI, TANKI ROAD‐C‐BLOCK BHAJANPURA, GHONDA PATTI CHAUHAN, JHANDEWALAN FATTED FACTORY COMPLEX, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK V‐GHONDA PATTI CHAUHAN, YAMUNA VIHAR YAMUNA
FLOOD PLAINS, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, PART II‐BLOCK E‐BLDGNAMERASTRIYA VIRJANAND ANDH KANYA MAHAVIDYALAYA, GAUTAM VIHAR‐GHONDA, NAYAGAON‐NEW KATWARA, BLOCK B‐NEW ASHOK NAGAR VSE, BLOCK J‐KARTAR NAGAR, BLOCK C‐GHONDA PATTI, BLOCK A‐JHANDEWALAN, JAGJEET NAGAR‐GHONDA, GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, DARYA GANJ, BLOCK E‐SUBHASH MOHALLA,
YVR 12749 5730 KVA UNPLANNED 30‐03‐2018 05:25:00 30‐03‐2018 06:18:00 0:53 0.00085389 MUs
176 BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK C‐PREET VIHAR, BLOCK D‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK
YVR 3258 5170 KVA UNPLANNED 29‐03‐2018 03:39:00 29‐03‐2018 04:38:00 0:58 0.00199778 MUs
177 BLOCK T‐GAUTAM PURI YVR 17 630 KVA UNPLANNED 14‐03‐2018 10:51:42 14‐03‐2018 11:47:56 0:56 0.00007778 MUs178 GOVT SARVODAY SCHOOL‐ZERO PUSTA, BLOCK T‐GAUTAM PURI, MCD COLONY‐NEW KATWARA, GEETA COLONY, GGS
INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI VIDHYUT BROAD‐ZERO PUSTA, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
YVR 305 800 KVA UNPLANNED 20‐03‐2018 18:18:00 20‐03‐2018 19:48:00 1:30 0.00115 MUs
179 CHAUHAN BANGAR‐JAFFRABAD, BLOCK N‐NEW SILAMPURI PHASE I, BLOCK J‐SILAMPUR COLONY, BLOCK A‐SILAMPUR COLONY, BLOCK G‐SILAMPUR COLONY, BLOCK B‐NEW SILAMPURI PHASE II, BLOCK F‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, JAFFRABAD‐MAUJ PUR, JHUGI‐NEW SILAMPURI PHASE I, DSIDC COMPLEX‐SEELAMPUR YVR, JAFFRABAD‐MAUJ PUR
YVR 6572 4000 KVA UNPLANNED 23‐03‐2018 03:52:37 23‐03‐2018 05:03:00 1:10 0.000875 MUs
180 BLOCK N‐NEW SILAMPURI PHASE III, BLOCK A‐SILAMPUR COLONY, BLOCK G‐SILAMPUR COLONY, BLOCK B‐NEW SILAMPURI PHASE II, BLOCK C‐NEW SILAMPURI PHASE II, BLOCK E‐NEW SILAMPURI PHASE II, BLOCK F‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, NEW SILAMPURI PHASE III, BLOCK D‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, JAFFRABAD‐MAUJ PUR
YVR 6237 2250 KVA UNPLANNED 31‐03‐2018 12:44:10 31‐03‐2018 14:31:00 1:46 0.00267944 MUs
181 BLOCK A‐JHANDEWALAN, DARYA GANJ, LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, JHANDEWALAN FATTED FACTORY COMPLEX, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, JAFFRABAD‐MAUJ PUR, MAUJ PUR COMPLEX 1, NORTH GHONDA, GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK V‐GHONDA PATTI CHAUHAN, LIG/MIG RES/NON COMM AREA‐BLOCK B, DDA POLICE QTRS.‐
AHATA KEDARA, BLOCK B‐SADAR BAZAR ‐ RAM NAGAR, PART II‐BLOCK E‐BLDGNAMERASTRIYA VIRJANAND ANDH KANYA MAHAVIDYALAYA
YVR 3328 630 KVA UNPLANNED 04‐03‐2018 12:28:00 04‐03‐2018 13:50:00 1:22 0.00455556 MUs
182 VIJAY PARK‐YAMUNA VIHAR, BLOCK C12‐YAMUNA VIHAR, BLOCK C11‐YAMUNA VIHAR, BLOCK C6‐YAMUNA VIHAR, BLOCK C7‐YAMUNA VIHAR, BLOCK C2‐YAMUNA VIHAR, BLOCK C10 MAHANAGAR STAFF UNION‐COMMUNITY CENTRE YAMUNA VIHAR BLOCK C, BLOCK C9‐YAMUNA VIHAR, BLOCK C1‐YAMUNA VIHAR, BLOCK B2‐YAMUNA VIHAR, BLOCK C8‐YAMUNA VIHAR, BLOCK C3‐YAMUNA VIHAR
YVR 5893 5220 KVA UNPLANNED 15‐03‐2018 14:21:00 15‐03‐2018 15:19:00 0:58 0.00116 MUs
183 VIJAY PARK‐YAMUNA VIHAR, BLOCK C12‐YAMUNA VIHAR, BLOCK C11‐YAMUNA VIHAR, BLOCK C6‐YAMUNA VIHAR, BLOCK C7‐YAMUNA VIHAR, BLOCK C2‐YAMUNA VIHAR, BLOCK C10 MAHANAGAR STAFF UNION‐COMMUNITY CENTRE YAMUNA VIHAR BLOCK C, BLOCK C9‐YAMUNA VIHAR, BLOCK C1‐YAMUNA VIHAR, BLOCK B2‐YAMUNA VIHAR, BLOCK C8‐YAMUNA VIHAR, BLOCK C3‐YAMUNA VIHAR
YVR 5893 5220 KVA UNPLANNED 15‐03‐2018 16:30:00 15‐03‐2018 17:50:00 1:19 0.00241389 MUs
184 JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, KACHI COLONY‐JAGJEET NAGAR, VIJAY PARK‐YAMUNA VIHAR, MAUJ PUR COMPLEX 1, BLOCK C‐BHAJANPURA, BLOCK B‐MANUJPUR, JAGJEET NAGAR‐GHONDA, ADARSH MOHALLA‐MAUJPUR
YVR 4720 2970 KVA UNPLANNED 22‐03‐2018 14:52:36 22‐03‐2018 15:35:35 0:42 0.001295 MUs
185 BLOCK C6‐YAMUNA VIHAR, BLOCK C7‐YAMUNA VIHAR, BLOCK C2‐YAMUNA VIHAR, BLOCK C8‐YAMUNA VIHAR YVR 208 990 KVA UNPLANNED 24‐03‐2018 10:54:13 24‐03‐2018 10:55:18 0:1 0.00000278 MUs
186 ZEENAT BARI‐MORI GATE, KASHMIRI GATE‐MORI GATE, MAIN MARKET‐KATRA DHOBI, OLD DELHI RAILWAY STATION‐CHANDNI CHOWK
CCK 1010 990 KVA UNPLANNED 04‐03‐2018 12:55:03 04‐03‐2018 14:37:14 1:42 0.00011333 MUs
187 GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, GOVT OF N C T OFFICE‐KASHMERE GATE, OLD COART(KASHMIR)‐KASHMERE GATE, RAILWAY COLONY‐KASHMERE GATE
CCK 192 990 KVA UNPLANNED 09‐03‐2018 11:48:15 09‐03‐2018 12:52:43 1:4 0.00003556 MUs lt cable repair work
188 TELEGRAPH OFFICE‐KASHMERE GATE, NIGAM BODH GHAT CEMETRY‐KASHMERE GATE CCK 16 990 KVA UNPLANNED 15‐03‐2018 16:03:55 15‐03‐2018 16:41:36 0:37 0.00012333 MUs189 GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, ZEENAT BARI‐MORI GATE, CHABI GANJ‐MORI GATE CCK 1046 990 KVA UNPLANNED 29‐03‐2018 11:56:32 29‐03‐2018 13:29:04 1:32 0.00010222 MUs190 OLD DELHI RAILWAY STATION‐CHANDNI CHOWK, ZEENAT BARI‐MORI GATE CCK 1283 990 KVA UNPLANNED 30‐03‐2018 12:29:15 30‐03‐2018 14:02:32 1:33 0.00010333 MUs191 MOTIA MAHAL‐CHANDNI CHOWK, CHIPI WARA‐KUCHA ALAM, ROSHAN PURA‐CHANDNI CHOWK CCK 747 990 KVA UNPLANNED 18‐03‐2018 14:43:37 18‐03‐2018 16:28:42 1:45 0.00005833 MUs192 HAUZ QAZI‐CHANDNI CHOWK, CHAWRI BAZAR‐KHUSH DIL CCK 502 630 KVA UNPLANNED 04‐03‐2018 11:11:46 04‐03‐2018 12:53:57 1:42 0.00011333 MUs193 MOSQUE‐LAL KUAN BAZAR, LALKUAN BAZAR‐FRASH KHANA CCK 1237 990 KVA UNPLANNED 10‐03‐2018 11:18:00 10‐03‐2018 13:07:08 1:49 0.00012111 MUs194 NAI SARAK‐JOGIWARA, CHAWRI BAZAR‐KHUSH DIL, MAIN BAZAR‐KHUSH DIL CCK 1307 990 KVA UNPLANNED 10‐03‐2018 11:06:29 10‐03‐2018 12:48:29 1:42 0.00011333 MUs195 AJMERI GATE‐CHANDNI CHOWK, MOSQUE‐LAL KUAN BAZAR CCK 800 990 KVA UNPLANNED 11‐03‐2018 11:05:21 11‐03‐2018 12:54:04 1:48 0.00012 MUs196 MOSQUE‐LAL KUAN BAZAR, LALKUAN BAZAR‐FRASH KHANA CCK 1237 990 KVA UNPLANNED 11‐03‐2018 11:23:48 11‐03‐2018 12:34:57 1:11 0.00003944 MUs197 NAI SARAK‐JOGIWARA, CHAWRI BAZAR‐KHUSH DIL, MAIN BAZAR‐KHUSH DIL CCK 936 990 KVA UNPLANNED 14‐03‐2018 11:19:34 14‐03‐2018 13:09:39 1:50 0.00012222 MUs198 GEETA COLONY, NAI SARAK‐JOGIWARA, NAI SARAK‐KATRA ASRAFI, ROSHAN PURA‐CHANDNI CHOWK, GGS
INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
CCK 637 990 KVA UNPLANNED 14‐03‐2018 11:28:58 14‐03‐2018 13:11:01 1:42 0.00011333 MUs
199 KATRA BARYAN‐BARA DARI CCK 146 990 KVA UNPLANNED 14‐03‐2018 11:37:45 14‐03‐2018 13:17:46 1:40 0.00011111 MUs200 NAYA BAZAR‐CHANDNI CHOWK, BLOCK T‐NAYA BAZAR CCK 636 990 KVA UNPLANNED 15‐03‐2018 11:24:27 15‐03‐2018 12:51:29 1:27 0.00029 MUs REPAIR OF PCC POLE
AT LAHORI GATE 201 KATRA NAWAB‐CHANDNI CHOWK, NAI SARAK‐JOGIWARA, NAYA BAZAR‐CHANDNI CHOWK CCK 710 990 KVA UNPLANNED 15‐03‐2018 11:28:20 15‐03‐2018 13:25:10 1:56 0.00022556 MUs SOCKET REPAIR
/REPLACEMENT 202 NAYA BAZAR‐CHANDNI CHOWK, BLOCK T‐NAYA BAZAR CCK 636 990 KVA UNPLANNED 15‐03‐2018 14:08:56 15‐03‐2018 16:05:36 1:56 0.00025778 MUs REPAIR OF PCC POLE
AT LAHORI GATE 203 MOSQUE‐LAL KUAN BAZAR CCK 737 990 KVA UNPLANNED 18‐03‐2018 11:06:23 18‐03‐2018 12:53:32 1:47 0.00005944 MUs204 NAYA BAZAR‐CHANDNI CHOWK, BLOCK T‐NAYA BAZAR CCK 269 990 KVA UNPLANNED 21‐03‐2018 11:03:00 21‐03‐2018 12:53:30 1:50 0.00012222 MUs205 RAILWAY STATION‐CHANDNI CHOWK, AJMERI GATE‐CHANDNI CHOWK, MOSQUE‐LAL KUAN BAZAR, LALKUAN BAZAR‐
FRASH KHANACCK 754 990 KVA UNPLANNED 23‐03‐2018 11:37:55 23‐03‐2018 13:11:14 1:33 0.00010333 MUs
206 AJMERI GATE‐CHANDNI CHOWK, MOSQUE‐LAL KUAN BAZAR CCK 800 990 KVA UNPLANNED 26‐03‐2018 11:31:55 26‐03‐2018 13:04:02 1:32 0.00010222 MUs207 MOSQUE‐LAL KUAN BAZAR, CHAWRI BAZAR‐KHUSH DIL, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, LALKUAN BAZAR‐
SIKRIWALAN‐ NEW HAUZ QAZICCK 649 990 KVA UNPLANNED 27‐03‐2018 11:18:25 27‐03‐2018 12:55:04 1:36 0.00013333 MUs SOCKET REPAIR
/REPLACEMENT 208 LALKUAN BAZAR‐FRASH KHANA CCK 868 990 KVA UNPLANNED 28‐03‐2018 11:44:00 28‐03‐2018 13:16:20 1:32 0.00010222 MUs209 AJMERI GATE‐CHANDNI CHOWK, MOSQUE‐LAL KUAN BAZAR CCK 447 990 KVA UNPLANNED 29‐03‐2018 12:16:00 29‐03‐2018 13:48:06 1:32 0.00010222 MUs210 LALKUAN BAZAR‐FRASH KHANA CCK 868 990 KVA UNPLANNED 30‐03‐2018 11:46:39 30‐03‐2018 13:26:53 1:40 0.00011111 MUs211 MOSQUE‐LAL KUAN BAZAR, LALKUAN BAZAR‐FRASH KHANA, BALI MARAN‐BARA DARI CCK 774 990 KVA UNPLANNED 31‐03‐2018 11:55:49 31‐03‐2018 13:27:54 1:32 0.00010222 MUs212 LAJPAT RAI MARKET‐CHANDNI CHOWK CCK 287 990 KVA UNPLANNED 04‐03‐2018 11:09:07 04‐03‐2018 12:41:16 1:32 0.00010222 MUs213 CHIPI WARA‐KUCHA ALAM, KINARI BAZAR‐DHARAM PURA, DARIBA KALA‐KATRA MASHRU, NAYA BAZAR‐CHANDNI
CHOWK, GOVT. BOYS SECONDARY SCHOOL‐KUCHA ALAM, DARIBA MARKET‐KATRA MASHRU, VAKIL PURA‐KUCHA ALAM, KUCHA JAGLLA‐KUCHA ALAM
CCK 1524 990 KVA UNPLANNED 08‐03‐2018 12:44:04 08‐03‐2018 13:40:00 0:55 0.00012222 MUs
214 ROSHAN PURA‐CHANDNI CHOWK, KINARI BAZAR‐DHARAM PURA CCK 662 990 KVA UNPLANNED 09‐03‐2018 10:37:10 09‐03‐2018 12:20:00 1:42 0.00005667 MUs lt cable repair work215 MAIN BAZAR CHANDANI CHOWK‐SISGANJ, TOWN HALL‐KUCHA NATWA, GURUDWARA SISGANJ ROAD‐CHANDNI
CHOWK, GURUDWAR SHAB LAND‐CHANDNI CHOWKCCK 693 990 KVA UNPLANNED 10‐03‐2018 11:51:00 10‐03‐2018 13:24:08 1:33 0.00010333 MUs
216 NAI SARAK‐KATRA ASRAFI, MAIN BAZAR CHANDANI CHOWK‐SISGANJ, TOWN HALL‐KUCHA NATWA, GURUDWARA SISGANJ ROAD‐CHANDNI CHOWK
CCK 349 990 KVA UNPLANNED 10‐03‐2018 14:26:53 10‐03‐2018 16:07:12 1:40 0.00011111 MUs
217 MAIN BAZAR CHANDANI CHOWK‐SISGANJ, DARIBA KALA‐KATRA MASHRU, NEW LAJPAT RAI MARKET‐CHANDNI CHOWK
CCK 1090 990 KVA UNPLANNED 11‐03‐2018 10:20:57 11‐03‐2018 12:07:49 1:46 0.00005889 MUs
218 KINARI BAZAR‐DHARAM PURA, MAIN BAZAR CHANDANI CHOWK‐SISGANJ CCK 685 400 KVA UNPLANNED 13‐03‐2018 10:39:14 13‐03‐2018 12:24:32 1:45 0.00011667 MUs219 GURUDWARA SISGANJ ROAD‐CHANDNI CHOWK, LAJPAT RAI MARKET‐CHANDNI CHOWK, BHAGIRATH PLACE‐
CHANDNI CHOWK, MOR SARAY COLONY‐CHANDNI CHOWKCCK 523 400 KVA UNPLANNED 15‐03‐2018 10:45:00 15‐03‐2018 11:39:05 0:54 0.000075 MUs RELAY REPLACEMENT
220 TOWN HALL‐KUCHA NATWA CCK 314 990 KVA UNPLANNED 25‐03‐2018 12:39:23 25‐03‐2018 14:29:17 1:49 0.00012111 MUs221 LAJPAT RAI MARKET‐CHANDNI CHOWK CCK 94 990 KVA UNPLANNED 26‐03‐2018 12:28:11 26‐03‐2018 14:00:37 1:32 0.00010222 MUs222 TOWN HALL‐KUCHA NATWA CCK 22 990 KVA UNPLANNED 27‐03‐2018 10:49:35 27‐03‐2018 12:45:00 1:55 0.00009583 MUs223 NAI SARAK‐KATRA ASRAFI, ROSHAN PURA‐CHANDNI CHOWK CCK 405 990 KVA UNPLANNED 28‐03‐2018 11:49:00 28‐03‐2018 13:22:07 1:33 0.00010333 MUs224 GURUDWARA SISGANJ ROAD‐CHANDNI CHOWK CCK 443 400 KVA UNPLANNED 28‐03‐2018 17:53:33 28‐03‐2018 19:30:00 1:36 0.00005333 MUs fire in building , bses
notwork is ok225 MOSQUE‐LAL KUAN BAZAR, CHAWRI BAZAR‐KHUSH DIL, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI CCK 387 990 KVA UNPLANNED 06‐03‐2018 10:25:28 06‐03‐2018 12:16:07 1:50 0.00006111 MUs TO PUNCH THE LT
SOCKET226 CHAWRI BAZAR‐KHUSH DIL, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, MOSQUE‐LAL KUAN BAZAR CCK 387 990 KVA UNPLANNED 24‐03‐2018 11:30:00 24‐03‐2018 13:17:07 1:47 0.00011889 MUs227 RAM NAGAR‐SILAMPUR, DELHI JAL BOARD‐DDA FLATS DGN 470 990 KVA UNPLANNED 01‐03‐2018 12:00:00 01‐03‐2018 12:50:00 0:49 0.00023139 MUs228 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 18 630 KVA UNPLANNED 01‐03‐2018 16:35:51 01‐03‐2018 17:31:11 0:55 0.00029028 MUs229 BLOCK B‐NEW MODERN SHAHDARA, BLOCK A‐B&C‐JAGAT PURI, BLOCK B‐JAGAT PURI DGN 393 990 KVA UNPLANNED 03‐03‐2018 10:40:00 03‐03‐2018 10:55:27 0:15 0.00007917 MUs230 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 9 630 KVA UNPLANNED 03‐03‐2018 11:35:18 03‐03‐2018 12:18:00 0:42 0.00021 MUs231 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 34 990 KVA UNPLANNED 05‐03‐2018 08:02:43 05‐03‐2018 08:42:00 0:39 0.00013 MUs232 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 37 630 KVA UNPLANNED 05‐03‐2018 11:11:36 05‐03‐2018 12:58:35 1:46 0.00058889 MUs LT CABLE REPAIR ,
3.5*300 AT HANS RAJ COMPOUND
233 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 8 990 KVA UNPLANNED 05‐03‐2018 14:35:32 05‐03‐2018 14:51:24 0:15 0.000125 MUs234 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 9 990 KVA UNPLANNED 06‐03‐2018 12:19:00 06‐03‐2018 12:45:46 0:26 0.00013722 MUs235 BLOCK B‐NEW MODERN SHAHDARA, BLOCK C‐NEW MODERN SHAHDARA DGN 268 990 KVA UNPLANNED 06‐03‐2018 12:44:49 06‐03‐2018 13:39:00 0:54 0.000255 MUs236 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 38 990 KVA UNPLANNED 06‐03‐2018 14:48:34 06‐03‐2018 15:36:00 0:47 0.00024806 MUs237 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 18 630 KVA UNPLANNED 07‐03‐2018 14:04:10 07‐03‐2018 14:28:57 0:24 0.00006667 MUs238 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 19 990 KVA UNPLANNED 07‐03‐2018 15:24:09 07‐03‐2018 16:02:48 0:38 0.00008444 MUs239 DDA FLATS‐SILAMPUR DGN 110 630 KVA UNPLANNED 07‐03‐2018 16:25:10 07‐03‐2018 17:08:08 0:42 0.00014 MUs240 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 63 990 KVA UNPLANNED 07‐03‐2018 18:31:53 07‐03‐2018 20:18:23 1:46 0.00035333 MUs fire on pole241 BLOCK_B‐VIVEK VIHAR PHASE II, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 57 630 KVA UNPLANNED 07‐03‐2018 20:18:43 07‐03‐2018 22:00:00 1:41 0.00028056 MUs fire on pole242 BLOCK_B‐VIVEK VIHAR PHASE II, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 180 1620 KVA UNPLANNED 07‐03‐2018 18:30:00 07‐03‐2018 20:18:00 1:48 0.00378 MUs243 BLOCK 1‐RAM NAGAR DGN 179 990 KVA UNPLANNED 08‐03‐2018 12:00:00 08‐03‐2018 12:55:00 0:54 0.000285 MUs244 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 18 630 KVA UNPLANNED 08‐03‐2018 13:34:06 08‐03‐2018 14:30:00 0:55 0.00029028 MUs245 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 30 630 KVA UNPLANNED 08‐03‐2018 13:42:20 08‐03‐2018 14:39:00 0:56 0.00029556 MUs246 BLOCK B‐MANSAROWAR PARK DGN 27 630 KVA UNPLANNED 08‐03‐2018 15:32:46 08‐03‐2018 15:49:50 0:17 0.00008972 MUs247 SANSAR COMPOUND‐DILSHAD GARDEN, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 102 630 KVA UNPLANNED 08‐03‐2018 16:34:00 08‐03‐2018 17:15:08 0:41 0.00022778 MUs248 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 13 630 KVA UNPLANNED 09‐03‐2018 13:51:40 09‐03‐2018 14:09:56 0:18 0.000085 MUs249 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 19 990 KVA UNPLANNED 10‐03‐2018 11:11:09 10‐03‐2018 11:40:41 0:29 0.00006444 MUs250 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 18 630 KVA UNPLANNED 10‐03‐2018 11:50:09 10‐03‐2018 12:45:00 0:54 0.000225 MUs251 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 38 990 KVA UNPLANNED 10‐03‐2018 12:51:54 10‐03‐2018 13:29:26 0:37 0.00020556 MUs252 SANSAR COMPOUND‐DILSHAD GARDEN, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 257 630 KVA UNPLANNED 12‐03‐2018 13:38:18 12‐03‐2018 14:09:16 0:30 0.00033333 MUs253 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 9 630 KVA UNPLANNED 12‐03‐2018 20:42:00 12‐03‐2018 21:27:05 0:45 0.0002375 MUs254 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 37 630 KVA UNPLANNED 13‐03‐2018 11:13:52 13‐03‐2018 12:27:27 1:13 0.00030417 MUs
255 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 4 990 KVA UNPLANNED 13‐03‐2018 12:18:24 13‐03‐2018 14:03:00 1:44 0.00028889 MUs256 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 62 990 KVA UNPLANNED 13‐03‐2018 17:05:58 13‐03‐2018 17:13:52 0:7 0.00002722 MUs to reconnectin257 ROHITASH NAGAR EAST‐SILAMPUR, KABUL NAGAR‐ROHITASH NAGAR, BLOCK G‐MANSAROWAR PARK, SUDARSHAN
STEEL ROLLING MILL‐RAM NAGAR EAST, RAM NAGAR‐SILAMPUR, GOVT SCHOOL NO‐2‐DDA FLATS, BLOCK B‐MANSAROWAR PARK, BLOCK A‐MANSAROWAR PARK, BLOCK F‐MANSAROWAR PARK, BLOCK D‐MANSAROWAR PARK, BLOCK C‐MANSAROWAR PARK, DDA FLATS‐SILAMPUR, DELHI JAL BOARD‐DDA FLATS, BLOCK E‐MANSAROWAR PARK, BLOCK H‐MANSAROWAR PARK
DGN 6949 7470 KVA UNPLANNED 14‐03‐2018 06:05:00 14‐03‐2018 06:31:00 0:26 0.00059944 MUs SAFETY PURPOSE
258 BLOCK G‐MANSAROWAR PARK, SUDARSHAN STEEL ROLLING MILL‐RAM NAGAR EAST, RAM NAGAR‐SILAMPUR, BLOCK B‐MANSAROWAR PARK, BLOCK A‐MANSAROWAR PARK, BLOCK F‐MANSAROWAR PARK, BLOCK D‐MANSAROWAR PARK, BLOCK C‐MANSAROWAR PARK, BLOCK E‐MANSAROWAR PARK, BLOCK H‐MANSAROWAR PARK
DGN 1824 630 KVA UNPLANNED 14‐03‐2018 12:26:16 14‐03‐2018 13:00:07 0:33 0.00022917 MUs
259 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 52 630 KVA UNPLANNED 14‐03‐2018 14:40:38 14‐03‐2018 15:20:00 0:39 0.00010833 MUs260 BLOCK G‐MANSAROWAR PARK, DDA FLATS‐SILAMPUR, BLOCK H‐MANSAROWAR PARK DGN 536 990 KVA UNPLANNED 14‐03‐2018 15:59:00 14‐03‐2018 16:53:30 0:54 0.000225 MUs261 SUDARSHAN STEEL ROLLING MILL‐RAM NAGAR EAST, BLOCK A‐MANSAROWAR PARK, JINDAL BHAWAN‐RAM NAGAR
EAST, SACHDEVA INDUSTRIES‐RAM NAGAR EASTDGN 273 990 KVA UNPLANNED 14‐03‐2018 17:54:41 14‐03‐2018 18:30:50 0:36 0.00012 MUs
262 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 63 990 KVA UNPLANNED 14‐03‐2018 19:00:30 14‐03‐2018 19:33:25 0:32 0.00010667 MUs263 BLOCK A‐MANSAROWAR PARK, BLOCK B‐MANSAROWAR PARK, BLOCK D‐MANSAROWAR PARK, RAM NAGAR‐
SILAMPUR, DDA FLATS‐SILAMPUR, SUDARSHAN STEEL ROLLING MILL‐RAM NAGAR EAST, KABUL NAGAR‐ROHITASH NAGAR, BLOCK E‐MANSAROWAR PARK, GOVT SCHOOL NO‐2‐DDA FLATS, BLOCK H‐MANSAROWAR PARK, BLOCK F‐MANSAROWAR PARK, ROHITASH NAGAR EAST‐SILAMPUR, BLOCK C‐MANSAROWAR PARK, DELHI JAL BOARD‐DDA FLATS BLOCK G‐MANSAROWAR PARK
DGN 6958 7470 KVA UNPLANNED 15‐03‐2018 10:20:00 15‐03‐2018 11:08:00 0:47 0.00107056 MUs safety purpose for cabal connecting of gt ‐1
264 BLOCK 1‐RAM NAGAR DGN 112 990 KVA UNPLANNED 15‐03‐2018 10:39:22 15‐03‐2018 11:30:00 0:50 0.00026389 MUs265 BLOCK B‐SHRI RAM NAGAR, BLOCK F‐SHRI RAM NAGAR DGN 313 990 KVA UNPLANNED 15‐03‐2018 15:23:00 15‐03‐2018 15:43:56 0:20 0.00010556 MUs266 BLOCK B‐JAGAT PURI, BLOCK B‐NEW MODERN SHAHDARA, BLOCK A‐B&C‐JAGAT PURI DGN 393 990 KVA UNPLANNED 16‐03‐2018 12:15:00 16‐03‐2018 12:57:31 0:42 0.00021 MUs267 BLOCK B‐SHRI RAM NAGAR, BLOCK A‐MANSAROWAR PARK DGN 112 990 KVA UNPLANNED 17‐03‐2018 11:04:31 17‐03‐2018 11:37:00 0:32 0.00016889 MUs268 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 52 630 KVA UNPLANNED 17‐03‐2018 12:26:28 17‐03‐2018 13:16:00 0:49 0.00028583 MUs269 BLOCK 1‐RAM NAGAR EXTN., GOVT SCHOOL NO‐2‐DDA FLATS, BLOCK 1‐BHAGWANPUR KHERA, DELHI JAL BOARD‐DDA
FLATSDGN 833 990 KVA UNPLANNED 18‐03‐2018 18:52:18 18‐03‐2018 19:24:57 0:32 0.00016 MUs
270 BLOCK 1‐RAM NAGAR EXTN., MAHAVEER (TRANSPORT)‐RAM NAGAR EXTN. DGN 79 990 KVA UNPLANNED 19‐03‐2018 11:59:41 19‐03‐2018 12:46:29 0:46 0.00007667 MUs271 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 60 990 KVA UNPLANNED 20‐03‐2018 15:35:41 20‐03‐2018 16:29:34 0:53 0.00029444 MUs272 BLOCK B‐NEW MODERN SHAHDARA, BLOCK A‐B&C‐JAGAT PURI, BLOCK B‐JAGAT PURI, BLOCK C‐NEW MODERN
SHAHDARA, BLOCK D‐JAGAT PURIDGN 1366 990 KVA UNPLANNED 21‐03‐2018 11:21:06 21‐03‐2018 12:18:00 0:56 0.00029556 MUs
273 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DGN 342 630 KVA UNPLANNED 21‐03‐2018 21:03:21 21‐03‐2018 21:45:33 0:42 0.00014 MUs
274 BLOCK B‐SHRI RAM NAGAR, SUDARSHAN STEEL ROLLING MILL‐RAM NAGAR EAST, BLOCK A‐MANSAROWAR PARK, JINDAL BHAWAN‐RAM NAGAR EAST, SACHDEVA INDUSTRIES‐RAM NAGAR EAST
DGN 273 990 KVA UNPLANNED 22‐03‐2018 11:21:52 22‐03‐2018 12:15:00 0:53 0.000265 MUs
275 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 21 630 KVA UNPLANNED 22‐03‐2018 11:33:45 22‐03‐2018 13:27:00 1:53 0.00059639 MUs276 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 38 990 KVA UNPLANNED 22‐03‐2018 12:12:00 22‐03‐2018 13:10:00 0:58 0.00030611 MUs277 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 21 630 KVA UNPLANNED 22‐03‐2018 13:50:00 22‐03‐2018 14:47:00 0:56 0.00028 MUs278 BLOCK B‐SHRI RAM NAGAR, BLOCK A‐MANSAROWAR PARK DGN 66 990 KVA UNPLANNED 23‐03‐2018 11:11:17 23‐03‐2018 12:01:15 0:49 0.00025861 MUs279 ROHITASH NAGAR EAST‐SILAMPUR, RAM NAGAR‐SILAMPUR, MAHAVEER (TRANSPORT)‐RAM NAGAR EXTN. DGN 232 990 KVA UNPLANNED 23‐03‐2018 11:27:37 23‐03‐2018 12:20:41 0:53 0.00027972 MUs280 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 5 990 KVA UNPLANNED 23‐03‐2018 11:59:10 23‐03‐2018 13:49:00 1:49 0.00057528 MUs281 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 62 990 KVA UNPLANNED 23‐03‐2018 13:54:10 23‐03‐2018 14:48:00 0:53 0.00027972 MUs282 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 9 990 KVA UNPLANNED 23‐03‐2018 13:56:54 23‐03‐2018 14:50:00 0:53 0.00027972 MUs283 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 17 630 KVA UNPLANNED 23‐03‐2018 14:50:00 23‐03‐2018 15:45:49 0:55 0.00029028 MUs284 SUDARSHAN STEEL ROLLING MILL‐RAM NAGAR EAST, BLOCK B‐MANSAROWAR PARK, BLOCK A‐MANSAROWAR PARK,
SACHDEVA INDUSTRIES‐RAM NAGAR EASTDGN 272 990 KVA UNPLANNED 23‐03‐2018 19:31:18 23‐03‐2018 19:53:49 0:22 0.00003667 MUs
285 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 21 630 KVA UNPLANNED 27‐03‐2018 17:43:19 27‐03‐2018 18:42:00 0:58 0.00022556 MUs METER WORK286 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 30 630 KVA UNPLANNED 29‐03‐2018 11:22:40 29‐03‐2018 13:17:00 1:54 0.00060167 MUs287 BLOCK 1‐RAM NAGAR DGN 179 990 KVA UNPLANNED 29‐03‐2018 12:15:08 29‐03‐2018 13:06:00 0:50 0.00026389 MUs288 BLOCK B‐SHRI RAM NAGAR, BLOCK A‐MANSAROWAR PARK DGN 112 990 KVA UNPLANNED 29‐03‐2018 13:23:02 29‐03‐2018 14:15:00 0:51 0.000255 MUs289 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 30 630 KVA UNPLANNED 29‐03‐2018 14:43:34 29‐03‐2018 15:40:00 0:56 0.00028 MUs290 BLOCK B‐SHRI RAM NAGAR, BLOCK A‐MANSAROWAR PARK DGN 66 990 KVA UNPLANNED 31‐03‐2018 05:50:00 31‐03‐2018 06:37:59 0:47 0.00024806 MUs291 RAJIV COLONY‐JHILMIL INDUSTRIAL AREA DGN 9 990 KVA UNPLANNED 01‐03‐2018 11:47:00 01‐03‐2018 12:41:00 0:54 0.000285 MUs pole broken unknown
vehical292 DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA, BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 47 990 KVA UNPLANNED 01‐03‐2018 12:26:41 01‐03‐2018 14:15:00 1:48 0.00051 MUs pole broken293 BLOCK A‐DILSHAD COLONY, BLOCK B‐DILSHAD COLONY DGN 279 990 KVA UNPLANNED 01‐03‐2018 13:14:00 01‐03‐2018 14:10:14 0:56 0.00026444 MUs294 BLOCK A‐DILSHAD COLONY, BLOCK B‐DILSHAD COLONY DGN 279 990 KVA UNPLANNED 01‐03‐2018 15:03:42 01‐03‐2018 15:40:10 0:36 0.00019 MUs295 PETROL PUMP‐POCKET C, SIYARAM‐GHISA, LIG/MIG RES/NON COMM AREA‐JEEVAN SARITA DGN 98 990 KVA UNPLANNED 01‐03‐2018 17:11:24 01‐03‐2018 17:34:06 0:22 0.00009167 MUs296 DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA, BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 29 990 KVA UNPLANNED 03‐03‐2018 12:54:47 03‐03‐2018 13:46:54 0:52 0.00027444 MUs297 DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA, BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 32 990 KVA UNPLANNED 03‐03‐2018 18:49:44 03‐03‐2018 20:15:52 1:26 0.00023889 MUs298 DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA, BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 7 630 KVA UNPLANNED 04‐03‐2018 10:03:20 04‐03‐2018 10:50:50 0:47 0.00022194 MUs299 BLOCK A‐DILSHAD COLONY, BLOCK B‐NEW SIMAPURI, BLOCK C‐NEW SIMAPURI, DDA FLATS‐BLOCK A, BLOCK A‐NEW
SIMAPURIDGN 1005 630 KVA UNPLANNED 04‐03‐2018 17:10:39 04‐03‐2018 17:37:07 0:26 0.00010111 MUs
300 DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN DGN 40 630 KVA UNPLANNED 05‐03‐2018 08:05:29 05‐03‐2018 08:45:00 0:39 0.00014083 MUs301 BLOCK F‐DILSHAD COLONY, BLOCK B‐DILSHAD COLONY DGN 41 630 KVA UNPLANNED 05‐03‐2018 11:03:28 05‐03‐2018 12:45:35 1:42 0.00022667 MUs302 DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN DGN 30 630 KVA UNPLANNED 05‐03‐2018 12:58:56 05‐03‐2018 13:26:06 0:27 0.00003 MUs303 BLOCK J & K‐POCKET J&K DGN 133 400 KVA UNPLANNED 05‐03‐2018 13:24:37 05‐03‐2018 14:17:03 0:52 0.00007222 MUs304 BLOCK J & K‐POCKET J&K DGN 47 630 KVA UNPLANNED 05‐03‐2018 14:03:42 05‐03‐2018 14:34:46 0:31 0.00006889 MUs305 BLOCK A‐DILSHAD COLONY, BLOCK C‐NEW SIMAPURI, DDA FLATS‐BLOCK A, BLOCK A‐NEW SIMAPURI, BLOCK B‐NEW
SIMAPURIDGN 1121 630 KVA UNPLANNED 05‐03‐2018 14:00:38 05‐03‐2018 15:48:40 1:48 0.0003 MUs
306 BLOCK F‐OLD SIMAPURI, BLOCK A‐OLD SIMAPURI DGN 948 630 KVA UNPLANNED 05‐03‐2018 16:46:38 05‐03‐2018 17:12:15 0:25 0.00008333 MUs307 MCD‐OLD SIMAPURI DGN 84 990 KVA UNPLANNED 06‐03‐2018 10:32:30 06‐03‐2018 11:00:51 0:28 0.00014778 MUs308 BLOCK F‐DILSHAD COLONY DGN 50 990 KVA UNPLANNED 06‐03‐2018 10:39:43 06‐03‐2018 11:30:00 0:50 0.00026389 MUs309 BLOCK B‐NEW SIMAPURI, BLOCK A‐NEW SIMAPURI DGN 4 630 KVA UNPLANNED 06‐03‐2018 11:50:20 06‐03‐2018 12:15:14 0:24 0.00011333 MUs310 CHIKAMBARPUR‐OLD SIMAPURI, RED CROSS HOSPITAL CHIKAMBARPUR‐OLD SIMAPURI DGN 18 400 KVA UNPLANNED 06‐03‐2018 11:58:14 06‐03‐2018 13:44:07 1:45 0.00055417 MUs311 HANSRAJ SCHOOL‐POCKET H, MCD OFFICE‐POCKET F & E DGN 31 990 KVA UNPLANNED 06‐03‐2018 12:48:01 06‐03‐2018 13:44:00 0:55 0.000275 MUs312 BLOCK B‐ GROUP I FLATS‐POCKET B, NAGAR NIGAM PUBLIC SCHOOL‐POCKET C DGN 42 630 KVA UNPLANNED 06‐03‐2018 14:54:04 06‐03‐2018 15:50:00 0:55 0.00029028 MUs313 BLOCK F‐DILSHAD COLONY DGN 178 990 KVA UNPLANNED 06‐03‐2018 16:13:21 06‐03‐2018 16:53:43 0:40 0.00021111 MUs314 BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 2 990 KVA UNPLANNED 06‐03‐2018 16:42:51 06‐03‐2018 17:36:21 0:53 0.00027972 MUs315 DELHI JAL BOARD‐POCKET C, FACTORY‐DILSHAD GARDEN DGN 98 630 KVA UNPLANNED 06‐03‐2018 17:19:59 06‐03‐2018 17:33:36 0:13 0.00004694 MUs316 BLOCK R‐ AADINATH BHAWAN‐POCKET R, BLOCK A‐ RESI FLATS‐POCKET A, BLOCK B‐ GROUP I FLATS‐POCKET B,
RAJKIYA SARVODAYA BALVIDYALAYA‐POCKET CDGN 501 990 KVA UNPLANNED 06‐03‐2018 17:31:48 06‐03‐2018 18:12:00 0:40 0.00014444 MUs
317 CHIKAMBARPUR‐OLD SIMAPURI, BLOCK J‐OLD SIMAPURI, BLOCK H‐OLD SIMAPURI, MCD‐OLD SIMAPURI DGN 1030 990 KVA UNPLANNED 06‐03‐2018 18:19:10 06‐03‐2018 20:06:02 1:46 0.00044167 MUs318 BLOCK J‐DILSHAD COLONY, JJC‐DILSHAD COLONY, BLOCK F‐DILSHAD COLONY, BLOCK B‐DILSHAD COLONY, BLOCK E‐
NEW SIMAPURI, BLOCK D‐NEW SIMAPURI, BLOCK D‐DILSHAD COLONYDGN 1620 630 KVA UNPLANNED 07‐03‐2018 17:05:44 07‐03‐2018 17:45:08 0:39 0.00013 MUs
319 BLOCK R‐ AADINATH BHAWAN‐POCKET R, BLOCK A‐ RESI FLATS‐POCKET A DGN 52 990 KVA UNPLANNED 08‐03‐2018 07:49:58 08‐03‐2018 08:04:00 0:14 0.00007389 MUs320 BLOCK F‐DILSHAD COLONY DGN 45 630 KVA UNPLANNED 08‐03‐2018 10:24:50 08‐03‐2018 12:20:00 1:55 0.00060694 MUs
321 BLOCK A‐ RESI FLATS‐POCKET A DGN 72 990 KVA UNPLANNED 08‐03‐2018 10:33:33 08‐03‐2018 11:10:18 0:36 0.00019 MUs322 BLOCK A‐ RESI FLATS‐POCKET A, DELHI JAL BOARD‐POCKET C DGN 7 630 KVA UNPLANNED 08‐03‐2018 10:50:00 08‐03‐2018 11:45:00 0:54 0.000285 MUs323 DDA FLATS‐BLOCK A DGN 132 630 KVA UNPLANNED 08‐03‐2018 11:20:00 08‐03‐2018 11:32:00 0:12 0.00006667 MUs324 GROUP I FLATS‐JANTA FLATS‐PKT A DGN 22 630 KVA UNPLANNED 08‐03‐2018 12:22:07 08‐03‐2018 13:17:00 0:54 0.00027 MUs325 PETROL PUMP‐POCKET C DGN 14 990 KVA UNPLANNED 08‐03‐2018 12:30:00 08‐03‐2018 13:20:00 0:49 0.00025861 MUs326 BLOCK F‐DILSHAD COLONY DGN 23 630 KVA UNPLANNED 08‐03‐2018 13:15:00 08‐03‐2018 14:10:00 0:54 0.000255 MUs327 DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN DGN 24 630 KVA UNPLANNED 08‐03‐2018 13:55:00 08‐03‐2018 14:47:39 0:52 0.00027444 MUs328 BLOCK A‐DILSHAD COLONY, BLOCK B‐DILSHAD COLONY DGN 1 990 KVA UNPLANNED 08‐03‐2018 14:13:19 08‐03‐2018 14:46:31 0:33 0.00015583 MUs329 BLOCK F‐DILSHAD COLONY DGN 23 630 KVA UNPLANNED 08‐03‐2018 14:55:00 08‐03‐2018 15:50:00 0:54 0.000285 MUs330 J.J.C.‐KALANDER COLONY, HANSRAJ SCHOOL‐POCKET H DGN 165 400 KVA UNPLANNED 08‐03‐2018 16:59:48 08‐03‐2018 17:24:20 0:24 0.00005333 MUs331 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR,
BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PETROL PUMP‐POCKET C, LIG/MIG RES/NON COMM AREA‐JEEVAN SARITA, SIDDHARTH INTER NATIONAL SCHOOL‐POCKET B, THE BOILER COMPONENTS S M F G COMPANY‐POCKET B, LIG FLATS‐POCKET F & E, BLOCK E‐ INDUSTRIAL FACTORY‐POCKET C, JHUALI JOHOPARI (J J C)‐POCKET C, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DGN 501 630 KVA UNPLANNED 09‐03‐2018 09:25:00 09‐03‐2018 09:58:55 0:33 0.00017417 MUs
332 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PETROL PUMP‐POCKET C, BLOCK E‐ INDUSTRIAL FACTORY‐POCKET C, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DGN 401 630 KVA UNPLANNED 09‐03‐2018 10:25:00 09‐03‐2018 11:14:03 0:49 0.00025861 MUs
333 FLORA DALE SECONDARY SCHOOL‐POCKET R DGN 18 400 KVA UNPLANNED 09‐03‐2018 11:09:38 09‐03‐2018 11:34:53 0:25 0.00013194 MUs334 JJC‐DILSHAD COLONY, BLOCK F‐DILSHAD COLONY, TUBLE‐DILSHAD COLONY, BLOCK C‐DILSHAD COLONY DGN 107 630 KVA UNPLANNED 09‐03‐2018 13:22:00 09‐03‐2018 14:07:04 0:45 0.0002125 MUs335 BLOCK F‐DILSHAD COLONY DGN 232 990 KVA UNPLANNED 09‐03‐2018 14:07:29 09‐03‐2018 15:00:00 0:52 0.00024556 MUs336 BLOCK A‐JHILMIL INDUSTRIAL AREA, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 55 630 KVA UNPLANNED 09‐03‐2018 15:13:01 09‐03‐2018 15:14:54 0:1 0.00000528 MUs337 BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 5 630 KVA UNPLANNED 09‐03‐2018 15:15:17 09‐03‐2018 16:39:58 1:24 0.00042 MUs338 JHILMIL INDUSTRIAL AREA BLOCK A‐JHILMIL COLONY DGN 77 630 KVA UNPLANNED 09‐03‐2018 18:36:58 09‐03‐2018 20:21:00 1:44 0.00072222 MUs339 BLOCK F‐DILSHAD COLONY DGN 179 990 KVA UNPLANNED 10‐03‐2018 11:10:05 10‐03‐2018 11:49:13 0:39 0.00008667 MUs340 HANSRAJ SCHOOL‐POCKET H DGN 48 400 KVA UNPLANNED 10‐03‐2018 12:08:00 10‐03‐2018 13:58:19 1:50 0.00018333 MUs341 DELHI JAL BOARD‐POCKET C, GROUP I FLATS‐JANTA FLATS‐PKT A DGN 214 630 KVA UNPLANNED 10‐03‐2018 13:27:57 10‐03‐2018 15:12:57 1:45 0.000175 MUs342 DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN DGN 551 630 KVA UNPLANNED 10‐03‐2018 15:37:32 10‐03‐2018 16:22:57 0:45 0.0001 MUs343 GROUP I FLATS‐JANTA FLATS‐PKT A DGN 74 630 KVA UNPLANNED 10‐03‐2018 16:30:23 10‐03‐2018 17:09:34 0:39 0.000195 MUs344 RAJIV COLONY‐JHILMIL INDUSTRIAL AREA, INDIRA CAMP‐JHILMIL INDUSTRIAL AREA DGN 67 990 KVA UNPLANNED 10‐03‐2018 16:36:07 10‐03‐2018 17:09:50 0:33 0.00017417 MUs345 GROUP I FLATS‐JANTA FLATS‐PKT A DGN 74 630 KVA UNPLANNED 10‐03‐2018 17:15:38 10‐03‐2018 18:00:00 0:44 0.00023222 MUs346 CHIKAMBARPUR‐OLD SIMAPURI, BLOCK J‐OLD SIMAPURI, BLOCK H‐OLD SIMAPURI, MCD‐OLD SIMAPURI DGN 334 990 KVA UNPLANNED 12‐03‐2018 12:02:48 12‐03‐2018 12:56:39 0:53 0.00011778 MUs347 BLOCK R‐ AADINATH BHAWAN‐POCKET R, BLOCK B‐ GROUP I FLATS‐POCKET B, DELHI JAL BOARD‐POCKET C, POST
OFFICE‐DILSHAD GARDEN, NAGAR NIGAM PUBLIC SCHOOL‐POCKET CDGN 195 630 KVA UNPLANNED 12‐03‐2018 12:57:05 12‐03‐2018 13:37:53 0:40 0.00013333 MUs
348 SANSAR COMPOUND‐DILSHAD GARDEN DGN 72 990 KVA UNPLANNED 12‐03‐2018 16:08:50 12‐03‐2018 16:47:39 0:38 0.00010556 MUs349 BLOCK J‐DILSHAD COLONY, BLOCK F‐DILSHAD COLONY DGN 748 990 KVA UNPLANNED 12‐03‐2018 16:10:14 12‐03‐2018 16:47:51 0:37 0.00008222 MUs350 BLOCK F‐DILSHAD COLONY DGN 45 630 KVA UNPLANNED 12‐03‐2018 17:05:00 12‐03‐2018 17:52:29 0:47 0.00024806 MUs351 PETROL PUMP‐POCKET C DGN 38 990 KVA UNPLANNED 13‐03‐2018 11:15:57 13‐03‐2018 11:20:03 0:4 0.00000778 MUs352 DDA QUARTERS‐POCKET Q DGN 375 400 KVA UNPLANNED 13‐03‐2018 11:20:27 13‐03‐2018 11:35:51 0:15 0.00004167 MUs353 BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 38 630 KVA UNPLANNED 13‐03‐2018 12:15:23 13‐03‐2018 14:03:00 1:47 0.00029722 MUs354 DELHI JAL BOARD‐POCKET C, FACTORY‐DILSHAD GARDEN DGN 98 630 KVA UNPLANNED 13‐03‐2018 16:54:32 13‐03‐2018 17:53:06 0:58 0.00019333 MUs355 BLOCK J‐DILSHAD COLONY, BLOCK F‐DILSHAD COLONY DGN 650 990 KVA UNPLANNED 13‐03‐2018 21:32:44 13‐03‐2018 22:00:07 0:27 0.000105 MUs one fuse blown356 BLOCK J‐DILSHAD COLONY, JJC‐DILSHAD COLONY, BLOCK F‐DILSHAD COLONY, BLOCK B‐DILSHAD COLONY, BLOCK E‐
NEW SIMAPURI, BLOCK D‐DILSHAD COLONYDGN 919 630 KVA UNPLANNED 14‐03‐2018 11:19:43 14‐03‐2018 13:08:26 1:48 0.00024 MUs
357 DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN DGN 551 630 KVA UNPLANNED 14‐03‐2018 12:12:58 14‐03‐2018 13:58:33 1:45 0.000175 MUs358 JJC‐DILSHAD COLONY, BLOCK B‐DILSHAD COLONY, NEAR JIVAN CLINIC‐DILSHAD COLONY DGN 487 630 KVA UNPLANNED 14‐03‐2018 13:00:53 14‐03‐2018 13:55:00 0:54 0.00012 MUs359 PETROL PUMP‐POCKET C, SIYARAM‐GHISA DGN 118 990 KVA UNPLANNED 14‐03‐2018 16:09:22 14‐03‐2018 16:52:24 0:43 0.00014333 MUs360 BLOCK A‐DILSHAD COLONY, BLOCK B‐DILSHAD COLONY DGN 377 990 KVA UNPLANNED 14‐03‐2018 17:09:55 14‐03‐2018 18:50:58 1:41 0.00033667 MUs361 JJC‐DILSHAD COLONY, BLOCK F‐DILSHAD COLONY, BLOCK B‐DILSHAD COLONY, J.J.C.‐NEW SIMAPURI, BLOCK C‐NEW
SIMAPURI, BLOCK D‐NEW SIMAPURI, BLOCK E‐NEW SIMAPURI, MCD PRIMARY SCHOOL‐NEW SIMAPURI, NEAR JIVAN CLINIC‐DILSHAD COLONY
DGN 962 630 KVA UNPLANNED 14‐03‐2018 17:22:06 14‐03‐2018 18:49:32 1:27 0.0003625 MUs
362 BLOCK A‐JHILMIL INDUSTRIAL AREA, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 55 630 KVA UNPLANNED 15‐03‐2018 09:57:00 15‐03‐2018 10:17:37 0:20 0.00010556 MUs363 PETROL PUMP‐POCKET C DGN 14 990 KVA UNPLANNED 15‐03‐2018 10:23:36 15‐03‐2018 10:26:18 0:2 0.00001056 MUs364 BLOCK F‐OLD SIMAPURI, BLOCK A‐OLD SIMAPURI DGN 160 630 KVA UNPLANNED 15‐03‐2018 10:35:24 15‐03‐2018 12:29:00 1:53 0.00059639 MUs365 BLOCK F‐DILSHAD COLONY DGN 178 990 KVA UNPLANNED 15‐03‐2018 11:00:41 15‐03‐2018 11:32:16 0:31 0.00016361 MUs366 DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN DGN 20 630 KVA UNPLANNED 15‐03‐2018 11:12:37 15‐03‐2018 12:01:28 0:48 0.00025333 MUs367 BLOCK E‐JHILMIL‐TAHIRPUR, BLOCK P‐JHILMIL‐TAHIRPUR, CHURCH‐JHILMIL‐TAHIRPUR DGN 194 630 KVA UNPLANNED 15‐03‐2018 11:20:00 15‐03‐2018 12:19:04 0:59 0.00027861 MUs368 PETROL PUMP‐POCKET C, SIYARAM‐GHISA DGN 85 990 KVA UNPLANNED 15‐03‐2018 11:47:04 15‐03‐2018 12:02:00 0:14 0.00006611 MUs369 BLOCK A‐DILSHAD COLONY, BLOCK B‐DILSHAD COLONY DGN 1 990 KVA UNPLANNED 15‐03‐2018 13:08:44 15‐03‐2018 13:56:51 0:48 0.00025333 MUs370 RAJIV COLONY‐JHILMIL INDUSTRIAL AREA DGN 9 990 KVA UNPLANNED 15‐03‐2018 13:11:23 15‐03‐2018 13:32:38 0:21 0.000105 MUs371 BLOCK J‐DILSHAD COLONY, BLOCK F‐DILSHAD COLONY DGN 169 990 KVA UNPLANNED 15‐03‐2018 13:13:26 15‐03‐2018 13:56:34 0:43 0.000215 MUs372 FLORA DALE SECONDARY SCHOOL‐POCKET R DGN 111 630 KVA UNPLANNED 15‐03‐2018 13:20:00 15‐03‐2018 13:46:12 0:26 0.00013 MUs373 CHURCH‐JHILMIL‐TAHIRPUR, BLOCK E‐JHILMIL‐TAHIRPUR, BLOCK P‐JHILMIL‐TAHIRPUR DGN 194 630 KVA UNPLANNED 15‐03‐2018 13:33:58 15‐03‐2018 13:46:42 0:12 0.00006333 MUs374 BLOCK A‐DILSHAD COLONY, BLOCK D‐DILSHAD COLONY, BLOCK B‐DILSHAD COLONY DGN 408 630 KVA UNPLANNED 15‐03‐2018 14:34:33 15‐03‐2018 15:25:56 0:51 0.00026917 MUs375 BLOCK R‐ AADINATH BHAWAN‐POCKET R DGN 17 990 KVA UNPLANNED 15‐03‐2018 15:24:09 15‐03‐2018 15:33:39 0:9 0.0000425 MUs376 BLOCK F‐DILSHAD COLONY DGN 45 630 KVA UNPLANNED 15‐03‐2018 15:49:05 15‐03‐2018 16:40:19 0:51 0.00026917 MUs377 DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN DGN 20 630 KVA UNPLANNED 15‐03‐2018 15:51:41 15‐03‐2018 16:09:31 0:17 0.00008972 MUs378 BLOCK F‐DILSHAD COLONY DGN 50 990 KVA UNPLANNED 15‐03‐2018 16:30:04 15‐03‐2018 17:29:00 0:58 0.00030611 MUs379 RAJIV COLONY‐JHILMIL INDUSTRIAL AREA DGN 9 990 KVA UNPLANNED 15‐03‐2018 16:31:28 15‐03‐2018 16:38:05 0:6 0.00003167 MUs380 BLOCK R‐ AADINATH BHAWAN‐POCKET R DGN 17 990 KVA UNPLANNED 15‐03‐2018 16:55:55 15‐03‐2018 17:53:17 0:57 0.00030083 MUs381 DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA, BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 29 990 KVA UNPLANNED 16‐03‐2018 10:36:25 16‐03‐2018 11:10:20 0:33 0.000165 MUs382 BLOCK E‐ INDUSTRIAL FACTORY‐POCKET C DGN 16 630 KVA UNPLANNED 16‐03‐2018 11:37:46 16‐03‐2018 12:08:47 0:31 0.000155 MUs383 BLOCK B‐ GROUP I FLATS‐POCKET B DGN 58 630 KVA UNPLANNED 16‐03‐2018 11:54:59 16‐03‐2018 12:38:26 0:43 0.00022694 MUs384 BLOCK E‐JHILMIL‐TAHIRPUR, BLOCK R‐ AADINATH BHAWAN‐POCKET R DGN 92 630 KVA UNPLANNED 16‐03‐2018 12:52:00 16‐03‐2018 13:05:50 0:13 0.00006861 MUs385 PETROL PUMP‐POCKET C DGN 164 630 KVA UNPLANNED 16‐03‐2018 13:04:27 16‐03‐2018 13:24:44 0:20 0.00010556 MUs386 BLOCK A‐JHILMIL INDUSTRIAL AREA, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 109 630 KVA UNPLANNED 16‐03‐2018 13:54:06 16‐03‐2018 14:50:00 0:55 0.00029028 MUs387 BLOCK F‐DILSHAD COLONY DGN 281 990 KVA UNPLANNED 16‐03‐2018 14:34:29 16‐03‐2018 15:03:00 0:28 0.00014778 MUs388 BLOCK F‐DILSHAD COLONY DGN 50 990 KVA UNPLANNED 16‐03‐2018 14:57:59 16‐03‐2018 15:10:00 0:12 0.00006333 MUs389 SANSAR COMPOUND‐DILSHAD GARDEN DGN 29 990 KVA UNPLANNED 16‐03‐2018 16:30:46 16‐03‐2018 17:00:57 0:30 0.00006667 MUs390 BLOCK A‐JHILMIL INDUSTRIAL AREA, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 55 630 KVA UNPLANNED 17‐03‐2018 09:51:20 17‐03‐2018 10:10:00 0:18 0.000095 MUs391 HANSRAJ SCHOOL‐POCKET H, MUKHRJI SCHOOL‐POCKET L DGN 8 400 KVA UNPLANNED 17‐03‐2018 10:30:00 17‐03‐2018 11:52:58 1:22 0.00038722 MUs392 BLOCK F‐DILSHAD COLONY DGN 45 630 KVA UNPLANNED 17‐03‐2018 10:35:00 17‐03‐2018 11:28:03 0:53 0.00027972 MUs393 HANSRAJ SCHOOL‐POCKET H DGN 14 400 KVA UNPLANNED 17‐03‐2018 10:57:29 17‐03‐2018 11:50:00 0:52 0.00027444 MUs394 BLOCK J & K‐POCKET J&K DGN 47 630 KVA UNPLANNED 17‐03‐2018 12:27:10 17‐03‐2018 12:29:15 0:2 0.00001056 MUs395 BLOCK J & K‐POCKET J&K DGN 46 630 KVA UNPLANNED 17‐03‐2018 12:28:28 17‐03‐2018 13:08:43 0:40 0.00018889 MUs
396 PETROL PUMP‐POCKET C, SIYARAM‐GHISA DGN 85 990 KVA UNPLANNED 17‐03‐2018 13:00:00 17‐03‐2018 13:25:46 0:25 0.00013194 MUs397 BLOCK F‐DILSHAD COLONY DGN 45 630 KVA UNPLANNED 17‐03‐2018 13:28:03 17‐03‐2018 14:08:23 0:40 0.00021111 MUs398 BLOCK F‐DILSHAD COLONY DGN 50 990 KVA UNPLANNED 17‐03‐2018 14:35:38 17‐03‐2018 14:53:40 0:18 0.000095 MUs399 PETROL PUMP‐POCKET C, SIDDHARTH INTER NATIONAL SCHOOL‐POCKET B, THE BOILER COMPONENTS S M F G
COMPANY‐POCKET B, LIG FLATS‐POCKET F & E, BLOCK E‐ INDUSTRIAL FACTORY‐POCKET C, JHUALI JOHOPARI (J J C)‐POCKET C
DGN 204 630 KVA UNPLANNED 17‐03‐2018 15:02:07 17‐03‐2018 15:55:00 0:52 0.00027444 MUs
400 BLOCK J‐DILSHAD COLONY, BLOCK F‐DILSHAD COLONY DGN 169 990 KVA UNPLANNED 17‐03‐2018 15:29:49 17‐03‐2018 16:59:30 1:29 0.00046972 MUs401 SIYARAM‐GHISA DGN 2 630 KVA UNPLANNED 17‐03‐2018 15:55:57 17‐03‐2018 16:19:22 0:23 0.00012139 MUs402 SIYARAM‐GHISA DGN 22 630 KVA UNPLANNED 17‐03‐2018 16:28:00 17‐03‐2018 18:10:56 1:42 0.00034 MUs403 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR,
BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PETROL PUMP‐POCKET C, BLOCK E‐ INDUSTRIAL FACTORY‐POCKET C, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DGN 416 630 KVA UNPLANNED 17‐03‐2018 16:57:36 17‐03‐2018 17:13:38 0:16 0.00005333 MUs
404 BLOCK A‐DILSHAD COLONY, BLOCK B‐DILSHAD COLONY DGN 434 990 KVA UNPLANNED 17‐03‐2018 17:42:49 17‐03‐2018 18:11:17 0:28 0.00009333 MUs405 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR,
BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, HANSRAJ SCHOOL‐POCKET H, MUKHRJI SCHOOL‐POCKET L, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DGN 384 400 KVA UNPLANNED 17‐03‐2018 18:19:04 17‐03‐2018 19:15:00 0:55 0.00022917 MUs
406 PETROL PUMP‐POCKET C, SIYARAM‐GHISA, LIG/MIG RES/NON COMM AREA‐JEEVAN SARITA DGN 98 990 KVA UNPLANNED 17‐03‐2018 18:40:10 17‐03‐2018 19:35:00 0:54 0.00018 MUs407 BLOCK R‐ AADINATH BHAWAN‐POCKET R DGN 17 990 KVA UNPLANNED 18‐03‐2018 13:14:52 18‐03‐2018 13:43:02 0:28 0.00014778 MUs408 BLOCK R‐ AADINATH BHAWAN‐POCKET R DGN 29 630 KVA UNPLANNED 18‐03‐2018 14:40:10 18‐03‐2018 15:01:11 0:21 0.00011083 MUs409 SIYARAM‐GHISA DGN 22 630 KVA UNPLANNED 18‐03‐2018 16:36:58 18‐03‐2018 17:12:42 0:35 0.00011667 MUs LT CABLE BURNT AT
PATHER WALI GALI410 BLOCK B‐NEW SIMAPURI, BLOCK C‐NEW SIMAPURI, DDA FLATS‐BLOCK A, BLOCK A‐NEW SIMAPURI DGN 472 630 KVA UNPLANNED 19‐03‐2018 10:04:07 19‐03‐2018 10:46:15 0:42 0.00011667 MUs411 J.J.C.‐KALANDER COLONY, HANSRAJ SCHOOL‐POCKET H DGN 165 400 KVA UNPLANNED 19‐03‐2018 10:47:43 19‐03‐2018 12:07:38 1:19 0.00013167 MUs412 PETROL PUMP‐POCKET C, SIYARAM‐GHISA DGN 118 990 KVA UNPLANNED 19‐03‐2018 11:01:05 19‐03‐2018 12:31:00 1:29 0.00049444 MUs413 BLOCK A‐ RESI FLATS‐POCKET A DGN 70 990 KVA UNPLANNED 19‐03‐2018 11:19:45 19‐03‐2018 12:04:31 0:44 0.00012222 MUs414 BLOCK E‐JHILMIL‐TAHIRPUR, BLOCK C‐ MOD PRIMARY SCHOOL‐JHILMIL‐TAHIRPUR, BLOCK P‐JHILMIL‐TAHIRPUR DGN 340 990 KVA UNPLANNED 19‐03‐2018 13:09:36 19‐03‐2018 15:00:00 1:50 0.00030556 MUs415 BLOCK R‐ AADINATH BHAWAN‐POCKET R, BLOCK B‐ GROUP I FLATS‐POCKET B, RAJKIYA SARVODAYA BALVIDYALAYA‐
POCKET C, BLOCK A‐ RESI FLATS‐POCKET ADGN 501 990 KVA UNPLANNED 19‐03‐2018 16:16:58 19‐03‐2018 16:58:52 0:41 0.00022778 MUs
416 BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 44 630 KVA UNPLANNED 19‐03‐2018 19:18:36 19‐03‐2018 19:48:43 0:30 0.000125 MUs417 BLOCK J‐OLD SIMAPURI, BLOCK H‐OLD SIMAPURI, BLOCK G‐OLD SIMAPURI, BLOCK D‐OLD SIMAPURI, MCD‐OLD
SIMAPURIDGN 702 990 KVA UNPLANNED 19‐03‐2018 20:33:00 19‐03‐2018 21:01:50 0:28 0.00009333 MUs
418 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PETROL PUMP‐POCKET C, SIYARAM‐GHISA, LIG/MIG RES/NON COMM AREA‐JEEVAN SARITA, DELHI JAL BOARD‐POCKET I, HANSRAJ SCHOOL‐POCKET H, MUKHRJI SCHOOL‐POCKET L, DDA FLATS‐POCKET SG, SIDDHARTH INTER NATIONAL SCHOOL‐POCKET B, THE BOILER COMPONENTS S M F G COMPANY‐POCKET B, LIG FLATS‐POCKET F & E, BLOCK E‐ INDUSTRIAL FACTORY‐POCKET C, JHUALI JOHOPARI (J J C)‐POCKET C, GURUDWARA‐POCKET C, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
DGN 2078 3640 KVA UNPLANNED 20‐03‐2018 08:30:15 20‐03‐2018 18:40:00 10:9 0 MUs panel bypass
419 DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA, BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 47 990 KVA UNPLANNED 20‐03‐2018 11:17:29 20‐03‐2018 11:50:55 0:33 0.00009167 MUs420 RAJIV COLONY‐JHILMIL INDUSTRIAL AREA, SONIA GANDHI JJ CAMP‐JHILMIL INDUSTRIAL AREA, INDIRA CAMP‐JHILMIL
INDUSTRIAL AREADGN 404 990 KVA UNPLANNED 20‐03‐2018 12:23:05 20‐03‐2018 13:18:00 0:54 0.00015 MUs
421 HANSRAJ SCHOOL‐POCKET H DGN 48 400 KVA UNPLANNED 20‐03‐2018 12:24:06 20‐03‐2018 14:14:00 1:49 0.00030278 MUs422 BLOCK A‐DILSHAD COLONY DGN 704 990 KVA UNPLANNED 20‐03‐2018 13:07:38 20‐03‐2018 13:56:56 0:49 0.00008167 MUs423 DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA, BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 60 990 KVA UNPLANNED 20‐03‐2018 15:33:18 20‐03‐2018 16:28:09 0:54 0.000225 MUs424 BLOCK R‐ AADINATH BHAWAN‐POCKET R, BLOCK A‐ RESI FLATS‐POCKET A DGN 48 990 KVA UNPLANNED 20‐03‐2018 16:07:33 20‐03‐2018 16:37:00 0:29 0.00006444 MUs425 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR,
BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, FACTORY‐DILSHAD GARDEN, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DGN 305 990 KVA UNPLANNED 20‐03‐2018 16:30:49 20‐03‐2018 17:51:29 1:20 0.00033333 MUs WORK MAINTENANCE TEAM
426 DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA, BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 29 990 KVA UNPLANNED 20‐03‐2018 17:07:53 21‐03‐2018 01:27:06 8:19 0.00291083 MUs POLE BROKEN 427 DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, DELHI JAL BOARD‐POCKET C, DELHI POWER
SUPPLY‐DILSHAD GARDEN, DARGAH SHARIF‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGNDGN 299 990 KVA UNPLANNED 20‐03‐2018 17:55:51 20‐03‐2018 18:40:00 0:44 0.00015889 MUs METER WORK
428 HANSRAJ SCHOOL‐POCKET H DGN 14 400 KVA UNPLANNED 21‐03‐2018 10:38:09 21‐03‐2018 12:27:00 1:48 0.00057 MUs429 BLOCK J‐OLD SIMAPURI, BLOCK H‐OLD SIMAPURI, BLOCK G‐OLD SIMAPURI, MCD‐OLD SIMAPURI, GOVT. DISPENCERY‐
OLD SIMAPURIDGN 154 990 KVA UNPLANNED 21‐03‐2018 10:55:00 21‐03‐2018 12:50:57 1:55 0.00060694 MUs
430 BLOCK A‐JHILMIL INDUSTRIAL AREA, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 2 990 KVA UNPLANNED 21‐03‐2018 11:16:46 21‐03‐2018 13:08:00 1:51 0.00058583 MUs431 DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN DGN 20 630 KVA UNPLANNED 21‐03‐2018 12:06:56 21‐03‐2018 12:57:40 0:50 0.00025 MUs432 BLOCK A‐ RESI FLATS‐POCKET A DGN 50 990 KVA UNPLANNED 21‐03‐2018 12:11:15 21‐03‐2018 12:48:11 0:36 0.00019 MUs433 RAJIV COLONY‐JHILMIL INDUSTRIAL AREA, SONIA GANDHI JJ CAMP‐JHILMIL INDUSTRIAL AREA, INDIRA CAMP‐JHILMIL
INDUSTRIAL AREADGN 250 990 KVA UNPLANNED 21‐03‐2018 12:17:28 21‐03‐2018 12:20:00 0:2 0.00001111 MUs
434 MCD‐OLD SIMAPURI, GOVT. DISPENCERY‐OLD SIMAPURI DGN 40 990 KVA UNPLANNED 21‐03‐2018 13:15:00 21‐03‐2018 15:10:00 1:55 0.00060694 MUs435 BLOCK J‐OLD SIMAPURI, BLOCK H‐OLD SIMAPURI, BLOCK G‐OLD SIMAPURI, BLOCK D‐OLD SIMAPURI, MCD‐OLD
SIMAPURI, GOVT. DISPENCERY‐OLD SIMAPURIDGN 505 990 KVA UNPLANNED 21‐03‐2018 15:30:00 21‐03‐2018 16:00:00 0:29 0.00015306 MUs
436 M.C.P. SCHOOL‐POCKET O, BLOCK P‐POCKET P DGN 243 630 KVA UNPLANNED 21‐03‐2018 15:25:00 21‐03‐2018 15:57:00 0:31 0.00016361 MUs437 J.J.C.‐KALANDER COLONY, HANSRAJ SCHOOL‐POCKET H DGN 1546 400 KVA UNPLANNED 21‐03‐2018 17:33:02 21‐03‐2018 18:22:05 0:49 0.00020417 MUs DT CLEANING WORK438 BLOCK B‐ GROUP I FLATS‐POCKET B DGN 193 630 KVA UNPLANNED 21‐03‐2018 18:14:35 21‐03‐2018 18:42:23 0:27 0.00009 MUs439 BLOCK R‐ AADINATH BHAWAN‐POCKET R DGN 68 990 KVA UNPLANNED 21‐03‐2018 23:35:23 22‐03‐2018 00:48:43 1:13 0.00024333 MUs440 BLOCK B‐PREM NAGAR DGN, BLOCK E‐JHILMIL‐TAHIRPUR, GANDHI KUSTH ASHARAM‐LEPROSY COLONY, BLOCK C‐
MOD PRIMARY SCHOOL‐JHILMIL‐TAHIRPUR, RAJIV GANDHI SUPER STC HOSPITAL‐JHILMIL‐TAHIRPURDGN 255 630 KVA UNPLANNED 22‐03‐2018 10:37:04 22‐03‐2018 10:40:00 0:2 0.00001056 MUs
441 BLOCK C‐ MOD PRIMARY SCHOOL‐JHILMIL‐TAHIRPUR, BLOCK E‐JHILMIL‐TAHIRPUR, BLOCK P‐JHILMIL‐TAHIRPUR DGN 340 990 KVA UNPLANNED 22‐03‐2018 10:43:31 22‐03‐2018 11:40:00 0:56 0.00029556 MUs442 BLOCK G‐OLD SIMAPURI, BLOCK D‐OLD SIMAPURI, BLOCK J‐OLD SIMAPURI, GOVT. DISPENCERY‐OLD SIMAPURI, MCD‐
OLD SIMAPURI, BLOCK H‐OLD SIMAPURIDGN 505 990 KVA UNPLANNED 22‐03‐2018 10:49:35 22‐03‐2018 11:41:35 0:51 0.00026917 MUs
443 J.J.C.‐KALANDER COLONY, HANSRAJ SCHOOL‐POCKET H DGN 165 400 KVA UNPLANNED 22‐03‐2018 11:05:00 22‐03‐2018 12:00:00 0:54 0.000285 MUs444 HANSRAJ SCHOOL‐POCKET H, MUKHRJI SCHOOL‐POCKET L DGN 8 400 KVA UNPLANNED 22‐03‐2018 11:13:34 22‐03‐2018 11:16:48 0:3 0.00001583 MUs445 BLOCK R‐ AADINATH BHAWAN‐POCKET R DGN 68 990 KVA UNPLANNED 22‐03‐2018 11:17:20 22‐03‐2018 12:14:00 0:56 0 MUs446 BLOCK F‐OLD SIMAPURI, BLOCK A‐OLD SIMAPURI DGN 3 630 KVA UNPLANNED 22‐03‐2018 12:00:00 22‐03‐2018 12:55:00 0:54 0.000285 MUs447 BLOCK J‐OLD SIMAPURI, BLOCK H‐OLD SIMAPURI, BLOCK G‐OLD SIMAPURI, BLOCK D‐OLD SIMAPURI, MCD‐OLD
SIMAPURIDGN 505 990 KVA UNPLANNED 22‐03‐2018 12:20:22 22‐03‐2018 12:38:57 0:18 0.000095 MUs
448 DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA, BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 29 990 KVA UNPLANNED 22‐03‐2018 13:52:55 22‐03‐2018 14:28:04 0:35 0.00020417 MUs449 JHILMIL INDUSTRIAL AREA BLOCK A‐JHILMIL COLONY DGN 21 630 KVA UNPLANNED 22‐03‐2018 18:01:43 22‐03‐2018 18:36:51 0:35 0.00012639 MUs METER WORK
450 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, GTB MIG FLATS‐POCKET D, FLORA DALE SECONDARY SCHOOL‐POCKET R, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DGN 703 400 KVA UNPLANNED 22‐03‐2018 19:13:16 22‐03‐2018 20:03:00 0:49 0.00017694 MUs DT CLEANING WORK
451 BLOCK F‐OLD SIMAPURI, BLOCK A‐OLD SIMAPURI, BLOCK B‐PREM NAGAR DGN, BLOCK A‐RAJIV NAGAR DGN, GANDHI KUSTH ASHARAM‐LEPROSY COLONY, M.C.P. SCHOOL‐POCKET O, BLOCK K‐LEPROSY COLONY, BLOCK A‐PREM NAGAR DGN, SHANTI KUSTH ASHRAM‐RAJIV NAGAR DGN, DDA FLATS‐RAJIV NAGAR DGN
DGN 579 630 KVA UNPLANNED 23‐03‐2018 11:05:00 23‐03‐2018 12:58:00 1:53 0.00059639 MUs
452 BLOCK A‐RAJIV NAGAR DGN, BLOCK 8‐SUNDER NAGRI DGN, J.J.C.‐SUNDER NAGRI DGN, MCD SCHOOL‐SUNDER NAGRI DGN, BLOCK A‐PREM NAGAR DGN
DGN 89 990 KVA UNPLANNED 23‐03‐2018 11:16:37 23‐03‐2018 12:03:25 0:46 0.00024278 MUs
453 BLOCK A‐DILSHAD COLONY, BLOCK C‐NEW SIMAPURI, DDA FLATS‐BLOCK A, BLOCK A‐NEW SIMAPURI, BLOCK B‐NEW SIMAPURI
DGN 1127 630 KVA UNPLANNED 23‐03‐2018 11:40:00 23‐03‐2018 12:15:09 0:35 0.00022361 MUs
454 DDA FLATS‐RAJIV NAGAR DGN, BLOCK F‐OLD SIMAPURI, BLOCK A‐OLD SIMAPURI, BLOCK K‐LEPROSY COLONY, BLOCK B‐PREM NAGAR DGN, BLOCK A‐RAJIV NAGAR DGN, BLOCK A‐PREM NAGAR DGN, GANDHI KUSTH ASHARAM‐LEPROSY COLONY, SHANTI KUSTH ASHRAM‐RAJIV NAGAR DGN, M.C.P. SCHOOL‐POCKET O
DGN 579 630 KVA UNPLANNED 23‐03‐2018 13:30:00 23‐03‐2018 15:23:25 1:53 0.00059639 MUs
455 BLOCK 8‐SUNDER NAGRI DGN DGN 20 990 KVA UNPLANNED 23‐03‐2018 13:40:38 23‐03‐2018 14:22:35 0:41 0.00021639 MUs456 BLOCK A‐DILSHAD COLONY, BLOCK B‐DILSHAD COLONY DGN 56 990 KVA UNPLANNED 23‐03‐2018 14:15:00 23‐03‐2018 15:00:22 0:45 0.0002375 MUs457 BLOCK E‐JHILMIL‐TAHIRPUR, BLOCK R‐ AADINATH BHAWAN‐POCKET R DGN 92 630 KVA UNPLANNED 23‐03‐2018 14:40:41 23‐03‐2018 15:11:09 0:30 0.00014167 MUs458 BLOCK C‐ MOD PRIMARY SCHOOL‐JHILMIL‐TAHIRPUR DGN 53 990 KVA UNPLANNED 23‐03‐2018 16:19:24 23‐03‐2018 16:57:56 0:38 0.00006333 MUs459 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR,
BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, FACTORY‐DILSHAD GARDEN, DAMODER PARK‐DILSHAD GARDEN, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DGN 334 990 KVA UNPLANNED 23‐03‐2018 17:04:48 23‐03‐2018 17:19:53 0:15 0.00008333 MUs
460 DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA, BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 29 990 KVA UNPLANNED 23‐03‐2018 17:50:48 23‐03‐2018 18:36:39 0:45 0.0001 MUs461 RAJIV COLONY‐JHILMIL INDUSTRIAL AREA, INDIRA CAMP‐JHILMIL INDUSTRIAL AREA DGN 34 990 KVA UNPLANNED 23‐03‐2018 18:44:03 23‐03‐2018 19:43:59 0:59 0.00013111 MUs462 BLOCK G‐DILSHAD COLONY, BLOCK F‐DILSHAD COLONY DGN 179 990 KVA UNPLANNED 23‐03‐2018 23:07:16 23‐03‐2018 23:49:31 0:42 0.00007 MUs463 DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, DELHI POWER SUPPLY‐DILSHAD GARDEN DGN 36 990 KVA UNPLANNED 24‐03‐2018 11:40:00 24‐03‐2018 13:16:29 1:36 0.00050667 MUs
464 DDA FLATS‐RAJIV NAGAR DGN, BLOCK F‐OLD SIMAPURI, BLOCK A‐OLD SIMAPURI, BLOCK K‐LEPROSY COLONY, BLOCK B‐PREM NAGAR DGN, BLOCK A‐RAJIV NAGAR DGN, BLOCK A‐PREM NAGAR DGN, GANDHI KUSTH ASHARAM‐LEPROSY COLONY, SHANTI KUSTH ASHRAM‐RAJIV NAGAR DGN, M.C.P. SCHOOL‐POCKET O
DGN 579 630 KVA UNPLANNED 24‐03‐2018 11:49:08 24‐03‐2018 13:42:00 1:52 0.00059111 MUs
465 HANSRAJ SCHOOL‐POCKET H, LIG FLATS‐POCKET F & E, MCD OFFICE‐POCKET F & E, HANSRAJ PUBLIC SCHOOL‐POCKET F & E
DGN 54 990 KVA UNPLANNED 24‐03‐2018 12:52:18 24‐03‐2018 13:40:00 0:47 0.00024806 MUs
466 DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA, BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 47 990 KVA UNPLANNED 25‐03‐2018 19:19:45 25‐03‐2018 20:04:19 0:44 0.00017111 MUs467 BLOCK J & K‐POCKET J&K DGN 170 630 KVA UNPLANNED 26‐03‐2018 10:41:38 26‐03‐2018 11:26:27 0:44 0.00009778 MUs468 BLOCK F‐DILSHAD COLONY, BLOCK B‐DILSHAD COLONY DGN 40 630 KVA UNPLANNED 26‐03‐2018 12:12:00 26‐03‐2018 13:06:37 0:54 0.00012 MUs469 BLOCK A‐KANTI NAGAR NORTH BLOCK A, BLOCK C‐KANTI NAGAR NORTH BLOCK C DGN 447 990 KVA UNPLANNED 26‐03‐2018 13:09:31 26‐03‐2018 15:04:46 1:55 0.00047917 MUs470 BLOCK J‐OLD SIMAPURI, CHIKAMBARPUR‐OLD SIMAPURI, MCD‐OLD SIMAPURI, BLOCK H‐OLD SIMAPURI DGN 334 990 KVA UNPLANNED 26‐03‐2018 15:20:06 26‐03‐2018 15:50:24 0:30 0.00006667 MUs471 RAJIV COLONY‐JHILMIL INDUSTRIAL AREA DGN 34 990 KVA UNPLANNED 26‐03‐2018 16:23:05 26‐03‐2018 17:14:29 0:51 0.00011333 MUs472 RAJIV COLONY‐JHILMIL INDUSTRIAL AREA, SONIA GANDHI JJ CAMP‐JHILMIL INDUSTRIAL AREA, INDIRA CAMP‐JHILMIL
INDUSTRIAL AREADGN 103 990 KVA UNPLANNED 27‐03‐2018 10:12:09 27‐03‐2018 10:29:11 0:17 0.00004722 MUs
473 BLOCK F‐DILSHAD COLONY DGN 23 630 KVA UNPLANNED 27‐03‐2018 11:37:49 27‐03‐2018 11:56:39 0:18 0.000095 MUs474 DDA FLATS‐BLOCK A, BLOCK A‐PREM NAGAR DGN, DDA FLATS‐RAJIV NAGAR DGN DGN 126 630 KVA UNPLANNED 27‐03‐2018 11:57:00 27‐03‐2018 13:41:29 1:44 0.00054889 MUs475 RAJIV COLONY‐JHILMIL INDUSTRIAL AREA DGN 9 990 KVA UNPLANNED 27‐03‐2018 13:26:02 27‐03‐2018 14:22:00 0:55 0.00029028 MUs476 SANSAR COMPOUND‐DILSHAD GARDEN DGN 28 990 KVA UNPLANNED 27‐03‐2018 13:41:50 27‐03‐2018 14:38:58 0:57 0.00030083 MUs477 BLOCK F‐DILSHAD COLONY DGN 45 630 KVA UNPLANNED 27‐03‐2018 14:30:00 27‐03‐2018 15:28:00 0:58 0.00032222 MUs478 DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA, BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 29 990 KVA UNPLANNED 27‐03‐2018 15:15:00 27‐03‐2018 16:14:00 0:58 0.00030611 MUs479 J.J.C.‐NEW SIMAPURI, BLOCK B‐DILSHAD COLONY, BLOCK C‐NEW SIMAPURI, MCD PRIMARY SCHOOL‐NEW SIMAPURI,
JJC‐DILSHAD COLONY, BLOCK D‐NEW SIMAPURI, BLOCK E‐NEW SIMAPURI, BLOCK F‐DILSHAD COLONY, NEAR JIVAN CLINIC‐DILSHAD COLONY
DGN 962 630 KVA UNPLANNED 27‐03‐2018 18:25:30 27‐03‐2018 19:25:00 0:59 0.00021306 MUs STATE THROU WORK
480 RAJIV COLONY‐JHILMIL INDUSTRIAL AREA DGN 9 990 KVA UNPLANNED 28‐03‐2018 11:59:29 28‐03‐2018 17:32:04 5:32 0.00175222 MUs pole broken481 PETROL PUMP‐POCKET C DGN 14 990 KVA UNPLANNED 28‐03‐2018 12:01:23 28‐03‐2018 12:47:40 0:46 0.00024278 MUs482 BLOCK F‐DILSHAD COLONY DGN 178 990 KVA UNPLANNED 28‐03‐2018 14:10:06 28‐03‐2018 14:42:53 0:32 0.00016889 MUs483 PETROL PUMP‐POCKET C DGN 50 990 KVA UNPLANNED 28‐03‐2018 17:04:06 28‐03‐2018 18:00:00 0:55 0.00015278 MUs484 INDIRA CAMP‐JHILMIL INDUSTRIAL AREA, SONIA GANDHI JJ CAMP‐JHILMIL INDUSTRIAL AREA, RAJIV COLONY‐JHILMIL
INDUSTRIAL AREADGN 103 990 KVA UNPLANNED 28‐03‐2018 18:47:54 28‐03‐2018 19:21:55 0:34 0.00007556 MUs
485 MIG FLATS‐POCKET F & E, HANSRAJ SCHOOL‐POCKET H, GTB MIG FLATS‐POCKET D, LIG FLATS‐POCKET F & E, MCD OFFICE‐POCKET F & E, HANSRAJ PUBLIC SCHOOL‐POCKET F & E
DGN 267 990 KVA UNPLANNED 29‐03‐2018 10:45:00 29‐03‐2018 12:34:00 1:49 0.00057528 MUs
486 BLOCK R‐ AADINATH BHAWAN‐POCKET R, PETROL PUMP‐POCKET C, BLOCK A‐PRATAP PURA DGN 14 990 KVA UNPLANNED 29‐03‐2018 11:30:00 29‐03‐2018 13:12:03 1:42 0.00053833 MUs487 BLOCK F‐DILSHAD COLONY, BLOCK B‐NEW SIMAPURI, BLOCK C‐NEW SIMAPURI, MCD PRIMARY SCHOOL‐NEW
SIMAPURIDGN 219 630 KVA UNPLANNED 29‐03‐2018 11:59:41 29‐03‐2018 12:52:00 0:52 0.00027444 MUs
488 PANCHSHEEL PARK‐NAVIN SHAHDARA DGN 140 990 KVA UNPLANNED 03‐03‐2018 12:03:43 03‐03‐2018 12:45:20 0:41 0.00021639 MUs489 ROHITASH NAGAR EAST‐SILAMPUR, KABUL NAGAR‐ROHITASH NAGAR DGN 151 630 KVA UNPLANNED 03‐03‐2018 12:12:31 03‐03‐2018 12:44:39 0:32 0.00016889 MUs490 GORAKH PARK WEST‐SILAMPUR, BLOCK A‐PRATAP PURA DGN 276 990 KVA UNPLANNED 03‐03‐2018 14:04:49 03‐03‐2018 14:35:42 0:30 0.00015833 MUs491 GORAKH PARK WEST‐SILAMPUR, PANCHSHEEL PARK‐NAVIN SHAHDARA, BLOCK D‐PRATAP PURA, BLOCK A‐PRATAP
PURADGN 1226 990 KVA UNPLANNED 03‐03‐2018 15:45:59 03‐03‐2018 16:32:08 0:46 0.00021722 MUs
492 DWARKAPURI‐NAVIN SHAHDARA DGN 23 400 KVA UNPLANNED 04‐03‐2018 09:41:10 04‐03‐2018 10:18:48 0:37 0.00019528 MUs493 DWARKAPURI‐NAVIN SHAHDARA, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK B DGN 41 990 KVA UNPLANNED 04‐03‐2018 11:41:02 04‐03‐2018 12:15:46 0:34 0.00023611 MUs494 ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 537 990 KVA UNPLANNED 05‐03‐2018 11:15:57 05‐03‐2018 11:37:17 0:21 0.00004667 MUs495 SUBHASH PARK EXTN.‐GORAKH PARK DGN 329 990 KVA UNPLANNED 05‐03‐2018 13:05:46 05‐03‐2018 14:03:00 0:57 0.00007917 MUs496 GORAKH PARK EAST‐SILAMPUR, SHIVAJI PARK‐BALBIR NAGAR, BALBIR NAGAR EXTN.‐SILAMPUR DGN 843 990 KVA UNPLANNED 05‐03‐2018 14:22:42 05‐03‐2018 15:00:16 0:37 0.00010278 MUs497 BALBIR NAGAR EXTN.‐SILAMPUR, SHIVAJI PARK‐BALBIR NAGAR, GORAKH PARK EAST‐SILAMPUR DGN 539 990 KVA UNPLANNED 05‐03‐2018 16:04:12 05‐03‐2018 16:40:55 0:36 0.00008 MUs498 KABUL NAGAR‐ROHITASH NAGAR, OLDANPUR‐NAVIN SHAHDARA, PANCHSHEEL PARK‐NAVIN SHAHDARA,
DWARKAPURI‐NAVIN SHAHDARA, DELHI TRANSPORT‐WELCOME COLONY, INDIAN GAS‐SHAHDARA DGN, BLOCK R‐PRATAP PURA
DGN 339 990 KVA UNPLANNED 05‐03‐2018 16:41:23 05‐03‐2018 17:11:56 0:30 0.00008333 MUs
499 SUBHASH PARK EXTN.‐GORAKH PARK DGN 329 990 KVA UNPLANNED 06‐03‐2018 10:46:52 06‐03‐2018 11:30:22 0:43 0.000215 MUs500 SUBHASH PARK EXTN.‐GORAKH PARK DGN 121 990 KVA UNPLANNED 06‐03‐2018 10:48:48 06‐03‐2018 11:30:41 0:41 0.00021639 MUs501 SUBHASH PARK EXTN.‐GORAKH PARK DGN 329 990 KVA UNPLANNED 07‐03‐2018 10:44:39 07‐03‐2018 11:40:32 0:55 0.00015278 MUs502 GOPAL K.OIL DEPO.‐PRATAP PURA DGN 176 990 KVA UNPLANNED 08‐03‐2018 10:44:04 08‐03‐2018 11:42:00 0:57 0.00030083 MUs503 SUBHASH PARK EXTN.‐GORAKH PARK DGN 121 990 KVA UNPLANNED 08‐03‐2018 12:43:40 08‐03‐2018 13:23:08 0:39 0.00020583 MUs504 BLOCK A‐PRATAP PURA DGN 193 990 KVA UNPLANNED 08‐03‐2018 15:04:11 08‐03‐2018 16:00:56 0:56 0.00029556 MUs505 GORAKH PARK WEST‐SILAMPUR, NEW JAFFRABAD‐GORAKH PARK, BLOCK A‐PRATAP PURA, DDA MIG FLATS‐VIVEK
VIHAR PHASE IIDGN 1022 990 KVA UNPLANNED 08‐03‐2018 20:17:43 08‐03‐2018 20:37:35 0:19 0.00010556 MUs
506 BLOCK D‐PRATAP PURA, BLOCK A‐PRATAP PURA DGN 65 990 KVA UNPLANNED 09‐03‐2018 11:05:00 09‐03‐2018 12:00:25 0:55 0.00029028 MUs507 BLOCK 1‐BALBIR NAGAR DGN 105 630 KVA UNPLANNED 09‐03‐2018 11:16:56 09‐03‐2018 12:06:45 0:49 0.00025861 MUs508 DWARKAPURI‐NAVIN SHAHDARA DGN 2 400 KVA UNPLANNED 09‐03‐2018 12:22:32 09‐03‐2018 13:19:00 0:56 0.00029556 MUs509 ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐RAM NAGAR EXTN., BLOCK 1‐BHAGWANPUR KHERA, BLOCK 1‐BALBIR
NAGARDGN 1110 990 KVA UNPLANNED 10‐03‐2018 10:35:07 10‐03‐2018 12:24:54 1:49 0.00060556 MUs
510 SUBHASH PARK‐GORAKH PARK, GORAKH PARK WEST‐SILAMPUR, NEW JAFFRABAD‐GORAKH PARK DGN 598 990 KVA UNPLANNED 12‐03‐2018 10:46:37 12‐03‐2018 10:52:40 0:6 0.000025 MUs511 GORAKH PARK WEST‐SILAMPUR, PANCHSHEEL PARK‐NAVIN SHAHDARA, BLOCK D‐PRATAP PURA, BLOCK A‐PRATAP
PURA, BLOCK B‐PRATAP PURADGN 2397 990 KVA UNPLANNED 12‐03‐2018 12:00:05 12‐03‐2018 12:26:23 0:26 0.00021667 MUs
512 GORAKH PARK WEST‐SILAMPUR, BLOCK D‐PRATAP PURA, BLOCK A‐PRATAP PURA, BLOCK B‐PRATAP PURA DGN 1259 990 KVA UNPLANNED 12‐03‐2018 15:06:42 12‐03‐2018 15:21:01 0:14 0.00003889 MUs513 SUBHASH PARK EXTN.‐GORAKH PARK DGN 329 990 KVA UNPLANNED 12‐03‐2018 15:21:15 12‐03‐2018 15:49:00 0:27 0.000075 MUs514 SUBHASH PARK‐GORAKH PARK, GORAKH PARK EAST‐SILAMPUR, GORAKH PARK WEST‐SILAMPUR, NEW JAFFRABAD‐
GORAKH PARK, BLOCK B‐GORAKH PARK, SHIVAJI PARK‐BALBIR NAGAR, ROHITASH NAGAR EAST‐SILAMPUR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK 1‐BALBIR NAGAR, BALBIR NAGAR EXTN.‐SILAMPUR, BABARPUR WEST‐BABAR PUR, ROHITASH NAGAR‐SILAMPUR, BLOCK A‐PRATAP PURA, BLOCK D‐PRATAP PURA, GOPAL K.OIL DEPO.‐PRATAP PURA, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
DGN 11790 8590 KVA UNPLANNED 12‐03‐2018 16:13:00 12‐03‐2018 16:33:00 0:20 0.00036667 MUs DUE TO DISTRIBUTION TRANSFORMER MAY BE FALL IN SEWER
515 GORAKH PARK EAST‐SILAMPUR, SHIVAJI PARK‐BALBIR NAGAR DGN 1031 990 KVA UNPLANNED 12‐03‐2018 17:11:29 12‐03‐2018 18:09:00 0:57 0.00030083 MUs516 GORAKH PARK EAST‐SILAMPUR DGN 16 990 KVA UNPLANNED 12‐03‐2018 18:46:22 12‐03‐2018 18:57:00 0:10 0.00004722 MUs517 GORAKH PARK EAST‐SILAMPUR DGN 16 990 KVA UNPLANNED 13‐03‐2018 08:10:05 13‐03‐2018 10:01:47 1:51 0.00058583 MUs518 BLOCK 1‐BHAGWANPUR KHERA, BLOCK 1‐RAM NAGAR EXTN., BLOCK 1‐BALBIR NAGAR, ROHITASH NAGAR EAST‐
SILAMPURDGN 1110 990 KVA UNPLANNED 14‐03‐2018 08:10:02 14‐03‐2018 09:03:00 0:52 0.00027444 MUs
519 GORAKH PARK EAST‐SILAMPUR, SHIVAJI PARK‐BALBIR NAGAR DGN 1042 990 KVA UNPLANNED 14‐03‐2018 15:28:46 14‐03‐2018 15:45:24 0:16 0.00011111 MUs520 OLDANPUR‐NAVIN SHAHDARA DGN 164 990 KVA UNPLANNED 15‐03‐2018 12:53:09 15‐03‐2018 13:47:11 0:54 0.000285 MUs521 BLOCK B‐GORAKH PARK, SHIVAJI PARK‐BALBIR NAGAR, ROHITASH NAGAR EAST‐SILAMPUR, ROHITASH NAGAR‐
SILAMPUR, BLOCK A‐PRATAP PURADGN 214 400 KVA UNPLANNED 15‐03‐2018 16:01:05 15‐03‐2018 16:50:38 0:49 0.00025861 MUs
522 SHIVAJI PARK‐BALBIR NAGAR DGN 190 400 KVA UNPLANNED 15‐03‐2018 17:09:15 15‐03‐2018 17:54:54 0:45 0.0002375 MUs523 ROHITASH NAGAR EAST‐SILAMPUR DGN 276 630 KVA UNPLANNED 16‐03‐2018 11:57:35 16‐03‐2018 13:50:00 1:52 0.00059111 MUs524 ROHITASH NAGAR EAST‐SILAMPUR DGN 167 990 KVA UNPLANNED 16‐03‐2018 13:46:31 16‐03‐2018 14:27:05 0:40 0.0002 MUs525 SUBHASH PARK EXTN.‐GORAKH PARK DGN 330 990 KVA UNPLANNED 16‐03‐2018 16:06:25 16‐03‐2018 16:32:49 0:26 0.00013722 MUs526 SUBHASH PARK EXTN.‐GORAKH PARK, PANCHSHEEL PARK‐NAVIN SHAHDARA, BLOCK D‐PRATAP PURA, BLOCK A‐
PRATAP PURADGN 674 990 KVA UNPLANNED 17‐03‐2018 10:58:04 17‐03‐2018 11:27:22 0:29 0.00015306 MUs
527 OLDANPUR‐NAVIN SHAHDARA, PANCHSHEEL PARK‐NAVIN SHAHDARA, BLOCK Y‐PRATAP PURA, BLOCK V‐PRATAP PURA, BLOCK X‐PRATAP PURA, BLOCK C‐PRATAP PURA
DGN 727 990 KVA UNPLANNED 17‐03‐2018 11:32:50 17‐03‐2018 12:20:52 0:48 0.00025333 MUs
528 ROHITASH NAGAR‐SILAMPUR, BLOCK A‐PRATAP PURA DGN 215 990 KVA UNPLANNED 17‐03‐2018 14:07:28 17‐03‐2018 15:00:00 0:52 0.00027444 MUs529 GOPAL K.OIL DEPO.‐PRATAP PURA DGN 176 990 KVA UNPLANNED 17‐03‐2018 14:39:49 17‐03‐2018 15:30:00 0:50 0.00026389 MUs530 SUBHASH PARK EXTN.‐GORAKH PARK DGN 219 990 KVA UNPLANNED 17‐03‐2018 16:20:12 17‐03‐2018 17:00:25 0:40 0.00013333 MUs531 SUBHASH PARK EXTN.‐GORAKH PARK DGN 219 990 KVA UNPLANNED 17‐03‐2018 17:00:44 17‐03‐2018 17:43:58 0:43 0.00014333 MUs532 OLDANPUR‐NAVIN SHAHDARA, PANCHSHEEL PARK‐NAVIN SHAHDARA DGN 739 990 KVA UNPLANNED 18‐03‐2018 00:25:38 18‐03‐2018 01:00:07 0:34 0.00011333 MUs533 NEW JAFFRABAD‐GORAKH PARK DGN 285 990 KVA UNPLANNED 19‐03‐2018 11:03:32 19‐03‐2018 11:57:14 0:53 0.00008833 MUs534 GORAKH PARK WEST‐SILAMPUR, BLOCK B‐GORAKH PARK, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐
KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, ROHITASH NAGAR‐SILAMPUR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DGN 1067 630 KVA UNPLANNED 19‐03‐2018 12:26:03 19‐03‐2018 13:21:00 0:54 0.000375 MUs
535 SUBHASH PARK EXTN.‐GORAKH PARK, PANCHSHEEL PARK‐NAVIN SHAHDARA DGN 893 990 KVA UNPLANNED 20‐03‐2018 11:48:52 20‐03‐2018 12:27:07 0:38 0.00021111 MUs536 SUBHASH PARK EXTN.‐GORAKH PARK, PANCHSHEEL PARK‐NAVIN SHAHDARA DGN 893 990 KVA UNPLANNED 20‐03‐2018 13:57:14 20‐03‐2018 14:16:44 0:19 0.00010556 MUs537 NEW JAFFRABAD‐GORAKH PARK DGN 72 990 KVA UNPLANNED 20‐03‐2018 16:22:16 20‐03‐2018 17:17:02 0:54 0.00015 MUs538 KABUL NAGAR‐ROHITASH NAGAR, BLOCK R‐PRATAP PURA DGN 1330 990 KVA UNPLANNED 20‐03‐2018 16:55:39 20‐03‐2018 17:22:47 0:27 0.00009 MUs meter install at kabool
ngr kiose539 KABUL NAGAR‐ROHITASH NAGAR DGN 271 990 KVA UNPLANNED 21‐03‐2018 10:15:45 21‐03‐2018 11:00:30 0:44 0.00023222 MUs540 ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐RAM NAGAR EXTN., BLOCK 1‐BHAGWANPUR KHERA DGN 276 990 KVA UNPLANNED 21‐03‐2018 11:55:16 21‐03‐2018 12:35:27 0:40 0.00021111 MUs541 OLDANPUR‐NAVIN SHAHDARA, PANCHSHEEL PARK‐NAVIN SHAHDARA DGN 562 990 KVA UNPLANNED 21‐03‐2018 12:18:57 21‐03‐2018 13:49:15 1:30 0.000475 MUs542 SUBHASH PARK‐GORAKH PARK, SUBHASH PARK EXTN.‐GORAKH PARK DGN 422 990 KVA UNPLANNED 21‐03‐2018 14:58:49 21‐03‐2018 15:49:23 0:50 0.00026389 MUs543 KABUL NAGAR‐ROHITASH NAGAR DGN 271 990 KVA UNPLANNED 22‐03‐2018 10:40:39 22‐03‐2018 11:35:00 0:54 0.000285 MUs544 BALBIR NAGAR EXTN.‐SILAMPUR DGN 208 990 KVA UNPLANNED 22‐03‐2018 12:46:16 22‐03‐2018 13:38:52 0:52 0.00027444 MUs545 KABUL NAGAR‐ROHITASH NAGAR DGN 271 990 KVA UNPLANNED 22‐03‐2018 15:12:14 22‐03‐2018 16:09:00 0:56 0.00029556 MUs546 BLOCK D‐PRATAP PURA, BLOCK A‐PRATAP PURA DGN 65 990 KVA UNPLANNED 23‐03‐2018 10:48:33 23‐03‐2018 11:25:05 0:36 0.00019 MUs547 GORAKH PARK EAST‐SILAMPUR DGN 16 990 KVA UNPLANNED 23‐03‐2018 11:25:30 23‐03‐2018 12:18:00 0:52 0.00027444 MUs548 ROHITASH NAGAR EAST‐SILAMPUR, RAM NAGAR‐SILAMPUR DGN 3 630 KVA UNPLANNED 23‐03‐2018 11:28:28 23‐03‐2018 12:20:00 0:51 0.00026917 MUs549 GOPAL K.OIL DEPO.‐PRATAP PURA DGN 176 990 KVA UNPLANNED 23‐03‐2018 12:36:33 23‐03‐2018 13:00:41 0:24 0.00011333 MUs550 KABUL NAGAR‐ROHITASH NAGAR DGN 151 990 KVA UNPLANNED 23‐03‐2018 12:37:52 23‐03‐2018 13:01:11 0:23 0.000115 MUs551 KABUL NAGAR‐ROHITASH NAGAR, OLDANPUR‐NAVIN SHAHDARA, PANCHSHEEL PARK‐NAVIN SHAHDARA,
DWARKAPURI‐NAVIN SHAHDARA, DELHI TRANSPORT‐WELCOME COLONY, INDIAN GAS‐SHAHDARA DGNDGN 36 990 KVA UNPLANNED 23‐03‐2018 12:38:53 23‐03‐2018 13:05:00 0:26 0.00013722 MUs
552 NEW JAFFRABAD‐GORAKH PARK DGN 62 990 KVA UNPLANNED 23‐03‐2018 12:40:06 23‐03‐2018 13:37:00 0:56 0.00029556 MUs553 KABUL NAGAR‐ROHITASH NAGAR DGN 271 990 KVA UNPLANNED 23‐03‐2018 15:00:00 23‐03‐2018 15:31:45 0:31 0.00014639 MUs554 GORAKH PARK EAST‐SILAMPUR DGN 16 990 KVA UNPLANNED 25‐03‐2018 12:19:01 25‐03‐2018 12:32:29 0:13 0.00006861 MUs555 OLDANPUR‐NAVIN SHAHDARA, PANCHSHEEL PARK‐NAVIN SHAHDARA, BLOCK Y‐PRATAP PURA, BLOCK V‐PRATAP
PURA, BLOCK X‐PRATAP PURA, BLOCK C‐PRATAP PURADGN 1340 990 KVA UNPLANNED 26‐03‐2018 11:37:17 26‐03‐2018 11:58:56 0:21 0.00014583 MUs
556 BLOCK A‐PRATAP PURA, GOPAL K.OIL DEPO.‐PRATAP PURA DGN 483 990 KVA UNPLANNED 26‐03‐2018 11:59:25 26‐03‐2018 12:54:00 0:54 0.00009 MUs557 GORAKH PARK WEST‐SILAMPUR, BLOCK B‐GORAKH PARK, ROHITASH NAGAR‐SILAMPUR DGN 627 630 KVA UNPLANNED 27‐03‐2018 10:17:06 27‐03‐2018 11:50:00 1:32 0.00020444 MUs558 BLOCK 1‐BALBIR NAGAR, BALBIR NAGAR EXTN.‐SILAMPUR DGN 105 630 KVA UNPLANNED 28‐03‐2018 10:50:15 28‐03‐2018 12:42:51 1:52 0.00059111 MUs559 ROHITASH NAGAR EAST‐SILAMPUR DGN 167 990 KVA UNPLANNED 28‐03‐2018 12:12:47 28‐03‐2018 12:35:49 0:23 0.00012139 MUs560 BLOCK D‐PRATAP PURA, BLOCK A‐PRATAP PURA DGN 66 990 KVA UNPLANNED 29‐03‐2018 12:15:00 29‐03‐2018 14:09:00 1:54 0.00060167 MUs pole broken561 GORAKH PARK WEST‐SILAMPUR, NEW JAFFRABAD‐GORAKH PARK DGN 553 990 KVA UNPLANNED 31‐03‐2018 10:58:06 31‐03‐2018 11:39:25 0:41 0.00017083 MUs562 ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 2024 990 KVA UNPLANNED 31‐03‐2018 11:17:54 31‐03‐2018 11:58:08 0:40 0.00022222 MUs563 DARYA GANJ DRG 824 990 KVA UNPLANNED 06‐03‐2018 13:53:45 06‐03‐2018 15:43:25 1:49 0 MUs564 DARYA GANJ DRG 401 990 KVA UNPLANNED 17‐03‐2018 14:40:10 17‐03‐2018 15:35:28 0:55 0.00007639 MUs panel testing 565 LIG/MIG RES/NON COMM AREA‐FEROJ SHAH KOTLA STADIUM DRG 116 990 KVA UNPLANNED 18‐03‐2018 11:00:01 18‐03‐2018 12:24:44 1:24 0.00021 MUs civil work at neharu
house sub/stn566 LIG/MIG RES/NON COMM AREA‐FEROJ SHAH KOTLA STADIUM DRG 103 400 KVA UNPLANNED 18‐03‐2018 15:03:33 18‐03‐2018 16:55:12 1:51 0.00024667 MUs Civil works567 DARYA GANJ DRG 322 990 KVA UNPLANNED 19‐03‐2018 10:14:00 19‐03‐2018 12:07:42 1:53 0.00012556 MUs lt cable repair at ansari
road568 DARYA GANJ DRG 322 990 KVA UNPLANNED 19‐03‐2018 12:03:00 19‐03‐2018 12:53:31 0:50 0.00013889 MUs LT CABLE REPAIR
NEAR HANUMAN MANDIR
569 DARYA GANJ DRG 110 990 KVA UNPLANNED 21‐03‐2018 10:40:44 21‐03‐2018 12:31:13 1:50 0.00015278 MUs ab conductor damaged pole shiffted to new pole
570 DARYA GANJ DRG 110 990 KVA UNPLANNED 21‐03‐2018 11:48:07 21‐03‐2018 13:34:53 1:46 0.00014722 MUs ab conductor shifting damaged pole to new pole
571 DARYA GANJ DRG 265 990 KVA UNPLANNED 21‐03‐2018 14:37:57 21‐03‐2018 15:11:58 0:34 0.00003778 MUs ab conductor shifted , damage pole to new pole
572 DARYA GANJ DRG 335 990 KVA UNPLANNED 23‐03‐2018 10:58:56 23‐03‐2018 12:40:00 1:41 0.00011222 MUs lt pole upgradtion573 DARYA GANJ DRG 265 990 KVA UNPLANNED 25‐03‐2018 10:40:24 25‐03‐2018 12:27:45 1:47 0.00014861 MUs shifting of new cable
on the pole at hindipark sub/ stn
574 DARYA GANJ DRG 322 990 KVA UNPLANNED 25‐03‐2018 12:57:46 25‐03‐2018 14:40:16 1:42 0.00017 MUs shifting of new cable on the pole at hindipark sub/ stn
575 DARYA GANJ DRG 322 990 KVA UNPLANNED 26‐03‐2018 10:24:00 26‐03‐2018 12:21:10 1:57 0.00013 MUs ab box repair at gurudwara road
576 DARYA GANJ DRG 322 990 KVA UNPLANNED 26‐03‐2018 12:47:00 26‐03‐2018 14:38:00 1:51 0.00012333 MUs ab box repair at gurudwara road
577 GEETA COLONY, CHRISTAN COLONY‐KHABAS PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, ARYA ANATHALAYA‐KALA MAHAL, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DRG 310 990 KVA UNPLANNED 06‐03‐2018 12:54:37 06‐03‐2018 14:20:30 1:25 0.00009444 MUs 4x300 mm cable Maintance at kucha dakhni rai main road
578 DARYA GANJ, COMMUNITY CENTRE‐JAMA MASZID, SITARAM BAZAR‐CHANDNI CHOWK, MOTIA MAHAL‐CHANDNI CHOWK, CHRISTAN COLONY‐KHABAS PURA, CHANDANI MAHAL‐CHANDNI CHOWK, PATODI HOUSE‐CHANDNI CHOWK, CHURI WALAN GALI‐CHANDNI CHOWK
DRG 4310 3600 KVA UNPLANNED 06‐03‐2018 17:27:13 06‐03‐2018 18:29:41 1:2 0.00017222 MUs
579 COMMUNITY CENTRE‐JAMA MASZID, MOTIA MAHAL‐CHANDNI CHOWK, EVERGREEN PUBLICATION‐KALA MAHAL, MOTHER DAIRY‐NETAJI SUBHASH MARG
DRG 643 990 KVA UNPLANNED 14‐03‐2018 12:52:26 14‐03‐2018 14:11:19 1:18 0.00008667 MUs oil leakage at transformer at urdu bazar so meena bazar , chitla gate , & urdu bazar area are effected
580 COMMUNITY CENTRE‐JAMA MASZID, MOTIA MAHAL‐CHANDNI CHOWK, EVERGREEN PUBLICATION‐KALA MAHAL, MOTHER DAIRY‐NETAJI SUBHASH MARG
DRG 884 990 KVA UNPLANNED 17‐03‐2018 15:28:21 17‐03‐2018 16:58:06 1:29 0.00009889 MUs 4X300 SQMM CABLE MAINTANCE AT URDU BAZAR s/s so meena bazar , chitla gate , & urdu bazar area are effected
581 GEETA COLONY, CHRISTAN COLONY‐KHABAS PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DRG 1199 400 KVA UNPLANNED 19‐03‐2018 15:15:32 19‐03‐2018 16:21:47 1:6 0.00007333 MUs 4x300 sqmm MAINTAINCE WORK at kucha challan
582 SITARAM BAZAR‐CHANDNI CHOWK, DDA FLATS‐KALA MASZID DRG 318 630 KVA UNPLANNED 20‐03‐2018 11:45:00 20‐03‐2018 13:42:12 1:57 0.0001625 MUs at project work583 GEETA COLONY, DAV PUBLIC SCHOOL‐KALA MASZID, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK
D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI POLICE BHAVAN‐PAHARI BHOJLA, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, DDA FLATS‐KALA MASZID, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DRG 1066 990 KVA UNPLANNED 23‐03‐2018 11:37:41 23‐03‐2018 13:34:51 1:57 0.00013 MUs socketing at shankar gali
584 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, SITARAM BAZAR‐CHANDNI CHOWK, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, DAV PUBLIC SCHOOL‐KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
DRG 1704 990 KVA UNPLANNED 24‐03‐2018 14:54:31 24‐03‐2018 16:46:17 1:51 0.00012333 MUs 4x300 mm cable Maintance at BULBULI KHANA S/S
585 CHANDANI MAHAL‐CHANDNI CHOWK, PATODI HOUSE‐CHANDNI CHOWK DRG 844 990 KVA UNPLANNED 26‐03‐2018 10:25:00 26‐03‐2018 13:42:31 3:17 0.00027361 MUs socket punching at chatta lal
586 CHANDANI MAHAL‐CHANDNI CHOWK DRG 125 990 KVA UNPLANNED 27‐03‐2018 11:16:30 27‐03‐2018 13:04:40 1:48 0.00015 MUs socket punching at chatta lal
587 CHANDANI MAHAL‐CHANDNI CHOWK DRG 15 990 KVA UNPLANNED 27‐03‐2018 13:27:20 27‐03‐2018 15:25:06 1:57 0.00026 MUs588 GEETA COLONY, CHANDANI MAHAL‐CHANDNI CHOWK, PATODI HOUSE‐CHANDNI CHOWK, GGS INDRAPRASTHA
UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DRG 1914 990 KVA UNPLANNED 31‐03‐2018 11:25:51 31‐03‐2018 12:29:21 1:3 0.00007 MUs predective maitance work under process at sheesh mahal s/s so ganj meer khan , main road chandni mahal , hauz swiwalan , rang mahal , rakab ganj, sheesh mahal area are effected
589 GEETA COLONY, COMMUNITY CENTRE‐JAMA MASZID, CHRISTAN COLONY‐KHABAS PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DRG 1270 400 KVA UNPLANNED 31‐03‐2018 15:13:58 31‐03‐2018 16:14:56 1:0 0.00008333 MUs mainatanance work at kucha nahar khan
590 VISHWAS NAGAR‐SHAHDARA JLM 306 990 KVA UNPLANNED 02‐03‐2018 10:25:10 02‐03‐2018 10:47:17 0:22 0.00003056 MUs to attend fault i591 MAHARAM NAGAR‐SHAHDARA, EAST ROHTASH NAGAR‐SHAHDARA JLM 465 990 KVA UNPLANNED 05‐03‐2018 07:32:18 05‐03‐2018 07:49:27 0:17 0.00002361 MUs LOCAL TRIP AT TASH
FACTORY592 EAST ROHTASH NAGAR‐SHAHDARA, VISHWAS NAGAR, VISHWAS NAGAR EXTN.‐SHAHDARA JLM 547 630 KVA UNPLANNED 09‐03‐2018 15:25:00 09‐03‐2018 17:00:00 1:34 0.00039167 MUs REPLACEMENT OF O/H
CONDUCTOR 593 VISHWAS NAGAR‐SHAHDARA JLM 306 990 KVA UNPLANNED 14‐03‐2018 13:30:50 14‐03‐2018 14:25:00 0:54 0.0003 MUs RMU INSTALLATION
AT RAM GALI594 SUNDER PARK‐SHAHDARA, BHOLA NATH NAGAR‐SHAHDARA, TELIBARA‐SHAHDARA, MAHARAM NAGAR‐SHAHDARA,
BIHARI COLONY‐SHAHDARA, EAST ROHTASH NAGAR‐SHAHDARA, VISHWAS NAGARJLM 6265 4000 KVA UNPLANNED 14‐03‐2018 15:00:00 14‐03‐2018 15:30:00 0:29 0.00049944 MUs GAS FILLING WORK
595 NAYA VISHWAS NAGAR‐SHAHDARA, VISHWAS NAGAR‐SHAHDARA, AMBEDKAR NAGAR‐SHAHDARA JLM 1101 990 KVA UNPLANNED 20‐03‐2018 09:15:00 20‐03‐2018 10:13:30 0:58 0.00016111 MUs dismentaling of ht o/h circuit at halkara kuan s/stn ‐2
596 BIHARI COLONY‐SHAHDARA JLM 576 990 KVA UNPLANNED 24‐03‐2018 13:00:00 24‐03‐2018 14:40:00 1:40 0.00013889 MUs prc burnt at gali no 8 bihari colony area affected gali no 8 to 16 bihari colony
597 MAHARAM NAGAR‐SHAHDARA JLM 829 990 KVA UNPLANNED 27‐03‐2018 15:49:34 27‐03‐2018 16:40:00 0:50 0.00013889 MUs replacement of lt ab 598 AGCR ENCLAVE‐ANAND VIHAR JLM 14 990 KVA UNPLANNED 16‐03‐2018 20:58:09 16‐03‐2018 22:54:24 1:56 0.00161111 MUs FIRE ON POLE599 JAGRITI ENCLAVE‐ANAND VIHAR JLM 26 990 KVA UNPLANNED 16‐03‐2018 21:22:00 16‐03‐2018 22:06:21 0:44 0.00061111 MUs FAULT IN LT CIRCUIT600 SHAHDARA JLM JLM 0 1260 KVA UNPLANNED 17‐03‐2018 10:15:00 17‐03‐2018 11:20:00 1:4 0 MUs PREVENTIVE
MAINTENANCE601 SURYA NIKETAN‐ANAND VIHAR, RAM VIHAR‐ANAND VIHAR, PUSHPANJALI‐ANAND VIHAR JLM 231 990 KVA UNPLANNED 22‐03‐2018 14:13:31 22‐03‐2018 15:11:00 0:57 0.00007917 MUs INSTALLATION OF
NEW LT ACB602 BLOCK 11‐GEETA COLONY KRN 2 990 KVA UNPLANNED 13‐03‐2018 12:21:00 13‐03‐2018 14:11:00 1:50 0.00006111 MUs603 BLOCK 11‐GEETA COLONY KRN 2 990 KVA UNPLANNED 14‐03‐2018 11:34:00 14‐03‐2018 13:11:00 1:37 0.00005389 MUs604 BLOCK 15‐GEETA COLONY, BLOCK 14‐GEETA COLONY KRN 427 990 KVA UNPLANNED 20‐03‐2018 14:20:00 20‐03‐2018 14:56:40 0:36 0.00002 MUs605 BLOCK 15‐GEETA COLONY KRN 430 990 KVA UNPLANNED 28‐03‐2018 14:35:00 28‐03‐2018 15:16:00 0:40 0.00002222 MUs606 BLOCK 11‐GEETA COLONY, BLOCK 2‐GEETA COLONY, BLOCK 6‐GEETA COLONY KRN 1038 990 KVA UNPLANNED 29‐03‐2018 22:00:55 29‐03‐2018 22:53:44 0:52 0.00004333 MUs fire on pole607 OLD BRIJPURI‐SWASTHYA VIHAR, BLOCK A‐BALDEV PARK EAST, NEW GOVIND PURA‐JAGATPURI, BLOCK H‐JAGATPURI,
BLOCK F‐BALDEV PARK EAST, BLOCK E‐ANARKALI COLONY NORTH, GALI NO‐1‐NEW LAYALPUR COLONY, BLOCK D‐RAM NAGAR, BLOCK B‐SOUTH ANARKALI COLONY, BLOCK B‐JAGATPURI, BLOCK B‐JAGATPURI, BLOCK D‐JAGATPURI, BALDEV PARK‐JAGATPURI, BLOCK K‐JAGATPURI, EXTENTION‐JAGATPURI, BLOCK A‐ANARKALI COLONY NORTH, BLOCK D‐SOUTH ANARKALI COLONY, BLOCK C‐NEW LAYALPUR COLONY, BLOCK D‐NEW LAYALPUR COLONY, BLOCK A‐NEW LAYALPUR COLONY BLOCK F‐NEW LAYALPUR COLONY
KRN 7261 2610 KVA UNPLANNED 01‐03‐2018 11:25:00 01‐03‐2018 11:55:00 0:29 0 MUs pc test
608 KHUREJI KHAS‐SWASTHYA VIHAR, OLD BRIJPURI‐SWASTHYA VIHAR, RASHID MARKET‐JAGATPURI, BALDEV PARK‐JAGATPURI
KRN 1169 990 KVA UNPLANNED 05‐03‐2018 12:36:21 05‐03‐2018 13:35:00 0:58 0.00008056 MUs lt ab repair
609 CHANDER NAGAR‐KRISHNA NAGAR, CHANDER NAGAR BLOCK F‐GOPAL PARK, BLOCK E‐WEST CHANDER NAGAR, SHIVPURI‐JAGATPURI
KRN 982 990 KVA UNPLANNED 05‐03‐2018 13:20:58 05‐03‐2018 15:09:50 1:48 0.00018 MUs
610 NEW GOVIND PURA‐JAGATPURI, CHANDER NAGAR BLOCK F‐GOPAL PARK, ARAM PARK‐GEETA COLONY, SAROJINI PARK‐GEETA COLONY, SHIVPURI‐JAGATPURI, BLOCK E‐JAGATPURI, RASHID MARKET‐JAGATPURI, BALDEV PARK‐JAGATPURI, WEST LAXMI MARKET KHUREJI‐ARAM PARK, SAROJINI PARK‐ARAM PARK
KRN 5313 2970 KVA UNPLANNED 05‐03‐2018 13:48:50 05‐03‐2018 14:59:45 1:10 0.00064167 MUs
611 RASHID MARKET‐JAGATPURI KRN 131 990 KVA UNPLANNED 10‐03‐2018 12:50:00 10‐03‐2018 14:10:00 1:19 0.00004389 MUs612 KHUREJI KHAS‐SWASTHYA VIHAR, BRIJ PURI‐SWASTHYA VIHAR, OLD BRIJPURI‐SWASTHYA VIHAR, WEST LAXMI
MARKET KHUREJI‐ARAM PARKKRN 1048 990 KVA UNPLANNED 12‐03‐2018 12:47:35 12‐03‐2018 13:24:06 0:36 0.00003 MUs
613 GOVIND PURA OLD‐SWASTHYA VIHAR, NEW GOVIND PURA‐JAGATPURI, NAI SARAK‐KATRA ASRAFI, BLOCK F‐BALDEV PARK EAST
KRN 1431 630 KVA UNPLANNED 12‐03‐2018 13:14:00 12‐03‐2018 13:51:50 0:37 0.00028778 MUs
614 SUKH VIHAR‐SWASTHYA VIHAR, BLOCK D‐BALDEV PARK EAST KRN 468 990 KVA UNPLANNED 16‐03‐2018 13:24:28 16‐03‐2018 14:10:27 0:45 0.00025 MUs615 SHIVPURI‐JAGATPURI, RASHID MARKET‐JAGATPURI KRN 959 990 KVA UNPLANNED 22‐03‐2018 12:06:30 22‐03‐2018 12:21:33 0:15 0.00010417 MUs616 RADHE SHYAM PARK‐SWASTHYA VIHAR, GOVIND PURA OLD‐SWASTHYA VIHAR, SUKH VIHAR‐SWASTHYA VIHAR,
RADHE SHYAM PARK EXTN.‐SWASTHYA VIHAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D‐BALDEV PARK EAST, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
KRN 2754 990 KVA UNPLANNED 23‐03‐2018 11:05:00 23‐03‐2018 12:13:42 1:8 0.00028333 MUs lt cable repairing
617 NEW GOVIND PURA‐JAGATPURI, CHANDER NAGAR BLOCK F‐GOPAL PARK, SHIVPURI‐JAGATPURI, RASHID MARKET‐JAGATPURI
KRN 1801 990 KVA UNPLANNED 24‐03‐2018 11:32:00 24‐03‐2018 12:24:21 0:52 0.00034667 MUs
618 NEW GOVIND PURA‐JAGATPURI, BALDEV PARK‐JAGATPURI KRN 484 990 KVA UNPLANNED 24‐03‐2018 13:16:00 24‐03‐2018 13:50:47 0:34 0.00018889 MUs619 SUKH VIHAR‐SWASTHYA VIHAR, BLOCK D‐BALDEV PARK EAST KRN 469 990 KVA UNPLANNED 26‐03‐2018 14:35:00 26‐03‐2018 16:08:27 1:33 0.00020667 MUs620 KHUREJI KHAS‐SWASTHYA VIHAR, RASHID MARKET‐JAGATPURI KRN 1208 990 KVA UNPLANNED 26‐03‐2018 14:40:00 26‐03‐2018 15:00:31 0:20 0.00011667 MUs621 BLOCK A‐NEW LAYALPUR COLONY, BLOCK E‐ANARKALI COLONY NORTH, BLOCK D‐SOUTH ANARKALI COLONY, BLOCK B‐
SOUTH ANARKALI COLONY, BLOCK A‐BALDEV PARK EAST, OLD BRIJPURI‐SWASTHYA VIHAR, NEW GOVIND PURA‐JAGATPURI, BLOCK K‐JAGATPURI, BLOCK C‐NEW LAYALPUR COLONY, BALDEV PARK‐JAGATPURI, EXTENTION‐JAGATPURI, BLOCK B‐JAGATPURI, BLOCK A‐ANARKALI COLONY NORTH, BLOCK D‐JAGATPURI, BLOCK B‐JAGATPURI, BLOCK F‐BALDEV PARK EAST, BLOCK D‐RAM NAGAR, BLOCK H‐JAGATPURI, BLOCK F‐NEW LAYALPUR COLONY, BLOCK D‐NEW LAYALPUR COLONY GALI NO‐1‐NEW LAYALPUR COLONY
KRN 7195 2610 KVA UNPLANNED 26‐03‐2018 18:05:00 26‐03‐2018 22:56:00 4:51 0 MUs cable shifting
622 CHANDER NAGAR BLOCK F‐GOPAL PARK, BLOCK D‐CHANDAR NAGAR KRN 127 990 KVA UNPLANNED 28‐03‐2018 14:02:01 28‐03‐2018 14:44:00 0:41 0.00002278 MUs623 BLOCK B‐JAGATPURI, BLOCK H‐JAGATPURI, BLOCK B‐JAGATPURI KRN 497 990 KVA UNPLANNED 29‐03‐2018 11:55:00 29‐03‐2018 12:29:04 0:34 0.00011333 MUs624 OLD SEELAMPUR, BLOCK D‐AJIT NAGAR, SUBHASH MOHALLA‐SEELAMPUR, BLOCK 9‐KAILASH NAGAR, OLD
SEELAMPUR DHRAM PURAKRN 755 630 KVA UNPLANNED 03‐03‐2018 17:05:17 03‐03‐2018 17:15:08 0:9 0.0001 MUs
625 DHARAM PURA‐KAILASH NAGAR, BLOCK 9‐SUBHASH MOHALLA_I, SUBHASH MOHALLA‐SEELAMPUR, BLOCK 9‐KAILASH NAGAR, GANDHI NAGAR‐KAILASH NAGAR
KRN 1193 990 KVA UNPLANNED 05‐03‐2018 11:36:28 05‐03‐2018 11:58:08 0:21 0.000105 MUs gas refilling
626 BLOCK 9‐SUBHASH MOHALLA_I, RAGUWARPURA‐SUBHASH MOHALLA II, SUBHASH MOHALLA‐SEELAMPUR, BLOCK 10‐RAM NAGAR
KRN 617 990 KVA UNPLANNED 05‐03‐2018 13:31:51 05‐03‐2018 15:25:16 1:53 0.00021972 MUs REPAIR WIRE ON POLE
627 OLD SEELAMPUR, BLOCK D‐AJIT NAGAR KRN 836 990 KVA UNPLANNED 05‐03‐2018 17:35:00 05‐03‐2018 18:01:46 0:26 0.00013 MUs628 OLD SEELAMPUR KRN 104 630 KVA UNPLANNED 06‐03‐2018 08:44:21 06‐03‐2018 10:35:13 1:50 0.00009167 MUs db box burnt629 BLOCK D‐AJIT NAGAR KRN 262 990 KVA UNPLANNED 06‐03‐2018 11:18:15 06‐03‐2018 11:54:09 0:35 0.00001944 MUs630 MAHILA COLONY‐SEELAMPUR, CHAND MOHALLA‐RAJGARH COLONY KRN 193 990 KVA UNPLANNED 06‐03‐2018 14:33:00 06‐03‐2018 15:25:00 0:51 0 MUs631 BLOCK D‐AJIT NAGAR, BLOCK 9‐KAILASH NAGAR KRN 224 990 KVA UNPLANNED 06‐03‐2018 14:50:00 06‐03‐2018 15:27:18 0:37 0.00002056 MUs632 OLD SEELAMPUR, BLOCK D‐AJIT NAGAR KRN 173 990 KVA UNPLANNED 06‐03‐2018 17:08:36 06‐03‐2018 17:35:09 0:26 0.00001444 MUs633 BLOCK 9‐RAGHUBARPURA KRN 92 990 KVA UNPLANNED 06‐03‐2018 17:21:36 06‐03‐2018 17:42:51 0:21 0.00001167 MUs634 BLOCK 9‐DHARAM PURA, SHYAM COLONY‐KAILASH NAGAR SOUTH, BLOCK 9‐KAILASH NAGAR, KAILASH NAGAR
SOUTH, BLOCK 9‐GANDHI NAGARKRN 1237 630 KVA UNPLANNED 08‐03‐2018 10:27:05 08‐03‐2018 11:26:00 0:58 0.00035444 MUs
635 OLD SEELAMPUR, BLOCK D‐AJIT NAGAR KRN 835 990 KVA UNPLANNED 09‐03‐2018 08:14:49 09‐03‐2018 08:44:53 0:30 0.00001667 MUs636 RAGHUBARPURA NO 2‐SEELAMPUR KRN 750 990 KVA UNPLANNED 09‐03‐2018 11:12:17 09‐03‐2018 11:39:02 0:26 0.00031056 MUs PRC CONNECT637 OLD SEELAMPUR KRN 624 630 KVA UNPLANNED 09‐03‐2018 11:46:27 09‐03‐2018 12:10:48 0:24 0.0003 MUs S/ST AMAR MOHALLA 638 BLOCK 9‐SUBHASH MOHALLA_I, BLOCK 9‐RAGHUBARPURA, MAHILA COLONY‐SEELAMPUR KRN 701 990 KVA UNPLANNED 09‐03‐2018 11:54:21 09‐03‐2018 13:10:17 1:15 0.00058333 MUs639 BLOCK 9‐SUBHASH MOHALLA_I, RAGUWARPURA‐SUBHASH MOHALLA II, BLOCK 10‐RAM NAGAR KRN 170 990 KVA UNPLANNED 09‐03‐2018 15:54:07 09‐03‐2018 16:40:00 0:45 0.000025 MUs640 RAGHUBARPURA NO 2‐SEELAMPUR KRN 199 990 KVA UNPLANNED 09‐03‐2018 16:08:00 09‐03‐2018 16:39:11 0:31 0.00001722 MUs641 BLOCK 9‐SUBHASH MOHALLA_I, RAGUWARPURA‐SUBHASH MOHALLA II, BLOCK 10‐RAM NAGAR KRN 302 990 KVA UNPLANNED 10‐03‐2018 10:03:28 10‐03‐2018 10:22:58 0:19 0.00007917 MUs642 BLOCK 9‐SUBHASH MOHALLA_I, RAGUWARPURA‐SUBHASH MOHALLA II, BLOCK 10‐RAM NAGAR KRN 170 990 KVA UNPLANNED 10‐03‐2018 12:54:16 10‐03‐2018 13:30:00 0:35 0.00001944 MUs643 KAILASH NAGAR KRN 1135 990 KVA UNPLANNED 12‐03‐2018 11:38:00 12‐03‐2018 11:56:28 0:18 0.00007 MUs 3 PHASE MTR
INSTALLATION644 BLOCK 9‐SUBHASH MOHALLA_I, SUBHASH MOHALLA‐SEELAMPUR, BLOCK 9‐KAILASH NAGAR, GANDHI NAGAR‐
KAILASH NAGARKRN 582 990 KVA UNPLANNED 12‐03‐2018 13:02:20 12‐03‐2018 13:21:47 0:19 0.00013722 MUs 3 PHASE MTR
INSTALLATION645 OLD SEELAMPUR, BLOCK D‐AJIT NAGAR KRN 835 990 KVA UNPLANNED 12‐03‐2018 13:48:05 12‐03‐2018 14:01:09 0:13 0.00009028 MUs 3 PHASE MTR
INSTALLATION646 KAILASH NAGAR, YAMUNA RIVER‐KAILASH NAGAR KRN 647 990 KVA UNPLANNED 12‐03‐2018 14:03:00 12‐03‐2018 15:44:56 1:41 0.00036472 MUs647 OLD SEELAMPUR, BLOCK D‐AJIT NAGAR KRN 173 990 KVA UNPLANNED 13‐03‐2018 11:40:53 13‐03‐2018 12:09:56 0:29 0.00001611 MUs648 BLOCK 9‐SUBHASH MOHALLA_I, BLOCK 9‐RAGHUBARPURA KRN 137 990 KVA UNPLANNED 14‐03‐2018 14:33:58 14‐03‐2018 14:57:49 0:23 0.00001278 MUs649 BLOCK 9‐SUBHASH MOHALLA_I, RAGUWARPURA‐SUBHASH MOHALLA II, BLOCK 10‐RAM NAGAR KRN 170 990 KVA UNPLANNED 14‐03‐2018 16:04:25 14‐03‐2018 16:30:00 0:25 0.00001389 MUs650 BLOCK 9‐KAILASH NAGAR KRN 82 630 KVA UNPLANNED 15‐03‐2018 13:54:00 15‐03‐2018 14:17:12 0:23 0.00001278 MUs651 DHARAM PURA‐KAILASH NAGAR KRN 186 990 KVA UNPLANNED 15‐03‐2018 17:11:04 15‐03‐2018 17:35:00 0:23 0.00001278 MUs
652 BLOCK 9‐KAILASH NAGAR, SHYAM COLONY‐KAILASH NAGAR SOUTH, KAILASH NAGAR SOUTH, BLOCK 9‐DHARAM PURA, BLOCK 9‐GANDHI NAGAR
KRN 1235 630 KVA UNPLANNED 16‐03‐2018 09:17:30 16‐03‐2018 09:45:43 0:28 0.00001556 MUs fire on pole
653 DHRAM PURA‐KAILASH NAGAR, BLOCK 9‐KAILASH NAGAR, AJIT NAGAR‐KAILASH NAGAR, BLOCK 9‐DHARAM PURA, BLOCK 9‐GANDHI NAGAR, DHARAM PURA‐KAILASH NAGAR
KRN 940 990 KVA UNPLANNED 19‐03‐2018 16:31:24 19‐03‐2018 17:27:00 0:55 0.00045833 MUs TRF REPLACEMENT UNDER HIGH VOLTAGE AT LT SIDE
654 BLOCK 9‐KAILASH NAGAR KRN 82 630 KVA UNPLANNED 20‐03‐2018 11:09:31 20‐03‐2018 11:30:24 0:20 0.00001111 MUs655 BLOCK 9‐RAGHUBARPURA KRN 92 990 KVA UNPLANNED 20‐03‐2018 15:13:49 20‐03‐2018 15:40:00 0:26 0.00001444 MUs656 OLD SEELAMPUR KRN 92 630 KVA UNPLANNED 20‐03‐2018 18:09:37 20‐03‐2018 18:38:01 0:28 0.00001556 MUs repair of db657 RAGHUVIR PURA‐SHANKAR NAGAR, GEETA COLONY, OLD SEELAMPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE
GATE, RAGHUBARPURA NO 2‐SEELAMPUR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, RAGHUVIR PURA‐KANTI NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KRN 2946 1980 KVA UNPLANNED 22‐03‐2018 18:02:00 22‐03‐2018 18:08:00 0:6 0.00007167 MUs CABLE CONNECTING WORK
658 OLD SEELAMPUR, BLOCK D‐AJIT NAGAR KRN 845 990 KVA UNPLANNED 23‐03‐2018 15:55:47 23‐03‐2018 16:45:00 0:49 0.00068056 MUs659 RAGHUVIR PURA‐SHANKAR NAGAR, GEETA COLONY, OLD SEELAMPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE
GATE, RAGHUBARPURA NO 2‐SEELAMPUR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, RAGHUVIR PURA‐KANTI NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KRN 2947 1980 KVA UNPLANNED 24‐03‐2018 08:56:00 24‐03‐2018 11:32:00 2:36 0 MUs to shift cable
660 BLOCK 9‐KAILASH NAGAR KRN 82 630 KVA UNPLANNED 24‐03‐2018 16:13:15 24‐03‐2018 16:51:26 0:38 0.00002111 MUs661 BLOCK D‐AJIT NAGAR KRN 267 990 KVA UNPLANNED 24‐03‐2018 16:17:05 24‐03‐2018 16:28:09 0:11 0.00000611 MUs662 BLOCK 9‐KAILASH NAGAR, GANDHI NAGAR‐KAILASH NAGAR, BLOCK 9‐GANDHI NAGAR KRN 181 630 KVA UNPLANNED 24‐03‐2018 16:57:24 24‐03‐2018 17:19:21 0:21 0.00001167 MUs663 BLOCK 9‐SUBHASH MOHALLA_I, RAGUWARPURA‐SUBHASH MOHALLA II, BLOCK 10‐RAM NAGAR KRN 171 990 KVA UNPLANNED 24‐03‐2018 17:39:02 24‐03‐2018 18:12:01 0:32 0.00001778 MUs664 SHANKAR NAGAR EXTN‐AZAD NAGAR, RAGHUBARPURA NO 2‐SEELAMPUR, CHAND MOHALLA‐RAJGARH COLONY,
BLOCK 10‐RAGHUBARPURA NO 1KRN 954 990 KVA UNPLANNED 26‐03‐2018 11:30:00 26‐03‐2018 12:35:00 1:4 0.00062222 MUs SUPPLY IS RUNNING
AT RAGHUBARPURA GALI N0 6 FEEDER
665 BLOCK 9‐SUBHASH MOHALLA_I, BLOCK 9‐RAGHUBARPURA KRN 878 990 KVA UNPLANNED 26‐03‐2018 14:58:00 26‐03‐2018 16:12:00 1:13 0.00014194 MUs666 OLD SEELAMPUR KRN 100 630 KVA UNPLANNED 28‐03‐2018 12:04:00 28‐03‐2018 12:30:01 0:26 0.00001444 MUs667 OLD SEELAMPUR KRN 108 630 KVA UNPLANNED 28‐03‐2018 16:39:27 28‐03‐2018 16:49:14 0:9 0.000005 MUs668 BLOCK D‐AJIT NAGAR KRN 1064 990 KVA UNPLANNED 29‐03‐2018 11:03:00 29‐03‐2018 11:25:00 0:22 0.00021389 MUs669 KAILASH NAGAR, BLOCK 9‐DHARAM PURA, BLOCK 9‐KAILASH NAGAR KRN 2684 990 KVA UNPLANNED 29‐03‐2018 13:05:44 29‐03‐2018 13:28:09 0:22 0.00034833 MUs670 BLOCK 9‐SUBHASH MOHALLA_I, RAGUWARPURA‐SUBHASH MOHALLA II, BLOCK 10‐RAM NAGAR KRN 177 990 KVA UNPLANNED 29‐03‐2018 14:29:29 29‐03‐2018 14:48:03 0:18 0.00001 MUs671 OLD SEELAMPUR, MAHILA COLONY‐SEELAMPUR KRN 304 630 KVA UNPLANNED 30‐03‐2018 12:49:40 30‐03‐2018 13:23:46 0:34 0.00028333 MUs672 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK 9‐SUBHASH MOHALLA_I, BLOCK 9‐
RAGHUBARPURA, MAHILA COLONY‐SEELAMPUR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KRN 1116 990 KVA UNPLANNED 31‐03‐2018 20:45:03 31‐03‐2018 21:17:56 0:32 0.00002667 MUs FIRE IN METER
673 WEST AZAD NAGAR, BLOCK A‐KRISHNA NAGAR, BLOCK D‐KRISHNA NAGAR KRN 903 990 KVA UNPLANNED 01‐03‐2018 09:14:13 01‐03‐2018 11:00:00 1:45 0.00005833 MUs area east azad nagar,west azad nagar rasgulle wala s/stn
674 RAGHUVIR PURA‐SHANKAR NAGAR, RAGHUVIR PURA‐KANTI NAGAR, OLD SEELAMPUR KRN 155 990 KVA UNPLANNED 01‐03‐2018 11:26:00 01‐03‐2018 12:15:00 0:49 0.00002722 MUs675 SHANKAR NAGAR EXTN‐AZAD NAGAR KRN 678 630 KVA UNPLANNED 03‐03‐2018 11:13:44 03‐03‐2018 12:10:00 0:56 0.00038889 MUs SOCKET
REPLACEMENT WORK676 AZAD NAGAR EAST, SHANKAR NAGAR WEST‐AZAD NAGAR, SHANKAR NAGAR EXTN‐AZAD NAGAR KRN 2695 990 KVA UNPLANNED 05‐03‐2018 11:27:49 05‐03‐2018 13:20:00 1:52 0.00127556 MUs677 AZAD NAGAR EAST, SHANKAR NAGAR EXTN‐AZAD NAGAR, SHANKAR NAGAR WEST‐AZAD NAGAR KRN 755 990 KVA UNPLANNED 07‐03‐2018 10:46:36 07‐03‐2018 12:30:00 1:43 0.00008583 MUs678 KANTI NAGAR SOUTH‐AZAD NAGAR KRN 565 990 KVA UNPLANNED 07‐03‐2018 10:49:35 07‐03‐2018 12:25:00 1:35 0.00005278 MUs679 OLD SEELAMPUR KRN 268 990 KVA UNPLANNED 07‐03‐2018 19:07:53 07‐03‐2018 20:52:24 1:44 0.00014444 MUs low high voltage area
part of koshik puri,part of east seelampur,part of santi mohalla
680 RAGHUVIR PURA‐SHANKAR NAGAR, GEETA COLONY, OLD SEELAMPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, RAGHUBARPURA NO 2‐SEELAMPUR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, RAGHUVIR PURA‐KANTI NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KRN 1536 990 KVA UNPLANNED 08‐03‐2018 06:07:22 08‐03‐2018 07:55:31 1:48 0.00045 MUs ht cable faulty panel to transformar
681 WEST AZAD NAGAR, BLOCK X‐RAJGARH COLONY, BLOCK A‐KRISHNA NAGAR, SHANKAR NAGAR‐AZAD NAGAR KRN 809 990 KVA UNPLANNED 09‐03‐2018 11:31:02 09‐03‐2018 12:30:00 0:58 0.00033833 MUs682 WEST AZAD NAGAR, BLOCK A‐KRISHNA NAGAR KRN 77 990 KVA UNPLANNED 09‐03‐2018 15:16:03 09‐03‐2018 15:53:30 0:37 0.00002056 MUs683 BLOCK A‐KANTI NAGAR NORTH BLOCK A KRN 199 990 KVA UNPLANNED 10‐03‐2018 12:19:15 10‐03‐2018 12:45:49 0:26 0.00001444 MUs684 OLD SEELAMPUR KRN 229 990 KVA UNPLANNED 10‐03‐2018 14:12:42 10‐03‐2018 15:03:00 0:50 0.00002778 MUs685 RAGHUVIR PURA‐KANTI NAGAR, OLD SEELAMPUR KRN 748 630 KVA UNPLANNED 12‐03‐2018 11:50:54 12‐03‐2018 12:39:39 0:48 0.00058667 MUs LT SOCKET BURNT686 RAGHUVIR PURA‐SHANKAR NAGAR, GEETA COLONY, OLD SEELAMPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE
GATE, RAGHUBARPURA NO 2‐SEELAMPUR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, RAGHUVIR PURA‐KANTI NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KRN 2157 990 KVA UNPLANNED 12‐03‐2018 16:55:00 12‐03‐2018 17:54:30 0:59 0.00027861 MUs
687 WEST AZAD NAGAR KRN 137 990 KVA UNPLANNED 13‐03‐2018 12:04:55 13‐03‐2018 12:55:00 0:50 0.00002778 MUs s/stn‐ west azad ngr rasgulle wala
688 OLD SEELAMPUR KRN 102 990 KVA UNPLANNED 13‐03‐2018 15:05:00 13‐03‐2018 16:45:00 1:40 0.00005556 MUs689 OLD SEELAMPUR KRN 102 990 KVA UNPLANNED 14‐03‐2018 10:44:07 14‐03‐2018 10:50:00 0:5 0.00000278 MUs s/stn‐ kaushik puri
park690 RAGHUVIR PURA‐SHANKAR NAGAR, OLD SEELAMPUR, RAGHUVIR PURA‐KANTI NAGAR KRN 497 990 KVA UNPLANNED 14‐03‐2018 12:22:20 14‐03‐2018 13:00:00 0:37 0.00002056 MUs691 OLD SEELAMPUR KRN 102 990 KVA UNPLANNED 14‐03‐2018 16:37:02 14‐03‐2018 17:13:00 0:35 0.00001944 MUs s/stn‐ kaushik puri
park692 WEST AZAD NAGAR, SHANKAR NAGAR EXTN‐AZAD NAGAR KRN 883 990 KVA UNPLANNED 15‐03‐2018 11:00:44 15‐03‐2018 11:24:03 0:23 0.0001725 MUs prc burnt693 OLD SEELAMPUR, RAGHUVIR PURA‐KANTI NAGAR, OLD SEELAMPUR KRN 451 990 KVA UNPLANNED 15‐03‐2018 11:02:46 15‐03‐2018 11:59:46 0:56 0.00066889 MUs694 WEST AZAD NAGAR, SHANKAR NAGAR‐AZAD NAGAR, BLOCK A‐KRISHNA NAGAR, BLOCK X‐RAJGARH COLONY KRN 809 990 KVA UNPLANNED 15‐03‐2018 12:30:29 15‐03‐2018 13:29:00 0:58 0.00030611 MUs695 BLOCK D‐KRISHNA NAGAR, BLOCK A‐KRISHNA NAGAR, WEST AZAD NAGAR KRN 893 990 KVA UNPLANNED 16‐03‐2018 11:35:58 16‐03‐2018 12:30:00 0:54 0.00033 MUs DB REPAIRING AT A
BLOCK KRN S/STN696 OLD SEELAMPUR, OLD SEELAMPUR KRN 200 990 KVA UNPLANNED 16‐03‐2018 14:18:48 16‐03‐2018 15:07:26 0:48 0.00002667 MUs697 BLOCK X‐RAJGARH COLONY KRN 226 990 KVA UNPLANNED 16‐03‐2018 14:28:31 16‐03‐2018 15:15:00 0:46 0.00002556 MUs698 WEST AZAD NAGAR, SHANKAR NAGAR‐AZAD NAGAR KRN 964 990 KVA UNPLANNED 17‐03‐2018 12:41:34 17‐03‐2018 14:09:02 1:27 0.0003625 MUs699 RAGHUVIR PURA‐SHANKAR NAGAR, RAGHUVIR PURA‐KANTI NAGAR KRN 599 990 KVA UNPLANNED 17‐03‐2018 16:16:00 17‐03‐2018 16:32:05 0:16 0.00004889 MUs prc burnt700 OLD SEELAMPUR, RAGHUVIR PURA‐KANTI NAGAR, OLD SEELAMPUR KRN 451 990 KVA UNPLANNED 17‐03‐2018 19:13:21 17‐03‐2018 19:56:21 0:42 0.00002333 MUs ab burnt
701 BLOCK X‐RAJGARH COLONY, CHAND MOHALLA‐RAJGARH COLONY KRN 21 630 KVA UNPLANNED 20‐03‐2018 11:23:52 20‐03‐2018 11:37:36 0:13 0.00000722 MUs702 OLD SEELAMPUR, OLD SEELAMPUR KRN 200 990 KVA UNPLANNED 20‐03‐2018 17:22:02 20‐03‐2018 17:55:00 0:32 0.00001778 MUs703 BLOCK X‐RAJGARH COLONY KRN 141 990 KVA UNPLANNED 20‐03‐2018 17:30:04 20‐03‐2018 18:47:01 1:16 0.00004222 MUs704 SHANKAR NAGAR EXTN‐AZAD NAGAR, RAGHUBARPURA NO 2‐SEELAMPUR, CHAND MOHALLA‐RAJGARH COLONY KRN 1424 990 KVA UNPLANNED 21‐03‐2018 14:23:59 21‐03‐2018 15:51:23 1:27 0.00038667 MUs ht ab burnt705 OLD SEELAMPUR, RAGHUVIR PURA‐KANTI NAGAR, OLD SEELAMPUR KRN 452 990 KVA UNPLANNED 21‐03‐2018 16:30:10 21‐03‐2018 17:02:51 0:32 0.00043556 MUs LT CABLE HANGING
DOWN706 SHANKAR NAGAR EXTN‐AZAD NAGAR, RAGHUBARPURA NO 2‐SEELAMPUR, CHAND MOHALLA‐RAJGARH COLONY KRN 1424 990 KVA UNPLANNED 22‐03‐2018 14:50:00 22‐03‐2018 16:46:08 1:56 0.00080556 MUs707 OLD SEELAMPUR, RAGHUVIR PURA‐KANTI NAGAR, OLD SEELAMPUR KRN 452 990 KVA UNPLANNED 23‐03‐2018 11:50:47 23‐03‐2018 12:09:38 0:18 0.00021 MUs PRC REPLACE708 RAGHUVIR PURA‐SHANKAR NAGAR, GEETA COLONY, OLD SEELAMPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE
GATE, RAGHUBARPURA NO 2‐SEELAMPUR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, RAGHUVIR PURA‐KANTI NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KRN 2191 990 KVA UNPLANNED 23‐03‐2018 12:30:00 23‐03‐2018 13:20:39 0:50 0.00044444 MUs
709 BLOCK X‐RAJGARH COLONY, MAHILA COLONY‐SEELAMPUR, CHAND MOHALLA‐RAJGARH COLONY, BLOCK 10‐RAGHUBARPURA NO 1
KRN 1529 630 KVA UNPLANNED 23‐03‐2018 15:05:00 23‐03‐2018 16:19:16 1:14 0.00032889 MUs affected area‐ parts of satsang mar, rajgarh & chand mohalla
710 OLD SEELAMPUR, OLD SEELAMPUR KRN 201 990 KVA UNPLANNED 23‐03‐2018 20:21:45 23‐03‐2018 20:37:23 0:15 0.00001667 MUs fir on pole711 BLOCK X‐RAJGARH COLONY, CHAND MOHALLA‐RAJGARH COLONY KRN 1303 990 KVA UNPLANNED 24‐03‐2018 11:51:46 24‐03‐2018 12:48:00 0:56 0.00020222 MUs712 WEST AZAD NAGAR, SHANKAR NAGAR EXTN‐AZAD NAGAR, BLOCK X‐RAJGARH COLONY, SHANKAR NAGAR‐AZAD
NAGARKRN 1395 990 KVA UNPLANNED 24‐03‐2018 12:45:06 24‐03‐2018 13:20:07 0:35 0.00031111 MUs
713 BLOCK D‐KRISHNA NAGAR, BLOCK A‐KRISHNA NAGAR, WEST AZAD NAGAR KRN 893 990 KVA UNPLANNED 26‐03‐2018 11:15:00 26‐03‐2018 12:11:53 0:56 0.00023333 MUs db repairing at a blk krn s/stn
714 BLOCK B‐KANTI NAGAR NORTH BLOCK B, BLOCK A‐KANTI NAGAR NORTH BLOCK A KRN 1575 990 KVA UNPLANNED 26‐03‐2018 12:38:00 26‐03‐2018 13:34:25 0:56 0.00037333 MUs DB REPAIR715 SHANKAR NAGAR EXTN‐AZAD NAGAR KRN 1114 990 KVA UNPLANNED 26‐03‐2018 16:30:00 26‐03‐2018 17:24:28 0:54 0.000195 MUs716 OLD SEELAMPUR, RAGHUVIR PURA‐KANTI NAGAR, OLD SEELAMPUR KRN 452 990 KVA UNPLANNED 27‐03‐2018 23:27:00 27‐03‐2018 23:52:23 0:25 0.00009722 MUs ab burnt717 BLOCK X‐RAJGARH COLONY KRN 141 990 KVA UNPLANNED 28‐03‐2018 11:20:00 28‐03‐2018 12:10:00 0:49 0.00002722 MUs718 SHANKAR NAGAR WEST‐AZAD NAGAR KRN 555 990 KVA UNPLANNED 28‐03‐2018 14:32:00 28‐03‐2018 16:12:00 1:40 0.00005556 MUs719 OLD SEELAMPUR, OLD SEELAMPUR KRN 207 990 KVA UNPLANNED 28‐03‐2018 14:34:43 28‐03‐2018 15:21:00 0:46 0.00002556 MUs720 RAGHUVIR PURA‐SHANKAR NAGAR, GEETA COLONY, OLD SEELAMPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE
GATE, RAGHUBARPURA NO 2‐SEELAMPUR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, RAGHUVIR PURA‐KANTI NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KRN 1558 990 KVA UNPLANNED 29‐03‐2018 12:59:56 29‐03‐2018 13:58:00 0:58 0.000725 MUs
721 RAGHUVIR PURA‐SHANKAR NAGAR, RAGHUVIR PURA‐KANTI NAGAR, OLD SEELAMPUR KRN 498 990 KVA UNPLANNED 29‐03‐2018 16:59:33 29‐03‐2018 17:31:00 0:31 0.00001722 MUs722 KANTI NAGAR SOUTH‐AZAD NAGAR KRN 184 630 KVA UNPLANNED 30‐03‐2018 13:05:00 30‐03‐2018 13:47:11 0:42 0.00012833 MUs EARTHING CONNECT 723 CHANDER NAGAR BLOCK C‐KRISHNA NAGAR EXTN., CHANDER NAGAR BLOCK D‐SHASTRI PARK, BLOCK D‐RAM NAGAR
EXTN., BLOCK F‐RAM NAGAR, CHANDER NAGAR BLOCK D‐KRISHNA NAGAR EXTN.KRN 749 990 KVA UNPLANNED 05‐03‐2018 16:20:00 05‐03‐2018 18:14:00 1:54 0.00069667 MUs LT CABLE BURNT
724 BLOCK D‐RADHEPURI EXTENSION KRN 74 990 KVA UNPLANNED 06‐03‐2018 11:52:00 06‐03‐2018 12:04:11 0:12 0.00001 MUs725 BLOCK B‐KRISHNA NAGAR EAST, BLOCK A‐KRISHNA NAGAR EAST, BLOCK J‐KRISHNA NAGAR EAST, BLOCK J‐KRISHNA
NAGAR EAST, KRISHNA NAGAR EAST BLOCK D‐RADHEPURI, KRISHNA NAGAR EAST BLOCK B‐RADHEPURI, JHEEL‐KRISHNA NAGAR BLOCK B
KRN 1515 990 KVA UNPLANNED 09‐03‐2018 11:50:15 09‐03‐2018 12:48:00 0:57 0.00020583 MUs
726 BLOCK F‐KRISHNA NAGAR KRN 203 990 KVA UNPLANNED 09‐03‐2018 18:06:59 09‐03‐2018 18:58:17 0:51 0.00002833 MUs727 CHANDER NAGAR BLOCK C‐PANDIT PARK, BLOCK A‐KRISHNA NAGAR, CHANDER NAGAR BLOCK C‐KRISHNA NAGAR
EXTN., JHEEL‐JHEEL KHURENJA, BLOCK B‐KRISHNA NAGAR BLOCK B, BLOCK A‐KRISHNA NAGAR BLOCK B, JHEEL‐GHONDALI, JHEEL‐KRISHNA NAGAR BLOCK B
KRN 1282 990 KVA UNPLANNED 12‐03‐2018 11:25:00 12‐03‐2018 13:15:27 1:50 0.00064167 MUs
728 JHEEL‐GHONDALI, JHEEL‐JHEEL KHURENJA, CHANDER NAGAR BLOCK C‐PANDIT PARK, JHEEL‐KRISHNA NAGAR BLOCK B, BLOCK B‐KRISHNA NAGAR BLOCK B, BLOCK A‐KRISHNA NAGAR BLOCK B, CHANDER NAGAR BLOCK C‐KRISHNA NAGAR EXTN., BLOCK A‐KRISHNA NAGAR
KRN 1282 990 KVA UNPLANNED 12‐03‐2018 14:03:00 12‐03‐2018 15:41:37 1:38 0.00043556 MUs
729 BLOCK A‐KRISHNA NAGAR, JHEEL‐JHEEL KHURENJA KRN 89 990 KVA UNPLANNED 14‐03‐2018 12:34:00 14‐03‐2018 12:46:45 0:12 0.00000667 MUs730 AZAD NAGAR EAST, BLOCK E‐KRISHNA NAGAR KRN 196 990 KVA UNPLANNED 14‐03‐2018 15:17:00 14‐03‐2018 16:12:00 0:54 0.00003 MUs S/STN‐WEST AZAD
NGR B&D BLK731 JHEEL‐GHONDALI, JHEEL‐JHEEL KHURENJA, CHANDER NAGAR BLOCK C‐PANDIT PARK, JHEEL‐KRISHNA NAGAR BLOCK
B, BLOCK B‐KRISHNA NAGAR BLOCK B, BLOCK A‐KRISHNA NAGAR BLOCK B, CHANDER NAGAR BLOCK C‐KRISHNA NAGAR EXTN., BLOCK A‐KRISHNA NAGAR
KRN 1279 990 KVA UNPLANNED 16‐03‐2018 12:18:00 16‐03‐2018 14:11:39 1:53 0.00065917 MUs
732 BLOCK B‐GHONDALI, BLOCK B‐BLOCK K, BLOCK B‐KRISHNA NAGAR BLOCK B, BLOCK K‐KRISHNA NAGAR, JHEEL‐KRISHNA NAGAR BLOCK B
KRN 957 990 KVA UNPLANNED 16‐03‐2018 13:20:45 16‐03‐2018 14:10:00 0:49 0.00016333 MUs DB REPAIRING
733 BLOCK E‐KRISHNA NAGAR KRN 59 630 KVA UNPLANNED 16‐03‐2018 15:55:22 16‐03‐2018 16:23:05 0:27 0.000015 MUs734 CHANDER NAGAR BLOCK D‐KRISHNA NAGAR EXTN., BLOCK F‐RAM NAGAR, CHANDER NAGAR BLOCK C‐KRISHNA
NAGAR EXTN., BLOCK D‐RAM NAGAR EXTN., CHANDER NAGAR BLOCK D‐SHASTRI PARKKRN 750 990 KVA UNPLANNED 17‐03‐2018 12:21:07 17‐03‐2018 13:40:07 1:19 0.00048278 MUs db repairing
735 CHANDER NAGAR‐KRISHNA NAGAR, CHANDER NAGAR BLOCK C‐KRISHNA NAGAR EXTN., CHANDER NAGAR BLOCK D‐KRISHNA NAGAR EXTN.
KRN 945 990 KVA UNPLANNED 17‐03‐2018 13:55:00 17‐03‐2018 14:15:48 0:20 0.00006667 MUs DB EARTHING
736 CHANDER NAGAR BLOCK D‐SHASTRI PARK, BLOCK D‐RAM NAGAR EXTN., BLOCK F‐RAM NAGAR KRN 156 990 KVA UNPLANNED 19‐03‐2018 14:34:32 19‐03‐2018 16:25:48 1:51 0.00006167 MUs737 BLOCK C‐KRISHNA NAGAR, BLOCK F‐KRISHNA NAGAR, BLOCK E‐KRISHNA NAGAR KRN 520 990 KVA UNPLANNED 23‐03‐2018 11:30:00 23‐03‐2018 11:52:54 0:22 0.00011 MUs738 BLOCK A‐KRISHNA NAGAR, BLOCK D‐KRISHNA NAGAR, BLOCK E‐KRISHNA NAGAR KRN 784 990 KVA UNPLANNED 23‐03‐2018 11:59:00 23‐03‐2018 12:34:01 0:35 0.00015556 MUs739 AZAD NAGAR EAST, BLOCK D‐KRISHNA NAGAR, BLOCK E‐KRISHNA NAGAR KRN 750 990 KVA UNPLANNED 24‐03‐2018 11:20:00 24‐03‐2018 11:57:53 0:37 0.00014389 MUs740 BLOCK E‐KRISHNA NAGAR KRN 23 990 KVA UNPLANNED 27‐03‐2018 12:05:00 27‐03‐2018 12:45:00 0:40 0.00002222 MUs741 BLOCK B‐KRISHNA NAGAR EAST, BLOCK J‐KRISHNA NAGAR EAST, BLOCK J‐KRISHNA NAGAR EAST, KRISHNA NAGAR
EAST BLOCK B‐RADHEPURI, JHEEL‐KRISHNA NAGAR BLOCK BKRN 190 990 KVA UNPLANNED 28‐03‐2018 11:19:04 28‐03‐2018 13:04:50 1:45 0.00005833 MUs
742 AZAD NAGAR EAST, BLOCK D‐KRISHNA NAGAR, BLOCK E‐KRISHNA NAGAR KRN 754 990 KVA UNPLANNED 29‐03‐2018 10:55:00 29‐03‐2018 11:07:53 0:12 0.00005 MUs db repair743 BLOCK J‐KRISHNA NAGAR EAST, BLOCK A‐KRISHNA NAGAR EAST, BLOCK J‐KRISHNA NAGAR EAST, BLOCK B‐KRISHNA
NAGAR EAST, KRISHNA NAGAR EAST BLOCK B‐RADHEPURI, KRISHNA NAGAR EAST BLOCK D‐RADHEPURI, JHEEL‐KRISHNA NAGAR BLOCK B
KRN 1518 990 KVA UNPLANNED 29‐03‐2018 11:00:00 29‐03‐2018 11:50:25 0:50 0.00048611 MUs
744 BLOCK C‐MAN SINGH NAGAR, BLOCK A‐MAN SINGH NAGAR, BLOCK B‐MAN SINGH NAGAR, PKT R‐BLOCK D, BLOCK B‐OLD MUSTAFABAD
KWN 1914 0 KVA UNPLANNED 04‐03‐2018 10:29:37 04‐03‐2018 12:14:52 1:45 0.00029167 MUs REPLACEMENT OF 25KVA HVDS TRANSFORMER AT GNO‐2 ZAUDDINPUR ON POLE NO‐VM17
745 GEETA COLONY, BLOCK B‐BHAGIRATHI VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐GANGA VIHAR, BLOCK G‐GANGA VIHAR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 1001 1260 KVA UNPLANNED 14‐03‐2018 13:00:00 14‐03‐2018 15:10:00 2:10 0 MUs RMU CONNECTING AT H‐BLK GANGA VIHAR
746 GEETA COLONY, BLOCK 5‐GEETA COLONY, BLOCK 7‐GEETA COLONY, BHAGIRATHI VIHAR KWN 149 0 KVA UNPLANNED 21‐03‐2018 15:03:22 21‐03‐2018 16:53:00 1:49 0.00060556 MUs hvds lead fault at pole no‐vt16 gali no‐1 tunda nagar
747 BLOCK B‐GOKUL PURI, BLOCK A‐GOKUL PURI, SANT NIRANKARI BHAVAN‐GANGA VIHAR KWN, PKT B‐BLOCK A KWN 1187 990 KVA UNPLANNED 26‐03‐2018 13:08:33 26‐03‐2018 15:03:00 1:54 0.00158333 MUs REPLACEMENT OF 990 KVA TRANSFORMER AT A‐BLK GOKULPURI
748 BLOCK A‐BABU NAGAR, BLOCK C‐GOVIND VIHAR, BLOCK D‐OLD MUSTAFABAD, OLD MUSTAFABAD‐ BLOCK C‐DAYALPUR, BHAJANPURA‐DAYALPUR
KWN 1551 990 KVA UNPLANNED 27‐03‐2018 12:21:02 27‐03‐2018 13:40:00 1:18 0.00043333 MUs
749 LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., TUNDA NAGAR‐BHAGIRATHI VIHAR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR
KWN 1401 0 KVA UNPLANNED 31‐03‐2018 14:50:00 31‐03‐2018 16:03:00 1:13 0.00060833 MUs
750 BLOCK A‐PREM VIHAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐NEW CHAUHAN PUR, LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAJANPURA‐DAYALPUR
KWN 1032 0 KVA UNPLANNED 01‐03‐2018 10:00:00 01‐03‐2018 11:20:00 1:19 0.00032917 MUs HVDS LEAD FAULT AT W887 GALI NO‐5 BHAGAT VIHAR
751 BLOCK A‐PREM VIHAR, BLOCK D‐PREM VIHAR, BLOCK B‐PREM VIHAR KWN 657 0 KVA UNPLANNED 01‐03‐2018 18:45:30 01‐03‐2018 19:40:00 0:54 0.0003 MUs HVDS LEAD FAULT AT XL872 80 FUTA RD MAHALAXMI VIHAR
752 BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C, PKT Y‐SHIV VIHAR, PKT D‐SHIV VIHAR, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C KWN 838 0 KVA UNPLANNED 05‐03‐2018 01:30:00 05‐03‐2018 02:29:11 0:59 0.00016389 MUs HVDS LEAD FAULTY AT B‐BLK GNO‐3 AMBIKA VIHAR ON POLE NO‐Y854
753 LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAGAT NAGAR‐DAYALPUR, BHAJANPURA‐DAYALPUR, BLOCK A‐PREM VIHAR, BLOCK B‐NEW CHAUHAN PUR
KWN 1032 0 KVA UNPLANNED 05‐03‐2018 19:03:00 05‐03‐2018 19:43:12 0:40 0.00016667 MUs hvds lead fault at gali no 1 bhagat vihar pole no‐ x‐080
754 LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAGAT NAGAR‐DAYALPUR, BHAJANPURA‐DAYALPUR, BLOCK A‐PREM VIHAR, BLOCK B‐NEW CHAUHAN PUR
KWN 1032 0 KVA UNPLANNED 07‐03‐2018 15:18:58 07‐03‐2018 15:58:40 0:39 0.00010833 MUs HVDS TR REPLACEMENT AT POLE NO. W874 GALI NO. 6 BHAGAT VIHAR
755 BLOCK A‐PREM VIHAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐NEW CHAUHAN PUR, LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAJANPURA‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 1032 0 KVA UNPLANNED 09‐03‐2018 11:52:23 09‐03‐2018 13:47:00 1:54 0.00063333 MUs HVDS 25 KVA FAULTY TRF REPLACEMENT AT POLE NO‐W881 GALI NO‐5 BHAGAT VIHAR
756 BLOCK CN‐MANGALAM VIHAR KWN 265 0 KVA UNPLANNED 12‐03‐2018 14:31:26 12‐03‐2018 15:29:00 0:57 0.00031667 MUs HVDS 25 KVA FAULTY TRF REPLACE AT POLE NO‐xh19 gali no‐2 a blk ph‐1 shiv vihar
757 BLOCK K‐WEST KARAWAL NAGAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK A‐KARAWAL NAGAR (DEHROTI), BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK K‐KARAWAL NAGAR (DEHROTI), BLOCK D‐WEST KARAWAL NAGAR
KWN 505 990 KVA UNPLANNED 13‐03‐2018 11:38:54 13‐03‐2018 13:25:47 1:46 0.00044167 MUs lt ab repair in aera
758 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BLOCK A‐PREM VIHAR, BLOCK A‐RAMA GARDEN, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 1276 630 KVA UNPLANNED 16‐03‐2018 13:32:28 16‐03‐2018 15:20:00 1:47 0.00059444 MUs replacement of ltab a‐blk gno‐9 prem nagar pole no‐kwnn694
759 BLOCK U‐SHIV VIHAR, BLOCK H‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR, BLOCK O‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, PKT R‐BLOCK A, PKT F‐BLOCK A, BLOCK V‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR
KWN 1836 0 KVA UNPLANNED 17‐03‐2018 12:03:34 17‐03‐2018 13:52:40 1:49 0.00045417 MUs POLE NO ‐Y 072 B BLOCK GALI NO ‐1 PREM VIHAR HVDS LEAD REPLACEMENT
760 BLOCK K‐WEST KARAWAL NAGAR, BLOCK B‐KARAWAL NAGAR (DEHROTI) KWN 326 990 KVA UNPLANNED 21‐03‐2018 15:35:55 21‐03‐2018 17:23:50 1:47 0.00118889 MUs at dall mill s/stn761 BLOCK A‐RAMA GARDEN, BLOCK A‐HARIJAN BASTI, FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK B‐HARIJAN BASTI,
BLOCK B‐NEW CHAUHAN PURKWN 685 990 KVA UNPLANNED 23‐03‐2018 11:31:15 23‐03‐2018 12:00:00 0:28 0.00023333 MUs meter replacement by
kcc department762 BLOCK H‐WEST KARAWAL NAGAR, BLOCK K‐WEST KARAWAL NAGAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK A‐
KARAWAL NAGAR (DEHROTI), BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK K‐KARAWAL NAGAR (DEHROTI), BLOCK D‐WEST KARAWAL NAGAR
KWN 509 990 KVA UNPLANNED 26‐03‐2018 14:29:38 26‐03‐2018 15:48:00 1:18 0.00043333 MUs
763 PKT B‐BLOCK B, PKT A‐BLOCK E, BLOCK 3A‐SADAT PUR, PKT EA‐BLOCK B, PKT D‐BLOCK B, PKT D‐BLOCK A, PKT C‐BLOCK A, PKT E‐BLOCK A, PKT B‐BLOCK A, PKT G‐BLOCK A
KWN 924 0 KVA UNPLANNED 27‐03‐2018 12:50:37 27‐03‐2018 14:40:00 1:49 0.00060556 MUs
764 BLOCK K‐WEST KARAWAL NAGAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK A‐KARAWAL NAGAR (DEHROTI), BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK K‐KARAWAL NAGAR (DEHROTI), BLOCK D‐WEST KARAWAL NAGAR
KWN 488 990 KVA UNPLANNED 27‐03‐2018 12:52:03 27‐03‐2018 14:47:00 1:54 0.00031667 MUs
765 BLOCK B‐KARAWAL NAGAR (DEHROTI), FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK B‐HARIJAN BASTI KWN 330 990 KVA UNPLANNED 28‐03‐2018 12:44:57 28‐03‐2018 14:30:36 1:45 0.00058333 MUs TO CONNECT LT CABLE AT MAIN KARAWAL NAGAR CHOWK OPPOSITE DTC DEPOT ON POLE NO‐N289
766 BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C, PKT Y‐SHIV VIHAR, PKT D‐SHIV VIHAR, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C KWN 846 0 KVA UNPLANNED 28‐03‐2018 14:53:42 28‐03‐2018 16:10:37 1:16 0.00031667 MUs HVDS LEAD FAULTY AT B‐BLK GNO‐15/3 AMBIKA VIHAR ON POLE NO‐Y270
767 BLOCK A‐KARAWAL NAGAR (DEHROTI), BLOCK D‐WEST KARAWAL NAGAR, BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK B‐BHAGAT SINGH COLONY, BLOCK K‐KARAWAL NAGAR (DEHROTI), BLOCK K‐WEST KARAWAL NAGAR
KWN 509 990 KVA UNPLANNED 28‐03‐2018 16:08:00 28‐03‐2018 17:05:00 0:56 0.00038889 MUs PRC BURNT AT MAIN PUSTA ROAD KARAWAL NAGAR VILLAGE ON POLE NO‐N316
768 BLOCK D‐SHIV VIHAR, BLOCK U‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK O‐SHIV VIHAR, BLOCK H‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR
KWN 1421 0 KVA UNPLANNED 28‐03‐2018 17:44:07 28‐03‐2018 18:38:09 0:54 0.00015 MUs HVDS LEAD FAULTY AT GNO‐14 PHASE‐6 SHIV VIHAR ON POLE NO‐Y093
769 BLOCK D‐SHIV VIHAR, BLOCK U‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK O‐SHIV VIHAR, BLOCK H‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR
KWN 1837 0 KVA UNPLANNED 29‐03‐2018 10:24:07 29‐03‐2018 12:04:44 1:40 0.00041667 MUs HVDS LEAD FAULT AT GALI NO‐16 POLE NO‐Y097 PH‐6 SHIV VIHAR
770 BLOCK U‐SHIV VIHAR, BLOCK H‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR, BLOCK S‐SHIV VIHAR, BLOCK O‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, PKT X‐SHIV VIHAR, PKT R‐BLOCK A, BLOCK J‐SHIV VIHAR
KWN 1837 0 KVA UNPLANNED 29‐03‐2018 14:13:17 29‐03‐2018 15:33:00 1:19 0.00043889 MUs HVDS LEAD FAULT at pole no‐z494 gali no‐3 ph‐4 shiv vihar
771 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NEW CHAUHAN PUR, PKT 1‐BLOCK A, BLOCK B‐NEW CHAUHAN PUR, BLOCK 3B‐SADAT PUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK B‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DEEKSHA MAHILA COLLAGE‐DAYALPUR EXTN., BLOCK E‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., BLOCK A‐NEHRU VIHAR, BHAGAT NAGAR‐DAYALPUR, BLOCK 1D‐SADAT PUR, BLOCK 2C‐SADAT PUR, BLOCK M‐SHIV VIHAR, BLOCK A‐MUSTAFABAD (DAYALPUR), PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK D‐NEW CHAUHAN PUR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., BLOCK F‐SADAT PUR, BLOCK 1B‐SADAT PUR, BLOCK C2‐NEW CHAUHAN PUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK 5B SADAT PUR
KWN 1175 990 KVA UNPLANNED 29‐03‐2018 17:09:31 29‐03‐2018 17:39:32 0:30 0.000125 MUs gno‐ 2 village panchyat ghar hvds lead fault
772 BLOCK H‐WEST KARAWAL NAGAR, BLOCK K‐WEST KARAWAL NAGAR, PKT B‐BLOCK B, PKT A‐BLOCK E, BLOCK B‐NEW CHAUHAN PUR, WEST KARAWAL NAGAR, BLOCK 3A‐SADAT PUR, PKT EA‐BLOCK B, PKT D‐BLOCK B, BLOCK C‐SHERPUR, BLOCK A‐KARAWAL NAGAR (DEHROTI), BLOCK B‐KARAWAL NAGAR (DEHROTI), PKT D‐BLOCK A, PKT C‐BLOCK A, PKT E‐BLOCK A, PKT B‐BLOCK A, PKT G‐BLOCK A, BLOCK D‐WEST KARAWAL NAGAR, BLOCK A‐HARIJAN BASTI, BLOCK D‐WEST KARAWAL NAGAR
KWN 924 0 KVA UNPLANNED 30‐03‐2018 02:15:30 30‐03‐2018 03:31:16 1:15 0.0003125 MUs a‐b blk west karwal nagar hvds fault
773 BLOCK U‐SHIV VIHAR, BLOCK H‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR, BLOCK O‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, PKT X‐SHIV VIHAR, PKT R‐BLOCK A, BLOCK H‐SHIV VIHAR
KWN 1837 0 KVA UNPLANNED 30‐03‐2018 16:14:10 30‐03‐2018 18:00:00 1:45 0.00029167 MUs HVDS LEAD AT GALI NO 6,PHASE 6,POLE NO 054
774 BLOCK H‐WEST KARAWAL NAGAR, PKT B‐BLOCK B, PKT A‐BLOCK E, BLOCK 3A‐SADAT PUR, PKT EA‐BLOCK B, PKT D‐BLOCK B, BLOCK H‐SHIV VIHAR, BLOCK C‐SHERPUR, PKT D‐BLOCK A, PKT C‐BLOCK A, PKT E‐BLOCK A, PKT B‐BLOCK A, PKT G‐BLOCK A, BLOCK D‐WEST KARAWAL NAGAR, BLOCK A‐HARIJAN BASTI
KWN 924 0 KVA UNPLANNED 31‐03‐2018 10:02:37 31‐03‐2018 10:43:05 0:40 0.00022222 MUs x‐144, gali no‐4, a‐blk karawal nagar
775 LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAGAT NAGAR‐DAYALPUR, BHAJANPURA‐DAYALPUR, BLOCK A‐PREM VIHAR, BLOCK B‐NEW CHAUHAN PUR
KWN 1033 0 KVA UNPLANNED 31‐03‐2018 10:48:01 31‐03‐2018 11:45:37 0:57 0.000475 MUs w‐881 hvds tr faulty
776 SHIV VIHAR, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C KWN 93 0 KVA UNPLANNED 31‐03‐2018 10:49:16 31‐03‐2018 11:40:19 0:51 0.000425 MUs c‐blk 33 futta road ambika vihar pole no‐xg43,44,4545
777 BLOCK H‐SHIV VIHAR, BLOCK K‐SHIV VIHAR, BLOCK S‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK J‐SHIV VIHAR KWN 1307 0 KVA UNPLANNED 31‐03‐2018 14:31:58 31‐03‐2018 15:53:25 1:21 0.000675 MUs POLE OP‐Z‐181,33 FUTTA ROAD PHASE ‐5 SHIV VIHAR
778 PKT W‐BLOCK A, BLOCK U‐SHIV VIHAR, PKT C‐SHIV VIHAR, PKT X‐SHIV VIHAR, PKT R‐BLOCK A, PKT A‐BLOCK A, PKT F‐BLOCK A, BLOCK B‐SHIV VIHAR, PKT C‐BLOCK B, PKT D‐BLOCK B, PKT W‐BLOCK A
KWN 3001 0 KVA UNPLANNED 31‐03‐2018 16:14:01 31‐03‐2018 17:18:35 1:4 0.00053333 MUs x‐181, MAIN 33 FUTTA ROAD A/1PREM VIHAR
779 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 169 0 KVA UNPLANNED 01‐03‐2018 14:38:12 01‐03‐2018 15:27:59 0:49 0.00020417 MUs HVDS LEAD FAULT AT POLE NO‐V905 GALI NO‐21 PART‐4 SONIA VIHAR
780 BLOCK F‐NEHRU VIHAR, BLOCK 9‐GANDHI NAGAR, BLOCK M‐NEHRU VIHAR, BLOCK E‐NEHRU VIHAR, BLOCK D‐NEHRU VIHAR
KWN 1308 630 KVA UNPLANNED 07‐03‐2018 14:01:21 07‐03‐2018 15:56:00 1:54 0.00031667 MUs TO CONNECT NEW CABLE
781 BLOCK F‐NEHRU VIHAR, BLOCK 9‐GANDHI NAGAR, BLOCK M‐NEHRU VIHAR, BLOCK E‐NEHRU VIHAR KWN 1308 630 KVA UNPLANNED 09‐03‐2018 11:14:14 09‐03‐2018 12:03:57 0:49 0.00034028 MUs lt acb replacement at c‐1 nehru vihar s/stn
782 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 2383 0 KVA UNPLANNED 09‐03‐2018 12:51:30 09‐03‐2018 13:47:58 0:56 0.00031111 MUs POLE PAINT WORK
783 BLOCK D‐NEHRU VIHAR, BLOCK F‐NEHRU VIHAR, BLOCK C‐TUKMIRPUR, BLOCK D‐KHAJURI KHAS, BLOCK B‐CHANDU NAGAR, MUSTAFABAD‐MUNGA NAGAR, PKT R‐BLOCK D, CLOCK C‐BIHARIPUR, BLOCK A‐NEHRU VIHAR, BLOCK C‐NEHRU VIHAR, BLOCK B‐NEHRU VIHAR, BLOCK D‐SHERPUR, BLOCK C‐SHERPUR, BLOCK D‐TUKMIRPUR, BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK K‐KARAWAL NAGAR (DEHROTI), CHAUHAN PATTI‐VIJAY VIHAR, BLOCK A1‐MUNGA NAGAR
KWN 5622 4630 KVA UNPLANNED 13‐03‐2018 12:30:00 13‐03‐2018 13:03:00 0:33 0.00051333 MUs REFILLING OF GAS BY VENDER
784 BLOCK D‐NEHRU VIHAR, BLOCK F‐NEHRU VIHAR, BLOCK 9‐GANDHI NAGAR, BLOCK M‐NEHRU VIHAR, BLOCK B‐NEHRU VIHAR, BLOCK E‐NEHRU VIHAR
KWN 2634 630 KVA UNPLANNED 14‐03‐2018 16:01:38 14‐03‐2018 17:50:00 1:48 0.0006 MUs
785 BLOCK A‐TUKMIRPUR, BLOCK C‐TUKMIRPUR, MUSTAFABAD‐MUNGA NAGAR, BLOCK B‐MUSTAFABAD (DAYALPUR), CLOCK C‐BIHARIPUR, BLOCK F‐MUSTAFABAD (DAYALPUR), BLOCK A‐MUSTAFABAD (DAYALPUR), BLOCK D‐MUSTAFABAD (DAYALPUR)
KWN 1887 990 KVA UNPLANNED 15‐03‐2018 11:28:00 15‐03‐2018 12:58:00 1:30 0.00025 MUs HT AB REPLACEMENT AT TUKMIRPUR VILL
786 LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 988 630 KVA UNPLANNED 16‐03‐2018 12:10:50 16‐03‐2018 13:30:30 1:19 0.00021944 MUs repaired work of lt cable at e‐blk ram leela ground s/stn.
787 LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, LIG/MIG RES/NON COMM AREA‐MILAN GARDEN KWN 32 630 KVA UNPLANNED 20‐03‐2018 17:09:45 20‐03‐2018 17:44:43 0:34 0.00006611 MUs replacement of damage lt pole at a‐blk gno‐1 milan garden near prakash farm house pole no‐j115
788 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 1600 0 KVA UNPLANNED 21‐03‐2018 15:27:32 21‐03‐2018 16:30:00 1:2 0.00025833 MUs hvds lead fault pole no‐m644 gali no‐8 g‐3 svr
789 BLOCK A‐SADAT PUR, PKT C2‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK 5C‐SADAT PUR, PKT C3‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT C1‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK
KWN 1050 990 KVA UNPLANNED 22‐03‐2018 12:34:38 22‐03‐2018 14:10:31 1:35 0.00079167 MUs for raising lt cable on pole
790 GURU ANGAD NAGAR EAST‐SWASTHYA VIHAR, BLOCK C‐KHAJURI KHAS, BLOCK A‐KHAJURI KHAS, BLOCK J‐KHAJURI KHAS, LIG/MIG RES/NON COMM AREA‐BLOCK B, BLOCK I‐KHAJURI KHAS EXTN.
KWN 4033 630 KVA UNPLANNED 26‐03‐2018 11:37:11 26‐03‐2018 12:10:00 0:32 0.00017778 MUs
791 BLOCK A‐SADAT PUR, PKT C2‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK 5C‐SADAT PUR, PKT C3‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT C1‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK
KWN 1050 990 KVA UNPLANNED 26‐03‐2018 12:50:21 26‐03‐2018 14:10:00 1:19 0.00043889 MUs
792 LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, LIG/MIG RES/NON COMM AREA‐SABHEPUR, LIG/MIG RES/NON COMM AREA‐MILAN GARDEN, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 759 630 KVA UNPLANNED 26‐03‐2018 12:56:21 26‐03‐2018 14:03:00 1:6 0.00161333 MUs
793 BLOCK C‐KHAJURI KHAS, BLOCK A‐KHAJURI KHAS, LIG/MIG RES/NON COMM AREA‐BLOCK B KWN 532 630 KVA UNPLANNED 26‐03‐2018 15:40:00 26‐03‐2018 16:20:00 0:40 0.00033333 MUs794 BLOCK A‐CHAND BAGH, BLOCK C‐BRIJ PURI, BLOCK B‐CHAND BAGH, BLOCK F‐BRIJ PURI KWN 1492 630 KVA UNPLANNED 26‐03‐2018 18:19:29 26‐03‐2018 19:08:25 0:48 0.0004 MUs795 BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK, BLOCK A‐SADAT PUR,
BLOCK 5C‐SADAT PUR, PKT C1‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, PKT C2‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, PKT C3‐SADATPUR EXT‐PUSTA AREA‐K BLOCK
KWN 1067 990 KVA UNPLANNED 27‐03‐2018 12:22:11 27‐03‐2018 13:20:00 0:57 0.00015833 MUs
796 BLOCK 3B‐SADAT PUR, PKT 2A‐BLOCK A, BLOCK 3A‐SADAT PUR, BLOCK 4C‐SADAT PUR, BLOCK 3C‐SADAT PUR, BLOCK 6C‐SADAT PUR, BLOCK 2C‐SADAT PUR, BLOCK 5B‐SADAT PUR, BLOCK 4B‐SADAT PUR, BLOCK 3A‐BLOCK B, PKT A‐BLOCK B, PKT EA‐BLOCK B, PKT F‐BLOCK B, PKT E‐BLOCK B, PKT 1‐BLOCK A, PKT E‐BLOCK A, PKT B‐BLOCK A, PKT G‐BLOCK A, PKT F‐BLOCK A
KWN 1492 990 KVA UNPLANNED 27‐03‐2018 13:45:20 27‐03‐2018 14:30:00 0:44 0.00024444 MUs
797 BLOCK A‐SADAT PUR, PKT C2‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK 5C‐SADAT PUR, PKT C3‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT C1‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK
KWN 1050 990 KVA UNPLANNED 30‐03‐2018 15:44:36 30‐03‐2018 17:25:06 1:40 0.00005556 MUs TO CONNECT NEW lt CABLE
798 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 935 400 KVA UNPLANNED 30‐03‐2018 18:40:00 30‐03‐2018 19:19:16 0:39 0.00021667 MUs
799 BLOCK B‐VINOD NAGAR WEST, BLOCK D‐VINOD NAGAR WEST, J.J. COLONY‐MOTHER DAIRY, BLOCK C‐MANDAWALI VILLAGE, BLOCK D‐MANDAWALI VILLAGE
LNR 2661 630 KVA UNPLANNED 01‐03‐2018 15:41:00 01‐03‐2018 15:48:00 0:7 0.00010694 MUs
800 FAZALPUR‐MANDAWALI VILLAGE, BLOCK D‐MANDAWALI VILLAGE, RAILWAY COLONY‐MANDAWALI VILLAGE LNR 1984 990 KVA UNPLANNED 03‐03‐2018 14:51:30 03‐03‐2018 15:40:06 0:48 0.00013333 MUs lt cable energised801 BHARTI COLONY‐NIRMAN VIHAR, BLOCK C‐VINOD NAGAR WEST, BLOCK A‐VINOD NAGAR EAST, BLOCK D‐
MANDAWALI VILLAGE, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK BLNR 41 990 KVA UNPLANNED 05‐03‐2018 06:47:03 05‐03‐2018 12:51:23 6:4 0.00151667 MUs
802 BLOCK J‐PANDAV NAGAR, BLOCK B‐GANESH NAGAR, BLOCK C‐GANESH NAGAR, BLOCK E‐GANESH NAGAR LNR 3109 990 KVA UNPLANNED 06‐03‐2018 11:15:00 06‐03‐2018 13:03:00 1:48 0.0003 MUs
803 BLOCK C‐PANDAV NAGAR, BLOCK D‐PANDAV NAGAR, BLOCK A‐PANDAV NAGAR, BLOCK J‐PANDAV NAGAR, BLOCK B‐VINOD NAGAR WEST, BLOCK D‐VINOD NAGAR WEST, BLOCK A‐GANESH NAGAR, BLOCK B‐GANESH NAGAR, BLOCK C‐GANESH NAGAR, PANDAV NAGAR BLOCK D‐GANESH NAGAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, FAZALPUR‐MANDAWALI VILLAGE, BLOCK C‐LALITA PARK, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐CHANDER VIHAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 2000 630 KVA UNPLANNED 06‐03‐2018 13:04:25 06‐03‐2018 14:34:55 1:30 0.00025 MUs lt ab installation
804 BLOCK E‐GANESH NAGAR, BLOCK B‐GANESH NAGAR, BLOCK C‐GANESH NAGAR, BLOCK J‐PANDAV NAGAR LNR 3109 990 KVA UNPLANNED 06‐03‐2018 14:25:00 06‐03‐2018 16:03:00 1:37 0.00026944 MUs maintenance team working
805 BLOCK A‐VINOD NAGAR EAST, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, FAZALPUR‐MANDAWALI VILLAGE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D‐MANDAWALI VILLAGE, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 2007 990 KVA UNPLANNED 07‐03‐2018 11:37:00 07‐03‐2018 12:40:43 1:3 0.000175 MUs lt cable installation
806 RAILWAY COLONY‐MANDAWALI VILLAGE, BLOCK D‐PREET VIHAR, FAZALPUR‐MANDAWALI VILLAGE, BLOCK H‐MANDAWALI VILLAGE
LNR 1627 990 KVA UNPLANNED 08‐03‐2018 10:43:08 08‐03‐2018 11:36:18 0:53 0.00014722 MUs lt CABLE FAULTY
807 BLOCK B‐VINOD NAGAR EAST LNR 796 990 KVA UNPLANNED 08‐03‐2018 15:55:47 08‐03‐2018 16:44:02 0:48 0.00013333 MUs lt ab conductor installation
808 BLOCK C‐PANDAV NAGAR, BLOCK J‐PANDAV NAGAR, PANDAV NAGAR‐PANDAV NAGAR LNR LNR 915 400 KVA UNPLANNED 10‐03‐2018 11:50:00 10‐03‐2018 13:40:00 1:50 0.00021389 MUs lt circuit energised809 BLOCK C‐PANDAV NAGAR, BLOCK J‐PANDAV NAGAR, BLOCK B‐GANESH NAGAR, PANDAV NAGAR‐PANDAV NAGAR LNR LNR 1469 990 KVA UNPLANNED 13‐03‐2018 12:18:00 13‐03‐2018 14:03:00 1:45 0.00029167 MUs work on lt cable
810 RAILWAY COLONY‐MANDAWALI VILLAGE, BLOCK D‐MANDAWALI VILLAGE, FAZALPUR‐MANDAWALI VILLAGE LNR 1984 990 KVA UNPLANNED 14‐03‐2018 11:07:25 14‐03‐2018 12:19:29 1:12 0.0002 MUs pole removal from s/stn
811 RAILWAY COLONY‐MANDAWALI VILLAGE, BLOCK D‐PREET VIHAR, FAZALPUR‐MANDAWALI VILLAGE, BLOCK H‐MANDAWALI VILLAGE
LNR 1628 990 KVA UNPLANNED 14‐03‐2018 15:40:00 14‐03‐2018 17:32:33 1:52 0.00031111 MUs ACB SHIFTING WORK
812 BLOCK J‐PANDAV NAGAR, BLOCK C‐PANDAV NAGAR, PANDAV NAGAR‐PANDAV NAGAR LNR LNR 915 400 KVA UNPLANNED 15‐03‐2018 12:45:40 15‐03‐2018 14:37:36 1:51 0.00030833 MUs lt ab installation813 BLOCK C‐VINOD NAGAR WEST, BLOCK A‐VINOD NAGAR EAST, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐
KASHMERE GATE, FAZALPUR‐MANDAWALI VILLAGE, BLOCK A‐MANDAWALI, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D‐MANDAWALI VILLAGE, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 2023 990 KVA UNPLANNED 17‐03‐2018 19:14:57 17‐03‐2018 20:52:17 1:37 0.00026944 MUs
814 BLOCK J‐PANDAV NAGAR, BLOCK C‐PANDAV NAGAR, PANDAV NAGAR‐PANDAV NAGAR LNR LNR 915 400 KVA UNPLANNED 20‐03‐2018 11:07:50 20‐03‐2018 11:52:51 0:45 0.000125 MUs LT CABLE ENERGISED815 FAJALPUR‐MANDAWALI, BLOCK H‐MANDAWALI VILLAGE LNR 559 400 KVA UNPLANNED 22‐03‐2018 14:43:14 22‐03‐2018 16:13:21 1:30 0.00025 MUs lt ab conductor
installation816 BLOCK J‐PANDAV NAGAR, BLOCK C‐PANDAV NAGAR, PANDAV NAGAR‐PANDAV NAGAR LNR LNR 916 400 KVA UNPLANNED 22‐03‐2018 14:45:00 22‐03‐2018 16:26:04 1:41 0.00042083 MUs maintenance team
working817 BLOCK A‐CHANDER VIHAR LNR 371 630 KVA UNPLANNED 24‐03‐2018 11:07:49 24‐03‐2018 11:48:00 0:40 0.00016667 MUs maintenance team
working818 RAILWAY COLONY‐MANDAWALI VILLAGE, BLOCK D‐PREET VIHAR, FAZALPUR‐MANDAWALI VILLAGE, BLOCK H‐
MANDAWALI VILLAGELNR 1628 990 KVA UNPLANNED 24‐03‐2018 13:46:16 24‐03‐2018 15:07:39 1:21 0.0003375 MUs
819 BLOCK D‐PANDAV NAGAR, BLOCK C‐PANDOW NAGAR LNR 139 990 KVA UNPLANNED 26‐03‐2018 10:10:00 26‐03‐2018 11:40:00 1:30 0.00025 MUs sparking on lt cable 4*300. team working
820 BLOCK C‐PANDAV NAGAR, BLOCK B‐GANESH NAGAR, BLOCK J‐PANDAV NAGAR, PANDAV NAGAR‐PANDAV NAGAR LNR LNR 1473 990 KVA UNPLANNED 27‐03‐2018 13:41:06 27‐03‐2018 15:30:29 1:49 0.00030278 MUs pole straightening work.
821 BLOCK D‐PANDAV NAGAR, BLOCK A‐PANDAV NAGAR LNR 139 990 KVA UNPLANNED 27‐03‐2018 14:45:00 27‐03‐2018 16:02:43 1:17 0.00021389 MUs work on lt cable 4*300
822 BLOCK D‐PANDAV NAGAR LNR 139 990 KVA UNPLANNED 27‐03‐2018 19:14:41 27‐03‐2018 20:30:00 1:15 0.00020833 MUs823 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, FAZALPUR‐MANDAWALI VILLAGE, PKT R‐BLOCK
D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 720 400 KVA UNPLANNED 29‐03‐2018 13:42:09 29‐03‐2018 15:02:40 1:20 0.00022222 MUs LOAD BALANCING
824 GURU RAMDAS NAGAR‐LAKSHMI NAGAR, EAST END ENCLAVE‐LAKSHMI NAGAR, KRISHAN KUNJ‐LAKSHMI NAGAR, BLOCK B‐PRIYADARSANI VIHAR, GYAN KUNJ‐WEST GURU ANGAD NAGAR
LNR 763 990 KVA UNPLANNED 01‐03‐2018 10:20:00 01‐03‐2018 11:17:00 0:56 0.00015556 MUs
825 BLOCK J & K‐NARAYAN NAGAR, RAMESH PARK‐NARAYAN NAGAR, BLOCK C‐LALITA PARK LNR 746 990 KVA UNPLANNED 01‐03‐2018 15:20:23 01‐03‐2018 15:43:58 0:23 0.00006389 MUs SUSPECTED CABLE FAULTY
826 LAXMI NAGAR COMMERCIAL COPLEX‐SWASTHYA VIHAR, BLOCK B‐GURU ANGAD NAGAR WEST, BLOCK F‐GURU ANGAD NAGAR WEST, BLOCK C‐GURU ANGAD NAGAR WEST, MOHAN PARK‐WEST GURU ANGAD NAGAR
LNR 949 990 KVA UNPLANNED 03‐03‐2018 13:25:00 03‐03‐2018 14:10:00 0:45 0.000125 MUs work on bus bar box
827 BLOCK F‐GURU ANGAD NAGAR WEST, GYAN KUNJ‐WEST GURU ANGAD NAGAR, MOHAN PARK‐WEST GURU ANGAD NAGAR
LNR 840 990 KVA UNPLANNED 05‐03‐2018 11:03:00 05‐03‐2018 12:28:00 1:25 0.00023611 MUs workiing on prc
828 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK G‐LAKSHMI NAGAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐LAKSHMI NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 1363 990 KVA UNPLANNED 06‐03‐2018 11:27:52 06‐03‐2018 12:15:58 0:48 0.00026667 MUs RUM REPAIR WORK BY WORKSHOP TEAM
829 GYAN KUNJ‐WEST GURU ANGAD NAGAR, MOHAN PARK‐WEST GURU ANGAD NAGAR, BLOCK F‐GURU ANGAD NAGAR WEST
LNR 840 990 KVA UNPLANNED 06‐03‐2018 11:54:10 06‐03‐2018 12:21:12 0:27 0.000075 MUs dt meter work
830 SHAKARPUR EXTN.‐SHAKARPUR KHAS LNR 822 990 KVA UNPLANNED 08‐03‐2018 11:45:00 08‐03‐2018 12:20:00 0:35 0.00009722 MUs supporting pole standing for lt pole
831 LAXMI NAGAR COMMERCIAL COPLEX‐SWASTHYA VIHAR, BLOCK A‐GURU RAMDAS NAGAR, BLOCK B‐GURU ANGAD NAGAR WEST, BLOCK C‐GURU ANGAD NAGAR WEST, BLOCK F‐LALITA PARK, BLOCK A‐LALITA PARK
LNR 922 990 KVA UNPLANNED 08‐03‐2018 13:00:28 08‐03‐2018 15:50:00 2:49 0.00093889 MUs trandformer replace due to over load on transformer 990kva. ester oil transformer install 990kva
832 BLOCK J & K‐NARAYAN NAGAR, LAKSHMI NAGAR BLOCK J&K LNR 981 990 KVA UNPLANNED 13‐03‐2018 19:10:00 13‐03‐2018 22:20:00 3:10 0.00052778 MUs833 BLOCK G‐SHAKARPUR KHAS, BLOCK R&A‐SHAKARPUR KHAS, SHAKARPUR EXTN.‐SHAKARPUR KHAS, KUNDAN NAGAR‐
LAKSHMI NAGARLNR 1011 990 KVA UNPLANNED 16‐03‐2018 11:40:00 16‐03‐2018 15:32:33 3:52 0.00128889 MUs lugs theft by someone
834 BLOCK J & K‐NARAYAN NAGAR, RAMESH PARK‐NARAYAN NAGAR, BLOCK C‐LALITA PARK LNR 747 990 KVA UNPLANNED 17‐03‐2018 11:55:00 17‐03‐2018 13:47:46 1:52 0.00031111 MUs835 BLOCK J & K‐NARAYAN NAGAR, RAMESH PARK‐NARAYAN NAGAR, BLOCK C‐LALITA PARK LNR 747 990 KVA UNPLANNED 17‐03‐2018 15:12:00 17‐03‐2018 16:30:05 1:18 0.00021667 MUs work on lt cable836 GANESH NAGAR EXTN.‐SHAKARPUR KHAS, LAXMI NAGAR COMMERCIAL COPLEX‐SWASTHYA VIHAR, BLOCK B‐GURU
ANGAD NAGAR WEST, BLOCK D‐LALITA PARK, BLOCK G‐LAKSHMI NAGAR, LAKSHMI NAGAR BLOCK L, BLOCK K‐JAGAT RAM PARK, RAMESH PARK‐NARAYAN NAGAR, BLOCK F‐LALITA PARK
LNR 854 630 KVA UNPLANNED 19‐03‐2018 13:03:00 19‐03‐2018 16:20:00 3:17 0.00109444 MUs new repair transformer replacement due to oil leakage 990 kva.
837 BLOCK C‐LALITA PARK, BLOCK E‐LAKSHMI NAGAR, BLOCK F‐LALITA PARK, BLOCK E‐LALITA PARK LNR 496 990 KVA UNPLANNED 19‐03‐2018 19:27:07 19‐03‐2018 20:26:00 0:58 0.00016111 MUs
838 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK S‐SCHOOL BLOCK, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 1896 630 KVA UNPLANNED 21‐03‐2018 13:47:03 21‐03‐2018 16:46:09 2:59 0.00074583 MUs low ir‐630 kva transformer
839 SHAKARPUR EXTN.‐SHAKARPUR KHAS LNR 822 990 KVA UNPLANNED 22‐03‐2018 17:08:25 22‐03‐2018 17:36:26 0:28 0.00007778 MUs840 EAST END ENCLAVE‐LAKSHMI NAGAR, BLOCK B‐PRIYADARSANI VIHAR LNR 134 990 KVA UNPLANNED 22‐03‐2018 18:52:20 22‐03‐2018 19:25:00 0:32 0.00008889 MUs841 GANESH NAGAR‐SHAKARPUR KHAS, BLOCK WA&O‐SHAKARPUR KHAS, BLOCK S‐SHAKARPUR KHAS, BLOCK G‐LAKSHMI
NAGARLNR 1214 990 KVA UNPLANNED 23‐03‐2018 13:33:00 23‐03‐2018 15:05:00 1:31 0.00025278 MUs over heating transfor
842 GANESH NAGAR‐SHAKARPUR KHAS, BLOCK WA&O‐SHAKARPUR KHAS, BLOCK S‐SHAKARPUR KHAS LNR 1917 990 KVA UNPLANNED 23‐03‐2018 15:55:33 23‐03‐2018 17:00:00 1:4 0.00017778 MUs fluctuation in area843 GANESH NAGAR‐SHAKARPUR KHAS, BLOCK WA&O‐SHAKARPUR KHAS, BLOCK S‐SHAKARPUR KHAS, BLOCK WA‐
SHAKARPUR KHASLNR 1019 990 KVA UNPLANNED 24‐03‐2018 01:40:19 24‐03‐2018 03:03:01 1:22 0.00022778 MUs
844 BLOCK A‐GURU RAMDAS NAGAR, BLOCK K‐JAGAT RAM PARK, GURU RAMDAS NAGAR‐LAKSHMI NAGAR LNR 2074 990 KVA UNPLANNED 24‐03‐2018 11:34:26 24‐03‐2018 11:58:00 0:23 0.00009583 MUs oil change845 BLOCK S1‐SCHOOL BLOCK LNR 1246 990 KVA UNPLANNED 24‐03‐2018 12:45:48 24‐03‐2018 14:03:00 1:17 0.00032083 MUs846 BLOCK S1‐SCHOOL BLOCK, NEHRU ENCLAVE‐SCHOOL BLOCK LNR 304 990 KVA UNPLANNED 25‐03‐2018 11:02:19 25‐03‐2018 11:33:34 0:31 0.00008611 MUs847 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK S‐SCHOOL BLOCK, PKT R‐BLOCK D,
BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 1896 630 KVA UNPLANNED 26‐03‐2018 13:00:28 26‐03‐2018 13:55:00 0:54 0.00015 MUs testing of transformer
848 BLOCK B‐GURU ANGAD NAGAR WEST, BLOCK F‐GURU ANGAD NAGAR WEST, BLOCK C‐LALITA PARK, BLOCK F‐LALITA PARK, BLOCK C‐MANDAWALI VILLAGE, BLOCK A‐LALITA PARK
LNR 578 990 KVA UNPLANNED 26‐03‐2018 18:30:00 26‐03‐2018 20:12:42 1:42 0.000425 MUs
849 BLOCK S‐SCHOOL BLOCK, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK B LNR 1034 630 KVA UNPLANNED 28‐03‐2018 15:21:43 28‐03‐2018 16:35:00 1:13 0.00040556 MUs new repair transformer replace 630kva
850 BLOCK J & K‐NARAYAN NAGAR, LAKSHMI NAGAR BLOCK J&K, RAMESH PARK‐NARAYAN NAGAR, BLOCK C‐LALITA PARK LNR 983 990 KVA UNPLANNED 28‐03‐2018 23:03:35 28‐03‐2018 23:10:33 0:6 0.00001667 MUs complaint no‐18032801423
851 BHARTI COLONY‐NIRMAN VIHAR LNR 113 990 KVA UNPLANNED 06‐03‐2018 12:45:00 06‐03‐2018 14:38:11 1:53 0.00031389 MUs lt cable install on feter pillar
852 BHARTI COLONY‐NIRMAN VIHAR, BLOCK C‐NIRMAN VIHAR, BLOCK D‐NIRMAN VIHAR LNR 184 990 KVA UNPLANNED 06‐03‐2018 17:49:22 06‐03‐2018 18:10:18 0:20 0.00005556 MUs BHARTI ARTIST COLONY AREA ARE AFFECTED
853 SHANKAR VIHAR‐SWASTHYA VIHAR, BLOCK B‐SWASTHYA VIHAR LNR 89 990 KVA UNPLANNED 07‐03‐2018 12:17:36 07‐03‐2018 13:07:00 0:49 0.00013611 MUs making joint through box
854 BHARTI COLONY‐NIRMAN VIHAR LNR 110 990 KVA UNPLANNED 07‐03‐2018 16:23:00 07‐03‐2018 17:19:34 0:56 0.00015556 MUs lt cable installation855 BLOCK F‐PREET VIHAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT
NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 391 400 KVA UNPLANNED 08‐03‐2018 13:21:00 08‐03‐2018 14:19:47 0:58 0.00016111 MUs joint box making
856 SHANKAR VIHAR‐SWASTHYA VIHAR, BLOCK A‐SWASTHYA VIHAR, DEFENCE ENCLAVE‐SWASTHYA VIHAR LNR 51 630 KVA UNPLANNED 10‐03‐2018 14:14:00 10‐03‐2018 14:43:56 0:29 0.00016111 MUs CLEANING OF SUBSTATION
857 GURU ANGAD NAGAR EAST‐SWASTHYA VIHAR, LAXMI NAGAR COMMERCIAL COPLEX‐SWASTHYA VIHAR LNR 1155 990 KVA UNPLANNED 12‐03‐2018 01:37:08 12‐03‐2018 02:00:38 0:23 0.00006389 MUs db box repair858 BLOCK F‐PREET VIHAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT
NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 406 400 KVA UNPLANNED 16‐03‐2018 11:13:40 16‐03‐2018 12:35:19 1:21 0.000225 MUs work on lt cable
859 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, BLOCK F‐PREET VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR BLOCK F‐SHIV VIHAR JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
LNR 406 400 KVA UNPLANNED 16‐03‐2018 15:55:46 16‐03‐2018 17:36:07 1:40 0.00027778 MUs
860 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, BLOCK F‐PREET VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR BLOCK F‐SHIV VIHAR JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
LNR 406 400 KVA UNPLANNED 16‐03‐2018 21:38:33 16‐03‐2018 22:01:00 0:22 0.00006111 MUs
861 BHARTI COLONY‐NIRMAN VIHAR LNR 110 990 KVA UNPLANNED 19‐03‐2018 12:55:00 19‐03‐2018 13:52:00 0:56 0.00015556 MUs LT CABLE ENERGISED862 BHARTI COLONY‐NIRMAN VIHAR, BLOCK A‐NIRMAN VIHAR, BLOCK C‐NIRMAN VIHAR, BLOCK D‐NIRMAN VIHAR,
BLOCK B‐NIRMAN VIHAR, SHAKARPUR EXTN.‐SHAKARPUR KHASLNR 441 990 KVA UNPLANNED 20‐03‐2018 15:36:26 20‐03‐2018 16:20:00 0:43 0.00011944 MUs lt cable jointing
863 BLOCK G‐PREET VIHAR, BLOCK F‐PREET VIHAR LNR 85 990 KVA UNPLANNED 20‐03‐2018 17:44:43 20‐03‐2018 19:33:06 1:48 0.0003 MUs lt main flash864 GURU ANGAD NAGAR EAST‐SWASTHYA VIHAR, LAXMI NAGAR COMMERCIAL COPLEX‐SWASTHYA VIHAR LNR 1155 990 KVA UNPLANNED 23‐03‐2018 11:25:33 23‐03‐2018 12:20:00 0:54 0.00015 MUs865 BHARTI COLONY‐NIRMAN VIHAR LNR 106 990 KVA UNPLANNED 27‐03‐2018 07:46:04 27‐03‐2018 08:05:00 0:18 0.000075 MUs866 BLOCK G‐PREET VIHAR LNR 164 990 KVA UNPLANNED 29‐03‐2018 14:54:29 29‐03‐2018 16:41:14 1:46 0.00029444 MUs fault in lt cable867 MADHU VIHAR‐INDRAPRASTHA EXTENSION LNR 369 990 KVA UNPLANNED 05‐03‐2018 11:03:00 05‐03‐2018 11:30:00 0:27 0.000075 MUs phase problem
complain attending868 LIG/MIG RES/NON COMM AREA‐MOTHER DAIRY LNR 86 630 KVA UNPLANNED 08‐03‐2018 11:55:00 08‐03‐2018 13:43:13 1:48 0.0003 MUs pole maintenance
work869 AGGARSEN APPARTMENT‐MOTHER DAIRY, ASHIRWAD APARTMENT‐MOTHER DAIRY LNR 65 630 KVA UNPLANNED 15‐03‐2018 08:59:27 15‐03‐2018 09:55:00 0:55 0.00061111 MUs870 BLOCK C1‐NEW ASHOK NAGAR, INDUSTRIAL AREA‐PATPAR GANJ INDUSTRIAL AREA LNR 340 3510 KVA UNPLANNED 23‐03‐2018 09:07:00 23‐03‐2018 13:06:00 3:59 0.00590861 MUs AREA BACKFEED
WORK871 INDUSTRIAL AREA‐PATPAR GANJ INDUSTRIAL AREA LNR 35 400 KVA UNPLANNED 26‐03‐2018 14:50:00 26‐03‐2018 15:45:00 0:54 0.0003 MUs gas feeling872 PKT 4‐PHASE I, BLOCK 18‐HIMMATPURI, CL‐CHILLA SARDA BANGAR VILLAGE, TRILOKPURI PHASE I‐MAYUR VIHAR,
MAYUR VIHAR EXTN., PHASE I‐MAYUR VIHAR, KOTLA‐MAYUR VIHAR, HIMMAT PURI‐CHILLA VILLAGEMVR 2087 3410 KVA UNPLANNED 23‐03‐2018 19:18:50 23‐03‐2018 19:37:17 0:18 0.00025 MUs load reduction
automatically so bd team checked the circuit
873 PKT B‐MAYUR VIHAR PHASE II, BLOCK C‐GAZIPUR DAIRY FARM, BLOCK D‐GAZIPUR DAIRY FARM, GAZIPUR DAIRY FARM
MVR 343 400 KVA UNPLANNED 09‐03‐2018 10:03:19 09‐03‐2018 11:39:57 1:36 0 MUs LOAD 1 AMP
874 BLOCK 10‐TRILOKPURI PHASE I, BLOCK 2‐TRILOKPURI PHASE I, PKT A‐MAYUR VIHAR PHASE II, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, MAYUR VIHAR PHASE II, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
MVR 706 630 KVA UNPLANNED 16‐03‐2018 11:33:51 16‐03‐2018 13:17:24 1:43 0.00028611 MUs
875 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, PKT A‐MAYUR VIHAR PHASE II, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
MVR 706 630 KVA UNPLANNED 16‐03‐2018 14:01:14 16‐03‐2018 15:44:52 1:43 0.00028611 MUs
876 PKT B‐MAYUR VIHAR PHASE II, BLOCK B‐GAZIPUR DAIRY FARM MVR 247 630 KVA UNPLANNED 20‐03‐2018 11:22:26 20‐03‐2018 11:39:06 0:16 0.00003556 MUs CURRENT IN MESSENGER WIRE
877 PKT B‐MAYUR VIHAR PHASE II, BLOCK B‐GAZIPUR DAIRY FARM MVR 247 630 KVA UNPLANNED 20‐03‐2018 11:44:11 20‐03‐2018 13:17:11 1:33 0.00012917 MUs CURRENT IN MESSENGER WIRE ON BHUSA WALA
878 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, PKT A‐MAYUR VIHAR PHASE II, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
MVR 708 630 KVA UNPLANNED 23‐03‐2018 10:29:53 23‐03‐2018 11:03:57 0:34 0.00007556 MUs CABLE REPLACING AT S/S‐3 PKT A PH‐2 NEAR RAM MANDIR
879 PKT 4‐PHASE I, BLOCK 21‐KALYAN PURI, BLOCK 20‐KALYAN PURI, BLOCK 19‐KALYAN PURI, MAYUR VIHAR PHASE II, BLOCK 18‐KALYAN PURI, KALYAN PURI‐MAYUR VIHAR
MVR 1219 400 KVA UNPLANNED 30‐03‐2018 13:10:22 30‐03‐2018 14:03:50 0:53 0.00001472 MUs joint work
880 PKT B‐MAYUR VIHAR PHASE II, PKT C‐MAYUR VIHAR PHASE II MVR 373 990 KVA UNPLANNED 30‐03‐2018 23:26:55 30‐03‐2018 23:43:10 0:16 0.00004444 MUs LT CABLE FAULT881 CL‐CHILLA SARDA BANGAR VILLAGE, BLOCK 36‐HIMMATPURI, PKT 3‐PHASE I, BLOCK B‐GARI MANDU, BLOCK 20‐
HIMMATPURI, BLOCK 1‐TRILOKPURI PHASE I, BLOCK 28‐HIMMATPURI, NEW JAFFRABAD‐GORAKH PARK, BLOCK 18‐KALYAN PURI, BLOCK H‐GHONDA PATTI, BLOCK 5‐TRILOKPURI PHASE I, KOTLA EXCT‐PHASE II, BLOCK 26‐HIMMATPURI, BLOCK 18‐KALYAN PURI, BLOCK 3‐TRILOKPURI PHASE I, BLOCK 33‐HIMMATPURI, MAYUR VIHAR EXTN., HIMMAT PURI‐CHILLA VILLAGE, NAVA KUNJ APARTMENT‐MOTHER DAIRY, HIMMATPURI‐MAYUR VIHAR, BLOCK 12‐KALYAN PURI, BLOCK 1‐KALYAN PURI, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 32‐HIMMATPURI, GHONDA PATTI, BLOCK 6‐TRILOKPURI PHASE I, BLOCK 4‐TRILOKPURI PHASE I, BLOCK 35‐HIMMATPURI, JAFFRABAD‐MAUJ PUR, BLOCK 27 HIMMATPURI BLOCK D BHAJANPURA
MVR 9994 7740 KVA UNPLANNED 13‐03‐2018 17:00:00 1243:58 0 MUs to connect the cable
882 BLOCK 17‐HIMMATPURI, BLOCK 22‐HIMMATPURI, BLOCK 16‐HIMMATPURI, BLOCK 18‐HIMMATPURI, TRILOKPURI PHASE I‐MAYUR VIHAR
MVR 1132 990 KVA UNPLANNED 15‐03‐2018 22:26:35 15‐03‐2018 22:30:49 0:4 0 MUs load 2 amp
883 BLOCK 17‐HIMMATPURI, BLOCK 22‐HIMMATPURI, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 16‐HIMMATPURI, BLOCK 18‐HIMMATPURI
MVR 1133 990 KVA UNPLANNED 22‐03‐2018 21:47:20 22‐03‐2018 22:00:32 0:13 0.00001444 MUs
884 BLOCK 17‐HIMMATPURI, BLOCK 22‐HIMMATPURI, BLOCK 16‐HIMMATPURI, BLOCK 18‐HIMMATPURI, TRILOKPURI PHASE I‐MAYUR VIHAR
MVR 1144 990 KVA UNPLANNED 27‐03‐2018 07:27:33 27‐03‐2018 07:59:06 0:31 0.00006889 MUs LOCAL TRF. TRIPPRD AT 16 BLK TRILOKPURI
885 BLOCK 12‐TRILOKPURI PHASE I, BLOCK 9‐TRILOKPURI PHASE I, BLOCK 17‐HIMMATPURI, BLOCK 22‐HIMMATPURI, BLOCK 16‐HIMMATPURI, BLOCK 18‐HIMMATPURI, BLOCK 15‐TRILOKPURI PHASE II, TRILOKPURI PHASE I‐MAYUR VIHAR
MVR 1137 990 KVA UNPLANNED 30‐03‐2018 01:53:30 30‐03‐2018 02:44:50 0:51 0.00014167 MUs
886 BLOCK 5‐TRILOKPURI PHASE I, BLOCK 6‐TRILOKPURI PHASE I, BLOCK 4‐TRILOKPURI PHASE I, BLOCK 3‐TRILOKPURI PHASE I, BLOCK 1‐TRILOKPURI PHASE I, TRILOKPURI PHASE I‐MAYUR VIHAR
MVR 1737 990 KVA UNPLANNED 30‐03‐2018 13:03:00 30‐03‐2018 13:41:26 0:38 0.00010556 MUs
887 BLOCK H‐PREM NAGAR NNG, BLOCK H‐JJ COLONY NNG 138 990 KVA UNPLANNED 05‐03‐2018 11:18:33 05‐03‐2018 12:57:33 1:39 0.0004125 MUs888 BLOCK J‐SUNDER NAGRI, BLOCK L‐SUNDER NAGRI, BLOCK B‐SUNDER NAGRI NNG, POCKET A‐JJ COLONY, BLOCK C‐
SUNDER NAGRI NNG, BLOCK H‐PREM NAGAR NNG, BLOCK F‐BUNKAR VIHAR, BLOCK H‐JJ COLONYNNG 791 990 KVA UNPLANNED 06‐03‐2018 11:49:27 06‐03‐2018 13:37:14 1:47 0.00029722 MUs
889 D.S.I.D.C. COMPLEX‐DTC DEPOT, BABA DA DARGA‐KARDAMPURI, BLOCK A2‐NAND NAGARI, BLOCK A4‐NAND NAGARI, BLOCK A3‐NAND NAGARI, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK A3
NNG 508 630 KVA UNPLANNED 08‐03‐2018 11:39:47 08‐03‐2018 13:03:00 1:23 0.00034583 MUs
890 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, POCKET B‐GURU TEG BAHADUR ENCLAVE, DELHI JAL BOARD MIG FLATS‐POCKET A, GOVT.BOYS SEC.SCHOOL‐POCKET A, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 1232 630 KVA UNPLANNED 13‐03‐2018 11:40:47 13‐03‐2018 13:24:05 1:43 0.00042917 MUs
891 DELHI JAL BOARD MIG FLATS‐POCKET A, GOVT.BOYS SEC.SCHOOL‐POCKET A NNG 975 990 KVA UNPLANNED 13‐03‐2018 15:55:33 13‐03‐2018 16:43:00 0:47 0.00026111 MUs892 BSES OFFICE‐BLOCK C2, BLOCK D‐BLOCK C3 NNG 381 630 KVA UNPLANNED 15‐03‐2018 10:58:10 15‐03‐2018 11:53:00 0:54 0.000225 MUs893 MCD SCHOOL‐BLOCK C3, BLOCK B5‐NAND NAGARI, BLOCK B6‐NAND NAGARI, BLOCK B4‐NAND NAGARI, BLOCK B2‐
NAND NAGARI, SS SCHOOL‐BLOCK B5NNG 1580 990 KVA UNPLANNED 20‐03‐2018 12:03:00 20‐03‐2018 12:56:15 0:53 0.00014722 MUs
894 BSES OFFICE‐BLOCK C2, BLOCK B5‐NAND NAGARI, BLOCK B4‐NAND NAGARI, BLOCK B2‐NAND NAGARI, BLOCK B3‐NAND NAGARI
NNG 1358 990 KVA UNPLANNED 21‐03‐2018 11:38:25 21‐03‐2018 12:23:00 0:44 0.00012222 MUs
895 MCD SCHOOL‐BLOCK C3, BSES OFFICE‐BLOCK C2, BLOCK C1‐NAND NAGARI NNG 353 990 KVA UNPLANNED 22‐03‐2018 12:47:59 22‐03‐2018 13:49:27 1:1 0.0001525 MUs896 L.I.G HOUSING NAND NAGARI‐PKT E, POCKET B‐GURU TEG BAHADUR ENCLAVE, RAJIV GANDHI SUPER STC HOSPITAL‐
GURU TEG BAHADUR ENCLAVE NNGNNG 685 630 KVA UNPLANNED 26‐03‐2018 11:48:40 26‐03‐2018 12:33:00 0:44 0.00018333 MUs
897 BANK OF BARODA‐SABOLI COLONY, VILLAGE SABOLI‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, SEWA DHAM‐MANDOLI
NNG 124 630 KVA UNPLANNED 26‐03‐2018 12:05:51 26‐03‐2018 12:42:01 0:36 0.0002 MUs
898 BLOCK C‐HARSH VIHAR, BLOCK C‐SEWA DHAM, BLOCK A‐SEWA DHAM, BLOCK D‐HARSH VIHAR, BLOCK B‐HARSH VIHAR, GOVT.CO. SEC. SCHOOL‐HARSH VIHAR, SABOLI COLONY‐MANDOLI
NNG 1643 0 KVA UNPLANNED 26‐03‐2018 13:06:49 26‐03‐2018 13:55:33 0:48 0.00026667 MUs
899 KACHI MANDIR‐BLOCK E4, BLOCK A4‐NAND NAGARI, BLOCK A3‐NAND NAGARI, BLOCK C1‐NAND NAGARI, BLOCK B1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK D3, GOVT. BOYS SCHOOL‐BLOCK A3
NNG 955 630 KVA UNPLANNED 26‐03‐2018 13:15:56 26‐03‐2018 14:10:00 0:54 0.000225 MUs
900 POCKET A‐JJ COLONY, BLOCK H‐PREM NAGAR NNG NNG 704 990 KVA UNPLANNED 26‐03‐2018 13:52:24 26‐03‐2018 14:49:00 0:56 0.00031111 MUs901 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR,
BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BHARAT MATA MANDIR‐JJ COLONY, HARSH VIHAR SUB STATION‐POLICE FARM, BLOCK A‐MANDOLI EXTN., BLOCK D‐MANDOLI EXTN., BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 1362 3010 KVA UNPLANNED 26‐03‐2018 14:21:37 26‐03‐2018 16:03:00 1:41 0.00056111 MUs
902 BLOCK KK‐SUNDER NAGRI, BLOCK N‐SUNDER NAGRI, BLOCK O‐SUNDER NAGRI, POCKET A‐JJ COLONY, BLOCK J‐SUNDER NAGRI NNG, BLOCK E1‐BUNKAR VIHAR
NNG 673 630 KVA UNPLANNED 26‐03‐2018 15:31:06 26‐03‐2018 16:23:00 0:51 0.000425 MUs
903 BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK A‐MANDOLI EXTN., LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, HARSH VIHAR SUB STATION‐POLICE FARM, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK B
NNG 477 3010 KVA UNPLANNED 26‐03‐2018 20:37:10 26‐03‐2018 22:18:20 1:41 0.00140278 MUs
904 SABOLI EXTN.‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, VILLAGE SABOLI‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI
NNG 124 630 KVA UNPLANNED 26‐03‐2018 20:45:53 26‐03‐2018 22:21:43 1:35 0.00131944 MUs
905 BLOCK B‐SUNDER NAGRI NNG, BLOCK H‐JJ COLONY, BLOCK C1‐NAND NAGARI, BLOCK E1‐BUNKAR VIHAR, GOVT.SARVODAY VIDHYALAYA‐BLOCK E5, BLOCK H‐PREM NAGAR NNG, BLOCK G3‐BUNKAR VIHAR, KACHI MANDIR‐BLOCK E4, BLOCK E1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK E3‐KANSHIPUR, BLOCK J‐SUNDER NAGRI, RAJIV GANDHI SUPER STC HOSPITAL‐GURU TEG BAHADUR ENCLAVE NNG, BLOCK E5‐NAND NAGARI, GOVT. BOYS SCHOOL‐BLOCK A3, BLOCK E2‐NAND NAGARI, BUNKAR BHAVAN‐PREM NAGAR NNG, BLOCK A3‐NAND NAGARI, BLOCK L‐SUNDER NAGRI, BLOCK B1‐NAND NAGARI, POCKET B‐GURU TEG BAHADUR ENCLAVE, BLOCK F‐BUNKAR VIHAR, BLOCK E3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, POCKET A‐JJ COLONY, D.S.I.D.C. COMPLEX‐DTC DEPOT, AMIG FLATS‐POCKET A, BLOCK A4‐NAND NAGARI, BLOCK KK‐SUNDER NAGRI, BLOCK F1‐BUNKAR VIHAR, BHARAT MATA MANDIR‐JJ COLONY, CLASS ROOM MCD SCHOOL‐BUNKAR VIHAR, JANTA FLATS‐NAND NAGARI, BLOCK E‐BUNKAR VIHAR, BLOCK C‐SUNDER NAGRI NNG, BLOCK G4‐BUNKAR VIHAR, MCD PRIMARY SCHOOL‐BLOCK D3, DELHI JAL BOARD MIG FLATS POCKET A
NNG 13433 6920 KVA UNPLANNED 27‐03‐2018 10:39:14 27‐03‐2018 11:35:00 0:55 0.00076389 MUs
906 BLOCK J‐SUNDER NAGRI NNG, BLOCK N‐SUNDER NAGRI, BLOCK O‐SUNDER NAGRI NNG 674 630 KVA UNPLANNED 27‐03‐2018 12:18:55 27‐03‐2018 13:15:59 0:57 0.00015833 MUs907 BANK OF BARODA‐SABOLI COLONY, BLOCK A‐MANDOLI VILLAGE, BLOCK D‐MANDOLI EXTN., BLOCK A‐BANK COLONY,
BLOCK A‐MANDOLI EXTN.NNG 797 990 KVA UNPLANNED 27‐03‐2018 12:20:00 27‐03‐2018 13:17:42 0:57 0.00015833 MUs
908 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 124 630 KVA UNPLANNED 27‐03‐2018 13:14:19 27‐03‐2018 14:03:15 0:48 0.00066667 MUs909 BLOCK KK‐SUNDER NAGRI, BLOCK C‐SUNDER NAGRI NNG NNG 170 400 KVA UNPLANNED 28‐03‐2018 10:34:18 28‐03‐2018 11:51:18 1:16 0.00019 MUs910 MCD SCHOOL‐BLOCK C3, BSES OFFICE‐BLOCK C2, BLOCK C1‐NAND NAGARI NNG 353 990 KVA UNPLANNED 28‐03‐2018 13:09:15 28‐03‐2018 14:00:00 0:50 0.000125 MUs
911 SABOLI EXTN.‐MANDOLI, SABOLI COLONY‐MANDOLI, SABOLI VILLAGE‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, VILLAGE SABOLI‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI
NNG 124 630 KVA UNPLANNED 28‐03‐2018 14:10:39 28‐03‐2018 15:03:23 0:52 0.00043333 MUs
912 BLOCK J‐SUNDER NAGRI, BLOCK L‐SUNDER NAGRI, BLOCK KK‐SUNDER NAGRI, BLOCK M‐SUNDER NAGRI, BLOCK N‐SUNDER NAGRI, BLOCK O‐SUNDER NAGRI, BLOCK B‐SUNDER NAGRI NNG, POCKET A‐JJ COLONY, BLOCK C‐SUNDER NAGRI NNG, BUNKAR BHAVAN‐PREM NAGAR NNG, BLOCK A‐RAJIV NAGAR NNG, BLOCK J‐SUNDER NAGRI NNG, BLOCK L‐SUNDER NAGRI NNG, BLOCK K‐SUNDER NAGRI NNG, BLOCK H‐PREM NAGAR NNG, BLOCK E1‐BUNKAR VIHAR, BLOCK G3‐BUNKAR VIHAR, BLOCK F‐BUNKAR VIHAR, BLOCK G4‐BUNKAR VIHAR, BLOCK H‐JJ COLONY
NNG 8384 5260 KVA UNPLANNED 28‐03‐2018 15:05:52 28‐03‐2018 16:00:00 0:54 0.00045 MUs
913 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 124 1030 KVA UNPLANNED 28‐03‐2018 15:24:34 28‐03‐2018 16:15:00 0:50 0.00041667 MUs hvds transformer and dp fuse blown saboli bagh madinea masjid
914 BLOCK A‐MANDOLI VILLAGE, BLOCK A‐BANK COLONY NNG 397 990 KVA UNPLANNED 28‐03‐2018 19:11:54 28‐03‐2018 20:10:00 0:58 0.00016111 MUs915 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR,
BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BHARAT MATA MANDIR‐JJ COLONY, HARSH VIHAR SUB STATION‐POLICE FARM, BLOCK A‐MANDOLI EXTN., BLOCK A‐SEWA DHAM, BLOCK D‐MANDOLI EXTN., BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 1362 3010 KVA UNPLANNED 29‐03‐2018 14:05:20 29‐03‐2018 15:56:50 1:51 0.000925 MUs htab cable fault at b4 block gali no‐5 harsh vihar
916 BLOCK C‐HARSH VIHAR, BLOCK C‐SEWA DHAM, BLOCK A‐SEWA DHAM, BLOCK B‐HARSH VIHAR, GOVT.CO. SEC. SCHOOL‐HARSH VIHAR, SABOLI COLONY‐MANDOLI
NNG 1643 0 KVA UNPLANNED 30‐03‐2018 11:27:26 30‐03‐2018 11:58:20 0:30 0.00016667 MUs
917 BLOCK C‐HARSH VIHAR, BLOCK B‐PRATAP NAGAR, BLOCK C‐SEWA DHAM, BLOCK A‐SEWA DHAM, BLOCK D‐HARSH VIHAR, BLOCK B‐HARSH VIHAR, BLOCK A‐HARSH VIHAR, GOVT.CO. SEC. SCHOOL‐HARSH VIHAR, SABOLI COLONY‐MANDOLI
NNG 1643 0 KVA UNPLANNED 30‐03‐2018 11:58:43 30‐03‐2018 13:51:02 1:52 0.00093333 MUs
918 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BHARAT MATA MANDIR‐JJ COLONY, HARSH VIHAR SUB STATION‐POLICE FARM, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 307 400 KVA UNPLANNED 30‐03‐2018 12:01:18 30‐03‐2018 12:31:46 0:30 0.00016667 MUs
919 BLOCK C‐HARSH VIHAR, BLOCK C‐SEWA DHAM, BLOCK A‐SEWA DHAM, BLOCK B‐HARSH VIHAR, BLOCK A‐HARSH VIHAR, GOVT.CO. SEC. SCHOOL‐HARSH VIHAR, SABOLI COLONY‐MANDOLI
NNG 1643 0 KVA UNPLANNED 30‐03‐2018 17:03:00 30‐03‐2018 17:43:58 0:40 0.00033333 MUs RMU TRIPPED HARSH VIHAR RMU NO‐3
920 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BHARAT MATA MANDIR‐JJ COLONY, HARSH VIHAR SUB STATION‐POLICE FARM, BLOCK A‐MANDOLI EXTN., BLOCK E‐SEWA DHAM, BLOCK B‐SEWA DHAM, BLOCK C‐SEWA DHAM, BLOCK A‐SEWA DHAM, BLOCK D‐MANDOLI EXTN., BLOCK D‐HARSH VIHAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 1362 3010 KVA UNPLANNED 30‐03‐2018 18:52:58 30‐03‐2018 20:25:05 1:32 0.00076667 MUs 25KVA HVDS TRANSFORMER OIL LEAKAGE AT RAJEEV NAGAR INDS AREA (ANY ABJECT FALLEN ON THE TF)
921 BLOCK C‐HARSH VIHAR, DEEPAK MEDITECH‐NEW MANDOLI INDUSTRIAL AREA, BLOCK C‐SEWA DHAM, BLOCK A‐SEWA DHAM, BLOCK B‐HARSH VIHAR, GOVT.CO. SEC. SCHOOL‐HARSH VIHAR, SABOLI COLONY‐MANDOLI
NNG 1643 0 KVA UNPLANNED 31‐03‐2018 14:30:07 31‐03‐2018 15:27:00 0:56 0.00046667 MUs
922 BLOCK N‐SUNDER NAGRI, BLOCK O‐SUNDER NAGRI, POCKET A‐JJ COLONY, BLOCK A‐RAJIV NAGAR NNG, BLOCK J‐SUNDER NAGRI NNG, BLOCK K‐SUNDER NAGRI NNG
NNG 752 630 KVA UNPLANNED 31‐03‐2018 17:15:34 31‐03‐2018 18:03:00 0:47 0.00039167 MUs
923 BLOCK B‐SUNDER NAGRI NNG, BLOCK H‐JJ COLONY, BLOCK C1‐NAND NAGARI, BLOCK E1‐BUNKAR VIHAR, GOVT.SARVODAY VIDHYALAYA‐BLOCK E5, BLOCK H‐PREM NAGAR NNG, BLOCK G3‐BUNKAR VIHAR, KACHI MANDIR‐BLOCK E4, BLOCK E1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK E3‐KANSHIPUR, BLOCK J‐SUNDER NAGRI, RAJIV GANDHI SUPER STC HOSPITAL‐GURU TEG BAHADUR ENCLAVE NNG, BLOCK E5‐NAND NAGARI, GOVT. BOYS SCHOOL‐BLOCK A3, BLOCK E2‐NAND NAGARI, BUNKAR BHAVAN‐PREM NAGAR NNG, BLOCK A3‐NAND NAGARI, BLOCK L‐SUNDER NAGRI, BLOCK B1‐NAND NAGARI, POCKET B‐GURU TEG BAHADUR ENCLAVE, L.I.G HOUSING NAND NAGARI‐PKT E, BLOCK F‐BUNKAR VIHAR, BLOCK E3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, POCKET A‐JJ COLONY, D.S.I.D.C. COMPLEX‐DTC DEPOT, AMIG FLATS‐POCKET A, BLOCK A4‐NAND NAGARI, BLOCK KK‐SUNDER NAGRI, BLOCK F1‐BUNKAR VIHAR, BHARAT MATA MANDIR‐JJ COLONY, CLASS ROOM MCD SCHOOL‐BUNKAR VIHAR, JANTA FLATS‐NAND NAGARI, BLOCK E‐BUNKAR VIHAR, BLOCK C‐SUNDER NAGRI NNG, BLOCK G4‐BUNKAR VIHAR, MCD PRIMARY SCHOOL BLOCK D3 DELHI JAL BOARD MIG FLATS POCKET A
NNG 13501 6920 KVA UNPLANNED 31‐03‐2018 18:18:51 31‐03‐2018 19:15:00 0:56 0.00155556 MUs
924 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐NATHU PURA, BLOCK A‐NATHU COLONY, BLOCK B‐ASHOK NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 1759 990 KVA UNPLANNED 16‐03‐2018 10:52:45 16‐03‐2018 11:49:00 0:56 0.00023333 MUs
925 BLOCK C‐GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI NNG 475 630 KVA UNPLANNED 20‐03‐2018 10:51:42 20‐03‐2018 11:50:00 0:58 0.00016111 MUs926 BLOCK A‐NATHU PURA, BLOCK E‐ASHOK NAGAR, BLOCK E‐JYOTI NAGAR EAST, BLOCK E‐NATHU PURA NNG 421 630 KVA UNPLANNED 21‐03‐2018 10:35:13 21‐03‐2018 11:01:47 0:26 0.00010833 MUs927 BLOCK C‐GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI NNG 475 630 KVA UNPLANNED 22‐03‐2018 14:45:30 22‐03‐2018 15:36:18 0:50 0.000125 MUs928 GORAKH PARK EAST‐SILAMPUR, GORAKH PARK WEST‐SILAMPUR, BLOCK B‐GORAKH PARK, SHIVAJI PARK‐BALBIR
NAGAR, BLOCK C‐DURGA PURI, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐NATHU PURA, SHIV MANDIR‐JYOTI NAGAR EAST, ROHITASH NAGAR‐SILAMPUR, BLOCK B‐HARDEV PURI, BLOCK D‐HARDEV PURI, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA
NNG 3211 990 KVA UNPLANNED 24‐03‐2018 10:23:53 24‐03‐2018 12:15:00 1:51 0.00061667 MUs
929 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐EAST GOKUL PURI NNG 178 630 KVA UNPLANNED 25‐03‐2018 09:58:03 25‐03‐2018 11:30:00 1:31 0.00050556 MUs930 BLOCK A‐EAST GOKUL PURI NNG 773 630 KVA UNPLANNED 26‐03‐2018 13:05:42 26‐03‐2018 14:03:00 0:57 0.0002375 MUs931 BLOCK B‐EAST GOKUL PURI, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐
MEET NAGARNNG 115 990 KVA UNPLANNED 26‐03‐2018 13:08:59 26‐03‐2018 14:03:00 0:54 0.000225 MUs
932 BLOCK D‐ASHOK NAGAR, BLOCK B‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR NNG 887 630 KVA UNPLANNED 26‐03‐2018 15:40:06 26‐03‐2018 16:23:00 0:42 0.00023333 MUs933 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL
PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR, BLOCK E‐MEET NAGARNNG 1412 3280 KVA UNPLANNED 26‐03‐2018 20:47:29 26‐03‐2018 22:25:51 1:38 0.00136111 MUs SHAKTI GARDEN
934 G.B.SSS SCHOOL‐GOKUL PURI NNG 298 630 KVA UNPLANNED 27‐03‐2018 10:48:06 27‐03‐2018 11:45:00 0:56 0.00077778 MUs935 BLOCK A‐EAST GOKUL PURI NNG 773 630 KVA UNPLANNED 27‐03‐2018 11:09:05 27‐03‐2018 12:03:00 0:53 0.00014722 MUs936 BLOCK A‐EAST GOKUL PURI, BLOCK D‐MEET NAGAR NNG 549 630 KVA UNPLANNED 27‐03‐2018 11:09:55 27‐03‐2018 12:03:00 0:53 0.00014722 MUs937 G.B.SSS SCHOOL‐GOKUL PURI NNG 298 630 KVA UNPLANNED 27‐03‐2018 12:17:49 27‐03‐2018 13:15:33 0:57 0.00063333 MUs938 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR
COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3331 2610 KVA UNPLANNED 27‐03‐2018 12:25:18 27‐03‐2018 13:23:00 0:57 0.00079167 MUs
939 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK A‐EAST GOKUL PURI NNG 178 630 KVA UNPLANNED 27‐03‐2018 14:21:12 27‐03‐2018 15:55:32 1:34 0.00130556 MUs940 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK
D‐MEET NAGARNNG 1490 3280 KVA UNPLANNED 27‐03‐2018 14:59:31 27‐03‐2018 15:56:37 0:57 0.00079167 MUs
941 BLOCK A‐AMAR COLONY, BLOCK A‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 1130 990 KVA UNPLANNED 27‐03‐2018 15:53:31 27‐03‐2018 16:50:00 0:56 0.00015556 MUs
942 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK E‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 1490 3280 KVA UNPLANNED 27‐03‐2018 16:02:52 27‐03‐2018 17:00:00 0:57 0.00079167 MUs
943 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR, BLOCK E‐MEET NAGAR
NNG 1490 3280 KVA UNPLANNED 27‐03‐2018 21:36:39 27‐03‐2018 22:20:11 0:43 0.00119444 MUs
944 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3306 2610 KVA UNPLANNED 28‐03‐2018 06:44:13 28‐03‐2018 07:35:00 0:50 0.00027778 MUs
945 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1490 3280 KVA UNPLANNED 28‐03‐2018 06:45:21 28‐03‐2018 07:42:28 0:57 0.00079167 MUs
946 BLOCK C‐DURGA PURI NNG 710 990 KVA UNPLANNED 28‐03‐2018 14:15:33 28‐03‐2018 15:10:26 0:54 0.000135 MUs947 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK
D‐MEET NAGAR, BLOCK E‐MEET NAGARNNG 1490 3280 KVA UNPLANNED 28‐03‐2018 15:31:47 28‐03‐2018 17:14:16 1:42 0.00085 MUs htab cable fault e
block shakti garden948 G.B.SSS SCHOOL‐GOKUL PURI NNG 583 990 KVA UNPLANNED 28‐03‐2018 15:41:28 28‐03‐2018 16:19:34 0:38 0.000095 MUs gokalpur vill near
unian bank949 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK E‐ASHOK
NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐KABIR NAGAR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 5713 1620 KVA UNPLANNED 28‐03‐2018 16:09:05 28‐03‐2018 17:45:00 1:35 0.00079167 MUs ht cable connected
950 DEV PUBLIC SCHOOL‐CHITRAKOOT NNG 172 400 KVA UNPLANNED 28‐03‐2018 16:24:08 28‐03‐2018 17:13:00 0:48 0.00012 MUs951 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST
GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURINNG 1126 3280 KVA UNPLANNED 28‐03‐2018 19:13:01 28‐03‐2018 21:10:00 1:56 0.00161111 MUs
952 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI
NNG 115 990 KVA UNPLANNED 28‐03‐2018 19:14:34 28‐03‐2018 21:10:00 1:55 0.00031944 MUs
953 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1126 3280 KVA UNPLANNED 28‐03‐2018 21:20:00 28‐03‐2018 22:03:00 0:42 0.00058333 MUs
954 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1126 3280 KVA UNPLANNED 29‐03‐2018 12:37:54 29‐03‐2018 14:26:40 1:48 0.0009 MUs fire on pole e block shakti garden main road (htab cable fault pole no 886)
955 SABOLI EXTN.‐MANDOLI, BLOCK A‐MEET NAGAR, SABOLI COLONY‐MANDOLI, BLOCK E‐UTTARANCHAL COLONY, BLOCK A‐ANUP VIHAR, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK D‐MEET NAGAR, BLOCK E‐MEET NAGAR
NNG 5294 400 KVA UNPLANNED 29‐03‐2018 13:17:37 29‐03‐2018 14:52:57 1:35 0.00039583 MUs replacement of hvds transformer c block meet nagar main road pole no‐w034
956 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 1411 3280 KVA UNPLANNED 29‐03‐2018 18:35:23 29‐03‐2018 19:25:00 0:49 0.00068056 MUs
957 BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐NATHU PURA, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 5721 1620 KVA UNPLANNED 30‐03‐2018 05:39:59 30‐03‐2018 06:18:27 0:38 0.00105556 MUs
958 BLOCK B‐EAST GOKUL PURI, BLOCK A‐AMAR COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY, BLOCK A‐ANUP VIHAR, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 3348 2610 KVA UNPLANNED 30‐03‐2018 07:01:17 30‐03‐2018 07:53:00 0:51 0.00141667 MUs
959 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 1411 3280 KVA UNPLANNED 30‐03‐2018 07:02:49 30‐03‐2018 07:55:00 0:52 0.00072222 MUs
960 PKT B‐CHITRAKOOT, BLOCK C‐GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐EAST GOKUL PURI
NNG 2076 3870 KVA UNPLANNED 30‐03‐2018 18:18:10 30‐03‐2018 19:10:00 0:51 0.000425 MUs dd fuse blown nahar wala s/st gokalpur vill
961 BLOCK A‐EAST GOKUL PURI, BLOCK D‐MEET NAGAR NNG 773 630 KVA UNPLANNED 30‐03‐2018 18:21:44 30‐03‐2018 19:13:00 0:51 0.00028333 MUs htab o/h joint BOX damage at loni road border
962 BLOCK A‐EAST GOKUL PURI, BLOCK D‐MEET NAGAR NNG 549 630 KVA UNPLANNED 30‐03‐2018 18:24:48 30‐03‐2018 19:15:00 0:50 0.00027778 MUs HTAB O/H JOINT BOX DAMAGE AT LONI ROAD BORDER
963 BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI
NNG 2076 3870 KVA UNPLANNED 31‐03‐2018 06:43:51 31‐03‐2018 07:37:37 0:53 0.00044167 MUs
964 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3348 2610 KVA UNPLANNED 31‐03‐2018 06:45:55 31‐03‐2018 07:43:00 0:57 0.000475 MUs LONI ROAD PANCHVATI CLY
965 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1411 3280 KVA UNPLANNED 31‐03‐2018 07:59:47 31‐03‐2018 08:30:04 0:30 0.00025 MUs
966 BLOCK A‐MEET NAGAR, BLOCK D‐MEET NAGAR NNG 814 0 KVA UNPLANNED 31‐03‐2018 13:20:48 31‐03‐2018 14:02:34 0:41 0.00034167 MUs967 BLOCK A‐EAST GOKUL PURI NNG 773 630 KVA UNPLANNED 31‐03‐2018 16:41:47 31‐03‐2018 17:38:01 0:56 0.00031111 MUs968 BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, DEV PUBLIC SCHOOL‐CHITRAKOOT NNG 105 400 KVA UNPLANNED 31‐03‐2018 17:03:08 31‐03‐2018 17:53:11 0:50 0.00027778 MUs969 PKT B‐CHITRAKOOT NNG 197 630 KVA UNPLANNED 31‐03‐2018 17:07:54 31‐03‐2018 18:03:00 0:55 0.00030556 MUs970 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR
COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3348 2610 KVA UNPLANNED 31‐03‐2018 19:15:48 31‐03‐2018 19:41:21 0:25 0.00034722 MUs
971 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 611 990 KVA UNPLANNED 10‐03‐2018 12:12:11 10‐03‐2018 14:12:00 1:59 0.00049583 MUs area sudamapuri 972 BLOCK F‐NORTH CHHAJUPUR, BLOCK E‐NORTH CHHAJUPUR, PKT C‐BLOCK B, BLOCK D‐JYOTI NAGAR, BLOCK C‐NORTH
CHHAJUPURNNG 468 990 KVA UNPLANNED 13‐03‐2018 10:32:44 13‐03‐2018 12:14:29 1:41 0.00042083 MUs
973 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 1074 400 KVA UNPLANNED 13‐03‐2018 12:25:09 13‐03‐2018 13:13:00 0:47 0.00019583 MUs974 BLOCK E‐NORTH CHHAJUPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR,
PKT C‐BLOCK BNNG 468 990 KVA UNPLANNED 13‐03‐2018 14:28:50 13‐03‐2018 15:13:32 0:44 0.00018333 MUs
975 BLOCK A‐KABIR NAGAR, BLOCK B‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK E‐NORTH CHHAJUPUR, BLOCK A‐NORTH CHHAJUPUR, BLOCK C‐NORTH CHHAJUPUR
NNG 743 630 KVA UNPLANNED 14‐03‐2018 11:27:35 14‐03‐2018 12:25:00 0:57 0.00015833 MUs
976 BLOCK B‐KONDALI VILLAGE, BLOCK A‐KONDALI VILLAGE, BLOCK M‐DURGA PURI, BLOCK B‐DURGA PURI NNG 753 990 KVA UNPLANNED 16‐03‐2018 10:12:28 16‐03‐2018 12:05:51 1:53 0.00047083 MUs977 BALBIR NAGAR EXTN.‐SILAMPUR, JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐KABIR NAGAR, BLOCK B‐NORTH
CHHAJUPUR, BLOCK E‐NORTH CHHAJUPUR, BLOCK B‐DURGA PURI, BLOCK A‐NORTH CHHAJUPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK B‐DURGA PURI
NNG 891 630 KVA UNPLANNED 16‐03‐2018 10:54:45 16‐03‐2018 11:41:54 0:47 0.00026111 MUs
978 BLOCK F‐NORTH CHHAJUPUR, BLOCK E‐NORTH CHHAJUPUR, PKT C‐BLOCK B, BLOCK D‐JYOTI NAGAR, BLOCK J‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BLOCK C‐NORTH CHHAJUPUR, BLOCK H‐JYOTI NAGAR, PKT H‐BLOCK D
NNG 735 990 KVA UNPLANNED 16‐03‐2018 12:47:59 16‐03‐2018 13:19:15 0:31 0.00017222 MUs
979 BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR NNG 1187 990 KVA UNPLANNED 19‐03‐2018 11:05:40 19‐03‐2018 12:00:00 0:54 0.0003 MUs
980 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3935 2250 KVA UNPLANNED 20‐03‐2018 15:36:00 20‐03‐2018 16:10:00 0:33 0 MUs fpi installation work
981 BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR NNG 392 990 KVA UNPLANNED 21‐03‐2018 10:54:05 21‐03‐2018 11:49:47 0:55 0.00030556 MUs982 BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR NNG 1207 990 KVA UNPLANNED 21‐03‐2018 11:14:29 21‐03‐2018 13:00:54 1:46 0.00044167 MUs983 BLOCK A‐KABIR NAGAR, BLOCK B‐NORTH CHHAJUPUR, BLOCK E‐NORTH CHHAJUPUR, BLOCK C‐NORTH CHHAJUPUR,
BLOCK F‐NORTH CHHAJUPUR, BLOCK A‐NORTH CHHAJUPURNNG 749 630 KVA UNPLANNED 22‐03‐2018 11:09:58 22‐03‐2018 12:40:48 1:30 0.000225 MUs
984 BABARPUR EXTN.‐BABAR PUR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 959 990 KVA UNPLANNED 23‐03‐2018 11:58:19 23‐03‐2018 13:08:41 1:10 0.00038889 MUs
985 CHHAJJUPUR‐BABAR PUR, BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, OLD SEELAMPUR, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK B‐KONDALI VILLAGE, BLOCK A‐KONDALI VILLAGE, BLOCK C‐KONDALI VILLAGE
NNG 3144 990 KVA UNPLANNED 23‐03‐2018 12:35:04 23‐03‐2018 13:28:54 0:53 0.00029444 MUs
986 BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR NNG 392 990 KVA UNPLANNED 23‐03‐2018 14:47:45 23‐03‐2018 16:20:56 1:33 0.00051667 MUs987 BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR NNG 1207 990 KVA UNPLANNED 24‐03‐2018 11:27:20 24‐03‐2018 12:25:00 0:57 0.00031667 MUs988 BALBIR NAGAR EXTN.‐SILAMPUR, JYOTI COLONY‐BALBIR NAGAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐
KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 702 630 KVA UNPLANNED 24‐03‐2018 11:44:28 24‐03‐2018 12:33:00 0:48 0.00026667 MUs
989 BLOCK E‐NORTH CHHAJUPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, PKT C‐BLOCK B
NNG 469 990 KVA UNPLANNED 24‐03‐2018 12:53:10 24‐03‐2018 13:33:10 0:40 0.00022222 MUs
990 OLD SEELAMPUR, BALBIR NAGAR EXTN.‐SILAMPUR, BLOCK C‐KONDALI VILLAGE, BABARPUR EXTN.‐BABAR PUR, BLOCK B‐KONDALI VILLAGE, CHHAJJUPUR‐BABAR PUR, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK A‐KONDALI VILLAGE
NNG 3149 990 KVA UNPLANNED 26‐03‐2018 11:29:19 26‐03‐2018 12:27:00 0:57 0.0002375 MUs
991 BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR NNG 1207 990 KVA UNPLANNED 26‐03‐2018 11:45:37 26‐03‐2018 12:43:00 0:57 0.00031667 MUs992 BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR NNG 392 990 KVA UNPLANNED 26‐03‐2018 12:18:48 26‐03‐2018 13:13:00 0:54 0.0003 MUs993 JYOTI COLONY‐BALBIR NAGAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D,
BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, BLOCK B‐DURGA PURI, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 1062 1000 KVA UNPLANNED 26‐03‐2018 15:08:57 26‐03‐2018 16:03:00 0:54 0.0003 MUs
994 BABA DA DARGA‐KARDAMPURI, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 343 630 KVA UNPLANNED 27‐03‐2018 11:20:00 27‐03‐2018 12:15:00 0:54 0.00015 MUs
995 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 306 630 KVA UNPLANNED 27‐03‐2018 11:44:24 27‐03‐2018 12:29:57 0:45 0.000125 MUs996 CHHAJJUPUR‐BABAR PUR, BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, OLD SEELAMPUR,
RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK B‐KONDALI VILLAGE, BLOCK A‐KONDALI VILLAGE, BLOCK C‐KONDALI VILLAGE
NNG 3147 990 KVA UNPLANNED 27‐03‐2018 11:45:18 27‐03‐2018 12:31:15 0:45 0.000125 MUs
997 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR, OLD SEELAMPUR, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK B‐KONDALI VILLAGE, BLOCK A‐KONDALI VILLAGE, BLOCK C‐KONDALI VILLAGE, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 1528 3600 KVA UNPLANNED 27‐03‐2018 12:26:34 27‐03‐2018 13:44:12 1:17 0.00106944 MUs
998 BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR NNG 260 400 KVA UNPLANNED 27‐03‐2018 20:17:38 27‐03‐2018 21:03:00 0:45 0.00025 MUs999 BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR NNG 8 990 KVA UNPLANNED 27‐03‐2018 21:57:30 27‐03‐2018 22:22:31 0:25 0.00034722 MUs1000 BLOCK C‐KABIR NAGAR, BLOCK B‐KABIR NAGAR NNG 762 0 KVA UNPLANNED 27‐03‐2018 23:38:13 27‐03‐2018 23:54:17 0:16 0.00008889 MUs1001 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4491 5260 KVA UNPLANNED 28‐03‐2018 06:02:54 28‐03‐2018 06:41:15 0:38 0.00052778 MUs1002 BLOCK B‐KABIR NAGAR NNG 411 990 KVA UNPLANNED 28‐03‐2018 06:00:00 28‐03‐2018 06:41:50 0:41 0.00056944 MUs1003 BLOCK A‐JAGATPURI EXTN., BLOCK A‐CHANDRA LOK, BLOCK B‐SAKDARPUR, BLOCK A‐ BHARTIYA BODH SABHA‐
HARDEV PURI, BLOCK B‐NATHU PURA, BLOCK A‐B&C‐JAGAT PURI, BLOCK A‐NATHU COLONY, BLOCK B‐CHANDRA LOK, BLOCK M‐DURGA PURI, BLOCK D‐JAGAT PURI, BLOCK B‐ASHOK NAGAR, BLOCK B‐DURGA PURI
NNG 2633 4230 KVA UNPLANNED 28‐03‐2018 10:46:42 28‐03‐2018 12:41:00 1:54 0.00095 MUs
1004 BLOCK B‐KABIR NAGAR, BABA DA DARGA‐KARDAMPURI NNG 1215 990 KVA UNPLANNED 28‐03‐2018 11:15:13 28‐03‐2018 12:09:19 0:54 0.000135 MUs1005 BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR NNG 1207 990 KVA UNPLANNED 28‐03‐2018 13:34:44 28‐03‐2018 14:30:00 0:55 0.0001375 MUs1006 PKT A‐BLOCK A, BLOCK A‐HARIJAN BASTI, PKT C‐BLOCK A, PKT D‐BLOCK A, PKT B‐BLOCK A, BLOCK H‐JYOTI NAGAR NNG 312 400 KVA UNPLANNED 28‐03‐2018 16:17:41 28‐03‐2018 17:03:00 0:45 0.0001125 MUs
1007 DELHI JAL BOARD‐JYOTI NAGAR, BABA DA DARGA‐KARDAMPURI, BLOCK A‐HARIJAN BASTI, PKT H‐BLOCK D NNG 857 630 KVA UNPLANNED 29‐03‐2018 10:38:24 29‐03‐2018 11:33:00 0:54 0.0003 MUs1008 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK A‐CHANDRA
LOK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐JAGATPURI EXTN., BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐B&C‐JAGAT PURI, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐JAGAT PURI, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, BLOCK B‐CHANDRA LOK, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B BLOCK A KONDALI VILLAGE
NNG 7234 4230 KVA UNPLANNED 29‐03‐2018 11:09:32 29‐03‐2018 12:00:22 0:50 0.00041667 MUs HT CABLE CONNECT TO PANNEL JAGJEEVAN NAGAR
1009 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13297 8470 KVA UNPLANNED 29‐03‐2018 11:14:06 29‐03‐2018 12:03:00 0:48 0.0004 MUs
1010 BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR NNG 1709 990 KVA UNPLANNED 29‐03‐2018 12:56:12 29‐03‐2018 13:41:32 0:45 0.0001125 MUs Kabir Nagar d block1011 BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR NNG 1709 990 KVA UNPLANNED 29‐03‐2018 15:51:16 29‐03‐2018 16:33:00 0:41 0.0001025 MUs
1012 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK A‐CHANDRA LOK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐JAGATPURI EXTN., BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐B&C‐JAGAT PURI, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐JAGAT PURI, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, BLOCK B‐CHANDRA LOK, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B BLOCK A KONDALI VILLAGE
NNG 7234 4230 KVA UNPLANNED 29‐03‐2018 18:41:23 29‐03‐2018 19:24:07 0:42 0.00116667 MUs
1013 BABARPUR WEST‐BABAR PUR NNG, CHHAJJUPUR‐BABAR PUR, BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, JYOTI COLONY‐BALBIR NAGAR, BLOCK J‐SUNDER NAGRI, GEETA COLONY, OLD SEELAMPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, RAGHUBARPURA NO 2‐SEELAMPUR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐KONDALI VILLAGE, BLOCK A‐KONDALI VILLAGE, BLOCK C‐KONDALI VILLAGE, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA SONIA VIHAR
NNG 5833 3600 KVA UNPLANNED 29‐03‐2018 20:58:30 29‐03‐2018 21:20:33 0:22 0.00030556 MUs
1014 DELHI JAL BOARD‐JYOTI NAGAR NNG 130 400 KVA UNPLANNED 30‐03‐2018 10:35:46 30‐03‐2018 11:13:00 0:37 0.00015417 MUs1015 BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR NNG 1207 990 KVA UNPLANNED 30‐03‐2018 13:48:05 30‐03‐2018 14:33:00 0:44 0.00024444 MUs1016 BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, JYOTI COLONY‐BALBIR NAGAR, KARISHMA
APPARTMENT‐MOTHER DAIRY, BLOCK E‐ASHOK NAGARNNG 1656 630 KVA UNPLANNED 30‐03‐2018 18:11:32 30‐03‐2018 19:03:00 0:51 0.0001275 MUs three phase meeter
burnt main road balbeer nagar
1017 BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR NNG 260 400 KVA UNPLANNED 30‐03‐2018 18:25:54 30‐03‐2018 19:13:00 0:47 0.0001175 MUs three phase meeter burnt main road balbeer nagar
1018 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 605 630 KVA UNPLANNED 30‐03‐2018 18:50:12 30‐03‐2018 19:29:05 0:38 0.000095 MUs ncc complaint gali no‐8 kardampuri
1019 BLOCK A‐CHANDRA LOK, BLOCK M‐DURGA PURI NNG 360 630 KVA UNPLANNED 31‐03‐2018 11:06:53 31‐03‐2018 12:03:00 0:56 0.00031111 MUs1020 BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, JYOTI COLONY‐BALBIR NAGAR, KARISHMA
APPARTMENT‐MOTHER DAIRYNNG 1656 630 KVA UNPLANNED 31‐03‐2018 12:00:50 31‐03‐2018 12:46:39 0:45 0.000375 MUs
1021 BLOCK A‐CHANDRA LOK, BLOCK M‐DURGA PURI NNG 360 630 KVA UNPLANNED 31‐03‐2018 12:53:01 31‐03‐2018 13:43:00 0:49 0.00027222 MUs1022 BABA DA DARGA‐KARDAMPURI NNG 7 630 KVA UNPLANNED 31‐03‐2018 18:39:13 31‐03‐2018 19:02:47 0:23 0.00031944 MUs1023 CHOWK NAI BASTI‐SADAR BAZAR, SHAHI IDGAH‐SADAR BAZAR ‐ P.P QUARTERS, MODEL BASTI‐SADAR BAZAR B G
ROAD, KABRISTAN‐SADAR BAZAR B G ROAD, FIRE STATION RANI JHANSI ROAD‐SADAR BAZAR B G ROADPHG 833 990 KVA UNPLANNED 06‐03‐2018 11:09:43 06‐03‐2018 11:44:09 0:34 0.00004722 MUs LT CABLE REPAIR AT
FILMISTAN1024 FYAZ GANJ‐NAWAB GANJ, TELI WARA‐NAWAB GANJ, PHARI DHIRAJ‐SADAR BAZAR PHG 1623 990 KVA UNPLANNED 09‐03‐2018 11:57:14 09‐03‐2018 13:55:25 1:58 0.00032778 MUs to lt acb at gali bahuji
kiosk1025 TELI WARA‐NAWAB GANJ PHG 269 630 KVA UNPLANNED 12‐03‐2018 13:15:36 12‐03‐2018 14:14:00 0:58 0.00008056 MUs lt cable maintenance
& CLEANING work at gali mata wali
1026 SADAR BAZAR B G ROAD PHG 818 630 KVA UNPLANNED 14‐03‐2018 15:53:52 14‐03‐2018 16:28:30 0:34 0.00009444 MUs Armoured Cable WOrk at bg rd dispansary
1027 BLOCK T‐AHATA KEDARA, SADAR BAZAR B G ROAD, KABRISTAN‐SADAR BAZAR B G ROAD, FIRE STATION RANI JHANSI ROAD‐SADAR BAZAR B G ROAD
PHG 150 990 KVA UNPLANNED 18‐03‐2018 07:31:08 18‐03‐2018 08:30:00 0:58 0.00016111 MUs 4*50 cable brunt at t 510 no ,wali gali
1028 FYAZ GANJ‐NAWAB GANJ, HATHI KHANA‐NAWAB GANJ, TELI WARA‐NAWAB GANJ, NAWAB GANJ‐SADAR BAZAR, PHARI DHIRAJ‐SADAR BAZAR, NAYA MOHALLA‐KISHAN GANJ RS
PHG 938 990 KVA UNPLANNED 20‐03‐2018 13:11:50 20‐03‐2018 14:04:25 0:52 0.00014444 MUs transformer MAINTENANCE & rmu CLEANING activity at b g road complaint center
1029 NAWAB GANJ‐SADAR BAZAR PHG 1108 990 KVA UNPLANNED 20‐03‐2018 13:28:47 20‐03‐2018 14:04:08 0:35 0.00004861 MUs feeder pillar maintenance
1030 HATHI KHANA‐NAWAB GANJ, PHARI DHIRAJ‐SADAR BAZAR PHG 788 990 KVA UNPLANNED 22‐03‐2018 15:55:28 22‐03‐2018 16:41:11 0:45 0.000125 MUs AB TO ARMOUND CABLE work at b.g road com ctr transferno3
1031 PHARI DHIRAJ‐SADAR BAZAR, SADAR BAZAR ‐ RAM NAGAR, SADAR BAZAR B G ROAD, SADAR BAZAR ‐ RAM NAGAR PHG 1225 990 KVA UNPLANNED 25‐03‐2018 12:57:34 25‐03‐2018 14:33:54 1:36 0.00026667 MUs lt ab burnt , repair & replacement work at 12 tooti chowk
1032 HATHI KHANA‐NAWAB GANJ, BLOCK T‐AHATA KEDARA, PHARI DHIRAJ‐SADAR BAZAR, CHOWK NAI BASTI‐SADAR BAZAR, NAYA MOHALLA‐KISHAN GANJ RS, SADAR BAZAR B G ROAD, SADAR BAZAR ‐ RAM NAGAR, SCHOOL‐AHATA KEDARA
PHG 4947 4590 KVA UNPLANNED 26‐03‐2018 11:30:41 26‐03‐2018 11:48:47 0:18 0.00005 MUs oil top up at
1033 TELI WARA‐NAWAB GANJ, SIMLA MANDI GOODTRAN‐RUI MANDI PHG 1603 990 KVA UNPLANNED 27‐03‐2018 13:19:32 27‐03‐2018 15:01:37 1:42 0.00014167 MUs DAMAGE POLE REPAIR AND PUT ON LOAD CABLES AT CANE MKT
1034 TELI WARA‐NAWAB GANJ, SIMLA MANDI GOODTRAN‐RUI MANDI PHG 1603 990 KVA UNPLANNED 28‐03‐2018 11:30:39 28‐03‐2018 12:07:42 0:37 0.00010278 MUs lt ab repair & replacement work at cane mkt
1035 FYAZ GANJ‐NAWAB GANJ, HATHI KHANA‐NAWAB GANJ, NAWAB GANJ‐SADAR BAZAR PHG 786 990 KVA UNPLANNED 28‐03‐2018 12:15:12 28‐03‐2018 12:49:56 0:34 0.00009444 MUs panel work at ajad mkt
1036 CHOWK NAI BASTI‐SADAR BAZAR, SADAR BAZAR B G ROAD, SADAR BAZAR ‐ RAM NAGAR PHG 830 990 KVA UNPLANNED 29‐03‐2018 12:21:21 29‐03‐2018 14:05:22 1:44 0.00028889 MUs lt cable maintance work at chimni mill kiosk
1037 BLOCK F‐SHIV VIHAR, MULTANI DHANDA‐SADAR BAZAR, PKT A‐BLOCK B PHG 41 990 KVA UNPLANNED 03‐03‐2018 22:50:03 03‐03‐2018 23:29:40 0:39 0.00005417 MUs fire in house at baggichi alluddin
1038 CHUNA MANDI‐PAHAR GANJ, MANTOLA MOHALLA‐PAHAR GANJ PHG 593 990 KVA UNPLANNED 04‐03‐2018 11:12:43 04‐03‐2018 11:52:29 0:39 0.00010833 MUs for taking load on repaired cable near khanna cinema
1039 CHUNA MANDI‐PAHAR GANJ, MANTOLA MOHALLA‐PAHAR GANJ PHG 593 990 KVA UNPLANNED 04‐03‐2018 13:25:13 04‐03‐2018 13:56:06 0:30 0.00008333 MUs to attend fault in circuit near khanna cinema
1040 BLOCK III‐ARAM BAGH, BLOCK II‐ARAM BAGH, BLOCK B‐ARAM BAGH PHG 737 990 KVA UNPLANNED 05‐03‐2018 10:06:41 05‐03‐2018 10:28:53 0:22 0.00003056 MUs maintance work feder pillar at aram bagh no.1
1041 DDA FLATS‐MOTIA KHAN, MOTIYA KHAN‐SHAHI IDGAH COLONY, BLOCK D‐MOTIA KHAN PHG 971 630 KVA UNPLANNED 05‐03‐2018 21:29:07 05‐03‐2018 21:48:27 0:19 0.00005278 MUs to attend consumer complaint (18030500996)
1042 MANTOLA MOHALLA‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ PHG 252 630 KVA UNPLANNED 06‐03‐2018 18:30:16 06‐03‐2018 19:13:33 0:43 0.00011944 MUs lt circuit work DUE TO 630 TRF ONE SWITCH TRIP
1043 MANTOLA MOHALLA‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ PHG 818 630 KVA UNPLANNED 07‐03‐2018 10:37:20 07‐03‐2018 11:20:00 0:42 0.00011667 MUs lt circuit work at dariba pan
1044 MANTOLA MOHALLA‐PAHAR GANJ, KASERU WALAN‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ PHG 664 990 KVA UNPLANNED 08‐03‐2018 22:23:37 08‐03‐2018 22:34:19 0:10 0.00004167 MUs to attend fault in circuit at tanga stand
1045 MANTOLA MOHALLA‐PAHAR GANJ PHG 1198 990 KVA UNPLANNED 09‐03‐2018 12:24:19 09‐03‐2018 12:54:03 0:29 0.00004028 MUs to repair lt ab cable at gali school wali
1046 PAHAR GANJ PHG, MANTOLA MOHALLA‐PAHAR GANJ PHG 300 990 KVA UNPLANNED 11‐03‐2018 15:22:41 11‐03‐2018 16:18:05 0:55 0.00015278 MUs to repair lt 4x300 cable near chuna mandi
1047 CHUNA MANDI‐PAHAR GANJ, MANTOLA MOHALLA‐PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ, MULTANI DHANDA‐SADAR BAZAR, S.R.T. NAGAR‐ARYA NAGAR, TYPE III HOUSE‐CHUNA MANDI, NEW RATAN MARKET‐PANCHKUIAN ROAD RAILWAY COLONY, SHEELA HOTEL‐ARYA NAGAR
PHG 1356 990 KVA UNPLANNED 13‐03‐2018 10:37:29 13‐03‐2018 12:25:53 1:48 0.00015 MUs LT AB CABLE MAINTENANCE AT P. G. DISPANSARY
1048 CHUNA MANDI‐PAHAR GANJ, MANTOLA MOHALLA‐PAHAR GANJ, BLOCK A‐AMAR NAGAR PHG 656 990 KVA UNPLANNED 13‐03‐2018 12:27:02 13‐03‐2018 14:03:05 1:36 0.00013333 MUs lt ab cable load diverted at chuna mandi
1049 R.G. COMPLEX‐MOTIA KHAN PHG 129 990 KVA UNPLANNED 13‐03‐2018 12:28:00 13‐03‐2018 14:20:00 1:52 0.00031111 MUs oil top up 1050 BLOCK L‐RAM NAGAR, BLOCK L‐AMAR NAGAR PHG 920 990 KVA UNPLANNED 13‐03‐2018 12:58:23 13‐03‐2018 13:34:53 0:36 0.00005 MUs1051 DDA FLATS‐ MOTIAKHAN DUMP SCHEME‐MOTIA KHAN, GEETA COLONY, DDA FLATS‐MOTIA KHAN, GGS
INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, SANT NIRANKARI SCHOOL‐MOTIA KHAN, R.G. COMPLEX‐MOTIA KHAN, LIG/MIG RES/NON COMM AREA‐MOTIA KHAN, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
PHG 623 990 KVA UNPLANNED 13‐03‐2018 14:41:28 13‐03‐2018 15:07:57 0:26 0.00003611 MUs
1052 MANTOLA MOHALLA‐PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, S.R.T. NAGAR‐ARYA NAGAR PHG 275 990 KVA UNPLANNED 14‐03‐2018 12:40:29 14‐03‐2018 14:21:11 1:40 0.00027778 MUs
1053 CHUNA MANDI‐PAHAR GANJ, MANTOLA MOHALLA‐PAHAR GANJ PHG 656 990 KVA UNPLANNED 14‐03‐2018 14:16:22 14‐03‐2018 15:03:00 0:46 0.00012778 MUs replace lt acb work at chuna mandi
1054 CHUNA MANDI‐PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ, MULTANI DHANDA‐SADAR BAZAR, SHEELA HOTEL‐ARYA NAGAR, TYPE III HOUSE‐CHUNA MANDI, MANTOLA MOHALLA‐PAHAR GANJ, S.R.T. NAGAR‐ARYA NAGAR
PHG 1357 990 KVA UNPLANNED 14‐03‐2018 16:16:36 14‐03‐2018 16:40:20 0:23 0.00006389 MUs lt circuit work at pahar ganj dispensary
1055 MANTOLA MOHALLA‐PAHAR GANJ, KASERU WALAN‐PAHAR GANJ PHG 567 400 KVA UNPLANNED 15‐03‐2018 10:13:29 15‐03‐2018 10:57:05 0:43 0.00011944 MUs oil top up work at gali mantola
1056 BLOCK I‐ARAM BAGH, GEETA COLONY, CHUNA MANDI‐PAHAR GANJ, MANTOLA MOHALLA‐PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ, MULTANI DHANDA‐SADAR BAZAR, S.R.T. NAGAR‐ARYA NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, TYPE III HOUSE‐CHUNA MANDI, SHEELA HOTEL‐ARYA NAGAR, ST. ANTONYS CHURCH SCHOOL‐ARYA NAGAR, SENIOR SECONDARY ENGINEER WORKSHOP N.R.OFFICE‐CHANDNI CHOWK CCK, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
PHG 5569 6570 KVA UNPLANNED 15‐03‐2018 11:32:00 15‐03‐2018 12:09:00 0:36 0.00021 MUs GAS FILLING WORK
1057 BLOCK I‐ARAM BAGH, BLOCK III‐ARAM BAGH, BLOCK II‐ARAM BAGH, BLOCK B‐ARAM BAGH, DDA FLATS‐ MOTIAKHAN DUMP SCHEME‐MOTIA KHAN, GEETA COLONY, DDA FLATS‐MOTIA KHAN, CHUNA MANDI‐PAHAR GANJ, MANTOLA MOHALLA‐PAHAR GANJ, MULTANI DHANDA‐SADAR BAZAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, SANT NIRANKARI SCHOOL‐MOTIA KHAN, R.G. COMPLEX‐MOTIA KHAN, LIG/MIG RES/NON COMM AREA‐MOTIA KHAN, TYPE III HOUSE‐CHUNA MANDI, MIG FLATS‐CHUNA MANDI, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA SONIA VIHAR
PHG 4574 6570 KVA UNPLANNED 16‐03‐2018 11:40:00 16‐03‐2018 17:45:16 6:5 0 MUs cable endbox making
1058 BLOCK I‐ARAM BAGH, MANTOLA MOHALLA‐PAHAR GANJ PHG 170 990 KVA UNPLANNED 17‐03‐2018 12:42:18 17‐03‐2018 13:08:52 0:26 0.00007222 MUs lt circuit work at chitra gupta rd
1059 BLOCK I‐ARAM BAGH, DDA FLATS‐MOTIA KHAN, MULTANI DHANDA‐SADAR BAZAR, SANT NIRANKARI SCHOOL‐MOTIA KHAN
PHG 816 630 KVA UNPLANNED 21‐03‐2018 16:04:08 21‐03‐2018 16:36:07 0:31 0.00008611 MUs AB TO ARMOUND CABLE REPLACEMENT work AT paharganj police stn
1060 MANTOLA MOHALLA‐PAHAR GANJ PHG 387 400 KVA UNPLANNED 22‐03‐2018 19:18:22 22‐03‐2018 19:51:13 0:32 0.00008889 MUs switch off from gali chandi wali due to nutrul brunt
1061 GEETA COLONY, BLOCK A‐AMAR NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, BLOCK T‐ARAM NAGAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
PHG 990 990 KVA UNPLANNED 23‐03‐2018 10:04:00 23‐03‐2018 11:34:28 1:30 0.000125 MUs NEW LT Cable Laying at amar puri
1062 DDA FLATS‐MOTIA KHAN, BLOCK D‐MOTIA KHAN, MOTIYA KHAN‐SHAHI IDGAH COLONY PHG 315 630 KVA UNPLANNED 23‐03‐2018 11:10:21 23‐03‐2018 11:40:12 0:29 0.00004028 MUs1063 ARAM NAGAR‐SADAR BAZAR PHG 107 990 KVA UNPLANNED 24‐03‐2018 17:30:28 24‐03‐2018 18:08:18 0:37 0.00010278 MUs one lt switch off due
to state throw no supply to consumer
1064 GEETA COLONY, BLOCK A‐AMAR NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
PHG 1399 990 KVA UNPLANNED 25‐03‐2018 11:10:17 25‐03‐2018 12:52:38 1:42 0.00028333 MUs lt cable 3*300 maintence work at amar puri
1065 GEETA COLONY, CHUNA MANDI‐PAHAR GANJ, MANTOLA MOHALLA‐PAHAR GANJ, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
PHG 451 990 KVA UNPLANNED 26‐03‐2018 16:34:06 26‐03‐2018 17:00:45 0:26 0.00003611 MUs LT CABLE MAINTENANCE AT KHANNA CINEMA
1066 PAHAR GANJ PHG, CHUNA MANDI‐PAHAR GANJ, MANTOLA MOHALLA‐PAHAR GANJ, MIG FLATS‐CHUNA MANDI PHG 152 990 KVA UNPLANNED 27‐03‐2018 01:08:13 27‐03‐2018 01:53:30 0:45 0.00015 MUs supply switch off due to attend complaint of fire in house
1067 CHUNA MANDI‐PAHAR GANJ, MANTOLA MOHALLA‐PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ, MULTANI DHANDA‐SADAR BAZAR, S.R.T. NAGAR‐ARYA NAGAR, TYPE III HOUSE‐CHUNA MANDI, SHEELA HOTEL‐ARYA NAGAR
PHG 1370 990 KVA UNPLANNED 27‐03‐2018 10:49:57 27‐03‐2018 12:21:18 1:31 0.00025278 MUs lt cable MAINTENANCE
1068 BLOCK A‐AMAR NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
PHG 740 990 KVA UNPLANNED 27‐03‐2018 13:12:58 27‐03‐2018 14:10:00 0:57 0.00007917 MUs
1069 MULTANI DHANDA‐SADAR BAZAR, S.R.T. NAGAR‐ARYA NAGAR PHG 801 990 KVA UNPLANNED 27‐03‐2018 15:17:17 27‐03‐2018 15:44:24 0:27 0.0000375 MUs1070 CHUNA MANDI‐PAHAR GANJ, MANTOLA MOHALLA‐PAHAR GANJ, BLOCK L‐RAM NAGAR, CHURI WALAN GALI‐
CHANDNI CHOWKPHG 106 990 KVA UNPLANNED 28‐03‐2018 07:43:03 28‐03‐2018 08:01:47 0:18 0.00005 MUs service line brunt
&meter brunt to consumer
1071 MSC‐ARAM NAGAR, BLOCK K‐ARAM NAGAR, ARAM NAGAR‐SADAR BAZAR PHG 1767 990 KVA UNPLANNED 28‐03‐2018 13:26:29 28‐03‐2018 14:19:24 0:52 0.00014444 MUs lt circuit work at kila kadam sharif
1072 BLOCK B‐ARAM BAGH PHG 656 990 KVA UNPLANNED 29‐03‐2018 11:33:14 29‐03‐2018 12:54:56 1:21 0.000225 MUs lt circuit work at aram bagh no.3
1073 NEW RATAN MARKET‐PANCHKUIAN ROAD RAILWAY COLONY PHG 129 990 KVA UNPLANNED 30‐03‐2018 17:46:46 30‐03‐2018 18:15:33 0:28 0.00007778 MUs to repair/replace 4x50 cable near mantola
1074 PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, NEW RATAN MARKET‐PANCHKUIAN ROAD RAILWAY COLONY PHG 65 990 KVA UNPLANNED 31‐03‐2018 12:52:35 31‐03‐2018 13:05:22 0:12 0.00001667 MUs lt cable MAINTENANCE at railway colony
1075 BLOCK T‐AHATA KEDARA, CHOWK NAI BASTI‐SADAR BAZAR, SCHOOL‐AHATA KEDARA, DDA POLICE QTRS.‐AHATA KEDARA
PHG 728 990 KVA UNPLANNED 07‐03‐2018 09:49:16 07‐03‐2018 10:35:00 0:45 0.000125 MUs lt cable maintance wok at chamelian rd
1076 BLOCK T‐AHATA KEDARA, SADAR BAZAR ‐ RAM NAGAR, SADAR BAZAR ‐ RAM NAGAR PHG 884 990 KVA UNPLANNED 07‐03‐2018 11:44:47 07‐03‐2018 12:30:00 0:45 0.000125 MUs db maintance work at chooti masjid
1077 BLOCK T‐SADAR BAZAR ‐ RAM NAGAR PHG 119 400 KVA UNPLANNED 07‐03‐2018 12:04:05 07‐03‐2018 12:50:00 0:45 0.000125 MUs lt pole MAINTENANCE work at idgaha rd pl
1078 BLOCK T‐AHATA KEDARA, CHOWK NAI BASTI‐SADAR BAZAR, SCHOOL‐AHATA KEDARA PHG 287 990 KVA UNPLANNED 10‐03‐2018 13:44:34 10‐03‐2018 14:40:00 0:55 0.00007639 MUs NEW POLE INSTAL NEAR CHAMELIAN ROAD S/STN
1079 GEETA COLONY, BLOCK T‐AHATA KEDARA, CHOWK NAI BASTI‐SADAR BAZAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, SADAR BAZAR ‐ RAM NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, FIRE STATION RANI JHANSI ROAD‐SADAR BAZAR B G ROAD, SCHOOL‐AHATA KEDARA, BLOCK J‐AHATA KEDARA, DDA POLICE QTRS.‐AHATA KEDARA, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR LIG/MIG RES/NON COMM AREA SONIA VIHAR
PHG 4451 3960 KVA UNPLANNED 12‐03‐2018 18:10:00 12‐03‐2018 18:32:21 0:22 0.00100833 MUs partially load backfeed gali darzian to chimni mill
1080 CHOWK NAI BASTI‐SADAR BAZAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, DDA POLICE QTRS.‐AHATA KEDARA, SCHOOL‐AHATA KEDARA, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK T‐AHATA KEDARA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SADAR BAZAR ‐ RAM NAGAR, BLOCK J‐AHATA KEDARA, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, FIRE STATION RANI JHANSI ROAD‐SADAR BAZAR B G ROAD, BLOCK F SHIV VIHAR JHILMIL INDUSTRIAL AREA JHILMIL COLONY PKT A BLOCK B
PHG 4451 3960 KVA UNPLANNED 12‐03‐2018 19:10:30 12‐03‐2018 19:52:37 0:42 0.001925 MUs partially load backfeed, to motia khan to ahata kidara tanki due to overload
1081 SADAR BAZAR ‐ RAM NAGAR, SADAR BAZAR ‐ RAM NAGAR, BLOCK T‐AHATA KEDARA PHG 887 990 KVA UNPLANNED 13‐03‐2018 10:35:32 13‐03‐2018 11:25:02 0:49 0.00006806 MUs SOCKET REPLACEMENT AT CHOOTI MASJID
1082 DDA FLATS‐MOTIA KHAN, BLOCK T‐AHATA KEDARA, SADAR BAZAR ‐ RAM NAGAR, BLOCK T‐SADAR BAZAR ‐ RAM NAGAR
PHG 980 990 KVA UNPLANNED 14‐03‐2018 14:37:40 14‐03‐2018 15:22:32 0:44 0.00012222 MUs oil top up at s/stn 24 qtr
1083 BLOCK T‐AHATA KEDARA, SADAR BAZAR B G ROAD, FIRE STATION RANI JHANSI ROAD‐SADAR BAZAR B G ROAD, BLOCK J‐AHATA KEDARA, DDA POLICE QTRS.‐AHATA KEDARA
PHG 586 400 KVA UNPLANNED 14‐03‐2018 15:24:25 14‐03‐2018 15:53:14 0:28 0.00007778 MUs oil top up at s/stn 4 pols pp qtr
1084 BLOCK T‐AHATA KEDARA, SADAR BAZAR ‐ RAM NAGAR PHG 496 990 KVA UNPLANNED 14‐03‐2018 16:13:45 14‐03‐2018 16:40:00 0:26 0.00007222 MUs oil top up work at ak tanki
1085 GEETA COLONY, BLOCK T‐AHATA KEDARA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, SADAR BAZAR ‐ RAM NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
PHG 1166 990 KVA UNPLANNED 15‐03‐2018 11:49:54 15‐03‐2018 12:18:00 0:28 0.00007778 MUs requested kcc deptment change joint meter replacement work at ak tankiod
1086 SADAR BAZAR ‐ RAM NAGAR PHG 849 990 KVA UNPLANNED 15‐03‐2018 15:08:05 15‐03‐2018 15:30:00 0:21 0.00005833 MUs db maintance work at gali drgniyan
1087 SADAR BAZAR ‐ RAM NAGAR, BLOCK T‐SADAR BAZAR ‐ RAM NAGAR PHG 395 990 KVA UNPLANNED 17‐03‐2018 13:33:42 17‐03‐2018 14:20:00 0:46 0.00012778 MUs pole maintance work aT sadar thana rd
1088 BLOCK T‐AHATA KEDARA, SADAR BAZAR B G ROAD, FIRE STATION RANI JHANSI ROAD‐SADAR BAZAR B G ROAD, BLOCK J‐AHATA KEDARA, DDA POLICE QTRS.‐AHATA KEDARA
PHG 586 400 KVA UNPLANNED 21‐03‐2018 10:08:30 21‐03‐2018 10:31:33 0:23 0.00006389 MUs lt cable mantinace work at 4 pols p.p qtr
1089 SADAR BAZAR ‐ RAM NAGAR PHG 849 990 KVA UNPLANNED 21‐03‐2018 11:43:56 21‐03‐2018 12:14:23 0:30 0.00008333 MUs db replacement work at gali drgniyan pkg
1090 SADAR BAZAR ‐ RAM NAGAR, BLOCK T‐SADAR BAZAR ‐ RAM NAGAR PHG 395 990 KVA UNPLANNED 31‐03‐2018 14:45:45 31‐03‐2018 16:05:07 1:19 0.00010972 MUs pole MAINTENANCE at sadar thana
1091 CHETAN BASTI‐ BLOCK J‐NEHRU NAGAR, PREM NAGAR‐BALJIT NAGAR PNR 1080 990 KVA UNPLANNED 01‐03‐2018 13:32:45 01‐03‐2018 15:02:44 1:29 0.00024722 MUs1092 BLOCK H‐WEST PATEL NAGAR, BLOCK G‐COTTAGE, BLOCK J‐WEST PATEL NAGAR, BLOCK O‐WEST PATEL NAGAR PNR 505 990 KVA UNPLANNED 05‐03‐2018 13:46:06 05‐03‐2018 14:12:43 0:26 0.00007222 MUs1093 BLOCK T‐FARIDPURI, BLOCK 26‐WEST PATEL NAGAR PNR 149 990 KVA UNPLANNED 07‐03‐2018 11:15:41 07‐03‐2018 13:04:14 1:48 0.0003 MUs1094 BLOCK 12‐EAST PATEL NAGAR, BLOCK 25‐EAST PATEL NAGAR, BLOCK 26‐EAST PATEL NAGAR, BLOCK 30‐EAST PATEL
NAGAR, BLOCK 29‐EAST PATEL NAGAR, BLOCK 24‐EAST PATEL NAGARPNR 606 990 KVA UNPLANNED 08‐03‐2018 16:21:44 08‐03‐2018 16:24:11 0:2 0.00000667 MUs
1095 BLOCK 29‐WEST PATEL NAGAR PNR 104 630 KVA UNPLANNED 12‐03‐2018 17:57:00 12‐03‐2018 18:23:00 0:26 0.00008667 MUs1096 BLOCK T‐BALJIT NAGAR, DELHI MILK SCHEM DMS‐PREM NAGAR, DMS COLONY‐PREM NAGAR PNR 132 990 KVA UNPLANNED 14‐03‐2018 13:03:00 14‐03‐2018 14:32:52 1:29 0.00029667 MUs1097 BLOCK 28‐WEST PATEL NAGAR, BLOCK 29‐WEST PATEL NAGAR, BLOCK F‐WEST PATEL NAGAR, BLOCK K‐WEST PATEL
NAGAR, BLOCK H‐WEST PATEL NAGAR, BLOCK E‐WEST PATEL NAGAR, BLOCK D‐WEST PATEL NAGARPNR 929 990 KVA UNPLANNED 17‐03‐2018 14:24:14 17‐03‐2018 15:24:35 1:0 0.0002 MUs
1098 BLOCK T‐BALJIT NAGAR, BLOCK V‐WEST PATEL NAGAR, PATEL NAGAR POLICE STATION‐WEST PATEL NAGAR PNR 103 990 KVA UNPLANNED 22‐03‐2018 15:43:38 22‐03‐2018 16:42:54 0:59 0.00022944 MUs1099 PREM NAGAR‐BALJIT NAGAR, BLOCK F‐PUNJABI BASTI PNR 351 990 KVA UNPLANNED 24‐03‐2018 13:25:00 24‐03‐2018 15:12:17 1:47 0.00074306 MUs1100 BLOCK 29‐EAST PATEL NAGAR, BLOCK 18‐EAST PATEL NAGAR, BLOCK 16‐EAST PATEL NAGAR, BLOCK 28‐EAST PATEL
NAGARPNR 111 990 KVA UNPLANNED 28‐03‐2018 19:57:55 28‐03‐2018 20:22:38 0:24 0.00006667 MUs
1101 RAJENDRA BHAWAN‐RAJENDRA PLACE, MIG FLATS‐PRASAD NAGAR PNR 259 990 KVA UNPLANNED 01‐03‐2018 10:41:14 01‐03‐2018 11:33:43 0:52 0.00028889 MUs1102 THAKKAR BAPA NAGAR‐BLOCK 16, BLOCK B‐PUNJABI BASTI PNR 1563 990 KVA UNPLANNED 15‐03‐2018 14:08:02 15‐03‐2018 16:03:03 1:55 0.00038333 MUs
1103 BLOCK 1B‐DEV NAGAR, PHASE I‐DEV NAGAR, MATA RAMESHWARI NEHRU NAGAR‐DEV NAGAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, THAKKAR BAPA NAGAR‐DEV NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, ST.MICHAELS JUNIOR SCHOOL‐PRASAD NAGAR, BAPA NAGAR‐ANAND PARBAT, KHALSA NAGAR‐DEV NAGAR, BLOCK G‐DEV NAGAR, ANDHRA PUBLIC SCHOOL‐PRASAD NAGAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
PNR 4671 2970 KVA UNPLANNED 19‐03‐2018 12:40:00 19‐03‐2018 15:02:00 2:22 0 MUs GAS FILLING WORK
1104 BLOCK 1B‐DEV NAGAR, MATA RAMESHWARI NEHRU NAGAR‐DEV NAGAR, BLOCK 8‐EAST PATEL NAGAR, KHALSA NAGAR‐DEV NAGAR
PNR 39 990 KVA UNPLANNED 19‐03‐2018 19:23:40 19‐03‐2018 20:19:43 0:56 0.00023333 MUs
1105 BLOCK_5B‐DEV NAGAR, BLOCK_9B‐DEV NAGAR, BLOCK_1‐DEV NAGAR, BLOCK_10B‐DEV NAGAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
PNR 1521 990 KVA UNPLANNED 21‐03‐2018 15:45:00 21‐03‐2018 17:22:22 1:37 0.00059278 MUs
1106 THAKKAR BAPA NAGAR‐DEV NAGAR, BLOCK G‐DEV NAGAR PNR 372 990 KVA UNPLANNED 22‐03‐2018 14:13:00 22‐03‐2018 15:52:54 1:39 0.00033 MUs1107 THAKKAR BAPA NAGAR‐BLOCK 16, BLOCK_5B‐DEV NAGAR, BLOCK_8B‐DEV NAGAR, BLOCK_9B‐DEV NAGAR, BLOCK_2‐
DEV NAGAR, BLOCK 1‐DEV NAGAR, BLOCK 10B‐DEV NAGAR, BLOCK 14B‐DEV NAGARPNR 1755 990 KVA UNPLANNED 24‐03‐2018 14:47:23 24‐03‐2018 15:43:00 0:55 0.00053472 MUs
1108 MATA RAMESHWARI NEHRU NAGAR‐DEV NAGAR, THAKKAR BAPA NAGAR‐DEV NAGAR, BAPA NAGAR‐ANAND PARBAT, KHALSA NAGAR‐DEV NAGAR, BLOCK G‐DEV NAGAR
PNR 2853 990 KVA UNPLANNED 31‐03‐2018 11:26:04 31‐03‐2018 13:13:00 1:46 0.00029444 MUs
1109 ANAND PARBAT PNR 197 990 KVA UNPLANNED 07‐03‐2018 13:31:08 07‐03‐2018 15:29:00 1:57 0.000325 MUs demolition on this area by dda
1110 ANAND PARBAT, ARMY QTRS‐ANAND PARBAT PNR 218 990 KVA UNPLANNED 07‐03‐2018 14:19:13 07‐03‐2018 15:07:48 0:48 0.00013333 MUs demolition on this area by dda(case office)
1111 ANAND PARBAT PNR 125 990 KVA UNPLANNED 15‐03‐2018 13:32:33 15‐03‐2018 14:29:09 0:56 0.00018667 MUs1112 ANAND PARBAT PNR 210 990 KVA UNPLANNED 17‐03‐2018 12:08:41 17‐03‐2018 12:52:31 0:43 0.00014333 MUs1113 ANAND PARBAT PNR 183 990 KVA UNPLANNED 20‐03‐2018 11:54:25 20‐03‐2018 12:48:22 0:53 0.00017667 MUs1114 BLOCK 27B‐AJMAL KHAN PARK, THAN SINGH NAGAR‐ANAND PARBAT PNR 1182 990 KVA UNPLANNED 26‐03‐2018 11:27:03 26‐03‐2018 12:22:28 0:55 0.00015278 MUs1115 ANAND PARBAT PNR 40 990 KVA UNPLANNED 27‐03‐2018 10:05:31 27‐03‐2018 11:03:00 0:57 0.000095 MUs1116 BLOCK 2E‐JHANDEWALAN EXTENSION, BLOCK 3E‐JHANDEWALAN EXTENSION, ANARKALI BAZAR‐JHANDEWALAN
EXTENSION, MCD OFFICE‐JHANDEWALAN EXTENSIONSRD 152 990 KVA UNPLANNED 01‐03‐2018 14:49:12 01‐03‐2018 15:41:27 0:52 0.00021667 MUs lt cable repair
1117 MOHALLA SUBHASH NAGAR‐NAIWALA, BLOCK_39‐NAIWALA, BLOCK_49A‐NAIWALA, BLOCK_48D‐NAIWALA SRD 609 990 KVA UNPLANNED 03‐03‐2018 17:56:37 03‐03‐2018 18:55:29 0:58 0.00024167 MUs pole maintenance work
1118 BLOCK 57‐AJMAL KHAN PARK, MCD GARAGE‐ SLUM‐JHANDEWALAN, KAROL BAGH TERMINAL SLUM‐JHANDEWALAN, SLUM‐JHANDEWALAN, BLOCK T‐JHANDEWALAN
SRD 434 630 KVA UNPLANNED 23‐03‐2018 09:55:58 23‐03‐2018 11:02:32 1:6 0.00022 MUs pd maintenance work
1119 JHANDEWALAN FATTED FACTORY COMPLEX SRD 113 990 KVA UNPLANNED 23‐03‐2018 11:32:31 23‐03‐2018 12:40:11 1:7 0.00022333 MUs pd maintenance work
1120 SWAMI RAMTIRTH NAGAR‐JHANDEWALAN EXTENSION, BHARTI COLONY‐NIRMAN VIHAR, BLOCK 1E‐JHANDEWALAN EXTENSION, CINEMA‐JHANDEWALAN EXTENSION, BLOCK 2E‐JHANDEWALAN EXTENSION, BLOCK 3E‐JHANDEWALAN EXTENSION, S.R.T. NAGAR‐JHANDEWALAN EXTENSION
SRD 198 990 KVA UNPLANNED 26‐03‐2018 10:18:25 26‐03‐2018 11:48:18 1:29 0.00049444 MUs pd maintenance work
1121 BLOCK 57‐AJMAL KHAN PARK, BHARTI COLONY‐NIRMAN VIHAR, MCD GARAGE‐ SLUM‐JHANDEWALAN, KAROL BAGH TERMINAL SLUM‐JHANDEWALAN, SLUM‐JHANDEWALAN, BLOCK T‐JHANDEWALAN
SRD 434 630 KVA UNPLANNED 26‐03‐2018 12:04:29 26‐03‐2018 13:47:30 1:43 0.00028611 MUs making of end box
1122 BLOCK 13‐KAROL BAGH, BLOCK 12‐REHGAR PURA, BLOCK 4‐KAROL BAGH SRD 391 990 KVA UNPLANNED 05‐03‐2018 13:18:59 05‐03‐2018 15:03:00 1:44 0.00072222 MUs lt cable repair1123 BLOCK_8A‐SANT NAGAR, BLOCK_9A‐BALMIKI COLONY, GEETA COLONY, SHAMSHAN GHAT‐SAT NAGAR, GGS
INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, TELEPHONE EXCHANGE‐SAT NAGAR, P & T COLONY‐SAT NAGAR, ALFA SPICE‐SAT NAGAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
SRD 562 990 KVA UNPLANNED 07‐03‐2018 09:57:10 07‐03‐2018 10:25:00 0:27 0.0000375 MUs
1124 BLOCK_6‐KAROL BAGH WEST EXTENSION AREA, BLOCK_17A‐KAROL BAGH WEST EXTENSION AREA, BLOCK 5‐KAROL BAGH, BLOCK 15A‐KAROL BAGH
SRD 205 990 KVA UNPLANNED 10‐03‐2018 09:24:06 10‐03‐2018 10:03:36 0:39 0.00021667 MUs line man is working on the site...fire in house complaint id is 1803100008
1125 BLOCK 13‐KAROL BAGH, BLOCK 12‐REHGAR PURA, BLOCK 4‐KAROL BAGH SRD 531 990 KVA UNPLANNED 19‐03‐2018 14:14:45 19‐03‐2018 15:01:46 0:47 0.00026111 MUs pole maintenance work
1126 BLOCK_34P‐KRISHNA NAGAR, BLOCK_45‐KRISHNA NAGAR, BLOCK_44O‐KRISHNA NAGAR, BLOCK_48‐KRISHNA NAGAR SRD 185 990 KVA UNPLANNED 22‐03‐2018 04:05:00 22‐03‐2018 04:37:00 0:31 0.00018083 MUs
1127 BLOCK 19‐OLD RAJENDRA NAGAR, BLOCK 11‐OLD RAJENDRA NAGAR, BLOCK 4D‐OLD RAJENDRA NAGAR, BLOCK 26‐OLD RAJENDRA NAGAR, BLOCK 27‐OLD RAJENDRA NAGAR, BLOCK 18‐OLD RAJENDRA NAGAR, BLOCK 21‐OLD RAJENDRA NAGAR, BLOCK 20‐OLD RAJENDRA NAGAR
SRD 553 630 KVA UNPLANNED 07‐03‐2018 10:25:53 07‐03‐2018 11:20:00 0:54 0.000075 MUs
1128 BLOCK B6‐OLD RAJENDRA NAGAR, BLOCK 51‐OLD RAJENDRA NAGAR, BLOCK 51‐OLD RAJENDRA NAGAR, BLOCK B‐OLD RAJENDRA NAGAR
SRD 405 990 KVA UNPLANNED 07‐03‐2018 15:30:32 07‐03‐2018 17:17:23 1:46 0.00058889 MUs replacement of dtr 990 against low oil bdv
1129 BLOCK 10‐OLD RAJENDRA NAGAR, BLOCK 14‐OLD RAJENDRA NAGAR, BLOCK 15‐OLD RAJENDRA NAGAR, BLOCK 16‐OLD RAJENDRA NAGAR, SIR GANGA RAM HOSPITAL‐CENTRAL RIDGE RESERVED FOREST
SRD 327 990 KVA UNPLANNED 21‐03‐2018 09:45:37 21‐03‐2018 11:03:00 1:17 0.00032083 MUs db burnt
1130 BLOCK 10‐OLD RAJENDRA NAGAR, BLOCK 15‐OLD RAJENDRA NAGAR, BLOCK 16‐OLD RAJENDRA NAGAR SRD 220 990 KVA UNPLANNED 22‐03‐2018 09:54:20 22‐03‐2018 11:41:01 1:46 0.00017667 MUs repair work of db1131 BLOCK 10‐OLD RAJENDRA NAGAR, BLOCK 9‐OLD RAJENDRA NAGAR, BLOCK 8A‐OLD RAJENDRA NAGAR, BLOCK 14‐OLD
RAJENDRA NAGAR, BLOCK 15‐OLD RAJENDRA NAGAR, BLOCK 16‐OLD RAJENDRA NAGAR, BLOCK 8‐OLD RAJENDRA NAGAR, SIR GANGA RAM HOSPITAL‐CENTRAL RIDGE RESERVED FOREST
SRD 1225 990 KVA UNPLANNED 22‐03‐2018 20:38:49 22‐03‐2018 21:15:30 0:36 0.0001 MUs lt socket burnt at 10 block old rajender nagar
1132 BLOCK 13‐OLD RAJENDRA NAGAR SRD 150 990 KVA UNPLANNED 23‐03‐2018 11:31:07 23‐03‐2018 13:25:00 1:53 0.00018833 MUs removal of expose joint
1133 BLOCK 4C‐OLD RAJENDRA NAGAR, BLOCK 4D‐OLD RAJENDRA NAGAR, BLOCK 4‐OLD RAJENDRA NAGAR SRD 187 990 KVA UNPLANNED 27‐03‐2018 12:05:35 27‐03‐2018 12:50:00 0:44 0.00006111 MUs repair work of service lines
1134 BLOCK_G1/A‐KONDALI GHAROLI SECTOR G, BLOCK_G3/C‐KONDALI GHAROLI SECTOR G, KONDALI GHAROLI SECTOR G‐GHAROLI KONDLI
VSE 225 630 KVA UNPLANNED 09‐03‐2018 14:27:19 09‐03‐2018 16:18:10 1:50 0 MUs coupling work load 8 amp
1135 BLOCK A‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III VSE 1728 0 KVA UNPLANNED 13‐03‐2018 10:15:30 13‐03‐2018 11:15:59 1:0 0.00013333 MUs1136 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK C‐AMAR COLONY, GHAROLI KONDLI,
BLOCK A‐MAYUR VIHAR PHASE III, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, PKT B1‐MAYUR VIHAR PHASE III, PKT B3‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III, SHAHDARA JLM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT B2‐MAYUR VIHAR PHASE III, BLOCK N‐SHIV VIHAR, PKT 1‐MAYUR VIHAR PHASE III, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐VIVEK VIHAR, PKT B4‐MAYUR VIHAR PHASE III, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, BLOCK B‐MAYUR VIHAR PHASE III, BLOCK B‐MOTHER DAIRY, PKT 6‐NEW KONDALI, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SEC C‐MAYUR VIHAR PHASE III, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, PKT B8‐MAYUR VIHAR PHASE III, INDIRA GANDHI STADIUM‐AJMERI GATE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, ISBT‐ISBT ANAND VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B PKT B CHITRAKOOT
VSE 8115 3510 KVA UNPLANNED 15‐03‐2018 02:00:05 15‐03‐2018 02:19:17 0:19 0.00016889 MUs hvds system supply off
1137 BLOCK A‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III VSE 2094 0 KVA UNPLANNED 16‐03‐2018 14:48:41 16‐03‐2018 15:36:05 0:47 0.00013056 MUs
1138 KONDALI VILLAGE‐GHAROLI KONDLI, BLOCK F‐KONDALI VILLAGE VSE 983 990 KVA UNPLANNED 17‐03‐2018 12:23:52 17‐03‐2018 14:15:00 1:51 0.00037 MUs 01139 BLOCK A‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III VSE 2094 0 KVA UNPLANNED 19‐03‐2018 14:11:11 19‐03‐2018 14:40:51 0:29 0.00008056 MUs sparking on hvds lead
1140 BLOCK_G3/C‐KONDALI GHAROLI SECTOR G, BLOCK B‐AMBEDKAR AWAS KALYAN SAMITI, GHAROLI VILLAGE‐GHAROLI KONDLI
VSE 158 630 KVA UNPLANNED 19‐03‐2018 14:20:41 19‐03‐2018 15:55:15 1:34 0.00020889 MUs pkt c sfs
1141 BLOCK D‐NEW KONDALI, KONDALI VILLAGE‐GHAROLI KONDLI, BLOCK A‐KONDALI VILLAGE, BLOCK F‐KONDALI VILLAGE VSE 132 630 KVA UNPLANNED 24‐03‐2018 13:03:00 24‐03‐2018 16:30:00 3:27 0.000345 MUs lt burnt cable change at s/s pr.school
1142 KONDALI VILLAGE‐GHAROLI KONDLI, BLOCK F‐KONDALI VILLAGE, KONDALI VILLAGE‐GHAROLI KONDLI VSE 752 630 KVA UNPLANNED 27‐03‐2018 12:14:50 27‐03‐2018 14:03:00 1:48 0.00024 MUs BYPASS OF RMU 1143 PKT B5‐MAYUR VIHAR PHASE III, PKT B8‐MAYUR VIHAR PHASE III VSE 407 400 KVA UNPLANNED 29‐03‐2018 12:17:33 29‐03‐2018 14:17:12 1:59 0 MUs repair and
replacement ht panal
1144 BLOCK A‐MAYUR VIHAR PHASE III, SEC C‐MAYUR VIHAR PHASE III VSE 768 0 KVA UNPLANNED 30‐03‐2018 14:06:36 30‐03‐2018 14:28:30 0:21 0.00005833 MUs1145 BLOCK C1‐NEW ASHOK NAGAR, BLOCK D‐NEW ASHOK NAGAR VSE 1188 630 KVA UNPLANNED 14‐03‐2018 15:04:20 14‐03‐2018 16:37:32 1:33 0.00025833 MUs oil leakage at c‐5 new
ashok ngr and transformer replacement
1146 BLOCK C2‐NEW ASHOK NAGAR, BLOCK C1‐NEW ASHOK NAGAR, BLOCK A‐NEW ASHOK NAGAR, BLOCK D‐NEW ASHOK NAGAR, BLOCK D‐NEW ASHOK NAGAR
VSE 2712 990 KVA UNPLANNED 17‐03‐2018 20:25:20 17‐03‐2018 20:35:25 0:10 0.00011111 MUs LOCAL TRF. TRIP
1147 SARASWATI KUNJ‐ EAST END APPARTMENT‐NEW ASHOK NAGAR VSE 105 630 KVA UNPLANNED 23‐03‐2018 22:38:51 23‐03‐2018 23:17:35 0:38 0.00010556 MUs1148 BLOCK C1‐NEW ASHOK NAGAR, BLOCK E‐NEW ASHOK NAGAR VSE 897 990 KVA UNPLANNED 27‐03‐2018 13:38:35 27‐03‐2018 15:34:00 1:55 0.00003194 MUs feeder pillar
replacement 1149 BLOCK B‐NEW ASHOK NAGAR VSE VSE 144 990 KVA UNPLANNED 28‐03‐2018 12:14:13 28‐03‐2018 13:17:50 1:3 0 MUs lt cable connection 1150 BLOCK B1‐NEW ASHOK NAGAR, BLOCK B‐NEW ASHOK NAGAR VSE VSE 827 400 KVA UNPLANNED 28‐03‐2018 15:38:53 28‐03‐2018 17:22:33 1:43 0.00011444 MUs1151 BLOCK A‐PHASE I, PKT 1‐ DDA FLATS‐PHASE I, KHICHRI PUR‐PHASE II, KOTLA EXCT‐PHASE II VSE 1216 1620 KVA UNPLANNED 20‐03‐2018 19:07:21 20‐03‐2018 19:17:27 0:10 0 MUs SUPPLY
AUTOMATICALLY OFF SO BD TEAM CHEKED THE CIRCUIT
1152 DURGA PARK COLONY‐DALLU PURA, DALLU PURA VSE‐VASUNDHARA ENCLAVE VSE, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK B
VSE 393 630 KVA UNPLANNED 04‐03‐2018 22:03:00 04‐03‐2018 22:43:00 0:40 0.00006667 MUs
1153 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, DALLU PURA VSE‐VASUNDHARA ENCLAVE VSE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
VSE 794 630 KVA UNPLANNED 07‐03‐2018 12:17:29 07‐03‐2018 13:07:46 0:50 0.00001389 MUs
1154 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, DALLU PURA VSE‐VASUNDHARA ENCLAVE VSE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
VSE 794 630 KVA UNPLANNED 10‐03‐2018 17:23:09 10‐03‐2018 18:10:00 0:46 0.00012778 MUs
1155 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, DALLU PURA VSE‐VASUNDHARA ENCLAVE VSE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
VSE 797 630 KVA UNPLANNED 14‐03‐2018 17:42:36 14‐03‐2018 18:18:24 0:35 0.00005833 MUs
1156 MANAVSTHALI APPARTMENT‐VASUNDHARA ENCLAVE VSE VSE 86 630 KVA UNPLANNED 20‐03‐2018 00:22:05 20‐03‐2018 01:30:34 1:8 0.00018889 MUs 630 transformer suspected faulty from high land cghs
1157 NDSE APPARTMENT‐VASUNDHARA ENCLAVE VSE VSE 27 400 KVA UNPLANNED 26‐03‐2018 15:52:23 26‐03‐2018 16:24:49 0:32 0 MUs1158 DURGA PARK COLONY‐DALLU PURA, VARUN ENCLAVE‐DALLU PURA, DALLU PURA VSE‐VASUNDHARA ENCLAVE VSE,
MCD SCHOOL‐GHAROLI KONDLI, BLOCK B‐DALLU PURA VSEVSE 1237 630 KVA UNPLANNED 27‐03‐2018 12:50:20 27‐03‐2018 14:46:38 1:56 0 MUs 1 amp
1159 PKT 6‐NEW KONDALI, PKT 2‐NEW KONDALI VSE 57 630 KVA UNPLANNED 30‐03‐2018 11:06:44 30‐03‐2018 13:59:28 2:52 0 MUs LOAD 1 AMP 1160 BLOCK 9‐GANDHI NAGAR, SHYAM COLONY‐KAILASH NAGAR SOUTH, BLOCK 9‐GANDHI NAGAR YVR 2018 990 KVA UNPLANNED 20‐03‐2018 15:25:21 20‐03‐2018 16:36:25 1:11 0.00019722 MUs1161 BLOCK B‐MANUJPUR, BLOCK B‐GARI MANDU YVR 1193 990 KVA UNPLANNED 02‐03‐2018 10:08:34 02‐03‐2018 10:47:00 0:38 0.00031667 MUs1162 NAYAGAON‐NEW KATWARA, KACHI COLONY‐JAGJEET NAGAR, JAGJEET NAGAR‐GHONDA YVR 1183 990 KVA UNPLANNED 05‐03‐2018 11:01:33 05‐03‐2018 11:19:28 0:17 0.00014167 MUs1163 NAYAGAON‐NEW KATWARA, NEW USMANPUR‐NEW KATWARA YVR 444 630 KVA UNPLANNED 05‐03‐2018 12:47:12 05‐03‐2018 13:09:13 0:22 0.00018333 MUs1164 BLOCK O‐BRAHM PURI, BLOCK M‐BRAHM PURI, BLOCK K‐BRAHM PURI, BLOCK B‐BRAHM PURI YVR 1223 990 KVA UNPLANNED 05‐03‐2018 13:28:01 05‐03‐2018 14:01:49 0:33 0.000275 MUs1165 BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA YVR 739 990 KVA UNPLANNED 05‐03‐2018 19:25:03 05‐03‐2018 19:53:14 0:28 0.00007778 MUs complaint
no.180305008361166 BLOCK B‐GARI MANDU, NAYAGAON‐NEW KATWARA, NEW USMANPUR‐NEW KATWARA, BLOCK C‐GHONDA PATTI,
BLOCK H‐GHONDA PATTI, GHONDA PATTIYVR 1227 630 KVA UNPLANNED 10‐03‐2018 12:37:52 10‐03‐2018 13:18:11 0:40 0.00033333 MUs
1167 NAYAGAON‐NEW KATWARA, BLOCK P‐BRAHM PURI, BLOCK F‐BRAHM PURI, BLOCK L‐BRAHM PURI YVR 2999 400 KVA UNPLANNED 10‐03‐2018 13:18:50 10‐03‐2018 14:04:10 0:45 0.0005 MUs1168 BLOCK A‐GARI MANDU, BLOCK B‐MANUJPUR YVR 829 990 KVA UNPLANNED 12‐03‐2018 13:34:00 12‐03‐2018 14:04:44 0:30 0.00025 MUs1169 NAYAGAON‐NEW KATWARA, BLOCK E‐SUBHASH MOHALLA, BLOCK F‐BRAHM PURI, KACHI COLONY‐JAGJEET NAGAR,
BLOCK H‐GHONDA PATTI, BLOCK B‐NEW ASHOK NAGAR VSE, BLOCK D‐BHAJANPURA, BLOCK C‐BHAJANPURA, JAGJEET NAGAR‐GHONDA, GHONDA PATTI, BLOCK E‐SUBHASH MOHALLA
YVR 5804 990 KVA UNPLANNED 13‐03‐2018 10:51:02 13‐03‐2018 11:34:45 0:43 0.00011944 MUs
1170 NAYAGAON‐NEW KATWARA, KACHI COLONY‐JAGJEET NAGAR, VIJAY PARK‐YAMUNA VIHAR, JAGJEET NAGAR‐GHONDA YVR 1222 1620 KVA UNPLANNED 13‐03‐2018 13:26:21 13‐03‐2018 14:10:33 0:44 0.00036667 MUs Installation of FPI
1171 BLOCK P‐BRAHM PURI, BLOCK C‐GHONDA PATTI, BLOCK J‐KARTAR NAGAR, BLOCK C‐JAI PRAKASH NAGAR YVR 1377 990 KVA UNPLANNED 13‐03‐2018 15:00:41 13‐03‐2018 16:23:21 1:22 0.00068333 MUs1172 BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA YVR 443 990 KVA UNPLANNED 13‐03‐2018 16:58:06 13‐03‐2018 17:52:36 0:54 0.00015 MUs1173 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV
VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐BHAJANPURA, BLOCK C‐GHONDA PATTI, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐GHONDA PATTI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK H‐GHONDA PATTI, BLOCK F‐SHIV VIHAR, BLOCK D‐BHAJANPURA, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
YVR 1542 630 KVA UNPLANNED 15‐03‐2018 12:47:50 15‐03‐2018 12:56:53 0:9 0.000025 MUs
1174 BLOCK H‐GHONDA PATTI, BLOCK C‐GHONDA PATTI, GHONDA PATTI, ARVIND NAGAR‐GHONDA, BLOCK C‐JAI PRAKASH NAGAR
YVR 1452 990 KVA UNPLANNED 15‐03‐2018 13:20:09 15‐03‐2018 13:43:47 0:23 0.00006389 MUs
1175 BLOCK C‐GHONDA PATTI, BLOCK C‐JAI PRAKASH NAGAR, BLOCK J‐KARTAR NAGAR YVR 1378 990 KVA UNPLANNED 15‐03‐2018 13:49:22 15‐03‐2018 14:45:00 0:55 0.00045833 MUs1176 NEW USMANPUR‐NEW KATWARA, BLOCK P‐BRAHM PURI, VIJAY PARK‐YAMUNA VIHAR, BLOCK A‐GARI MANDU,
BLOCK D‐BHAJANPURA, BLOCK C‐BHAJANPURA, BLOCK B‐MANUJPUR, BLOCK B‐GARI MANDU, GHONDA PATTI CHAUHAN, BLOCK V‐GHONDA PATTI CHAUHAN
YVR 1519 630 KVA UNPLANNED 15‐03‐2018 17:03:32 15‐03‐2018 17:22:53 0:19 0.00011083 MUs burnt db repair at tikona park gamri
1177 BLOCK C‐BHAJANPURA, JAGJEET NAGAR‐GHONDA, GHONDA PATTI, BLOCK E‐SUBHASH MOHALLA, BLOCK B‐NEW ASHOK NAGAR VSE, NAYAGAON‐NEW KATWARA, BLOCK H‐GHONDA PATTI, KACHI COLONY‐JAGJEET NAGAR, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK F‐BRAHM PURI
YVR 5808 990 KVA UNPLANNED 16‐03‐2018 14:05:23 16‐03‐2018 15:20:26 1:15 0.00083333 MUs
1178 NAYAGAON‐NEW KATWARA, BLOCK I‐BRAHM PURI, BLOCK O‐BRAHM PURI, BLOCK M‐BRAHM PURI, BLOCK K‐BRAHM PURI, BLOCK N‐BRAHM PURI, BLOCK P‐BRAHM PURI, BLOCK E‐BRAHM PURI, BLOCK F‐BRAHM PURI, BLOCK L‐BRAHM PURI, BLOCK J‐BRAHM PURI
YVR 3129 990 KVA UNPLANNED 16‐03‐2018 14:57:54 16‐03‐2018 15:13:10 0:15 0.00008333 MUs INSTALLATION three phase meter at side
1179 BLOCK R‐BRAHM PURI, BLOCK N‐BRAHM PURI, BLOCK P‐BRAHM PURI YVR 223 990 KVA UNPLANNED 16‐03‐2018 18:29:23 16‐03‐2018 19:15:46 0:46 0.00019167 MUs to attend fault in lt circuit at r blk gali no‐19
1180 NEW USMANPUR‐NEW KATWARA, BLOCK P‐BRAHM PURI, VIJAY PARK‐YAMUNA VIHAR, BLOCK A‐GARI MANDU, BLOCK D‐BHAJANPURA, BLOCK C‐BHAJANPURA, BLOCK B‐MANUJPUR, BLOCK B‐GARI MANDU, GHONDA PATTI CHAUHAN, BLOCK V‐GHONDA PATTI CHAUHAN
YVR 1675 630 KVA UNPLANNED 17‐03‐2018 10:03:44 17‐03‐2018 11:23:49 1:20 0.00022222 MUs
1181 NAYAGAON‐NEW KATWARA, BLOCK P‐BRAHM PURI, BLOCK F‐BRAHM PURI, BLOCK L‐BRAHM PURI YVR 3004 400 KVA UNPLANNED 17‐03‐2018 11:31:04 17‐03‐2018 13:05:37 1:34 0.00052222 MUs1182 BLOCK P‐BRAHM PURI, BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, BLOCK A‐GARI MANDU, GHONDA PATTI
CHAUHAN, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK B‐GARI MANDU, NEW USMANPUR‐NEW KATWARA, BLOCK D‐BHAJANPURA, VIJAY PARK‐YAMUNA VIHAR
YVR 1675 630 KVA UNPLANNED 17‐03‐2018 12:29:56 17‐03‐2018 14:36:50 2:6 0.00105 MUs
1183 BLOCK J‐KARTAR NAGAR, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN YVR 1480 990 KVA UNPLANNED 17‐03‐2018 12:52:29 17‐03‐2018 13:11:00 0:18 0.00015 MUs1184 BLOCK C‐BHAJANPURA, BLOCK B‐MANUJPUR, BLOCK B‐GARI MANDU YVR 87 630 KVA UNPLANNED 17‐03‐2018 19:16:54 17‐03‐2018 21:03:21 1:46 0.00029444 MUs fire on pole1185 BLOCK J‐KARTAR NAGAR, GAMRI‐GHONDA, BLOCK B‐KARTAR NAGAR YVR 1206 630 KVA UNPLANNED 19‐03‐2018 11:21:34 19‐03‐2018 12:29:12 1:7 0.00018611 MUs1186 NEW USMANPUR‐NEW KATWARA, BLOCK P‐BRAHM PURI, VIJAY PARK‐YAMUNA VIHAR, BLOCK A‐GARI MANDU,
BLOCK D‐BHAJANPURA, BLOCK C‐BHAJANPURA, BLOCK B‐MANUJPUR, BLOCK B‐GARI MANDU, GHONDA PATTI CHAUHAN, BLOCK V‐GHONDA PATTI CHAUHAN
YVR 1519 630 KVA UNPLANNED 19‐03‐2018 11:43:34 19‐03‐2018 13:19:59 1:36 0.00026667 MUs to change a burnt lt cable at tikona park
1187 BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA YVR 255 990 KVA UNPLANNED 20‐03‐2018 08:00:00 20‐03‐2018 08:26:00 0:26 0.00008667 MUs1188 BLOCK A‐GHONDA PATTI, BLOCK B‐GARI MANDU YVR 477 400 KVA UNPLANNED 20‐03‐2018 12:42:38 20‐03‐2018 13:24:26 0:41 0.00011389 MUs1189 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GHONDA PATTI CHAUHAN, BLOCK D‐
HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR BLOCK F‐SHIV VIHAR JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
YVR 1566 630 KVA UNPLANNED 22‐03‐2018 11:41:09 22‐03‐2018 12:20:49 0:39 0.000325 MUs
1190 BLOCK B‐GARI MANDU, NAYAGAON‐NEW KATWARA, NEW USMANPUR‐NEW KATWARA, BLOCK C‐GHONDA PATTI, BLOCK H‐GHONDA PATTI, GHONDA PATTI
YVR 1230 630 KVA UNPLANNED 22‐03‐2018 12:32:11 22‐03‐2018 14:10:23 1:38 0.00081667 MUs
1191 BLOCK C‐BHAJANPURA, JAGJEET NAGAR‐GHONDA, GHONDA PATTI, BLOCK E‐SUBHASH MOHALLA, BLOCK B‐NEW ASHOK NAGAR VSE, NAYAGAON‐NEW KATWARA, BLOCK H‐GHONDA PATTI, KACHI COLONY‐JAGJEET NAGAR, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK F‐BRAHM PURI
YVR 5810 990 KVA UNPLANNED 23‐03‐2018 11:19:11 23‐03‐2018 12:18:56 0:59 0.00016389 MUs
1192 BLOCK B‐SUBHASH MOHALLA, ARVIND NAGAR‐GHONDA, GHONDA PATTI CHAUHAN, WEST GHONDA, BLOCK C‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN
YVR 1288 990 KVA UNPLANNED 23‐03‐2018 13:35:47 23‐03‐2018 14:45:38 1:9 0.000575 MUs
1193 BLOCK I‐BRAHM PURI, JAFFRABAD‐MAUJ PUR, GHONDA PATTI CHAUHAN, JAFFRABAD‐MAUJ PUR YVR 966 990 KVA UNPLANNED 23‐03‐2018 14:57:02 23‐03‐2018 16:17:51 1:20 0.00022222 MUs to change burnt DB 1194 BLOCK C‐BHAJANPURA, JAGJEET NAGAR‐GHONDA, GHONDA PATTI, BLOCK E‐SUBHASH MOHALLA, BLOCK B‐NEW
ASHOK NAGAR VSE, NAYAGAON‐NEW KATWARA, BLOCK H‐GHONDA PATTI, KACHI COLONY‐JAGJEET NAGAR, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK F‐BRAHM PURI
YVR 5810 990 KVA UNPLANNED 25‐03‐2018 12:09:09 25‐03‐2018 14:00:21 1:51 0.00095583 MUs installation of new panel at d block bhajanpura
1195 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GHONDA PATTI CHAUHAN, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR BLOCK F‐SHIV VIHAR JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
YVR 1566 630 KVA UNPLANNED 26‐03‐2018 11:12:56 26‐03‐2018 12:03:05 0:50 0.00013889 MUs
1196 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GHONDA PATTI CHAUHAN, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR BLOCK F‐SHIV VIHAR JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
YVR 1566 630 KVA UNPLANNED 26‐03‐2018 15:05:29 26‐03‐2018 16:22:33 1:17 0.00042778 MUs
1197 GHONDA PATTI CHAUHAN, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK B YVR 1166 630 KVA UNPLANNED 27‐03‐2018 18:02:46 27‐03‐2018 19:00:22 0:57 0.000285 MUs BURNT DB REPAIR AT AMBEDKAR BASTI GHONDA
1198 GHONDA PATTI CHAUHAN YVR 1259 630 KVA UNPLANNED 27‐03‐2018 19:09:36 27‐03‐2018 20:35:37 1:26 0.00045389 MUs BURNT DB REPAIR AT AMBEDKAR BASTI GHONDA
1199 NAYAGAON‐NEW KATWARA, KACHI COLONY‐JAGJEET NAGAR, VIJAY PARK‐YAMUNA VIHAR, JAGJEET NAGAR‐GHONDA YVR 917 990 KVA UNPLANNED 28‐03‐2018 10:33:10 28‐03‐2018 11:07:39 0:34 0.00018889 MUs
1200 BLOCK I‐BRAHM PURI, JAFFRABAD‐MAUJ PUR, GHONDA PATTI CHAUHAN, JAFFRABAD‐MAUJ PUR YVR 970 990 KVA UNPLANNED 28‐03‐2018 10:54:47 28‐03‐2018 11:07:11 0:12 0.00003333 MUs1201 BLOCK I‐BRAHM PURI, BLOCK B‐BRAHM PURI, GHONDA PATTI CHAUHAN YVR 1079 990 KVA UNPLANNED 28‐03‐2018 12:03:48 28‐03‐2018 13:26:21 1:22 0.00022778 MUs1202 BLOCK A‐GHONDA PATTI, BLOCK C‐GHONDA PATTI, BLOCK A‐GARI MANDU, BLOCK B‐MANUJPUR, BLOCK B‐GARI
MANDU, YAMUNA VIHAR YAMUNA FLOOD PLAINSYVR 1129 630 KVA UNPLANNED 28‐03‐2018 12:18:27 28‐03‐2018 13:28:22 1:9 0.00019167 MUs
1203 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GHONDA PATTI CHAUHAN, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR BLOCK F‐SHIV VIHAR JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
YVR 1566 630 KVA UNPLANNED 29‐03‐2018 11:29:56 29‐03‐2018 12:27:48 0:57 0.000475 MUs
1204 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GHONDA PATTI CHAUHAN, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR BLOCK F‐SHIV VIHAR JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
YVR 1566 630 KVA UNPLANNED 29‐03‐2018 13:38:09 29‐03‐2018 13:57:12 0:19 0.00015833 MUs
1205 BLOCK F‐BRAHM PURI, JAGJEET NAGAR‐GHONDA, BLOCK J‐KARTAR NAGAR, GAUTAM VIHAR‐GHONDA YVR 1438 630 KVA UNPLANNED 31‐03‐2018 08:21:39 31‐03‐2018 09:10:00 0:48 0.00024 MUs T ATTEND CONSUMER COMPLAINT AT GAUTAM VIHAR
1206 BLOCK V‐GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK J‐KARTAR NAGAR YVR 1484 990 KVA UNPLANNED 31‐03‐2018 14:47:37 31‐03‐2018 14:57:46 0:10 0.00002778 MUs1207 JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, KATRA NAWAB‐CHANDNI CHOWK, BALI MARAN‐BARA DARI,
TOWN HILL‐KATRA NEEL, JAFFRABAD‐MAUJ PUR, MAUJ PUR COMPLEX 1, ADARSH MOHALLA‐MAUJPURYVR 3428 0 KVA UNPLANNED 07‐03‐2018 16:05:00 07‐03‐2018 17:05:37 1:0 0 MUs cable connect work
1208 JAFFRABAD‐MAUJ PUR YVR 1215 990 KVA UNPLANNED 02‐03‐2018 11:26:27 02‐03‐2018 11:34:50 0:8 0.00006667 MUs1209 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR YVR 1550 990 KVA UNPLANNED 03‐03‐2018 12:50:02 03‐03‐2018 13:18:13 0:28 0.00023333 MUs1210 BLOCK Z‐WELCOME COLONY, BLOCK I‐WELCOME COLONY YVR 165 630 KVA UNPLANNED 04‐03‐2018 15:33:42 04‐03‐2018 16:06:12 0:32 0.00017778 MUs TO ATTEND
CONSUMER COMPLAINT AT photo chowk
1211 CHAUHAN BANGAR‐JAFFRABAD, BLOCK C‐NEW SILAMPURI PHASE II, BLOCK E‐NEW SILAMPURI PHASE II, JAFFRABAD‐MAUJ PUR
YVR 826 990 KVA UNPLANNED 05‐03‐2018 16:57:23 05‐03‐2018 17:23:27 0:26 0.00021667 MUs
1212 JAFFRABAD‐MAUJ PUR YVR 52 990 KVA UNPLANNED 05‐03‐2018 18:46:46 05‐03‐2018 19:15:48 0:29 0.00008056 MUs1213 CHAUHAN BANGAR‐JAFFRABAD, JAFFRABAD‐MAUJ PUR YVR 120 630 KVA UNPLANNED 05‐03‐2018 18:51:18 05‐03‐2018 19:15:22 0:24 0.00006667 MUs1214 NEW SILAMPURI PHASE III YVR 394 990 KVA UNPLANNED 06‐03‐2018 10:54:05 06‐03‐2018 11:39:59 0:45 0.000375 MUs1215 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR YVR 1352 990 KVA UNPLANNED 06‐03‐2018 11:02:52 06‐03‐2018 12:56:43 1:53 0.00031389 MUs1216 CHAUHAN BANGAR‐JAFFRABAD, BLOCK B‐NEW SILAMPURI PHASE II, BLOCK C‐NEW SILAMPURI PHASE II, BLOCK E‐
NEW SILAMPURI PHASE II, BLOCK F‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, BLOCK D‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, JAFFRABAD‐MAUJ PUR
YVR 6139 2005 KVA UNPLANNED 06‐03‐2018 11:26:00 06‐03‐2018 11:40:27 0:14 0 MUs FOR TAKEN RMU IN CKT.
1217 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD YVR 3780 990 KVA UNPLANNED 07‐03‐2018 10:06:55 07‐03‐2018 10:26:28 0:19 0.00005278 MUs
1218 BLOCK E‐NEW SILAMPURI PHASE II, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD, BLOCK C‐NEW SILAMPURI PHASE II
YVR 826 990 KVA UNPLANNED 07‐03‐2018 12:30:16 07‐03‐2018 14:07:46 1:37 0.00080833 MUs
1219 JAFFRABAD‐MAUJ PUR YVR 674 990 KVA UNPLANNED 07‐03‐2018 16:21:01 07‐03‐2018 17:05:08 0:44 0.00024444 MUs1220 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD YVR 3783 990 KVA UNPLANNED 07‐03‐2018 19:36:03 07‐03‐2018 19:48:55 0:12 0.00008333 MUs PHASE PROBLEM &
BURNT PRC REPAIR AT CHAUHAN BANGAR
1221 BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK YVR 185 990 KVA UNPLANNED 08‐03‐2018 09:19:14 08‐03‐2018 09:43:04 0:23 0.00006389 MUs service cable broken 1222 CHAUHAN BANGAR‐JAFFRABAD YVR 211 990 KVA UNPLANNED 08‐03‐2018 10:58:00 08‐03‐2018 12:18:00 1:19 0.00087778 MUs1223 BLOCK E‐NEW SILAMPURI PHASE II, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD, BLOCK C‐NEW
SILAMPURI PHASE IIYVR 826 990 KVA UNPLANNED 08‐03‐2018 11:25:57 08‐03‐2018 13:01:05 1:35 0.00079167 MUs
1224 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR YVR 1352 990 KVA UNPLANNED 08‐03‐2018 14:21:08 08‐03‐2018 15:03:40 0:42 0.00023333 MUs1225 CHAUHAN BANGAR‐JAFFRABAD, JAFFRABAD‐MAUJ PUR YVR 1096 990 KVA UNPLANNED 08‐03‐2018 16:02:44 08‐03‐2018 17:14:42 1:11 0.00059167 MUs1226 BLOCK B‐NEW SILAMPURI PHASE IV, BLOCK Z‐WELCOME COLONY, BLOCK I‐WELCOME COLONY, BLOCK U‐WELCOME
COLONY, BLOCK W‐WELCOME COLONY, BLOCK X‐WELCOME COLONYYVR 1854 630 KVA UNPLANNED 09‐03‐2018 15:37:56 09‐03‐2018 16:45:13 1:7 0.00018611 MUs
1227 CHAUHAN BANGAR‐JAFFRABAD, JAFFRABAD‐MAUJ PUR YVR 1143 990 KVA UNPLANNED 10‐03‐2018 11:31:13 10‐03‐2018 12:24:36 0:53 0.00044167 MUs1228 JAFFRABAD‐MAUJ PUR, BLOCK G‐SILAMPUR COLONY, BLOCK E‐NEW SILAMPURI PHASE II YVR 1264 990 KVA UNPLANNED 10‐03‐2018 12:23:25 10‐03‐2018 14:06:33 1:43 0.00085833 MUs1229 CHAUHAN BANGAR‐JAFFRABAD, JAFFRABAD‐MAUJ PUR YVR 1143 990 KVA UNPLANNED 10‐03‐2018 15:53:25 10‐03‐2018 17:01:04 1:7 0.00018611 MUs1230 CHAUHAN BANGAR‐JAFFRABAD, JAFFRABAD‐MAUJ PUR YVR 863 990 KVA UNPLANNED 10‐03‐2018 17:33:35 10‐03‐2018 18:10:50 0:37 0.00025694 MUs TO ATTEND THE
COMPLAINT AT CHAUHAN BANGAR GALI NO‐10
1231 BLOCK E‐NEW SILAMPURI PHASE II, JAFFRABAD‐MAUJ PUR YVR 373 990 KVA UNPLANNED 10‐03‐2018 19:52:42 10‐03‐2018 20:10:19 0:17 0.00011333 MUs TO ATTEND CONSUMER COMPLANT AT E BLOCK GHODE WALA SEELAMPUR
1232 BLOCK P‐NEW SILAMPURI PHASE III, BLOCK C‐WELCOME COLONY, BLOCK S‐WELCOME COLONY, BLOCK A‐WELCOME COLONY, NEW SILAMPURI PHASE III, DELHI TRANSPORT‐WELCOME COLONY
YVR 294 990 KVA UNPLANNED 11‐03‐2018 10:59:38 11‐03‐2018 12:17:54 1:18 0.00021667 MUs
1233 CHAUHAN BANGAR‐JAFFRABAD, JAFFRABAD‐MAUJ PUR YVR 863 990 KVA UNPLANNED 11‐03‐2018 19:39:21 11‐03‐2018 19:48:15 0:8 0.00005333 MUs TO attend consumer complaint at chauhan bangar gali no‐10
1234 SUBHASH PARK‐GORAKH PARK YVR 326 630 KVA UNPLANNED 12‐03‐2018 13:27:14 12‐03‐2018 14:06:07 0:38 0.00010556 MUs to attend high voltage COMPLAINTS 18031200345
1235 JAFFRABAD‐MAUJ PUR YVR 317 400 KVA UNPLANNED 12‐03‐2018 13:25:41 12‐03‐2018 14:05:42 0:40 0.00011111 MUs1236 JAFFRABAD‐MAUJ PUR YVR 734 990 KVA UNPLANNED 12‐03‐2018 14:56:59 12‐03‐2018 15:26:53 0:29 0.00024167 MUs1237 CHAUHAN BANGAR‐JAFFRABAD, BLOCK C‐NEW SILAMPURI PHASE II, BLOCK E‐NEW SILAMPURI PHASE II, JAFFRABAD‐
MAUJ PURYVR 515 990 KVA UNPLANNED 12‐03‐2018 18:23:22 12‐03‐2018 18:39:27 0:16 0.00004444 MUs
1238 BLOCK P‐NEW SILAMPURI PHASE III, BLOCK Z‐WELCOME COLONY, BLOCK C‐WELCOME COLONY, BLOCK T‐WELCOME COLONY, BLOCK S‐WELCOME COLONY, BLOCK I‐WELCOME COLONY, BLOCK A‐WELCOME COLONY, BLOCK U‐WELCOME COLONY, BLOCK W‐WELCOME COLONY, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, NEW SILAMPURI PHASE III, DELHI TRANSPORT‐WELCOME COLONY, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR LIG/MIG RES/NON COMM AREA SONIA VIHAR
YVR 2661 990 KVA UNPLANNED 13‐03‐2018 11:06:43 13‐03‐2018 11:09:06 0:2 0.00000556 MUs
1239 JAFFRABAD‐MAUJ PUR, BLOCK G‐SILAMPUR COLONY, BLOCK E‐NEW SILAMPURI PHASE II YVR 1264 990 KVA UNPLANNED 13‐03‐2018 11:14:24 13‐03‐2018 11:41:09 0:26 0.00007222 MUs1240 BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV,
SUBHASH PARK‐GORAKH PARKYVR 569 990 KVA UNPLANNED 13‐03‐2018 11:58:53 13‐03‐2018 12:11:46 0:12 0.00003333 MUs
1241 BLOCK P‐NEW SILAMPURI PHASE III, BLOCK Z‐WELCOME COLONY, BLOCK C‐WELCOME COLONY, BLOCK T‐WELCOME COLONY, BLOCK S‐WELCOME COLONY, BLOCK I‐WELCOME COLONY, BLOCK A‐WELCOME COLONY, BLOCK U‐WELCOME COLONY, BLOCK W‐WELCOME COLONY, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, NEW SILAMPURI PHASE III, DELHI TRANSPORT‐WELCOME COLONY, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR LIG/MIG RES/NON COMM AREA SONIA VIHAR
YVR 2643 990 KVA UNPLANNED 13‐03‐2018 13:17:49 13‐03‐2018 13:47:22 0:29 0.00008056 MUs
1242 BLOCK B‐NEW SILAMPURI PHASE IV, BLOCK Z‐WELCOME COLONY, BLOCK I‐WELCOME COLONY, BLOCK U‐WELCOME COLONY, BLOCK W‐WELCOME COLONY, BLOCK X‐WELCOME COLONY
YVR 1854 630 KVA UNPLANNED 13‐03‐2018 15:35:37 13‐03‐2018 16:49:27 1:13 0.00060833 MUs
1243 JAFFRABAD‐MAUJ PUR YVR 52 990 KVA UNPLANNED 13‐03‐2018 20:42:36 13‐03‐2018 21:16:45 0:34 0.00009444 MUs1244 CHAUHAN BANGAR‐JAFFRABAD YVR 243 630 KVA UNPLANNED 14‐03‐2018 14:09:41 14‐03‐2018 15:08:43 0:59 0.00016389 MUs1245 JAFFRABAD‐MAUJ PUR, BLOCK G‐SILAMPUR COLONY, BLOCK E‐NEW SILAMPURI PHASE II YVR 1268 990 KVA UNPLANNED 15‐03‐2018 10:58:41 15‐03‐2018 11:10:12 0:11 0.00003056 MUs1246 SUBHASH PARK‐GORAKH PARK, JAFFRABAD‐MAUJ PUR YVR 857 990 KVA UNPLANNED 15‐03‐2018 11:00:01 15‐03‐2018 12:49:18 1:49 0.00030278 MUs to attend surveillance
case 1247 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR YVR 1354 990 KVA UNPLANNED 15‐03‐2018 13:58:30 15‐03‐2018 15:52:17 1:53 0.00094167 MUs1248 BLOCK U‐WELCOME COLONY, BLOCK W‐WELCOME COLONY, BLOCK X‐WELCOME COLONY, BLOCK Z‐WELCOME
COLONY, BLOCK I‐WELCOME COLONY, BLOCK B‐NEW SILAMPURI PHASE IVYVR 1854 630 KVA UNPLANNED 16‐03‐2018 11:54:09 16‐03‐2018 12:13:32 0:19 0.00005278 MUs
1249 JAFFRABAD‐MAUJ PUR, BLOCK G‐SILAMPUR COLONY, BLOCK E‐NEW SILAMPURI PHASE II YVR 962 990 KVA UNPLANNED 16‐03‐2018 19:19:07 16‐03‐2018 19:35:45 0:16 0.00010667 MUs TO ATTEND CONSUMER COMPLAINT AT NALA NO‐1 SEELAMPUR
1250 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR YVR 1005 990 KVA UNPLANNED 16‐03‐2018 20:02:05 16‐03‐2018 20:30:51 0:28 0.00019444 MUs to attend complaint at inside kothi zafarbad
1251 BLOCK O‐BRAHM PURI, BLOCK M‐BRAHM PURI, BLOCK K‐BRAHM PURI, BLOCK B‐BRAHM PURI, JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR
YVR 2577 1980 KVA UNPLANNED 17‐03‐2018 10:49:19 17‐03‐2018 12:40:46 1:51 0.00123333 MUs for PM at Brahmpur Gali No‐1
1252 SUBHASH PARK‐GORAKH PARK YVR 225 630 KVA UNPLANNED 18‐03‐2018 10:29:39 18‐03‐2018 10:44:07 0:14 0.00008167 MUs to attend fault in lt circuit at janta colony no‐5
1253 SUBHASH PARK‐GORAKH PARK YVR 191 630 KVA UNPLANNED 18‐03‐2018 11:05:41 18‐03‐2018 11:31:37 0:25 0.00013889 MUs to attend consumer complaint janta colony no‐4
1254 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR YVR 1354 990 KVA UNPLANNED 18‐03‐2018 12:26:57 18‐03‐2018 14:13:10 1:46 0.00070667 MUs to attend fault in lt circuit at sazid wala chauhan bangar gali no‐5
1255 CHAUHAN BANGAR‐JAFFRABAD, BLOCK C‐NEW SILAMPURI PHASE II, BLOCK E‐NEW SILAMPURI PHASE II, JAFFRABAD‐MAUJ PUR
YVR 1956 1980 KVA UNPLANNED 18‐03‐2018 17:59:22 18‐03‐2018 18:58:16 0:58 0.00024167 MUs
1256 BLOCK B‐NEW SILAMPURI PHASE II, BLOCK C‐NEW SILAMPURI PHASE II, BLOCK E‐NEW SILAMPURI PHASE II, BLOCK F‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, BLOCK D‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II
YVR 4209 25 KVA UNPLANNED 18‐03‐2018 19:35:00 18‐03‐2018 20:17:40 0:42 0.00011667 MUs
1257 SUBHASH PARK‐GORAKH PARK, JAFFRABAD‐MAUJ PUR YVR 1233 990 KVA UNPLANNED 19‐03‐2018 12:15:58 19‐03‐2018 14:04:00 1:48 0.0009 MUs1258 BLOCK P‐NEW SILAMPURI PHASE III, BLOCK Z‐WELCOME COLONY, BLOCK C‐WELCOME COLONY, BLOCK T‐WELCOME
COLONY, BLOCK S‐WELCOME COLONY, BLOCK I‐WELCOME COLONY, BLOCK A‐WELCOME COLONY, BLOCK U‐WELCOME COLONY, BLOCK W‐WELCOME COLONY, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, NEW SILAMPURI PHASE III, DELHI TRANSPORT‐WELCOME COLONY, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR LIG/MIG RES/NON COMM AREA SONIA VIHAR
YVR 2661 990 KVA UNPLANNED 19‐03‐2018 15:25:39 19‐03‐2018 16:46:05 1:20 0.00022222 MUs
1259 JAFFRABAD‐MAUJ PUR YVR 317 400 KVA UNPLANNED 19‐03‐2018 15:34:04 19‐03‐2018 15:50:14 0:16 0.00004444 MUs1260 SUBHASH PARK‐GORAKH PARK, JAFFRABAD‐MAUJ PUR YVR 4 990 KVA UNPLANNED 19‐03‐2018 19:22:18 19‐03‐2018 19:31:57 0:9 0.000025 MUs1261 BLOCK Z‐WELCOME COLONY, BLOCK W‐WELCOME COLONY, BLOCK X‐WELCOME COLONY YVR 360 630 KVA UNPLANNED 20‐03‐2018 18:05:42 20‐03‐2018 18:14:12 0:8 0.00002222 MUs1262 SUBHASH PARK‐GORAKH PARK, JAFFRABAD‐MAUJ PUR YVR 4 990 KVA UNPLANNED 21‐03‐2018 11:05:07 21‐03‐2018 12:54:09 1:49 0.00030278 MUs1263 BLOCK N‐NEW SILAMPURI PHASE III, BLOCK A‐SILAMPUR COLONY, BLOCK G‐SILAMPUR COLONY, BLOCK B‐NEW
SILAMPURI PHASE II, BLOCK C‐NEW SILAMPURI PHASE II, BLOCK E‐NEW SILAMPURI PHASE II, BLOCK F‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, NEW SILAMPURI PHASE III, BLOCK D‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, JAFFRABAD‐MAUJ PUR
YVR 6218 2250 KVA UNPLANNED 21‐03‐2018 16:11:34 21‐03‐2018 17:10:24 0:58 0.00016111 MUs
1264 SUBHASH PARK‐GORAKH PARK, JAFFRABAD‐MAUJ PUR YVR 1233 990 KVA UNPLANNED 21‐03‐2018 16:45:52 21‐03‐2018 16:57:12 0:11 0.00003056 MUs1265 CHAUHAN BANGAR‐JAFFRABAD YVR 243 630 KVA UNPLANNED 22‐03‐2018 11:44:00 22‐03‐2018 12:04:10 0:20 0.00022222 MUs1266 CHAUHAN BANGAR‐JAFFRABAD, BLOCK O‐BRAHM PURI, BLOCK M‐BRAHM PURI, BLOCK K‐BRAHM PURI, BLOCK B‐
BRAHM PURI, JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PURYVR 5011 1980 KVA UNPLANNED 22‐03‐2018 12:51:42 22‐03‐2018 14:04:52 1:13 0.00060833 MUs
1267 SUBHASH PARK‐GORAKH PARK YVR 1060 400 KVA UNPLANNED 22‐03‐2018 14:59:28 22‐03‐2018 15:07:25 0:7 0.00003889 MUs1268 BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK B‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK
D‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK, BLOCK Z‐WELCOME COLONY, BLOCK JB‐WELCOME COLONY
YVR 1359 990 KVA UNPLANNED 22‐03‐2018 20:15:29 22‐03‐2018 20:53:11 0:37 0.00022611 MUs TO ATTEND CONSUMER COMPLAINT AT KABOOTER MARKET WELCOME
1269 JAFFRABAD‐MAUJ PUR YVR 700 990 KVA UNPLANNED 23‐03‐2018 12:52:24 23‐03‐2018 13:17:20 0:24 0.00006667 MUs1270 BLOCK U‐WELCOME COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK Z‐
WELCOME COLONY, BLOCK A‐WELCOME COLONY, BLOCK S‐WELCOME COLONY, BLOCK P‐NEW SILAMPURI PHASE III, BLOCK W‐WELCOME COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI TRANSPORT‐WELCOME COLONY, BLOCK C‐WELCOME COLONY, NEW SILAMPURI PHASE III, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK I‐WELCOME COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK T‐WELCOME COLONY, BLOCK F‐SHIV VIHAR JHILMIL INDUSTRIAL AREA JHILMIL COLONY PKT A BLOCK B
YVR 2663 990 KVA UNPLANNED 23‐03‐2018 16:18:30 23‐03‐2018 17:22:28 1:3 0.000525 MUs
1271 BLOCK E‐NEW SILAMPURI PHASE II, JAFFRABAD‐MAUJ PUR YVR 376 990 KVA UNPLANNED 23‐03‐2018 18:54:35 23‐03‐2018 19:23:04 0:28 0.00011667 MUs to attend consumer complaint at pahari wala seelampur
1272 BLOCK P‐NEW SILAMPURI PHASE III, BLOCK Z‐WELCOME COLONY, BLOCK C‐WELCOME COLONY, BLOCK T‐WELCOME COLONY, BLOCK S‐WELCOME COLONY, BLOCK I‐WELCOME COLONY, BLOCK A‐WELCOME COLONY, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, NEW SILAMPURI PHASE III, DELHI TRANSPORT‐WELCOME COLONY, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
YVR 1662 990 KVA UNPLANNED 23‐03‐2018 20:09:13 23‐03‐2018 20:24:19 0:15 0.00007083 MUs to attend consumer complaint at sbi welcome
1273 BLOCK E‐NEW SILAMPURI PHASE II, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD, BLOCK C‐NEW SILAMPURI PHASE II
YVR 529 990 KVA UNPLANNED 25‐03‐2018 10:53:00 25‐03‐2018 11:08:34 0:15 0.00008333 MUs TO ATTEND FAULT IN LT CIRCUIT AT E BLK SEELAMPUR GHODE WALA
1274 SUBHASH PARK‐GORAKH PARK YVR 225 630 KVA UNPLANNED 25‐03‐2018 12:46:34 25‐03‐2018 13:01:02 0:14 0.00004667 MUs TO ATTEND CONSUMER COMPLAINT AT JANTA COLONY NO‐5
1275 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR YVR 1354 990 KVA UNPLANNED 26‐03‐2018 12:58:20 26‐03‐2018 14:02:09 1:3 0.000175 MUs to attend surveillance case
1276 JAFFRABAD‐MAUJ PUR, BLOCK G‐SILAMPUR COLONY, BLOCK E‐NEW SILAMPURI PHASE II YVR 1268 990 KVA UNPLANNED 27‐03‐2018 10:50:44 27‐03‐2018 11:53:05 1:2 0.00017222 MUs1277 BLOCK C‐PREET VIHAR, BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW
SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARKYVR 3263 5170 KVA UNPLANNED 27‐03‐2018 11:35:47 27‐03‐2018 13:03:46 1:27 0.00169167 MUs installation of fpi
1278 JAFFRABAD‐MAUJ PUR YVR 1245 990 KVA UNPLANNED 27‐03‐2018 11:48:27 27‐03‐2018 12:41:46 0:53 0.00014722 MUs1279 CHAUHAN BANGAR‐JAFFRABAD, BLOCK C‐NEW SILAMPURI PHASE II, BLOCK E‐NEW SILAMPURI PHASE II, JAFFRABAD‐
MAUJ PURYVR 835 990 KVA UNPLANNED 27‐03‐2018 13:41:20 27‐03‐2018 15:27:32 1:46 0.00029444 MUs change faulty lt cable
1280 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD YVR 3785 990 KVA UNPLANNED 28‐03‐2018 10:32:30 28‐03‐2018 11:43:47 1:11 0.00059167 MUs1281 BLOCK E‐NEW SILAMPURI PHASE II, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD, BLOCK C‐NEW
SILAMPURI PHASE IIYVR 835 990 KVA UNPLANNED 28‐03‐2018 10:39:47 28‐03‐2018 11:46:29 1:6 0.00018333 MUs
1282 CHAUHAN BANGAR‐JAFFRABAD YVR 211 990 KVA UNPLANNED 28‐03‐2018 13:40:50 28‐03‐2018 15:06:34 1:25 0.00023611 MUs1283 BLOCK U‐WELCOME COLONY, BLOCK W‐WELCOME COLONY, BLOCK X‐WELCOME COLONY, BLOCK Z‐WELCOME
COLONY, BLOCK I‐WELCOME COLONY, BLOCK B‐NEW SILAMPURI PHASE IVYVR 1855 630 KVA UNPLANNED 28‐03‐2018 14:02:53 28‐03‐2018 15:07:10 1:4 0.00035556 MUs
1284 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD YVR 3796 990 KVA UNPLANNED 29‐03‐2018 12:50:13 29‐03‐2018 13:25:36 0:35 0.00048611 MUs1285 BLOCK W‐WELCOME COLONY, BLOCK X‐WELCOME COLONY, BLOCK Z‐WELCOME COLONY YVR 362 630 KVA UNPLANNED 29‐03‐2018 23:33:16 29‐03‐2018 23:44:48 0:11 0.00003056 MUs1286 CHAUHAN BANGAR‐JAFFRABAD, JAFFRABAD‐MAUJ PUR YVR 511 990 KVA UNPLANNED 30‐03‐2018 00:16:46 30‐03‐2018 00:39:52 0:23 0.00006389 MUs1287 BLOCK N‐NEW SILAMPURI PHASE III, NEW SILAMPURI PHASE III YVR 64 630 KVA UNPLANNED 31‐03‐2018 14:36:42 31‐03‐2018 14:54:39 0:17 0.00004722 MUs area closed taj colony
& DSIDC welcome
1288 LIG/MIG RES/NON COMM AREA‐SHASTRI PARK, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK B YVR 41 990 KVA UNPLANNED 01‐03‐2018 10:36:09 01‐03‐2018 11:10:56 0:34 0.00009444 MUs1289 BLOCK T‐GAUTAM PURI, MCD COLONY‐NEW KATWARA, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, ZERO
PUSTA‐USMAN PURYVR 1254 1030 KVA UNPLANNED 01‐03‐2018 11:21:24 01‐03‐2018 12:13:44 0:52 0.00043333 MUs
1290 NEW USMANPUR‐NEW KATWARA, MCD COLONY‐NEW KATWARA, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, JAG JEEVAN NAGAR‐NEW KATWARA GHONDA
YVR 702 990 KVA UNPLANNED 08‐03‐2018 10:01:21 08‐03‐2018 10:33:16 0:31 0.00008611 MUs
1291 BLOCK N‐NEW SILAMPURI PHASE I, BLOCK A‐SILAMPUR COLONY, BLOCK G‐SILAMPUR COLONY YVR 167 990 KVA UNPLANNED 09‐03‐2018 21:10:53 09‐03‐2018 21:22:42 0:11 0.00005806 MUs to attend complaint at h block seelampur
1292 BLOCK A‐SILAMPUR COLONY, BLOCK G‐SILAMPUR COLONY, BLOCK F‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II
YVR 718 630 KVA UNPLANNED 10‐03‐2018 11:48:46 10‐03‐2018 13:08:24 1:19 0.00065833 MUs
1293 LIG/MIG RES/NON COMM AREA‐SHASTRI PARK YVR 1155 630 KVA UNPLANNED 10‐03‐2018 12:35:34 10‐03‐2018 13:45:35 1:10 0.00019444 MUs1294 BLOCK T‐GAUTAM PURI, MCD COLONY‐NEW KATWARA, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK YVR 610 1030 KVA UNPLANNED 12‐03‐2018 10:46:12 12‐03‐2018 11:18:53 0:32 0.00026667 MUs1295 BLOCK J‐SILAMPUR COLONY, BLOCK A‐SILAMPUR COLONY, JHUGI‐NEW SILAMPURI PHASE I YVR 1109 630 KVA UNPLANNED 15‐03‐2018 12:01:30 15‐03‐2018 12:41:07 0:39 0.00010833 MUs RAID FOR ILLEGAL
CABLE
1296 BLOCK A‐SHASTRI PARK, BLOCK C‐SHASTRI PARK, BLOCK G‐SILAMPUR COLONY, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SHASTRI PARK, KAILASH NAGAR YVR, YAMUNA RIVER‐BLOCK 9, BLOCK D‐SHASTRI PARK, BLOCK D‐OLD MUSTAFABAD, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, YAMUNA VIHAR YAMUNA FLOOD PLAINS, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
YVR 4194 4605 KVA UNPLANNED 15‐03‐2018 12:05:00 15‐03‐2018 12:38:00 0:33 0.00031167 MUs PROTECTION RElLY instolation
1297 BLOCK C‐SHASTRI PARK, BLOCK N‐NEW SILAMPURI PHASE I, BLOCK J‐SILAMPUR COLONY, BLOCK A‐SILAMPUR COLONY, BLOCK C‐NEW SILAMPURI PHASE II, MANTOLA MOHALLA‐PAHAR GANJ, PHASE I‐MAYUR VIHAR, JHUGI‐NEW SILAMPURI PHASE I, ZERO PUSTA‐USMAN PUR, JAFFRABAD‐MAUJ PUR
YVR 3350 6480 KVA UNPLANNED 15‐03‐2018 12:39:00 15‐03‐2018 14:21:00 1:42 0.000595 MUs relay instolation
1298 GOVT SARVODAY SCHOOL‐ZERO PUSTA, BLOCK F‐ZERO PUSTA, NAYAGAON‐NEW KATWARA, NEW USMANPUR‐NEW KATWARA, MCD COLONY‐NEW KATWARA, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, BLOCK H‐GHONDA PATTI, BLOCK C‐GHONDA PATTI, BLOCK B‐GARI MANDU, GHONDA PATTI, JAG JEEVAN NAGAR‐NEW KATWARA GHONDA, BLOCK G‐ZERO PUSTA, BLOCK H‐ZERO PUSTA
YVR 4482 3010 KVA UNPLANNED 15‐03‐2018 13:01:06 15‐03‐2018 13:41:57 0:40 0.00055556 MUs fpi installation
1299 BLOCK A‐SHASTRI PARK, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SHASTRI PARK, KAILASH NAGAR YVR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, YAMUNA VIHAR YAMUNA FLOOD PLAINS, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
YVR 658 4000 KVA UNPLANNED 16‐03‐2018 14:45:00 16‐03‐2018 15:23:00 0:38 0 MUs RELAY REPLACEMENT WORK
1300 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SHASTRI PARK, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
YVR 578 990 KVA UNPLANNED 16‐03‐2018 18:00:06 16‐03‐2018 18:26:03 0:25 0.00015278 MUs TO ATTEND CONSUMER COMPLAINT AT BULAND MASJID SCHOOL WALA
1301 BLOCK A‐SILAMPUR COLONY, BLOCK F‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, BLOCK J‐SILAMPUR COLONY, BLOCK B‐NEW SILAMPURI PHASE II
YVR 1630 990 KVA UNPLANNED 20‐03‐2018 10:42:16 20‐03‐2018 11:21:50 0:39 0.00010833 MUs to clean the s/stn
1302 BLOCK A‐SILAMPUR COLONY, BLOCK N‐NEW SILAMPURI PHASE I, BLOCK G‐SILAMPUR COLONY YVR 167 990 KVA UNPLANNED 20‐03‐2018 11:52:00 20‐03‐2018 12:54:48 1:2 0.00017222 MUs1303 BLOCK T‐GAUTAM PURI, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK YVR 837 400 KVA UNPLANNED 20‐03‐2018 11:59:37 20‐03‐2018 13:10:51 1:11 0.00059167 MUs1304 BLOCK F‐ZERO PUSTA, BLOCK E‐ZERO PUSTA, LIG/MIG RES/NON COMM AREA‐ZERO PUSTA, BLOCK G‐ZERO PUSTA YVR 1310 990 KVA UNPLANNED 21‐03‐2018 10:58:46 21‐03‐2018 11:25:51 0:27 0.000075 MUs bussing problem
1305 BLOCK G‐SILAMPUR COLONY, BLOCK F‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II YVR 81 630 KVA UNPLANNED 21‐03‐2018 12:58:19 21‐03‐2018 13:32:06 0:33 0.00009167 MUs1306 BLOCK T‐GAUTAM PURI, MCD COLONY‐NEW KATWARA YVR 140 400 KVA UNPLANNED 23‐03‐2018 14:51:13 23‐03‐2018 15:03:23 0:12 0.00003333 MUs1307 BLOCK A‐SILAMPUR COLONY, BLOCK J‐SILAMPUR COLONY, JHUGI‐NEW SILAMPURI PHASE I YVR 1109 630 KVA UNPLANNED 24‐03‐2018 10:42:19 24‐03‐2018 11:04:57 0:22 0.00006111 MUs1308 LIG/MIG RES/NON COMM AREA‐SHASTRI PARK YVR 1224 730 KVA UNPLANNED 24‐03‐2018 11:15:39 24‐03‐2018 11:40:39 0:24 0.00013333 MUs installation of FPI1309 BLOCK F‐ZERO PUSTA, BLOCK E‐ZERO PUSTA, ZERO PUSTA‐USMAN PUR, LIG/MIG RES/NON COMM AREA‐ZERO PUSTA,
BLOCK G‐ZERO PUSTAYVR 1755 990 KVA UNPLANNED 24‐03‐2018 11:41:11 24‐03‐2018 12:25:16 0:44 0.00012222 MUs installation of FPI
1310 BLOCK A‐SHASTRI PARK, BLOCK C‐SHASTRI PARK, LIG/MIG RES/NON COMM AREA‐SHASTRI PARK YVR 1224 755 KVA UNPLANNED 24‐03‐2018 12:25:50 24‐03‐2018 13:34:04 1:8 0.00018889 MUs installation of FPI 1311 LIG/MIG RES/NON COMM AREA‐SHASTRI PARK YVR 1155 630 KVA UNPLANNED 24‐03‐2018 12:35:40 24‐03‐2018 14:05:48 1:30 0.00025 MUs1312 JHUGI‐NEW SILAMPURI PHASE I YVR 857 990 KVA UNPLANNED 24‐03‐2018 12:57:36 24‐03‐2018 14:41:39 1:44 0.00057778 MUs installation of FPI 1313 BLOCK F‐PANDAV NAGAR, BLOCK E‐PANDAV NAGAR, BLOCK N‐NEW SILAMPURI PHASE I, BLOCK A‐SILAMPUR
COLONY, BLOCK G‐SILAMPUR COLONY, JHUGI‐NEW SILAMPURI PHASE IYVR 1609 990 KVA UNPLANNED 24‐03‐2018 15:16:48 24‐03‐2018 16:38:36 1:21 0.000225 MUs
1314 BLOCK A‐SHASTRI PARK, BLOCK C‐SHASTRI PARK, BLOCK G‐SILAMPUR COLONY, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SHASTRI PARK, KAILASH NAGAR YVR, YAMUNA RIVER‐BLOCK 9, BLOCK D‐SHASTRI PARK, BLOCK D‐OLD MUSTAFABAD, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, YAMUNA VIHAR YAMUNA FLOOD PLAINS, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
YVR 4196 4605 KVA UNPLANNED 25‐03‐2018 16:21:39 25‐03‐2018 17:18:53 0:57 0.00060167 MUs REPAIR /REPLACEMENT OF DEFECTIVE MECHANISM & PANEL NOT HOLD AT ABCD BLOCK SHASTRI PARK
1315 BLOCK J‐SILAMPUR COLONY YVR 184 630 KVA UNPLANNED 26‐03‐2018 12:52:22 26‐03‐2018 14:00:42 1:8 0.00018889 MUs1316 BLOCK J‐SILAMPUR COLONY, JHUGI‐NEW SILAMPURI PHASE I, ZERO PUSTA‐USMAN PUR YVR 610 1600 KVA UNPLANNED 28‐03‐2018 11:16:45 28‐03‐2018 11:35:55 0:19 0.00005278 MUs1317 BLOCK F‐ZERO PUSTA, BLOCK E‐ZERO PUSTA, ZERO PUSTA‐USMAN PUR, LIG/MIG RES/NON COMM AREA‐ZERO PUSTA,
BLOCK G‐ZERO PUSTAYVR 1755 990 KVA UNPLANNED 28‐03‐2018 11:33:12 28‐03‐2018 12:21:00 0:47 0.00013056 MUs
1318 BLOCK F‐SHIV VIHAR, PKT A‐BLOCK B YVR 41 990 KVA UNPLANNED 28‐03‐2018 12:31:39 28‐03‐2018 13:45:07 1:13 0.00060833 MUs1319 ZERO PUSTA‐USMAN PUR YVR 73 400 KVA UNPLANNED 28‐03‐2018 13:58:33 28‐03‐2018 15:06:54 1:8 0.00018889 MUs1320 LIG/MIG RES/NON COMM AREA‐SHASTRI PARK YVR 98 630 KVA UNPLANNED 28‐03‐2018 21:38:23 28‐03‐2018 22:45:00 1:6 0.00018333 MUs1321 GOVT SARVODAY SCHOOL‐ZERO PUSTA, BLOCK F‐ZERO PUSTA, BLOCK G‐ZERO PUSTA, BLOCK H‐ZERO PUSTA YVR 1584 990 KVA UNPLANNED 31‐03‐2018 10:39:26 31‐03‐2018 12:31:11 1:51 0.000925 MUs1322 MAUJ PUR COMPLEX 1 YVR 13 990 KVA UNPLANNED 02‐03‐2018 00:03:00 02‐03‐2018 01:00:00 0:56 0.00018667 MUs fire in lt ab due to holi
fired1323 BLOCK B2‐YAMUNA VIHAR, BLOCK B3‐YAMUNA VIHAR YVR 811 990 KVA UNPLANNED 07‐03‐2018 12:56:37 07‐03‐2018 13:09:30 0:12 0.0001 MUs1324 BLOCK B2‐YAMUNA VIHAR, BLOCK B3‐YAMUNA VIHAR YVR 811 990 KVA UNPLANNED 07‐03‐2018 17:32:01 07‐03‐2018 18:29:44 0:57 0.0002375 MUs BURNT DB
REPAIR/replacement AT b‐2 yamuna vihar
1325 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JAFFRABAD‐MAUJ PUR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
YVR 2661 990 KVA UNPLANNED 08‐03‐2018 10:36:31 08‐03‐2018 11:38:55 1:2 0.00051667 MUs
1326 BLOCK B‐SUBHASH MOHALLA, BLOCK E‐SUBHASH MOHALLA, BLOCK B5‐YAMUNA PUR (GONDA) BLOCK B, BLOCK E‐SUBHASH MOHALLA
YVR 2603 990 KVA UNPLANNED 08‐03‐2018 11:37:51 08‐03‐2018 11:53:50 0:15 0.00008333 MUs
1327 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JAFFRABAD‐MAUJ PUR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
YVR 2661 990 KVA UNPLANNED 08‐03‐2018 15:32:06 08‐03‐2018 16:37:31 1:5 0.00072222 MUs to connect new cable
1328 BLOCK C12‐YAMUNA VIHAR YVR 260 400 KVA UNPLANNED 09‐03‐2018 10:18:29 09‐03‐2018 10:37:12 0:18 0.00005 MUs1329 BLOCK V‐GHONDA PATTI CHAUHAN, GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA YVR 639 630 KVA UNPLANNED 09‐03‐2018 14:15:25 09‐03‐2018 15:15:56 1:0 0.00066667 MUs1330 BLOCK B‐SUBHASH MOHALLA, SUBHASH VIHAR‐YAMUNA VIHAR, NORTH GHONDA, BLOCK C‐GHONDA YVR 2289 990 KVA UNPLANNED 10‐03‐2018 11:34:56 10‐03‐2018 12:06:31 0:31 0.00034444 MUs1331 BLOCK B‐SUBHASH MOHALLA, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK E‐SUBHASH MOHALLA,
WEST GHONDAYVR 2470 630 KVA UNPLANNED 10‐03‐2018 11:45:13 10‐03‐2018 12:03:55 0:18 0.00015 MUs
1332 BLOCK B‐MANUJPUR, TANKI ROAD‐C‐BLOCK BHAJANPURA, BLOCK C‐BHAJANPURA YVR 346 990 KVA UNPLANNED 11‐03‐2018 14:40:00 11‐03‐2018 15:30:13 0:50 0.00016667 MUs1333 BLOCK B‐SUBHASH MOHALLA, BLOCK E‐SUBHASH MOHALLA, SUBHASH VIHAR‐YAMUNA VIHAR, BLOCK B5‐YAMUNA
PUR (GONDA) BLOCK B, NORTH GHONDA, BLOCK C‐GHONDA, BLOCK E‐SUBHASH MOHALLAYVR 4869 1980 KVA UNPLANNED 12‐03‐2018 12:43:48 12‐03‐2018 14:13:33 1:29 0.00098889 MUs installation of FPI and
CBCT 1334 MAUJ PUR COMPLEX 1, ADARSH MOHALLA‐MAUJPUR YVR 1120 990 KVA UNPLANNED 12‐03‐2018 14:25:03 12‐03‐2018 14:48:55 0:23 0.00006389 MUs to attend the fire in
pole COMPLAINTS no 18031200367
1335 MAUJ PUR COMPLEX 1 YVR 1618 990 KVA UNPLANNED 13‐03‐2018 11:43:00 13‐03‐2018 13:11:44 1:28 0.00048889 MUs
1336 VIJAY PARK‐YAMUNA VIHAR, JAFFRABAD‐MAUJ PUR, MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR YVR 2301 990 KVA UNPLANNED 13‐03‐2018 14:32:41 13‐03‐2018 16:22:56 1:50 0.00091667 MUs1337 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV
VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JAFFRABAD‐MAUJ PUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
YVR 2659 990 KVA UNPLANNED 14‐03‐2018 11:06:15 14‐03‐2018 12:32:47 1:26 0.00071667 MUs
1338 MAUJ PUR COMPLEX 1, ADARSH MOHALLA‐MAUJPUR YVR 1120 990 KVA UNPLANNED 14‐03‐2018 11:49:19 14‐03‐2018 12:54:16 1:4 0.00053333 MUs1339 BLOCK V‐GHONDA PATTI CHAUHAN, GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA YVR 640 630 KVA UNPLANNED 15‐03‐2018 11:34:12 15‐03‐2018 13:18:52 1:44 0.00086667 MUs1340 MAUJ PUR COMPLEX 1, ADARSH MOHALLA‐MAUJPUR YVR 1122 990 KVA UNPLANNED 15‐03‐2018 18:24:34 15‐03‐2018 18:56:16 0:31 0.00019806 MUs FOR TAKING LOAD ON
REPAIRED HT CABLE AT VIJAY PARK ADARSH MOHALLA
1341 MAUJ PUR COMPLEX 1 YVR 12 990 KVA UNPLANNED 16‐03‐2018 06:34:40 16‐03‐2018 07:02:49 0:28 0.00007778 MUs 18031600016 fire in house
1342 JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, MAUJ PUR COMPLEX 1, ADARSH MOHALLA‐MAUJPUR YVR 1122 990 KVA UNPLANNED 16‐03‐2018 11:09:24 16‐03‐2018 13:02:39 1:53 0.00094167 MUs1343 MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ PUR, VIJAY PARK‐YAMUNA VIHAR YVR 2303 990 KVA UNPLANNED 16‐03‐2018 17:51:50 16‐03‐2018 18:34:40 0:42 0.00022167 MUs high voltage in area &
attend fault in lt circuit
1344 MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ PUR, VIJAY PARK‐YAMUNA VIHAR YVR 2303 990 KVA UNPLANNED 16‐03‐2018 18:58:40 16‐03‐2018 19:56:59 0:58 0.00035444 MUs high voltage in area & attend fault in lt circuit AT SUBZI MANDI MAUJPUR
1345 VIJAY PARK‐YAMUNA VIHAR, JAFFRABAD‐MAUJ PUR, MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR YVR 3478 1980 KVA UNPLANNED 17‐03‐2018 10:05:03 17‐03‐2018 10:55:19 0:50 0.00013889 MUs to attend high voltage COMPLAINTS no 18031700111
1346 BHARTI COLONY‐NIRMAN VIHAR, BLOCK C2‐YAMUNA VIHAR, BLOCK C9‐YAMUNA VIHAR, BLOCK C1‐YAMUNA VIHAR, BLOCK B2‐YAMUNA VIHAR, BLOCK C8‐YAMUNA VIHAR
YVR 1723 990 KVA UNPLANNED 17‐03‐2018 11:15:11 17‐03‐2018 13:39:56 2:24 0.0004 MUs making og end box
1347 MAUJ PUR COMPLEX 1 YVR 1622 990 KVA UNPLANNED 17‐03‐2018 13:42:57 17‐03‐2018 13:47:35 0:4 0.00003333 MUs1348 LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, NORTH GHONDA, GHONDA PATTI CHAUHAN, JHANDEWALAN FATTED
FACTORY COMPLEX, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK V‐GHONDA PATTI CHAUHAN, PART II‐ BLOCK E‐BLDGNAMERASTRIYA VIRJANAND ANDH KANYA MAHAVIDYALAYA, DR. AMBEDKAR STADIUM‐FEROJ SHAH
KOTLA STADIUM, DDA POLICE QTRS.‐AHATA KEDARA, BLOCK B‐SADAR BAZAR ‐ RAM NAGAR, BLOCK A‐JHANDEWALAN, DARYA GANJ, MAUJ PUR COMPLEX 1, JAFFRABAD‐MAUJ PUR, BLOCK C‐GHONDA, LIG/MIG RES/NON COMM AREA‐BLOCK B
YVR 3333 630 KVA UNPLANNED 17‐03‐2018 15:33:32 17‐03‐2018 16:02:28 0:28 0.00007778 MUs to attend the complaint fine in pole
1349 MAUJ PUR COMPLEX 1 YVR 1212 990 KVA UNPLANNED 18‐03‐2018 12:56:52 18‐03‐2018 14:03:00 1:6 0.00042167 MUs lOW VOLTAGE PROBLEM & fault in lt circuit babu ram chowk maujpur
1350 JAFFRABAD‐MAUJ PUR YVR 1744 990 KVA UNPLANNED 18‐03‐2018 16:35:00 18‐03‐2018 17:11:41 0:36 0.00015 MUs1351 BLOCK B‐SUBHASH MOHALLA YVR 213 990 KVA UNPLANNED 19‐03‐2018 07:28:33 19‐03‐2018 07:53:50 0:25 0.00006944 MUs1352 JAFFRABAD‐MAUJ PUR YVR 1744 990 KVA UNPLANNED 19‐03‐2018 11:26:08 19‐03‐2018 11:53:10 0:27 0.000075 MUs1353 JAFFRABAD‐MAUJ PUR, MAUJ PUR COMPLEX 1 YVR 639 990 KVA UNPLANNED 19‐03‐2018 19:24:20 19‐03‐2018 19:31:37 0:7 0.00001944 MUs1354 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR,
BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JAFFRABAD‐MAUJ PUR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
YVR 2448 990 KVA UNPLANNED 20‐03‐2018 15:00:00 20‐03‐2018 16:14:43 1:14 0.00041111 MUs
1355 BLOCK D‐BHAJANPURA, BLOCK C‐BHAJANPURA, BLOCK B‐MANUJPUR, BLOCK E‐SUBHASH MOHALLA, BLOCK D‐BHAJANPURA
YVR 1157 900 KVA UNPLANNED 20‐03‐2018 16:08:39 20‐03‐2018 17:44:36 1:35 0.00026389 MUs
1356 GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA YVR 186 630 KVA UNPLANNED 20‐03‐2018 17:59:12 20‐03‐2018 18:43:37 0:44 0.00012222 MUs taking the circuit on the new pole
1357 MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ PUR, VIJAY PARK‐YAMUNA VIHAR YVR 3478 1980 KVA UNPLANNED 21‐03‐2018 09:06:52 21‐03‐2018 10:36:06 1:29 0.00061806 MUs1358 VIJAY PARK‐YAMUNA VIHAR, BLOCK C12‐YAMUNA VIHAR YVR 749 990 KVA UNPLANNED 21‐03‐2018 13:08:06 21‐03‐2018 13:28:28 0:20 0.00005556 MUs fire on pole1359 BLOCK C6‐YAMUNA VIHAR, BLOCK C7‐YAMUNA VIHAR, BLOCK C2‐YAMUNA VIHAR, BLOCK C3‐YAMUNA VIHAR YVR 117 630 KVA UNPLANNED 22‐03‐2018 15:06:05 22‐03‐2018 15:59:00 0:52 0.00014444 MUs1360 BLOCK B3‐YAMUNA VIHAR, BLOCK B‐MANUJPUR, TANKI ROAD‐C‐BLOCK BHAJANPURA, WAZIRABAD ROAD‐C‐BLOCK
BHAJANPURAYVR 1853 990 KVA UNPLANNED 23‐03‐2018 13:33:01 23‐03‐2018 13:52:47 0:19 0.00015833 MUs
1361 BLOCK V‐GHONDA PATTI CHAUHAN, GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA YVR 642 630 KVA UNPLANNED 23‐03‐2018 15:25:33 23‐03‐2018 16:33:08 1:7 0.00018611 MUs1362 BLOCK V‐GHONDA PATTI CHAUHAN, GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA YVR 642 630 KVA UNPLANNED 23‐03‐2018 16:39:26 23‐03‐2018 16:42:13 0:2 0.00001667 MUs1363 MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ PUR, VIJAY PARK‐YAMUNA VIHAR YVR 3479 1980 KVA UNPLANNED 24‐03‐2018 13:36:25 24‐03‐2018 14:06:21 0:29 0.00016111 MUs1364 MAUJ PUR COMPLEX 1 YVR 1623 990 KVA UNPLANNED 24‐03‐2018 15:18:00 24‐03‐2018 16:39:19 1:21 0.000225 MUs1365 KACHI COLONY‐JAGJEET NAGAR, VIJAY PARK‐YAMUNA VIHAR, MAUJ PUR COMPLEX 1, BLOCK C‐BHAJANPURA, BLOCK
B‐MANUJPUR, JAGJEET NAGAR‐GHONDAYVR 1770 990 KVA UNPLANNED 27‐03‐2018 09:51:26 27‐03‐2018 10:14:58 0:23 0.00006389 MUs
1366 JAFFRABAD‐MAUJ PUR, MAUJ PUR COMPLEX 1 YVR 451 990 KVA UNPLANNED 27‐03‐2018 12:39:40 27‐03‐2018 14:07:20 1:27 0.00024167 MUs to connect lt cable for DMRC at Nala No 4
1367 JAFFRABAD‐MAUJ PUR YVR 1758 990 KVA UNPLANNED 27‐03‐2018 13:20:55 27‐03‐2018 13:44:07 0:23 0.00006389 MUs installation of FPI1368 JAFFRABAD‐MAUJ PUR YVR 634 990 KVA UNPLANNED 27‐03‐2018 13:42:51 27‐03‐2018 14:05:48 0:22 0.00006111 MUs installation of FPI 1369 BLOCK C3‐YAMUNA VIHAR, BLOCK C5‐YAMUNA VIHAR, BLOCK C6‐YAMUNA VIHAR, BLOCK C4‐YAMUNA VIHAR, BLOCK
C12‐YAMUNA VIHARYVR 872 990 KVA UNPLANNED 27‐03‐2018 16:03:00 27‐03‐2018 16:36:48 0:33 0.00009167 MUs installation of Fpi
1370 VIJAY PARK‐YAMUNA VIHAR, JAFFRABAD‐MAUJ PUR, MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR YVR 2304 990 KVA UNPLANNED 27‐03‐2018 17:34:31 27‐03‐2018 18:02:01 0:27 0.000105 MUs BURNT PRC REPAIR AT SABJI MANDI MAUJPUR
1371 JAFFRABAD‐MAUJ PUR, MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR YVR 5166 2970 KVA UNPLANNED 28‐03‐2018 10:44:26 28‐03‐2018 11:45:10 1:0 0.00066667 MUs Installation of FPI 1372 BLOCK B‐SUBHASH MOHALLA, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK E‐SUBHASH MOHALLA,
WEST GHONDAYVR 2499 630 KVA UNPLANNED 28‐03‐2018 14:01:38 28‐03‐2018 14:17:37 0:15 0.00008333 MUs
1373 BLOCK B2‐YAMUNA VIHAR YVR 13 990 KVA UNPLANNED 28‐03‐2018 20:42:18 28‐03‐2018 21:36:53 0:54 0.00015 MUs fire on pole b‐1 yamuna vihar
1374 BLOCK C9‐YAMUNA VIHAR YVR 355 990 KVA UNPLANNED 29‐03‐2018 09:25:37 29‐03‐2018 10:10:08 0:44 0.00012222 MUs1375 BLOCK B‐SUBHASH MOHALLA, NORTH GHONDA YVR 775 990 KVA UNPLANNED 29‐03‐2018 11:42:24 29‐03‐2018 12:34:00 0:51 0.00007083 MUs1376 BLOCK B5‐YAMUNA PUR (GONDA) BLOCK B, BLOCK B2‐YAMUNA VIHAR YVR 825 990 KVA UNPLANNED 29‐03‐2018 11:50:49 29‐03‐2018 12:31:14 0:40 0.00033333 MUs1377 BLOCK C2‐YAMUNA VIHAR, BLOCK C9‐YAMUNA VIHAR, BLOCK C1‐YAMUNA VIHAR, BLOCK B2‐YAMUNA VIHAR, BLOCK
C8‐YAMUNA VIHARYVR 1727 990 KVA UNPLANNED 29‐03‐2018 12:51:34 29‐03‐2018 13:16:38 0:25 0.00020833 MUs
1378 DARYA GANJ DRG 824 990 KVA UNPLANNED 06‐03‐2018 19:52:00 06‐03‐2018 20:28:00 0:36 0.00007 MUs panel bypass1379 DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM DRG 65 100 KVA UNPLANNED 07‐03‐2018 10:35:52 07‐03‐2018 10:37:25 0:1 0.00000139 MUs1380 DARYA GANJ DRG 20 990 KVA UNPLANNED 13‐03‐2018 13:53:37 13‐03‐2018 13:57:26 0:3 0.00000417 MUs1381 HAPPY PUBLIC SCHOOL‐PARDA BAGH DRG 15 990 KVA UNPLANNED 18‐03‐2018 10:48:26 18‐03‐2018 11:12:20 0:23 0.00003833 MUs1382 PATODI HOUSE‐CHANDNI CHOWK, MTNL TELEPHONE EXCHANGE‐PATODI HOUSE DRG 284 990 KVA UNPLANNED 31‐03‐2018 22:17:34 31‐03‐2018 22:38:34 0:20 0.00002778 MUs1383 DDA FLATS‐ROUSE AVENUE, MEDICAL COUNCIL OF INDIA‐BAL BHAWAN, UNIVERSITY GRANT COMMISSION‐ITO, BAR
COUNSIL OF INDIA‐ROUSE AVENUE, BLOCK E‐CONNAUGHT PLACE DRGDRG 178 630 KVA UNPLANNED 04‐03‐2018 09:01:07 04‐03‐2018 09:15:13 0:14 0.00003889 MUs
1384 VISHWAS NAGAR‐SHAHDARA JLM 306 990 KVA UNPLANNED 05‐03‐2018 14:11:24 05‐03‐2018 14:43:00 0:31 0.00043056 MUs
1385 MAHARAM NAGAR‐SHAHDARA, EAST ROHTASH NAGAR‐SHAHDARA JLM 302 990 KVA UNPLANNED 07‐03‐2018 13:21:55 07‐03‐2018 13:54:27 0:32 0 MUs1386 BLOCK A‐SHAKARPUR KHAS, BLOCK G‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR KHAS, BLOCK R&A‐SHAKARPUR KHAS,
SHAKARPUR EXTN.‐SHAKARPUR KHAS, VISHWAS NAGAR‐SHAHDARA, EAST ROHTASH NAGAR‐SHAHDARAJLM 2802 7200 KVA UNPLANNED 23‐03‐2018 10:48:19 23‐03‐2018 11:10:26 0:22 0.00007944 MUs
1387 BLOCK_C‐SAVITA VIHAR, VISHWAS NAGAR‐SHRESHTHA VIHAR JLM 279 630 KVA UNPLANNED 29‐03‐2018 17:43:44 29‐03‐2018 18:32:00 0:48 0.00002667 MUs1388 BLOCK B‐BHAGIRATHI VIHAR, BLOCK C‐BRIJ PURI, BLOCK D‐BHAGIRATHI VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BLOCK
C‐BHAGIRATHI VIHAR, BLOCK H‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK B, BLOCK A‐SHIV VIHARKWN 41 1260 KVA UNPLANNED 02‐03‐2018 14:56:00 02‐03‐2018 15:50:00 0:54 0.0015 MUs
1389 BLOCK B‐JOHRI PUR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR KWN 25 0 KVA UNPLANNED 06‐03‐2018 12:14:33 06‐03‐2018 14:03:00 1:48 0.0009 MUs
1390 TUNDA NAGAR‐BHAGIRATHI VIHAR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR KWN 1398 0 KVA UNPLANNED 07‐03‐2018 13:21:05 07‐03‐2018 15:12:00 1:50 0.00030556 MUs1391 BLOCK C‐MAN SINGH NAGAR, PKT R‐BLOCK D, BLOCK B‐MAN SINGH NAGAR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR,
BLOCK B‐OLD MUSTAFABAD, BLOCK A‐MAN SINGH NAGAR, BLOCK B‐SHIV VIHAR, BHARAT‐AMBEDKAR NAGARKWN 1914 0 KVA UNPLANNED 10‐03‐2018 13:09:46 10‐03‐2018 15:05:00 1:55 0.00095833 MUs
1392 AMBEDKAR NAGAR INDUSTRIAL AREA‐BHAGIRATHI VIHAR, LAXMI GARDEN‐AMBEDKAR NAGAR KWN 23 990 KVA UNPLANNED 10‐03‐2018 16:09:46 10‐03‐2018 16:43:38 0:33 0.00018333 MUs1393 JOHRI ENCLAVE‐BHAGIRATHI VIHAR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR KWN 25 0 KVA UNPLANNED 11‐03‐2018 13:52:40 11‐03‐2018 15:50:00 1:57 0.00065 MUs1394 GEETA COLONY, BLOCK B‐BHAGIRATHI VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D,
BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐BHAGIRATHI VIHAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 1229 1260 KVA UNPLANNED 11‐03‐2018 16:21:43 11‐03‐2018 17:31:00 1:9 0.00095833 MUs
1395 BLOCK A‐JOHRI PUR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR KWN 25 0 KVA UNPLANNED 12‐03‐2018 02:50:00 12‐03‐2018 03:19:58 0:29 0.00016111 MUs1396 JOHRI ENCLAVE‐BHAGIRATHI VIHAR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR KWN 1398 0 KVA UNPLANNED 12‐03‐2018 16:24:10 12‐03‐2018 17:20:00 0:55 0.00030556 MUs1397 BLOCK H‐OLD MUSTAFABAD, BLOCK T‐OLD MUSTAFABAD, BLOCK D‐OLD MUSTAFABAD, BLOCK T‐NEHRU VIHAR KWN 1878 990 KVA UNPLANNED 13‐03‐2018 17:40:52 13‐03‐2018 18:17:43 0:36 0.0003 MUs1398 BLOCK B‐JOHRI PUR, BLOCK A‐JOHRI PUR, GEETA COLONY, BLOCK 5‐GEETA COLONY, BLOCK 7‐GEETA COLONY,
AMBEDKAR NAGAR INDUSTRIAL AREA‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK F‐INDIRA VIHAR, BLOCK B‐CHAMAN PARK, TUNDA NAGAR‐BHAGIRATHI VIHAR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, LAXMI GARDEN‐AMBEDKAR NAGAR, BLOCK B‐JOHRI PUR, BHARAT‐AMBEDKAR NAGAR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR
KWN 4209 7305 KVA UNPLANNED 15‐03‐2018 21:54:00 15‐03‐2018 22:40:00 0:45 0.00125 MUs
1399 BLOCK T‐OLD MUSTAFABAD, BLOCK D‐OLD MUSTAFABAD, BLOCK T‐NEHRU VIHAR, BLOCK H‐OLD MUSTAFABAD KWN 1879 990 KVA UNPLANNED 17‐03‐2018 14:45:58 17‐03‐2018 15:43:00 0:57 0.000475 MUs1400 BLOCK D‐OLD MUSTAFABAD, BLOCK H‐BHAGIRATHI VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK F‐INDIRA VIHAR KWN 2183 0 KVA UNPLANNED 18‐03‐2018 10:31:44 18‐03‐2018 12:12:57 1:41 0.00084167 MUs1401 GEETA COLONY, BLOCK B‐BHAGIRATHI VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D,
BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐BHAGIRATHI VIHAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 1250 1260 KVA UNPLANNED 18‐03‐2018 12:10:00 18‐03‐2018 14:00:00 1:50 0.00244444 MUs
1402 JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, LAXMI GARDEN‐AMBEDKAR NAGAR, BLOCK B‐JOHRI PUR, BHAGIRATHI VIHAR, BLOCK 5‐GEETA COLONY, GEETA COLONY, BLOCK B‐JOHRI PUR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, BLOCK B‐CHAMAN PARK, AMBEDKAR NAGAR INDUSTRIAL AREA‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐JOHRI PUR, BLOCK F‐INDIRA VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BLOCK 7‐GEETA COLONY, BHARAT‐AMBEDKAR NAGAR, BHAGIRATHI VIHAR
KWN 4209 7305 KVA UNPLANNED 18‐03‐2018 18:12:00 18‐03‐2018 19:54:00 1:42 0.00311667 MUs
1403 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐TUKMIRPUR, BLOCK F‐NEHRU VIHAR, BLOCK C‐TUKMIRPUR, BLOCK B‐NEW CHAUHAN PUR, BLOCK D‐OLD MUSTAFABAD, BLOCK Z‐NEHRU VIHAR, BLOCK M‐NEHRU VIHAR, BLOCK T‐NEHRU VIHAR, BLOCK B‐HARIJAN BASTI, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, OLD MUSTAFABAD‐ BLOCK C‐DAYALPUR, BLOCK A‐RAMA GARDEN, PKT M‐BLOCK D, BLOCK N‐SHIV VIHAR, BLOCK G‐NEHRU VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DEEKSHA MAHILA COLLAGE‐DAYALPUR EXTN., BLOCK E‐DAYALPUR, BLOCK T‐NEHRU VIHAR, BLOCK A‐NEHRU VIHAR, BHAGAT NAGAR‐DAYALPUR, FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, BLOCK H‐OLD MUSTAFABAD, BLOCK B‐NEW CHAUHAN PUR, BLOCK D‐TUKMIRPUR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK A‐NEHRU VIHAR, BLOCK B‐NEHRU VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐HARIJAN BASTI, BLOCK M‐OLD MUSTAFABAD, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐OLD MUSTAFABAD, BLOCK T‐OLD MUSTAFABAD, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐
KWN 10484 6890 KVA UNPLANNED 19‐03‐2018 14:55:00 19‐03‐2018 16:53:00 1:58 0.00131111 MUs
1404 BHAGIRATHI VIHAR, LAXMI GARDEN‐AMBEDKAR NAGAR KWN 484 0 KVA UNPLANNED 20‐03‐2018 13:27:05 20‐03‐2018 15:27:00 1:59 0.00066111 MUs1405 GEETA COLONY, BLOCK B‐BHAGIRATHI VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D,
BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK H‐BHAGIRATHI VIHAR, BLOCK C‐BHAGIRATHI VIHAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 1252 1260 KVA UNPLANNED 23‐03‐2018 09:06:00 23‐03‐2018 09:46:53 0:40 0.00033333 MUs
1406 BLOCK C‐MAN SINGH NAGAR, GEETA COLONY, BLOCK B‐BHAGIRATHI VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐BHAGIRATHI VIHAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 1252 1260 KVA UNPLANNED 23‐03‐2018 09:51:00 23‐03‐2018 11:49:00 1:58 0.00131111 MUs
1407 PKT R‐BLOCK D, BLOCK D‐OLD MUSTAFABAD, BLOCK B‐OLD MUSTAFABAD, BLOCK M‐OLD MUSTAFABAD, BLOCK M‐NEHRU VIHAR, BLOCK A‐MAN SINGH NAGAR, BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK K‐KARAWAL NAGAR (DEHROTI), PKT M‐BLOCK D, BLOCK A1‐MUNGA NAGAR
KWN 6147 4230 KVA UNPLANNED 23‐03‐2018 10:27:00 23‐03‐2018 11:50:00 1:22 0.00387222 MUs
1408 BLOCK B‐JOHRI PUR, BLOCK A‐JOHRI PUR, AMBEDKAR NAGAR INDUSTRIAL AREA‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK B‐CHAMAN PARK, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, LAXMI GARDEN‐AMBEDKAR NAGAR, BLOCK C‐KARAWAL NAGAR, BLOCK F‐SHIV VIHAR, BLOCK P‐SHIV VIHAR, BLOCK B‐JOHRI PUR, BHARAT‐AMBEDKAR NAGAR, BLOCK A‐CHAMAN PARK, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR BHAGIRATHI VIHAR
KWN 6926 2475 KVA UNPLANNED 23‐03‐2018 16:15:17 23‐03‐2018 16:40:00 0:24 0.00006667 MUs
1409 AMBEDKAR NAGAR INDUSTRIAL AREA‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, LAXMI GARDEN‐AMBEDKAR NAGAR KWN 484 0 KVA UNPLANNED 27‐03‐2018 18:30:00 27‐03‐2018 20:25:00 1:55 0.00063889 MUs
1410 BLOCK A‐CHAND BAGH, BLOCK B‐BRIJ PURI, BLOCK E‐BRIJ PURI, BLOCK C‐BRIJ PURI, BLOCK B‐CHAND BAGH, SANT NIRANKARI BHAVAN‐GANGA VIHAR KWN, NIRAHKARI BHAVAN (HOUSE)‐BRIJ PURI, BLOCK D‐BRIJ PURI, BLOCK F‐BRIJ PURI
KWN 5003 4370 KVA UNPLANNED 27‐03‐2018 21:15:00 27‐03‐2018 22:00:00 0:45 0.001 MUs
1411 BLOCK C‐PATEL VIHAR, BLOCK CN‐MANGALAM VIHAR, PHASE I‐SHIV VIHAR, BLOCK A‐PRAKASH VIHAR, VILLAGE‐KAMAL VIHAR, BLOCK C‐KARAWAL NAGAR, SHIV VIHAR, BLOCK R‐PATEL VIHAR, BLOCK B‐PATEL VIHAR, BLOCK A‐MANGALAM VIHAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK C‐PRAKASH VIHAR, BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK C‐PATEL VIHAR, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C
KWN 2462 2790 KVA UNPLANNED 02‐03‐2018 19:27:00 02‐03‐2018 20:55:00 1:28 0.00122222 MUs
1412 BLOCK A‐RAMA GARDEN, BLOCK A‐HARIJAN BASTI, BLOCK D‐DLF ANKUR VIHAR, BLOCK A‐PRAKASH VIHAR, BLOCK F‐SHIV VIHAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK H‐BHAGAT SINGH COLONY, BLOCK C‐BHAGAT SINGH COLONY, BLOCK I‐BHAGAT SINGH COLONY, BLOCK E‐BHAGAT SINGH COLONY, BLOCK B‐PRAKASH VIHAR, BLOCK E‐PRAKASH VIHAR, NANK MILK PLANT‐PRAKASH VIHAR, BLOCK D‐PRAKASH VIHAR, BLOCK C‐PRAKASH VIHAR, BLOCK C‐DLF ANKUR VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐HARIJAN BASTI, PKT A‐BLOCK B, LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BLOCK A‐NEW CHAUHAN PUR, BLOCK A‐HARIJAN BASTI, BLOCK B‐NEW CHAUHAN PUR
KWN 4563 5960 KVA UNPLANNED 03‐03‐2018 11:50:00 03‐03‐2018 12:48:00 0:58 0.00106333 MUs
1413 FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK B‐HARIJAN BASTI, BLOCK B‐NEW CHAUHAN PUR KWN 281 990 KVA UNPLANNED 04‐03‐2018 14:33:29 04‐03‐2018 15:18:38 0:45 0.0003125 MUs1414 BLOCK C‐PATEL VIHAR, BLOCK CN‐MANGALAM VIHAR, PHASE I‐SHIV VIHAR, BLOCK A‐PRAKASH VIHAR, VILLAGE‐
KAMAL VIHAR, SHIV VIHAR, BLOCK R‐PATEL VIHAR, BLOCK B‐PATEL VIHAR, BLOCK A‐MANGALAM VIHAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK E‐PRAKASH VIHAR, BLOCK C‐PRAKASH VIHAR, BLOCK C‐PATEL VIHAR, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C
KWN 2462 2790 KVA UNPLANNED 05‐03‐2018 09:02:30 05‐03‐2018 10:00:00 0:57 0.00055417 MUs
1415 BLOCK CN‐MANGALAM VIHAR, PHASE I‐SHIV VIHAR, BLOCK C‐PRAKASH VIHAR KWN 265 0 KVA UNPLANNED 06‐03‐2018 10:23:35 06‐03‐2018 11:22:34 0:58 0.00048333 MUs1416 BLOCK C‐PATEL VIHAR, BLOCK CN‐MANGALAM VIHAR, PHASE I‐SHIV VIHAR, BLOCK A‐PRAKASH VIHAR, VILLAGE‐
KAMAL VIHAR, SHIV VIHAR, BLOCK R‐PATEL VIHAR, BLOCK B‐PATEL VIHAR, BLOCK A‐MANGALAM VIHAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK C‐PRAKASH VIHAR, BLOCK C‐PATEL VIHAR, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C
KWN 2462 2790 KVA UNPLANNED 06‐03‐2018 11:00:00 06‐03‐2018 12:54:47 1:54 0.00171 MUs
1417 BLOCK U‐SHIV VIHAR, BLOCK Q‐SHIV VIHAR, BLOCK H‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR, BLOCK O‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK Q‐SHIV VIHAR
KWN 1827 0 KVA UNPLANNED 07‐03‐2018 01:45:31 07‐03‐2018 03:40:00 1:54 0.00063333 MUs
1418 BLOCK A‐PRAKASH VIHAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK C‐PRAKASH VIHAR KWN 565 990 KVA UNPLANNED 07‐03‐2018 12:58:30 07‐03‐2018 14:26:00 1:27 0.00048333 MUs1419 BLOCK A‐PREM VIHAR, BLOCK C‐KARAWAL NAGAR, BLOCK D‐PREM VIHAR, BLOCK B‐PREM VIHAR KWN 657 0 KVA UNPLANNED 09‐03‐2018 09:30:00 09‐03‐2018 10:14:42 0:44 0.00024444 MUs1420 BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C, BLOCK CN‐MANGALAM VIHAR, SHIV VIHAR, BLOCK CN‐AMBIKA VIHAR BLOCK ‐
B&C, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&CKWN 840 0 KVA UNPLANNED 10‐03‐2018 10:41:40 10‐03‐2018 11:32:29 0:50 0.00041667 MUs
1421 BLOCK R‐PATEL VIHAR, PHASE I‐SHIV VIHAR, VILLAGE‐KAMAL VIHAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK CN‐MANGALAM VIHAR, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C, BLOCK A‐MANGALAM VIHAR, BLOCK C‐PATEL VIHAR, BLOCK A‐PRAKASH VIHAR, SHIV VIHAR, BLOCK C‐PATEL VIHAR, BLOCK C‐PRAKASH VIHAR, BLOCK B‐PATEL VIHAR
KWN 2462 2790 KVA UNPLANNED 10‐03‐2018 13:59:34 10‐03‐2018 15:15:00 1:15 0.0014375 MUs
1422 BLOCK U‐SHIV VIHAR, BLOCK H‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR, BLOCK O‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK Q‐SHIV VIHAR
KWN 1827 0 KVA UNPLANNED 10‐03‐2018 15:12:52 10‐03‐2018 16:00:00 0:47 0.00039167 MUs
1423 LIG/MIG RES/NON COMM AREA‐SABHEPUR, BLOCK C‐PATEL VIHAR, BLOCK CN‐MANGALAM VIHAR, PHASE I‐SHIV VIHAR, BLOCK A‐PRAKASH VIHAR, VILLAGE‐KAMAL VIHAR, SHIV VIHAR, BLOCK R‐PATEL VIHAR, BLOCK B‐PATEL VIHAR, BLOCK A‐MANGALAM VIHAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK C‐PRAKASH VIHAR, BLOCK C‐PATEL VIHAR, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C
KWN 2462 2790 KVA UNPLANNED 12‐03‐2018 11:37:00 12‐03‐2018 13:30:00 1:53 0.00094167 MUs
1424 PKT W‐BLOCK A, BLOCK U‐SHIV VIHAR, PKT C‐SHIV VIHAR, PKT X‐SHIV VIHAR, PKT R‐BLOCK A, PKT A‐BLOCK A, PKT F‐BLOCK A, BLOCK B‐SHIV VIHAR, PKT C‐BLOCK B, PKT D‐BLOCK B, PKT W‐BLOCK A
KWN 3122 0 KVA UNPLANNED 13‐03‐2018 13:14:50 13‐03‐2018 14:59:57 1:45 0.00046667 MUs
1425 BLOCK K‐WEST KARAWAL NAGAR, PKT A‐BLOCK E, BLOCK A‐HARIJAN BASTI, BLOCK C‐SADAT PUR, PKT C‐BLOCK E, PKT A1‐BLOCK E, PKT A4‐BLOCK E, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK B‐HARIJAN BASTI, BLOCK D‐WEST KARAWAL NAGAR
KWN 1560 0 KVA UNPLANNED 13‐03‐2018 15:49:32 13‐03‐2018 17:47:53 1:58 0.00022944 MUs
1426 BLOCK J‐SHIV VIHAR, BLOCK Q‐SHIV VIHAR KWN 652 0 KVA UNPLANNED 13‐03‐2018 16:50:00 13‐03‐2018 18:13:00 1:22 0.00022778 MUs1427 BLOCK D‐SHIV VIHAR, BLOCK U‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK
O‐SHIV VIHAR, BLOCK H‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHARKWN 1836 0 KVA UNPLANNED 13‐03‐2018 18:13:00 13‐03‐2018 19:59:03 1:46 0.00029444 MUs
1428 BLOCK D‐SHIV VIHAR, BLOCK U‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK O‐SHIV VIHAR, BLOCK H‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR
KWN 1836 0 KVA UNPLANNED 13‐03‐2018 21:13:00 13‐03‐2018 22:37:06 1:24 0.00023333 MUs
1429 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐HARIJAN BASTI, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK A‐RAMA GARDEN, BLOCK N‐SHIV VIHAR, BLOCK A‐PREM VIHAR, BLOCK A‐NEW CHAUHAN PUR, BLOCK E‐PRAKASH VIHAR, BLOCK E‐BHAGAT SINGH COLONY, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A‐PRAKASH VIHAR, BLOCK I‐BHAGAT SINGH COLONY, BLOCK D‐PRAKASH VIHAR, BLOCK C‐PRAKASH VIHAR, BLOCK C‐BHAGAT SINGH COLONY, LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAGAT NAGAR‐DAYALPUR, FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, BLOCK B‐NEW CHAUHAN PUR, PKT R‐BLOCK D, BLOCK C‐DLF ANKUR VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK B‐BHAGAT SINGH COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, NANK MILK PLANT‐PRAKASH VIHAR, BLOCK A‐HARIJAN BASTI, BLOCK H‐BHAGAT SINGH COLONY, BLOCK A‐HARIJAN BASTI, BLOCK B‐PRAKASH VIHAR, BLOCK D‐DLF ANKUR VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐
KWN 8747 5960 KVA UNPLANNED 14‐03‐2018 09:30:00 14‐03‐2018 10:03:00 0:33 0.00100833 MUs
1430 PKT W‐BLOCK A, BLOCK U‐SHIV VIHAR, PKT C‐SHIV VIHAR, PKT X‐SHIV VIHAR, PKT R‐BLOCK A, PKT A‐BLOCK A, PKT F‐BLOCK A, BLOCK B‐SHIV VIHAR, PKT C‐BLOCK B, PKT D‐BLOCK B, PKT W‐BLOCK A
KWN 3122 0 KVA UNPLANNED 14‐03‐2018 11:17:49 14‐03‐2018 11:54:50 0:37 0.00020556 MUs
1431 BLOCK C‐PATEL VIHAR, BLOCK CN‐MANGALAM VIHAR, PHASE I‐SHIV VIHAR, BLOCK A‐PRAKASH VIHAR, VILLAGE‐KAMAL VIHAR, SHIV VIHAR, BLOCK R‐PATEL VIHAR, BLOCK B‐PATEL VIHAR, BLOCK A‐MANGALAM VIHAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK C‐PRAKASH VIHAR, BLOCK C‐PATEL VIHAR, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C
KWN 2465 2790 KVA UNPLANNED 14‐03‐2018 11:57:25 14‐03‐2018 12:50:00 0:52 0.00057778 MUs
1432 BLOCK D‐SHIV VIHAR, BLOCK U‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK O‐SHIV VIHAR, BLOCK H‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR
KWN 1836 0 KVA UNPLANNED 14‐03‐2018 13:52:35 14‐03‐2018 15:05:00 1:12 0.0004 MUs
1433 BLOCK B‐KARAWAL NAGAR (DEHROTI) KWN 326 990 KVA UNPLANNED 14‐03‐2018 14:18:27 14‐03‐2018 14:47:22 0:28 0.00023333 MUs1434 BLOCK CN‐MANGALAM VIHAR KWN 267 0 KVA UNPLANNED 14‐03‐2018 16:20:42 14‐03‐2018 17:48:00 1:27 0.000725 MUs1435 BLOCK A‐PRAKASH VIHAR, BLOCK C‐BHAGAT SINGH COLONY, BLOCK B‐PRAKASH VIHAR, BLOCK E‐PRAKASH VIHAR,
BLOCK D‐PRAKASH VIHARKWN 994 0 KVA UNPLANNED 14‐03‐2018 22:30:00 15‐03‐2018 00:03:00 1:33 0.00051667 MUs
1436 BLOCK F‐WEST KARAWAL NAGAR, BLOCK H‐WEST KARAWAL NAGAR, BLOCK K‐WEST KARAWAL NAGAR, PKT B‐BLOCK B, PKT A‐BLOCK E, BLOCK A‐HARIJAN BASTI, BLOCK F & G‐BHAGAT SINGH COLONY, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK, WEST KARAWAL NAGAR, BLOCK 5C‐SADAT PUR, BLOCK 4A‐SADAT PUR, BLOCK 3A‐SADAT PUR, BLOCK B‐KHAJURI KHAS, BLOCK F‐BHAGAT SINGH COLONY, BLOCK A‐BHAGAT SINGH COLONY, BLOCK E‐SADAT PUR, BLOCK B‐SADAT PUR, BLOCK C‐SADAT PUR, PKT C‐BLOCK E, PKT A1‐BLOCK E, PKT A3‐BLOCK E, PKT A2‐BLOCK E, PKT A4‐BLOCK E, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK A‐KARAWAL NAGAR (DEHROTI), BLOCK B‐HARIJAN BASTI, PKT C3‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK D‐WEST KARAWAL NAGAR, BLOCK D‐WEST KARAWAL NAGAR
KWN 7175 2650 KVA UNPLANNED 17‐03‐2018 13:35:00 17‐03‐2018 14:33:00 0:58 0.00064444 MUs
1437 BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK B‐BHAGAT SINGH COLONY, BLOCK B‐HARIJAN BASTI, BLOCK K‐KARAWAL NAGAR (DEHROTI), BLOCK K‐WEST KARAWAL NAGAR
KWN 715 1980 KVA UNPLANNED 19‐03‐2018 17:00:00 19‐03‐2018 17:24:00 0:24 0.00033333 MUs
1438 BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C, PHASE I‐SHIV VIHAR, SHIV VIHAR, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C
KWN 92 0 KVA UNPLANNED 20‐03‐2018 09:55:00 20‐03‐2018 11:23:00 1:28 0.00036667 MUs
1439 BHAGIRATHI VIHAR, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, BLOCK P‐SHIV VIHAR, BHARAT‐AMBEDKAR NAGAR, BHAGIRATHI VIHAR
KWN 1672 0 KVA UNPLANNED 22‐03‐2018 13:42:55 22‐03‐2018 15:03:00 1:20 0.00044444 MUs HT AB REPLACEMENT
1440 BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK B‐BHAGAT SINGH COLONY, BLOCK B‐HARIJAN BASTI, BLOCK K‐KARAWAL NAGAR (DEHROTI), BLOCK K‐WEST KARAWAL NAGAR
KWN 719 1980 KVA UNPLANNED 23‐03‐2018 15:38:00 23‐03‐2018 16:30:00 0:51 0.00141667 MUs
1441 BLOCK D‐SHRI RAM COLONY, BLOCK C‐PATEL VIHAR, BLOCK CN‐MANGALAM VIHAR, PHASE I‐SHIV VIHAR, BLOCK A‐PRAKASH VIHAR, VILLAGE‐KAMAL VIHAR, SHIV VIHAR, BLOCK P‐SHIV VIHAR, BLOCK R‐PATEL VIHAR, BLOCK B‐PATEL VIHAR, BLOCK A‐MANGALAM VIHAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK B‐SHIV VIHAR, BLOCK E‐PRAKASH VIHAR, BLOCK C‐PRAKASH VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐PATEL VIHAR, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C
KWN 2473 2790 KVA UNPLANNED 27‐03‐2018 18:00:00 27‐03‐2018 19:40:00 1:40 0.00111111 MUs hvds lead faulty at pole no. x856 gali no. 3 west kamal vihar
1442 BLOCK K‐WEST KARAWAL NAGAR, PKT B‐BLOCK B, PKT A‐BLOCK E, BLOCK A‐HARIJAN BASTI, BLOCK C‐SADAT PUR, PKT C‐BLOCK E, PKT A1‐BLOCK E, PKT A4‐BLOCK E, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK B‐HARIJAN BASTI, BLOCK D‐WEST KARAWAL NAGAR
KWN 1566 0 KVA UNPLANNED 28‐03‐2018 08:54:10 28‐03‐2018 10:27:11 1:33 0.00025833 MUs
1443 BLOCK B‐SADAT PUR, PKT A3‐BLOCK E, PKT A‐BLOCK E, BLOCK 3A‐SADAT PUR, PKT A4‐BLOCK E, BLOCK B‐HARIJAN BASTI, BLOCK F‐WEST KARAWAL NAGAR, BLOCK C‐SADAT PUR, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, PKT A1‐BLOCK E, BLOCK F‐BHAGAT SINGH COLONY, PKT C‐BLOCK E, PKT B‐BLOCK B, BLOCK E‐SADAT PUR, BLOCK A‐BHAGAT SINGH COLONY, BLOCK A‐KARAWAL NAGAR (DEHROTI), PKT A2‐BLOCK E, PKT C3‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK H‐WEST KARAWAL NAGAR, BLOCK F & G‐BHAGAT SINGH COLONY, BLOCK B‐KHAJURI KHAS, BLOCK 4A‐SADAT PUR, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK, BLOCK D‐WEST KARAWAL NAGAR, BLOCK K‐WEST KARAWAL NAGAR, BLOCK A‐HARIJAN BASTI, BLOCK D‐WEST KARAWAL NAGAR, BLOCK 5C‐SADAT PUR, WEST KARAWAL NAGAR
KWN 7190 2650 KVA UNPLANNED 29‐03‐2018 01:33:00 29‐03‐2018 02:28:00 0:54 0.00075 MUs
1444 BLOCK D‐HARIJAN BASTI, BLOCK B‐TUKMIRPUR, BLOCK C‐TUKMIRPUR, BLOCK B‐NEW CHAUHAN PUR, BLOCK B‐NEW CHAUHAN PUR, BLOCK D‐PREM VIHAR, BLOCK N‐SHIV VIHAR, BLOCK A‐PREM VIHAR, BLOCK B‐DAYALPUR, DEEKSHA MAHILA COLLAGE‐DAYALPUR EXTN., BLOCK E‐DAYALPUR, BLOCK A‐BABU NAGAR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐PREM VIHAR, BLOCK 2C‐SADAT PUR, BLOCK M‐SHIV VIHAR, BLOCK A‐KHAJURI KHAS, BHAJANPURA‐DAYALPUR, BLOCK D‐SHIV VIHAR, BLOCK D‐NEW CHAUHAN PUR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., BLOCK F‐SADAT PUR, BLOCK 1B‐SADAT PUR, BLOCK C2‐NEW CHAUHAN PUR, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK B, BLOCK 5B‐SADAT PUR
KWN 5851 6160 KVA UNPLANNED 29‐03‐2018 17:55:19 29‐03‐2018 18:53:00 0:57 0.00079167 MUs
1445 BLOCK K‐WEST KARAWAL NAGAR, BLOCK A‐RAMA GARDEN, BLOCK B‐NEW CHAUHAN PUR, BLOCK A‐HARIJAN BASTI, BLOCK B‐KARAWAL NAGAR (DEHROTI), FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK B‐HARIJAN BASTI, PKT D‐BLOCK A, PKT B‐BLOCK A, BLOCK B‐NEW CHAUHAN PUR
KWN 1015 3600 KVA UNPLANNED 30‐03‐2018 05:45:00 30‐03‐2018 06:10:02 0:25 0.00010417 MUs
1446 BLOCK K‐WEST KARAWAL NAGAR, PKT B‐BLOCK B, PKT A‐BLOCK E, BLOCK A‐RAMA GARDEN, BLOCK B‐NEW CHAUHAN PUR, BLOCK A‐HARIJAN BASTI, BLOCK 3A‐SADAT PUR, PKT EA‐BLOCK B, PKT D‐BLOCK B, BLOCK B‐BHAGAT SINGH COLONY, BLOCK A‐KARAWAL NAGAR (DEHROTI), BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK K‐KARAWAL NAGAR (DEHROTI), FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK B‐HARIJAN BASTI, PKT D‐BLOCK A, PKT C‐BLOCK A, PKT E‐BLOCK A, PKT B‐BLOCK A, PKT G‐BLOCK A, BLOCK D‐WEST KARAWAL NAGAR, BLOCK B‐NEW CHAUHAN PUR
KWN 2412 3600 KVA UNPLANNED 30‐03‐2018 11:19:00 30‐03‐2018 12:00:00 0:40 0.00055556 MUs
1447 BLOCK C‐PATEL VIHAR, BLOCK CN‐MANGALAM VIHAR, PHASE I‐SHIV VIHAR, BLOCK A‐PRAKASH VIHAR, VILLAGE‐KAMAL VIHAR, BLOCK R‐PATEL VIHAR, BLOCK B‐PATEL VIHAR, BLOCK A‐MANGALAM VIHAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK C‐PRAKASH VIHAR, BLOCK C‐PATEL VIHAR
KWN 2380 2790 KVA UNPLANNED 30‐03‐2018 13:05:00 30‐03‐2018 13:56:00 0:51 0.00070833 MUs
1448 BLOCK J‐SHIV VIHAR, BLOCK H‐SHIV VIHAR, BLOCK P‐SHIV VIHAR, BLOCK F‐BRIJ PURI, BLOCK Q‐SHIV VIHAR, BLOCK H‐SHIV VIHAR
KWN 2198 0 KVA UNPLANNED 31‐03‐2018 07:40:00 31‐03‐2018 08:40:00 1:0 0.00033333 MUs
1449 BLOCK F‐WEST KARAWAL NAGAR, BLOCK K‐WEST KARAWAL NAGAR, BLOCK D‐DLF ANKUR VIHAR, BLOCK F & G‐BHAGAT SINGH COLONY, WEST KARAWAL NAGAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK F‐BHAGAT SINGH COLONY, BLOCK A‐BHAGAT SINGH COLONY, BLOCK C‐BHAGAT SINGH COLONY, BLOCK H‐BHAGAT SINGH COLONY, BLOCK C‐BHAGAT SINGH COLONY, BLOCK I‐BHAGAT SINGH COLONY, BLOCK E‐BHAGAT SINGH COLONY, BLOCK A‐KARAWAL NAGAR (DEHROTI), BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK K‐KARAWAL NAGAR (DEHROTI), BLOCK D‐WEST KARAWAL NAGAR BLOCK D‐WEST KARAWAL NAGAR
KWN 4943 5285 KVA UNPLANNED 31‐03‐2018 17:01:29 31‐03‐2018 17:19:58 0:18 0.00037 MUs
1450 LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK A‐SHRI RAM COLONY, BLOCK D‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 3395 2060 KVA UNPLANNED 02‐03‐2018 07:22:00 02‐03‐2018 07:59:57 0:37 0.00020556 MUs
1451 BLOCK E‐SUBHASH MOHALLA, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, LIG/MIG RES/NON COMM AREA‐SABHEPUR, BLOCK B‐NEW CHAUHAN PUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, MAUJ PUR COMPLEX 1, BLOCK B‐GARI MANDU, LIG/MIG RES/NON COMM AREA‐MILAN GARDEN, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK B, CHAUHAN PATTI‐VIJAY VIHAR, BADARPUR KHADAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 905 4645 KVA UNPLANNED 03‐03‐2018 10:03:00 03‐03‐2018 11:26:28 1:23 0.00205194 MUs
1452 BLOCK A‐TUKMIRPUR, BLOCK B‐MUSTAFABAD (DAYALPUR), BLOCK F‐MUSTAFABAD (DAYALPUR), BLOCK A‐MUSTAFABAD (DAYALPUR), BLOCK D‐MUSTAFABAD (DAYALPUR)
KWN 779 990 KVA UNPLANNED 03‐03‐2018 11:13:19 03‐03‐2018 12:04:00 0:50 0.00041667 MUs
1453 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 2437 0 KVA UNPLANNED 03‐03‐2018 13:48:43 03‐03‐2018 14:45:30 0:56 0.00031111 MUs
1454 BLOCK B‐NEHRU VIHAR, BLOCK T‐NEHRU VIHAR KWN 112 630 KVA UNPLANNED 05‐03‐2018 09:31:37 05‐03‐2018 09:56:31 0:24 0 MUs1455 BLOCK D‐NEHRU VIHAR, BLOCK 9‐GANDHI NAGAR, BLOCK F‐NEHRU VIHAR, BLOCK M‐NEHRU VIHAR, BLOCK E‐NEHRU
VIHAR, BLOCK B‐NEHRU VIHARKWN 2543 630 KVA UNPLANNED 07‐03‐2018 16:41:43 07‐03‐2018 17:10:09 0:28 0.00023333 MUs
1456 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 2437 0 KVA UNPLANNED 07‐03‐2018 17:34:46 07‐03‐2018 18:18:43 0:43 0.00023889 MUs
1457 BLOCK F‐NEHRU VIHAR, BLOCK Z‐NEHRU VIHAR KWN 61 990 KVA UNPLANNED 07‐03‐2018 17:58:02 07‐03‐2018 18:20:00 0:21 0.00005833 MUs1458 LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK A‐SHRI RAM COLONY, BLOCK D‐SHRI RAM COLONY,
LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 3395 2060 KVA UNPLANNED 07‐03‐2018 22:21:00 08‐03‐2018 00:04:00 1:43 0.00057222 MUs HVDS LEAD FAULTY AT PKT‐5 GALI NO. 5 SONIA VIHAR
1459 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHRI RAM COLONY
KWN 3395 2060 KVA UNPLANNED 08‐03‐2018 07:00:00 08‐03‐2018 07:56:46 0:56 0.00155556 MUs
1460 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐GARI MANDU, CLOCK C‐BIHARIPUR, LIG/MIG RES/NON COMM AREA‐MILAN GARDEN, KACHI COLONY‐JAGJEET NAGAR, BLOCK T‐NEHRU VIHAR, CHAUHAN PATTI‐VIJAY VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BADARPUR KHADAR, MAUJ PUR COMPLEX 1, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK C‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK D‐TUKMIRPUR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, JAGJEET NAGAR‐GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SABHEPUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK E‐SUBHASH MOHALLA, PKT A‐BLOCK B
KWN 5009 4645 KVA UNPLANNED 08‐03‐2018 07:18:00 08‐03‐2018 08:45:00 1:27 0.0029 MUs
1461 GURU ANGAD NAGAR EAST‐SWASTHYA VIHAR, BLOCK C‐KHAJURI KHAS, BLOCK A‐KHAJURI KHAS, BLOCK J‐KHAJURI KHAS, LIG/MIG RES/NON COMM AREA‐BLOCK B, BLOCK I‐KHAJURI KHAS EXTN.
KWN 4029 630 KVA UNPLANNED 09‐03‐2018 18:25:29 09‐03‐2018 19:15:00 0:49 0.00054444 MUs
1462 LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐BLOCK B, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 5544 2060 KVA UNPLANNED 10‐03‐2018 08:48:00 10‐03‐2018 09:27:14 0:39 0.00096417 MUs
1463 BLOCK 3B‐SADAT PUR, PKT 2A‐BLOCK A, BLOCK 3A‐SADAT PUR, BLOCK 4C‐SADAT PUR, BLOCK 3C‐SADAT PUR, BLOCK 6C‐SADAT PUR, BLOCK 2C‐SADAT PUR, BLOCK 5B‐SADAT PUR, BLOCK 4B‐SADAT PUR, BLOCK 3A‐BLOCK B, PKT A‐BLOCK B, PKT EA‐BLOCK B, PKT F‐BLOCK B, PKT E‐BLOCK B, PKT 1‐BLOCK A, PKT E‐BLOCK A, PKT B‐BLOCK A, PKT G‐BLOCK A, PKT F‐BLOCK A
KWN 1487 990 KVA UNPLANNED 11‐03‐2018 12:59:31 11‐03‐2018 13:50:00 0:50 0.00027778 MUs
1464 BLOCK D‐NEHRU VIHAR, BLOCK F‐NEHRU VIHAR, BLOCK C‐TUKMIRPUR, BLOCK C‐SHERPUR, CLOCK C‐BIHARIPUR, MUSTAFABAD‐MUNGA NAGAR, BLOCK D‐TUKMIRPUR, PKT R‐BLOCK D, BLOCK B‐NEHRU VIHAR, CHAUHAN PATTI‐VIJAY VIHAR, BLOCK A‐NEHRU VIHAR, BLOCK C‐NEHRU VIHAR, BLOCK A1‐MUNGA NAGAR, BLOCK D‐SHERPUR, BLOCK D‐KHAJURI KHAS, BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK B‐CHANDU NAGAR, BLOCK K‐KARAWAL NAGAR (DEHROTI)
KWN 5611 4630 KVA UNPLANNED 11‐03‐2018 12:50:00 11‐03‐2018 14:10:00 1:19 0.00087778 MUs area affected a‐blk nehru vihar
1465 BLOCK D‐NEHRU VIHAR, BLOCK F‐NEHRU VIHAR, BLOCK C‐TUKMIRPUR, BLOCK C‐SHERPUR, CLOCK C‐BIHARIPUR, MUSTAFABAD‐MUNGA NAGAR, BLOCK D‐TUKMIRPUR, PKT R‐BLOCK D, BLOCK B‐NEHRU VIHAR, CHAUHAN PATTI‐VIJAY VIHAR, BLOCK A‐NEHRU VIHAR, BLOCK C‐NEHRU VIHAR, BLOCK A1‐MUNGA NAGAR, BLOCK D‐SHERPUR, BLOCK D‐KHAJURI KHAS, BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK B‐CHANDU NAGAR, BLOCK K‐KARAWAL NAGAR (DEHROTI)
KWN 5611 4630 KVA UNPLANNED 11‐03‐2018 15:50:00 11‐03‐2018 16:18:00 0:27 0.000075 MUs
1466 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐GARI MANDU, CLOCK C‐BIHARIPUR, LIG/MIG RES/NON COMM AREA‐MILAN GARDEN, KACHI COLONY‐JAGJEET NAGAR, BLOCK T‐NEHRU VIHAR, CHAUHAN PATTI‐VIJAY VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BADARPUR KHADAR, BLOCK B‐SHIV VIHAR, MAUJ PUR COMPLEX 1, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK C‐KABIR NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK D‐TUKMIRPUR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, JAGJEET NAGAR‐GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SABHEPUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK E‐SUBHASH MOHALLA, PKT A‐BLOCK B, LIG/MIG RES/NON COMM AREA SONIA VIHAR EXTENSION
KWN 5016 4645 KVA UNPLANNED 11‐03‐2018 20:07:15 11‐03‐2018 20:35:00 0:27 0.00075 MUs
1467 LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐BLOCK B
KWN 5545 2060 KVA UNPLANNED 14‐03‐2018 12:15:00 14‐03‐2018 13:00:00 0:45 0.00075 MUs
1468 LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, CHAUHAN PATTI‐VIJAY VIHAR KWN 292 400 KVA UNPLANNED 14‐03‐2018 16:32:34 14‐03‐2018 17:55:00 1:22 0.00045556 MUs1469 BLOCK F‐KHAJURI KHAS EXTN., BLOCK G‐KHAJURI KHAS EXTN., BLOCK H‐KHAJURI KHAS EXTN. KWN 91 990 KVA UNPLANNED 14‐03‐2018 19:00:00 14‐03‐2018 20:19:44 1:19 0.00043889 MUs1470 LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK A‐SHRI RAM COLONY, BLOCK D‐SHRI RAM COLONY,
BLOCK F‐WEST KARAWAL NAGAR, BLOCK H‐OLD MUSTAFABAD, BLOCK D‐DLF ANKUR VIHAR, BLOCK F & G‐BHAGAT SINGH COLONY, WEST KARAWAL NAGAR, BLOCK C‐KARAWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK B‐KHAJURI KHAS, BLOCK B‐BHAGAT SINGH COLONY, BLOCK C‐BHAGAT SINGH COLONY, BLOCK H‐BHAGAT SINGH COLONY, BLOCK C‐BHAGAT SINGH COLONY, BLOCK I‐BHAGAT SINGH COLONY, BLOCK E‐BHAGAT SINGH COLONY, BLOCK C‐DLF ANKUR VIHAR, BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK D‐WEST KARAWAL NAGAR BLOCK D WEST KARAWAL NAGAR
KWN 1037 630 KVA UNPLANNED 14‐03‐2018 22:05:00 14‐03‐2018 23:55:00 1:50 0.00342222 MUs
1471 BLOCK A‐KHAJURI KHAS KWN 3 630 KVA UNPLANNED 15‐03‐2018 08:52:08 15‐03‐2018 09:27:00 0:34 0.00001889 MUs1472 BLOCK F‐NEHRU VIHAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BLOCK B‐
MUSTAFABAD (DAYALPUR), BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SADAT PUR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK A‐NEHRU VIHAR, BLOCK F‐MUSTAFABAD (DAYALPUR), BLOCK A‐MUSTAFABAD (DAYALPUR), BLOCK D‐MUSTAFABAD (DAYALPUR), BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK A‐MUSTAFABAD (DAYALPUR), LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 588 630 KVA UNPLANNED 16‐03‐2018 20:40:00 16‐03‐2018 22:04:00 1:24 0 MUs
1473 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐GARI MANDU, CLOCK C‐BIHARIPUR, LIG/MIG RES/NON COMM AREA‐MILAN GARDEN, KACHI COLONY‐JAGJEET NAGAR, BLOCK T‐NEHRU VIHAR, CHAUHAN PATTI‐VIJAY VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BADARPUR KHADAR, MAUJ PUR COMPLEX 1, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK C‐KABIR NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK D‐TUKMIRPUR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, JAGJEET NAGAR‐GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SABHEPUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK E‐SUBHASH MOHALLA PKT A BLOCK B
KWN 5040 4645 KVA UNPLANNED 17‐03‐2018 14:10:00 17‐03‐2018 15:23:00 1:13 0.00162222 MUs
1474 BLOCK B‐SHRI RAM COLONY, BLOCK A‐SONIA VIHAR EXTENSION, BLOCK B‐SONIA VIHAR EXTENSION, BLOCK E‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION
KWN 1156 0 KVA UNPLANNED 19‐03‐2018 13:30:00 19‐03‐2018 15:28:00 1:58 0.00065556 MUs HVDS LEAD FAULTY AT G‐1 PUSTA‐5 POLE NO. M706 GALI NO. 1 SONIA VIHAR
1475 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHRI RAM COLONY
KWN 3408 2060 KVA UNPLANNED 19‐03‐2018 20:03:00 19‐03‐2018 21:00:00 0:56 0.00155556 MUs
1476 BLOCK A‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 169 0 KVA UNPLANNED 19‐03‐2018 22:15:00 19‐03‐2018 23:31:15 1:16 0.00042222 MUs
1477 LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK A‐SHRI RAM COLONY, BLOCK D‐SHRI RAM COLONY, BLOCK D‐DLF ANKUR VIHAR, WEST KARAWAL NAGAR, BLOCK C‐KARAWAL NAGAR, SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK B‐KHAJURI KHAS, BLOCK A‐BHAGAT SINGH COLONY, BLOCK I‐BHAGAT SINGH COLONY, BLOCK E‐BHAGAT SINGH COLONY, BLOCK D‐WEST KARAWAL NAGAR
KWN 1037 630 KVA UNPLANNED 20‐03‐2018 04:54:00 20‐03‐2018 05:52:00 0:58 0.00064444 MUs
1478 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 1600 0 KVA UNPLANNED 20‐03‐2018 15:50:00 20‐03‐2018 16:48:00 0:58 0.00024167 MUs
1479 GEETA COLONY, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, LIG/MIG RES/NON COMM AREA‐SABHEPUR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐MILAN GARDEN, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
KWN 1007 630 KVA UNPLANNED 20‐03‐2018 19:26:21 20‐03‐2018 19:55:51 0:29 0.00008056 MUs
1480 LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK A‐SHRI RAM COLONY, BLOCK D‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 3410 2060 KVA UNPLANNED 22‐03‐2018 13:03:00 22‐03‐2018 14:55:00 1:52 0.00264444 MUs
1481 BLOCK E‐BRIJ PURI, BLOCK B‐BRIJ PURI, BLOCK A‐CHAND BAGH, NIRAHKARI BHAVAN (HOUSE)‐BRIJ PURI, SANT NIRANKARI BHAVAN‐GANGA VIHAR KWN, BLOCK D‐BRIJ PURI, BLOCK F‐BRIJ PURI, BLOCK B‐CHAND BAGH, BLOCK C‐BRIJ PURI
KWN 5003 4370 KVA UNPLANNED 22‐03‐2018 20:20:00 22‐03‐2018 21:10:00 0:49 0.00114333 MUs
1482 GURU ANGAD NAGAR EAST‐SWASTHYA VIHAR, BLOCK C‐KHAJURI KHAS, BLOCK A‐KHAJURI KHAS, BLOCK J‐KHAJURI KHAS EXTN., CLOCK C‐BIHARIPUR, BLOCK C‐KHAJURI KHAS, BLOCK B‐KHAJURI KHAS, PKT A‐BLOCK B, BLOCK J‐KHAJURI KHAS, LIG/MIG RES/NON COMM AREA‐BLOCK B, BLOCK F‐KHAJURI KHAS EXTN., BLOCK H‐KHAJURI KHAS EXTN., BLOCK I‐KHAJURI KHAS EXTN., BLOCK C‐SHERPUR
KWN 5478 3510 KVA UNPLANNED 23‐03‐2018 17:10:00 23‐03‐2018 18:40:00 1:30 0.00125 MUs
1483 BLOCK 3B‐SADAT PUR, PKT 2A‐BLOCK A, BLOCK 3A‐SADAT PUR, BLOCK 4C‐SADAT PUR, BLOCK 3C‐SADAT PUR, BLOCK 6C‐SADAT PUR, BLOCK 2C‐SADAT PUR, BLOCK 5B‐SADAT PUR, BLOCK 4B‐SADAT PUR, BLOCK 3A‐BLOCK B, PKT A‐BLOCK B, PKT EA‐BLOCK B, PKT F‐BLOCK B, PKT E‐BLOCK B, PKT 1‐BLOCK A, PKT E‐BLOCK A, PKT B‐BLOCK A, PKT G‐BLOCK A, PKT F‐BLOCK A
KWN 1492 990 KVA UNPLANNED 24‐03‐2018 11:19:40 24‐03‐2018 13:00:20 1:40 0.00055556 MUs
1484 GEETA COLONY, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, LIG/MIG RES/NON COMM AREA‐SABHEPUR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐MILAN GARDEN, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, CHAUHAN PATTI‐VIJAY VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 2218 2715 KVA UNPLANNED 24‐03‐2018 13:00:00 24‐03‐2018 14:56:18 1:56 0.00225556 MUs
1485 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 1601 0 KVA UNPLANNED 24‐03‐2018 13:20:21 24‐03‐2018 15:11:58 1:51 0.0004625 MUs
1486 BLOCK A‐SONIA VIHAR EXTENSION, BLOCK B‐SONIA VIHAR EXTENSION, BLOCK E‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION
KWN 1156 0 KVA UNPLANNED 24‐03‐2018 16:52:43 24‐03‐2018 17:45:10 0:52 0.00021667 MUs
1487 BLOCK J‐KHAJURI KHAS, BLOCK A‐KHAJURI KHAS, BLOCK C‐KHAJURI KHAS, BLOCK I‐KHAJURI KHAS EXTN., GURU ANGAD NAGAR EAST‐SWASTHYA VIHAR, LIG/MIG RES/NON COMM AREA‐BLOCK B
KWN 4033 630 KVA UNPLANNED 25‐03‐2018 02:23:00 25‐03‐2018 03:15:11 0:52 0.00036111 MUs
1488 BLOCK C‐TUKMIRPUR, BLOCK D‐KHAJURI KHAS, BLOCK B‐CHANDU NAGAR, CLOCK C‐BIHARIPUR, BLOCK B‐KHAJURI KHAS, BLOCK D‐SHERPUR, BLOCK C‐SHERPUR, BLOCK D‐TUKMIRPUR, CHAUHAN PATTI‐VIJAY VIHAR
KWN 914 1620 KVA UNPLANNED 25‐03‐2018 03:41:22 25‐03‐2018 04:40:00 0:58 0.00048333 MUs
1489 BLOCK C‐KHAJURI KHAS, BLOCK A‐KHAJURI KHAS, BLOCK C‐KHAJURI KHAS, BLOCK B‐KHAJURI KHAS, PKT A‐BLOCK B, BLOCK C‐SHERPUR
KWN 611 1620 KVA UNPLANNED 25‐03‐2018 03:40:00 25‐03‐2018 04:38:00 0:58 0.00048333 MUs
1490 LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK A‐SHRI RAM COLONY, BLOCK D‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 3410 2060 KVA UNPLANNED 25‐03‐2018 13:50:00 25‐03‐2018 14:48:00 0:58 0.00145 MUs
1491 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐GARI MANDU, CLOCK C‐BIHARIPUR, LIG/MIG RES/NON COMM AREA‐MILAN GARDEN, KACHI COLONY‐JAGJEET NAGAR, BLOCK T‐NEHRU VIHAR, CHAUHAN PATTI‐VIJAY VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BADARPUR KHADAR, MAUJ PUR COMPLEX 1, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK C‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK D‐TUKMIRPUR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, JAGJEET NAGAR‐GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SABHEPUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK E‐SUBHASH MOHALLA, PKT A‐BLOCK B
KWN 5058 4645 KVA UNPLANNED 25‐03‐2018 14:15:30 25‐03‐2018 15:04:28 0:48 0.0012 MUs
1492 BLOCK C‐TUKMIRPUR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK A‐SHRI RAM COLONY, BLOCK D‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK A‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA SONIA VIHAR
KWN 3410 2060 KVA UNPLANNED 25‐03‐2018 19:55:00 25‐03‐2018 20:50:00 0:54 0.00075 MUs
1493 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK C‐TUKMIRPUR, BLOCK B‐GARI MANDU, CLOCK C‐BIHARIPUR, LIG/MIG RES/NON COMM AREA‐MILAN GARDEN, KACHI COLONY‐JAGJEET NAGAR, BLOCK T‐NEHRU VIHAR, CHAUHAN PATTI‐VIJAY VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BADARPUR KHADAR, BLOCK B‐SHIV VIHAR, MAUJ PUR COMPLEX 1, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK C‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK D‐TUKMIRPUR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐HARIJAN BASTI, JAGJEET NAGAR‐GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SABHEPUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK E‐SUBHASH MOHALLA, PKT A‐BLOCK B
KWN 5058 4645 KVA UNPLANNED 26‐03‐2018 09:00:00 26‐03‐2018 09:58:00 0:58 0.001885 MUs
1494 BLOCK A‐TUKMIRPUR KWN 11 0 KVA UNPLANNED 26‐03‐2018 16:30:00 26‐03‐2018 17:30:00 1:0 0.0005 MUs1495 BLOCK 4B‐SADAT PUR, PKT EA‐BLOCK B, PKT F‐BLOCK A, BLOCK 2C‐SADAT PUR, BLOCK 6C‐SADAT PUR, PKT 1‐BLOCK A,
BLOCK 4C‐SADAT PUR, BLOCK 3A‐SADAT PUR, PKT F‐BLOCK B, BLOCK 3B‐SADAT PUR, PKT E‐BLOCK B, BLOCK 3A‐BLOCK B, BLOCK 3C‐SADAT PUR, PKT B‐BLOCK A, PKT G‐BLOCK A, PKT 2A‐BLOCK A, PKT A‐BLOCK B, PKT E‐BLOCK A, BLOCK 5B‐SADAT PUR
KWN 1492 990 KVA UNPLANNED 26‐03‐2018 21:50:00 26‐03‐2018 22:20:35 0:30 0.00025 MUs
1496 LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, LIG/MIG RES/NON COMM AREA‐SABHEPUR, CLOCK C‐BIHARIPUR, MAUJ PUR COMPLEX 1, LIG/MIG RES/NON COMM AREA‐MILAN GARDEN, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK D‐TUKMIRPUR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, CHAUHAN PATTI‐VIJAY VIHAR, BLOCK T‐NEHRU VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 1432 4645 KVA UNPLANNED 27‐03‐2018 08:20:00 27‐03‐2018 09:40:00 1:19 0.00241389 MUs
1497 BLOCK D‐NEHRU VIHAR, BLOCK B‐CHANDU NAGAR, MUSTAFABAD‐MUNGA NAGAR KWN 1001 990 KVA UNPLANNED 27‐03‐2018 10:35:00 27‐03‐2018 12:20:00 1:45 0.00029167 MUs1498 BLOCK C‐KHAJURI KHAS, BLOCK A‐KHAJURI KHAS, CLOCK C‐BIHARIPUR, BLOCK C‐KHAJURI KHAS, BLOCK B‐KHAJURI
KHAS, PKT A‐BLOCK B, BLOCK J‐KHAJURI KHAS, LIG/MIG RES/NON COMM AREA‐BLOCK B, BLOCK I‐KHAJURI KHAS EXTN., BLOCK C‐SHERPUR
KWN 3660 3510 KVA UNPLANNED 27‐03‐2018 15:45:00 27‐03‐2018 16:44:00 0:58 0.00080556 MUs
1499 BLOCK E‐SUBHASH MOHALLA, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, LIG/MIG RES/NON COMM AREA‐SABHEPUR, MAUJ PUR COMPLEX 1, BLOCK B‐GARI MANDU, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK B, CHAUHAN PATTI‐VIJAY VIHAR
KWN 909 4645 KVA UNPLANNED 27‐03‐2018 17:14:10 27‐03‐2018 18:10:00 0:55 0.00122222 MUs
1500 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 5553 2060 KVA UNPLANNED 27‐03‐2018 18:40:00 27‐03‐2018 19:30:00 0:49 0.00108889 MUs
1501 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐MUSTAFABAD (DAYALPUR), YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 5553 2060 KVA UNPLANNED 27‐03‐2018 21:51:00 27‐03‐2018 22:50:00 0:58 0.00177222 MUs
1502 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NEW CHAUHAN PUR, BLOCK B‐GARI MANDU, CLOCK C‐BIHARIPUR, LIG/MIG RES/NON COMM AREA‐MILAN GARDEN, KACHI COLONY‐JAGJEET NAGAR, BLOCK T‐NEHRU VIHAR, CHAUHAN PATTI‐VIJAY VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BADARPUR KHADAR, MAUJ PUR COMPLEX 1, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK C‐KABIR NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, BHAGAT NAGAR‐DAYALPUR, BHAGIRATHI VIHAR, BLOCK M‐SHIV VIHAR, BLOCK D‐TUKMIRPUR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, JAGJEET NAGAR‐GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SABHEPUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK E‐SUBHASH MOHALLA, PKT A‐BLOCK B
KWN 5058 4645 KVA UNPLANNED 29‐03‐2018 14:27:13 29‐03‐2018 15:57:00 1:29 0.00257111 MUs
1503 BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, CLOCK C‐BIHARIPUR, BLOCK D‐TUKMIRPUR, LIG/MIG RES/NON COMM AREA‐MILAN GARDEN, BLOCK T‐NEHRU VIHAR, CHAUHAN PATTI‐VIJAY VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, LIG/MIG RES/NON COMM AREA‐SABHEPUR, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK F‐SHIV VIHAR PKT A‐BLOCK B
KWN 1432 4645 KVA UNPLANNED 29‐03‐2018 20:35:00 29‐03‐2018 21:22:28 0:47 0.00156667 MUs
1504 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, BLOCK B‐GARI MANDU, CLOCK C‐BIHARIPUR, LIG/MIG RES/NON COMM AREA‐MILAN GARDEN, KACHI COLONY‐JAGJEET NAGAR, BLOCK T‐NEHRU VIHAR, CHAUHAN PATTI‐VIJAY VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BADARPUR KHADAR, MAUJ PUR COMPLEX 1, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK C‐KARAWAL NAGAR, BLOCK C‐KABIR NAGAR, BLOCK E‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SONIA VIHAR EXTENSION, BLOCK D‐TUKMIRPUR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, JAGJEET NAGAR‐GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SABHEPUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK E‐
KWN 5058 4645 KVA UNPLANNED 30‐03‐2018 00:03:00 30‐03‐2018 01:37:38 1:34 0.00104444 MUs
1505 BLOCK C‐KABIR NAGAR, BLOCK E‐SUBHASH MOHALLA, KACHI COLONY‐JAGJEET NAGAR, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, LIG/MIG RES/NON COMM AREA‐SABHEPUR, CLOCK C‐BIHARIPUR, MAUJ PUR COMPLEX 1, BLOCK B‐GARI MANDU, JAGJEET NAGAR‐GHONDA, BLOCK A‐SONIA VIHAR EXTENSION, BLOCK D‐TUKMIRPUR, CHAUHAN PATTI‐VIJAY VIHAR, BADARPUR KHADAR, BLOCK T‐NEHRU VIHAR
KWN 2370 1130 KVA UNPLANNED 30‐03‐2018 07:40:00 30‐03‐2018 09:15:00 1:34 0.00130556 MUs
1506 LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK A‐SHRI RAM COLONY, BLOCK D‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 3411 2060 KVA UNPLANNED 30‐03‐2018 08:00:00 30‐03‐2018 08:36:00 0:36 0.00115 MUs
1507 LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK A‐SHRI RAM COLONY, BLOCK D‐SHRI RAM COLONY, BLOCK F & G‐BHAGAT SINGH COLONY, WEST KARAWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, PKT EA‐BLOCK B, PKT D‐BLOCK B, BLOCK B‐KHAJURI KHAS, BLOCK C‐SHERPUR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK H‐BHAGAT SINGH COLONY, BLOCK C‐BHAGAT SINGH COLONY, BLOCK E‐BHAGAT SINGH COLONY, BLOCK B‐KARAWAL NAGAR (DEHROTI), PKT D‐BLOCK A, PKT E‐BLOCK A, BLOCK D‐WEST KARAWAL NAGAR
KWN 1038 630 KVA UNPLANNED 30‐03‐2018 09:40:00 30‐03‐2018 10:50:00 1:10 0.00311111 MUs
1508 BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, CLOCK C‐BIHARIPUR, BLOCK D‐TUKMIRPUR, LIG/MIG RES/NON COMM AREA‐MILAN GARDEN, BLOCK T‐NEHRU VIHAR, CHAUHAN PATTI‐VIJAY VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, LIG/MIG RES/NON COMM AREA‐SABHEPUR, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK F‐SHIV VIHAR PKT A‐BLOCK B
KWN 1432 4645 KVA UNPLANNED 30‐03‐2018 10:00:00 30‐03‐2018 13:00:00 3:0 0.0075 MUs HVDS LEAD FAULTY AT BADARPUR KHADAR,
1509 LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐BLOCK B, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 5566 2060 KVA UNPLANNED 30‐03‐2018 10:20:00 30‐03‐2018 10:52:12 0:32 0.0008 MUs
1510 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHRI RAM COLONY
KWN 3411 2060 KVA UNPLANNED 30‐03‐2018 15:15:00 30‐03‐2018 15:42:28 0:27 0.00075 MUs
1511 LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐BLOCK B
KWN 5566 2060 KVA UNPLANNED 30‐03‐2018 16:12:05 30‐03‐2018 17:10:00 0:57 0.00126667 MUs
1512 GURU ANGAD NAGAR EAST‐SWASTHYA VIHAR, BLOCK C‐KHAJURI KHAS, BLOCK A‐KHAJURI KHAS, CLOCK C‐BIHARIPUR, BLOCK C‐KHAJURI KHAS, BLOCK B‐KHAJURI KHAS, PKT A‐BLOCK B, BLOCK J‐KHAJURI KHAS, LIG/MIG RES/NON COMM AREA‐BLOCK B, BLOCK I‐KHAJURI KHAS EXTN., BLOCK C‐SHERPUR
KWN 5501 3510 KVA UNPLANNED 30‐03‐2018 16:00:00 30‐03‐2018 17:30:00 1:30 0.001 MUs
1513 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHRI RAM COLONY
KWN 3411 2060 KVA UNPLANNED 30‐03‐2018 16:30:00 30‐03‐2018 16:50:00 0:20 0.00038889 MUs
1514 LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR KWN 7 100 KVA UNPLANNED 31‐03‐2018 13:03:00 31‐03‐2018 14:01:00 0:58 0.00170778 MUs1515 PANDAV NAGAR BLOCK D‐GANESH NAGAR, GANESH NAGAR SOUTH‐INDRAPRASTHA EXTENSION LNR 1193 630 KVA UNPLANNED 16‐03‐2018 13:55:00 16‐03‐2018 14:33:39 0:38 0.00021111 MUs1516 BLOCK A‐CHANDER VIHAR, BLOCK B‐MANDAWALI VILLAGE LNR 1709 630 KVA UNPLANNED 21‐03‐2018 17:11:02 21‐03‐2018 17:23:28 0:12 0.00006667 MUs1517 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, GYAN KUNJ‐WEST GURU ANGAD NAGAR, PKT R‐
BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 507 990 KVA UNPLANNED 23‐03‐2018 10:53:00 23‐03‐2018 11:42:00 0:49 0.00013611 MUs
1518 BLOCK S1‐SCHOOL BLOCK LNR 763 990 KVA UNPLANNED 25‐03‐2018 13:01:50 25‐03‐2018 13:26:47 0:24 0.00006667 MUs
1519 BLOCK F‐GURU ANGAD NAGAR WEST, BLOCK C‐GURU ANGAD NAGAR WEST, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 1759 990 KVA UNPLANNED 25‐03‐2018 15:00:59 25‐03‐2018 15:26:09 0:25 0.00006944 MUs
1520 SHANKAR VIHAR‐SWASTHYA VIHAR, BLOCK B‐SWASTHYA VIHAR LNR 105 990 KVA UNPLANNED 22‐03‐2018 17:45:56 22‐03‐2018 18:04:33 0:18 0.00005 MUs1521 SHAKARPUR EXTN.‐SHAKARPUR KHAS, BHARTI COLONY‐NIRMAN VIHAR, BLOCK D‐NIRMAN VIHAR, BLOCK B‐NIRMAN
VIHAR, BLOCK C‐NIRMAN VIHAR, BLOCK A‐NIRMAN VIHARLNR 441 990 KVA UNPLANNED 26‐03‐2018 18:17:35 26‐03‐2018 18:46:00 0:28 0.00011667 MUs
1522 INDUSTRIAL AREA‐PATPAR GANJ INDUSTRIAL AREA LNR 17 630 KVA UNPLANNED 10‐03‐2018 14:48:00 10‐03‐2018 15:25:00 0:36 0.0001 MUs1523 INDUSTRIAL AREA‐PATPAR GANJ INDUSTRIAL AREA LNR 44 990 KVA UNPLANNED 22‐03‐2018 17:43:51 22‐03‐2018 18:01:32 0:17 0.00004722 MUs1524 BLOCK A‐GAZIPUR VILLAGE LNR 56 630 KVA UNPLANNED 22‐03‐2018 17:59:48 22‐03‐2018 18:14:53 0:15 0.00004167 MUs1525 MANDAWALI FAZALPUR BLOCK B‐JOSHI COLONY, MANDAWALI FAZALPUR BLOCK A‐JOSHI COLONY LNR 243 990 KVA UNPLANNED 25‐03‐2018 13:00:32 25‐03‐2018 13:24:55 0:24 0.00006667 MUs1526 BLOCK C‐GAZIPUR DAIRY FARM, BLOCK D‐GAZIPUR DAIRY FARM, GAZIPUR DAIRY FARM MVR 70 400 KVA UNPLANNED 09‐03‐2018 08:07:03 09‐03‐2018 08:41:48 0:34 0.00009444 MUs1527 PKT A‐MAYUR VIHAR PHASE II MVR 58 630 KVA UNPLANNED 28‐03‐2018 10:31:31 28‐03‐2018 11:13:22 0:41 0 MUs1528 GAZIPUR DAIRY FARM MVR 123 630 KVA UNPLANNED 31‐03‐2018 17:12:14 31‐03‐2018 17:36:10 0:23 0 MUs1529 D.S.I.D.C. COMPLEX‐DTC DEPOT, KACHI MANDIR‐BLOCK E4, BLOCK A2‐NAND NAGARI, BLOCK A4‐NAND NAGARI,
BLOCK A3‐NAND NAGARI, BLOCK C1‐NAND NAGARI, BLOCK B1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK D3, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK A3
NNG 2571 630 KVA UNPLANNED 01‐03‐2018 20:32:06 01‐03‐2018 20:53:15 0:21 0.000175 MUs
1530 GTB MIG FLATS‐POCKET F, GTB ENCLAVE POLICE BOOTH‐JHILMIL‐TAHIRPUR NNG, RAJIV GANDHI SUPER STC HOSPITAL‐GURU TEG BAHADUR ENCLAVE NNG
NNG 1110 1890 KVA UNPLANNED 01‐03‐2018 20:49:35 01‐03‐2018 21:04:14 0:14 0.00007778 MUs
1531 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 124 630 KVA UNPLANNED 03‐03‐2018 09:26:59 03‐03‐2018 09:58:51 0:31 0.00034444 MUs1532 BLOCK J‐SUNDER NAGRI, BLOCK L‐SUNDER NAGRI, BLOCK B‐SUNDER NAGRI NNG, POCKET A‐JJ COLONY, BLOCK C‐
SUNDER NAGRI NNG, BLOCK H‐PREM NAGAR NNG, BLOCK F‐BUNKAR VIHAR, BLOCK H‐JJ COLONYNNG 1427 990 KVA UNPLANNED 03‐03‐2018 11:52:04 03‐03‐2018 13:40:39 1:48 0.0006 MUs
1533 D.S.I.D.C. COMPLEX‐DTC DEPOT, BLOCK D3‐NAND NAGARI, KACHI MANDIR‐BLOCK E4, BLOCK A2‐NAND NAGARI, BLOCK A4‐NAND NAGARI, BLOCK A3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK D1, MCD SCHOOL‐BLOCK C3, BSES OFFICE‐BLOCK C2, BLOCK C1‐NAND NAGARI, BLOCK B1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK D2‐NAND NAGARI, BLOCK D‐BLOCK C3, MCD PRIMARY SCHOOL‐BLOCK D3, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK A3 PKT C4‐BLOCK C1 PKT D3‐BLOCK C1 PKT C3‐BLOCK C1
NNG 6164 1620 KVA UNPLANNED 06‐03‐2018 08:35:22 06‐03‐2018 09:05:00 0:29 0.00048333 MUs
1534 JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐JAGATPURI EXTN., BLOCK C‐JAGATPURI EXTN., BLOCK D‐JAGATPURI EXTN., BLOCK B‐JAGATPURI EXTN., BLOCK D3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK D1, MCD SCHOOL‐BLOCK C3, BSES OFFICE‐BLOCK C2, BLOCK C1‐NAND NAGARI, BLOCK B5‐NAND NAGARI, BLOCK B6‐NAND NAGARI, BLOCK B4‐NAND NAGARI, BLOCK B2‐NAND NAGARI, BLOCK B1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK D2‐NAND NAGARI, BLOCK E‐GTB STAFF COLONY, GTB HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES NNG, BLOCK E‐JAGATPURI EXTN., BLOCK D‐BLOCK C3, BSES YAMUNA POWER LTD‐GTB STAFF COLONY, TYPE B QUARTERS‐GTB STAFF COLONY, PKT C4‐BLOCK C1, PKT D3‐BLOCK C1, PKT C3‐BLOCK C1, SS SCHOOL‐BLOCK B5, TOILET‐GTB STAFF COLONY
NNG 10451 5220 KVA UNPLANNED 06‐03‐2018 09:31:19 06‐03‐2018 10:14:48 0:43 0.00059722 MUs
1535 SEWA DHAM‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY
NNG 124 1030 KVA UNPLANNED 06‐03‐2018 13:25:54 06‐03‐2018 14:19:05 0:53 0.00073611 MUs
1536 BLOCK B‐SUNDER NAGRI NNG, BLOCK H‐JJ COLONY, BLOCK C1‐NAND NAGARI, BLOCK E1‐BUNKAR VIHAR, GOVT.SARVODAY VIDHYALAYA‐BLOCK E5, BLOCK H‐PREM NAGAR NNG, BLOCK G3‐BUNKAR VIHAR, KACHI MANDIR‐BLOCK E4, BLOCK E1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK E3‐KANSHIPUR, BLOCK J‐SUNDER NAGRI, RAJIV GANDHI SUPER STC HOSPITAL‐GURU TEG BAHADUR ENCLAVE NNG, BLOCK E5‐NAND NAGARI, GOVT. BOYS SCHOOL‐BLOCK A3, BLOCK E2‐NAND NAGARI, BUNKAR BHAVAN‐PREM NAGAR NNG, BLOCK A3‐NAND NAGARI, BLOCK L‐SUNDER NAGRI, BLOCK B1‐NAND NAGARI, POCKET B‐GURU TEG BAHADUR ENCLAVE, L.I.G HOUSING NAND NAGARI‐PKT E, BLOCK F‐BUNKAR VIHAR, BLOCK E3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, POCKET A‐JJ COLONY, D.S.I.D.C. COMPLEX‐DTC DEPOT, AMIG FLATS‐POCKET A, BLOCK A4‐NAND NAGARI, BLOCK KK‐SUNDER NAGRI, BLOCK F1‐BUNKAR VIHAR, BHARAT MATA MANDIR‐JJ COLONY, CLASS ROOM MCD SCHOOL‐BUNKAR VIHAR, JANTA FLATS‐NAND NAGARI, BLOCK E‐BUNKAR VIHAR, BLOCK C‐SUNDER NAGRI NNG, BLOCK A2‐NAND NAGARI, BLOCK G4‐BUNKAR VIHAR, MCD PRIMARY SCHOOL‐BLOCK D3, DELHI JAL BOARD MIG FLATS‐POCKET A
NNG 14019 6920 KVA UNPLANNED 06‐03‐2018 15:20:34 06‐03‐2018 16:03:00 0:42 0.00058333 MUs
1537 SEWA DHAM‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY
NNG 124 1030 KVA UNPLANNED 06‐03‐2018 15:33:23 06‐03‐2018 16:30:00 0:56 0.00077778 MUs
1538 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 124 630 KVA UNPLANNED 06‐03‐2018 15:34:12 06‐03‐2018 16:30:00 0:55 0.00076389 MUs1539 JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐JAGATPURI EXTN., BLOCK C‐JAGATPURI EXTN., BLOCK D‐JAGATPURI EXTN.,
BLOCK B‐JAGATPURI EXTN., BLOCK D3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK D1, MCD SCHOOL‐BLOCK C3, BSES OFFICE‐BLOCK C2, BLOCK C1‐NAND NAGARI, BLOCK B5‐NAND NAGARI, BLOCK B6‐NAND NAGARI, BLOCK B4‐NAND NAGARI, BLOCK B2‐NAND NAGARI, BLOCK B1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK D2‐NAND NAGARI, BLOCK E‐GTB STAFF COLONY, GTB HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES NNG, BLOCK E‐JAGATPURI EXTN., BLOCK D‐BLOCK C3, BSES YAMUNA POWER LTD‐GTB STAFF COLONY, TYPE B QUARTERS‐GTB STAFF COLONY, PKT C4‐BLOCK C1, PKT D3‐BLOCK C1, PKT C3‐BLOCK C1, SS SCHOOL‐BLOCK B5, TOILET‐GTB STAFF COLONY
NNG 10420 5220 KVA UNPLANNED 06‐03‐2018 16:30:13 06‐03‐2018 17:28:08 0:57 0.00079167 MUs
1540 SABOLI COLONY‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, VILLAGE SABOLI‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI
NNG 124 630 KVA UNPLANNED 07‐03‐2018 07:12:56 07‐03‐2018 08:05:00 0:52 0.00043333 MUs
1541 SABOLI EXTN.‐MANDOLI, SABOLI COLONY‐MANDOLI, SEWA DHAM‐MANDOLI, BLOCK K‐ANUP VIHAR, BANK OF BARODA‐SABOLI COLONY, VILLAGE SABOLI‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI
NNG 124 630 KVA UNPLANNED 07‐03‐2018 09:31:41 07‐03‐2018 11:13:00 1:41 0.00112222 MUs
1542 BABA DA DARGA‐KARDAMPURI, BANK OF BARODA‐SABOLI COLONY, SEWA DHAM‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI
NNG 124 1030 KVA UNPLANNED 07‐03‐2018 10:04:49 07‐03‐2018 11:00:00 0:55 0.00015278 MUs
1543 D.S.I.D.C. COMPLEX‐DTC DEPOT, BLOCK D3‐NAND NAGARI, KACHI MANDIR‐BLOCK E4, BLOCK A2‐NAND NAGARI, BLOCK A4‐NAND NAGARI, BLOCK A3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK D1, MCD SCHOOL‐BLOCK C3, BSES OFFICE‐BLOCK C2, BLOCK C1‐NAND NAGARI, BLOCK B1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK D2‐NAND NAGARI, BLOCK D‐BLOCK C3, MCD PRIMARY SCHOOL‐BLOCK D3, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK A3 PKT C4‐BLOCK C1 PKT D3‐BLOCK C1 PKT C3‐BLOCK C1
NNG 6147 1620 KVA UNPLANNED 07‐03‐2018 11:16:08 07‐03‐2018 11:46:11 0:30 0.00016667 MUs
1544 BLOCK J‐SUNDER NAGRI, BLOCK L‐SUNDER NAGRI, BLOCK KK‐SUNDER NAGRI, BLOCK M‐SUNDER NAGRI, BLOCK N‐SUNDER NAGRI, BLOCK O‐SUNDER NAGRI, BLOCK B‐SUNDER NAGRI NNG, BLOCK B4‐NAND NAGARI, BLOCK F1‐BUNKAR VIHAR, POCKET A‐JJ COLONY, BLOCK C‐SUNDER NAGRI NNG, BUNKAR BHAVAN‐PREM NAGAR NNG, BLOCK A‐RAJIV NAGAR NNG, BLOCK J‐SUNDER NAGRI NNG, BLOCK L‐SUNDER NAGRI NNG, BLOCK K‐SUNDER NAGRI NNG, BLOCK H‐PREM NAGAR NNG, BLOCK E1‐BUNKAR VIHAR, BLOCK G3‐BUNKAR VIHAR, BLOCK F‐BUNKAR VIHAR, BLOCK G4‐BUNKAR VIHAR BLOCK H‐JJ COLONY
NNG 8455 5260 KVA UNPLANNED 07‐03‐2018 11:50:03 07‐03‐2018 12:43:00 0:52 0.00043333 MUs
1545 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 124 630 KVA UNPLANNED 07‐03‐2018 12:16:11 07‐03‐2018 12:52:03 0:35 0.00048611 MUs1546 BLOCK B1‐NAND NAGARI, MCD SCHOOL‐BLOCK C3, BLOCK D2‐NAND NAGARI, BLOCK C1‐NAND NAGARI, BLOCK D3‐
NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, D.S.I.D.C. COMPLEX‐DTC DEPOT, BLOCK A4‐NAND NAGARI, BLOCK D‐BLOCK C3, KACHI MANDIR‐BLOCK E4, BLOCK B3‐NAND NAGARI, PKT C3‐BLOCK C1, MCD PRIMARY SCHOOL‐BLOCK D1, BLOCK A2‐NAND NAGARI, BSES OFFICE‐BLOCK C2, PKT D3‐BLOCK C1, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK D3 BLOCK A3‐NAND NAGARI PKT C4‐BLOCK C1
NNG 6147 1620 KVA UNPLANNED 07‐03‐2018 12:30:56 07‐03‐2018 13:24:15 0:53 0.00073611 MUs
1547 SEWA DHAM‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY
NNG 124 1030 KVA UNPLANNED 07‐03‐2018 12:37:22 07‐03‐2018 13:24:43 0:47 0.00039167 MUs
1548 BLOCK B‐SUNDER NAGRI NNG, BLOCK H‐JJ COLONY, BLOCK C1‐NAND NAGARI, BLOCK E1‐BUNKAR VIHAR, GOVT.SARVODAY VIDHYALAYA‐BLOCK E5, BLOCK H‐PREM NAGAR NNG, BLOCK G3‐BUNKAR VIHAR, KACHI MANDIR‐BLOCK E4, BLOCK E1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK E3‐KANSHIPUR, BLOCK J‐SUNDER NAGRI, RAJIV GANDHI SUPER STC HOSPITAL‐GURU TEG BAHADUR ENCLAVE NNG, BLOCK E5‐NAND NAGARI, GOVT. BOYS SCHOOL‐BLOCK A3, BLOCK E2‐NAND NAGARI, BUNKAR BHAVAN‐PREM NAGAR NNG, BLOCK A3‐NAND NAGARI, BLOCK L‐SUNDER NAGRI, BLOCK B1‐NAND NAGARI, POCKET B‐GURU TEG BAHADUR ENCLAVE, L.I.G HOUSING NAND NAGARI‐PKT E, BLOCK F‐BUNKAR VIHAR, BLOCK E3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, POCKET A‐JJ COLONY, D.S.I.D.C. COMPLEX‐DTC DEPOT, AMIG FLATS‐POCKET A, BLOCK A4‐NAND NAGARI, BLOCK KK‐SUNDER NAGRI, BLOCK F1‐BUNKAR VIHAR, BHARAT MATA MANDIR‐JJ COLONY, CLASS ROOM MCD SCHOOL‐BUNKAR VIHAR, JANTA FLATS‐NAND NAGARI, BLOCK E‐BUNKAR VIHAR, BLOCK C‐SUNDER NAGRI NNG, BLOCK A2‐NAND NAGARI, BLOCK G4‐BUNKAR VIHAR, MCD PRIMARY SCHOOL‐BLOCK D3, DELHI JAL BOARD MIG FLATS‐POCKET A
NNG 14000 6920 KVA UNPLANNED 07‐03‐2018 13:08:50 07‐03‐2018 14:03:00 0:54 0.0003 MUs
1549 BLOCK B1‐NAND NAGARI, MCD SCHOOL‐BLOCK C3, BLOCK D2‐NAND NAGARI, BLOCK C1‐NAND NAGARI, BLOCK D3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, D.S.I.D.C. COMPLEX‐DTC DEPOT, BLOCK A4‐NAND NAGARI, BLOCK D‐BLOCK C3, KACHI MANDIR‐BLOCK E4, BLOCK B3‐NAND NAGARI, PKT C3‐BLOCK C1, MCD PRIMARY SCHOOL‐BLOCK D1, BLOCK A2‐NAND NAGARI, BSES OFFICE‐BLOCK C2, PKT D3‐BLOCK C1, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK D3 BLOCK A3‐NAND NAGARI PKT C4‐BLOCK C1
NNG 6147 1620 KVA UNPLANNED 07‐03‐2018 13:51:40 07‐03‐2018 14:43:00 0:51 0.00028333 MUs
1550 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 124 630 KVA UNPLANNED 07‐03‐2018 14:59:23 07‐03‐2018 15:43:00 0:43 0.00035833 MUs1551 BLOCK B1‐NAND NAGARI, MCD SCHOOL‐BLOCK C3, BLOCK D2‐NAND NAGARI, BLOCK C1‐NAND NAGARI, BLOCK D3‐
NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, D.S.I.D.C. COMPLEX‐DTC DEPOT, BLOCK A4‐NAND NAGARI, BLOCK D‐BLOCK C3, KACHI MANDIR‐BLOCK E4, BLOCK B3‐NAND NAGARI, PKT C3‐BLOCK C1, MCD PRIMARY SCHOOL‐BLOCK D1, BLOCK A2‐NAND NAGARI, BSES OFFICE‐BLOCK C2, PKT D3‐BLOCK C1, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK D3 BLOCK A3‐NAND NAGARI PKT C4‐BLOCK C1
NNG 6147 1620 KVA UNPLANNED 08‐03‐2018 13:23:13 08‐03‐2018 14:18:00 0:54 0.00045 MUs
1552 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 124 630 KVA UNPLANNED 08‐03‐2018 15:13:33 08‐03‐2018 15:36:13 0:22 0.00024444 MUs1553 BLOCK B1‐NAND NAGARI, MCD SCHOOL‐BLOCK C3, BLOCK D2‐NAND NAGARI, BLOCK C1‐NAND NAGARI, BLOCK D3‐
NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, D.S.I.D.C. COMPLEX‐DTC DEPOT, BLOCK A4‐NAND NAGARI, BLOCK D‐BLOCK C3, KACHI MANDIR‐BLOCK E4, BLOCK B3‐NAND NAGARI, PKT C3‐BLOCK C1, MCD PRIMARY SCHOOL‐BLOCK D1, BLOCK A2‐NAND NAGARI, BSES OFFICE‐BLOCK C2, PKT D3‐BLOCK C1, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK D3 BLOCK A3‐NAND NAGARI PKT C4‐BLOCK C1
NNG 6147 1620 KVA UNPLANNED 08‐03‐2018 16:58:03 08‐03‐2018 17:37:23 0:39 0.00021667 MUs
1554 SABOLI EXTN.‐MANDOLI, SABOLI COLONY‐MANDOLI, SABOLI VILLAGE‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, VILLAGE SABOLI‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI
NNG 124 630 KVA UNPLANNED 09‐03‐2018 06:43:19 09‐03‐2018 07:40:00 0:56 0.00155556 MUs
1555 BANK OF BARODA‐SABOLI COLONY, SABOLI COLONY‐MANDOLI, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY
NNG 124 630 KVA UNPLANNED 09‐03‐2018 11:56:09 09‐03‐2018 13:51:53 1:55 0.00095833 MUs
1556 BLOCK A‐SEWA DHAM, BLOCK K‐ANUP VIHAR, BANK OF BARODA‐SABOLI COLONY, SEWA DHAM‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI
NNG 124 1030 KVA UNPLANNED 09‐03‐2018 12:02:41 09‐03‐2018 13:52:42 1:50 0.00091667 MUs
1557 SABOLI EXTN.‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY
NNG 124 630 KVA UNPLANNED 09‐03‐2018 14:10:14 09‐03‐2018 15:10:00 0:59 0.00049167 MUs affected area saboli vill, susheela garden, saboli ext
1558 D.S.I.D.C. COMPLEX‐DTC DEPOT, KACHI MANDIR‐BLOCK E4, BLOCK A2‐NAND NAGARI, BLOCK A4‐NAND NAGARI, BLOCK A3‐NAND NAGARI, BLOCK C1‐NAND NAGARI, BLOCK B1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK D3, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK A3
NNG 2571 630 KVA UNPLANNED 09‐03‐2018 14:56:00 09‐03‐2018 15:40:00 0:44 0.00036667 MUs
1559 SEWA DHAM‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY
NNG 124 1030 KVA UNPLANNED 10‐03‐2018 12:26:29 10‐03‐2018 14:23:00 1:56 0.00064444 MUs
1560 BLOCK E‐JAGATPURI EXTN., MCD SCHOOL‐BLOCK C3, BLOCK E‐GTB STAFF COLONY, BLOCK D2‐NAND NAGARI, BLOCK C1‐NAND NAGARI, TOILET‐GTB STAFF COLONY, BLOCK B3‐NAND NAGARI, SS SCHOOL‐BLOCK B5, PKT C3‐BLOCK C1, BSES YAMUNA POWER LTD‐GTB STAFF COLONY, MCD PRIMARY SCHOOL‐BLOCK D1, BLOCK B4‐NAND NAGARI, BLOCK D‐JAGATPURI EXTN., BLOCK B2‐NAND NAGARI, TYPE B QUARTERS‐GTB STAFF COLONY, BSES OFFICE‐BLOCK C2, PKT D3‐BLOCK C1, JYOTI COLONY‐BALBIR NAGAR, PKT C4‐BLOCK C1, BLOCK B6‐NAND NAGARI, BLOCK A‐JAGATPURI EXTN., BLOCK B1‐NAND NAGARI, BLOCK D3‐NAND NAGARI, BLOCK D‐BLOCK C3, BLOCK B5‐NAND NAGARI, BLOCK B‐JAGATPURI EXTN., BLOCK C‐JAGATPURI EXTN., GTB HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES NNG
NNG 10420 5220 KVA UNPLANNED 10‐03‐2018 12:48:21 10‐03‐2018 13:47:00 0:58 0.00032222 MUs
1561 BLOCK B‐SUNDER NAGRI NNG, BLOCK H‐JJ COLONY, BLOCK C1‐NAND NAGARI, BLOCK E1‐BUNKAR VIHAR, GOVT.SARVODAY VIDHYALAYA‐BLOCK E5, BLOCK H‐PREM NAGAR NNG, BLOCK G3‐BUNKAR VIHAR, KACHI MANDIR‐BLOCK E4, BLOCK E1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK E3‐KANSHIPUR, BLOCK J‐SUNDER NAGRI, RAJIV GANDHI SUPER STC HOSPITAL‐GURU TEG BAHADUR ENCLAVE NNG, BLOCK E5‐NAND NAGARI, GOVT. BOYS SCHOOL‐BLOCK A3, BLOCK E2‐NAND NAGARI, BUNKAR BHAVAN‐PREM NAGAR NNG, BLOCK A3‐NAND NAGARI, BLOCK L‐SUNDER NAGRI, BLOCK B1‐NAND NAGARI, POCKET B‐GURU TEG BAHADUR ENCLAVE, L.I.G HOUSING NAND NAGARI‐PKT E, BLOCK F‐BUNKAR VIHAR, BLOCK E3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, POCKET A‐JJ COLONY, D.S.I.D.C. COMPLEX‐DTC DEPOT, AMIG FLATS‐POCKET A, BLOCK A4‐NAND NAGARI, BLOCK KK‐SUNDER NAGRI, BLOCK F1‐BUNKAR VIHAR, BHARAT MATA MANDIR‐JJ COLONY, CLASS ROOM MCD SCHOOL‐BUNKAR VIHAR, JANTA FLATS‐NAND NAGARI, BLOCK E‐BUNKAR VIHAR, BLOCK C‐SUNDER NAGRI NNG, BLOCK A2‐NAND NAGARI, BLOCK G4‐BUNKAR VIHAR, MCD PRIMARY SCHOOL‐BLOCK D3, DELHI JAL BOARD MIG FLATS‐POCKET A
NNG 14000 6920 KVA UNPLANNED 10‐03‐2018 13:17:05 10‐03‐2018 14:03:00 0:45 0.000375 MUs
1562 BLOCK J‐SUNDER NAGRI, BLOCK L‐SUNDER NAGRI, BLOCK KK‐SUNDER NAGRI, BLOCK M‐SUNDER NAGRI, BLOCK N‐SUNDER NAGRI, BLOCK O‐SUNDER NAGRI, BLOCK B‐SUNDER NAGRI NNG, POCKET A‐JJ COLONY, BLOCK C‐SUNDER NAGRI NNG, BUNKAR BHAVAN‐PREM NAGAR NNG, BLOCK A‐RAJIV NAGAR NNG, BLOCK J‐SUNDER NAGRI NNG, BLOCK L‐SUNDER NAGRI NNG, BLOCK K‐SUNDER NAGRI NNG, BLOCK H‐PREM NAGAR NNG, BLOCK E1‐BUNKAR VIHAR, BLOCK G3‐BUNKAR VIHAR, BLOCK F‐BUNKAR VIHAR, BLOCK G4‐BUNKAR VIHAR, BLOCK H‐JJ COLONY
NNG 8455 5260 KVA UNPLANNED 10‐03‐2018 14:47:22 10‐03‐2018 15:28:58 0:41 0.00034167 MUs
1563 BANK OF BARODA‐SABOLI COLONY, SABOLI COLONY‐MANDOLI, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY
NNG 124 630 KVA UNPLANNED 11‐03‐2018 14:25:28 11‐03‐2018 14:59:44 0:34 0.00018889 MUs
1564 BLOCK E‐JAGATPURI EXTN., MCD SCHOOL‐BLOCK C3, BLOCK E‐GTB STAFF COLONY, BLOCK D2‐NAND NAGARI, BLOCK C1‐NAND NAGARI, TOILET‐GTB STAFF COLONY, BLOCK B3‐NAND NAGARI, SS SCHOOL‐BLOCK B5, PKT C3‐BLOCK C1, BSES YAMUNA POWER LTD‐GTB STAFF COLONY, MCD PRIMARY SCHOOL‐BLOCK D1, BLOCK B4‐NAND NAGARI, BLOCK D‐JAGATPURI EXTN., BLOCK B2‐NAND NAGARI, TYPE B QUARTERS‐GTB STAFF COLONY, BSES OFFICE‐BLOCK C2, PKT D3‐BLOCK C1, JYOTI COLONY‐BALBIR NAGAR, PKT C4‐BLOCK C1, BLOCK B6‐NAND NAGARI, BLOCK A‐JAGATPURI EXTN., BLOCK B1‐NAND NAGARI, BLOCK D3‐NAND NAGARI, BLOCK D‐BLOCK C3, BLOCK B5‐NAND NAGARI, BLOCK B‐JAGATPURI EXTN., BLOCK C‐JAGATPURI EXTN., GTB HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES NNG
NNG 10420 5220 KVA UNPLANNED 12‐03‐2018 14:03:00 12‐03‐2018 14:25:58 0:22 0.00030556 MUs
1565 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 124 630 KVA UNPLANNED 12‐03‐2018 20:15:00 12‐03‐2018 21:35:00 1:19 0.00109722 MUs1566 SEWA DHAM‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI
COLONYNNG 124 1030 KVA UNPLANNED 13‐03‐2018 12:34:07 13‐03‐2018 13:30:24 0:56 0.00046667 MUs
1567 BABA DA DARGA‐KARDAMPURI, SABOLI EXTN.‐MANDOLI, SABOLI COLONY‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, SEWA DHAM‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI
NNG 124 1030 KVA UNPLANNED 13‐03‐2018 13:55:57 13‐03‐2018 15:43:00 1:47 0.00059444 MUs
1568 BLOCK B‐SUNDER NAGRI NNG, BLOCK H‐JJ COLONY, BLOCK C1‐NAND NAGARI, BLOCK E1‐BUNKAR VIHAR, GOVT.SARVODAY VIDHYALAYA‐BLOCK E5, BLOCK H‐PREM NAGAR NNG, BLOCK G3‐BUNKAR VIHAR, KACHI MANDIR‐BLOCK E4, BLOCK E1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK E3‐KANSHIPUR, BLOCK J‐SUNDER NAGRI, RAJIV GANDHI SUPER STC HOSPITAL‐GURU TEG BAHADUR ENCLAVE NNG, BLOCK E5‐NAND NAGARI, GOVT. BOYS SCHOOL‐BLOCK A3, BLOCK E2‐NAND NAGARI, BUNKAR BHAVAN‐PREM NAGAR NNG, BLOCK A3‐NAND NAGARI, BLOCK L‐SUNDER NAGRI, BLOCK B1‐NAND NAGARI, POCKET B‐GURU TEG BAHADUR ENCLAVE, L.I.G HOUSING NAND NAGARI‐PKT E, BLOCK F‐BUNKAR VIHAR, BLOCK E3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, POCKET A‐JJ COLONY, D.S.I.D.C. COMPLEX‐DTC DEPOT, AMIG FLATS‐POCKET A, BLOCK A4‐NAND NAGARI, BLOCK KK‐SUNDER NAGRI, BLOCK F1‐BUNKAR VIHAR, BHARAT MATA MANDIR‐JJ COLONY, CLASS ROOM MCD SCHOOL‐BUNKAR VIHAR, JANTA FLATS‐NAND NAGARI, BLOCK E‐BUNKAR VIHAR, BLOCK C‐SUNDER NAGRI NNG, BLOCK G4‐BUNKAR VIHAR, MCD PRIMARY SCHOOL BLOCK D3 DELHI JAL BOARD MIG FLATS POCKET A
NNG 13518 6920 KVA UNPLANNED 13‐03‐2018 14:36:03 13‐03‐2018 15:23:00 0:46 0.00051111 MUs
1569 BLOCK B‐SUNDER NAGRI NNG, BLOCK H‐JJ COLONY, BLOCK C1‐NAND NAGARI, BLOCK E1‐BUNKAR VIHAR, GOVT.SARVODAY VIDHYALAYA‐BLOCK E5, BLOCK H‐PREM NAGAR NNG, BLOCK G3‐BUNKAR VIHAR, KACHI MANDIR‐BLOCK E4, BLOCK E1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK E3‐KANSHIPUR, BLOCK J‐SUNDER NAGRI, RAJIV GANDHI SUPER STC HOSPITAL‐GURU TEG BAHADUR ENCLAVE NNG, BLOCK E5‐NAND NAGARI, GOVT. BOYS SCHOOL‐BLOCK A3, BLOCK E2‐NAND NAGARI, BUNKAR BHAVAN‐PREM NAGAR NNG, BLOCK A3‐NAND NAGARI, BLOCK L‐SUNDER NAGRI, BLOCK B1‐NAND NAGARI, POCKET B‐GURU TEG BAHADUR ENCLAVE, L.I.G HOUSING NAND NAGARI‐PKT E, BLOCK F‐BUNKAR VIHAR, BLOCK E3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, POCKET A‐JJ COLONY, D.S.I.D.C. COMPLEX‐DTC DEPOT, AMIG FLATS‐POCKET A, BLOCK A4‐NAND NAGARI, BLOCK KK‐SUNDER NAGRI, BLOCK F1‐BUNKAR VIHAR, BHARAT MATA MANDIR‐JJ COLONY, CLASS ROOM MCD SCHOOL‐BUNKAR VIHAR, JANTA FLATS‐NAND NAGARI, BLOCK E‐BUNKAR VIHAR, BLOCK C‐SUNDER NAGRI NNG, BLOCK G4‐BUNKAR VIHAR, MCD PRIMARY SCHOOL BLOCK D3 DELHI JAL BOARD MIG FLATS POCKET A
NNG 13518 6920 KVA UNPLANNED 13‐03‐2018 16:14:41 13‐03‐2018 17:03:00 0:48 0.00026667 MUs
1570 SABOLI EXTN.‐MANDOLI, SABOLI COLONY‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, VILLAGE SABOLI‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI
NNG 124 630 KVA UNPLANNED 13‐03‐2018 16:18:09 13‐03‐2018 17:16:04 0:57 0.000475 MUs
1571 SEWA DHAM‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY
NNG 124 1030 KVA UNPLANNED 14‐03‐2018 12:42:32 14‐03‐2018 13:17:09 0:34 0.00047222 MUs
1572 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 124 1030 KVA UNPLANNED 14‐03‐2018 17:20:02 14‐03‐2018 19:18:14 1:58 0.00065556 MUs1573 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 124 630 KVA UNPLANNED 14‐03‐2018 21:39:35 14‐03‐2018 23:12:31 1:32 0.00051111 MUs1574 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 124 630 KVA UNPLANNED 15‐03‐2018 11:28:21 15‐03‐2018 12:21:03 0:52 0.00043333 MUs1575 SABOLI EXTN.‐MANDOLI, SABOLI VILLAGE‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, VILLAGE SABOLI‐SABOLI
COLONY, SABOLI EXTN.‐MANDOLINNG 124 630 KVA UNPLANNED 15‐03‐2018 13:43:52 15‐03‐2018 15:29:46 1:45 0.00116667 MUs
1576 BLOCK L‐SUNDER NAGRI, BLOCK N‐SUNDER NAGRI, BLOCK B‐SUNDER NAGRI NNG, BLOCK F‐BUNKAR VIHAR, BLOCK H‐JJ COLONY, BLOCK E1‐BUNKAR VIHAR, BLOCK O‐SUNDER NAGRI, BLOCK L‐SUNDER NAGRI NNG, POCKET A‐JJ COLONY, BLOCK A‐RAJIV NAGAR NNG, BLOCK H‐PREM NAGAR NNG, BLOCK KK‐SUNDER NAGRI, BLOCK G3‐BUNKAR VIHAR, BLOCK K‐SUNDER NAGRI NNG, BLOCK J‐SUNDER NAGRI NNG, BLOCK J‐SUNDER NAGRI, BLOCK C‐SUNDER NAGRI NNG, BLOCK M‐SUNDER NAGRI BLOCK G4‐BUNKAR VIHAR BUNKAR BHAVAN‐PREM NAGAR NNG
NNG 8304 5260 KVA UNPLANNED 16‐03‐2018 11:00:30 16‐03‐2018 11:53:00 0:52 0.00028889 MUs
1577 JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐JAGATPURI EXTN., BLOCK C‐JAGATPURI EXTN., BLOCK D‐JAGATPURI EXTN., BLOCK B‐JAGATPURI EXTN., BLOCK D3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK D1, MCD SCHOOL‐BLOCK C3, BSES OFFICE‐BLOCK C2, BLOCK C1‐NAND NAGARI, BLOCK B5‐NAND NAGARI, BLOCK B6‐NAND NAGARI, BLOCK B4‐NAND NAGARI, BLOCK B2‐NAND NAGARI, BLOCK B1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK D2‐NAND NAGARI, BLOCK E‐GTB STAFF COLONY, GTB HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES NNG, BLOCK E‐JAGATPURI EXTN., BLOCK D‐BLOCK C3, BSES YAMUNA POWER LTD‐GTB STAFF COLONY, TYPE B QUARTERS‐GTB STAFF COLONY, PKT C4‐BLOCK C1, PKT D3‐BLOCK C1, PKT C3‐BLOCK C1, SS SCHOOL‐BLOCK B5, TOILET‐GTB STAFF COLONY
NNG 10422 5220 KVA UNPLANNED 17‐03‐2018 10:50:11 17‐03‐2018 11:38:36 0:48 0.0004 MUs
1578 BLOCK B‐SUNDER NAGRI NNG, BLOCK H‐JJ COLONY, BLOCK C1‐NAND NAGARI, BLOCK E1‐BUNKAR VIHAR, GOVT.SARVODAY VIDHYALAYA‐BLOCK E5, BLOCK H‐PREM NAGAR NNG, BLOCK G3‐BUNKAR VIHAR, KACHI MANDIR‐BLOCK E4, BLOCK E1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK E3‐KANSHIPUR, BLOCK J‐SUNDER NAGRI, RAJIV GANDHI SUPER STC HOSPITAL‐GURU TEG BAHADUR ENCLAVE NNG, BLOCK E5‐NAND NAGARI, GOVT. BOYS SCHOOL‐BLOCK A3, BLOCK E2‐NAND NAGARI, BUNKAR BHAVAN‐PREM NAGAR NNG, BLOCK A3‐NAND NAGARI, BLOCK L‐SUNDER NAGRI, BLOCK B1‐NAND NAGARI, POCKET B‐GURU TEG BAHADUR ENCLAVE, L.I.G HOUSING NAND NAGARI‐PKT E, BLOCK F‐BUNKAR VIHAR, BLOCK E3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, POCKET A‐JJ COLONY, D.S.I.D.C. COMPLEX‐DTC DEPOT, AMIG FLATS‐POCKET A, BLOCK A4‐NAND NAGARI, BLOCK KK‐SUNDER NAGRI, BLOCK F1‐BUNKAR VIHAR, BHARAT MATA MANDIR‐JJ COLONY, CLASS ROOM MCD SCHOOL‐BUNKAR VIHAR, JANTA FLATS‐NAND NAGARI, BLOCK E‐BUNKAR VIHAR, BLOCK C‐SUNDER NAGRI NNG, BLOCK G4‐BUNKAR VIHAR, MCD PRIMARY SCHOOL BLOCK D3 DELHI JAL BOARD MIG FLATS POCKET A
NNG 13367 6920 KVA UNPLANNED 17‐03‐2018 15:42:52 17‐03‐2018 16:32:07 0:49 0.00040833 MUs
1579 D.S.I.D.C. COMPLEX‐DTC DEPOT, KACHI MANDIR‐BLOCK E4, BLOCK E3‐KANSHIPUR, BLOCK A2‐NAND NAGARI, BLOCK A1‐NAND NAGARI, BLOCK A4‐NAND NAGARI, BLOCK A3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK D1, MCD SCHOOL‐BLOCK C3, BSES OFFICE‐BLOCK C2, BLOCK C1‐NAND NAGARI, BLOCK B5‐NAND NAGARI, BLOCK B6‐NAND NAGARI, BLOCK B4‐NAND NAGARI, BLOCK B2‐NAND NAGARI, BLOCK B1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK D2‐NAND NAGARI, GOVT. SCHOOL‐DTC DEPOT, KARMACHARI RAJYA BEEMA HOSPITAL‐DTC DEPOT, SULABH‐DTC DEPOT, DELHI JAL BOARD MIG FLATS‐POCKET A, AMIG FLATS‐POCKET A, BLOCK E2‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK D3, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK A3, SS SCHOOL‐BLOCK B5
NNG 9604 5570 KVA UNPLANNED 17‐03‐2018 18:19:38 17‐03‐2018 18:55:41 0:36 0.0003 MUs
1580 SABOLI EXTN.‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY
NNG 124 630 KVA UNPLANNED 17‐03‐2018 18:46:45 17‐03‐2018 19:33:05 0:46 0.00038333 MUs
1581 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 124 630 KVA UNPLANNED 17‐03‐2018 22:12:29 17‐03‐2018 22:32:37 0:20 0.00016667 MUs1582 BLOCK 22‐WEST PATEL NAGAR, BLOCK A‐MANDOLI VILLAGE, SABOLI COLONY‐MANDOLI, SABOLI VILLAGE‐MANDOLI,
VILLAGE SABOLI‐SABOLI COLONYNNG 483 990 KVA UNPLANNED 18‐03‐2018 07:11:59 18‐03‐2018 07:49:50 0:37 0.00025694 MUs
1583 SABOLI EXTN.‐MANDOLI, SABOLI COLONY‐MANDOLI, SABOLI VILLAGE‐MANDOLI, BLOCK B‐ANUP VIHAR, BLOCK B‐SEWA DHAM, BANK OF BARODA‐SABOLI COLONY, SEWA DHAM‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI
NNG 124 630 KVA UNPLANNED 19‐03‐2018 09:30:47 19‐03‐2018 11:13:00 1:42 0.00056667 MUs
1584 BLOCK E‐JAGATPURI EXTN., MCD SCHOOL‐BLOCK C3, BLOCK E‐GTB STAFF COLONY, BLOCK D2‐NAND NAGARI, BLOCK C1‐NAND NAGARI, TOILET‐GTB STAFF COLONY, BLOCK B3‐NAND NAGARI, SS SCHOOL‐BLOCK B5, PKT C3‐BLOCK C1, BSES YAMUNA POWER LTD‐GTB STAFF COLONY, MCD PRIMARY SCHOOL‐BLOCK D1, BLOCK B4‐NAND NAGARI, BLOCK D‐JAGATPURI EXTN., BLOCK B2‐NAND NAGARI, TYPE B QUARTERS‐GTB STAFF COLONY, BSES OFFICE‐BLOCK C2, PKT D3‐BLOCK C1, JYOTI COLONY‐BALBIR NAGAR, PKT C4‐BLOCK C1, BLOCK B6‐NAND NAGARI, BLOCK A‐JAGATPURI EXTN., BLOCK B1‐NAND NAGARI, BLOCK D3‐NAND NAGARI, BLOCK D‐BLOCK C3, BLOCK B5‐NAND NAGARI, BLOCK B‐JAGATPURI EXTN., BLOCK C‐JAGATPURI EXTN., GTB HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES NNG
NNG 10422 5220 KVA UNPLANNED 19‐03‐2018 10:19:43 19‐03‐2018 11:03:00 0:43 0.00023889 MUs
1585 BLOCK B‐SUNDER NAGRI NNG, BLOCK H‐JJ COLONY, BLOCK C1‐NAND NAGARI, BLOCK E1‐BUNKAR VIHAR, GOVT.SARVODAY VIDHYALAYA‐BLOCK E5, BLOCK H‐PREM NAGAR NNG, BLOCK G3‐BUNKAR VIHAR, KACHI MANDIR‐BLOCK E4, BLOCK E1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK E3‐KANSHIPUR, BLOCK J‐SUNDER NAGRI, RAJIV GANDHI SUPER STC HOSPITAL‐GURU TEG BAHADUR ENCLAVE NNG, BLOCK M‐SUNDER NAGRI, BLOCK E5‐NAND NAGARI, GOVT. BOYS SCHOOL‐BLOCK A3, BLOCK E2‐NAND NAGARI, BUNKAR BHAVAN‐PREM NAGAR NNG, BLOCK A3‐NAND NAGARI, BLOCK L‐SUNDER NAGRI, BLOCK B1‐NAND NAGARI, POCKET B‐GURU TEG BAHADUR ENCLAVE, L.I.G HOUSING NAND NAGARI‐PKT E, BLOCK F‐BUNKAR VIHAR, BLOCK E3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, POCKET A‐JJ COLONY, D.S.I.D.C. COMPLEX‐DTC DEPOT, AMIG FLATS‐POCKET A, BLOCK A4‐NAND NAGARI, BLOCK KK‐SUNDER NAGRI, BLOCK F1‐BUNKAR VIHAR, BHARAT MATA MANDIR‐JJ COLONY, CLASS ROOM MCD SCHOOL‐BUNKAR VIHAR, JANTA FLATS‐NAND NAGARI, BLOCK E‐BUNKAR VIHAR, BLOCK C‐SUNDER NAGRI NNG, BLOCK G4‐BUNKAR VIHAR, MCD PRIMARY SCHOOL‐BLOCK D3, DELHI JAL BOARD MIG FLATS‐POCKET A
NNG 13367 6920 KVA UNPLANNED 19‐03‐2018 14:31:10 19‐03‐2018 15:23:00 0:51 0.00028333 MUs
1586 BLOCK B‐SUNDER NAGRI NNG, BLOCK H‐JJ COLONY, BLOCK C1‐NAND NAGARI, BLOCK E1‐BUNKAR VIHAR, GOVT.SARVODAY VIDHYALAYA‐BLOCK E5, BLOCK H‐PREM NAGAR NNG, BLOCK G3‐BUNKAR VIHAR, KACHI MANDIR‐BLOCK E4, BLOCK E1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK E3‐KANSHIPUR, BLOCK J‐SUNDER NAGRI, RAJIV GANDHI SUPER STC HOSPITAL‐GURU TEG BAHADUR ENCLAVE NNG, BLOCK E5‐NAND NAGARI, GOVT. BOYS SCHOOL‐BLOCK A3, BLOCK E2‐NAND NAGARI, BUNKAR BHAVAN‐PREM NAGAR NNG, BLOCK A3‐NAND NAGARI, BLOCK L‐SUNDER NAGRI, BLOCK B1‐NAND NAGARI, POCKET B‐GURU TEG BAHADUR ENCLAVE, L.I.G HOUSING NAND NAGARI‐PKT E, BLOCK F‐BUNKAR VIHAR, BLOCK E3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, POCKET A‐JJ COLONY, D.S.I.D.C. COMPLEX‐DTC DEPOT, AMIG FLATS‐POCKET A, BLOCK A4‐NAND NAGARI, BLOCK KK‐SUNDER NAGRI, BLOCK F1‐BUNKAR VIHAR, BHARAT MATA MANDIR‐JJ COLONY, CLASS ROOM MCD SCHOOL‐BUNKAR VIHAR, JANTA FLATS‐NAND NAGARI, BLOCK E‐BUNKAR VIHAR, BLOCK C‐SUNDER NAGRI NNG, BLOCK G4‐BUNKAR VIHAR, MCD PRIMARY SCHOOL BLOCK D3 DELHI JAL BOARD MIG FLATS POCKET A
NNG 13366 6920 KVA UNPLANNED 20‐03‐2018 10:56:07 20‐03‐2018 11:50:00 0:53 0.00073611 MUs
1587 BLOCK J‐SUNDER NAGRI, BLOCK L‐SUNDER NAGRI, BLOCK KK‐SUNDER NAGRI, BLOCK M‐SUNDER NAGRI, BLOCK N‐SUNDER NAGRI, BLOCK O‐SUNDER NAGRI, BLOCK B‐SUNDER NAGRI NNG, POCKET A‐JJ COLONY, BLOCK C‐SUNDER NAGRI NNG, BUNKAR BHAVAN‐PREM NAGAR NNG, BLOCK A‐RAJIV NAGAR NNG, BLOCK J‐SUNDER NAGRI NNG, BLOCK L‐SUNDER NAGRI NNG, BLOCK K‐SUNDER NAGRI NNG, BLOCK H‐PREM NAGAR NNG, BLOCK E1‐BUNKAR VIHAR, BLOCK G3‐BUNKAR VIHAR, BLOCK F‐BUNKAR VIHAR, BLOCK G4‐BUNKAR VIHAR, BLOCK H‐JJ COLONY
NNG 8304 5260 KVA UNPLANNED 20‐03‐2018 11:57:20 20‐03‐2018 12:54:17 0:56 0.00077778 MUs
1588 BLOCK D3‐NAND NAGARI, KACHI MANDIR‐BLOCK E4, BLOCK A4‐NAND NAGARI, BLOCK A3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK D1, MCD SCHOOL‐BLOCK C3, BSES OFFICE‐BLOCK C2, BLOCK C1‐NAND NAGARI, BLOCK B1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK D2‐NAND NAGARI, BLOCK D‐BLOCK C3, MCD PRIMARY SCHOOL‐BLOCK D3, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK A3, PKT C4‐BLOCK C1, PKT D3‐BLOCK C1, PKT C3‐BLOCK C1
NNG 5666 1620 KVA UNPLANNED 20‐03‐2018 12:31:23 20‐03‐2018 13:24:36 0:53 0.00073611 MUs
1589 BLOCK E‐JAGATPURI EXTN., MCD SCHOOL‐BLOCK C3, BLOCK E‐GTB STAFF COLONY, BLOCK D2‐NAND NAGARI, BLOCK C1‐NAND NAGARI, TOILET‐GTB STAFF COLONY, BLOCK B3‐NAND NAGARI, SS SCHOOL‐BLOCK B5, PKT C3‐BLOCK C1, BSES YAMUNA POWER LTD‐GTB STAFF COLONY, MCD PRIMARY SCHOOL‐BLOCK D1, BLOCK B4‐NAND NAGARI, BLOCK D‐JAGATPURI EXTN., BLOCK B2‐NAND NAGARI, TYPE B QUARTERS‐GTB STAFF COLONY, BSES OFFICE‐BLOCK C2, PKT D3‐BLOCK C1, JYOTI COLONY‐BALBIR NAGAR, PKT C4‐BLOCK C1, BLOCK B6‐NAND NAGARI, BLOCK A‐JAGATPURI EXTN., BLOCK B1‐NAND NAGARI, BLOCK D3‐NAND NAGARI, BLOCK D‐BLOCK C3, BLOCK B5‐NAND NAGARI, BLOCK B‐JAGATPURI EXTN., BLOCK C‐JAGATPURI EXTN., GTB HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES NNG
NNG 10422 5220 KVA UNPLANNED 20‐03‐2018 14:20:29 20‐03‐2018 15:14:45 0:54 0.00075 MUs
1590 BLOCK A‐MANDOLI EXTN. NNG 794 990 KVA UNPLANNED 20‐03‐2018 20:30:00 20‐03‐2018 21:23:52 0:53 0.00058889 MUs1591 SABOLI EXTN.‐MANDOLI, SABOLI COLONY‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, VILLAGE SABOLI‐SABOLI
COLONY, SABOLI EXTN.‐MANDOLINNG 124 630 KVA UNPLANNED 21‐03‐2018 10:01:04 21‐03‐2018 11:43:00 1:41 0.00140278 MUs
1592 BLOCK B‐SUNDER NAGRI NNG, BLOCK H‐JJ COLONY, BLOCK C1‐NAND NAGARI, BLOCK E1‐BUNKAR VIHAR, GOVT.SARVODAY VIDHYALAYA‐BLOCK E5, BLOCK H‐PREM NAGAR NNG, BLOCK G3‐BUNKAR VIHAR, KACHI MANDIR‐BLOCK E4, BLOCK E1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK E3‐KANSHIPUR, BLOCK J‐SUNDER NAGRI, RAJIV GANDHI SUPER STC HOSPITAL‐GURU TEG BAHADUR ENCLAVE NNG, BLOCK E5‐NAND NAGARI, GOVT. BOYS SCHOOL‐BLOCK A3, BLOCK E2‐NAND NAGARI, BUNKAR BHAVAN‐PREM NAGAR NNG, BLOCK A3‐NAND NAGARI, BLOCK L‐SUNDER NAGRI, BLOCK B1‐NAND NAGARI, POCKET B‐GURU TEG BAHADUR ENCLAVE, L.I.G HOUSING NAND NAGARI‐PKT E, BLOCK F‐BUNKAR VIHAR, BLOCK E3‐NAND NAGARI, BLOCK O‐SUNDER NAGRI, MCD PRIMARY SCHOOL‐BLOCK A3, POCKET A‐JJ COLONY, D.S.I.D.C. COMPLEX‐DTC DEPOT, AMIG FLATS‐POCKET A, BLOCK A4‐NAND NAGARI, BLOCK KK‐SUNDER NAGRI, BLOCK F1‐BUNKAR VIHAR, BHARAT MATA MANDIR‐JJ COLONY, CLASS ROOM MCD SCHOOL‐BUNKAR VIHAR, JANTA FLATS‐NAND NAGARI, BLOCK E‐BUNKAR VIHAR, BLOCK C‐SUNDER NAGRI NNG, BLOCK G4‐BUNKAR VIHAR, MCD PRIMARY SCHOOL‐BLOCK D3, DELHI JAL BOARD MIG FLATS‐POCKET A
NNG 13366 6920 KVA UNPLANNED 21‐03‐2018 12:24:47 21‐03‐2018 13:13:00 0:48 0.00005333 MUs
1593 BLOCK L‐SUNDER NAGRI, BLOCK N‐SUNDER NAGRI, BLOCK B‐SUNDER NAGRI NNG, BLOCK F‐BUNKAR VIHAR, BLOCK H‐JJ COLONY, BLOCK E1‐BUNKAR VIHAR, BLOCK O‐SUNDER NAGRI, BLOCK L‐SUNDER NAGRI NNG, POCKET A‐JJ COLONY, BLOCK A‐RAJIV NAGAR NNG, BLOCK H‐PREM NAGAR NNG, BLOCK KK‐SUNDER NAGRI, BLOCK G3‐BUNKAR VIHAR, BLOCK K‐SUNDER NAGRI NNG, BLOCK J‐SUNDER NAGRI NNG, BLOCK J‐SUNDER NAGRI, BLOCK C‐SUNDER NAGRI NNG, BLOCK M‐SUNDER NAGRI BLOCK G4‐BUNKAR VIHAR BUNKAR BHAVAN‐PREM NAGAR NNG
NNG 8384 5260 KVA UNPLANNED 21‐03‐2018 13:49:55 21‐03‐2018 14:44:16 0:54 0.00075 MUs
1594 SABOLI EXTN.‐MANDOLI, SABOLI COLONY‐MANDOLI, SABOLI VILLAGE‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, MCD SCHOOL‐SABOLI COLONY, SABOLI COLONY‐MANDOLI, ANUP VIHAR‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI
NNG 124 630 KVA UNPLANNED 21‐03‐2018 17:48:53 21‐03‐2018 19:15:18 1:26 0.00238889 MUs
1595 BHARTI COLONY‐NIRMAN VIHAR, BLOCK D3‐NAND NAGARI, KACHI MANDIR‐BLOCK E4, BLOCK A4‐NAND NAGARI, BLOCK A3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK D1, MCD SCHOOL‐BLOCK C3, BSES OFFICE‐BLOCK C2, BLOCK C1‐NAND NAGARI, BLOCK B1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK D2‐NAND NAGARI, BLOCK D‐BLOCK C3, MCD PRIMARY SCHOOL‐BLOCK D3, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK A3, PKT C4‐BLOCK C1 PKT D3‐BLOCK C1 PKT C3‐BLOCK C1
NNG 5670 1620 KVA UNPLANNED 22‐03‐2018 11:25:45 22‐03‐2018 12:22:00 0:56 0.00046667 MUs
1596 BLOCK B‐SUNDER NAGRI NNG, BLOCK H‐JJ COLONY, BLOCK C1‐NAND NAGARI, BLOCK E1‐BUNKAR VIHAR, GOVT.SARVODAY VIDHYALAYA‐BLOCK E5, BLOCK H‐PREM NAGAR NNG, BLOCK G3‐BUNKAR VIHAR, KACHI MANDIR‐BLOCK E4, BLOCK E1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK E3‐KANSHIPUR, BLOCK J‐SUNDER NAGRI, RAJIV GANDHI SUPER STC HOSPITAL‐GURU TEG BAHADUR ENCLAVE NNG, BLOCK E5‐NAND NAGARI, GOVT. BOYS SCHOOL‐BLOCK A3, BLOCK E2‐NAND NAGARI, BUNKAR BHAVAN‐PREM NAGAR NNG, BLOCK A3‐NAND NAGARI, BLOCK L‐SUNDER NAGRI, BLOCK B1‐NAND NAGARI, POCKET B‐GURU TEG BAHADUR ENCLAVE, L.I.G HOUSING NAND NAGARI‐PKT E, BLOCK F‐BUNKAR VIHAR, BLOCK E3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, POCKET A‐JJ COLONY, D.S.I.D.C. COMPLEX‐DTC DEPOT, AMIG FLATS‐POCKET A, BLOCK A4‐NAND NAGARI, BLOCK KK‐SUNDER NAGRI, BLOCK F1‐BUNKAR VIHAR, BHARAT MATA MANDIR‐JJ COLONY, CLASS ROOM MCD SCHOOL‐BUNKAR VIHAR, JANTA FLATS‐NAND NAGARI, BLOCK E‐BUNKAR VIHAR, BLOCK C‐SUNDER NAGRI NNG, BLOCK G4‐BUNKAR VIHAR, MCD PRIMARY SCHOOL BLOCK D3 DELHI JAL BOARD MIG FLATS POCKET A
NNG 13448 6920 KVA UNPLANNED 22‐03‐2018 14:30:30 22‐03‐2018 15:21:24 0:50 0.00041667 MUs
1597 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BHARAT MATA MANDIR‐JJ COLONY, HARSH VIHAR SUB STATION‐POLICE FARM, BLOCK C‐HARSH VIHAR, BLOCK A‐MANDOLI EXTN., BLOCK A‐SEWA DHAM, BLOCK D‐MANDOLI EXTN., BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 1362 3010 KVA UNPLANNED 23‐03‐2018 10:30:21 23‐03‐2018 12:22:32 1:52 0.00077778 MUs
1598 D.S.I.D.C. COMPLEX‐DTC DEPOT, KACHI MANDIR‐BLOCK E4, BLOCK E3‐KANSHIPUR, BLOCK A2‐NAND NAGARI, BLOCK A1‐NAND NAGARI, BLOCK A4‐NAND NAGARI, BLOCK A3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK D1, MCD SCHOOL‐BLOCK C3, BSES OFFICE‐BLOCK C2, BLOCK C1‐NAND NAGARI, BLOCK B5‐NAND NAGARI, BLOCK B6‐NAND NAGARI, BLOCK B4‐NAND NAGARI, BLOCK B2‐NAND NAGARI, BLOCK B1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK D2‐NAND NAGARI, GOVT. SCHOOL‐DTC DEPOT, KARMACHARI RAJYA BEEMA HOSPITAL‐DTC DEPOT, SULABH‐DTC DEPOT, DELHI JAL BOARD MIG FLATS‐POCKET A, AMIG FLATS‐POCKET A, BLOCK E2‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK D3, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK A3, SS SCHOOL‐BLOCK B5
NNG 9621 5570 KVA UNPLANNED 23‐03‐2018 11:10:44 23‐03‐2018 11:59:51 0:49 0.00027222 MUs
1599 BLOCK B1‐NAND NAGARI, MCD SCHOOL‐BLOCK C3, BLOCK D2‐NAND NAGARI, BLOCK C1‐NAND NAGARI, BLOCK D3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, BLOCK A4‐NAND NAGARI, BLOCK D‐BLOCK C3, KACHI MANDIR‐BLOCK E4, BLOCK B3‐NAND NAGARI, PKT C3‐BLOCK C1, MCD PRIMARY SCHOOL‐BLOCK D1, BSES OFFICE‐BLOCK C2, PKT D3‐BLOCK C1, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK D3, BLOCK A3‐NAND NAGARI, PKT C4‐BLOCK C1
NNG 5670 1620 KVA UNPLANNED 23‐03‐2018 11:14:16 23‐03‐2018 12:02:07 0:47 0.00026111 MUs
1600 BLOCK E‐GTB STAFF COLONY, BSES YAMUNA POWER LTD‐GTB STAFF COLONY, TYPE B QUARTERS‐GTB STAFF COLONY, JRD HOSPITAL‐GTB STAFF COLONY, TOILET‐GTB STAFF COLONY
NNG 385 630 KVA UNPLANNED 23‐03‐2018 12:00:55 23‐03‐2018 12:23:17 0:22 0.00012222 MUs
1601 BLOCK E‐JAGATPURI EXTN., MCD SCHOOL‐BLOCK C3, BLOCK E‐GTB STAFF COLONY, BLOCK D2‐NAND NAGARI, BLOCK C1‐NAND NAGARI, TOILET‐GTB STAFF COLONY, BLOCK B3‐NAND NAGARI, SS SCHOOL‐BLOCK B5, PKT C3‐BLOCK C1, BSES YAMUNA POWER LTD‐GTB STAFF COLONY, MCD PRIMARY SCHOOL‐BLOCK D1, BLOCK B4‐NAND NAGARI, BLOCK D‐JAGATPURI EXTN., BLOCK B2‐NAND NAGARI, TYPE B QUARTERS‐GTB STAFF COLONY, BSES OFFICE‐BLOCK C2, PKT D3‐BLOCK C1, JYOTI COLONY‐BALBIR NAGAR, PKT C4‐BLOCK C1, BLOCK B6‐NAND NAGARI, BLOCK A‐JAGATPURI EXTN., BLOCK B1‐NAND NAGARI, BLOCK D3‐NAND NAGARI, BLOCK D‐BLOCK C3, BLOCK B5‐NAND NAGARI, BLOCK B‐JAGATPURI EXTN., BLOCK C‐JAGATPURI EXTN., GTB HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES NNG
NNG 10449 5220 KVA UNPLANNED 23‐03‐2018 17:47:35 23‐03‐2018 18:19:39 0:32 0.00035556 MUs
1602 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK A‐MANDOLI EXTN., BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BHARAT MATA MANDIR‐JJ COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D‐MANDOLI EXTN., HARSH VIHAR SUB STATION‐POLICE FARM, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
NNG 1362 3010 KVA UNPLANNED 23‐03‐2018 19:24:45 23‐03‐2018 20:20:00 0:55 0.00061111 MUs
1603 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, HARSH VIHAR SUB STATION‐POLICE FARM, BLOCK A‐MANDOLI EXTN., BLOCK D‐MANDOLI EXTN., BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 1362 3010 KVA UNPLANNED 23‐03‐2018 21:29:36 23‐03‐2018 22:20:00 0:50 0.00069444 MUs
1604 BANK OF BARODA‐SABOLI COLONY, VILLAGE SABOLI‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI NNG 124 630 KVA UNPLANNED 24‐03‐2018 06:15:00 24‐03‐2018 07:06:21 0:51 0.00070833 MUs1605 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 124 630 KVA UNPLANNED 24‐03‐2018 10:40:56 24‐03‐2018 12:33:00 1:52 0.00046667 MUs1606 BLOCK L‐SUNDER NAGRI, BLOCK N‐SUNDER NAGRI, BLOCK B‐SUNDER NAGRI NNG, BLOCK F‐BUNKAR VIHAR, BLOCK H‐
JJ COLONY, BLOCK E1‐BUNKAR VIHAR, BLOCK O‐SUNDER NAGRI, BLOCK L‐SUNDER NAGRI NNG, POCKET A‐JJ COLONY, BLOCK A‐RAJIV NAGAR NNG, BLOCK H‐PREM NAGAR NNG, BLOCK KK‐SUNDER NAGRI, BLOCK G3‐BUNKAR VIHAR, BLOCK K‐SUNDER NAGRI NNG, BLOCK J‐SUNDER NAGRI NNG, BLOCK J‐SUNDER NAGRI, BLOCK C‐SUNDER NAGRI NNG, BLOCK M‐SUNDER NAGRI BLOCK G4‐BUNKAR VIHAR BUNKAR BHAVAN‐PREM NAGAR NNG
NNG 8384 5260 KVA UNPLANNED 24‐03‐2018 10:41:38 24‐03‐2018 11:33:00 0:51 0.000425 MUs
1607 BLOCK B‐SUNDER NAGRI NNG, BLOCK H‐JJ COLONY, BLOCK C1‐NAND NAGARI, BLOCK E1‐BUNKAR VIHAR, GOVT.SARVODAY VIDHYALAYA‐BLOCK E5, BLOCK H‐PREM NAGAR NNG, BLOCK G3‐BUNKAR VIHAR, KACHI MANDIR‐BLOCK E4, BLOCK E1‐NAND NAGARI, BLOCK B3‐NAND NAGARI, BLOCK E3‐KANSHIPUR, BLOCK J‐SUNDER NAGRI, RAJIV GANDHI SUPER STC HOSPITAL‐GURU TEG BAHADUR ENCLAVE NNG, BLOCK E5‐NAND NAGARI, GOVT. BOYS SCHOOL‐BLOCK A3, BLOCK E2‐NAND NAGARI, BUNKAR BHAVAN‐PREM NAGAR NNG, BLOCK A3‐NAND NAGARI, BLOCK L‐SUNDER NAGRI, BLOCK B1‐NAND NAGARI, POCKET B‐GURU TEG BAHADUR ENCLAVE, L.I.G HOUSING NAND NAGARI‐PKT E, BLOCK F‐BUNKAR VIHAR, BLOCK E3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, POCKET A‐JJ COLONY, D.S.I.D.C. COMPLEX‐DTC DEPOT, AMIG FLATS‐POCKET A, BLOCK A4‐NAND NAGARI, BLOCK KK‐SUNDER NAGRI, BLOCK F1‐BUNKAR VIHAR, BHARAT MATA MANDIR‐JJ COLONY, CLASS ROOM MCD SCHOOL‐BUNKAR VIHAR, JANTA FLATS‐NAND NAGARI, BLOCK E‐BUNKAR VIHAR, BLOCK C‐SUNDER NAGRI NNG, BLOCK G4‐BUNKAR VIHAR, MCD PRIMARY SCHOOL BLOCK D3 DELHI JAL BOARD MIG FLATS POCKET A
NNG 13448 6920 KVA UNPLANNED 24‐03‐2018 11:50:48 24‐03‐2018 12:33:00 0:42 0.00023333 MUs
1608 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK A‐MANDOLI EXTN., BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BHARAT MATA MANDIR‐JJ COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D‐MANDOLI EXTN., HARSH VIHAR SUB STATION‐POLICE FARM, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
NNG 1362 3010 KVA UNPLANNED 24‐03‐2018 12:11:34 24‐03‐2018 13:57:54 1:46 0.00088333 MUs
1609 BLOCK B1‐NAND NAGARI, MCD SCHOOL‐BLOCK C3, BLOCK D2‐NAND NAGARI, BLOCK C1‐NAND NAGARI, BLOCK D3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, BLOCK A4‐NAND NAGARI, BLOCK D‐BLOCK C3, KACHI MANDIR‐BLOCK E4, BLOCK B3‐NAND NAGARI, PKT C3‐BLOCK C1, MCD PRIMARY SCHOOL‐BLOCK D1, BSES OFFICE‐BLOCK C2, PKT D3‐BLOCK C1, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK D3, BLOCK A3‐NAND NAGARI, PKT C4‐BLOCK C1
NNG 5670 1620 KVA UNPLANNED 24‐03‐2018 13:05:31 24‐03‐2018 14:03:00 0:57 0.00031667 MUs
1610 BLOCK B1‐NAND NAGARI, MCD SCHOOL‐BLOCK C3, BLOCK D2‐NAND NAGARI, BLOCK C1‐NAND NAGARI, BLOCK D3‐NAND NAGARI, MCD PRIMARY SCHOOL‐BLOCK A3, BLOCK A4‐NAND NAGARI, BLOCK D‐BLOCK C3, KACHI MANDIR‐BLOCK E4, BLOCK B3‐NAND NAGARI, PKT C3‐BLOCK C1, MCD PRIMARY SCHOOL‐BLOCK D1, BSES OFFICE‐BLOCK C2, PKT D3‐BLOCK C1, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK D3, BLOCK A3‐NAND NAGARI, PKT C4‐BLOCK C1
NNG 5670 1620 KVA UNPLANNED 24‐03‐2018 15:17:25 24‐03‐2018 16:03:00 0:45 0.0003125 MUs
1611 SABOLI EXTN.‐MANDOLI, SABOLI VILLAGE‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, VILLAGE SABOLI‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI
NNG 124 630 KVA UNPLANNED 24‐03‐2018 17:28:55 24‐03‐2018 18:13:54 0:44 0.00036667 MUs
1612 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 124 630 KVA UNPLANNED 25‐03‐2018 15:25:31 25‐03‐2018 16:05:10 0:39 0.00021667 MUs1613 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK A‐
MANDOLI EXTN., BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BHARAT MATA MANDIR‐JJ COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D‐MANDOLI EXTN., HARSH VIHAR SUB STATION‐POLICE FARM, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
NNG 1362 3010 KVA UNPLANNED 25‐03‐2018 15:47:07 25‐03‐2018 17:40:00 1:52 0.00062222 MUs
1614 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 124 630 KVA UNPLANNED 26‐03‐2018 08:22:31 26‐03‐2018 08:39:37 0:17 0.00023611 MUs1615 BLOCK A‐MANDOLI VILLAGE, BLOCK A‐BANK COLONY NNG 397 990 KVA UNPLANNED 27‐03‐2018 07:06:42 27‐03‐2018 07:53:00 0:46 0.00038333 MUs1616 SABOLI EXTN.‐MANDOLI, SABOLI COLONY‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, VILLAGE SABOLI‐SABOLI
COLONY, SABOLI EXTN.‐MANDOLINNG 124 630 KVA UNPLANNED 29‐03‐2018 13:21:36 29‐03‐2018 14:49:20 1:27 0.000725 MUs
1617 GORAKH PARK EAST‐SILAMPUR, SHIVAJI PARK‐BALBIR NAGAR, BLOCK C‐DURGA PURI, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐NATHU PURA, BLOCK A‐NATHU COLONY, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK F‐DURGA PURI, BLOCK B‐HARDEV PURI, BLOCK D‐HARDEV PURI, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK B
NNG 1986 4590 KVA UNPLANNED 01‐03‐2018 10:22:18 01‐03‐2018 11:01:41 0:39 0.0001625 MUs
1618 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK E‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 1489 3280 KVA UNPLANNED 01‐03‐2018 10:23:13 01‐03‐2018 11:02:32 0:39 0.00021667 MUs
1619 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 1489 3280 KVA UNPLANNED 01‐03‐2018 12:21:27 01‐03‐2018 13:03:00 0:41 0.00017083 MUs
1620 BLOCK B‐NATHU PURA, BLOCK B‐ASHOK NAGAR, GORAKH PARK EAST‐SILAMPUR, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK A‐NATHU COLONY, BLOCK B‐HARDEV PURI, BLOCK F‐DURGA PURI, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK D‐HARDEV PURI, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK F‐SHIV VIHAR, SHIVAJI PARK‐BALBIR NAGAR, BLOCK C‐DURGA PURI, PKT A‐BLOCK B
NNG 1986 4590 KVA UNPLANNED 01‐03‐2018 15:38:19 01‐03‐2018 16:28:27 0:50 0.00020833 MUs
1621 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1489 3280 KVA UNPLANNED 02‐03‐2018 11:40:29 02‐03‐2018 12:29:18 0:48 0.0004 MUs
1622 BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY, BLOCK A‐ANUP VIHAR, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK D‐MEET NAGAR, BLOCK E‐MEET NAGAR
NNG 5259 400 KVA UNPLANNED 02‐03‐2018 19:13:53 02‐03‐2018 20:00:05 0:46 0.00012778 MUs
1623 BLOCK A‐EAST GOKUL PURI, BLOCK D‐MEET NAGAR NNG 549 630 KVA UNPLANNED 03‐03‐2018 10:53:08 03‐03‐2018 11:50:00 0:56 0.00046667 MUs1624 BLOCK A‐EAST GOKUL PURI NNG 773 630 KVA UNPLANNED 03‐03‐2018 10:53:43 03‐03‐2018 11:51:00 0:57 0.00031667 MUs
1625 PKT A‐CHITRAKOOT, PKT B‐CHITRAKOOT, SHAHDARA JLM, GHAROLI KONDLI, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐VIVEK VIHAR, ISBT‐ISBT ANAND VIHAR, BLOCK D‐ASHOK NAGAR, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, INDIRA GANDHI STADIUM‐AJMERI GATE, BLOCK B‐MOTHER DAIRY, BLOCK C‐AMAR COLONY
NNG 3265 3640 KVA UNPLANNED 03‐03‐2018 11:52:40 03‐03‐2018 13:35:09 1:42 0.00085 MUs
1626 BLOCK E‐UTTARANCHAL COLONY, BLOCK A‐ANUP VIHAR, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY
NNG 1333 0 KVA UNPLANNED 03‐03‐2018 13:10:05 03‐03‐2018 14:00:55 0:50 0.00041667 MUs
1627 PKT A‐CHITRAKOOT, PKT B‐CHITRAKOOT, BLOCK C‐DURGA PURI, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK D‐ASHOK NAGAR, DEV PUBLIC SCHOOL‐CHITRAKOOT, BLOCK B‐DURGA PURI, MANSAROVAR PARK‐DURGA PURI, BLOCK F‐DURGA PURI, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK E‐JYOTI NAGAR EAST, BLOCK B‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, MCD SCHOOL‐CHITRAKOOT, BLOCK A & B‐VASUNDHARA ENCLAVE BLOCK M‐DURGA PURI
NNG 6398 5300 KVA UNPLANNED 04‐03‐2018 08:33:59 04‐03‐2018 08:49:30 0:15 0.00020833 MUs
1628 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1489 3280 KVA UNPLANNED 04‐03‐2018 09:40:35 04‐03‐2018 10:30:00 0:49 0.00068056 MUs
1629 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3299 2610 KVA UNPLANNED 04‐03‐2018 09:41:05 04‐03‐2018 10:30:00 0:48 0.00066667 MUs
1630 BLOCK M‐DURGA PURI, MCD SCHOOL‐CHITRAKOOT, BLOCK B‐ASHOK NAGAR, DEV PUBLIC SCHOOL‐CHITRAKOOT, BLOCK D‐ASHOK NAGAR, BLOCK E‐JYOTI NAGAR EAST, BLOCK E‐ASHOK NAGAR, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK F‐DURGA PURI, PKT A‐CHITRAKOOT, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK B‐DURGA PURI, BLOCK A & B‐VASUNDHARA ENCLAVE, MANSAROVAR PARK‐DURGA PURI BLOCK C‐DURGA PURI PKT B‐CHITRAKOOT
NNG 6398 5300 KVA UNPLANNED 04‐03‐2018 10:23:57 04‐03‐2018 11:03:05 0:39 0.00054167 MUs
1631 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1489 3280 KVA UNPLANNED 04‐03‐2018 11:15:43 04‐03‐2018 11:44:14 0:28 0.00077778 MUs
1632 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3299 2610 KVA UNPLANNED 04‐03‐2018 11:20:37 04‐03‐2018 11:50:56 0:30 0.00083333 MUs
1633 BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐NATHU PURA, BLOCK A‐NATHU COLONY, BLOCK D‐ASHOK NAGAR, MCD SCHOOL‐BLOCK C3, BLOCK A‐AMAR COLONY, BLOCK A‐MEET NAGAR, BLOCK B‐ASHOK NAGAR, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK B
NNG 3060 2610 KVA UNPLANNED 04‐03‐2018 13:01:51 04‐03‐2018 13:38:01 0:36 0.001 MUs
1634 BLOCK C‐AMAR COLONY, GHAROLI KONDLI, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, BLOCK B‐MOTHER DAIRY, BLOCK D‐ASHOK NAGAR, SHAHDARA JLM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, INDIRA GANDHI STADIUM‐AJMERI GATE, PKT A‐CHITRAKOOT, BLOCK B‐VIVEK VIHAR, ISBT‐ISBT ANAND VIHAR, PKT B‐CHITRAKOOT
NNG 3265 3640 KVA UNPLANNED 04‐03‐2018 19:56:08 04‐03‐2018 20:27:48 0:31 0.00025833 MUs
1635 BLOCK D‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐AMAR COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY, BLOCK A‐ANUP VIHAR, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 3299 2610 KVA UNPLANNED 05‐03‐2018 03:56:18 05‐03‐2018 04:55:00 0:58 0.00048333 MUs
1636 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK E‐UTTARANCHAL COLONY, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1489 3280 KVA UNPLANNED 05‐03‐2018 10:52:02 05‐03‐2018 12:43:00 1:50 0.00045833 MUs
1637 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3299 2610 KVA UNPLANNED 05‐03‐2018 11:52:20 05‐03‐2018 13:43:00 1:50 0.00045833 MUs
1638 BABARPUR WEST‐BABAR PUR NNG, CHHAJJUPUR‐BABAR PUR, BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, PKT B‐CHITRAKOOT, DEV PUBLIC SCHOOL‐CHITRAKOOT
NNG 3646 3050 KVA UNPLANNED 05‐03‐2018 13:26:41 05‐03‐2018 14:13:00 0:46 0.00025556 MUs
1639 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, PKT B‐CHITRAKOOT, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3646 3050 KVA UNPLANNED 05‐03‐2018 17:49:21 05‐03‐2018 18:40:00 0:50 0.00069444 MUs
1640 BLOCK M‐DURGA PURI, MCD SCHOOL‐CHITRAKOOT, BLOCK B‐ASHOK NAGAR, DEV PUBLIC SCHOOL‐CHITRAKOOT, BLOCK D‐ASHOK NAGAR, BLOCK E‐JYOTI NAGAR EAST, BLOCK E‐ASHOK NAGAR, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK F‐DURGA PURI, PKT A‐CHITRAKOOT, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK B‐DURGA PURI, BLOCK A & B‐VASUNDHARA ENCLAVE, MANSAROVAR PARK‐DURGA PURI BLOCK C‐DURGA PURI PKT B‐CHITRAKOOT
NNG 6398 5300 KVA UNPLANNED 05‐03‐2018 20:45:42 05‐03‐2018 22:03:00 1:17 0.00106944 MUs
1641 PKT A‐CHITRAKOOT, PKT B‐CHITRAKOOT, SHAHDARA JLM, GEETA COLONY, GHAROLI KONDLI, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐VIVEK VIHAR, ISBT‐ISBT ANAND VIHAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D‐ASHOK NAGAR, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, INDIRA GANDHI STADIUM‐AJMERI GATE, BLOCK B‐MOTHER DAIRY, BLOCK B‐ASHOK NAGAR, BLOCK C‐AMAR COLONY, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 5805 3640 KVA UNPLANNED 05‐03‐2018 20:47:06 05‐03‐2018 22:03:00 1:15 0.00104167 MUs
1642 BLOCK A‐EAST GOKUL PURI NNG 773 630 KVA UNPLANNED 06‐03‐2018 05:33:16 06‐03‐2018 06:19:32 0:46 0.00031944 MUs1643 PKT A‐CHITRAKOOT, PKT B‐CHITRAKOOT, BLOCK C‐DURGA PURI, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI,
SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK D‐ASHOK NAGAR, DEV PUBLIC SCHOOL‐CHITRAKOOT, BLOCK B‐DURGA PURI, BLOCK F‐DURGA PURI, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK E‐JYOTI NAGAR EAST, BLOCK B‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, MCD SCHOOL‐CHITRAKOOT, BLOCK A & B‐VASUNDHARA ENCLAVE, BLOCK M‐DURGA PURI
NNG 6398 5300 KVA UNPLANNED 06‐03‐2018 05:34:52 06‐03‐2018 06:22:45 0:47 0.00032639 MUs
1644 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1489 3280 KVA UNPLANNED 06‐03‐2018 10:15:42 06‐03‐2018 11:12:49 0:57 0.00079167 MUs
1645 BLOCK B‐EAST GOKUL PURI, BLOCK A‐AMAR COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY, BLOCK A‐ANUP VIHAR, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 3299 2610 KVA UNPLANNED 06‐03‐2018 10:16:13 06‐03‐2018 11:13:48 0:57 0.00079167 MUs
1646 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK C‐AMAR COLONY, GHAROLI KONDLI, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, BLOCK D‐ASHOK NAGAR, SHAHDARA JLM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, PKT A‐CHITRAKOOT, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐VIVEK VIHAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, BLOCK B‐MOTHER DAIRY, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, INDIRA GANDHI STADIUM‐AJMERI GATE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, ISBT‐ISBT ANAND VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, PKT B‐CHITRAKOOT
NNG 5805 3640 KVA UNPLANNED 06‐03‐2018 10:59:41 06‐03‐2018 11:51:14 0:51 0.00070833 MUs
1647 PKT B‐CHITRAKOOT, BLOCK C‐GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐EAST GOKUL PURI
NNG 2072 3870 KVA UNPLANNED 06‐03‐2018 11:24:14 06‐03‐2018 12:20:00 0:55 0.00076389 MUs
1648 BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI
NNG 2072 3870 KVA UNPLANNED 06‐03‐2018 14:27:05 06‐03‐2018 15:24:10 0:57 0.00079167 MUs
1649 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR, BLOCK E‐MEET NAGAR
NNG 1489 3280 KVA UNPLANNED 06‐03‐2018 15:39:21 06‐03‐2018 17:27:32 1:48 0.0015 MUs
1650 BLOCK C‐GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐EAST GOKUL PURI NNG 2072 3870 KVA UNPLANNED 06‐03‐2018 16:44:49 06‐03‐2018 17:29:15 0:44 0.00061111 MUs1651 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR
COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3299 2610 KVA UNPLANNED 06‐03‐2018 18:41:21 06‐03‐2018 19:37:25 0:56 0.00077778 MUs
1652 PKT A‐CHITRAKOOT, PKT B‐CHITRAKOOT, SHAHDARA JLM, GHAROLI KONDLI, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐VIVEK VIHAR, ISBT‐ISBT ANAND VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, SHIV MANDIR‐JYOTI NAGAR EAST, DEV PUBLIC SCHOOL‐CHITRAKOOT, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, INDIRA GANDHI STADIUM‐AJMERI GATE, BLOCK B‐MOTHER DAIRY MCD SCHOOL‐CHITRAKOOT BLOCK C‐AMAR COLONY
NNG 2332 3890 KVA UNPLANNED 06‐03‐2018 20:30:41 06‐03‐2018 21:01:36 0:30 0.00041667 MUs
1653 BLOCK B‐EAST GOKUL PURI, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 75 990 KVA UNPLANNED 07‐03‐2018 00:34:33 07‐03‐2018 01:31:00 0:56 0.00046667 MUs
1654 BLOCK E‐NEW ASHOK NAGAR, PKT A‐CHITRAKOOT, PKT B‐CHITRAKOOT, SHAHDARA JLM, GEETA COLONY, GHAROLI KONDLI, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐VIVEK VIHAR, ISBT‐ISBT ANAND VIHAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D‐ASHOK NAGAR, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, INDIRA GANDHI STADIUM‐AJMERI GATE, BLOCK B‐MOTHER DAIRY, BLOCK B‐ASHOK NAGAR, BLOCK C‐AMAR COLONY, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 5805 3640 KVA UNPLANNED 07‐03‐2018 07:11:04 07‐03‐2018 08:03:00 0:51 0.000425 MUs
1655 BLOCK A‐EAST GOKUL PURI NNG 773 630 KVA UNPLANNED 07‐03‐2018 07:11:42 07‐03‐2018 07:46:22 0:34 0.00023611 MUs1656 BLOCK A‐EAST GOKUL PURI, BLOCK D‐MEET NAGAR NNG 549 630 KVA UNPLANNED 07‐03‐2018 07:12:21 07‐03‐2018 08:05:00 0:52 0.00036111 MUs1657 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST
GOKUL PURI, BLOCK E‐UTTARANCHAL COLONY, G.B.SSS SCHOOL‐GOKUL PURINNG 1488 3280 KVA UNPLANNED 07‐03‐2018 07:48:14 07‐03‐2018 09:36:10 1:47 0.00089167 MUs
1658 BLOCK M‐DURGA PURI, MCD SCHOOL‐CHITRAKOOT, BLOCK B‐ASHOK NAGAR, DEV PUBLIC SCHOOL‐CHITRAKOOT, BLOCK D‐ASHOK NAGAR, BLOCK E‐JYOTI NAGAR EAST, BLOCK E‐ASHOK NAGAR, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK F‐DURGA PURI, PKT A‐CHITRAKOOT, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK B‐DURGA PURI, BLOCK A & B‐VASUNDHARA ENCLAVE, MANSAROVAR PARK‐DURGA PURI BLOCK C‐DURGA PURI PKT B‐CHITRAKOOT
NNG 6398 5300 KVA UNPLANNED 07‐03‐2018 08:51:36 07‐03‐2018 09:43:00 0:51 0.000425 MUs
1659 BLOCK F‐NORTH CHHAJUPUR, BLOCK E‐NORTH CHHAJUPUR, DELHI JAL BOARD‐JYOTI NAGAR, PKT C‐BLOCK B, BLOCK D‐JYOTI NAGAR, BLOCK J‐JYOTI NAGAR, PKT A‐BLOCK A, BLOCK A‐HARIJAN BASTI, SHIV MANDIR‐JYOTI NAGAR EAST, PKT S‐BLOCK C, BLOCK B‐DURGA PURI, MANSAROVAR PARK‐DURGA PURI, BLOCK F‐DURGA PURI, BLOCK C‐NORTH CHHAJUPUR, PKT C‐BLOCK A, PKT D‐BLOCK A, PKT B‐BLOCK A, BLOCK E‐JYOTI NAGAR EAST, BLOCK B‐JYOTI NAGAR, BLOCK H‐JYOTI NAGAR, PKT H‐BLOCK D, BLOCK A & B‐VASUNDHARA ENCLAVE, BLOCK M‐DURGA PURI
NNG 4659 4040 KVA UNPLANNED 07‐03‐2018 10:49:36 07‐03‐2018 11:23:00 0:33 0.00018333 MUs
1660 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK C‐AMAR COLONY, GHAROLI KONDLI, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, BLOCK D‐ASHOK NAGAR, SHAHDARA JLM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, PKT A‐CHITRAKOOT, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐VIVEK VIHAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, BLOCK B‐MOTHER DAIRY, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, INDIRA GANDHI STADIUM‐AJMERI GATE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, ISBT‐ISBT ANAND VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, PKT B‐CHITRAKOOT
NNG 5805 3640 KVA UNPLANNED 07‐03‐2018 11:11:15 07‐03‐2018 12:03:00 0:51 0.00070833 MUs
1661 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, GORAKH PARK WEST‐SILAMPUR, GORAKH PARK EAST‐SILAMPUR, BLOCK E‐ASHOK NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐HARDEV PURI, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK D‐HARDEV PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐GORAKH PARK, SHIVAJI PARK‐BALBIR NAGAR, BLOCK C‐DURGA PURI, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, DEV PUBLIC SCHOOL‐CHITRAKOOT, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, BLOCK F‐DURGA PURI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK F‐SHIV VIHAR, ROHITASH NAGAR‐SILAMPUR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
NNG 9527 4590 KVA UNPLANNED 07‐03‐2018 11:14:45 07‐03‐2018 12:03:00 0:48 0.00026667 MUs
1662 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3299 2610 KVA UNPLANNED 07‐03‐2018 11:21:36 07‐03‐2018 12:03:00 0:41 0.00022778 MUs
1663 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, PKT B‐CHITRAKOOT, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3652 3050 KVA UNPLANNED 07‐03‐2018 11:47:40 07‐03‐2018 12:43:00 0:55 0.00045833 MUs
1664 BLOCK M‐DURGA PURI, PKT A‐BLOCK A, PKT B‐BLOCK A, BLOCK E‐NORTH CHHAJUPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BLOCK E‐JYOTI NAGAR EAST, PKT C‐BLOCK B, BLOCK H‐JYOTI NAGAR, PKT S‐BLOCK C, PKT D‐BLOCK A, BLOCK B‐JYOTI NAGAR, BLOCK J‐JYOTI NAGAR, BLOCK F‐DURGA PURI, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK B‐DURGA PURI, BLOCK A & B‐VASUNDHARA ENCLAVE, PKT H‐BLOCK D, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, MANSAROVAR PARK‐DURGA PURI, PKT C‐BLOCK A
NNG 4659 4040 KVA UNPLANNED 07‐03‐2018 12:40:29 07‐03‐2018 13:34:44 0:54 0.000225 MUs
1665 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3652 3050 KVA UNPLANNED 07‐03‐2018 14:24:24 07‐03‐2018 14:41:09 0:16 0.00008889 MUs
1666 PKT A‐CHITRAKOOT, PKT B‐CHITRAKOOT, SHAHDARA JLM, GEETA COLONY, GHAROLI KONDLI, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐VIVEK VIHAR, ISBT‐ISBT ANAND VIHAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D‐ASHOK NAGAR, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, INDIRA GANDHI STADIUM‐AJMERI GATE, BLOCK B‐MOTHER DAIRY, BLOCK B‐ASHOK NAGAR, BLOCK C‐AMAR COLONY, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 5805 3640 KVA UNPLANNED 07‐03‐2018 19:11:20 07‐03‐2018 20:05:58 0:54 0.0015 MUs
1667 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3299 2610 KVA UNPLANNED 07‐03‐2018 19:28:32 07‐03‐2018 20:00:54 0:32 0.00088889 MUs
1668 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 1488 3280 KVA UNPLANNED 08‐03‐2018 08:36:04 08‐03‐2018 09:33:00 0:56 0.00155556 MUs
1669 BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI
NNG 2072 3870 KVA UNPLANNED 08‐03‐2018 08:41:57 08‐03‐2018 09:23:00 0:41 0.00056944 MUs
1670 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐NATHU PURA, BLOCK A‐NATHU COLONY, BLOCK D‐ASHOK NAGAR, MCD SCHOOL‐BLOCK C3, BLOCK A‐AMAR COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
NNG 9346 2610 KVA UNPLANNED 08‐03‐2018 10:40:56 08‐03‐2018 11:12:05 0:31 0.00012917 MUs
1671 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 5259 400 KVA UNPLANNED 08‐03‐2018 10:51:06 08‐03‐2018 11:12:31 0:21 0.0000875 MUs
1672 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1488 3280 KVA UNPLANNED 08‐03‐2018 10:55:50 08‐03‐2018 11:43:00 0:47 0.00026111 MUs
1673 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1488 3280 KVA UNPLANNED 08‐03‐2018 12:07:11 08‐03‐2018 13:03:00 0:55 0.00045833 MUs
1674 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3299 2610 KVA UNPLANNED 08‐03‐2018 13:55:17 08‐03‐2018 14:43:00 0:47 0.00026111 MUs
1675 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3299 2610 KVA UNPLANNED 08‐03‐2018 17:05:02 08‐03‐2018 17:54:41 0:49 0.00068056 MUs
1676 PKT A‐CHITRAKOOT, PKT B‐CHITRAKOOT, SHAHDARA JLM, GEETA COLONY, GHAROLI KONDLI, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐VIVEK VIHAR, ISBT‐ISBT ANAND VIHAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D‐ASHOK NAGAR, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, INDIRA GANDHI STADIUM‐AJMERI GATE, BLOCK B‐MOTHER DAIRY, BLOCK B‐ASHOK NAGAR, BLOCK C‐AMAR COLONY, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 5805 3640 KVA UNPLANNED 08‐03‐2018 18:31:46 08‐03‐2018 19:24:32 0:52 0.00072222 MUs
1677 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR, VILLAGE SABOLI‐SABOLI COLONY
NNG 1488 3280 KVA UNPLANNED 09‐03‐2018 07:02:07 09‐03‐2018 08:32:17 1:30 0.0025 MUs
1678 BLOCK B‐EAST GOKUL PURI, BLOCK A‐AMAR COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY, BLOCK A‐ANUP VIHAR, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, MCD SCHOOL‐SABOLI COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 3299 2610 KVA UNPLANNED 09‐03‐2018 07:02:43 09‐03‐2018 08:30:59 1:28 0.00244444 MUs
1679 BLOCK A‐EAST GOKUL PURI, BLOCK D‐MEET NAGAR NNG 549 630 KVA UNPLANNED 09‐03‐2018 10:02:12 09‐03‐2018 11:00:00 0:57 0.00031667 MUs1680 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR,
BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐NATHU PURA, BLOCK A‐B&C‐JAGAT PURI, BLOCK A‐NATHU COLONY, BLOCK D‐ASHOK NAGAR, MCD SCHOOL‐BLOCK C3, BLOCK A‐AMAR COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
NNG 9346 2610 KVA UNPLANNED 09‐03‐2018 11:00:02 09‐03‐2018 12:48:24 1:48 0.0006 MUs
1681 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, PKT B‐CHITRAKOOT, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3652 3050 KVA UNPLANNED 09‐03‐2018 13:19:53 09‐03‐2018 14:13:34 0:53 0.00044167 MUs
1682 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1488 3280 KVA UNPLANNED 09‐03‐2018 17:18:54 09‐03‐2018 18:13:00 0:54 0.00045 MUs
1683 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR, BLOCK E‐MEET NAGAR
NNG 1488 3280 KVA UNPLANNED 10‐03‐2018 10:51:37 10‐03‐2018 12:43:00 1:51 0.00061667 MUs
1684 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, PKT B‐CHITRAKOOT, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3652 3050 KVA UNPLANNED 10‐03‐2018 11:33:54 10‐03‐2018 12:24:52 0:50 0.00041667 MUs
1685 MCD SCHOOL‐BLOCK C3, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK D‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐AMAR COLONY, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A‐MEET NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 9346 2610 KVA UNPLANNED 10‐03‐2018 14:13:27 10‐03‐2018 15:11:00 0:57 0.00031667 MUs
1686 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1488 3280 KVA UNPLANNED 10‐03‐2018 14:30:24 10‐03‐2018 15:25:26 0:55 0.00038194 MUs
1687 BLOCK A‐AMAR COLONY, BLOCK A‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 1342 990 KVA UNPLANNED 11‐03‐2018 08:49:25 11‐03‐2018 09:43:00 0:53 0.00029444 MUs
1688 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1488 3280 KVA UNPLANNED 11‐03‐2018 10:09:57 11‐03‐2018 11:22:08 1:12 0.0005 MUs
1689 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐MEET NAGAR, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 1488 3280 KVA UNPLANNED 11‐03‐2018 12:43:27 11‐03‐2018 14:21:30 1:38 0.00081667 MUs
1690 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3299 2610 KVA UNPLANNED 11‐03‐2018 17:02:22 11‐03‐2018 18:40:45 1:38 0.00054444 MUs
1691 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3299 2610 KVA UNPLANNED 12‐03‐2018 08:14:39 12‐03‐2018 10:03:00 1:48 0.0015 MUs
1692 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1488 3280 KVA UNPLANNED 12‐03‐2018 08:22:56 12‐03‐2018 10:16:52 1:53 0.00156944 MUs
1693 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3339 2610 KVA UNPLANNED 12‐03‐2018 11:53:17 12‐03‐2018 12:40:00 0:46 0.00063889 MUs
1694 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, GORAKH PARK WEST‐SILAMPUR, GORAKH PARK EAST‐SILAMPUR, BLOCK E‐ASHOK NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐HARDEV PURI, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK D‐HARDEV PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐GORAKH PARK, SHIVAJI PARK‐BALBIR NAGAR, BLOCK C‐DURGA PURI, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, DEV PUBLIC SCHOOL‐CHITRAKOOT, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, BLOCK F‐DURGA PURI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK F‐SHIV VIHAR, ROHITASH NAGAR‐SILAMPUR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
NNG 9538 4590 KVA UNPLANNED 12‐03‐2018 15:38:48 12‐03‐2018 16:31:42 0:52 0.00072222 MUs
1695 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3339 2610 KVA UNPLANNED 12‐03‐2018 17:54:55 12‐03‐2018 18:50:00 0:55 0.00076389 MUs
1696 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 1528 3280 KVA UNPLANNED 12‐03‐2018 17:55:31 12‐03‐2018 18:50:00 0:54 0.00075 MUs
1697 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK E‐ASHOK NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐KABIR NAGAR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 7755 2610 KVA UNPLANNED 13‐03‐2018 07:04:10 13‐03‐2018 07:29:38 0:25 0.00034722 MUs
1698 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3339 2610 KVA UNPLANNED 13‐03‐2018 08:27:17 13‐03‐2018 10:13:16 1:45 0.00291667 MUs
1699 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 1528 3280 KVA UNPLANNED 13‐03‐2018 08:28:09 13‐03‐2018 10:18:00 1:49 0.00302778 MUs
1700 MCD SCHOOL‐BLOCK C3, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK D‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐AMAR COLONY, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A‐MEET NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 9347 2610 KVA UNPLANNED 13‐03‐2018 10:17:15 13‐03‐2018 11:13:00 0:55 0.00061111 MUs
1701 BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI
NNG 2072 3870 KVA UNPLANNED 13‐03‐2018 10:18:03 13‐03‐2018 11:15:00 0:56 0.00046667 MUs
1702 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK E‐UTTARANCHAL COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 1528 3280 KVA UNPLANNED 13‐03‐2018 10:56:28 13‐03‐2018 11:53:00 0:56 0.00031111 MUs
1703 BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI
NNG 2072 3870 KVA UNPLANNED 13‐03‐2018 12:35:02 13‐03‐2018 13:23:00 0:47 0.00032639 MUs
1704 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, PKT B‐CHITRAKOOT, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3652 3050 KVA UNPLANNED 13‐03‐2018 14:29:57 13‐03‐2018 15:12:59 0:43 0.00035833 MUs
1705 PKT B‐CHITRAKOOT, BLOCK C‐GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐EAST GOKUL PURI, BLOCK E‐MEET NAGAR
NNG 2072 3870 KVA UNPLANNED 13‐03‐2018 14:42:47 13‐03‐2018 15:33:00 0:50 0.00027778 MUs
1706 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1528 3280 KVA UNPLANNED 13‐03‐2018 15:20:03 13‐03‐2018 16:14:02 0:53 0.00036806 MUs
1707 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, PKT B‐CHITRAKOOT, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3652 3050 KVA UNPLANNED 13‐03‐2018 16:47:02 13‐03‐2018 17:40:00 0:52 0.00043333 MUs
1708 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1530 3280 KVA UNPLANNED 13‐03‐2018 19:10:45 13‐03‐2018 20:00:00 0:49 0.00040833 MUs
1709 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3341 2610 KVA UNPLANNED 13‐03‐2018 21:08:00 13‐03‐2018 21:52:26 0:44 0.00036667 MUs
1710 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1530 3280 KVA UNPLANNED 13‐03‐2018 21:26:36 13‐03‐2018 22:24:00 0:57 0.000475 MUs
1711 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐AMAR COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR, BLOCK E‐MEET NAGAR
NNG 1528 3280 KVA UNPLANNED 13‐03‐2018 23:57:58 14‐03‐2018 00:42:38 0:44 0.00036667 MUs
1712 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3339 2610 KVA UNPLANNED 14‐03‐2018 06:48:25 14‐03‐2018 07:46:00 0:57 0.000475 MUs
1713 BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐ASHOK NAGAR, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK C‐KABIR NAGAR, PKT A BLOCK B
NNG 5680 1620 KVA UNPLANNED 14‐03‐2018 06:49:00 14‐03‐2018 07:33:00 0:44 0.00036667 MUs
1714 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, PKT B‐CHITRAKOOT, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3652 3050 KVA UNPLANNED 14‐03‐2018 07:05:33 14‐03‐2018 07:51:04 0:45 0.000375 MUs
1715 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK C‐AMAR COLONY, GHAROLI KONDLI, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, BLOCK D‐ASHOK NAGAR, SHAHDARA JLM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, PKT A‐CHITRAKOOT, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐VIVEK VIHAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, BLOCK B‐MOTHER DAIRY, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, INDIRA GANDHI STADIUM‐AJMERI GATE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, ISBT‐ISBT ANAND VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, PKT B‐CHITRAKOOT
NNG 5806 3640 KVA UNPLANNED 14‐03‐2018 07:24:12 14‐03‐2018 08:13:00 0:48 0.0004 MUs
1716 BLOCK A‐EAST GOKUL PURI, BLOCK D‐MEET NAGAR NNG 549 630 KVA UNPLANNED 14‐03‐2018 08:37:52 14‐03‐2018 10:35:00 1:57 0.000975 MUs HTAB CABLE FAULT AT LONI ROAD
1717 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐NATHU PURA, BLOCK A‐NATHU COLONY, BLOCK D‐ASHOK NAGAR, BLOCK A‐AMAR COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 9349 2610 KVA UNPLANNED 14‐03‐2018 10:35:00 14‐03‐2018 11:34:00 0:58 0.00080556 MUs
1718 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK E‐UTTARANCHAL COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR, BLOCK E‐MEET NAGAR
NNG 1528 3280 KVA UNPLANNED 14‐03‐2018 11:05:59 14‐03‐2018 12:56:55 1:50 0.00152778 MUs
1719 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3339 2610 KVA UNPLANNED 14‐03‐2018 11:40:00 14‐03‐2018 12:38:00 0:58 0.00080556 MUs
1720 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, GORAKH PARK WEST‐SILAMPUR, GORAKH PARK EAST‐SILAMPUR, BLOCK E‐ASHOK NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐HARDEV PURI, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK D‐HARDEV PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐GORAKH PARK, SHIVAJI PARK‐BALBIR NAGAR, BLOCK C‐DURGA PURI, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, DEV PUBLIC SCHOOL‐CHITRAKOOT, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, BLOCK F‐DURGA PURI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK F‐SHIV VIHAR, ROHITASH NAGAR‐SILAMPUR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
NNG 9541 4590 KVA UNPLANNED 14‐03‐2018 12:40:00 14‐03‐2018 13:37:50 0:57 0.00079167 MUs
1721 BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI NNG 2074 3870 KVA UNPLANNED 14‐03‐2018 12:56:20 14‐03‐2018 14:27:31 1:31 0.00126389 MUs1722 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST
GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURINNG 1530 3280 KVA UNPLANNED 14‐03‐2018 13:40:00 14‐03‐2018 14:32:46 0:52 0.00072222 MUs
1723 PKT A‐CHITRAKOOT, PKT B‐CHITRAKOOT, SHAHDARA JLM, GHAROLI KONDLI, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐VIVEK VIHAR, ISBT‐ISBT ANAND VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, SHIV MANDIR‐JYOTI NAGAR EAST, DEV PUBLIC SCHOOL‐CHITRAKOOT, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, INDIRA GANDHI STADIUM‐AJMERI GATE, BLOCK B‐MOTHER DAIRY MCD SCHOOL‐CHITRAKOOT BLOCK C‐AMAR COLONY
NNG 2334 3890 KVA UNPLANNED 14‐03‐2018 16:32:03 14‐03‐2018 17:19:27 0:47 0.00052222 MUs
1724 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR, BLOCK E‐MEET NAGAR
NNG 1530 3280 KVA UNPLANNED 14‐03‐2018 21:21:45 14‐03‐2018 22:03:00 0:41 0.00022778 MUs
1725 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1530 3280 KVA UNPLANNED 15‐03‐2018 06:50:57 15‐03‐2018 07:47:00 0:56 0.00077778 MUs
1726 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3341 2610 KVA UNPLANNED 15‐03‐2018 06:52:54 15‐03‐2018 07:48:00 0:55 0.00076389 MUs
1727 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, GORAKH PARK WEST‐SILAMPUR, GORAKH PARK EAST‐SILAMPUR, BLOCK E‐ASHOK NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐HARDEV PURI, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK D‐HARDEV PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐GORAKH PARK, SHIVAJI PARK‐BALBIR NAGAR, BLOCK C‐DURGA PURI, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, DEV PUBLIC SCHOOL‐CHITRAKOOT, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, BLOCK F‐DURGA PURI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK F‐SHIV VIHAR, ROHITASH NAGAR‐SILAMPUR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
NNG 9556 4590 KVA UNPLANNED 15‐03‐2018 11:57:54 15‐03‐2018 12:56:00 0:58 0.00048333 MUs
1728 MCD SCHOOL‐BLOCK C3, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK D‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐AMAR COLONY, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A‐MEET NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐B&C‐JAGAT PURI, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA JHILMIL COLONY PKT A BLOCK B
NNG 9363 2610 KVA UNPLANNED 15‐03‐2018 12:09:45 15‐03‐2018 13:03:00 0:53 0.00058889 MUs
1729 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3341 2610 KVA UNPLANNED 15‐03‐2018 20:24:01 15‐03‐2018 21:22:00 0:57 0.000475 MUs
1730 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1530 3280 KVA UNPLANNED 15‐03‐2018 20:24:42 15‐03‐2018 21:23:00 0:58 0.00048333 MUs
1731 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, PKT B‐CHITRAKOOT, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3652 3050 KVA UNPLANNED 16‐03‐2018 06:57:27 16‐03‐2018 07:40:53 0:43 0.00035833 MUs
1732 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3341 2610 KVA UNPLANNED 16‐03‐2018 07:08:11 16‐03‐2018 07:53:11 0:45 0.000375 MUs
1733 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1530 3280 KVA UNPLANNED 16‐03‐2018 07:08:40 16‐03‐2018 07:55:04 0:46 0.00038333 MUs
1734 BLOCK A‐EAST GOKUL PURI, BLOCK D‐MEET NAGAR NNG 549 630 KVA UNPLANNED 16‐03‐2018 08:17:35 16‐03‐2018 10:10:39 1:53 0.00062778 MUs1735 BLOCK A‐EAST GOKUL PURI NNG 773 630 KVA UNPLANNED 16‐03‐2018 08:17:59 16‐03‐2018 10:02:30 1:44 0.00057778 MUs1736 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK C‐AMAR COLONY, GHAROLI KONDLI,
HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, BLOCK D‐ASHOK NAGAR, SHAHDARA JLM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, PKT A‐CHITRAKOOT, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐VIVEK VIHAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, BLOCK B‐MOTHER DAIRY, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, INDIRA GANDHI STADIUM‐AJMERI GATE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, ISBT‐ISBT ANAND VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, PKT B‐CHITRAKOOT
NNG 5823 3640 KVA UNPLANNED 16‐03‐2018 08:45:47 16‐03‐2018 09:33:00 0:47 0.00039167 MUs
1737 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3341 2610 KVA UNPLANNED 16‐03‐2018 13:20:11 16‐03‐2018 14:43:00 1:22 0.00045556 MUs
1738 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1530 3280 KVA UNPLANNED 16‐03‐2018 13:22:05 16‐03‐2018 14:43:00 1:20 0.00044444 MUs
1739 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK C‐AMAR COLONY, GHAROLI KONDLI, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, BLOCK D‐ASHOK NAGAR, SHAHDARA JLM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, PKT A‐CHITRAKOOT, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐VIVEK VIHAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, BLOCK B‐MOTHER DAIRY, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, INDIRA GANDHI STADIUM‐AJMERI GATE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, ISBT‐ISBT ANAND VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, PKT B‐CHITRAKOOT
NNG 5823 3640 KVA UNPLANNED 16‐03‐2018 14:51:20 16‐03‐2018 15:30:36 0:39 0.00021667 MUs
1740 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1530 3280 KVA UNPLANNED 16‐03‐2018 17:40:00 16‐03‐2018 18:35:00 0:54 0.00075 MUs
1741 BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI
NNG 2074 3870 KVA UNPLANNED 16‐03‐2018 17:40:00 16‐03‐2018 18:35:00 0:54 0.00075 MUs
1742 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3341 2610 KVA UNPLANNED 16‐03‐2018 17:40:00 16‐03‐2018 18:35:00 0:54 0.00075 MUs
1743 BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐ASHOK NAGAR, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK C‐KABIR NAGAR, PKT A BLOCK B
NNG 5701 1620 KVA UNPLANNED 17‐03‐2018 07:26:28 17‐03‐2018 08:18:33 0:52 0.00072222 MUs
1744 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3341 2610 KVA UNPLANNED 17‐03‐2018 08:51:53 17‐03‐2018 09:12:23 0:20 0.00027778 MUs
1745 BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI
NNG 2074 3870 KVA UNPLANNED 17‐03‐2018 09:32:05 17‐03‐2018 10:23:00 0:50 0.00069444 MUs
1746 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR, BLOCK E‐MEET NAGAR
NNG 1530 3280 KVA UNPLANNED 17‐03‐2018 09:32:31 17‐03‐2018 11:23:16 1:50 0.00152778 MUs
1747 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3341 2610 KVA UNPLANNED 17‐03‐2018 09:33:10 17‐03‐2018 11:30:00 1:56 0.00161111 MUs
1748 BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐ASHOK NAGAR, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK C‐KABIR NAGAR, PKT A BLOCK B
NNG 5701 1620 KVA UNPLANNED 17‐03‐2018 09:59:16 17‐03‐2018 10:43:00 0:43 0.00035833 MUs
1749 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK C‐AMAR COLONY, GHAROLI KONDLI, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, BLOCK D‐ASHOK NAGAR, SHAHDARA JLM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, PKT A‐CHITRAKOOT, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐VIVEK VIHAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, BLOCK B‐MOTHER DAIRY, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, INDIRA GANDHI STADIUM‐AJMERI GATE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, ISBT‐ISBT ANAND VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, PKT B‐CHITRAKOOT
NNG 5823 3640 KVA UNPLANNED 17‐03‐2018 11:46:10 17‐03‐2018 12:32:29 0:46 0 MUs
1750 BLOCK B‐EAST GOKUL PURI, BLOCK A‐AMAR COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY, BLOCK A‐ANUP VIHAR, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR, BLOCK E‐MEET NAGAR
NNG 3341 2610 KVA UNPLANNED 17‐03‐2018 12:04:03 17‐03‐2018 12:42:08 0:38 0.00021111 MUs
1751 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK E‐ASHOK NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐KABIR NAGAR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 5701 1620 KVA UNPLANNED 17‐03‐2018 12:08:59 17‐03‐2018 13:03:00 0:54 0.0003 MUs
1752 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1530 3280 KVA UNPLANNED 17‐03‐2018 13:32:08 17‐03‐2018 14:28:00 0:55 0.00045833 MUs
1753 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3341 2610 KVA UNPLANNED 17‐03‐2018 14:11:38 17‐03‐2018 14:48:27 0:36 0.0002 MUs
1754 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, PKT B‐CHITRAKOOT, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3652 3050 KVA UNPLANNED 17‐03‐2018 17:20:39 17‐03‐2018 18:00:15 0:39 0.000325 MUs
1755 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3341 2610 KVA UNPLANNED 17‐03‐2018 19:03:45 17‐03‐2018 19:56:33 0:52 0.00028889 MUs
1756 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1530 3280 KVA UNPLANNED 17‐03‐2018 19:04:10 17‐03‐2018 19:57:42 0:53 0.00044167 MUs
1757 BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI
NNG 2074 3870 KVA UNPLANNED 17‐03‐2018 19:32:35 17‐03‐2018 21:03:00 1:30 0.00075 MUs
1758 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1530 3280 KVA UNPLANNED 18‐03‐2018 06:27:34 18‐03‐2018 07:22:00 0:54 0.00045 MUs
1759 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3341 2610 KVA UNPLANNED 18‐03‐2018 06:28:13 18‐03‐2018 07:21:00 0:52 0.00043333 MUs
1760 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, PKT B‐CHITRAKOOT, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3652 3050 KVA UNPLANNED 18‐03‐2018 06:54:10 18‐03‐2018 07:38:52 0:44 0.00036667 MUs
1761 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1530 3280 KVA UNPLANNED 18‐03‐2018 10:35:30 18‐03‐2018 11:03:00 0:27 0.00015 MUs
1762 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3341 2610 KVA UNPLANNED 18‐03‐2018 12:25:27 18‐03‐2018 13:02:53 0:37 0.00020556 MUs
1763 BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI
NNG 2074 3870 KVA UNPLANNED 18‐03‐2018 13:23:55 18‐03‐2018 14:22:00 0:58 0.00024167 MUs
1764 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1530 3280 KVA UNPLANNED 18‐03‐2018 13:32:48 18‐03‐2018 15:07:19 1:34 0.00052222 MUs
1765 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, PKT B‐CHITRAKOOT, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3652 3050 KVA UNPLANNED 18‐03‐2018 15:06:33 18‐03‐2018 15:47:47 0:41 0.00017083 MUs
1766 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK E‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR, BLOCK E‐MEET NAGAR
NNG 1530 3280 KVA UNPLANNED 18‐03‐2018 22:26:41 18‐03‐2018 23:15:01 0:48 0.00133333 MUs
1767 BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐ASHOK NAGAR, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK C‐KABIR NAGAR, PKT A BLOCK B
NNG 5701 1620 KVA UNPLANNED 19‐03‐2018 05:42:31 19‐03‐2018 06:30:00 0:47 0.00065278 MUs
1768 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐AMAR COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY, BLOCK A‐ANUP VIHAR, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 3341 2610 KVA UNPLANNED 19‐03‐2018 06:55:30 19‐03‐2018 08:45:00 1:49 0.00151389 MUs
1769 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1530 3280 KVA UNPLANNED 19‐03‐2018 06:59:12 19‐03‐2018 08:53:31 1:54 0.00158333 MUs
1770 BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI
NNG 2074 3870 KVA UNPLANNED 19‐03‐2018 06:59:55 19‐03‐2018 07:50:56 0:51 0.00141667 MUs
1771 BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐ASHOK NAGAR, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK C‐KABIR NAGAR, PKT A BLOCK B
NNG 5701 1620 KVA UNPLANNED 19‐03‐2018 09:52:47 19‐03‐2018 10:44:00 0:51 0.000425 MUs
1772 BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI
NNG 2074 3870 KVA UNPLANNED 19‐03‐2018 10:54:15 19‐03‐2018 11:43:00 0:48 0.00026667 MUs
1773 BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐NATHU PURA, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 5701 1620 KVA UNPLANNED 19‐03‐2018 11:04:47 19‐03‐2018 12:00:00 0:55 0.00045833 MUs
1774 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1530 3280 KVA UNPLANNED 19‐03‐2018 11:08:02 19‐03‐2018 12:13:00 1:4 0.00053333 MUs
1775 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, GORAKH PARK WEST‐SILAMPUR, GORAKH PARK EAST‐SILAMPUR, BLOCK E‐ASHOK NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐HARDEV PURI, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK D‐HARDEV PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐GORAKH PARK, SHIVAJI PARK‐BALBIR NAGAR, BLOCK C‐DURGA PURI, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, DEV PUBLIC SCHOOL‐CHITRAKOOT, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, BLOCK F‐DURGA PURI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK F‐SHIV VIHAR, ROHITASH NAGAR‐SILAMPUR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
NNG 9556 4590 KVA UNPLANNED 19‐03‐2018 12:02:11 19‐03‐2018 13:00:00 0:57 0.00031667 MUs
1776 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1530 3280 KVA UNPLANNED 19‐03‐2018 13:57:02 19‐03‐2018 14:43:00 0:45 0.00025 MUs
1777 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1530 3280 KVA UNPLANNED 20‐03‐2018 06:41:13 20‐03‐2018 07:39:35 0:58 0.00048333 MUs
1778 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3341 2610 KVA UNPLANNED 20‐03‐2018 06:42:14 20‐03‐2018 07:38:00 0:55 0.00045833 MUs
1779 BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI
NNG 2074 3870 KVA UNPLANNED 20‐03‐2018 07:34:21 20‐03‐2018 08:23:00 0:48 0.0004 MUs
1780 BLOCK A‐EAST GOKUL PURI, BLOCK D‐MEET NAGAR NNG 549 630 KVA UNPLANNED 20‐03‐2018 08:24:20 20‐03‐2018 09:20:00 0:55 0.00030556 MUs1781 BLOCK A‐EAST GOKUL PURI NNG 773 630 KVA UNPLANNED 20‐03‐2018 08:24:53 20‐03‐2018 09:20:00 0:55 0.00030556 MUs1782 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK D‐ASHOK
NAGAR, BLOCK E‐ASHOK NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐AMAR COLONY, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A‐MEET NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
NNG 9363 2610 KVA UNPLANNED 20‐03‐2018 10:12:03 20‐03‐2018 11:10:00 0:57 0.00079167 MUs
1783 BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐ASHOK NAGAR, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK C‐KABIR NAGAR, PKT A BLOCK B
NNG 5701 1620 KVA UNPLANNED 20‐03‐2018 10:29:04 20‐03‐2018 11:28:00 0:58 0.00080556 MUs
1784 BABARPUR WEST‐BABAR PUR NNG, BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR, PKT B‐CHITRAKOOT, BABA DA DARGA‐KARDAMPURI, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR
NNG 6422 4060 KVA UNPLANNED 20‐03‐2018 11:10:03 20‐03‐2018 12:03:00 0:52 0.00072222 MUs
1785 BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI
NNG 2074 3870 KVA UNPLANNED 20‐03‐2018 11:50:00 20‐03‐2018 12:45:00 0:54 0.00075 MUs
1786 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK E‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR, BLOCK E‐MEET NAGAR
NNG 1530 3280 KVA UNPLANNED 20‐03‐2018 13:04:13 20‐03‐2018 14:30:00 1:25 0.00118056 MUs
1787 BABARPUR WEST‐BABAR PUR NNG, CHHAJJUPUR‐BABAR PUR, BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, PKT B‐CHITRAKOOT, DEV PUBLIC SCHOOL‐CHITRAKOOT
NNG 3652 3050 KVA UNPLANNED 20‐03‐2018 13:39:09 20‐03‐2018 15:13:22 1:34 0.00130556 MUs
1788 PKT A‐CHITRAKOOT, PKT B‐CHITRAKOOT, SHAHDARA JLM, GEETA COLONY, GHAROLI KONDLI, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐VIVEK VIHAR, ISBT‐ISBT ANAND VIHAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D‐ASHOK NAGAR, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, INDIRA GANDHI STADIUM‐AJMERI GATE, BLOCK B‐MOTHER DAIRY, BLOCK B‐ASHOK NAGAR, BLOCK C‐AMAR COLONY, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 5823 3640 KVA UNPLANNED 20‐03‐2018 15:19:25 20‐03‐2018 16:18:00 0:58 0.00080556 MUs
1789 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1530 3280 KVA UNPLANNED 20‐03‐2018 15:03:00 20‐03‐2018 16:30:00 1:27 0.00096667 MUs
1790 BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐ASHOK NAGAR, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK C‐KABIR NAGAR, PKT A BLOCK B
NNG 5701 1620 KVA UNPLANNED 20‐03‐2018 15:30:04 20‐03‐2018 16:25:00 0:54 0.00075 MUs
1791 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1530 3280 KVA UNPLANNED 20‐03‐2018 18:38:58 20‐03‐2018 19:33:00 0:54 0.00075 MUs
1792 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3341 2610 KVA UNPLANNED 20‐03‐2018 18:39:53 20‐03‐2018 19:35:00 0:55 0.00076389 MUs
1793 BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐ASHOK NAGAR, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK C‐KABIR NAGAR, PKT A BLOCK B
NNG 5701 1620 KVA UNPLANNED 20‐03‐2018 21:20:00 20‐03‐2018 21:43:12 0:23 0.00025556 MUs
1794 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3666 3050 KVA UNPLANNED 21‐03‐2018 06:14:46 21‐03‐2018 07:11:52 0:57 0.000475 MUs
1795 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1531 3280 KVA UNPLANNED 21‐03‐2018 06:30:54 21‐03‐2018 07:25:00 0:54 0.000375 MUs
1796 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3346 2610 KVA UNPLANNED 21‐03‐2018 06:31:42 21‐03‐2018 07:26:00 0:54 0.000375 MUs
1797 BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI
NNG 2074 3870 KVA UNPLANNED 21‐03‐2018 08:16:00 21‐03‐2018 09:13:00 0:56 0.00046667 MUs
1798 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR, BLOCK E‐MEET NAGAR
NNG 1530 3280 KVA UNPLANNED 21‐03‐2018 10:08:07 21‐03‐2018 12:03:00 1:54 0.00063333 MUs
1799 BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG, BABA DA DARGA‐KARDAMPURI, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, BLOCK C‐KABIR NAGAR, PKT B‐CHITRAKOOT
NNG 6422 4060 KVA UNPLANNED 21‐03‐2018 13:03:41 21‐03‐2018 14:43:00 1:39 0.00055 MUs
1800 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3666 3050 KVA UNPLANNED 21‐03‐2018 14:29:39 21‐03‐2018 15:02:24 0:32 0 MUs
1801 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, GORAKH PARK WEST‐SILAMPUR, GORAKH PARK EAST‐SILAMPUR, BLOCK E‐ASHOK NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐HARDEV PURI, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK D‐HARDEV PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐GORAKH PARK, SHIVAJI PARK‐BALBIR NAGAR, BLOCK C‐DURGA PURI, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, DEV PUBLIC SCHOOL‐CHITRAKOOT, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK F‐SHIV VIHAR, ROHITASH NAGAR‐SILAMPUR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
NNG 9563 4590 KVA UNPLANNED 21‐03‐2018 14:44:44 21‐03‐2018 15:33:00 0:48 0.00033333 MUs
1802 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR, BLOCK E‐MEET NAGAR
NNG 1530 3280 KVA UNPLANNED 21‐03‐2018 15:43:22 21‐03‐2018 17:40:00 1:56 0.00064444 MUs
1803 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3341 2610 KVA UNPLANNED 21‐03‐2018 16:09:37 21‐03‐2018 18:03:00 1:53 0.00062778 MUs
1804 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐NATHU PURA, BLOCK A‐NATHU COLONY, BLOCK D‐ASHOK NAGAR, MCD SCHOOL‐BLOCK C3, BLOCK A‐AMAR COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
NNG 9363 2610 KVA UNPLANNED 21‐03‐2018 17:54:42 21‐03‐2018 18:38:25 0:43 0.00119444 MUs
1805 BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐ASHOK NAGAR, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK C‐KABIR NAGAR, PKT A BLOCK B
NNG 5713 1620 KVA UNPLANNED 22‐03‐2018 04:23:00 22‐03‐2018 05:15:00 0:51 0.00141667 MUs
1806 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3346 2610 KVA UNPLANNED 22‐03‐2018 05:04:22 22‐03‐2018 05:40:00 0:35 0.00097222 MUs
1807 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3346 2610 KVA UNPLANNED 22‐03‐2018 07:28:14 22‐03‐2018 09:17:59 1:49 0.00151389 MUs
1808 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1531 3280 KVA UNPLANNED 22‐03‐2018 07:30:32 22‐03‐2018 09:19:12 1:48 0.0015 MUs
1809 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK E‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 1531 3280 KVA UNPLANNED 22‐03‐2018 11:31:06 22‐03‐2018 13:07:11 1:36 0.0008 MUs
1810 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3346 2610 KVA UNPLANNED 22‐03‐2018 11:57:58 22‐03‐2018 12:53:00 0:55 0.00045833 MUs
1811 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, GORAKH PARK WEST‐SILAMPUR, GORAKH PARK EAST‐SILAMPUR, BLOCK E‐ASHOK NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐HARDEV PURI, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK D‐HARDEV PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐GORAKH PARK, SHIVAJI PARK‐BALBIR NAGAR, BLOCK C‐DURGA PURI, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, DEV PUBLIC SCHOOL‐CHITRAKOOT, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, BLOCK F‐DURGA PURI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK F‐SHIV VIHAR, ROHITASH NAGAR‐SILAMPUR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
NNG 9563 4590 KVA UNPLANNED 22‐03‐2018 11:58:24 22‐03‐2018 13:28:39 1:30 0.00075 MUs
1812 BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI
NNG 2076 3870 KVA UNPLANNED 22‐03‐2018 13:30:59 22‐03‐2018 14:23:00 0:52 0 MUs
1813 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3666 3050 KVA UNPLANNED 22‐03‐2018 17:14:06 22‐03‐2018 18:10:04 0:55 0.00045833 MUs
1814 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐NATHU PURA, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 3178 630 KVA UNPLANNED 22‐03‐2018 17:36:40 22‐03‐2018 18:34:00 0:57 0.000475 MUs
1815 BLOCK C‐GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI NNG 475 630 KVA UNPLANNED 22‐03‐2018 18:12:02 22‐03‐2018 19:03:00 0:50 0.00055556 MUs1816 BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG, BABA DA DARGA‐KARDAMPURI,
BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, BLOCK C‐KABIR NAGAR, PKT B‐CHITRAKOOTNNG 6446 4060 KVA UNPLANNED 23‐03‐2018 05:58:29 23‐03‐2018 06:39:04 0:40 0.00055556 MUs
1817 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3346 2610 KVA UNPLANNED 23‐03‐2018 06:46:53 23‐03‐2018 08:32:47 1:45 0.00145833 MUs
1818 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1531 3280 KVA UNPLANNED 23‐03‐2018 06:48:32 23‐03‐2018 08:33:51 1:45 0.00145833 MUs
1819 BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG, BABA DA DARGA‐KARDAMPURI, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, BLOCK C‐KABIR NAGAR, PKT B‐CHITRAKOOT
NNG 6446 4060 KVA UNPLANNED 23‐03‐2018 10:07:11 23‐03‐2018 11:05:00 0:57 0.00031667 MUs
1820 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, PKT B‐CHITRAKOOT, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3666 3050 KVA UNPLANNED 23‐03‐2018 12:01:37 23‐03‐2018 12:34:21 0:32 0.00026667 MUs
1821 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, GORAKH PARK WEST‐SILAMPUR, GORAKH PARK EAST‐SILAMPUR, BLOCK E‐ASHOK NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐HARDEV PURI, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK D‐HARDEV PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐GORAKH PARK, SHIVAJI PARK‐BALBIR NAGAR, BLOCK C‐DURGA PURI, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, DEV PUBLIC SCHOOL‐CHITRAKOOT, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, BLOCK F‐DURGA PURI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK F‐SHIV VIHAR, ROHITASH NAGAR‐SILAMPUR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
NNG 9563 4590 KVA UNPLANNED 23‐03‐2018 13:35:06 23‐03‐2018 14:25:00 0:49 0.00027222 MUs
1822 BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐ASHOK NAGAR, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK C‐KABIR NAGAR, PKT A BLOCK B
NNG 5713 1620 KVA UNPLANNED 23‐03‐2018 14:03:38 23‐03‐2018 15:00:00 0:56 0.00046667 MUs
1823 BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG, BABA DA DARGA‐KARDAMPURI, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, BLOCK C‐KABIR NAGAR, PKT B‐CHITRAKOOT
NNG 6446 4060 KVA UNPLANNED 23‐03‐2018 18:09:51 23‐03‐2018 18:53:05 0:43 0.00047778 MUs
1824 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1531 3280 KVA UNPLANNED 23‐03‐2018 18:40:00 23‐03‐2018 19:35:00 0:54 0.0006 MUs
1825 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3346 2610 KVA UNPLANNED 23‐03‐2018 20:16:27 23‐03‐2018 21:03:00 0:46 0.00063889 MUs
1826 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1531 3280 KVA UNPLANNED 23‐03‐2018 20:17:00 23‐03‐2018 21:03:00 0:45 0.000625 MUs
1827 BABARPUR WEST‐BABAR PUR NNG, BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR, BABA DA DARGA‐KARDAMPURI
NNG 6446 4060 KVA UNPLANNED 24‐03‐2018 04:53:52 24‐03‐2018 05:51:22 0:57 0.00079167 MUs
1828 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1531 3280 KVA UNPLANNED 24‐03‐2018 05:49:44 24‐03‐2018 06:45:00 0:55 0.00076389 MUs
1829 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3346 2610 KVA UNPLANNED 24‐03‐2018 05:50:34 24‐03‐2018 06:40:00 0:49 0.00068056 MUs
1830 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, PKT B‐CHITRAKOOT, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3666 3050 KVA UNPLANNED 24‐03‐2018 11:23:22 24‐03‐2018 12:13:08 0:49 0.00027222 MUs
1831 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK E‐MEET NAGAR, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1531 3280 KVA UNPLANNED 24‐03‐2018 13:10:03 24‐03‐2018 14:56:24 1:46 0.00058889 MUs
1832 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, GORAKH PARK WEST‐SILAMPUR, GORAKH PARK EAST‐SILAMPUR, BLOCK E‐ASHOK NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐HARDEV PURI, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK D‐HARDEV PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐GORAKH PARK, SHIVAJI PARK‐BALBIR NAGAR, BLOCK C‐DURGA PURI, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, DEV PUBLIC SCHOOL‐CHITRAKOOT, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, BLOCK F‐DURGA PURI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK F‐SHIV VIHAR, ROHITASH NAGAR‐SILAMPUR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
NNG 9563 4590 KVA UNPLANNED 24‐03‐2018 13:34:32 24‐03‐2018 14:23:00 0:48 0.00026667 MUs
1833 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, PKT B‐CHITRAKOOT, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3666 3050 KVA UNPLANNED 24‐03‐2018 15:08:28 24‐03‐2018 15:52:15 0:43 0.00023889 MUs
1834 BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI
NNG 2076 3870 KVA UNPLANNED 24‐03‐2018 15:53:07 24‐03‐2018 16:30:59 0:37 0.00015417 MUs
1835 BLOCK A‐EAST GOKUL PURI NNG 773 630 KVA UNPLANNED 24‐03‐2018 18:30:33 24‐03‐2018 19:28:00 0:57 0.000475 MUs1836 BLOCK A‐EAST GOKUL PURI, BLOCK D‐MEET NAGAR NNG 549 630 KVA UNPLANNED 24‐03‐2018 18:31:01 24‐03‐2018 19:30:00 0:58 0.00048333 MUs1837 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL
PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGARNNG 1531 3280 KVA UNPLANNED 24‐03‐2018 19:56:22 24‐03‐2018 20:50:00 0:53 0.00044167 MUs
1838 BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI
NNG 2076 3870 KVA UNPLANNED 25‐03‐2018 06:10:25 25‐03‐2018 07:46:45 1:36 0.0008 MUs
1839 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3346 2610 KVA UNPLANNED 25‐03‐2018 06:13:46 25‐03‐2018 07:12:00 0:58 0.00048333 MUs
1840 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1531 3280 KVA UNPLANNED 25‐03‐2018 07:49:04 25‐03‐2018 08:36:36 0:47 0.00039167 MUs
1841 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1531 3280 KVA UNPLANNED 25‐03‐2018 16:03:23 25‐03‐2018 17:45:00 1:41 0.00056111 MUs
1842 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, PKT B‐CHITRAKOOT, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3666 3050 KVA UNPLANNED 25‐03‐2018 19:33:28 25‐03‐2018 20:05:51 0:32 0.00044444 MUs
1843 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3346 2610 KVA UNPLANNED 25‐03‐2018 19:44:12 25‐03‐2018 20:40:00 0:55 0.00076389 MUs
1844 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1531 3280 KVA UNPLANNED 25‐03‐2018 19:47:02 25‐03‐2018 20:45:00 0:57 0.00079167 MUs
1845 PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK E‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR, BLOCK E‐MEET NAGAR
NNG 1531 3280 KVA UNPLANNED 25‐03‐2018 21:55:50 25‐03‐2018 23:19:57 1:24 0.00233333 MUs
1846 G.B.SSS SCHOOL‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR
NNG 1531 3280 KVA UNPLANNED 25‐03‐2018 23:52:45 26‐03‐2018 00:39:39 0:46 0.00063889 MUs
1847 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3668 3050 KVA UNPLANNED 26‐03‐2018 05:05:51 26‐03‐2018 06:01:06 0:55 0.00076389 MUs
1848 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3346 2610 KVA UNPLANNED 26‐03‐2018 07:15:27 26‐03‐2018 08:10:00 0:54 0.00075 MUs
1849 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1531 3280 KVA UNPLANNED 26‐03‐2018 07:16:07 26‐03‐2018 08:12:00 0:55 0.00076389 MUs
1850 BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐ASHOK NAGAR, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK C‐KABIR NAGAR, PKT A BLOCK B
NNG 5713 1620 KVA UNPLANNED 26‐03‐2018 18:06:37 26‐03‐2018 18:54:18 0:47 0.00065278 MUs
1851 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI
NNG 1126 3280 KVA UNPLANNED 27‐03‐2018 08:07:36 27‐03‐2018 09:00:00 0:52 0.00043333 MUs
1852 BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY
NNG 3349 2610 KVA UNPLANNED 27‐03‐2018 08:08:14 27‐03‐2018 09:00:00 0:51 0.00028333 MUs
1853 BLOCK B‐EAST GOKUL PURI, BLOCK A‐AMAR COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY, BLOCK A‐ANUP VIHAR, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK C‐MEET NAGAR, BLOCK D‐MEET NAGAR, SABOLI EXTN.‐MANDOLI
NNG 3306 2610 KVA UNPLANNED 28‐03‐2018 15:33:08 28‐03‐2018 17:06:45 1:33 0.000775 MUs
1854 DEV PUBLIC SCHOOL‐CHITRAKOOT, CHHAJJUPUR‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR
NNG 3668 3050 KVA UNPLANNED 28‐03‐2018 15:58:51 28‐03‐2018 16:15:07 0:16 0.00013333 MUs
1855 BLOCK A‐EAST GOKUL PURI, BLOCK D‐MEET NAGAR NNG 549 630 KVA UNPLANNED 28‐03‐2018 17:59:28 28‐03‐2018 18:55:00 0:55 0.00045833 MUs1856 BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR, BLOCK A‐CHANDER VIHAR, BLOCK B‐NATHU
PURA, BLOCK B‐ASHOK NAGAR, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK BNNG 2046 2610 KVA UNPLANNED 01‐03‐2018 11:42:42 01‐03‐2018 12:09:53 0:27 0.00015 MUs
1857 BLOCK A‐JAGATPURI EXTN., BLOCK A‐CHANDRA LOK, BLOCK B‐SAKDARPUR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐NATHU PURA, BLOCK A‐B&C‐JAGAT PURI, BLOCK A‐NATHU COLONY, BLOCK B‐CHANDRA LOK, BLOCK M‐DURGA PURI, BLOCK D‐JAGAT PURI, BLOCK B‐ASHOK NAGAR, BLOCK B‐DURGA PURI
NNG 2625 4230 KVA UNPLANNED 01‐03‐2018 21:58:20 01‐03‐2018 22:34:00 0:35 0.00029167 MUs
1858 BABARPUR WEST‐BABAR PUR NNG, BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR, PKT B‐CHITRAKOOT, BABA DA DARGA‐KARDAMPURI, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR
NNG 6409 4060 KVA UNPLANNED 03‐03‐2018 09:03:27 03‐03‐2018 09:45:18 0:41 0.00034167 MUs
1859 BLOCK C‐KABIR NAGAR, BLOCK B‐KABIR NAGAR NNG 1768 0 KVA UNPLANNED 03‐03‐2018 11:40:34 03‐03‐2018 12:38:00 0:57 0.00031667 MUs1860 BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK B NNG 296 630 KVA UNPLANNED 03‐03‐2018 16:47:05 03‐03‐2018 17:23:40 0:36 0.0002 MUs1861 BLOCK B‐KABIR NAGAR, BABA DA DARGA‐KARDAMPURI, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK
BNNG 570 2250 KVA UNPLANNED 05‐03‐2018 11:34:00 05‐03‐2018 12:13:00 0:38 0.00021111 MUs
1862 BLOCK A‐JAGATPURI EXTN., BLOCK A‐NATHU COLONY, BLOCK B‐NATHU PURA, BLOCK A‐CHANDRA LOK, BLOCK B‐ASHOK NAGAR, BLOCK D‐JAGAT PURI, BLOCK M‐DURGA PURI, BLOCK A‐B&C‐JAGAT PURI, BLOCK B‐SAKDARPUR, BLOCK B‐CHANDRA LOK, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐DURGA PURI
NNG 2625 4230 KVA UNPLANNED 05‐03‐2018 11:37:11 05‐03‐2018 12:33:00 0:55 0.00045833 MUs
1863 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK A‐CHANDRA LOK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐JAGATPURI EXTN., BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐B&C‐JAGAT PURI, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐JAGAT PURI, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, BLOCK B‐CHANDRA LOK, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B BLOCK A KONDALI VILLAGE
NNG 7198 4230 KVA UNPLANNED 05‐03‐2018 17:12:57 05‐03‐2018 18:30:00 1:17 0.00064167 MUs
1864 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 720 990 KVA UNPLANNED 06‐03‐2018 05:17:11 06‐03‐2018 06:00:00 0:42 0.00035 MUs1865 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR,
BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 1309 630 KVA UNPLANNED 06‐03‐2018 05:18:14 06‐03‐2018 06:03:29 0:45 0.000375 MUs
1866 BLOCK C‐KABIR NAGAR, BLOCK B‐KABIR NAGAR NNG 1768 0 KVA UNPLANNED 06‐03‐2018 05:18:57 06‐03‐2018 06:04:36 0:45 0.000375 MUs1867 BLOCK B‐KABIR NAGAR, GEETA COLONY, DELHI JAL BOARD‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐
KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, BLOCK A‐HARIJAN BASTI, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, PKT H‐BLOCK D, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
NNG 3876 2250 KVA UNPLANNED 06‐03‐2018 11:12:07 06‐03‐2018 12:03:00 0:50 0.00069444 MUs
1868 BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK A‐CHANDER VIHAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐NATHU PURA, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, LIG/MIG RES/NON COMM AREA‐CHANDER VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 10095 2610 KVA UNPLANNED 06‐03‐2018 11:18:39 06‐03‐2018 12:15:43 0:57 0.00079167 MUs
1869 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4466 5260 KVA UNPLANNED 06‐03‐2018 14:20:13 06‐03‐2018 15:10:00 0:49 0.00068056 MUs1870 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐
HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3876 2250 KVA UNPLANNED 06‐03‐2018 14:27:47 06‐03‐2018 15:20:00 0:52 0.00072222 MUs
1871 BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG, BABA DA DARGA‐KARDAMPURI, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, BLOCK C‐KABIR NAGAR, PKT B‐CHITRAKOOT
NNG 6409 4060 KVA UNPLANNED 06‐03‐2018 15:19:16 06‐03‐2018 16:11:01 0:51 0.00070833 MUs
1872 BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK A‐CHANDER VIHAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐NATHU PURA, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, LIG/MIG RES/NON COMM AREA‐CHANDER VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 10114 2610 KVA UNPLANNED 06‐03‐2018 16:10:00 06‐03‐2018 16:48:48 0:38 0.00052778 MUs
1873 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13201 8470 KVA UNPLANNED 06‐03‐2018 17:56:18 06‐03‐2018 18:49:44 0:53 0.00073611 MUs
1874 BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG, BABA DA DARGA‐KARDAMPURI, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, BLOCK C‐KABIR NAGAR, PKT B‐CHITRAKOOT
NNG 6441 4060 KVA UNPLANNED 07‐03‐2018 09:26:03 07‐03‐2018 10:13:00 0:46 0.00019167 MUs
1875 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3910 2250 KVA UNPLANNED 07‐03‐2018 09:27:13 07‐03‐2018 10:23:00 0:55 0.00030556 MUs
1876 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13201 8470 KVA UNPLANNED 07‐03‐2018 11:08:04 07‐03‐2018 12:03:00 0:54 0.000225 MUs
1877 BLOCK B‐KABIR NAGAR, GEETA COLONY, DELHI JAL BOARD‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, BLOCK A‐HARIJAN BASTI, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, PKT H‐BLOCK D, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
NNG 3910 2250 KVA UNPLANNED 07‐03‐2018 11:16:39 07‐03‐2018 12:13:00 0:56 0.00046667 MUs
1878 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13201 8470 KVA UNPLANNED 07‐03‐2018 15:22:00 07‐03‐2018 16:03:00 0:40 0.00016667 MUs
1879 BABARPUR WEST‐BABAR PUR NNG, CHHAJJUPUR‐BABAR PUR, BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, GEETA COLONY, OLD SEELAMPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, RAGHUBARPURA NO 2‐SEELAMPUR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐KONDALI VILLAGE, BLOCK A‐KONDALI VILLAGE, BLOCK C‐KONDALI VILLAGE, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 5766 3600 KVA UNPLANNED 07‐03‐2018 17:14:17 07‐03‐2018 18:04:36 0:50 0.00041667 MUs
1880 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3910 2250 KVA UNPLANNED 07‐03‐2018 17:56:16 07‐03‐2018 18:25:00 0:28 0.00038889 MUs
1881 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK E‐ASHOK NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐KABIR NAGAR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐CHANDER VIHAR, LIG/MIG RES/NON COMM AREA‐CHANDER VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
NNG 10114 2610 KVA UNPLANNED 07‐03‐2018 18:39:25 07‐03‐2018 19:10:22 0:30 0.00041667 MUs
1882 BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG, BABA DA DARGA‐KARDAMPURI, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, BLOCK C‐KABIR NAGAR, PKT B‐CHITRAKOOT
NNG 6408 4060 KVA UNPLANNED 08‐03‐2018 11:36:36 08‐03‐2018 12:28:55 0:52 0.00043333 MUs
1883 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK E‐ASHOK NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐KABIR NAGAR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐CHANDER VIHAR, LIG/MIG RES/NON COMM AREA‐CHANDER VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
NNG 10114 2610 KVA UNPLANNED 08‐03‐2018 12:29:25 08‐03‐2018 13:13:00 0:43 0.00035833 MUs
1884 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3910 2250 KVA UNPLANNED 08‐03‐2018 16:57:23 08‐03‐2018 17:40:09 0:42 0.00035 MUs
1885 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13201 8470 KVA UNPLANNED 08‐03‐2018 17:00:45 08‐03‐2018 17:41:08 0:40 0.00055556 MUs
1886 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK E‐ASHOK NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐KABIR NAGAR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐CHANDER VIHAR, LIG/MIG RES/NON COMM AREA‐CHANDER VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
NNG 10114 2610 KVA UNPLANNED 08‐03‐2018 17:02:26 08‐03‐2018 17:52:02 0:49 0.00068056 MUs
1887 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4475 5260 KVA UNPLANNED 08‐03‐2018 17:03:42 08‐03‐2018 17:53:51 0:50 0.00069444 MUs1888 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4475 5260 KVA UNPLANNED 08‐03‐2018 19:59:57 08‐03‐2018 20:28:26 0:28 0.00038889 MUs1889 BLOCK B‐KABIR NAGAR, GEETA COLONY, DELHI JAL BOARD‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐
KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, BLOCK A‐HARIJAN BASTI, BABARPUR WEST‐BABAR PUR, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, PKT H‐BLOCK D, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA SONIA VIHAR
NNG 3910 2250 KVA UNPLANNED 09‐03‐2018 06:43:57 09‐03‐2018 07:31:50 0:47 0.00130556 MUs
1890 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13201 8470 KVA UNPLANNED 09‐03‐2018 06:45:28 09‐03‐2018 07:15:00 0:29 0.00080556 MUs
1891 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK A‐CHANDRA LOK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐JAGATPURI EXTN., BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐B&C‐JAGAT PURI, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐JAGAT PURI, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, BLOCK B‐CHANDRA LOK, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B BLOCK A KONDALI VILLAGE
NNG 7198 4230 KVA UNPLANNED 09‐03‐2018 10:02:41 09‐03‐2018 11:00:00 0:57 0.000475 MUs
1892 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13201 8470 KVA UNPLANNED 09‐03‐2018 10:39:20 09‐03‐2018 11:33:00 0:53 0.00029444 MUs
1893 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4475 5260 KVA UNPLANNED 09‐03‐2018 14:34:45 09‐03‐2018 15:15:41 0:40 0.00033333 MUs1894 JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐CHANDRA LOK, BLOCK B‐SAKDARPUR, BLOCK A‐B&C‐JAGAT PURI, BLOCK B‐
CHANDRA LOK, BLOCK M‐DURGA PURI, BLOCK B‐DURGA PURINNG 900 990 KVA UNPLANNED 09‐03‐2018 14:40:41 09‐03‐2018 15:25:39 0:44 0.00024444 MUs
1895 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK A‐CHANDRA LOK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐JAGATPURI EXTN., BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐B&C‐JAGAT PURI, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐JAGAT PURI, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, BLOCK B‐CHANDRA LOK, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B BLOCK A KONDALI VILLAGE
NNG 7198 4230 KVA UNPLANNED 09‐03‐2018 16:08:10 09‐03‐2018 17:00:00 0:51 0.000425 MUs
1896 BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG, BABA DA DARGA‐KARDAMPURI, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, BLOCK C‐KABIR NAGAR, PKT B‐CHITRAKOOT
NNG 6408 4060 KVA UNPLANNED 10‐03‐2018 07:19:32 10‐03‐2018 08:03:00 0:43 0.00059722 MUs
1897 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3910 2250 KVA UNPLANNED 10‐03‐2018 07:31:37 10‐03‐2018 08:21:23 0:49 0.00068056 MUs
1898 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13201 8470 KVA UNPLANNED 10‐03‐2018 17:21:49 10‐03‐2018 18:10:00 0:48 0.00033333 MUs
1899 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK E‐ASHOK NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐KABIR NAGAR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐CHANDER VIHAR, LIG/MIG RES/NON COMM AREA‐CHANDER VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
NNG 10114 2610 KVA UNPLANNED 10‐03‐2018 17:38:10 10‐03‐2018 18:21:02 0:42 0.00058333 MUs
1900 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13201 8470 KVA UNPLANNED 11‐03‐2018 07:10:54 11‐03‐2018 07:40:07 0:29 0.00024167 MUs
1901 BLOCK B‐DURGA PURI, BLOCK B‐KONDALI VILLAGE, BLOCK M‐DURGA PURI, BLOCK A‐KONDALI VILLAGE NNG 753 990 KVA UNPLANNED 11‐03‐2018 08:08:14 11‐03‐2018 08:48:15 0:40 0.00027778 MUs1902 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK E‐ASHOK
NAGAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐KABIR NAGAR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐CHANDER VIHAR, LIG/MIG RES/NON COMM AREA‐CHANDER VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
NNG 10114 2610 KVA UNPLANNED 11‐03‐2018 11:16:28 11‐03‐2018 12:08:00 0:51 0.000425 MUs
1903 BABARPUR WEST‐BABAR PUR NNG, CHHAJJUPUR‐BABAR PUR, BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, GEETA COLONY, OLD SEELAMPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, RAGHUBARPURA NO 2‐SEELAMPUR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐KONDALI VILLAGE, BLOCK A‐KONDALI VILLAGE, BLOCK C‐KONDALI VILLAGE, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 5766 3600 KVA UNPLANNED 11‐03‐2018 12:26:56 11‐03‐2018 13:23:00 0:56 0.00046667 MUs
1904 BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG, BABA DA DARGA‐KARDAMPURI, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, BLOCK C‐KABIR NAGAR, PKT B‐CHITRAKOOT
NNG 6408 4060 KVA UNPLANNED 12‐03‐2018 10:04:04 12‐03‐2018 10:50:13 0:46 0.00063889 MUs
1905 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3910 2250 KVA UNPLANNED 12‐03‐2018 11:22:02 12‐03‐2018 12:20:00 0:57 0.00079167 MUs
1906 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13201 8470 KVA UNPLANNED 12‐03‐2018 11:53:53 12‐03‐2018 12:50:00 0:56 0.00077778 MUs
1907 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK A‐CHANDRA LOK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐JAGATPURI EXTN., BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐B&C‐JAGAT PURI, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐JAGAT PURI, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, BLOCK B‐CHANDRA LOK, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B BLOCK A KONDALI VILLAGE
NNG 7199 4230 KVA UNPLANNED 12‐03‐2018 17:18:49 12‐03‐2018 18:04:49 0:45 0.000625 MUs
1908 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3911 2250 KVA UNPLANNED 12‐03‐2018 17:21:59 12‐03‐2018 18:06:13 0:44 0.00061111 MUs
1909 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4475 5260 KVA UNPLANNED 12‐03‐2018 17:22:30 12‐03‐2018 18:07:38 0:45 0.000625 MUs1910 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN
BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13202 8470 KVA UNPLANNED 13‐03‐2018 07:04:59 13‐03‐2018 07:38:33 0:33 0.00045833 MUs
1911 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4475 5260 KVA UNPLANNED 13‐03‐2018 11:05:57 13‐03‐2018 12:03:00 0:57 0.000475 MUs
1912 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13202 8470 KVA UNPLANNED 13‐03‐2018 15:18:12 13‐03‐2018 15:43:00 0:24 0.0002 MUs
1913 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3911 2250 KVA UNPLANNED 14‐03‐2018 06:49:45 14‐03‐2018 07:36:00 0:46 0.00038333 MUs
1914 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4475 5260 KVA UNPLANNED 14‐03‐2018 07:06:02 14‐03‐2018 07:52:50 0:46 0.00038333 MUs1915 BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR NNG 1060 400 KVA UNPLANNED 14‐03‐2018 09:32:52 14‐03‐2018 11:20:00 1:47 0.00059444 MUs1916 BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR NNG 4609 1980 KVA UNPLANNED 14‐03‐2018 14:28:48 14‐03‐2018 15:10:00 0:41 0.00045556 MUs1917 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐
HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3921 2250 KVA UNPLANNED 14‐03‐2018 14:43:01 14‐03‐2018 15:00:03 0:17 0.00023611 MUs
1918 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13218 8470 KVA UNPLANNED 15‐03‐2018 11:39:16 15‐03‐2018 13:03:00 1:23 0.00092222 MUs
1919 BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BABA DA DARGA‐KARDAMPURI, BLOCK C‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG
NNG 6422 4060 KVA UNPLANNED 15‐03‐2018 15:59:09 15‐03‐2018 17:39:35 1:40 0.00055556 MUs
1920 BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR NNG 2526 990 KVA UNPLANNED 15‐03‐2018 19:16:38 15‐03‐2018 19:49:15 0:32 0.00017778 MUs1921 JYOTI COLONY‐BALBIR NAGAR, BALBIR NAGAR EXTN.‐SILAMPUR, KARISHMA APPARTMENT‐MOTHER DAIRY,
BABARPUR EXTN.‐BABAR PURNNG 2092 630 KVA UNPLANNED 15‐03‐2018 21:01:08 15‐03‐2018 21:22:01 0:20 0.00011111 MUs
1922 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 612 990 KVA UNPLANNED 15‐03‐2018 23:23:54 16‐03‐2018 00:05:29 0:41 0.00022778 MUs1923 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐
HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3935 2250 KVA UNPLANNED 16‐03‐2018 07:47:01 16‐03‐2018 09:03:00 1:15 0.000625 MUs
1924 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3935 2250 KVA UNPLANNED 16‐03‐2018 09:36:45 16‐03‐2018 10:23:00 0:46 0.00025556 MUs
1925 BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG, BABA DA DARGA‐KARDAMPURI, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, BLOCK C‐KABIR NAGAR, PKT B‐CHITRAKOOT
NNG 6422 4060 KVA UNPLANNED 16‐03‐2018 11:43:24 16‐03‐2018 12:42:00 0:58 0.00032222 MUs
1926 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK A‐CHANDRA LOK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐JAGATPURI EXTN., BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐B&C‐JAGAT PURI, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐JAGAT PURI, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, BLOCK B‐CHANDRA LOK, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B BLOCK A KONDALI VILLAGE
NNG 7213 4230 KVA UNPLANNED 16‐03‐2018 13:16:46 16‐03‐2018 14:13:00 0:56 0.00046667 MUs
1927 BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG, BABA DA DARGA‐KARDAMPURI, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, BLOCK C‐KABIR NAGAR, PKT B‐CHITRAKOOT
NNG 6422 4060 KVA UNPLANNED 16‐03‐2018 16:21:10 16‐03‐2018 17:00:47 0:39 0.00021667 MUs
1928 PKT A‐BLOCK A, BLOCK A‐HARIJAN BASTI, PKT C‐BLOCK A, PKT D‐BLOCK A, PKT B‐BLOCK A, BLOCK H‐JYOTI NAGAR NNG 985 400 KVA UNPLANNED 17‐03‐2018 17:21:10 17‐03‐2018 18:00:53 0:39 0.00021667 MUs
1929 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3935 2250 KVA UNPLANNED 18‐03‐2018 06:55:02 18‐03‐2018 07:43:00 0:47 0.00039167 MUs
1930 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4478 5260 KVA UNPLANNED 18‐03‐2018 06:57:20 18‐03‐2018 07:40:00 0:42 0.00035 MUs1931 BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR NNG 1595 990 KVA UNPLANNED 18‐03‐2018 06:58:18 18‐03‐2018 08:28:27 1:30 0.000625 MUs1932 OLD SEELAMPUR, BALBIR NAGAR EXTN.‐SILAMPUR, BLOCK C‐KONDALI VILLAGE, BABARPUR EXTN.‐BABAR PUR, BLOCK
B‐KONDALI VILLAGE, CHHAJJUPUR‐BABAR PUR, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK A‐KONDALI VILLAGENNG 3122 990 KVA UNPLANNED 18‐03‐2018 07:00:06 18‐03‐2018 07:55:25 0:55 0.00038194 MUs
1933 BABARPUR WEST‐BABAR PUR NNG, CHHAJJUPUR‐BABAR PUR, BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, GEETA COLONY, OLD SEELAMPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, RAGHUBARPURA NO 2‐SEELAMPUR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐KONDALI VILLAGE, BLOCK A‐KONDALI VILLAGE, BLOCK C‐KONDALI VILLAGE, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 5780 3600 KVA UNPLANNED 19‐03‐2018 16:16:56 19‐03‐2018 17:15:06 0:58 0.00032222 MUs
1934 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13218 8470 KVA UNPLANNED 19‐03‐2018 18:08:44 19‐03‐2018 18:59:28 0:50 0.00069444 MUs
1935 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, RAGHUBARPURA NO 2‐SEELAMPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK C‐KONDALI VILLAGE, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, CHHAJJUPUR‐BABAR PUR, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK A‐KONDALI VILLAGE
NNG 5780 3600 KVA UNPLANNED 20‐03‐2018 07:36:59 20‐03‐2018 08:23:00 0:46 0.00038333 MUs
1936 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13218 8470 KVA UNPLANNED 20‐03‐2018 07:37:25 20‐03‐2018 08:23:00 0:45 0.000375 MUs
1937 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, RAGHUBARPURA NO 2‐SEELAMPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK C‐KONDALI VILLAGE, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, CHHAJJUPUR‐BABAR PUR, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK A‐KONDALI VILLAGE
NNG 5780 3600 KVA UNPLANNED 20‐03‐2018 09:03:40 20‐03‐2018 09:22:00 0:18 0.00015 MUs
1938 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3935 2250 KVA UNPLANNED 20‐03‐2018 09:20:00 20‐03‐2018 10:12:56 0:52 0.00072222 MUs
1939 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13218 8470 KVA UNPLANNED 20‐03‐2018 11:58:44 20‐03‐2018 12:55:05 0:56 0.00077778 MUs
1940 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK A‐CHANDRA LOK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐JAGATPURI EXTN., BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐B&C‐JAGAT PURI, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐JAGAT PURI, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, BLOCK B‐CHANDRA LOK, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B BLOCK A KONDALI VILLAGE
NNG 7213 4230 KVA UNPLANNED 20‐03‐2018 12:23:59 20‐03‐2018 13:20:00 0:56 0.00077778 MUs
1941 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13218 8470 KVA UNPLANNED 20‐03‐2018 14:15:29 20‐03‐2018 14:51:08 0:35 0.00048611 MUs
1942 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK A‐CHANDRA LOK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐JAGATPURI EXTN., BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐B&C‐JAGAT PURI, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐JAGAT PURI, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, BLOCK B‐CHANDRA LOK, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B BLOCK A KONDALI VILLAGE
NNG 7213 4230 KVA UNPLANNED 20‐03‐2018 17:54:33 20‐03‐2018 18:41:06 0:46 0.00063889 MUs
1943 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13271 8470 KVA UNPLANNED 21‐03‐2018 06:15:22 21‐03‐2018 07:13:18 0:57 0.000475 MUs
1944 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3958 2250 KVA UNPLANNED 21‐03‐2018 06:15:56 21‐03‐2018 07:14:10 0:58 0.00048333 MUs
1945 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4478 5260 KVA UNPLANNED 21‐03‐2018 08:43:00 21‐03‐2018 09:33:00 0:49 0.00040833 MUs1946 OLD SEELAMPUR, BALBIR NAGAR EXTN.‐SILAMPUR, BLOCK C‐KONDALI VILLAGE, BABARPUR EXTN.‐BABAR PUR, BLOCK
B‐KONDALI VILLAGE, CHHAJJUPUR‐BABAR PUR, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK A‐KONDALI VILLAGENNG 3131 990 KVA UNPLANNED 21‐03‐2018 08:43:54 21‐03‐2018 09:38:00 0:54 0.0003 MUs
1947 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK A‐CHANDRA LOK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐JAGATPURI EXTN., BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐B&C‐JAGAT PURI, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐JAGAT PURI, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, BLOCK B‐CHANDRA LOK, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B BLOCK A KONDALI VILLAGE
NNG 7227 4230 KVA UNPLANNED 21‐03‐2018 14:58:57 21‐03‐2018 15:43:00 0:44 0.00036667 MUs
1948 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4491 5260 KVA UNPLANNED 22‐03‐2018 05:28:24 22‐03‐2018 06:03:00 0:34 0.00047222 MUs1949 BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR NNG 1598 990 KVA UNPLANNED 22‐03‐2018 09:49:05 22‐03‐2018 10:39:55 0:50 0.00027778 MUs1950 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐
HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3958 2250 KVA UNPLANNED 22‐03‐2018 10:40:48 22‐03‐2018 11:33:00 0:52 0.00043333 MUs
1951 JYOTI COLONY‐BALBIR NAGAR, BALBIR NAGAR EXTN.‐SILAMPUR, KARISHMA APPARTMENT‐MOTHER DAIRY, BABARPUR EXTN.‐BABAR PUR
NNG 2100 630 KVA UNPLANNED 22‐03‐2018 14:47:06 22‐03‐2018 15:34:41 0:47 0.00039167 MUs
1952 BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR NNG 2535 990 KVA UNPLANNED 22‐03‐2018 15:06:48 22‐03‐2018 16:03:00 0:56 0.00031111 MUs1953 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN
BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13271 8470 KVA UNPLANNED 22‐03‐2018 17:37:43 22‐03‐2018 18:03:58 0:26 0.00021667 MUs
1954 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13271 8470 KVA UNPLANNED 23‐03‐2018 05:57:10 23‐03‐2018 06:34:56 0:37 0.00102778 MUs
1955 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3958 2250 KVA UNPLANNED 23‐03‐2018 06:00:30 23‐03‐2018 06:33:24 0:32 0.00044444 MUs
1956 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK A‐CHANDRA LOK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐JAGATPURI EXTN., BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐B&C‐JAGAT PURI, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐JAGAT PURI, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, BLOCK B‐CHANDRA LOK, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B BLOCK A KONDALI VILLAGE
NNG 7227 4230 KVA UNPLANNED 23‐03‐2018 12:11:51 23‐03‐2018 12:59:46 0:47 0.00026111 MUs
1957 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3958 2250 KVA UNPLANNED 24‐03‐2018 04:33:00 24‐03‐2018 05:30:00 0:56 0.00077778 MUs
1958 BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR NNG 1598 990 KVA UNPLANNED 24‐03‐2018 10:50:12 24‐03‐2018 11:22:41 0:32 0.00017778 MUs1959 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4491 5260 KVA UNPLANNED 24‐03‐2018 12:13:41 24‐03‐2018 12:55:29 0:41 0.00022778 MUs1960 BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR NNG 2535 990 KVA UNPLANNED 24‐03‐2018 17:17:22 24‐03‐2018 18:08:01 0:50 0.00041667 MUs1961 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4491 5260 KVA UNPLANNED 24‐03‐2018 17:17:53 24‐03‐2018 18:09:00 0:51 0.000425 MUs1962 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐
HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3958 2250 KVA UNPLANNED 24‐03‐2018 17:18:23 24‐03‐2018 18:13:00 0:54 0.00045 MUs
1963 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3958 2250 KVA UNPLANNED 24‐03‐2018 19:17:03 24‐03‐2018 19:59:01 0:41 0.00034167 MUs
1964 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 605 630 KVA UNPLANNED 24‐03‐2018 20:44:21 24‐03‐2018 21:02:35 0:18 0.00015 MUs
1965 BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR NNG 1598 990 KVA UNPLANNED 25‐03‐2018 05:58:41 25‐03‐2018 06:43:00 0:44 0.00036667 MUs1966 BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN
BASTI, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐BLOCK B, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK H‐JYOTI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐JYOTI NAGAR, BLOCK N‐SHIV VIHAR, BLOCK J‐JYOTI NAGAR, BLOCK C‐KONDALI VILLAGE, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL
NNG 13276 8470 KVA UNPLANNED 25‐03‐2018 05:59:36 25‐03‐2018 06:43:00 0:43 0.00035833 MUs
1967 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4494 5260 KVA UNPLANNED 26‐03‐2018 05:06:55 26‐03‐2018 06:02:03 0:55 0.00076389 MUs1968 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐NATHU PURA, BLOCK A‐CHANDRA
LOK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐JAGATPURI EXTN., BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐B&C‐JAGAT PURI, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐JAGAT PURI, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, BLOCK B‐CHANDRA LOK, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B BLOCK A KONDALI VILLAGE
NNG 7227 4230 KVA UNPLANNED 26‐03‐2018 11:03:01 26‐03‐2018 12:00:00 0:56 0.00046667 MUs
1969 BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI JAL BOARD‐JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
NNG 3958 2250 KVA UNPLANNED 26‐03‐2018 18:05:22 26‐03‐2018 18:52:37 0:47 0.00065278 MUs
1970 BABARPUR WEST‐BABAR PUR NNG, CHHAJJUPUR‐BABAR PUR, BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR, BLOCK B‐NORTH CHHAJUPUR, OLD SEELAMPUR, RAGHUBARPURA NO 2‐SEELAMPUR, BABA DA DARGA‐KARDAMPURI, KARISHMA APPARTMENT‐MOTHER DAIRY, BLOCK B‐DURGA PURI, BLOCK A‐NORTH CHHAJUPUR, BLOCK M‐DURGA PURI, BLOCK B‐JYOTI NAGAR BLOCK B‐DURGA PURI
NNG 3769 8470 KVA UNPLANNED 27‐03‐2018 18:34:42 27‐03‐2018 19:15:44 0:41 0.00056944 MUs
1971 BABARPUR WEST‐BABAR PUR NNG, CHHAJJUPUR‐BABAR PUR, BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, BLOCK B‐KABIR NAGAR, OLD SEELAMPUR, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK B
NNG 2062 3600 KVA UNPLANNED 27‐03‐2018 18:44:52 27‐03‐2018 19:03:00 0:18 0.00025 MUs
1972 BLOCK D‐SHIV VIHAR, BLOCK B‐KABIR NAGAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK D‐HARIJAN BASTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, PKT A‐BLOCK B
NNG 2216 2250 KVA UNPLANNED 28‐03‐2018 12:10:12 28‐03‐2018 13:00:00 0:49 0.00040833 MUs
1973 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK D‐HARIJAN BASTI, BABARPUR EXTN.‐BABAR PUR, RAGHUBARPURA NO 2‐SEELAMPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK C‐KONDALI VILLAGE, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, CHHAJJUPUR‐BABAR PUR, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK A‐KONDALI VILLAGE
NNG 5833 3600 KVA UNPLANNED 29‐03‐2018 05:50:00 29‐03‐2018 06:20:56 0:30 0.00041667 MUs
1974 BLOCK F‐WEST PATEL NAGAR, BLOCK K‐WEST PATEL NAGAR, BLOCK H‐WEST PATEL NAGAR, BLOCK E‐WEST PATEL NAGAR
PNR 539 990 KVA UNPLANNED 19‐03‐2018 17:05:30 19‐03‐2018 18:03:15 0:57 0.00019 MUs
1975 THAKKAR BAPA NAGAR‐BLOCK 16, BLOCK_10B‐DEV NAGAR, BLOCK A‐PUNJABI BASTI, BLOCK B‐PUNJABI BASTI PNR 2290 990 KVA UNPLANNED 14‐03‐2018 15:11:00 14‐03‐2018 15:52:19 0:41 0.00022778 MUs1976 DALLU PURA VSE‐VASUNDHARA ENCLAVE VSE VSE 230 630 KVA UNPLANNED 05‐03‐2018 17:23:04 05‐03‐2018 17:51:41 0:28 0 MUs1977 TELEGRAPH OFFICE‐KASHMERE GATE, NIGAM BODH GHAT CEMETRY‐KASHMERE GATE CCK 16 990 KVA PLANNED 12‐03‐2018 10:40:00 12‐03‐2018 14:42:45 4:2 0.00033611 MUs1978 ZEENAT BARI‐MORI GATE, KASHMIRI GATE‐MORI GATE CCK 898 990 KVA PLANNED 15‐03‐2018 10:33:00 15‐03‐2018 12:18:25 1:45 0.00014583 MUs1979 AJMERI GATE‐CHANDNI CHOWK, MOSQUE‐LAL KUAN BAZAR CCK 1214 990 KVA PLANNED 13‐03‐2018 10:34:00 13‐03‐2018 12:19:42 1:45 0.00011667 MUs1980 MOSQUE‐LAL KUAN BAZAR, CHAWRI BAZAR‐KHUSH DIL, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, LALKUAN BAZAR‐
SIKRIWALAN‐ NEW HAUZ QAZI, MAIN BAZAR‐KHUSH DILCCK 1526 990 KVA PLANNED 21‐03‐2018 10:48:00 21‐03‐2018 14:03:09 3:15 0.00021667 MUs
1981 GEETA COLONY, KATRA NAWAB‐CHANDNI CHOWK, NAI SARAK‐KATRA ASRAFI, ROSHAN PURA‐CHANDNI CHOWK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, GHANTA GHAR‐KATRA ASRAFI, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
CCK 1509 990 KVA PLANNED 22‐03‐2018 10:20:00 22‐03‐2018 14:15:36 3:55 0.00032639 MUs
1982 AJMERI GATE‐CHANDNI CHOWK, MOSQUE‐LAL KUAN BAZAR CCK 1463 990 KVA PLANNED 03‐03‐2018 11:55:00 03‐03‐2018 14:04:57 2:9 0.00035833 MUs1983 NAYA BAZAR‐CHANDNI CHOWK, FATEHPURI‐KHARI BAOLI CCK 1769 990 KVA PLANNED 06‐03‐2018 10:45:00 06‐03‐2018 12:32:20 1:47 0.00014861 MUs1984 GEETA COLONY, NAI SARAK‐JOGIWARA, ROSHAN PURA‐CHANDNI CHOWK, GGS INDRAPRASTHA UNIVERSITY‐
KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
CCK 1209 990 KVA PLANNED 07‐03‐2018 10:15:00 07‐03‐2018 14:23:19 4:8 0.00034444 MUs
1985 NAYA BAZAR‐CHANDNI CHOWK, FATEHPURI‐KHARI BAOLI CCK 387 990 KVA PLANNED 08‐03‐2018 10:40:00 08‐03‐2018 13:26:52 2:46 0.00023056 MUs1986 MOSQUE‐LAL KUAN BAZAR, LALKUAN BAZAR‐FRASH KHANA CCK 2081 990 KVA PLANNED 26‐03‐2018 10:33:00 26‐03‐2018 13:08:43 2:35 0.00017222 MUs1987 NAI SARAK‐JOGIWARA, KATRA NAWAB‐CHANDNI CHOWK, NAYA BAZAR‐CHANDNI CHOWK, MAIN BAZAR‐KHUSH DIL CCK 1064 990 KVA PLANNED 28‐03‐2018 10:20:00 28‐03‐2018 14:03:35 3:43 0.00043361 MUs
1988 DARIBA KALA‐KATRA MASHRU, DARIBA MARKET‐KATRA MASHRU, JAMA MASZID AREA‐CHANDNI CHOWK CCK 139 630 KVA PLANNED 14‐03‐2018 10:09:00 14‐03‐2018 13:53:26 3:44 0.00049778 MUs1989 TOWN HALL‐KUCHA NATWA CCK 314 990 KVA PLANNED 16‐03‐2018 11:11:00 16‐03‐2018 14:43:47 3:32 0.00023556 MUs1990 NAI SARAK‐KATRA ASRAFI, MAIN BAJAR‐MALIWARA CCK 145 990 KVA PLANNED 17‐03‐2018 10:59:00 17‐03‐2018 14:58:11 3:59 0.00026556 MUs1991 NAI SARAK‐KATRA ASRAFI, ROSHAN PURA‐CHANDNI CHOWK, MAIN BAZAR CHANDANI CHOWK‐SISGANJ CCK 730 990 KVA PLANNED 20‐03‐2018 10:12:00 20‐03‐2018 13:49:00 3:37 0.00030139 MUs1992 TOWN HALL‐KUCHA NATWA, MAIN BAJAR‐MALIWARA CCK 774 990 KVA PLANNED 05‐03‐2018 11:15:00 05‐03‐2018 15:34:00 4:19 0.00028778 MUs1993 LAJPAT RAI MARKET‐CHANDNI CHOWK, BHAGIRATH PLACE‐CHANDNI CHOWK, HARI RAM MARKET‐CHANDNI CHOWK CCK 145 990 KVA PLANNED 09‐03‐2018 10:00:02 09‐03‐2018 12:29:40 2:29 0.00016556 MUs
1994 BARA MORE SARAI‐CHANDNI CHOWK, GURUDWARA SISGANJ ROAD‐CHANDNI CHOWK, RED FORT‐CHANDNI CHOWK‐RED FORT, LAJPAT RAI MARKET‐CHANDNI CHOWK, MOR SARAY COLONY‐CHANDNI CHOWK
CCK 599 990 KVA PLANNED 10‐03‐2018 10:19:00 10‐03‐2018 13:00:24 2:41 0.00017889 MUs
1995 NAI SARAK‐KATRA ASRAFI, ROSHAN PURA‐CHANDNI CHOWK CCK 405 990 KVA PLANNED 23‐03‐2018 11:44:00 23‐03‐2018 15:30:11 3:46 0.00025111 MUs1996 LAJPAT RAI MARKET‐CHANDNI CHOWK CCK 94 990 KVA PLANNED 27‐03‐2018 10:25:00 27‐03‐2018 12:54:47 2:29 0.00020694 MUs1997 RED FORT‐CHANDNI CHOWK‐RED FORT, NIGAM BODH GHAT CEMETRY‐KASHMERE GATE CCK 154 990 KVA PLANNED 31‐03‐2018 11:57:00 31‐03‐2018 13:19:51 1:22 0.00009111 MUs1998 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 38 990 KVA PLANNED 20‐03‐2018 11:50:00 20‐03‐2018 15:37:54 3:47 0.00145028 MUs INSTALLATION OF
SENSITIVE DEVICE BY M/S UNLIMIT
1999 SUDARSHAN STEEL ROLLING MILL‐RAM NAGAR EAST, RAM NAGAR‐SILAMPUR DGN 105 630 KVA PLANNED 16‐03‐2018 13:10:00 16‐03‐2018 17:55:00 4:45 0.0016625 MUs2000 BLOCK 1‐RAM NAGAR DGN 742 990 KVA PLANNED 03‐03‐2018 10:45:00 03‐03‐2018 13:30:29 2:45 0.00091667 MUs2001 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR,
BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DGN 331 630 KVA PLANNED 10‐03‐2018 10:10:00 10‐03‐2018 15:26:57 5:16 0.00219444 MUs
2002 GOVT SCHOOL NO‐2‐DDA FLATS, DELHI JAL BOARD‐DDA FLATS DGN 247 400 KVA PLANNED 31‐03‐2018 10:22:00 31‐03‐2018 12:32:00 2:10 0.00090278 MUs2003 RAJIV COLONY‐JHILMIL INDUSTRIAL AREA, INDIRA CAMP‐JHILMIL INDUSTRIAL AREA DGN 101 990 KVA PLANNED 21‐03‐2018 12:25:00 21‐03‐2018 17:16:08 4:51 0.00177833 MUs INSTALLATION OF
SENSITIVE DEVICE BY M/S UNLIMIT
2004 RAJIV COLONY‐JHILMIL INDUSTRIAL AREA, SONIA GANDHI JJ CAMP‐JHILMIL INDUSTRIAL AREA, INDIRA CAMP‐JHILMIL INDUSTRIAL AREA, JHILMIL INDUSTRIAL AREA BLOCK A‐JHILMIL COLONY
DGN 435 990 KVA PLANNED 26‐03‐2018 11:22:00 26‐03‐2018 13:59:43 2:37 0.00095944 MUs INSTALLATION OF SENSITIVE DEVICE BY M/S UNLIMIT
2005 INDIRA CAMP‐JHILMIL INDUSTRIAL AREA, SONIA GANDHI JJ CAMP‐JHILMIL INDUSTRIAL AREA, RAJIV COLONY‐JHILMIL INDUSTRIAL AREA, JHILMIL INDUSTRIAL AREA BLOCK A‐JHILMIL COLONY
DGN 435 990 KVA PLANNED 27‐03‐2018 10:50:00 27‐03‐2018 17:49:47 6:59 0.00244417 MUs INSTALLATION OF SENSITIVE DEVICE BY M/S UNLIMIT
2006 JHILMIL INDUSTRIAL AREA BLOCK A‐JHILMIL COLONY DGN 31 990 KVA PLANNED 28‐03‐2018 11:30:00 28‐03‐2018 15:30:00 4:0 0.0014 MUs INSTALLATION OF SENSITIVE DEVICE BY M/S UNLIMIT
2007 DDA QUARTERS‐POCKET Q DGN 612 400 KVA PLANNED 12‐03‐2018 10:05:00 12‐03‐2018 13:39:27 3:34 0.00118889 MUs2008 BLOCK E‐OLD SIMAPURI, BLOCK F‐OLD SIMAPURI, BLOCK A‐OLD SIMAPURI, BLOCK B‐OLD SIMAPURI, BLOCK A‐NEW
SIMAPURIDGN 2286 630 KVA PLANNED 14‐03‐2018 10:20:00 14‐03‐2018 15:38:11 5:18 0.00353333 MUs
2009 RAM NAGAR‐SILAMPUR, GROUP I FLATS‐JANTA FLATS‐PKT A, DELHI JAL BOARD‐ PKT A‐JANTA FLATS‐PKT A DGN 22 630 KVA PLANNED 07‐03‐2018 12:36:00 07‐03‐2018 17:07:15 4:31 0.00143028 MUs2010 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK A‐JHILMIL INDUSTRIAL AREA, PRATAP
KHAND‐JHILMIL COLONY, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DGN 378 990 KVA PLANNED 20‐03‐2018 11:00:00 20‐03‐2018 15:26:49 4:26 0.00147778 MUs
2011 BLOCK J & K‐POCKET J&K, MUKHRJI SCHOOL‐POCKET L DGN 545 630 KVA PLANNED 21‐03‐2018 10:55:00 21‐03‐2018 14:07:00 3:12 0.00106667 MUs2012 DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN DGN 30 630 KVA PLANNED 06‐03‐2018 10:45:00 06‐03‐2018 15:38:35 4:53 0.00162778 MUs2013 M.C.D. HOUSE‐POCKET B, MIG FLATS‐POCKET F & E, RAJKIYA SARVODAYA BALVIDYALAYA‐POCKET C, DELHI JAL BOARD‐
PKT A‐JANTA FLATS‐PKT A, GROUP 4‐POCKET BDGN 310 630 KVA PLANNED 07‐03‐2018 10:38:00 07‐03‐2018 14:43:28 4:5 0.00170139 MUs
2014 BLOCK R‐ AADINATH BHAWAN‐POCKET R DGN 321 990 KVA PLANNED 09‐03‐2018 11:15:00 09‐03‐2018 16:19:56 5:4 0.00185778 MUs2015 HANSRAJ SCHOOL‐POCKET H, GTB MIG FLATS‐POCKET D, FLORA DALE SECONDARY SCHOOL‐POCKET R DGN 627 630 KVA PLANNED 23‐03‐2018 10:25:00 23‐03‐2018 13:25:00 3:0 0.001 MUs2016 SIMAPURI BUS DEPOT‐DILSHAD COLONY, BLOCK J‐DILSHAD COLONY, JJC‐DILSHAD COLONY, BLOCK F‐DILSHAD
COLONY, BLOCK G‐DILSHAD COLONY, BLOCK B‐DILSHAD COLONY, J.J.C.‐NEW SIMAPURI, BLOCK B‐NEW SIMAPURI, BLOCK C‐NEW SIMAPURI, BLOCK E‐NEW SIMAPURI, BLOCK D‐NEW SIMAPURI, BLOCK F‐OLD SIMAPURI, BLOCK E‐NEW SIMAPURI, MCD PRIMARY SCHOOL‐NEW SIMAPURI, SHIV MANDIR‐NEW SIMAPURI, BLOCK D‐DILSHAD COLONY, NEAR JIVAN CLINIC‐DILSHAD COLONY
DGN 4081 1260 KVA PLANNED 23‐03‐2018 11:51:00 23‐03‐2018 15:37:00 3:46 0 MUs
2017 BLOCK J & K‐POCKET J&K DGN 170 630 KVA PLANNED 24‐03‐2018 10:45:00 24‐03‐2018 13:44:34 2:59 0.00099444 MUs2018 RAJIV COLONY‐JHILMIL INDUSTRIAL AREA, SONIA GANDHI JJ CAMP‐JHILMIL INDUSTRIAL AREA, INDIRA CAMP‐JHILMIL
INDUSTRIAL AREA, JHILMIL INDUSTRIAL AREA BLOCK A‐JHILMIL COLONYDGN 631 990 KVA PLANNED 27‐03‐2018 10:30:00 27‐03‐2018 12:55:00 2:25 0.00076528 MUs
2019 BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 13 630 KVA PLANNED 28‐03‐2018 11:10:00 28‐03‐2018 12:59:55 1:49 0.00057528 MUs2020 BALBIR NAGAR EXTN.‐SILAMPUR, SHIVAJI PARK‐BALBIR NAGAR, GORAKH PARK EAST‐SILAMPUR DGN 847 990 KVA PLANNED 15‐03‐2018 10:35:00 15‐03‐2018 13:08:23 2:33 0.0008075 MUs2021 ROHITASH NAGAR EAST‐SILAMPUR DGN 1934 630 KVA PLANNED 19‐03‐2018 10:55:00 19‐03‐2018 14:16:04 3:21 0.00139583 MUs2022 GORAKH PARK WEST‐SILAMPUR, NEW JAFFRABAD‐GORAKH PARK, BABARPUR WEST‐BABAR PUR DGN 606 630 KVA PLANNED 05‐03‐2018 12:30:00 05‐03‐2018 15:41:20 3:11 0 MUs2023 ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR, BALBIR NAGAR EXTN.‐SILAMPUR DGN 387 990 KVA PLANNED 08‐03‐2018 10:50:00 08‐03‐2018 14:24:39 3:34 0.00112944 MUs
2024 KABUL NAGAR‐ROHITASH NAGAR, OLDANPUR‐NAVIN SHAHDARA, DWARKAPURI‐NAVIN SHAHDARA, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK S‐PRATAP PURA, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DGN 874 990 KVA PLANNED 26‐03‐2018 10:42:00 26‐03‐2018 12:14:58 1:32 0.00038333 MUs
2025 LIG/MIG RES/NON COMM AREA‐FEROJ SHAH KOTLA STADIUM DRG 48 400 KVA PLANNED 12‐03‐2018 10:05:00 12‐03‐2018 13:04:00 2:59 0 MUs2026 DARYA GANJ DRG 357 990 KVA PLANNED 24‐03‐2018 10:40:00 24‐03‐2018 12:26:37 1:46 0 MUs2027 DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, LIG/MIG RES/NON COMM AREA‐VIKRAM NAGAR, LIG/MIG
RES/NON COMM AREA‐FEROJ SHAH KOTLA STADIUMDRG 885 990 KVA PLANNED 27‐03‐2018 10:00:00 27‐03‐2018 12:06:51 2:6 0 MUs
2028 EVERGREEN PUBLICATION‐KALA MAHAL, CHRISTAN COLONY‐KHABAS PURA, LIG/MIG RES/NON COMM AREA‐MEENA BAZAR, MOTHER DAIRY‐NETAJI SUBHASH MARG
DRG 280 990 KVA PLANNED 17‐03‐2018 09:15:00 17‐03‐2018 11:39:42 2:24 0.0002 MUs at project work
2029 EVERGREEN PUBLICATION‐KALA MAHAL, CHRISTAN COLONY‐KHABAS PURA, MOTHER DAIRY‐NETAJI SUBHASH MARG DRG 280 990 KVA PLANNED 20‐03‐2018 09:35:00 20‐03‐2018 11:33:10 1:58 0.00016389 MUs at project work
2030 EVERGREEN PUBLICATION‐KALA MAHAL, CHRISTAN COLONY‐KHABAS PURA, CHANDANI MAHAL‐CHANDNI CHOWK, LIG/MIG RES/NON COMM AREA‐MEENA BAZAR, MOTHER DAIRY‐NETAJI SUBHASH MARG
DRG 280 990 KVA PLANNED 22‐03‐2018 09:00:00 22‐03‐2018 10:30:01 1:30 0.0001 MUs at project work
2031 PATODI HOUSE‐CHANDNI CHOWK, MTNL TELEPHONE EXCHANGE‐PATODI HOUSE DRG 160 990 KVA PLANNED 23‐03‐2018 10:30:00 23‐03‐2018 12:50:50 2:20 0.00019444 MUs at project work2032 CHRISTAN COLONY‐KHABAS PURA, CHANDANI MAHAL‐CHANDNI CHOWK, PATODI HOUSE‐CHANDNI CHOWK DRG 500 900 KVA PLANNED 26‐03‐2018 12:30:00 26‐03‐2018 15:06:36 2:36 0.00021667 MUs project work2033 CHRISTAN COLONY‐KHABAS PURA, CHANDANI MAHAL‐CHANDNI CHOWK DRG 500 900 KVA PLANNED 28‐03‐2018 12:03:00 28‐03‐2018 14:08:21 2:5 0.00017361 MUs at project work2034 DAV PUBLIC SCHOOL‐KALA MASZID, CHRISTAN COLONY‐KHABAS PURA, PATODI HOUSE‐CHANDNI CHOWK, MTNL
TELEPHONE EXCHANGE‐PATODI HOUSEDRG 160 990 KVA PLANNED 31‐03‐2018 13:15:00 31‐03‐2018 13:49:27 0:34 0.00004722 MUs
2035 COMMUNITY CENTRE‐JAMA MASZID, EVERGREEN PUBLICATION‐KALA MAHAL, MOTHER DAIRY‐NETAJI SUBHASH MARG
DRG 401 630 KVA PLANNED 22‐03‐2018 11:45:00 22‐03‐2018 14:05:00 2:20 0.00031111 MUs
2036 COMMUNITY CENTRE‐JAMA MASZID, SITARAM BAZAR‐CHANDNI CHOWK, MOTIA MAHAL‐CHANDNI CHOWK, CHURI WALAN GALI‐CHANDNI CHOWK
DRG 427 990 KVA PLANNED 21‐03‐2018 12:50:00 21‐03‐2018 14:20:10 1:30 0.0002 MUs
2037 GEETA COLONY, SITARAM BAZAR‐CHANDNI CHOWK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DRG 1168 990 KVA PLANNED 19‐03‐2018 14:30:00 19‐03‐2018 15:52:50 1:22 0.000205 MUs
2038 COMMUNITY CENTRE‐JAMA MASZID, SITARAM BAZAR‐CHANDNI CHOWK, MOTIA MAHAL‐CHANDNI CHOWK, CHURI WALAN GALI‐CHANDNI CHOWK
DRG 427 990 KVA PLANNED 26‐03‐2018 14:10:00 26‐03‐2018 15:15:33 1:5 0.00014444 MUs at project work
2039 GEETA COLONY, SITARAM BAZAR‐CHANDNI CHOWK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DRG 1168 990 KVA PLANNED 24‐03‐2018 12:45:00 24‐03‐2018 14:39:11 1:54 0.00025333 MUs at project work
2040 GEETA COLONY, SITARAM BAZAR‐CHANDNI CHOWK, DAV PUBLIC SCHOOL‐KALA MASZID, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DRG 1690 990 KVA PLANNED 26‐03‐2018 14:40:00 26‐03‐2018 15:32:53 0:52 0.00011556 MUs at project work
2041 CHANDANI MAHAL‐CHANDNI CHOWK, HAPPY PUBLIC SCHOOL‐PARDA BAGH DRG 567 990 KVA PLANNED 08‐03‐2018 10:03:00 08‐03‐2018 12:52:38 2:49 0 MUs2042 COMMUNITY CENTRE‐JAMA MASZID, MOTIA MAHAL‐CHANDNI CHOWK DRG 299 990 KVA PLANNED 27‐03‐2018 15:05:00 27‐03‐2018 16:41:11 1:36 0.00013333 MUs project work2043 GEETA COLONY, SITARAM BAZAR‐CHANDNI CHOWK, DAV PUBLIC SCHOOL‐KALA MASZID, CHANDANI MAHAL‐
CHANDNI CHOWK, PATODI HOUSE‐CHANDNI CHOWK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, DDA FLATS‐KALA MASZID, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
DRG 6602 5580 KVA PLANNED 09‐03‐2018 12:46:00 09‐03‐2018 13:19:00 0:33 0.00077917 MUs preventive maintenance
2044 EVERGREEN PUBLICATION‐KALA MAHAL, CHRISTAN COLONY‐KHABAS PURA, GOVT SENIOR SECONDARY SCHOOL‐KALA MAHAL, ARYA ANATHALAYA‐KALA MAHAL
DRG 1318 990 KVA PLANNED 12‐03‐2018 12:11:00 12‐03‐2018 14:47:00 2:36 0.00195 MUs preventive maintenance
2045 CHANDANI MAHAL‐CHANDNI CHOWK DRG 154 990 KVA PLANNED 14‐03‐2018 10:10:00 14‐03‐2018 12:17:46 2:7 0 MUs2046 KUCHA PATI RAM‐CHANDNI CHOWK, DAV PUBLIC SCHOOL‐KALA MASZID, CHRISTAN COLONY‐KHABAS PURA DRG 654 990 KVA PLANNED 15‐03‐2018 11:00:00 15‐03‐2018 13:12:19 2:12 0 MUs2047 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV
VIHAR, SITARAM BAZAR‐CHANDNI CHOWK, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, DAV PUBLIC SCHOOL‐KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
DRG 2187 990 KVA PLANNED 19‐03‐2018 10:12:00 19‐03‐2018 12:58:36 2:46 0 MUs
2048 MOTHER DAIRY‐NETAJI SUBHASH MARG, CHRISTAN COLONY‐KHABAS PURA, EVERGREEN PUBLICATION‐KALA MAHAL DRG 280 990 KVA PLANNED 05‐03‐2018 11:45:00 05‐03‐2018 13:13:58 1:28 0.00012222 MUs at project work
2049 MOTHER DAIRY‐NETAJI SUBHASH MARG, CHRISTAN COLONY‐KHABAS PURA, EVERGREEN PUBLICATION‐KALA MAHAL DRG 280 990 KVA PLANNED 07‐03‐2018 14:00:00 07‐03‐2018 16:52:05 2:52 0.00023889 MUs at project work
2050 MOTHER DAIRY‐NETAJI SUBHASH MARG, CHRISTAN COLONY‐KHABAS PURA, EVERGREEN PUBLICATION‐KALA MAHAL DRG 280 990 KVA PLANNED 08‐03‐2018 11:30:00 08‐03‐2018 12:51:26 1:21 0.0001125 MUs at project work
2051 MOTHER DAIRY‐NETAJI SUBHASH MARG, CHRISTAN COLONY‐KHABAS PURA, EVERGREEN PUBLICATION‐KALA MAHAL DRG 280 990 KVA PLANNED 09‐03‐2018 11:35:00 09‐03‐2018 11:43:59 0:8 0.00001111 MUs at project work
2052 PATODI HOUSE‐CHANDNI CHOWK, CHANDANI MAHAL‐CHANDNI CHOWK, CHRISTAN COLONY‐KHABAS PURA DRG 633 900 KVA PLANNED 09‐03‐2018 10:45:00 09‐03‐2018 12:38:50 1:53 0.00015694 MUs at project work2053 CHANDANI MAHAL‐CHANDNI CHOWK DRG 844 990 KVA PLANNED 12‐03‐2018 13:45:00 12‐03‐2018 14:21:08 0:36 0.00005 MUs at project work2054 MOTHER DAIRY‐NETAJI SUBHASH MARG, CHRISTAN COLONY‐KHABAS PURA, EVERGREEN PUBLICATION‐KALA MAHAL DRG 280 990 KVA PLANNED 12‐03‐2018 12:05:00 12‐03‐2018 14:17:18 2:12 0.00018333 MUs at project work
2055 GEETA COLONY, CHANDANI MAHAL‐CHANDNI CHOWK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
DRG 1736 990 KVA PLANNED 14‐03‐2018 12:15:00 14‐03‐2018 14:18:12 2:3 0.00017083 MUs at project work
2056 CHANDANI MAHAL‐CHANDNI CHOWK DRG 844 990 KVA PLANNED 15‐03‐2018 11:15:00 15‐03‐2018 12:59:11 1:44 0.00014444 MUs at project work2057 SITARAM BAZAR‐CHANDNI CHOWK DRG 134 990 KVA PLANNED 05‐03‐2018 14:45:00 05‐03‐2018 15:55:20 1:10 0.00009722 MUs project work2058 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV
VIHAR, SITARAM BAZAR‐CHANDNI CHOWK, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
DRG 1164 990 KVA PLANNED 08‐03‐2018 12:15:00 08‐03‐2018 14:14:29 1:59 0.00026444 MUs
2059 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, ARYA ANATHALAYA‐KALA MAHAL, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, CHRISTAN COLONY‐KHABAS PURA PKT A‐BLOCK B
DRG 309 990 KVA PLANNED 08‐03‐2018 14:50:00 08‐03‐2018 16:02:31 1:12 0.00018 MUs
2060 CHAWRI BAZAR‐CHANDNI CHOWK DRG 233 630 KVA PLANNED 05‐03‐2018 10:40:00 05‐03‐2018 13:06:35 2:26 0 MUs2061 COMMUNITY CENTRE‐JAMA MASZID, CHRISTAN COLONY‐KHABAS PURA, PATODI HOUSE‐CHANDNI CHOWK DRG 1412 990 KVA PLANNED 06‐03‐2018 10:10:00 06‐03‐2018 14:14:29 4:4 0 MUs2062 KUCHA PATI RAM‐CHANDNI CHOWK, CHAWRI BAZAR‐CHANDNI CHOWK, BINDRABAN UDYOG‐KUCHA PATI RAM DRG 1656 990 KVA PLANNED 07‐03‐2018 10:30:00 07‐03‐2018 13:21:43 2:51 0 MUs2063 COMMUNITY CENTRE‐JAMA MASZID, SITARAM BAZAR‐CHANDNI CHOWK, MOTIA MAHAL‐CHANDNI CHOWK,
EVERGREEN PUBLICATION‐KALA MAHAL, CHANDANI MAHAL‐CHANDNI CHOWK, MOTHER DAIRY‐NETAJI SUBHASH MARG, CHURI WALAN GALI‐CHANDNI CHOWK
DRG 4601 1620 KVA PLANNED 28‐03‐2018 11:16:00 28‐03‐2018 12:40:00 1:24 0.00245 MUs
2064 DDA FLATS‐ROUSE AVENUE, GOVT. QTRS‐64 KHAMBA, MATA SUNDARI SCHOOL‐ROUSE AVENUE, DEMOLISHED AREA‐ROUSE AVENUE
DRG 717 990 KVA PLANNED 13‐03‐2018 10:15:00 13‐03‐2018 12:54:53 2:39 0 MUs
2065 DELHI GOVT. STAFF FLATS‐PRESS ENCLAVE DRG 263 630 KVA PLANNED 16‐03‐2018 10:00:00 16‐03‐2018 11:52:09 1:52 0 MUs2066 GOVIND BALLABH PANT HASPITAL‐LN JPN COLONY, MEDICAL COUNCIL OF INDIA‐BAL BHAWAN, UNIVERSITY GRANT
COMMISSION‐ITO, SOC SCHOOL‐CONNAUGHT PLACE DRG, MATA SUNDARI SCHOOL‐ROUSE AVENUE, MEER DARD H.S.‐ROUSE AVENUE, DEMOLISHED AREA‐ROUSE AVENUE
DRG 640 1260 KVA PLANNED 19‐03‐2018 10:48:00 19‐03‐2018 12:52:53 2:4 0.00165333 MUs precv mtc.
2067 GOVT. GIRLS SENIOR SECONDARY SCHOOL‐TURKMAN GATE, CHANDANI MAHAL‐CHANDNI CHOWK DRG 330 990 KVA PLANNED 20‐03‐2018 10:10:00 20‐03‐2018 13:43:21 3:33 0 MUs2068 DDA FLATS‐ROUSE AVENUE, GOVT. QTRS‐64 KHAMBA, GOVIND BALLABH PANT HASPITAL‐LN JPN COLONY, BSES
OFFICE‐TURKMAN MARG, ZAKIR HUSAIN P.G. EVENING COLLAGE‐SKD BASTI, DELHI GOVT. STAFF FLATS‐PRESS ENCLAVE, GOVT FLAT‐AJMERI GATE, MATA SUNDARI SCHOOL‐ROUSE AVENUE, DEMOLISHED AREA‐ROUSE AVENUE, BLOCK D‐AJMERI GATE, RAILWAY COLONY‐CONNAUGHT PLACE DRG, BLOCK E‐CONNAUGHT PLACE DRG
DRG 920 3110 KVA PLANNED 21‐03‐2018 12:15:00 21‐03‐2018 13:24:00 1:9 0 MUs
2069 GOVT. QTRS‐64 KHAMBA, GOVIND BALLABH PANT HASPITAL‐LN JPN COLONY, MEER DARD H.S.‐ROUSE AVENUE, DEMOLISHED AREA‐ROUSE AVENUE
DRG 1680 990 KVA PLANNED 10‐03‐2018 10:00:20 10‐03‐2018 13:08:46 3:8 0 MUs
2070 KAMLA MARKET‐AJMERI GATE, GOVT FLAT‐AJMERI GATE DRG 106 990 KVA PLANNED 23‐03‐2018 10:45:00 23‐03‐2018 12:41:36 1:56 0 MUs2071 GOVIND BALLABH PANT HASPITAL‐LN JPN COLONY, ZAKIR HUSAIN P.G. EVENING COLLAGE‐SKD BASTI DRG 24 630 KVA PLANNED 26‐03‐2018 12:20:00 26‐03‐2018 14:05:00 1:45 0.00040833 MUs2072 ZAKIR HUSAIN P.G. EVENING COLLAGE‐SKD BASTI DRG 386 630 KVA PLANNED 28‐03‐2018 10:25:00 28‐03‐2018 12:01:10 1:36 0 MUs2073 SUNDER PARK‐SHAHDARA, BHOLA NATH NAGAR‐SHAHDARA, SHALIMAR PARK‐SHAHDARA JLM 985 990 KVA PLANNED 08‐03‐2018 12:15:00 08‐03‐2018 16:55:00 4:40 0.00038889 MUs INSTALLATION OF LT
ACB2074 EAST ROHTASH NAGAR‐SHAHDARA, VISHWAS NAGAR EXTN.‐SHAHDARA JLM 246 990 KVA PLANNED 17‐03‐2018 11:00:00 17‐03‐2018 13:59:00 2:59 0.00049722 MUs replacement of lt db
box2075 VISHWAS NAGAR JLM 182 990 KVA PLANNED 22‐03‐2018 11:25:00 22‐03‐2018 14:24:00 2:59 0.00049722 MUs FOR NEW LT AB
LAYING WORK2076 KASTURBA NAGAR‐SHAHDARA, TELIBARA‐SHAHDARA, JAWALA NAGAR‐SHAHDARA JLM 223 990 KVA PLANNED 16‐03‐2018 10:50:00 16‐03‐2018 12:34:26 1:44 0.00028889 MUs DB
REPAIRING,LOCKING,DRESSING WORK
2077 EAST ROHTASH NAGAR‐SHAHDARA JLM 87 990 KVA PLANNED 20‐03‐2018 10:40:00 20‐03‐2018 12:30:00 1:50 0.00030556 MUs DB REPAIRING,LOCKING,DRESSING WORK
2078 SUNDER PARK‐SHAHDARA JLM 146 990 KVA PLANNED 22‐03‐2018 10:55:00 22‐03‐2018 13:45:00 2:50 0.00047222 MUs DB REPAIRING,LOCKING,DRESSING WORK
2079 EAST ROHTASH NAGAR‐SHAHDARA JLM 10 990 KVA PLANNED 27‐03‐2018 11:00:00 27‐03‐2018 12:53:48 1:53 0.00031389 MUs DB REPAIRING,LOCKING,DRESSING WORK
2080 SUNDER PARK‐SHAHDARA JLM 331 990 KVA PLANNED 12‐03‐2018 10:26:00 12‐03‐2018 12:48:40 2:22 0.00019722 MUs2081 NEW VISWAS NAGAR‐SHAHDARA JLM 263 630 KVA PLANNED 14‐03‐2018 10:05:00 14‐03‐2018 12:05:00 2:0 0.00033333 MUs2082 NEW VISWAS NAGAR‐SHAHDARA JLM 270 400 KVA PLANNED 16‐03‐2018 10:10:00 16‐03‐2018 12:05:12 1:55 0.00015972 MUs2083 VISHWAS NAGAR‐SHAHDARA JLM 111 630 KVA PLANNED 19‐03‐2018 10:15:00 19‐03‐2018 13:13:36 2:58 0.00049444 MUs2084 VISHWAS NAGAR‐SHAHDARA JLM 344 990 KVA PLANNED 21‐03‐2018 10:05:00 21‐03‐2018 13:00:00 2:55 0.00048611 MUs2085 VISHWAS NAGAR‐SHAHDARA, AMBEDKAR NAGAR‐SHAHDARA JLM 309 990 KVA PLANNED 13‐03‐2018 10:48:00 13‐03‐2018 13:31:31 2:43 0.00022639 MUs Existing Trf
Replacement2086 SUNDER PARK‐SHAHDARA, EAST ROHTASH NAGAR‐SHAHDARA, VISHWAS NAGAR JLM 1291 990 KVA PLANNED 13‐03‐2018 14:50:00 13‐03‐2018 17:24:06 2:34 0.00021389 MUs Existing Trf Replace by
NGEF Make Trf2087 NAYA VISHWAS NAGAR‐SHAHDARA, AMBEDKAR NAGAR‐SHAHDARA, JAWALA NAGAR‐SHAHDARA JLM 331 630 KVA PLANNED 15‐03‐2018 11:50:00 15‐03‐2018 14:16:35 2:26 0.00202778 MUs FOR NEW LTAB
LAYING2088 SUNDER PARK‐SHAHDARA, VISHWAS NAGAR JLM 196 990 KVA PLANNED 06‐03‐2018 11:03:00 06‐03‐2018 13:29:04 2:26 0.00202778 MUs DB
REPAIRING,LOCKING,DRESSING WORK
2089 BHOLA NATH NAGAR‐SHAHDARA JLM 298 990 KVA PLANNED 08‐03‐2018 11:05:00 08‐03‐2018 12:44:00 1:39 0.000275 MUs DB REPAIRING,LOCKING,DRESSING WORK
2090 SUNDER PARK‐SHAHDARA JLM 182 990 KVA PLANNED 12‐03‐2018 11:10:00 12‐03‐2018 13:45:26 2:35 0.00215278 MUs DB REPAIRING,LOCKING,DRESSING WORK
2091 SUNDER PARK‐SHAHDARA, VISHWAS NAGAR JLM 196 990 KVA PLANNED 13‐03‐2018 10:40:00 13‐03‐2018 13:13:31 2:33 0.002125 MUs DB REPAIRING,LOCKING,DRESSING WORK
2092 BHOLA NATH NAGAR‐SHAHDARA, TELIBARA‐SHAHDARA, BIHARI COLONY‐SHAHDARA JLM 1008 990 KVA PLANNED 06‐03‐2018 11:34:00 06‐03‐2018 17:30:14 5:56 0.00098889 MUs INSTALLATION OF 630 KVA TRANSFORMER
2093 SUNDER PARK‐SHAHDARA, BHOLA NATH NAGAR‐SHAHDARA JLM 760 990 KVA PLANNED 05‐03‐2018 10:22:00 05‐03‐2018 13:00:00 2:38 0.00021944 MUs2094 TELIBARA‐SHAHDARA JLM 471 400 KVA PLANNED 07‐03‐2018 10:10:00 07‐03‐2018 13:34:26 3:24 0.00056667 MUs2095 MAHARAM NAGAR‐SHAHDARA JLM 819 990 KVA PLANNED 09‐03‐2018 10:30:00 09‐03‐2018 13:10:00 2:40 0.00044444 MUs2096 BLOCK_B‐VIVEK VIHAR PHASE II, AMBEDKAR NAGAR‐SHAHDARA, JAWALA NAGAR‐SHAHDARA, DDA MIG FLATS‐VIVEK
VIHAR PHASE IIJLM 1298 990 KVA PLANNED 01‐03‐2018 10:00:00 01‐03‐2018 12:50:00 2:50 0.00047222 MUs PREVENTIVE
MAINTENANCE AT SHAMSHAN GHAT
2097 VISHWAS NAGAR‐SHAHDARA JLM 327 990 KVA PLANNED 23‐03‐2018 10:08:00 23‐03‐2018 14:29:03 4:21 0.000725 MUs2098 BLOCK A‐SHAKARPUR KHAS, BLOCK G‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR KHAS, BLOCK R&A‐SHAKARPUR KHAS,
SHAKARPUR EXTN.‐SHAKARPUR KHAS, VISHWAS NAGAR‐SHAHDARAJLM 1324 990 KVA PLANNED 26‐03‐2018 10:00:00 26‐03‐2018 13:00:00 3:0 0.0005 MUs
2099 VISHWAS NAGAR‐SHAHDARA JLM 311 630 KVA PLANNED 28‐03‐2018 10:28:00 28‐03‐2018 12:44:00 2:16 0.00037778 MUs2100 VILL KARKARDOOMA‐KARKAR DUMA, SHANTI VIHAR‐KARKAR DUMA, DDA FLATS‐KARKAR DUMA JLM 1027 630 KVA PLANNED 16‐03‐2018 13:55:00 16‐03‐2018 16:47:00 2:52 0.00023889 MUs REPLACEMENT OF 990
KVA DTR2101 DAYA NAND VIHAR‐ANAND VIHAR JLM 358 630 KVA PLANNED 19‐03‐2018 13:14:00 19‐03‐2018 14:53:05 1:39 0.0006875 MUs LOAD SHIFTING AND
LOAD BALANCING2102 MANAK VIHAR‐ANAND VIHAR JLM 185 990 KVA PLANNED 21‐03‐2018 13:30:00 21‐03‐2018 17:16:34 3:46 0.00156944 MUs TO PROVIDE EGG
INSULATOR2103 SHANTI VIHAR‐ANAND VIHAR, SHANTI VIHAR‐KARKAR DUMA, DDA FLATS‐KARKAR DUMA JLM 59 990 KVA PLANNED 23‐03‐2018 12:58:00 23‐03‐2018 14:08:04 1:10 0.00048611 MUs TO PROVIDE EGG
INSULATOR2104 ANAND VIHAR BLOCK A, ANAND VIHAR BLOCK C, ANAND VIHAR BLOCK B JLM 344 990 KVA PLANNED 19‐03‐2018 13:06:00 19‐03‐2018 16:38:30 3:32 0.00147222 MUs LT AB SCHEME WORK
2105 PUSHPANJALI‐ANAND VIHAR, JAGRITI ENCLAVE‐ANAND VIHAR, SAINI ENCLAVE‐ANAND VIHAR JLM 82 990 KVA PLANNED 23‐03‐2018 12:32:00 23‐03‐2018 17:32:00 5:0 0.00208333 MUs LT AB SCHEME WORK2106 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, ANAND VIHAR BLOCK C, BLOCK D‐ANAND VIHAR,
PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
JLM 641 990 KVA PLANNED 24‐03‐2018 12:00:00 24‐03‐2018 17:40:59 5:40 0.00094444 MUs LT AB SCHEME WORK.
2107 DAYA NAND VIHAR‐ANAND VIHAR JLM 358 630 KVA PLANNED 27‐03‐2018 12:26:00 27‐03‐2018 16:49:46 4:23 0.00182639 MUs LT AB SCHEME WORK.
2108 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, ANAND VIHAR BLOCK C, JAGRITI ENCLAVE‐ANAND VIHAR, BLOCK D‐ANAND VIHAR, ANAND VIHAR BLOCK B, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, J J COLONY‐ANAND VIHAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
JLM 942 990 KVA PLANNED 28‐03‐2018 13:19:00 28‐03‐2018 17:45:17 4:26 0.00184722 MUs LT AB SCHEME WORK.
2109 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, INSTITUTIONAL AREA BLOCK B‐ALL INDIA DEAF & DUMB SOCIETY, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, HOSPITAL AREA‐INSTITUTIONAL AREA, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
JLM 290 400 KVA PLANNED 07‐03‐2018 15:50:00 07‐03‐2018 16:22:04 0:32 0.00001778 MUs
2110 VILL KARKARDOOMA‐KARKAR DUMA, KIRAN VIHAR‐ANAND VIHAR, DDA FLATS‐KARKAR DUMA JLM 849 990 KVA PLANNED 17‐03‐2018 11:05:00 17‐03‐2018 13:30:00 2:25 0.00020139 MUs DB RELATED WORK2111 VISHWAS NAGAR EXTN.‐SHAHDARA, VISHWAS NAGAR EXTN.‐SHAHDARA JLM 1053 630 KVA PLANNED 19‐03‐2018 10:36:00 19‐03‐2018 14:04:11 3:28 0.00288889 MUs DB RELATED WORK2112 KIRAN VIHAR‐ANAND VIHAR, VILL KARKARDOOMA‐KARKAR DUMA, DDA FLATS‐KARKAR DUMA JLM 849 990 KVA PLANNED 20‐03‐2018 11:20:00 20‐03‐2018 14:20:00 3:0 0.00025 MUs DB RELATED WORK2113 VISHWAS NAGAR EXTN.‐SHAHDARA, VISHWAS NAGAR EXTN.‐SHAHDARA JLM 1053 630 KVA PLANNED 23‐03‐2018 11:28:00 23‐03‐2018 12:03:00 0:35 0.00004861 MUs DB RELATED WORK2114 KIRAN VIHAR‐ANAND VIHAR, VILL KARKARDOOMA‐KARKAR DUMA, DDA FLATS‐KARKAR DUMA JLM 849 990 KVA PLANNED 24‐03‐2018 11:40:00 24‐03‐2018 13:39:00 1:59 0.00016528 MUs DB RELATED WORK2115 BLOCK _A‐SURAJMAL VIHAR, SURYA NIKETAN‐RISHAB VIHAR, BAHUBALI ENCLAVE‐ANAND VIHAR JLM 184 990 KVA PLANNED 26‐03‐2018 13:10:00 26‐03‐2018 14:42:26 1:32 0.00012778 MUs LOAD BALANCING
WORK2116 JHILMIL INDUSTRIAL AREA BLOCK A‐JHILMIL COLONY, BLOCK B‐CHANDU NAGAR, BLOCK D‐WEST KARAWAL NAGAR,
ARVIND NAGAR‐GHONDA, INDIRA CAMP‐JHILMIL INDUSTRIAL AREA, BLOCK B‐NEHRU VIHAR, BLOCK B‐NEW ASHOK NAGAR VSE, BLOCK G‐NEHRU VIHAR, BLOCK_1A‐REHAGAR PURA, BLOCK E‐INDIRA VIHAR, BLOCK D‐SHIV VIHAR, SHAHNI DEV MANDIR‐POCKET SG, BLOCK E‐BRIJ PURI, POCKET B‐GURU TEG BAHADUR ENCLAVE, BLOCK B‐MOTHER DAIRY, BLOCK U‐SHIV VIHAR, PANCHMAHAL APPARTMENT‐MOTHER DAIRY, BLOCK B‐VINOD NAGAR EAST, JAFFRABAD‐MAUJ PUR, BLOCK C1‐YAMUNA VIHAR, GOVT SCHOOL NO‐2‐DDA FLATS, BLOCK 13‐GEETA COLONY, BLOCK A‐KHAJURI KHAS, PKT A‐BLOCK B, KOTLA EXCT‐PHASE II, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK A‐GHONDA PATTI, BLOCK C2‐YAMUNA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK D‐RAM NAGAR, BLOCK 9‐KAILASH NAGAR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., BLOCK 25‐TRILOKPURI PHASE II, BLOCK B‐GANESH NAGAR, BLOCK J‐SILAMPUR COLONY, MAYUR VIHAR PHASE III, AMBEDKAR NAGAR‐SHAHDARA, BLOCK D‐HARIJAN BASTI, PKT A‐MAYUR VIHAR PHASE II, BLOCK F‐SHIV VIHAR, BLOCK D‐GOKUL PURI, MUSTAFABAD‐MUNGA NAGAR, BLOCK H‐JAGATPURI, LIG/MIG RES/NON
JLM 5205 630 KVA PLANNED 27‐03‐2018 12:50:00 27‐03‐2018 16:19:26 3:29 0.00029028 MUs WORK OF TPD CABLE SCHEME
2117 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, ANAND VIHAR BLOCK C, JAGRITI ENCLAVE‐ANAND VIHAR, BLOCK D‐ANAND VIHAR, ANAND VIHAR BLOCK B, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, SURAJMAL VIHAR‐VIVEK VIHAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
JLM 946 990 KVA PLANNED 22‐03‐2018 11:08:00 22‐03‐2018 17:41:47 6:33 0.00054583 MUs LT AB SCHEME WORK
2118 SHANTI VIHAR‐KARKAR DUMA JLM 37 400 KVA PLANNED 13‐03‐2018 10:15:00 13‐03‐2018 12:18:57 2:3 0.00034167 MUs2119 SHAHDARA JLM JLM 2 400 KVA PLANNED 13‐03‐2018 14:15:00 13‐03‐2018 16:47:00 2:32 0 MUs NEW PANEL
INSTALLATION 2120 VISHWAS NAGAR EXTN.‐SHAHDARA, VISHWAS NAGAR EXTN.‐SHAHDARA JLM 75 630 KVA PLANNED 06‐03‐2018 11:59:00 06‐03‐2018 15:07:38 3:8 0.00261111 MUs DB RELATED WORK2121 VILL KARKARDOOMA‐KARKAR DUMA JLM 216 990 KVA PLANNED 07‐03‐2018 10:30:00 07‐03‐2018 13:45:38 3:15 0.00270833 MUs DB RELATED WORK2122 VISHWAS NAGAR EXTN.‐SHAHDARA, VISHWAS NAGAR EXTN.‐SHAHDARA JLM 504 630 KVA PLANNED 09‐03‐2018 12:30:00 09‐03‐2018 14:47:59 2:17 0.00190278 MUs DB RELATED WORK2123 VISHWAS NAGAR EXTN.‐SHAHDARA JLM 157 630 KVA PLANNED 12‐03‐2018 10:48:00 12‐03‐2018 13:35:00 2:47 0.00231944 MUs DB RELATED WORK2124 VILL KARKARDOOMA‐KARKAR DUMA JLM 44 990 KVA PLANNED 14‐03‐2018 12:05:00 14‐03‐2018 15:04:00 2:59 0.00248611 MUs DB RELATED WORK2125 VISHWAS NAGAR EXTN.‐SHAHDARA, VISHWAS NAGAR EXTN.‐SHAHDARA JLM 77 630 KVA PLANNED 15‐03‐2018 12:25:00 15‐03‐2018 14:42:23 2:17 0.00190278 MUs DB RELATED WORK2126 J J COLONY‐ANAND VIHAR JLM 249 630 KVA PLANNED 07‐03‐2018 12:35:00 07‐03‐2018 17:47:31 5:12 0.00433333 MUs WORK OF TPD CABLE
SCHEME2127 J J COLONY‐ANAND VIHAR JLM 495 630 KVA PLANNED 09‐03‐2018 10:25:00 09‐03‐2018 16:25:00 6:0 0.005 MUs WORK OF TPD CABLE
SCHEME2128 J J COLONY‐ANAND VIHAR JLM 495 630 KVA PLANNED 10‐03‐2018 11:50:00 10‐03‐2018 16:55:00 5:5 0.00423611 MUs WORK OF TPD CABLE
SCHEME2129 J J COLONY‐ANAND VIHAR JLM 495 630 KVA PLANNED 14‐03‐2018 12:30:00 14‐03‐2018 15:01:36 2:31 0.00209722 MUs WORK OF TPD CABLE
SCHEME2130 ARJUN NAGAR EAST‐SHAHDARA JLM 24 400 KVA PLANNED 07‐03‐2018 12:15:00 07‐03‐2018 15:45:27 3:30 0.00291667 MUs SHIFTING OF LT ACB
ON CONSUMER REQUEST
2131 PRIYA ENCLAVE‐ANAND VIHAR, KIRAN VIHAR‐ANAND VIHAR, SHANTI VIHAR‐ANAND VIHAR JLM 147 990 KVA PLANNED 09‐03‐2018 12:03:00 09‐03‐2018 14:57:03 2:54 0.00024167 MUs REPLACEMENT OF 990 KVA DTR
2132 ANAND VIHAR BLOCK C, BLOCK D‐ANAND VIHAR, ANAND VIHAR BLOCK B JLM 18 990 KVA PLANNED 10‐03‐2018 13:20:00 10‐03‐2018 15:43:32 2:23 0.00198611 MUs LT AB SCHEME WORK.
2133 DAYA NAND VIHAR‐ANAND VIHAR JLM 6 630 KVA PLANNED 15‐03‐2018 12:30:00 15‐03‐2018 15:29:00 2:59 0.00248611 MUs LT AB SCHEME WORK.
2134 SHAHDARA JLM JLM 1 400 KVA PLANNED 12‐03‐2018 11:22:00 12‐03‐2018 13:27:00 2:5 0 MUs INSTALLATION OF RMU
2135 AGCR ENCLAVE‐INSTITUTIONAL AREA JLM 15 630 KVA PLANNED 22‐03‐2018 14:40:00 22‐03‐2018 15:28:01 0:48 0.00006667 MUs2136 SHANTI VIHAR‐KARKAR DUMA JLM 136 990 KVA PLANNED 03‐03‐2018 10:30:00 03‐03‐2018 11:56:24 1:26 0.00023889 MUs2137 VIGYAN LOK‐ANAND VIHAR JLM 85 400 KVA PLANNED 06‐03‐2018 10:12:00 06‐03‐2018 12:24:28 2:12 0.00036667 MUs2138 VIGYAN LOK‐ANAND VIHAR JLM 174 630 KVA PLANNED 08‐03‐2018 10:30:00 08‐03‐2018 12:43:00 2:13 0.00018472 MUs preventive
maintenance at gharonda appartment
2139 VISHWAS NAGAR EXTN.‐SHAHDARA JLM 46 630 KVA PLANNED 10‐03‐2018 10:05:00 10‐03‐2018 12:00:00 1:55 0.00031944 MUs2140 VILL KARKARDOOMA‐KARKAR DUMA, KARKARDOOMA COMPLAX‐KARKAR DUMA JLM 152 630 KVA PLANNED 24‐03‐2018 10:30:00 24‐03‐2018 12:28:00 1:58 0.00016389 MUs PREVENTIVE
MAINTENANCE AT S/STN 1 KKD COMPLEX
2141 VILL KARKARDOOMA‐KARKAR DUMA, KARKARDOOMA COMPLAX‐KARKAR DUMA JLM 69 630 KVA PLANNED 27‐03‐2018 10:21:00 27‐03‐2018 11:40:40 1:19 0.00021944 MUs2142 KARKARDOOMA COMPLAX‐KARKAR DUMA JLM 82 630 KVA PLANNED 31‐03‐2018 11:00:00 31‐03‐2018 12:05:00 1:4 0.00017778 MUs2143 BLOCK A‐VIVEK VIHAR, BLOCK B‐VIVEK VIHAR, TELEPHONE EXCHANGE‐TELEPHONE COLONY, SUPER BAZAR‐VIVEK
VIHAR BLOCK A, BLOCK D‐VIVEK VIHAR, JANTA COLONY‐VIVEK VIHARJLM 511 990 KVA PLANNED 08‐03‐2018 11:40:00 08‐03‐2018 16:05:00 4:25 0.00073611 MUs lt acb installation and
lt ab laying
2144 BLOCK C‐SURAJMAL VIHAR, BLOCK B‐SURAJMAL VIHAR, YAMUNA SPORTS COMPLEX‐VIVEK VIHAR JLM 207 990 KVA PLANNED 16‐03‐2018 12:35:00 16‐03‐2018 15:52:14 3:17 0.00027361 MUs BARE CONDUCTOR REPLACEMENT WORK.
2145 VIVEK VIHAR BLOCK C, BLOCK D‐VIVEK VIHAR JLM 552 630 KVA PLANNED 19‐03‐2018 13:45:00 19‐03‐2018 16:25:17 2:40 0.00222222 MUs SHIFTING OF LT POLE AT D 12
2146 PRATAP KHAND‐JHILMIL COLONY, GOVIND KHAND‐JHILMIL COLONY, JHILMIL COLONY BLOCK A, JHILMIL COLONY BLOCK B, ITI QUARTERS‐IT STAFF COLONY
JLM 633 990 KVA PLANNED 22‐03‐2018 12:44:00 22‐03‐2018 14:30:00 1:46 0.00088333 MUs DB RELATED WORK
2147 BLOCK A‐VIVEK VIHAR PHASE II, JHILMIL COLONY BLOCK A, GOVT GIRLS SECONDARY SCHOOL‐DDA FLATS, BLOCK E‐JHILMIL COLONY BLOCK E, BLOCK D‐JHILMIL COLONY BLOCK D
JLM 178 990 KVA PLANNED 23‐03‐2018 10:55:00 23‐03‐2018 12:45:28 1:50 0.00015278 MUs DB RELATED WORK
2148 JHILMIL COLONY BLOCK B, ESI HOSPITAL‐JHILMIL COLONY BLOCK C, VIVEKANAND FLATS‐DISTICT PARK, BLOCK C‐JHILMIL COLONY BLOCK C
JLM 578 990 KVA PLANNED 23‐03‐2018 12:26:00 23‐03‐2018 14:20:00 1:54 0.00015833 MUs DB RELATED WORK
2149 BLOCK B‐SURAJMAL VIHAR JLM 395 990 KVA PLANNED 26‐03‐2018 12:10:00 26‐03‐2018 17:55:00 5:45 0.00047917 MUs BARE CONDUCTOR REPLACEMENT WORK. AND DAMAGE POLE REPLACEMENT
2150 BLOCK E‐JHILMIL COLONY BLOCK E, ESI HOSPITAL‐JHILMIL COLONY BLOCK C JLM 421 990 KVA PLANNED 27‐03‐2018 11:03:00 27‐03‐2018 12:54:24 1:51 0.00015417 MUs DB RELATED WORK2151 VIVEK VIHAR BLOCK C, SUPER BAZAR‐VIVEK VIHAR BLOCK A, BLOCK D‐VIVEK VIHAR JLM 342 630 KVA PLANNED 28‐03‐2018 14:32:00 28‐03‐2018 15:09:45 0:37 0.00025694 MUs straight through IN
DAMAGE LT CABLE AT F766
2152 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK A‐VIVEK VIHAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
JLM 600 990 KVA PLANNED 20‐03‐2018 13:20:00 20‐03‐2018 15:20:00 2:0 0.00016667 MUs BARE CONDUCTOR REPLACEMENT WORK
2153 BLOCK E‐JHILMIL COLONY BLOCK E JLM 96 630 KVA PLANNED 15‐03‐2018 10:20:00 15‐03‐2018 11:48:26 1:28 0.00012222 MUs2154 PRATAP KHAND‐JHILMIL COLONY, LABOUR COURT‐SHIVA KHAND, GOVIND KHAND‐JHILMIL COLONY, JHILMIL COLONY
BLOCK A, EAST ROHTASH NAGAR‐SHAHDARAJLM 986 630 KVA PLANNED 20‐03‐2018 10:10:00 20‐03‐2018 13:10:00 3:0 0.0005 MUs
2155 BLOCK A‐VIVEK VIHAR JLM 47 990 KVA PLANNED 01‐03‐2018 12:00:00 01‐03‐2018 13:57:00 1:57 0.000325 MUs DB RELATED WORK2156 BLOCK D‐JHILMIL COLONY BLOCK D JLM 223 990 KVA PLANNED 06‐03‐2018 11:18:00 06‐03‐2018 13:31:07 2:13 0.00184722 MUs DB REPAIRING WORK2157 BLOCK D‐VIVEK VIHAR JLM 15 630 KVA PLANNED 07‐03‐2018 12:50:00 07‐03‐2018 14:00:00 1:10 0.00097222 MUs STUD ON POLE 2158 BLOCK_C‐SAVITA VIHAR JLM 48 990 KVA PLANNED 12‐03‐2018 11:11:00 12‐03‐2018 13:47:42 2:36 0.00216667 MUs LT AB SCHEME WORK.
2159 ESI HOSPITAL‐JHILMIL COLONY BLOCK C JLM 22 990 KVA PLANNED 13‐03‐2018 11:40:00 13‐03‐2018 13:21:34 1:41 0.00140278 MUs db repair work2160 BLOCK A‐VIVEK VIHAR JLM 47 990 KVA PLANNED 14‐03‐2018 12:35:00 14‐03‐2018 15:25:32 2:50 0.00236111 MUs BARE CONDUCTOR
REPLACEMENT2161 BLOCK 9‐GANDHI NAGAR, SHYAM COLONY‐KAILASH NAGAR SOUTH, KAILASH NAGAR SOUTH, BLOCK 9‐GANDHI
NAGARKRN 1775 990 KVA PLANNED 05‐03‐2018 10:50:00 05‐03‐2018 15:27:06 4:37 0.00130806 MUs
2162 GEETA COLONY, BLOCK 2‐GEETA COLONY, BLOCK 12‐GEETA COLONY, BLOCK 9‐GANDHI NAGAR, BLOCK 8A‐GEETA COLONY, BLOCK 4‐GEETA COLONY, BLOCK 8‐GEETA COLONY, BLOCK 2A‐GEETA COLONY, BLOCK 10‐GANDHI NAGAR, BLOCK 9‐GANDHI NAGAR, OLD GEETA COLONY‐BLOCK 8A
KRN 3595 3010 KVA PLANNED 12‐03‐2018 10:52:00 12‐03‐2018 13:48:00 2:56 0.00303111 MUs preventive maintenance
2163 AZAD NAGAR EAST, CHANDER NAGAR‐KRISHNA NAGAR, BLOCK A‐KRISHNA NAGAR, BLOCK 11‐GEETA COLONY, BLOCK 14‐GEETA COLONY, SHIVPURI‐JAGATPURI, RASHID MARKET‐JAGATPURI
KRN 955 990 KVA PLANNED 15‐03‐2018 10:10:00 15‐03‐2018 12:46:28 2:36 0.00065 MUs
2164 CHANDER NAGAR BLOCK C‐PANDIT PARK, BLOCK B‐GHONDALI, CHANDER NAGAR BLOCK C‐KRISHNA NAGAR EXTN., JHEEL‐JHEEL KHURENJA, BLOCK 11‐GEETA COLONY, BLOCK 12‐GEETA COLONY
KRN 448 630 KVA PLANNED 17‐03‐2018 10:08:00 17‐03‐2018 12:50:00 2:42 0.000675 MUs
2165 BLOCK 2‐GEETA COLONY, BLOCK 6‐GEETA COLONY, BLOCK 11‐GEETA COLONY KRN 1035 990 KVA PLANNED 03‐03‐2018 12:10:00 03‐03‐2018 14:36:53 2:26 0.00040556 MUs2166 GEETA COLONY, NEW LAHORE EXTENTION‐SHASTRI NAGAR, NEW LAHORE EXTENTION‐JJ COLONY, NEW LAHORE‐
SUNDER PARK, NEW LAHORE EXTENTION‐SAROJINI PARK, RANI GARDEN‐JJ COLONYKRN 1492 990 KVA PLANNED 08‐03‐2018 15:19:00 08‐03‐2018 16:15:00 0:56 0.00015556 MUs
2167 ARAM PARK‐GEETA COLONY, SAROJINI PARK‐GEETA COLONY, WEST LAXMI MARKET KHUREJI‐ARAM PARK, SAROJINI PARK‐ARAM PARK
KRN 1590 990 KVA PLANNED 03‐03‐2018 10:24:00 03‐03‐2018 13:35:27 3:11 0.00063667 MUs
2168 GEETA COLONY, BLOCK 9‐GANDHI NAGAR, YAMUNA RIVER‐BLOCK 9 KRN 818 630 KVA PLANNED 10‐03‐2018 10:05:00 10‐03‐2018 12:42:37 2:37 0.00052333 MUs2169 GEETA COLONY KRN 141 2060 KVA PLANNED 26‐03‐2018 11:57:00 26‐03‐2018 14:18:00 2:21 0.00027417 MUs2170 BLOCK 5‐GEETA COLONY, BLOCK 9‐GANDHI NAGAR, SHYAM COLONY‐KAILASH NAGAR SOUTH, BLOCK 9‐GANDHI
NAGARKRN 3473 3600 KVA PLANNED 28‐03‐2018 10:31:00 28‐03‐2018 14:49:59 4:18 0.001505 MUs
2171 BLOCK 13‐GEETA COLONY, BLOCK 15‐GEETA COLONY, BLOCK 14‐GEETA COLONY KRN 773 990 KVA PLANNED 31‐03‐2018 10:12:00 31‐03‐2018 12:45:00 2:33 0.00051 MUs2172 KHUREJI KHAS‐SWASTHYA VIHAR, NEW GOVIND PURA‐JAGATPURI, BALDEV PARK‐JAGATPURI KRN 1362 990 KVA PLANNED 21‐03‐2018 11:40:00 21‐03‐2018 15:21:59 3:41 0.00153472 MUs2173 CHANDER NAGAR BLOCK F‐GOPAL PARK, BLOCK E‐CHANDAR NAGAR, BLOCK D‐CHANDAR NAGAR, BLOCK F‐CHANDAR
NAGARKRN 974 990 KVA PLANNED 20‐03‐2018 11:22:00 20‐03‐2018 13:56:42 2:34 0.00042778 MUs
2174 BLOCK A‐BALDEV PARK EAST, OLD SEELAMPUR, BLOCK E‐ANARKALI COLONY NORTH, BLOCK B‐SOUTH ANARKALI COLONY, BLOCK B‐JAGATPURI, BLOCK D‐JAGATPURI, BLOCK K‐JAGATPURI, EXTENTION‐JAGATPURI, BLOCK A‐ANARKALI COLONY NORTH, BLOCK D‐SOUTH ANARKALI COLONY
KRN 766 990 KVA PLANNED 14‐03‐2018 10:14:00 14‐03‐2018 12:50:00 2:36 0.00086667 MUs
2175 KHUREJI KHAS‐SWASTHYA VIHAR, BRIJ PURI‐SWASTHYA VIHAR, RADHE SHYAM PARK‐SWASTHYA VIHAR, GOVIND PURA OLD‐SWASTHYA VIHAR, OLD BRIJPURI‐SWASTHYA VIHAR
KRN 921 990 KVA PLANNED 20‐03‐2018 10:16:00 20‐03‐2018 13:30:33 3:14 0.00107778 MUs
2176 BLOCK D‐RAM NAGAR, BLOCK D‐RADHEPURI EXTENSION, BLOCK E‐RADHEPURI EXTENSION, BLOCK D‐ANARKALI COLONY NORTH, BLOCK C‐NEW LAYALPUR COLONY, BLOCK C‐RAM NAGAR, BLOCK E‐RAM NAGAR
KRN 1394 990 KVA PLANNED 01‐03‐2018 10:09:00 01‐03‐2018 13:00:00 2:51 0.00095 MUs
2177 MAUSAM VIHAR‐SWASTHYA VIHAR, SUKH VIHAR‐SWASTHYA VIHAR, RADHE SHYAM PARK EXTN.‐SWASTHYA VIHAR, JITAR NAGAR BLOCK C‐GAGAN VIHAR
KRN 580 630 KVA PLANNED 27‐03‐2018 10:05:00 27‐03‐2018 12:54:41 2:49 0.00103278 MUs
2178 BLOCK E‐CHANDAR NAGAR, BLOCK D‐AJIT NAGAR, BLOCK 9‐KAILASH NAGAR, OLD SEELAMPUR DHRAM PURA KRN 1073 990 KVA PLANNED 05‐03‐2018 10:23:00 05‐03‐2018 13:41:42 3:18 0.00121 MUs2179 OLD SEELAMPUR, RAGUWARPURA‐SUBHASH MOHALLA II, RAGHUBARPURA NO 2‐SEELAMPUR KRN 488 630 KVA PLANNED 16‐03‐2018 12:07:00 16‐03‐2018 13:57:37 1:50 0.00174167 MUs2180 OLD SEELAMPUR, BLOCK D‐AJIT NAGAR KRN 835 990 KVA PLANNED 17‐03‐2018 11:54:00 17‐03‐2018 14:45:23 2:51 0.0016625 MUs2181 DHARAM PURA‐KAILASH NAGAR, BLOCK 9‐DHARAM PURA, BLOCK 9‐KAILASH NAGAR, AJIT NAGAR‐KAILASH NAGAR,
DHRAM PURA‐KAILASH NAGAR, BLOCK 9‐GANDHI NAGARKRN 941 990 KVA PLANNED 17‐03‐2018 15:10:00 17‐03‐2018 16:34:42 1:24 0.00060667 MUs
2182 BLOCK 9‐GANDHI NAGAR, BLOCK 9‐SUBHASH MOHALLA_I, GANDHI NAGAR‐KAILASH NAGAR, BLOCK 9‐GANDHI NAGAR
KRN 980 990 KVA PLANNED 19‐03‐2018 10:53:00 19‐03‐2018 15:53:58 5:0 0.00083333 MUs
2183 OLD SEELAMPUR, BLOCK D‐AJIT NAGAR, RAGUWARPURA‐SUBHASH MOHALLA II, SUBHASH MOHALLA‐SEELAMPUR, BLOCK 9‐KAILASH NAGAR, OLD SEELAMPUR DHRAM PURA
KRN 1102 630 KVA PLANNED 20‐03‐2018 12:42:00 20‐03‐2018 16:25:00 3:43 0.00061944 MUs
2184 DHARAM PURA‐KAILASH NAGAR, BLOCK 9‐SUBHASH MOHALLA_I, SUBHASH MOHALLA‐SEELAMPUR, BLOCK 9‐KAILASH NAGAR, GANDHI NAGAR‐KAILASH NAGAR
KRN 765 990 KVA PLANNED 21‐03‐2018 12:14:00 21‐03‐2018 14:03:16 1:49 0.00024222 MUs
2185 BLOCK D‐AJIT NAGAR KRN 1026 990 KVA PLANNED 22‐03‐2018 11:09:00 22‐03‐2018 14:40:00 3:31 0.0015825 MUs2186 BLOCK C‐KRISHNA NAGAR, BLOCK 9‐SUBHASH MOHALLA_I, RAGUWARPURA‐SUBHASH MOHALLA II, RAGHUBARPURA
NO 2‐SEELAMPUR, BLOCK 10‐RAM NAGAR, BLOCK 10‐RAGHUBARPURA NO 1KRN 302 990 KVA PLANNED 22‐03‐2018 14:24:00 22‐03‐2018 16:05:40 1:41 0.00039278 MUs
2187 RAGHUVIR PURA‐SHANKAR NAGAR, GEETA COLONY, OLD SEELAMPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, RAGHUBARPURA NO 2‐SEELAMPUR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, RAGHUVIR PURA‐KANTI NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KRN 2898 1980 KVA PLANNED 07‐03‐2018 12:02:00 07‐03‐2018 14:53:03 2:51 0.00152 MUs
2188 OLD SEELAMPUR, RAGHUBARPURA NO 2‐SEELAMPUR KRN 488 630 KVA PLANNED 23‐03‐2018 15:37:00 23‐03‐2018 16:32:00 0:54 0.0006 MUs2189 BLOCK 9‐KAILASH NAGAR, GANDHI NAGAR‐KAILASH NAGAR, BLOCK 9‐GANDHI NAGAR KRN 388 630 KVA PLANNED 24‐03‐2018 12:00:00 24‐03‐2018 14:25:20 2:25 0.00128889 MUs2190 GANDHI NAGAR‐KAILASH NAGAR, BLOCK 9‐GANDHI NAGAR, BLOCK 9‐SUBHASH MOHALLA_I, BLOCK 9‐GANDHI
NAGARKRN 980 990 KVA PLANNED 26‐03‐2018 11:20:00 26‐03‐2018 14:30:00 3:10 0.00063333 MUs
2191 OLD SEELAMPUR, BLOCK D‐AJIT NAGAR, RAGUWARPURA‐SUBHASH MOHALLA II, SUBHASH MOHALLA‐SEELAMPUR, BLOCK 9‐KAILASH NAGAR, OLD SEELAMPUR DHRAM PURA
KRN 1100 630 KVA PLANNED 27‐03‐2018 11:13:00 27‐03‐2018 15:17:00 4:4 0.00271111 MUs
2192 DHARAM PURA‐KAILASH NAGAR, BLOCK 9‐DHARAM PURA, BLOCK 9‐KAILASH NAGAR, AJIT NAGAR‐KAILASH NAGAR, DHRAM PURA‐KAILASH NAGAR, BLOCK 9‐GANDHI NAGAR
KRN 941 990 KVA PLANNED 28‐03‐2018 11:26:00 28‐03‐2018 14:58:45 3:32 0.00088333 MUs
2193 RAGUWARPURA‐SUBHASH MOHALLA II, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK 10‐RAGHUBARPURA NO 1 KRN 940 990 KVA PLANNED 12‐03‐2018 10:22:00 12‐03‐2018 12:45:40 2:23 0.00039722 MUs2194 BLOCK B‐JAGATPURI, KAILASH NAGAR, BLOCK 9‐DHARAM PURA, BLOCK 9‐KAILASH NAGAR, YAMUNA RIVER‐KAILASH
NAGAR, JITAR NAGAR BLOCK C‐GAGAN VIHARKRN 4279 2970 KVA PLANNED 14‐03‐2018 12:15:00 14‐03‐2018 15:55:40 3:40 0.00281111 MUs PREVENTIVE
MAINTENANCE2195 BLOCK 9‐GANDHI NAGAR, BLOCK 9‐SUBHASH MOHALLA_I, BLOCK 9‐RAGHUBARPURA KRN 868 990 KVA PLANNED 19‐03‐2018 10:18:00 19‐03‐2018 13:03:29 2:45 0.00091667 MUs2196 CHANDER NAGAR‐KRISHNA NAGAR, OLD SEELAMPUR, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK 10‐
RAGHUBARPURA NO 1KRN 3640 3240 KVA PLANNED 21‐03‐2018 10:48:00 21‐03‐2018 17:21:00 6:33 0.01048 MUs
2197 MAHILA COLONY‐SEELAMPUR, CHAND MOHALLA‐RAJGARH COLONY KRN 654 990 KVA PLANNED 09‐03‐2018 10:31:00 09‐03‐2018 13:40:00 3:9 0.00063 MUs2198 KAILASH NAGAR, OLD SEELAMPUR, CHANDER NAGAR BLOCK F‐GOPAL PARK, BLOCK D‐AJIT NAGAR, BLOCK 9‐DHARAM
PURA, RAGUWARPURA‐SUBHASH MOHALLA II, SUBHASH MOHALLA‐SEELAMPUR, BLOCK 9‐KAILASH NAGAR, OLD SEELAMPUR DHRAM PURA, AJIT NAGAR‐KAILASH NAGAR
KRN 6667 3600 KVA PLANNED 23‐03‐2018 11:07:00 23‐03‐2018 14:19:28 3:12 0.00688 MUs
2199 MAHILA COLONY‐SEELAMPUR KRN 326 990 KVA PLANNED 26‐03‐2018 10:03:00 26‐03‐2018 12:49:36 2:46 0.00055333 MUs2200 DHARAM PURA‐KAILASH NAGAR, BLOCK 9‐SUBHASH MOHALLA_I, RAGUWARPURA‐SUBHASH MOHALLA II,
RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK 10‐RAM NAGAR, BLOCK 9‐KAILASH NAGAR, GANDHI NAGAR‐KAILASH NAGAR, OLD SEELAMPUR‐SUBHASH MOHALLA II, BLOCK 9‐GANDHI NAGAR
KRN 2495 1620 KVA PLANNED 31‐03‐2018 11:59:00 31‐03‐2018 14:59:00 3:0 0.0065 MUs
2201 WEST AZAD NAGAR, SHANKAR NAGAR EXTN‐AZAD NAGAR KRN 883 990 KVA PLANNED 16‐03‐2018 11:08:00 16‐03‐2018 17:29:02 6:21 0.00370417 MUs2202 SHANKAR NAGAR EXTN‐AZAD NAGAR, WEST AZAD NAGAR, SHANKAR NAGAR‐AZAD NAGAR, BLOCK X‐RAJGARH
COLONYKRN 1386 990 KVA PLANNED 17‐03‐2018 10:39:00 17‐03‐2018 11:37:00 0:58 0.00009667 MUs
2203 WEST AZAD NAGAR, RAGHUVIR PURA‐SHANKAR NAGAR, BLOCK X‐RAJGARH COLONY, BLOCK A‐KRISHNA NAGAR, SHANKAR NAGAR‐AZAD NAGAR
KRN 808 990 KVA PLANNED 19‐03‐2018 12:45:00 19‐03‐2018 15:34:30 2:49 0.00046944 MUs
2204 SHANKAR NAGAR EXTN‐AZAD NAGAR, WEST AZAD NAGAR, SHANKAR NAGAR‐AZAD NAGAR, BLOCK X‐RAJGARH COLONY
KRN 1386 990 KVA PLANNED 23‐03‐2018 14:20:00 23‐03‐2018 15:42:08 1:22 0.00041 MUs
2205 MAHILA COLONY‐SEELAMPUR, BLOCK 10‐RAGHUBARPURA NO 1, CHAND MOHALLA‐RAJGARH COLONY, BLOCK X‐RAJGARH COLONY
KRN 1526 630 KVA PLANNED 16‐03‐2018 10:12:00 16‐03‐2018 12:55:00 2:43 0.00113194 MUs
2206 WEST AZAD NAGAR, BLOCK A‐KRISHNA NAGAR, BLOCK D‐KRISHNA NAGAR KRN 904 990 KVA PLANNED 06‐03‐2018 12:40:00 06‐03‐2018 16:00:00 3:20 0.00044444 MUs s/stn‐ bhagat singh park
2207 WEST AZAD NAGAR, BLOCK A‐KRISHNA NAGAR, BLOCK D‐KRISHNA NAGAR, SHANKAR NAGAR‐AZAD NAGAR KRN 904 990 KVA PLANNED 09‐03‐2018 11:43:00 09‐03‐2018 13:57:14 2:14 0.00040944 MUs s/stn= bhagat singh park
2208 SHANKAR NAGAR EXTN‐AZAD NAGAR, OLD SEELAMPUR, BLOCK X‐RAJGARH COLONY, RAGHUBARPURA NO 2‐SEELAMPUR, CHAND MOHALLA‐RAJGARH COLONY
KRN 5321 3600 KVA PLANNED 05‐03‐2018 11:12:00 05‐03‐2018 11:25:39 0:13 0.00009028 MUs INSTALLATION OF FPI (FAULT PASSAGE INDICATOR) ON MAIN CABLE
2209 BLOCK A‐KANTI NAGAR NORTH BLOCK A, BLOCK C‐KANTI NAGAR NORTH BLOCK C, KANTI NAGAR SOUTH‐AZAD NAGAR, SHANKAR NAGAR WEST‐AZAD NAGAR
KRN 1656 990 KVA PLANNED 22‐03‐2018 10:10:00 22‐03‐2018 13:17:38 3:7 0.00181806 MUs
2210 KANTI NAGAR SOUTH‐AZAD NAGAR KRN 195 630 KVA PLANNED 06‐03‐2018 10:25:00 06‐03‐2018 13:44:43 3:19 0.00082917 MUs2211 RAGHUVIR PURA‐SHANKAR NAGAR, SHANKAR NAGAR EXTN‐AZAD NAGAR KRN 882 990 KVA PLANNED 23‐03‐2018 10:16:00 23‐03‐2018 13:03:43 2:47 0.00092778 MUs2212 RAGHUVIR PURA‐SHANKAR NAGAR, RAGHUVIR PURA‐KANTI NAGAR, OLD SEELAMPUR KRN 934 990 KVA PLANNED 28‐03‐2018 10:12:00 28‐03‐2018 12:13:14 2:1 0.00117639 MUs2213 BLOCK D‐KRISHNA NAGAR, BLOCK A‐KRISHNA NAGAR, BLOCK E‐KRISHNA NAGAR KRN 784 990 KVA PLANNED 13‐03‐2018 10:16:00 13‐03‐2018 12:43:57 2:27 0.0006125 MUs2214 CHANDER NAGAR BLOCK C‐KRISHNA NAGAR EXTN., CHANDER NAGAR BLOCK D‐KRISHNA NAGAR EXTN. KRN 164 990 KVA PLANNED 05‐03‐2018 13:07:00 05‐03‐2018 16:59:38 3:52 0.00128889 MUs2215 CHANDER NAGAR BLOCK C‐KRISHNA NAGAR EXTN., CHANDER NAGAR BLOCK D‐SHASTRI PARK, BLOCK D‐RAM NAGAR
EXTN., BLOCK 4‐GEETA COLONY, ROHITASH NAGAR‐SILAMPUR, BLOCK F‐RAM NAGAR, CHANDER NAGAR BLOCK D‐KRISHNA NAGAR EXTN.
KRN 747 990 KVA PLANNED 12‐03‐2018 10:33:00 12‐03‐2018 14:40:00 4:7 0.0018525 MUs lt cable repair WORK
2216 CHANDER NAGAR‐KRISHNA NAGAR, CHANDER NAGAR BLOCK D‐KRISHNA NAGAR EXTN., CHANDER NAGAR BLOCK C‐KRISHNA NAGAR EXTN.
KRN 945 990 KVA PLANNED 14‐03‐2018 11:20:00 14‐03‐2018 14:58:57 3:38 0.00048444 MUs
2217 CHANDER NAGAR BLOCK C‐KRISHNA NAGAR EXTN., CHANDER NAGAR BLOCK D‐SHASTRI PARK, BLOCK D‐RAM NAGAR EXTN., BLOCK 10‐GANDHI NAGAR, BLOCK F‐RAM NAGAR, CHANDER NAGAR BLOCK D‐KRISHNA NAGAR EXTN.
KRN 747 990 KVA PLANNED 15‐03‐2018 12:19:00 15‐03‐2018 15:45:16 3:26 0.00074389 MUs lt cable repair WORK
2218 AZAD NAGAR EAST, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK E‐KRISHNA NAGAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, OLD SEELAMPUR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KRN 1202 990 KVA PLANNED 21‐03‐2018 10:29:00 21‐03‐2018 12:45:00 2:16 0.00068 MUs
2219 CHANDER NAGAR BLOCK C‐PANDIT PARK, BLOCK A‐KRISHNA NAGAR, CHANDER NAGAR BLOCK C‐KRISHNA NAGAR EXTN., JHEEL‐JHEEL KHURENJA, BLOCK B‐KRISHNA NAGAR BLOCK B, BLOCK A‐KRISHNA NAGAR BLOCK B, JHEEL‐GHONDALI, EKTA APPARTMENT‐RANI GARDEN, JHEEL‐KRISHNA NAGAR BLOCK B
KRN 1279 990 KVA PLANNED 07‐03‐2018 10:22:00 07‐03‐2018 13:26:32 3:4 0.00076667 MUs
2220 BLOCK H‐KRISHNA NAGAR, BLOCK F‐KRISHNA NAGAR, BLOCK J‐KRISHNA NAGAR EAST, JHEEL‐KRISHNA NAGAR BLOCK B
KRN 1137 990 KVA PLANNED 24‐03‐2018 10:14:00 24‐03‐2018 12:50:00 2:36 0.00091 MUs
2221 GAGAN VIHAR‐JAGATPURI, JITAR NAGAR BLOCK C‐GAGAN VIHAR KRN 1130 990 KVA PLANNED 08‐03‐2018 11:01:00 08‐03‐2018 14:24:00 3:23 0.00157889 MUs2222 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐TUKMIRPUR, BLOCK F‐NEHRU
VIHAR, BLOCK C‐TUKMIRPUR, BLOCK B‐NEW CHAUHAN PUR, BLOCK D‐OLD MUSTAFABAD, BLOCK Z‐NEHRU VIHAR, BLOCK M‐NEHRU VIHAR, BLOCK T‐NEHRU VIHAR, BLOCK B‐HARIJAN BASTI, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, OLD MUSTAFABAD‐ BLOCK C‐DAYALPUR, BLOCK A‐RAMA GARDEN, PKT M‐BLOCK D, BLOCK N‐SHIV VIHAR, BLOCK G‐NEHRU VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DEEKSHA MAHILA COLLAGE‐DAYALPUR EXTN., BLOCK E‐DAYALPUR, BLOCK T‐NEHRU VIHAR, BLOCK A‐NEHRU VIHAR, BHAGAT NAGAR‐DAYALPUR, FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, BLOCK H‐OLD MUSTAFABAD, BLOCK B‐NEW CHAUHAN PUR, BLOCK D‐TUKMIRPUR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK A‐NEHRU VIHAR, BLOCK B‐NEHRU VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐HARIJAN BASTI, BLOCK M‐OLD MUSTAFABAD, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐OLD MUSTAFABAD, BLOCK T‐OLD MUSTAFABAD, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐
KWN 10444 6890 KVA PLANNED 09‐03‐2018 10:15:00 09‐03‐2018 12:40:00 2:25 0.0018125 MUs RMU EARTHING & S/STN MAINTENANCE
2223 BLOCK A‐CHAND BAGH, BLOCK B‐BRIJ PURI, BLOCK E‐BRIJ PURI, BLOCK C‐BRIJ PURI, BLOCK B‐CHAND BAGH, SANT NIRANKARI BHAVAN‐GANGA VIHAR KWN, NIRAHKARI BHAVAN (HOUSE)‐BRIJ PURI, BLOCK D‐BRIJ PURI, BLOCK F‐BRIJ PURI
KWN 4982 4370 KVA PLANNED 12‐03‐2018 11:10:00 12‐03‐2018 13:00:00 1:50 0.00152778 MUs DB REPAIR & EARTHING CONNECT IN RMU & S/STN MAINTENANCE
2224 BLOCK B‐JOHRI PUR, BLOCK A‐JOHRI PUR, BLOCK F‐INDIRA VIHAR, BHAGIRATHI VIHAR KWN 863 0 KVA PLANNED 13‐03‐2018 10:03:00 13‐03‐2018 16:13:00 6:10 0.00154167 MUs2225 BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BHAGIRATHI VIHAR KWN 159 630 KVA PLANNED 13‐03‐2018 09:45:00 13‐03‐2018 14:53:23 5:8 0.00188222 MUs2226 JOHRI ENCLAVE‐BHAGIRATHI VIHAR, BLOCK B‐MAHALAXMI ENCLAVE, JOHRI ENCLAVE‐BHAGIRATHI VIHAR KWN 25 0 KVA PLANNED 14‐03‐2018 10:10:00 14‐03‐2018 16:12:16 6:2 0.00301667 MUs2227 BLOCK A‐BABU NAGAR, BLOCK B‐GOVIND VIHAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE,
PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐MAHALAXMI ENCLAVE, BLOCK C‐GOVIND VIHAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 1087 990 KVA PLANNED 12‐03‐2018 11:25:00 12‐03‐2018 15:45:00 4:20 0.00144444 MUs dt cleaning
2228 BLOCK G‐BHAGIRATHI VIHAR, BLOCK F‐BHAGIRATHI VIHAR, BLOCK E‐BHAGIRATHI VIHAR, BLOCK D‐BHAGIRATHI VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BLOCK C‐BHAGIRATHI VIHAR
KWN 1271 630 KVA PLANNED 15‐03‐2018 09:57:00 15‐03‐2018 13:38:42 3:41 0.00184167 MUs
2229 BLOCK 7‐GEETA COLONY, BLOCK 5‐GEETA COLONY, GEETA COLONY, BHAGIRATHI VIHAR KWN 149 0 KVA PLANNED 16‐03‐2018 10:03:00 16‐03‐2018 15:45:16 5:42 0.001425 MUs
2230 BLOCK C‐MAHALAXMI ENCLAVE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK D‐OLD MUSTAFABAD, BLOCK Z‐NEHRU VIHAR, BLOCK M‐NEHRU VIHAR, BLOCK T‐NEHRU VIHAR, BLOCK B‐GOVIND VIHAR, BLOCK A‐SHASTRI PARK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, OLD MUSTAFABAD‐ BLOCK C‐DAYALPUR, BLOCK N‐SHIV VIHAR, BLOCK F‐INDIRA VIHAR, MAUJ PUR COMPLEX 1, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A‐BABU NAGAR, BLOCK T‐NEHRU VIHAR, BLOCK C‐GOVIND VIHAR, BLOCK C‐GHONDA, NORTH GHONDA, BHAGAT NAGAR‐DAYALPUR, GHONDA PATTI CHAUHAN, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK M‐SHIV VIHAR, BLOCK H‐OLD MUSTAFABAD, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK M‐OLD MUSTAFABAD, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐OLD MUSTAFABAD, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
KWN 11616 6880 KVA PLANNED 16‐03‐2018 11:00:00 16‐03‐2018 11:58:05 0:58 0.00177222 MUs
2231 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐BHAGIRATHI VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK B‐BHAGIRATHI VIHAR
KWN 1250 1260 KVA PLANNED 21‐03‐2018 10:45:00 21‐03‐2018 13:44:00 2:59 0.00099444 MUs rmu earthing & s/stn maintenance
2232 PKT B‐BLOCK A, BLOCK B‐GOKUL PURI, BLOCK A‐GOKUL PURI, SANT NIRANKARI BHAVAN‐GANGA VIHAR KWN KWN 1176 990 KVA PLANNED 05‐03‐2018 10:10:00 05‐03‐2018 13:05:00 2:55 0.00145833 MUs MAINTENANCE OF 990 KVA TR (OIL TOP UP BREATHER REPLACEMENT, TAPPING OF HT/LT BUSHING DONE
2233 TUNDA NAGAR‐BHAGIRATHI VIHAR, BHARAT‐AMBEDKAR NAGAR, BLOCK B‐MAHALAXMI ENCLAVE KWN 43 990 KVA PLANNED 06‐03‐2018 10:20:00 06‐03‐2018 14:00:00 3:40 0.00183333 MUs2234 BLOCK C‐GOKUL PURI, BLOCK D‐GOKUL PURI, BLOCK A‐GOKUL PURI, BLOCK B‐GANGA VIHAR KWN 1584 990 KVA PLANNED 08‐03‐2018 10:20:00 08‐03‐2018 13:10:00 2:50 0.00236111 MUs MAINTENANCE OF
990+990 KVA TR (OIL TOP UP BREATHER REPLACEMENT, TAPPING OF HT/LT BUSHING DONE)
2235 GEETA COLONY, BLOCK B‐BHAGIRATHI VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 563 630 KVA PLANNED 09‐03‐2018 10:15:00 09‐03‐2018 13:30:00 3:15 0.001625 MUs MAINTENANCE OF 630 KVA TR (OIL TOP UP BREATHER REPLACEMENT, TAPPING OF HT/LT BUSHING DONE)
2236 PKT C‐BLOCK C, BLOCK B‐GANGA VIHAR, PKT G‐BLOCK A, BLOCK E‐GANGA VIHAR, PKT G‐BLOCK C, PKT A‐BLOCK C, PKT B‐BLOCK C, PKT A‐BLOCK A, PKT B‐BLOCK A
KWN 1667 630 KVA PLANNED 10‐03‐2018 10:15:00 10‐03‐2018 14:05:11 3:50 0.00191667 MUs
2237 BLOCK F‐WEST KARAWAL NAGAR, BLOCK K‐WEST KARAWAL NAGAR, BLOCK D‐DLF ANKUR VIHAR, BLOCK F & G‐BHAGAT SINGH COLONY, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, WEST KARAWAL NAGAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK F‐BHAGAT SINGH COLONY, BLOCK A‐BHAGAT SINGH COLONY, BLOCK C‐BHAGAT SINGH COLONY, BLOCK H‐BHAGAT SINGH COLONY, BLOCK C‐BHAGAT SINGH COLONY, BLOCK I‐BHAGAT SINGH COLONY, BLOCK E‐BHAGAT SINGH COLONY, BLOCK A‐KARAWAL NAGAR (DEHROTI), BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK K‐KARAWAL NAGAR (DEHROTI), BLOCK D‐WEST KARAWAL NAGAR, BLOCK D‐WEST KARAWAL NAGAR
KWN 4885 5285 KVA PLANNED 05‐03‐2018 11:25:00 05‐03‐2018 14:10:00 2:45 0.00160417 MUs DP REPAIR & DB BOX REPAIR & EIRTHING PROPER DONE
2238 BHAGIRATHI VIHAR, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, BLOCK F‐SHIV VIHAR KWN 580 0 KVA PLANNED 12‐03‐2018 10:17:00 12‐03‐2018 15:37:00 5:20 0.00177778 MUs 13 HVDS 25 KVA TRF & 17 no. db & CIRCUIT MAINTENANCE
2239 LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK A‐RAMA GARDEN, BLOCK N‐SHIV VIHAR, BLOCK A‐PREM VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
KWN 1253 630 KVA PLANNED 05‐03‐2018 11:25:00 05‐03‐2018 14:00:00 2:35 0.00086111 MUs dt cleaning
2240 BLOCK B‐BHAGAT SINGH COLONY, BLOCK A‐BHAGAT SINGH COLONY, BLOCK H‐BHAGAT SINGH COLONY, BLOCK I‐BHAGAT SINGH COLONY, BLOCK E‐BHAGAT SINGH COLONY
KWN 452 630 KVA PLANNED 07‐03‐2018 11:16:00 07‐03‐2018 16:00:00 4:44 0.00157778 MUs
2241 BLOCK P‐SHIV VIHAR, BHAGIRATHI VIHAR, BHARAT‐AMBEDKAR NAGAR, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR
KWN 1664 0 KVA PLANNED 15‐03‐2018 10:20:00 15‐03‐2018 16:48:16 6:28 0.00215556 MUs
2242 BLOCK U‐SHIV VIHAR, BLOCK H‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR, BLOCK O‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK Q‐SHIV VIHAR, BLOCK H‐SHIV VIHAR
KWN 1836 0 KVA PLANNED 17‐03‐2018 10:03:00 17‐03‐2018 16:02:06 5:59 0.00149583 MUs
2243 LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAGAT NAGAR‐DAYALPUR, BHAJANPURA‐DAYALPUR, BLOCK A‐PREM VIHAR, BLOCK B‐NEW CHAUHAN PUR
KWN 1033 0 KVA PLANNED 19‐03‐2018 10:02:00 19‐03‐2018 16:18:23 6:16 0.00208889 MUs
2244 BLOCK K‐WEST KARAWAL NAGAR, PKT B‐BLOCK B, PKT A‐BLOCK E, BLOCK A‐RAMA GARDEN, BLOCK B‐NEW CHAUHAN PUR, BLOCK A‐HARIJAN BASTI, BLOCK 3A‐SADAT PUR, PKT EA‐BLOCK B, PKT D‐BLOCK B, BLOCK B‐BHAGAT SINGH COLONY, BLOCK A‐KARAWAL NAGAR (DEHROTI), BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK K‐KARAWAL NAGAR (DEHROTI), FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK B‐HARIJAN BASTI, PKT D‐BLOCK A, PKT C‐BLOCK A, PKT E‐BLOCK A, PKT B‐BLOCK A, PKT G‐BLOCK A, BLOCK D‐WEST KARAWAL NAGAR, BLOCK B‐NEW CHAUHAN PUR
KWN 2403 3600 KVA PLANNED 19‐03‐2018 10:08:00 19‐03‐2018 12:06:30 1:58 0.00458889 MUs
2245 PKT W‐BLOCK A, BLOCK U‐SHIV VIHAR, PKT C‐SHIV VIHAR, PKT X‐SHIV VIHAR, PKT R‐BLOCK A, PKT A‐BLOCK A, PKT F‐BLOCK A, BLOCK B‐SHIV VIHAR, PKT C‐BLOCK B, PKT D‐BLOCK B, PKT W‐BLOCK A
KWN 2966 0 KVA PLANNED 20‐03‐2018 10:06:00 20‐03‐2018 16:03:00 5:57 0.0014875 MUs
2246 BLOCK A‐HARIJAN BASTI, BLOCK A‐RAMA GARDEN, FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK B‐HARIJAN BASTI, BLOCK B‐NEW CHAUHAN PUR
KWN 677 990 KVA PLANNED 03‐03‐2018 10:20:00 03‐03‐2018 13:19:14 2:59 0.00149167 MUs
2247 BLOCK B‐BHAGAT SINGH COLONY, BLOCK H‐BHAGAT SINGH COLONY, BLOCK B‐PRAKASH VIHAR KWN 713 990 KVA PLANNED 07‐03‐2018 10:07:00 07‐03‐2018 13:31:44 3:24 0.00113333 MUs2248 LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐
SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK A‐RAMA GARDEN, BLOCK N‐SHIV VIHAR, BLOCK A‐PREM VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
KWN 1253 630 KVA PLANNED 01‐03‐2018 10:15:00 01‐03‐2018 12:45:00 2:30 0.00145833 MUs MAINTENANCE OF 630+630 KVA TR (OIL TOP UP BREATHER REPLACEMENT, TAPPING OF HT/LT BUSHING DONE)
2249 BLOCK H‐SHIV VIHAR, BLOCK J‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK S‐SHIV VIHAR, BLOCK K‐SHIV VIHAR KWN 1307 0 KVA PLANNED 24‐03‐2018 10:05:00 24‐03‐2018 15:38:42 5:33 0.0013875 MUs2250 BLOCK C‐PATEL VIHAR, BLOCK CN‐MANGALAM VIHAR, BLOCK A‐MANGALAM VIHAR, BLOCK C‐PATEL VIHAR KWN 321 400 KVA PLANNED 27‐03‐2018 09:57:00 27‐03‐2018 12:33:00 2:36 0.00078 MUs2251 PKT H‐BLOCK E, BLOCK D‐KHAJURI KHAS, BLOCK A‐KHAJURI KHAS, BLOCK B‐CHANDU NAGAR, BLOCK B‐KHAJURI KHAS,
LIG/MIG RES/NON COMM AREA‐BLOCK BKWN 3015 2020 KVA PLANNED 07‐03‐2018 10:35:00 07‐03‐2018 13:35:00 3:0 0.0015 MUs
2252 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 1598 0 KVA PLANNED 10‐03‐2018 10:20:00 10‐03‐2018 13:12:30 2:52 0.00143333 MUs
2253 LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, CHAUHAN PATTI‐VIJAY VIHAR KWN 292 400 KVA PLANNED 12‐03‐2018 10:35:00 12‐03‐2018 14:30:00 3:55 0.00130556 MUs MAINTENANCE OF 400 KVA TR (OIL TOP UP BREATHER REPLACEMENT, TAPPING OF HT/LT BUSHING DONE)
2254 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐MUSTAFABAD (DAYALPUR), LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 831 400 KVA PLANNED 14‐03‐2018 10:00:00 14‐03‐2018 13:57:19 3:57 0.001975 MUs
2255 LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK A‐SHRI RAM COLONY, BLOCK B‐SHRI RAM COLONY, BLOCK C‐SHRI RAM COLONY, BLOCK D‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, BLOCK C‐KHAJURI KHAS, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 6575 5570 KVA PLANNED 14‐03‐2018 11:15:00 14‐03‐2018 13:30:00 2:15 0.0015 MUs
2256 BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK, BLOCK A‐SADAT PUR, BLOCK 5C‐SADAT PUR, PKT C1‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, PKT C2‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, PKT C3‐SADATPUR EXT‐PUSTA AREA‐K BLOCK
KWN 1045 990 KVA PLANNED 05‐03‐2018 10:30:00 05‐03‐2018 16:38:26 6:8 0.00306667 MUs RAISING OF S/STN HEIGHT
2257 BLOCK 4B‐SADAT PUR, PKT EA‐BLOCK B, PKT F‐BLOCK A, BLOCK 2C‐SADAT PUR, BLOCK 6C‐SADAT PUR, PKT 1‐BLOCK A, BLOCK 4C‐SADAT PUR, BLOCK 3A‐SADAT PUR, PKT F‐BLOCK B, BLOCK 3B‐SADAT PUR, PKT E‐BLOCK B, BLOCK 3A‐BLOCK B, BLOCK 3C‐SADAT PUR, PKT B‐BLOCK A, PKT G‐BLOCK A, PKT 2A‐BLOCK A, PKT A‐BLOCK B, PKT E‐BLOCK A, BLOCK 5B‐SADAT PUR
KWN 1487 990 KVA PLANNED 12‐03‐2018 11:35:00 12‐03‐2018 16:00:00 4:25 0.00073611 MUs PLASTER OF WALLS AT TRANSFER SIDE
2258 BLOCK C‐KHAJURI KHAS, BLOCK B‐KHAJURI KHAS, BLOCK C‐SHERPUR KWN 242 990 KVA PLANNED 16‐03‐2018 10:03:00 16‐03‐2018 12:55:03 2:52 0.00105111 MUs2259 BLOCK A‐SADAT PUR, PKT C2‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK 5C‐SADAT PUR, PKT C3‐SADATPUR EXT‐
PUSTA AREA‐K BLOCK, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT C1‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK
KWN 1050 990 KVA PLANNED 16‐03‐2018 12:07:00 16‐03‐2018 17:27:27 5:20 0.00177778 MUs
2260 LIG/MIG RES/NON COMM AREA‐SABHEPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 55 400 KVA PLANNED 17‐03‐2018 10:00:00 17‐03‐2018 13:49:38 3:49 0.00095417 MUs2261 LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK A‐SHRI RAM COLONY, BLOCK D‐SHRI RAM COLONY KWN 317 630 KVA PLANNED 21‐03‐2018 14:52:00 21‐03‐2018 15:48:15 0:56 0.00046667 MUs MAINTENANCE OF
630 KVA TR (OIL TOP UP BREATHER REPLACEMENT, TAPPING OF HT/LT BUSHING DONE)
2262 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 2433 0 KVA PLANNED 01‐03‐2018 10:15:00 01‐03‐2018 14:49:49 4:34 0.00152222 MUs 06 HVDS 25 KVA TRF & 08 no. db & CIRCUIT MAINTENANCE
2263 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 19 400 KVA PLANNED 05‐03‐2018 10:10:00 05‐03‐2018 16:15:00 6:5 0.00202778 MUs 10 HVDS 25 KVA TRF & 15 no. db & CIRCUIT MAINTENANcE
2264 BLOCK J‐SHIV VIHAR, BHAGIRATHI VIHAR, BLOCK F‐SHIV VIHAR, BLOCK C & D‐INDIRA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C & D‐INDIRA VIHAR
KWN 1405 0 KVA PLANNED 09‐03‐2018 10:15:00 09‐03‐2018 16:25:00 6:10 0.00205556 MUs 12 HVDS 25 KVA TRF & 12 no. db & CIRCUIT MAINTENANCE
2265 BLOCK F‐NEHRU VIHAR, BLOCK A‐NEHRU VIHAR, BLOCK B‐NEHRU VIHAR KWN 715 630 KVA PLANNED 23‐03‐2018 09:49:00 23‐03‐2018 13:00:00 3:11 0.00116722 MUs2266 BLOCK G‐NEHRU VIHAR, BLOCK D‐OLD MUSTAFABAD, CHAUHAN PATTI‐VIJAY VIHAR, BLOCK A‐NEHRU VIHAR, BLOCK B‐
NEHRU VIHAR, BLOCK T‐NEHRU VIHARKWN 1751 630 KVA PLANNED 24‐03‐2018 10:00:00 24‐03‐2018 13:29:13 3:29 0.00116111 MUs
2267 GURU ANGAD NAGAR EAST‐SWASTHYA VIHAR, BLOCK C‐KHAJURI KHAS, BLOCK A‐KHAJURI KHAS, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., CLOCK C‐BIHARIPUR, BLOCK C‐KHAJURI KHAS, BLOCK B‐KHAJURI KHAS, PKT A‐BLOCK B, BLOCK J‐KHAJURI KHAS, LIG/MIG RES/NON COMM AREA‐BLOCK B, BLOCK I‐KHAJURI KHAS EXTN., BLOCK C‐SHERPUR
KWN 5478 3510 KVA PLANNED 24‐03‐2018 10:17:00 24‐03‐2018 12:20:05 2:3 0.00341667 MUs
2268 BLOCK G‐NEHRU VIHAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D‐OLD MUSTAFABAD, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, BLOCK E‐DAYALPUR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK A‐NEHRU VIHAR, OLD MUSTAFABAD‐ BLOCK C‐DAYALPUR, BHAJANPURA‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
KWN 1352 630 KVA PLANNED 21‐03‐2018 13:00:00 21‐03‐2018 17:30:00 4:30 0.00225 MUs
2269 LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK A‐SHRI RAM COLONY, BLOCK D‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY
KWN 1038 630 KVA PLANNED 28‐03‐2018 10:06:00 28‐03‐2018 12:34:22 2:28 0.00090444 MUs
2270 BLOCK A‐TUKMIRPUR, BLOCK C‐TUKMIRPUR, BLOCK B‐MUSTAFABAD (DAYALPUR), BLOCK F‐MUSTAFABAD (DAYALPUR), BLOCK A‐MUSTAFABAD (DAYALPUR), BLOCK D‐MUSTAFABAD (DAYALPUR), BLOCK D‐TUKMIRPUR, BLOCK B‐SHIV VIHAR
KWN 780 990 KVA PLANNED 31‐03‐2018 10:20:00 31‐03‐2018 13:41:04 3:21 0.001675 MUs
2271 BLOCK C‐PANDAV NAGAR, BLOCK D‐PANDAV NAGAR, BLOCK A‐PANDAV NAGAR, BLOCK J‐PANDAV NAGAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 766 630 KVA PLANNED 26‐03‐2018 11:05:00 26‐03‐2018 16:24:52 5:19 0.00088611 MUs
2272 BLOCK B‐VINOD NAGAR WEST, BLOCK B‐VINOD NAGAR EAST, BLOCK A‐VINOD NAGAR EAST LNR 2089 990 KVA PLANNED 21‐03‐2018 13:32:00 21‐03‐2018 16:02:38 2:30 0.00041667 MUs2273 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR,
BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, RETREAT APARTMENT‐MOTHER DAIRY, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 290 630 KVA PLANNED 12‐03‐2018 10:56:00 12‐03‐2018 13:23:58 2:27 0.0006125 MUs
2274 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PHASE I‐MAYUR VIHAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK J‐KRISHNA NAGAR EAST, BLOCK J‐KRISHNA NAGAR EAST, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, ARUNA APARTMENT‐MOTHER DAIRY, AGGARWAL PLAZA‐MOTHER DAIRY, BLOCK B‐MOTHER DAIRY, VIJAY LAXMI APPARTMENT‐MOTHER DAIRY, HIMVARSHA APARTMENT‐MOTHER DAIRY, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 1411 6240 KVA PLANNED 12‐03‐2018 12:10:00 12‐03‐2018 14:32:31 2:22 0.00078889 MUs
2275 PRIYADARSHINI APARTMENT‐MOTHER DAIRY LNR 96 630 KVA PLANNED 13‐03‐2018 11:12:00 13‐03‐2018 15:10:00 3:58 0.00099167 MUs2276 PRIYADARSHINI APARTMENT‐MOTHER DAIRY LNR 61 630 KVA PLANNED 13‐03‐2018 10:21:00 13‐03‐2018 15:10:00 4:49 0.00120417 MUs2277 KAROL APARTMENT‐MOTHER DAIRY LNR 115 630 KVA PLANNED 14‐03‐2018 11:56:00 14‐03‐2018 15:09:08 3:13 0.00080417 MUs2278 ENGG ESTATE‐MOTHER DAIRY LNR 84 630 KVA PLANNED 14‐03‐2018 10:22:00 14‐03‐2018 13:09:31 2:47 0.00069583 MUs2279 ENGG ESTATE‐MOTHER DAIRY LNR 114 630 KVA PLANNED 14‐03‐2018 13:49:00 14‐03‐2018 15:29:01 1:40 0.00041667 MUs2280 PHASE I‐MAYUR VIHAR, NAVA KUNJ APARTMENT‐MOTHER DAIRY LNR 126 630 KVA PLANNED 15‐03‐2018 11:15:00 15‐03‐2018 13:40:04 2:25 0.00060417 MUs
2281 NAVA KUNJ APARTMENT‐MOTHER DAIRY LNR 110 630 KVA PLANNED 15‐03‐2018 13:42:00 15‐03‐2018 16:14:20 2:32 0.00063333 MUs2282 PRIYADARSHINI APARTMENT‐MOTHER DAIRY LNR 92 400 KVA PLANNED 16‐03‐2018 10:42:00 16‐03‐2018 14:32:27 3:50 0.00127778 MUs2283 TRANG APPARTMENT‐MOTHER DAIRY LNR 129 630 KVA PLANNED 19‐03‐2018 10:24:00 19‐03‐2018 13:10:36 2:46 0.00092222 MUs2284 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR,
BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, TRANG APPARTMENT‐MOTHER DAIRY, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 305 400 KVA PLANNED 19‐03‐2018 13:22:00 19‐03‐2018 16:40:51 3:18 0.000825 MUs
2285 BLOCK B‐VINOD NAGAR WEST, BLOCK D‐VINOD NAGAR WEST, J.J. COLONY‐MOTHER DAIRY, BLOCK C‐MANDAWALI VILLAGE, BLOCK D‐MANDAWALI VILLAGE
LNR 1956 630 KVA PLANNED 07‐03‐2018 14:19:00 07‐03‐2018 15:29:35 1:10 0.00029167 MUs
2286 BLOCK B‐VINOD NAGAR WEST, BLOCK B‐VINOD NAGAR EAST, BLOCK A‐VINOD NAGAR EAST LNR 2085 990 KVA PLANNED 09‐03‐2018 13:12:00 09‐03‐2018 16:29:19 3:17 0.00082083 MUs2287 BLOCK B‐VINOD NAGAR EAST, BLOCK A‐VINOD NAGAR EAST, BLOCK A‐MANDAWALI, MOTHER DAIRY‐INDRAPRASTHA
EXTENSION LNRLNR 1511 990 KVA PLANNED 12‐03‐2018 11:17:00 12‐03‐2018 16:04:06 4:47 0.00119583 MUs
2288 ENGG ESTATE‐MOTHER DAIRY LNR 130 400 KVA PLANNED 22‐03‐2018 16:08:00 22‐03‐2018 17:37:52 1:29 0.00037083 MUs2289 AKSHARDHAM MANDIR, BLOCK E‐MADHU VIHAR LNR 1 990 KVA PLANNED 06‐03‐2018 10:44:00 06‐03‐2018 12:20:00 1:36 0.0004 MUs2290 AKSHARDHAM MANDIR LNR 4 990 KVA PLANNED 06‐03‐2018 12:12:00 06‐03‐2018 15:03:00 2:51 0.0007125 MUs2291 GEETA COLONY, AKSHARDHAM MANDIR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D,
BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 289 990 KVA PLANNED 07‐03‐2018 11:05:00 07‐03‐2018 14:30:00 3:25 0.00085417 MUs
2292 AKSHARDHAM MANDIR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR BLOCK F‐SHIV VIHAR JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
LNR 289 990 KVA PLANNED 08‐03‐2018 10:50:00 08‐03‐2018 13:50:46 3:0 0.0005 MUs
2293 BLOCK D‐VINOD NAGAR WEST LNR 172 630 KVA PLANNED 09‐03‐2018 10:40:00 09‐03‐2018 13:19:50 2:39 0.00088333 MUs2294 PANCHMAHAL APPARTMENT‐MOTHER DAIRY LNR 99 400 KVA PLANNED 10‐03‐2018 10:39:00 10‐03‐2018 13:21:56 2:42 0.0009 MUs2295 BHARAT APARTMENT‐MOTHER DAIRY LNR 82 630 KVA PLANNED 23‐03‐2018 10:58:00 23‐03‐2018 13:15:00 2:17 0.00057083 MUs2296 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR,
BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, SARANSH APARTMENT‐MOTHER DAIRY, SHUBHAM APARTMENT‐MOTHER DAIRY, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 336 400 KVA PLANNED 24‐03‐2018 11:10:00 24‐03‐2018 13:25:38 2:15 0 MUs
2297 SARANSH APARTMENT‐MOTHER DAIRY, SHUBHAM APARTMENT‐MOTHER DAIRY LNR 44 400 KVA PLANNED 24‐03‐2018 13:30:00 24‐03‐2018 15:21:49 1:51 0 MUs2298 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PHASE I‐MAYUR VIHAR, PKT R‐BLOCK D, BHAGAT
NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, ARUNA APARTMENT‐MOTHER DAIRY, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 396 400 KVA PLANNED 24‐03‐2018 11:03:00 24‐03‐2018 15:54:37 4:51 0 MUs ashok swami g
2299 ORIENTAL APARTMENT‐MOTHER DAIRY LNR 78 400 KVA PLANNED 26‐03‐2018 10:45:00 26‐03‐2018 13:40:00 2:55 0.00072917 MUs2300 AGGARWAL PLAZA‐MOTHER DAIRY LNR 64 400 KVA PLANNED 27‐03‐2018 11:40:00 27‐03‐2018 13:04:12 1:24 0.00035 MUs2301 FAZALPUR‐MANDAWALI VILLAGE, BLOCK U‐CHANDER VIHAR LNR 143 630 KVA PLANNED 16‐03‐2018 15:32:00 16‐03‐2018 17:15:00 1:43 0.00028611 MUs2302 MITRA APPARTMENT‐MOTHER DAIRY LNR 60 630 KVA PLANNED 28‐03‐2018 10:51:00 28‐03‐2018 13:48:09 2:57 0.0007375 MUs2303 BLOCK D‐VINOD NAGAR WEST, BLOCK F‐GANGA VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BLOCK A‐MAN SINGH
NAGAR, TUNDA NAGAR‐BHAGIRATHI VIHARLNR 172 630 KVA PLANNED 31‐03‐2018 11:58:00 31‐03‐2018 14:10:17 2:12 0.00055 MUs
2304 GANESH NAGAR‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR KHAS, GANESH NAGAR EXTN.‐SHAKARPUR KHAS LNR 1523 990 KVA PLANNED 16‐03‐2018 13:38:00 16‐03‐2018 16:55:00 3:17 0.00054722 MUs2305 GANESH NAGAR‐SHAKARPUR KHAS, BLOCK WA&O‐SHAKARPUR KHAS, BLOCK H‐SHAKARPUR KHAS, BLOCK A‐
SHAKARPUR KHAS, BLOCK G‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR KHAS, BLOCK R&A‐SHAKARPUR KHAS, SHAKARPUR EXTN.‐SHAKARPUR KHAS, BLOCK S1‐SCHOOL BLOCK
LNR 1517 990 KVA PLANNED 20‐03‐2018 12:48:00 20‐03‐2018 17:11:08 4:23 0.00073056 MUs
2306 BHARTI COLONY‐NIRMAN VIHAR, GANESH NAGAR‐SHAKARPUR KHAS, BLOCK WA&O‐SHAKARPUR KHAS, BLOCK S‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR KHAS, GANESH NAGAR EXTN.‐SHAKARPUR KHAS, BLOCK WA‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR KHAS, BLOCK G‐LAKSHMI NAGAR, NEHRU ENCLAVE‐SCHOOL BLOCK
LNR 86 990 KVA PLANNED 22‐03‐2018 10:42:00 22‐03‐2018 16:03:10 5:21 0.00089167 MUs
2307 BLOCK F‐GURU ANGAD NAGAR WEST, BLOCK C‐GURU ANGAD NAGAR WEST, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 1740 990 KVA PLANNED 28‐03‐2018 11:57:00 28‐03‐2018 14:27:10 2:30 0.00041667 MUs
2308 KUNDAN NAGAR‐LAKSHMI NAGAR, BANK ENCLAVE‐LAKSHMI NAGAR LNR 86 990 KVA PLANNED 23‐03‐2018 13:08:00 23‐03‐2018 16:25:00 3:17 0.00054722 MUs2309 BLOCK B‐GURU ANGAD NAGAR WEST, BLOCK F‐GURU ANGAD NAGAR WEST, GEETA COLONY, GGS INDRAPRASTHA
UNIVERSITY‐KASHMERE GATE, BLOCK D‐LALITA PARK, BLOCK G‐LAKSHMI NAGAR, BLOCK C‐LALITA PARK, EAST END ENCLAVE‐LAKSHMI NAGAR, BANK ENCLAVE‐LAKSHMI NAGAR, BLOCK F‐LALITA PARK, BLOCK C‐LALITA PARK, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐MANDAWALI VILLAGE, BLOCK B‐LAKSHMI NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
LNR 815 990 KVA PLANNED 26‐03‐2018 11:11:00 26‐03‐2018 16:40:00 5:29 0.00091389 MUs
2310 BLOCK R&A‐SHAKARPUR KHAS, LAKSHMI NAGAR BLOCK J&K LNR 86 990 KVA PLANNED 27‐03‐2018 11:53:00 27‐03‐2018 14:14:25 2:21 0.00039167 MUs2311 BLOCK F‐GURU ANGAD NAGAR WEST, BLOCK C‐LALITA PARK, BLOCK E‐LAKSHMI NAGAR, BLOCK F‐LALITA PARK, BLOCK
E‐LALITA PARKLNR 1200 990 KVA PLANNED 19‐03‐2018 11:22:00 19‐03‐2018 16:58:39 5:36 0.00093333 MUs
2312 BLOCK A‐GURU RAMDAS NAGAR, GURU RAMDAS NAGAR‐LAKSHMI NAGAR LNR 228 630 KVA PLANNED 21‐03‐2018 12:00:00 21‐03‐2018 16:53:31 4:53 0.00081389 MUs2313 BLOCK J‐VISHWAKARMA PARK, BLOCK K‐JAGAT RAM PARK, GURU RAMDAS NAGAR‐LAKSHMI NAGAR LNR 597 990 KVA PLANNED 16‐03‐2018 11:23:00 16‐03‐2018 17:44:36 6:21 0.00105833 MUs2314 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, LAKSHMI NAGAR BLOCK J&K, LAKSHMI NAGAR
BLOCK L, BLOCK K‐JAGAT RAM PARK, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK J‐LALITA PARK, BLOCK N‐JAGAT RAM PARK, BLOCK E‐LALITA PARK, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
LNR 290 990 KVA PLANNED 22‐03‐2018 11:04:00 22‐03‐2018 15:43:52 4:39 0.000775 MUs
2315 BLOCK C‐PANDAV NAGAR, BLOCK D‐PANDAV NAGAR, BLOCK A‐PANDAV NAGAR, BLOCK J‐PANDAV NAGAR, BLOCK B‐VINOD NAGAR WEST, BLOCK D‐VINOD NAGAR WEST, BLOCK J & K‐NARAYAN NAGAR, BLOCK B‐GANESH NAGAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, FAZALPUR‐MANDAWALI VILLAGE, BLOCK D‐LALITA PARK, RAMESH PARK‐NARAYAN NAGAR, BLOCK C‐LALITA PARK, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐CHANDER VIHAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 3912 990 KVA PLANNED 17‐03‐2018 10:26:00 17‐03‐2018 15:58:55 5:32 0.00184444 MUs
2316 SHAKARPUR EXTN.‐SHAKARPUR KHAS, BLOCK F‐GURU ANGAD NAGAR WEST, BLOCK F‐LALITA PARK LNR 984 990 KVA PLANNED 05‐03‐2018 11:44:00 05‐03‐2018 16:19:36 4:35 0.00114583 MUs transformer lead replacment
2317 BLOCK B‐KUNDAN NAGAR, BLOCK F‐VISHWAKARMA PARK, KUNDAN NAGAR‐LAKSHMI NAGAR, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, BANK ENCLAVE‐LAKSHMI NAGAR, KRISHAN KUNJ‐LAKSHMI NAGAR
LNR 1867 990 KVA PLANNED 08‐03‐2018 13:32:00 08‐03‐2018 14:23:47 0:51 0.0002125 MUs
2318 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, GYAN KUNJ‐WEST GURU ANGAD NAGAR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 489 990 KVA PLANNED 09‐03‐2018 10:57:00 09‐03‐2018 15:03:00 4:6 0.001025 MUs
2319 BLOCK N‐VISHWAKARMA PARK, BLOCK J‐VISHWAKARMA PARK, BLOCK M‐JAGAT RAM PARK, RAMESH PARK‐LAKSHMI NAGAR, VISHWAKARMA PARK‐LAKSHMI NAGAR, BLOCK K‐JAGAT RAM PARK, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, BLOCK J‐LALITA PARK, BLOCK R‐LALITA PARK
LNR 1540 990 KVA PLANNED 13‐03‐2018 11:43:00 13‐03‐2018 17:17:20 5:34 0.00139167 MUs
2320 BHARTI COLONY‐NIRMAN VIHAR, GANESH NAGAR EXTN.‐SHAKARPUR KHAS, BLOCK F‐GURU ANGAD NAGAR WEST, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK D‐LALITA PARK, LAKSHMI NAGAR BLOCK J&K, LAKSHMI NAGAR BLOCK L, BLOCK K‐JAGAT RAM PARK, RAMESH PARK‐NARAYAN NAGAR, BLOCK C‐LALITA PARK, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK J‐LALITA PARK, BLOCK A‐LALITA PARK, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
LNR 1299 990 KVA PLANNED 12‐03‐2018 11:38:00 12‐03‐2018 17:36:31 5:58 0.00149167 MUs
2321 BLOCK R&A‐SHAKARPUR KHAS, SHAKARPUR EXTN.‐SHAKARPUR KHAS, NEHRU ENCLAVE‐SCHOOL BLOCK LNR 1012 990 KVA PLANNED 21‐03‐2018 11:32:00 21‐03‐2018 15:49:51 4:17 0 MUs2322 GANESH NAGAR EXTN.‐SHAKARPUR KHAS, SHAKARPUR EXTN.‐SHAKARPUR KHAS LNR 576 630 KVA PLANNED 05‐03‐2018 11:35:00 05‐03‐2018 15:00:08 3:25 0.00085417 MUs2323 GANESH NAGAR‐SHAKARPUR KHAS, BLOCK S‐SHAKARPUR KHAS, BLOCK H‐SHAKARPUR KHAS, BLOCK D‐SHAKARPUR
KHAS, BLOCK A‐SHAKARPUR KHAS, BLOCK G‐SHAKARPUR KHAS, GANESH NAGAR EXTN.‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR KHAS, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, LAKSHMI NAGAR BLOCK J&K, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 1018 990 KVA PLANNED 07‐03‐2018 11:58:00 07‐03‐2018 15:45:07 3:47 0.00094583 MUs
2324 SHAKARPUR EXTN.‐SHAKARPUR KHAS LNR 822 990 KVA PLANNED 05‐03‐2018 11:47:00 05‐03‐2018 16:38:00 4:51 0.00161667 MUs2325 BLOCK U‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR KHAS LNR 20 990 KVA PLANNED 13‐03‐2018 12:33:00 13‐03‐2018 14:58:00 2:25 0.00060417 MUs2326 BLOCK S‐SCHOOL BLOCK, BLOCK S1‐SCHOOL BLOCK, NEHRU ENCLAVE‐SCHOOL BLOCK LNR 1301 990 KVA PLANNED 06‐03‐2018 10:57:00 06‐03‐2018 15:03:00 4:6 0.00136667 MUs2327 BLOCK S‐SHAKARPUR KHAS, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, EAST END ENCLAVE‐LAKSHMI NAGAR, KRISHAN
KUNJ‐LAKSHMI NAGAR, BLOCK B‐PRIYADARSANI VIHAR, GYAN KUNJ‐WEST GURU ANGAD NAGARLNR 835 990 KVA PLANNED 07‐03‐2018 10:52:00 07‐03‐2018 16:35:00 5:43 0.00190556 MUs
2328 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK S‐SCHOOL BLOCK, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
LNR 1855 630 KVA PLANNED 09‐03‐2018 11:03:00 09‐03‐2018 17:48:06 6:45 0.00225 MUs
2329 BLOCK G‐PREET VIHAR, BLOCK E‐PREET VIHAR LNR 119 990 KVA PLANNED 24‐03‐2018 10:44:00 24‐03‐2018 16:37:10 5:53 0.00098056 MUs lt ab conductor installation
2330 BLOCK G‐PREET VIHAR, BLOCK E‐PREET VIHAR LNR 119 990 KVA PLANNED 26‐03‐2018 10:25:00 26‐03‐2018 17:35:16 7:10 0.00119444 MUs lt ab conductor installation
2331 BLOCK G‐PREET VIHAR, BLOCK E‐PREET VIHAR LNR 119 990 KVA PLANNED 27‐03‐2018 11:08:00 27‐03‐2018 16:24:04 5:16 0.00131667 MUs ab conductor installation
2332 BLOCK G‐PREET VIHAR, BLOCK E‐PREET VIHAR LNR 119 990 KVA PLANNED 31‐03‐2018 10:36:00 31‐03‐2018 16:30:00 5:54 0.001475 MUs AB CONDUCTOR INSTALLATION
2333 BLOCK D‐PREET VIHAR LNR 55 990 KVA PLANNED 16‐03‐2018 10:32:00 16‐03‐2018 13:45:00 3:13 0.00080417 MUs AB CONDUCTOR INSTALLATION
2334 BLOCK D‐PREET VIHAR LNR 55 990 KVA PLANNED 17‐03‐2018 10:44:00 17‐03‐2018 17:08:08 6:24 0.0016 MUs AB CONDUCTOR INSTALLATION
2335 BLOCK D‐PREET VIHAR LNR 55 990 KVA PLANNED 21‐03‐2018 11:00:00 21‐03‐2018 17:39:17 6:39 0.0016625 MUs2336 BLOCK D‐PREET VIHAR LNR 55 990 KVA PLANNED 22‐03‐2018 11:22:00 22‐03‐2018 15:50:12 4:28 0.00111667 MUs AB CONDUCTOR
INSTALLATION2337 BLOCK D‐PREET VIHAR LNR 55 990 KVA PLANNED 23‐03‐2018 10:36:00 23‐03‐2018 16:35:00 5:59 0.00149583 MUs2338 BLOCK D‐PREET VIHAR LNR 111 990 KVA PLANNED 06‐03‐2018 16:43:00 06‐03‐2018 17:37:21 0:54 0.00015 MUs cleaning activity2339 BLOCK A‐SWASTHYA VIHAR, BLOCK B‐SWASTHYA VIHAR LNR 167 630 KVA PLANNED 08‐03‐2018 11:19:00 08‐03‐2018 14:00:00 2:41 0.00044722 MUs cleaning activity2340 BHARTI COLONY‐NIRMAN VIHAR, BLOCK C‐NIRMAN VIHAR, BLOCK D‐NIRMAN VIHAR LNR 184 990 KVA PLANNED 14‐03‐2018 15:59:00 14‐03‐2018 16:55:00 0:56 0.00015556 MUs cleaning activity2341 GURU ANGAD NAGAR EAST‐SWASTHYA VIHAR, CHITRA VIHAR‐SWASTHYA VIHAR, CHITRA VIHAR‐SWASTHYA VIHAR,
BLOCK K‐JAGAT RAM PARK, SUKH VIHAR CAMP‐SWASTHYA VIHARLNR 672 630 KVA PLANNED 15‐03‐2018 14:47:00 15‐03‐2018 15:23:41 0:36 0.0001 MUs CABLE FAULTY
2342 BHARTI COLONY‐NIRMAN VIHAR, INDUSTRIAL AREA‐PATPAR GANJ INDUSTRIAL AREA LNR 103 3240 KVA PLANNED 09‐03‐2018 11:53:00 09‐03‐2018 15:42:00 3:49 0.00419833 MUs PREVENTIVE MAINTENANCE
2343 BLOCK B‐MOTHER DAIRY LNR 72 630 KVA PLANNED 12‐03‐2018 10:53:00 12‐03‐2018 16:41:00 5:48 0.00145 MUs2344 BHARAT GAS‐GAZIPUR VILLAGE LNR 2 400 KVA PLANNED 16‐03‐2018 14:07:00 16‐03‐2018 16:50:00 2:43 0.00090556 MUs2345 BLOCK D‐PREET VIHAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT
NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, MAYFAIR APPARTMENT‐MADHU VIHAR, TRILOK APPARTMENT‐MADHU VIHAR, FRIENDS APARTMENT‐MADHU VIHAR, VIKALP APPARTMENT‐MADHU VIHAR, VIDHISA APPARTMENT‐MADHU VIHAR, RAMA KRISHNA VIHAR APARTMENT‐MADHU VIHAR, ST.ANDREWS SOOTS SCHOOL‐MADHU VIHAR, NAVKRANTI APPARTMENT‐MADHU VIHAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, LIG/MIG RES/NON COMM AREA‐CHANDER VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
LNR 994 4290 KVA PLANNED 17‐03‐2018 11:48:00 17‐03‐2018 13:53:00 2:5 0 MUs prev mtc
2346 BLOCK E‐MADHU VIHAR LNR 107 630 KVA PLANNED 19‐03‐2018 10:34:00 19‐03‐2018 13:45:00 3:11 0.00079583 MUs2347 MEENA APPARTMENT‐MOTHER DAIRY, BLOCK E‐MADHU VIHAR LNR 121 400 KVA PLANNED 21‐03‐2018 11:25:00 21‐03‐2018 16:43:43 5:18 0 MUs2348 BLOCK C‐RAJBIR COLONY, BLOCK B‐MAYUR VIHAR PHASE III, MADHU VIHAR‐INDRAPRASTHA EXTENSION, BLOCK H‐
GAZIPUR VILLAGELNR 1818 0 KVA PLANNED 08‐03‐2018 15:18:00 08‐03‐2018 17:20:00 2:2 0.00067778 MUs
2349 VIDHISA APPARTMENT‐MADHU VIHAR, RAMA KRISHNA VIHAR APARTMENT‐MADHU VIHAR LNR 90 400 KVA PLANNED 10‐03‐2018 10:17:00 10‐03‐2018 13:17:57 3:0 0.001 MUs2350 PHARMA APARTMENT‐MADHU VIHAR, MEENA APPARTMENT‐MOTHER DAIRY LNR 68 630 KVA PLANNED 23‐03‐2018 11:24:00 23‐03‐2018 13:45:32 2:21 0.0005875 MUs2351 TAKSHILA APARTMENT‐MOTHER DAIRY LNR 110 400 KVA PLANNED 26‐03‐2018 13:52:00 26‐03‐2018 16:52:16 3:0 0.00075 MUs
2352 TAKSHILA APARTMENT‐MOTHER DAIRY LNR 163 400 KVA PLANNED 26‐03‐2018 11:13:00 26‐03‐2018 13:14:01 2:1 0.00033611 MUs2353 RAILWAY COLONY‐MANDAWALI VILLAGE, BLOCK C‐RAJBIR COLONY, BLOCK B‐MAYUR VIHAR PHASE III, MADHU VIHAR‐
INDRAPRASTHA EXTENSION, BLOCK A‐CHANDER VIHAR, FAZALPUR‐MANDAWALI VILLAGE, HARIZAN BASTI‐GAZIPUR VILLAGE, BLOCK H‐GAZIPUR VILLAGE, BLOCK U‐CHANDER VIHAR, BLOCK B‐MANDAWALI VILLAGE, BHARAT GAS‐GAZIPUR VILLAGE
LNR 3724 1130 KVA PLANNED 27‐03‐2018 10:41:00 27‐03‐2018 13:40:00 2:59 0.00069611 MUs
2354 BLOCK A‐PHASE I, PKT 1‐ DDA FLATS‐PHASE I, KHICHRI PUR‐PHASE II MVR 582 630 KVA PLANNED 15‐03‐2018 11:30:00 15‐03‐2018 15:05:22 3:35 0.00059722 MUs2355 CL‐CHILLA SARDA BANGAR VILLAGE MVR 586 990 KVA PLANNED 17‐03‐2018 12:10:00 17‐03‐2018 14:55:38 2:45 0.00045833 MUs2356 BLOCK F‐PANDAV NAGAR, SAMASPUR‐PANDAV NAGAR, BLOCK C‐PANDAV NAGAR, PRIYA ENCLAVE‐ANAND VIHAR,
KIRAN VIHAR‐ANAND VIHAR, SHANTI VIHAR‐ANAND VIHAR, PANDAV NAGAR MVR‐SHAKARPUR MVRMVR 1492 990 KVA PLANNED 21‐03‐2018 13:48:00 21‐03‐2018 14:21:33 0:33 0 MUs
2357 PRATAP NAGAR‐PHASE I, PKT 1‐ DDA FLATS‐PHASE I, ACHARYA NIKETAN‐SHASHI GARDEN, PATPAR GANJ‐SHASHI GARDEN, BLOCK F‐PANDAV NAGAR, SAMASPUR‐PANDAV NAGAR, PANDAV NAGAR MVR‐SHAKARPUR MVR
MVR 2535 2520 KVA PLANNED 08‐03‐2018 10:20:00 08‐03‐2018 13:48:54 3:28 0.00485333 MUs 11kv feeder mtc work
2358 PRATAP NAGAR‐PHASE I, PKT 1‐ DDA FLATS‐PHASE I, PATPAR GANJ‐SHASHI GARDEN, GEETA COLONY, MANTOLA MOHALLA‐PAHAR GANJ, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, MAYUR PLACE‐MAYUR VIHAR, MAYUR VIHAR EXTN., PHASE I‐MAYUR VIHAR, PANDAV NAGAR MVR‐SHAKARPUR MVR, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, OLD NOIDA AUTHORITY‐VASUNDHARA ENCLAVE YAMUNA FLOOD PLAINS, MAYUR VIHAR YAMUNA FLOOD PLAINS, NEW ASHOK NAGAR MVR‐VASUNDHARA ENCLAVE MVR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, CHILLA‐ A.I.I.M.S. APPARTMENT‐NEW ASHOK NAGAR, C‐101 TO 104‐201 T‐CHILLA‐NAGARJUNA APPARTMENT‐ BLOCK C, KHICHRI PUR‐PHASE II, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA SONIA VIHAR
MVR 4148 6570 KVA PLANNED 12‐03‐2018 10:45:00 12‐03‐2018 11:58:00 1:13 0.00156139 MUs 11kv feeder mtc work
2359 CL‐CHILLA SARDA BANGAR VILLAGE, HIMMAT PURI‐CHILLA VILLAGE MVR 338 630 KVA PLANNED 15‐03‐2018 11:35:00 15‐03‐2018 15:53:10 4:18 0.00071667 MUs2360 MAYUR VIHAR EXTN. MVR 63 400 KVA PLANNED 23‐03‐2018 14:38:00 23‐03‐2018 16:54:38 2:16 0 MUs2361 MAYUR VIHAR EXTN. MVR 97 400 KVA PLANNED 23‐03‐2018 14:35:00 23‐03‐2018 16:54:53 2:19 0 MUs2362 MAYUR VIHAR EXTN. MVR 51 400 KVA PLANNED 24‐03‐2018 11:18:00 24‐03‐2018 13:04:31 1:46 0.00029444 MUs2363 MAYUR VIHAR EXTN. MVR 115 400 KVA PLANNED 31‐03‐2018 10:57:00 31‐03‐2018 14:20:00 3:23 0 MUs2364 MAYUR VIHAR EXTN. MVR 0 400 KVA PLANNED 31‐03‐2018 10:55:00 31‐03‐2018 14:20:00 3:25 0 MUs2365 PKT B‐MAYUR VIHAR PHASE II, BLOCK B‐GAZIPUR DAIRY FARM MVR 246 630 KVA PLANNED 16‐03‐2018 12:10:00 16‐03‐2018 17:04:32 4:54 0.00081667 MUs2366 BLOCK 18‐KALYAN PURI MVR 86 990 KVA PLANNED 17‐03‐2018 12:30:00 17‐03‐2018 17:42:50 5:12 0.00086667 MUs2367 BLOCK 18‐KALYAN PURI, BLOCK 12‐KALYAN PURI MVR 330 990 KVA PLANNED 20‐03‐2018 13:50:00 20‐03‐2018 17:14:22 3:24 0 MUs2368 BLOCK B‐GAZIPUR DAIRY FARM, BLOCK E‐GAZIPUR DAIRY FARM, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐
KASHMERE GATE, GAZIPUR DAIRY FARM, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, SHANGHTA HOUSE STORE‐GAZIPUR DAIRY FARM, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
MVR 577 630 KVA PLANNED 21‐03‐2018 13:54:00 21‐03‐2018 17:25:00 3:31 0 MUs
2369 BLOCK 18‐KALYAN PURI, BLOCK 17‐KALYAN PURI, BLOCK 12‐KALYAN PURI MVR 1058 990 KVA PLANNED 22‐03‐2018 15:15:00 22‐03‐2018 17:12:41 1:57 0.0002275 MUs2370 BLOCK 31‐HIMMATPURI, BLOCK 18‐KALYAN PURI, BLOCK 12‐KALYAN PURI MVR 330 990 KVA PLANNED 24‐03‐2018 11:07:00 24‐03‐2018 13:33:53 2:26 0.00028389 MUs2371 AMBEDKAR CAMP‐KALYAN PURI, KALYAN VAS‐KALYAN PURI, KHICHARIPUR‐GAZIPUR, BLOCK C‐VINOD NAGAR EAST MVR 590 990 KVA PLANNED 26‐03‐2018 12:24:00 26‐03‐2018 16:27:14 4:3 0.000135 MUs
2372 BLOCK 21‐KALYAN PURI, BLOCK 20‐KALYAN PURI, AMBEDKAR CAMP‐KALYAN PURI, KALYAN VAS‐KALYAN PURI, BLOCK 17‐KALYAN PURI, BLOCK 14‐KALYAN PURI, KALYAN PURI‐MAYUR VIHAR
MVR 935 630 KVA PLANNED 27‐03‐2018 11:07:00 27‐03‐2018 11:55:31 0:48 0.00001333 MUs
2373 BLOCK C‐GAZIPUR DAIRY FARM, PKT B‐MAYUR VIHAR PHASE II, GAZIPUR DAIRY FARM, BLOCK D‐GAZIPUR DAIRY FARM
MVR 343 400 KVA PLANNED 28‐03‐2018 12:33:00 28‐03‐2018 13:34:11 1:1 0.00001694 MUs
2374 BHARTI COLONY‐NIRMAN VIHAR, BLOCK 11‐TRILOKPURI PHASE I, BLOCK C‐VINOD NAGAR EAST, PKT 1‐MAYUR VIHAR PHASE III, KHICHARIPUR‐GAZIPUR, VINOD NAGAR EAST‐INDRAPRASTHA EXTENSION
MVR 146 400 KVA PLANNED 28‐03‐2018 11:34:00 28‐03‐2018 16:10:04 4:36 0.00007667 MUs
2375 PKT B‐MAYUR VIHAR PHASE II, PKT F‐MAYUR VIHAR PHASE II, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, MAYUR VIHAR PHASE II, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
MVR 787 400 KVA PLANNED 14‐03‐2018 11:46:00 14‐03‐2018 14:18:32 2:32 0.00050667 MUs
2376 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK 7‐KHICHRIPUR RESETTLEMENT COLONY BLOCK 7, BLOCK 10‐KHICHRIPUR RESETTLEMENT COLONY BLOCK 5, BLOCK 3‐KHICHARIPUR BLOCK 1, KHICHARIPUR‐GAZIPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK C‐VINOD NAGAR EAST, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, KALYAN VAS‐KALYAN PURI, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK C‐VINOD NAGAR EAST, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 9‐KHICHRIPUR RESETTLEMENT COLONY BLOCK 9, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA JHILMIL COLONY PKT A BLOCK B
MVR 4488 2650 KVA PLANNED 07‐03‐2018 11:47:00 07‐03‐2018 13:10:40 1:23 0 MUs 11kv feeder mtc work
2377 BLOCK B‐GAZIPUR DAIRY FARM, BLOCK E‐GAZIPUR DAIRY FARM, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, SHANGHTA HOUSE STORE‐GAZIPUR DAIRY FARM, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
MVR 745 1890 KVA PLANNED 13‐03‐2018 10:46:00 13‐03‐2018 13:34:23 2:48 0.00116667 MUs 11kv feeder mtc work
2378 BHARTI COLONY‐NIRMAN VIHAR, BLOCK 15‐KALYAN PURI, BLOCK 21‐KALYAN PURI, BLOCK 20‐KALYAN PURI, BLOCK 19‐KALYAN PURI, BLOCK 18‐KALYAN PURI, BLOCK 17‐KALYAN PURI, BLOCK 16‐KALYAN PURI, BLOCK 12‐KALYAN PURI, BLOCK 14‐KALYAN PURI, BLOCK 1‐KALYAN PURI, TRILOKPURI PHASE I‐MAYUR VIHAR, MAYUR VIHAR PHASE II, BLOCK 18‐KALYAN PURI, MAYUR VIHAR YAMUNA FLOOD PLAINS, KALYAN PURI‐MAYUR VIHAR
MVR 5230 3770 KVA PLANNED 15‐03‐2018 11:16:00 15‐03‐2018 13:56:00 2:40 0.0036 MUs 11kv feeder mtc work
2379 BLOCK 20‐KALYAN PURI, BLOCK 17‐KALYAN PURI, BLOCK 14‐KALYAN PURI, KALYAN PURI‐MAYUR VIHAR, BLOCK 21‐KALYAN PURI, AMBEDKAR CAMP‐KALYAN PURI, KALYAN VAS‐KALYAN PURI
MVR 935 630 KVA PLANNED 07‐03‐2018 13:08:00 07‐03‐2018 18:00:00 4:52 0.00008111 MUs
2380 PKT B‐MAYUR VIHAR PHASE II, BLOCK B‐GAZIPUR DAIRY FARM, BLOCK C‐GAZIPUR DAIRY FARM, BLOCK D‐GAZIPUR DAIRY FARM, GAZIPUR DAIRY FARM
MVR 343 400 KVA PLANNED 09‐03‐2018 12:44:00 09‐03‐2018 17:48:57 5:4 0.00008444 MUs
2381 BLOCK 18‐KALYAN PURI, BLOCK 12‐KALYAN PURI, BLOCK 1‐KALYAN PURI, BLOCK 18‐KALYAN PURI, MAYUR VIHAR YAMUNA FLOOD PLAINS
MVR 1343 990 KVA PLANNED 12‐03‐2018 13:38:00 12‐03‐2018 17:53:16 4:15 0 MUs
2382 BLOCK 18‐KALYAN PURI, BLOCK 12‐KALYAN PURI MVR 330 990 KVA PLANNED 14‐03‐2018 11:50:00 14‐03‐2018 17:31:17 5:41 0.00094722 MUs2383 PKT F‐MAYUR VIHAR PHASE II, KALYAN VAS‐KALYAN PURI MVR 120 400 KVA PLANNED 01‐03‐2018 10:52:00 01‐03‐2018 16:40:32 5:48 0.00116 MUs2384 PKT B‐MAYUR VIHAR PHASE II MVR 251 630 KVA PLANNED 05‐03‐2018 11:18:00 05‐03‐2018 13:40:05 2:22 0.00023667 MUs2385 PKT B‐MAYUR VIHAR PHASE II, MAYUR VIHAR PHASE II MVR 505 630 KVA PLANNED 07‐03‐2018 11:13:00 07‐03‐2018 15:17:27 4:4 0.00054222 MUs2386 BLOCK 2‐TRILOKPURI PHASE I, PKT B‐MAYUR VIHAR PHASE II, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐
KASHMERE GATE, MAYUR VIHAR PHASE II, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
MVR 468 630 KVA PLANNED 08‐03‐2018 11:07:00 08‐03‐2018 13:46:50 2:39 0.00022083 MUs
2387 BLOCK 5‐TRILOKPURI PHASE I, BLOCK 6‐TRILOKPURI PHASE I, BLOCK 4‐TRILOKPURI PHASE I, BLOCK 3‐TRILOKPURI PHASE I, BLOCK 1‐TRILOKPURI PHASE I, PKT 3‐PHASE I, BLOCK 36‐HIMMATPURI, BLOCK 28‐HIMMATPURI, BLOCK 33‐HIMMATPURI, BLOCK 20‐HIMMATPURI, BLOCK 27‐HIMMATPURI, BLOCK 26‐HIMMATPURI, BLOCK 35‐HIMMATPURI, BLOCK 18‐KALYAN PURI, BLOCK 12‐KALYAN PURI, BLOCK 1‐KALYAN PURI, NEW JAFFRABAD‐GORAKH PARK, BLOCK H‐GHONDA PATTI, CL‐CHILLA SARDA BANGAR VILLAGE, TRILOKPURI PHASE I‐MAYUR VIHAR, MAYUR VIHAR EXTN., HIMMATPURI‐MAYUR VIHAR, BLOCK 18‐KALYAN PURI, JAFFRABAD‐MAUJ PUR, BLOCK D‐BHAJANPURA, BLOCK B‐GARI MANDU, GHONDA PATTI, NAVA KUNJ APARTMENT‐MOTHER DAIRY, HIMMAT PURI‐CHILLA VILLAGE
MVR 9994 7740 KVA PLANNED 06‐03‐2018 11:30:00 06‐03‐2018 14:28:00 2:58 0 MUs 11kv feeder mtc work
2388 BLOCK 29‐HIMMATPURI, BLOCK 28‐HIMMATPURI, BLOCK 20‐HIMMATPURI, HIMMATPURI‐MAYUR VIHAR MVR 981 630 KVA PLANNED 05‐03‐2018 11:46:00 05‐03‐2018 12:29:25 0:43 0.00002389 MUs Replacement of Burnt /damaged DB and damaged service cable, Load balancing of TRF.,cleaning of s/stn
2389 BLOCK 20‐HIMMATPURI, BLOCK 21‐HIMMATPURI, BLOCK 17‐HIMMATPURI, BLOCK 22‐HIMMATPURI, HIMMATPURI‐MAYUR VIHAR
MVR 783 630 KVA PLANNED 13‐03‐2018 10:15:00 13‐03‐2018 12:55:34 2:40 0 MUs
2390 BLOCK D‐ASHOK NAGAR, GTB MIG FLATS‐POCKET F, GTB ENCLAVE POLICE BOOTH‐JHILMIL‐TAHIRPUR NNG NNG 380 630 KVA PLANNED 12‐03‐2018 10:36:00 12‐03‐2018 13:16:04 2:40 0.00222222 MUs2391 BLOCK A‐MANDOLI EXTN., BLOCK A‐BANK COLONY, SABOLI COLONY‐MANDOLI, BLOCK D‐HARIJAN BASTI EAST EXTN.,
BLOCK E‐SEWA DHAM, BLOCK D‐HARSH VIHAR, SEWA DHAM‐MANDOLINNG 568 0 KVA PLANNED 12‐03‐2018 10:54:00 12‐03‐2018 17:00:00 6:6 0.00508333 MUs
2392 D.S.I.D.C. COMPLEX‐DTC DEPOT, BLOCK E3‐KANSHIPUR, BLOCK E2‐NAND NAGARI NNG 32 630 KVA PLANNED 13‐03‐2018 10:18:00 13‐03‐2018 13:30:59 3:12 0.00106667 MUs2393 BHARTI COLONY‐NIRMAN VIHAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK
D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, POCKET B‐GURU TEG BAHADUR ENCLAVE, DELHI JAL BOARD MIG FLATS‐POCKET A, GOVT.BOYS SEC.SCHOOL‐POCKET A, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, AJANTA APARTMENT‐MOTHER DAIRY, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
NNG 2041 630 KVA PLANNED 15‐03‐2018 10:16:00 15‐03‐2018 13:27:28 3:11 0.00106111 MUs
2394 HARSH VIHAR SUB STATION‐POLICE FARM, BLOCK C‐HARSH VIHAR, POCKET A‐JJ COLONY, BLOCK B‐HARSH VIHAR, BLOCK A‐HARSH VIHAR, GOVT.CO. SEC. SCHOOL‐HARSH VIHAR
NNG 3557 0 KVA PLANNED 16‐03‐2018 10:14:00 16‐03‐2018 16:21:16 6:7 0.00254861 MUs
2395 BLOCK C‐HARSH VIHAR, BLOCK E‐RAJIV NAGAR, BLOCK E‐SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH‐NEW MANDOLI INDUSTRIAL AREA, LIG/MIG RES/NON COMM AREA‐SEWA DHAM, BLOCK A‐RAJIV NAGAR, BLOCK E‐SEWA DHAM
NNG 263 0 KVA PLANNED 20‐03‐2018 10:36:00 20‐03‐2018 14:10:00 3:34 0.00297222 MUs
2396 BLOCK A‐MANDOLI VILLAGE, SABOLI COLONY‐MANDOLI, BLOCK A‐SEWA DHAM NNG 148 990 KVA PLANNED 20‐03‐2018 10:36:00 20‐03‐2018 17:00:00 6:24 0.00533333 MUs2397 BLOCK A‐MANDOLI EXTN., BLOCK A‐BANK COLONY, BLOCK D‐HARIJAN BASTI EAST EXTN., BLOCK D‐HARSH VIHAR NNG 571 0 KVA PLANNED 22‐03‐2018 10:17:00 22‐03‐2018 16:34:20 6:17 0 MUs2398 RAJIV GANDHI SUPER STC HOSPITAL‐GURU TEG BAHADUR ENCLAVE NNG, POCKET B‐GURU TEG BAHADUR ENCLAVE,
L.I.G HOUSING NAND NAGARI‐PKT ENNG 684 630 KVA PLANNED 01‐03‐2018 10:06:00 01‐03‐2018 13:15:16 3:9 0.00105 MUs
2399 BLOCK E‐SEWA DHAM NNG 442 0 KVA PLANNED 05‐03‐2018 10:12:00 05‐03‐2018 16:31:36 6:19 0.00263194 MUs2400 SABOLI EXTN.‐MANDOLI, SABOLI VILLAGE‐MANDOLI, MCD SCHOOL‐SABOLI COLONY, VILLAGE SABOLI‐SABOLI COLONY NNG 774 990 KVA PLANNED 07‐03‐2018 10:05:00 07‐03‐2018 12:54:02 2:49 0.00093889 MUs
2401 BLOCK A‐BANK COLONY NNG 214 0 KVA PLANNED 08‐03‐2018 10:09:00 08‐03‐2018 16:02:32 5:53 0.00245139 MUs2402 D.S.I.D.C. COMPLEX‐DTC DEPOT, BLOCK E3‐KANSHIPUR, BLOCK A2‐NAND NAGARI, BLOCK A1‐NAND NAGARI, BLOCK
A3‐NAND NAGARINNG 661 630 KVA PLANNED 10‐03‐2018 10:07:00 10‐03‐2018 13:06:11 2:59 0.00099444 MUs
2403 BLOCK A‐MANDOLI VILLAGE, BLOCK A‐BANK COLONY NNG 393 990 KVA PLANNED 23‐03‐2018 10:25:00 23‐03‐2018 12:33:45 2:8 0.00071111 MUs2404 SABOLI COLONY‐MANDOLI, SABOLI VILLAGE‐MANDOLI, BLOCK B‐ANUP VIHAR, BLOCK D‐ANUP VIHAR, BLOCK K‐ANUP
VIHAR, BLOCK A‐ANUP VIHAR, BLOCK C‐ANUP VIHAR, BLOCK E‐MEET NAGAR, ANUP VIHAR‐MANDOLINNG 3436 0 KVA PLANNED 24‐03‐2018 10:26:00 24‐03‐2018 16:18:23 5:52 0.00244444 MUs
2405 BLOCK A‐RAJIV NAGAR NNG NNG 284 630 KVA PLANNED 27‐03‐2018 10:16:00 27‐03‐2018 12:47:38 2:31 0.00209722 MUs2406 BLOCK C‐HARSH VIHAR, BLOCK B‐HARSH VIHAR, BLOCK A‐HARSH VIHAR, GOVT.CO. SEC. SCHOOL‐HARSH VIHAR NNG 3573 0 KVA PLANNED 28‐03‐2018 10:15:00 28‐03‐2018 16:07:48 5:52 0 MUs2407 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR,
BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐NATHU PURA, BLOCK D‐ASHOK NAGAR, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
NNG 3160 630 KVA PLANNED 14‐03‐2018 10:28:00 14‐03‐2018 15:10:13 4:42 0.00391667 MUs
2408 BLOCK D‐ASHOK NAGAR, BLOCK B‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR NNG 1154 630 KVA PLANNED 16‐03‐2018 10:13:00 16‐03‐2018 13:21:35 3:8 0.00130556 MUs2409 BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, G.B.SSS SCHOOL‐GOKUL PURI, BLOCK A‐MEET NAGAR, BLOCK C‐
HARSH VIHAR, BLOCK E‐UTTARANCHAL COLONY, BLOCK A‐NATHU PURA, SEWA DHAM‐MANDOLI, BLOCK A‐ANUP VIHAR, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK D‐HARSH VIHAR, BLOCK A‐HARSH VIHAR, BLOCK E‐MEET NAGAR
NNG 1335 0 KVA PLANNED 19‐03‐2018 10:14:00 19‐03‐2018 16:11:01 5:57 0.00247917 MUs
2410 GORAKH PARK EAST‐SILAMPUR, GORAKH PARK WEST‐SILAMPUR, BLOCK B‐GORAKH PARK, SHIVAJI PARK‐BALBIR NAGAR, BAGICHI ALLUDDIN‐SADAR BAZAR, BLOCK C‐DURGA PURI, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐NATHU PURA, SHIV MANDIR‐JYOTI NAGAR EAST, ROHITASH NAGAR‐SILAMPUR, BLOCK B‐HARDEV PURI, BLOCK D‐HARDEV PURI, BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK B‐ASHOK NAGAR
NNG 3209 990 KVA PLANNED 19‐03‐2018 10:14:00 19‐03‐2018 13:59:48 3:45 0.00125 MUs
2411 BLOCK C‐GOKUL PURI, BLOCK D‐JYOTI NAGAR, G.B.SSS SCHOOL‐GOKUL PURI NNG 475 630 KVA PLANNED 21‐03‐2018 10:21:00 21‐03‐2018 13:07:54 2:46 0.00092222 MUs2412 PKT A‐CHITRAKOOT, PKT B‐CHITRAKOOT, BLOCK D‐ASHOK NAGAR NNG 706 630 KVA PLANNED 06‐03‐2018 10:20:00 06‐03‐2018 16:00:00 5:40 0.00472222 MUs2413 BLOCK E‐NATHU PURA, BLOCK A‐NATHU PURA, BLOCK E‐JYOTI NAGAR EAST, BLOCK B‐ASHOK NAGAR, BLOCK E‐ASHOK
NAGARNNG 1006 630 KVA PLANNED 08‐03‐2018 10:10:00 08‐03‐2018 13:27:01 3:17 0.00109444 MUs
2414 BLOCK A‐MEET NAGAR, BLOCK E‐RAJIV NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK D‐MEET NAGAR, BLOCK E‐MEET NAGAR
NNG 0 0 KVA PLANNED 10‐03‐2018 10:08:00 10‐03‐2018 16:23:06 6:15 0.00260417 MUs
2415 BLOCK A‐MEET NAGAR, SULOCHANA APPARTMENT‐VASUNDHARA ENCLAVE VSE, BLOCK E‐MEET NAGAR NNG 90 400 KVA PLANNED 26‐03‐2018 10:10:00 26‐03‐2018 16:24:07 6:14 0.00259722 MUs2416 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR, BLOCK C‐KABIR NAGAR, BLOCK B‐KABIR NAGAR NNG 568 630 KVA PLANNED 17‐03‐2018 10:22:00 17‐03‐2018 14:10:54 3:48 0.00126667 MUs
2417 BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, BLOCK C‐KABIR NAGAR NNG 1161 630 KVA PLANNED 22‐03‐2018 10:30:00 22‐03‐2018 14:29:30 3:59 0 MUs2418 BLOCK C‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BLOCK B‐KABIR NAGAR NNG 2133 990 KVA PLANNED 03‐03‐2018 10:25:00 03‐03‐2018 12:35:54 2:10 0 MUs2419 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 302 630 KVA PLANNED 09‐03‐2018 10:43:00 09‐03‐2018 15:30:25 4:47 0 MUs2420 JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐CHANDRA LOK, BLOCK B‐SAKDARPUR, BLOCK A‐ BHARTIYA BODH SABHA‐
HARDEV PURI, BLOCK B‐NATHU PURA, BLOCK A‐B&C‐JAGAT PURI, BLOCK A‐NATHU COLONY, BLOCK B‐CHANDRA LOK, BLOCK M‐DURGA PURI, BLOCK B‐DURGA PURI
NNG 902 990 KVA PLANNED 24‐03‐2018 10:26:00 24‐03‐2018 13:31:50 3:5 0.00102778 MUs
2421 BLOCK B‐KABIR NAGAR, BABA DA DARGA‐KARDAMPURI, BABARPUR WEST‐BABAR PUR NNG NNG 705 990 KVA PLANNED 26‐03‐2018 10:37:00 26‐03‐2018 13:10:25 2:33 0.00085 MUs2422 JYOTI COLONY‐BALBIR NAGAR, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK B, BLOCK B‐DURGA PURI NNG 405 1000 KVA PLANNED 28‐03‐2018 10:15:00 28‐03‐2018 11:49:45 1:34 0 MUs2423 FYAZ GANJ‐NAWAB GANJ, HATHI KHANA‐NAWAB GANJ, NAWAB GANJ‐SADAR BAZAR, PHARI DHIRAJ‐SADAR BAZAR,
NAYA MOHALLA‐KISHAN GANJ RS, SADAR BAZAR B G ROADPHG 2682 990 KVA PLANNED 15‐03‐2018 10:35:00 15‐03‐2018 16:01:54 5:26 0.00090556 MUs
2424 HATHI KHANA‐NAWAB GANJ, NAWAB GANJ‐SADAR BAZAR, PHARI DHIRAJ‐SADAR BAZAR, CHOWK NAI BASTI‐SADAR BAZAR, SADAR BAZAR B G ROAD, SADAR BAZAR ‐ RAM NAGAR
PHG 1188 990 KVA PLANNED 17‐03‐2018 10:14:00 17‐03‐2018 15:41:36 5:27 0.00090833 MUs
2425 PHARI DHIRAJ‐SADAR BAZAR, SADAR BAZAR B G ROAD PHG 115 400 KVA PLANNED 04‐03‐2018 11:03:00 04‐03‐2018 16:00:24 4:57 0.00066 MUs new pole already installed. shutdown required to shift equipment from old pole to new pole
2426 PHARI DHIRAJ‐SADAR BAZAR, CHOWK NAI BASTI‐SADAR BAZAR, SADAR BAZAR B G ROAD, SADAR BAZAR B G ROAD, SADAR BAZAR ‐ RAM NAGAR
PHG 829 990 KVA PLANNED 09‐03‐2018 10:25:00 09‐03‐2018 16:05:03 5:40 0.00094444 MUs
2427 HATHI KHANA‐NAWAB GANJ, PHARI DHIRAJ‐SADAR BAZAR, NAYA MOHALLA‐KISHAN GANJ RS, SADAR BAZAR B G ROAD
PHG 1467 630 KVA PLANNED 23‐03‐2018 10:05:00 23‐03‐2018 15:35:39 5:30 0.00091667 MUs
2428 BLOCK A‐AMAR NAGAR, BLOCK F‐SHIV VIHAR, PKT A‐BLOCK B PHG 41 990 KVA PLANNED 17‐03‐2018 12:08:00 17‐03‐2018 14:25:32 2:17 0.00038056 MUs rep. of piercing with socket at first pole
2429 BLOCK I‐ARAM BAGH, BLOCK B‐ARAM BAGH, CHUNA MANDI‐PAHAR GANJ, MANTOLA MOHALLA‐PAHAR GANJ PHG 656 990 KVA PLANNED 22‐03‐2018 11:15:00 22‐03‐2018 15:59:27 4:44 0.00078889 MUs feeder pillar maintenance work at chuna mandi
2430 BLOCK I‐ARAM BAGH, BLOCK II‐ARAM BAGH, BLOCK B‐ARAM BAGH, BLOCK C‐ARAM BAGH, BLOCK A‐ARAM BAGH, MANTOLA MOHALLA‐PAHAR GANJ, SADAR BAZAR ‐ RAM NAGAR
PHG 840 990 KVA PLANNED 18‐03‐2018 10:11:00 18‐03‐2018 15:50:00 5:39 0.0014125 MUs making of end termination box at s/stn aram bagh no 4
2431 CHUNA MANDI‐PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ, MULTANI DHANDA‐SADAR BAZAR, SHEELA HOTEL‐ARYA NAGAR, TYPE III HOUSE‐CHUNA MANDI, MANTOLA MOHALLA‐PAHAR GANJ, S.R.T. NAGAR‐ARYA NAGAR
PHG 1356 990 KVA PLANNED 16‐03‐2018 11:50:00 16‐03‐2018 15:15:13 3:25 0.00028472 MUs new lt acb installation & new lt feeder work at paharganj dispensary
2432 BLOCK A‐AMAR NAGAR PHG 512 990 KVA PLANNED 16‐03‐2018 14:20:00 16‐03‐2018 14:49:56 0:29 0.00004028 MUs prc to socketing at first pole
2433 BLOCK L‐RAM NAGAR, BLOCK C‐AMAR NAGAR, BLOCK L‐AMAR NAGAR PHG 916 990 KVA PLANNED 23‐03‐2018 14:40:00 23‐03‐2018 17:06:39 2:26 0.00040556 MUs prc to socketing at first pole
2434 ARAM NAGAR‐SADAR BAZAR, BLOCK T‐ARAM NAGAR PHG 881 990 KVA PLANNED 26‐03‐2018 11:35:00 26‐03‐2018 14:15:35 2:40 0.00044444 MUs prc to socketing at first pole
2435 DDA FLATS‐ MOTIAKHAN DUMP SCHEME‐MOTIA KHAN, DDA FLATS‐MOTIA KHAN, MOTIYA KHAN‐SHAHI IDGAH COLONY, BLOCK D‐MOTIA KHAN
PHG 1146 630 KVA PLANNED 12‐03‐2018 10:31:00 12‐03‐2018 16:38:49 6:7 0.00101944 MUs PREVENTIVE MAINTENANCE AT CHARA MANDI IN CHARGE SH SACHIN KUMAR CONTRACT NO 8595174223
2436 MANTOLA MOHALLA‐PAHAR GANJ PHG 1196 990 KVA PLANNED 01‐03‐2018 11:23:00 01‐03‐2018 12:21:08 0:58 0.00016111 MUs AB TO ARMOUND CABLE REPLACEMENT AT gali school wali
2437 MANTOLA MOHALLA‐PAHAR GANJ PHG 1196 990 KVA PLANNED 03‐03‐2018 11:18:00 03‐03‐2018 12:10:09 0:52 0.00014444 MUs AB TO ARMOUND CABLE REPLACEMENT AT gali school wali
2438 DDA FLATS‐MOTIA KHAN, BLOCK D‐MOTIA KHAN, MOTIYA KHAN‐SHAHI IDGAH COLONY PHG 966 630 KVA PLANNED 05‐03‐2018 12:00:00 05‐03‐2018 16:25:19 4:25 0.00036806 MUs AB TO ARMOUND CABLE REPLACEMENT AT chara mandi
2439 DDA FLATS‐MOTIA KHAN, BLOCK D‐MOTIA KHAN, MOTIYA KHAN‐SHAHI IDGAH COLONY PHG 966 630 KVA PLANNED 06‐03‐2018 11:54:00 06‐03‐2018 15:31:56 3:37 0.00030139 MUs AB TO ARMOUND CABLE REPLACEMENT AT chara mandi
2440 DDA FLATS‐ MOTIAKHAN DUMP SCHEME‐MOTIA KHAN, DDA FLATS‐MOTIA KHAN, MOTIYA KHAN‐SHAHI IDGAH COLONY, SADAR BAZAR ‐ RAM NAGAR
PHG 205 630 KVA PLANNED 10‐03‐2018 12:15:00 10‐03‐2018 15:53:24 3:38 0.00030278 MUs AB TO ARMOUND CABLE REPLACEMENT AT chara mandi
2441 BLOCK A‐AMAR NAGAR, ARAM NAGAR‐SADAR BAZAR, BLOCK T‐ARAM NAGAR PHG 2379 990 KVA PLANNED 19‐03‐2018 10:03:00 19‐03‐2018 15:37:45 5:34 0.00092778 MUs2442 BLOCK J‐NABI KARIM, BAGICHI ALLUDDIN‐SADAR BAZAR, BLOCK K‐ARAM NAGAR PHG 183 990 KVA PLANNED 08‐03‐2018 11:41:00 08‐03‐2018 14:32:57 2:51 0.000475 MUs2443 DDA FLATS‐MOTIA KHAN, MOTIYA KHAN‐SHAHI IDGAH COLONY PHG 286 630 KVA PLANNED 05‐03‐2018 12:15:00 05‐03‐2018 14:04:00 1:49 0.00045417 MUs2444 BLOCK I‐ARAM BAGH, BLOCK III‐ARAM BAGH, BLOCK B‐ARAM BAGH, BLOCK A‐ARAM BAGH PHG 378 990 KVA PLANNED 06‐03‐2018 10:35:00 06‐03‐2018 16:11:00 5:36 0.00093333 MUs2445 MANTOLA MOHALLA‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ, S.R.T. NAGAR‐ARYA NAGAR PHG 1252 630 KVA PLANNED 06‐03‐2018 10:05:00 06‐03‐2018 17:26:00 7:21 0 MUs PREVENTIVE
MAINTENANCE due to 30amp load effected
2446 GEETA COLONY, CHUNA MANDI‐PAHAR GANJ, MANTOLA MOHALLA‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, SADAR BAZAR ‐ RAM NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
PHG 1581 990 KVA PLANNED 08‐03‐2018 10:13:00 08‐03‐2018 17:35:46 7:22 0.00122778 MUs PREVENTIVE MAINTENANCE AT S/STN KHANNA CINEMA
2447 MANTOLA MOHALLA‐PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, MAULANA AZAD FOUNDATION‐PANCHKUIAN ROAD RAILWAY COLONY
PHG 482 990 KVA PLANNED 27‐03‐2018 10:02:00 27‐03‐2018 15:01:54 4:59 0.00083056 MUs
2448 DDA FLATS‐ MOTIAKHAN DUMP SCHEME‐MOTIA KHAN, GEETA COLONY, DDA FLATS‐MOTIA KHAN, S.R.T. NAGAR‐ARYA NAGAR, MOTIYA KHAN‐SHAHI IDGAH COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, SANT NIRANKARI SCHOOL‐MOTIA KHAN, R.G. COMPLEX‐MOTIA KHAN, LIG/MIG RES/NON COMM AREA‐MOTIA KHAN, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
PHG 617 990 KVA PLANNED 31‐03‐2018 10:10:00 31‐03‐2018 13:53:01 3:43 0.00061944 MUs
2449 DDA POLICE QTRS.‐AHATA KEDARA, CHOWK NAI BASTI‐SADAR BAZAR, BLOCK T‐AHATA KEDARA, SCHOOL‐AHATA KEDARA
PHG 730 990 KVA PLANNED 13‐03‐2018 10:30:00 13‐03‐2018 15:48:40 5:18 0.00088333 MUs PREVENTIVE MAINTENANCE AT CHAMALIYAN ROAD SH SACHIN KUMAR SR. SUPERVISOUR
2450 SADAR BAZAR ‐ RAM NAGAR PHG 849 990 KVA PLANNED 14‐03‐2018 10:12:00 14‐03‐2018 11:44:32 1:32 0.00025556 MUs2451 BLOCK T‐AHATA KEDARA, CHOWK NAI BASTI‐SADAR BAZAR, SADAR BAZAR ‐ RAM NAGAR, SCHOOL‐AHATA KEDARA PHG 1071 990 KVA PLANNED 16‐03‐2018 10:02:00 16‐03‐2018 15:59:49 5:57 0.00099167 MUs
2452 HATHI KHANA‐NAWAB GANJ, BLOCK T‐AHATA KEDARA, SADAR BAZAR ‐ RAM NAGAR PHG 1431 990 KVA PLANNED 20‐03‐2018 10:13:00 20‐03‐2018 15:47:41 5:34 0.00092778 MUs2453 BLOCK T‐AHATA KEDARA, SADAR BAZAR ‐ RAM NAGAR PHG 344 990 KVA PLANNED 06‐03‐2018 11:08:00 06‐03‐2018 16:04:38 4:56 0.00082222 MUs Shifting Of network
from old pole to new pole
2454 SADAR BAZAR ‐ RAM NAGAR PHG 238 990 KVA PLANNED 06‐03‐2018 11:08:00 06‐03‐2018 16:04:01 4:56 0.00082222 MUs SHIFTING OF NETWORK FROM OLD POLE TO NEW POLE
2455 BLOCK T‐AHATA KEDARA PHG 1150 990 KVA PLANNED 22‐03‐2018 10:05:00 22‐03‐2018 16:02:51 5:57 0.00099167 MUs2456 BLOCK T‐AHATA KEDARA, SHAHI IDGAH‐SADAR BAZAR ‐ P.P QUARTERS, BLOCK J‐AHATA KEDARA, BLOCK T‐SADAR
BAZAR ‐ RAM NAGARPHG 753 990 KVA PLANNED 05‐03‐2018 10:10:00 05‐03‐2018 14:39:28 4:29 0.00074722 MUs
2457 BLOCK T‐AHATA KEDARA, SADAR BAZAR ‐ RAM NAGAR, BLOCK T‐SADAR BAZAR ‐ RAM NAGAR PHG 788 990 KVA PLANNED 07‐03‐2018 10:38:00 07‐03‐2018 15:56:18 5:18 0.00088333 MUs
2458 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, SADAR BAZAR ‐ RAM NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
PHG 3000 990 KVA PLANNED 10‐03‐2018 10:30:00 10‐03‐2018 15:46:06 5:16 0.00087778 MUs
2459 GEETA COLONY, BLOCK T‐AHATA KEDARA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, SADAR BAZAR ‐ RAM NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
PHG 1855 990 KVA PLANNED 24‐03‐2018 10:11:00 24‐03‐2018 16:06:25 5:55 0.00098611 MUs
2460 CHOWK NAI BASTI‐SADAR BAZAR, SADAR BAZAR ‐ RAM NAGAR PHG 771 400 KVA PLANNED 26‐03‐2018 10:10:00 26‐03‐2018 15:48:16 5:38 0.00093889 MUs2461 PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, BLOCK T‐AHATA KEDARA, SADAR BAZAR ‐ RAM NAGAR, BLOCK T‐
SADAR BAZAR ‐ RAM NAGARPHG 702 400 KVA PLANNED 28‐03‐2018 10:00:37 28‐03‐2018 16:03:05 6:2 0.00100556 MUs
2462 BLOCK F‐PUNJABI BASTI PNR 3 990 KVA PLANNED 16‐03‐2018 12:05:00 16‐03‐2018 16:35:54 4:30 0.0009 MUs2463 BLOCK T‐BALJIT NAGAR, DMS COLONY‐PREM NAGAR, DELHI MILK SCHEM DMS‐PREM NAGAR PNR 610 990 KVA PLANNED 16‐03‐2018 13:37:00 16‐03‐2018 15:43:10 2:6 0.00042 MUs2464 CHETAN BASTI‐ BLOCK J‐NEHRU NAGAR PNR 155 990 KVA PLANNED 16‐03‐2018 13:39:00 16‐03‐2018 15:43:30 2:4 0.00041333 MUs2465 BLOCK T‐PANJABI BASTI, BLOCK F‐PUNJABI BASTI PNR 276 990 KVA PLANNED 17‐03‐2018 14:08:00 17‐03‐2018 15:23:09 1:15 0.00025 MUs2466 BLOCK T‐BALJIT NAGAR, BLOCK L‐WEST PATEL NAGAR, BLOCK T‐WEST PATEL NAGAR, BLOCK P‐WEST PATEL NAGAR,
BLOCK V‐WEST PATEL NAGARPNR 510 990 KVA PLANNED 17‐03‐2018 14:08:00 17‐03‐2018 16:48:58 2:40 0.00053333 MUs
2467 BLOCK T‐BALJIT NAGAR, BLOCK 30‐WEST PATEL NAGAR PNR 84 990 KVA PLANNED 17‐03‐2018 14:08:00 17‐03‐2018 15:23:25 1:15 0.00025 MUs2468 BLOCK T‐BALJIT NAGAR PNR 274 990 KVA PLANNED 17‐03‐2018 14:08:00 17‐03‐2018 15:22:43 1:14 0.00024667 MUs2469 BLOCK 28‐WEST PATEL NAGAR, BLOCK F‐WEST PATEL NAGAR PNR 82 990 KVA PLANNED 19‐03‐2018 16:13:00 19‐03‐2018 16:43:52 0:30 0.00011667 MUs2470 BLOCK T‐PANJABI BASTI, BLOCK F‐PUNJABI BASTI PNR 49 630 KVA PLANNED 19‐03‐2018 13:06:00 19‐03‐2018 14:55:20 1:49 0.00036333 MUs2471 BLOCK 35‐RAMJAS SPORTS COMPLEX, RAJASTHAN COLONY‐FARIDPURI PNR 169 400 KVA PLANNED 19‐03‐2018 13:07:00 19‐03‐2018 14:55:56 1:48 0.00033 MUs2472 CHETAN BASTI‐ BLOCK J‐NEHRU NAGAR PNR 361 990 KVA PLANNED 21‐03‐2018 11:18:00 21‐03‐2018 13:13:06 1:55 0.00035139 MUs2473 BLOCK T‐BALJIT NAGAR, BLOCK L‐WEST PATEL NAGAR, BLOCK V‐WEST PATEL NAGAR PNR 57 990 KVA PLANNED 21‐03‐2018 11:18:00 21‐03‐2018 13:13:21 1:55 0.00035139 MUs2474 BLOCK T‐BALJIT NAGAR, BLOCK 30‐WEST PATEL NAGAR PNR 84 990 KVA PLANNED 21‐03‐2018 12:53:00 21‐03‐2018 13:50:00 0:56 0.00017111 MUs2475 BLOCK T‐BALJIT NAGAR, BLOCK T‐PANJABI BASTI PNR 190 990 KVA PLANNED 21‐03‐2018 11:18:00 21‐03‐2018 13:13:34 1:55 0.00035139 MUs2476 BLOCK 28‐WEST PATEL NAGAR, BLOCK F‐WEST PATEL NAGAR PNR 82 990 KVA PLANNED 22‐03‐2018 11:21:00 22‐03‐2018 13:19:41 1:58 0.00036056 MUs2477 BLOCK F‐PUNJABI BASTI, BLOCK F‐PUNJABI BASTI PNR 6 990 KVA PLANNED 22‐03‐2018 11:21:00 22‐03‐2018 13:19:59 1:58 0.00036056 MUs2478 BLOCK T‐PANJABI BASTI, BLOCK F‐PUNJABI BASTI PNR 49 630 KVA PLANNED 22‐03‐2018 11:21:00 22‐03‐2018 13:19:18 1:58 0.00036056 MUs2479 BLOCK 35‐RAMJAS SPORTS COMPLEX, RAJASTHAN COLONY‐FARIDPURI PNR 169 400 KVA PLANNED 22‐03‐2018 11:45:00 22‐03‐2018 13:20:16 1:35 0.00031667 MUs2480 BLOCK T‐PANJABI BASTI, BLOCK F‐PUNJABI BASTI PNR 331 990 KVA PLANNED 23‐03‐2018 11:50:00 23‐03‐2018 13:48:02 1:58 0.00036056 MUs2481 BLOCK T‐BALJIT NAGAR, DMS COLONY‐PREM NAGAR, DELHI MILK SCHEM DMS‐PREM NAGAR PNR 610 990 KVA PLANNED 23‐03‐2018 11:50:00 23‐03‐2018 13:47:43 1:57 0.0003575 MUs2482 CHETAN BASTI‐ BLOCK J‐NEHRU NAGAR PNR 243 990 KVA PLANNED 23‐03‐2018 11:51:00 23‐03‐2018 13:48:18 1:57 0.0003575 MUs2483 BLOCK T‐PANJABI BASTI, BLOCK F‐PUNJABI BASTI PNR 331 990 KVA PLANNED 24‐03‐2018 11:58:00 24‐03‐2018 13:55:06 1:57 0.00039 MUs2484 BLOCK T‐BALJIT NAGAR, BLOCK L‐WEST PATEL NAGAR, BLOCK V‐WEST PATEL NAGAR PNR 57 990 KVA PLANNED 24‐03‐2018 11:58:00 24‐03‐2018 13:54:50 1:56 0.00035444 MUs2485 BLOCK T‐BALJIT NAGAR, BLOCK 30‐WEST PATEL NAGAR PNR 84 990 KVA PLANNED 24‐03‐2018 11:58:00 24‐03‐2018 13:55:23 1:57 0.0003575 MUs2486 BLOCK T‐BALJIT NAGAR PNR 274 990 KVA PLANNED 24‐03‐2018 11:58:00 24‐03‐2018 13:54:12 1:56 0.00038667 MUs2487 BLOCK 28‐WEST PATEL NAGAR, BLOCK F‐WEST PATEL NAGAR PNR 82 990 KVA PLANNED 26‐03‐2018 11:44:00 26‐03‐2018 14:43:44 2:59 0.00059667 MUs2488 PREM NAGAR‐BALJIT NAGAR, BLOCK F‐PUNJABI BASTI PNR 350 990 KVA PLANNED 26‐03‐2018 13:40:00 26‐03‐2018 14:44:03 1:4 0.00019556 MUs2489 BLOCK T‐PANJABI BASTI, BLOCK F‐PUNJABI BASTI PNR 49 630 KVA PLANNED 26‐03‐2018 11:43:00 26‐03‐2018 14:43:21 3:0 0.00055 MUs2490 BLOCK 35‐RAMJAS SPORTS COMPLEX, RAJASTHAN COLONY‐FARIDPURI PNR 169 400 KVA PLANNED 26‐03‐2018 11:43:00 26‐03‐2018 14:42:50 2:59 0.00059667 MUs2491 BLOCK T‐BALJIT NAGAR, DMS COLONY‐PREM NAGAR, DELHI MILK SCHEM DMS‐PREM NAGAR PNR 610 990 KVA PLANNED 27‐03‐2018 11:35:00 27‐03‐2018 15:35:00 4:0 0.00073333 MUs2492 PREM NAGAR‐BALJIT NAGAR, BLOCK F‐PUNJABI BASTI PNR 450 630 KVA PLANNED 13‐03‐2018 10:22:00 13‐03‐2018 15:52:17 5:30 0.0011 MUs2493 BLOCK T‐BALJIT NAGAR, BLOCK 30‐WEST PATEL NAGAR PNR 84 990 KVA PLANNED 01‐03‐2018 11:30:00 01‐03‐2018 15:02:12 3:32 0.00070667 MUs2494 BLOCK T‐BALJIT NAGAR, BLOCK 30‐WEST PATEL NAGAR PNR 774 990 KVA PLANNED 03‐03‐2018 11:35:00 03‐03‐2018 15:01:12 3:26 0.00068667 MUs2495 BLOCK F‐WEST PATEL NAGAR, BLOCK K‐WEST PATEL NAGAR PNR 172 990 KVA PLANNED 03‐03‐2018 11:35:00 03‐03‐2018 15:01:23 3:26 0.00068667 MUs2496 BLOCK 30‐EAST PATEL NAGAR, BLOCK 29‐EAST PATEL NAGAR, BLOCK 24‐EAST PATEL NAGAR PNR 134 990 KVA PLANNED 03‐03‐2018 11:33:00 03‐03‐2018 15:00:46 3:27 0.00069 MUs2497 BLOCK H‐WEST PATEL NAGAR, BLOCK J‐WEST PATEL NAGAR PNR 289 990 KVA PLANNED 03‐03‐2018 11:35:00 03‐03‐2018 15:00:56 3:25 0.00637778 MUs2498 BLOCK N‐WEST PATEL NAGAR, BLOCK Q‐WEST PATEL NAGAR, BLOCK V‐WEST PATEL NAGAR PNR 71 990 KVA PLANNED 05‐03‐2018 11:48:00 05‐03‐2018 14:13:39 2:25 0.00048333 MUs2499 PATEL NAGAR POLICE STATION‐WEST PATEL NAGAR, BLOCK T‐BALJIT NAGAR, BLOCK V‐WEST PATEL NAGAR PNR 101 990 KVA PLANNED 05‐03‐2018 11:48:00 05‐03‐2018 14:13:16 2:25 0.00048333 MUs2500 BLOCK T‐BALJIT NAGAR, BLOCK 30‐WEST PATEL NAGAR, THAKKAR BAPA NAGAR‐DEV NAGAR, BLOCK T‐PANJABI BASTI PNR 684 990 KVA PLANNED 07‐03‐2018 13:13:00 07‐03‐2018 16:45:52 3:32 0.00070667 MUs
2501 BLOCK 29‐EAST PATEL NAGAR, BLOCK 24‐EAST PATEL NAGAR, BLOCK 30‐EAST PATEL NAGAR PNR 134 990 KVA PLANNED 07‐03‐2018 14:13:00 07‐03‐2018 15:58:36 1:45 0.00035 MUs2502 CLOSED FACTORY‐FARIDPURI, BLOCK 35‐RAMJAS SPORTS COMPLEX PNR 274 400 KVA PLANNED 08‐03‐2018 12:43:00 08‐03‐2018 14:46:36 2:3 0.00044417 MUs2503 BLOCK T‐BALJIT NAGAR PNR 417 990 KVA PLANNED 08‐03‐2018 12:43:00 08‐03‐2018 14:47:15 2:4 0.00048222 MUs2504 BLOCK T‐BALJIT NAGAR PNR 287 990 KVA PLANNED 09‐03‐2018 13:41:00 09‐03‐2018 14:33:00 0:51 0.00017 MUs2505 BLOCK T‐PANJABI BASTI, BLOCK F‐PUNJABI BASTI PNR 49 630 KVA PLANNED 09‐03‐2018 13:41:00 09‐03‐2018 17:00:00 3:19 0.00066333 MUs2506 BLOCK T‐BALJIT NAGAR, BLOCK 30‐WEST PATEL NAGAR PNR 84 990 KVA PLANNED 09‐03‐2018 13:40:00 09‐03‐2018 14:34:00 0:54 0.00018 MUs2507 PATEL NAGAR POLICE STATION‐WEST PATEL NAGAR, BLOCK T‐BALJIT NAGAR, BLOCK V‐WEST PATEL NAGAR PNR 101 990 KVA PLANNED 09‐03‐2018 13:40:00 09‐03‐2018 14:35:00 0:54 0.00018 MUs2508 CLOSED FACTORY‐FARIDPURI, BLOCK 35‐RAMJAS SPORTS COMPLEX PNR 581 400 KVA PLANNED 12‐03‐2018 11:44:00 12‐03‐2018 13:54:50 2:10 0.00043333 MUs2509 BLOCK N‐WEST PATEL NAGAR, BLOCK P‐WEST PATEL NAGAR, BLOCK V‐WEST PATEL NAGAR, BLOCK O‐WEST PATEL
NAGARPNR 40 990 KVA PLANNED 12‐03‐2018 11:44:00 12‐03‐2018 13:55:08 2:11 0.00043667 MUs
2510 BLOCK T‐BALJIT NAGAR, BLOCK T‐WEST PATEL NAGAR, BLOCK V‐WEST PATEL NAGAR, PATEL NAGAR POLICE STATION‐WEST PATEL NAGAR
PNR 193 990 KVA PLANNED 12‐03‐2018 11:44:00 12‐03‐2018 13:54:37 2:10 0.00043333 MUs
2511 BLOCK T‐BALJIT NAGAR PNR 53 990 KVA PLANNED 12‐03‐2018 11:44:00 12‐03‐2018 13:54:19 2:10 0.00043333 MUs2512 BLOCK T‐BALJIT NAGAR, BLOCK 30‐WEST PATEL NAGAR, BLOCK T‐PANJABI BASTI, BLOCK F‐PUNJABI BASTI PNR 56 990 KVA PLANNED 14‐03‐2018 11:53:00 14‐03‐2018 13:26:31 1:33 0.00031 MUs2513 BLOCK F‐WEST PATEL NAGAR, BLOCK H‐WEST PATEL NAGAR, BLOCK E‐WEST PATEL NAGAR, BLOCK D‐WEST PATEL
NAGARPNR 515 990 KVA PLANNED 14‐03‐2018 11:53:00 14‐03‐2018 13:25:53 1:32 0.00030667 MUs
2514 BLOCK 25‐EAST PATEL NAGAR, BLOCK 26‐EAST PATEL NAGAR, BLOCK 29‐EAST PATEL NAGAR, BLOCK 24‐EAST PATEL NAGAR
PNR 4 990 KVA PLANNED 14‐03‐2018 11:24:00 14‐03‐2018 13:25:01 2:1 0.00040333 MUs
2515 BLOCK H‐WEST PATEL NAGAR, BLOCK J‐WEST PATEL NAGAR PNR 216 990 KVA PLANNED 14‐03‐2018 12:30:00 14‐03‐2018 17:22:33 4:52 0.00097333 MUs db replacement and made lt staright through joint
2516 BLOCK T‐BALJIT NAGAR PNR 287 990 KVA PLANNED 15‐03‐2018 11:30:00 15‐03‐2018 14:32:37 3:2 0.00060667 MUs2517 BLOCK H‐WEST PATEL NAGAR, BLOCK N‐WEST PATEL NAGAR, BLOCK P‐WEST PATEL NAGAR, BLOCK V‐WEST PATEL
NAGAR, BLOCK O‐WEST PATEL NAGARPNR 88 990 KVA PLANNED 15‐03‐2018 11:30:00 15‐03‐2018 14:31:35 3:1 0.00060333 MUs
2518 BLOCK T‐BALJIT NAGAR, BLOCK A‐COTTAGE, BLOCK V‐WEST PATEL NAGAR, PATEL NAGAR POLICE STATION‐WEST PATEL NAGAR
PNR 13 990 KVA PLANNED 15‐03‐2018 12:30:00 15‐03‐2018 14:31:01 2:1 0.00040333 MUs
2519 BLOCK T‐BALJIT NAGAR, SHADIPUR DEPOT‐BALJIT NAGAR PNR 17 990 KVA PLANNED 15‐03‐2018 11:30:00 15‐03‐2018 14:32:11 3:2 0.00060667 MUs2520 BLOCK 12‐EAST PATEL NAGAR, BLOCK 25‐EAST PATEL NAGAR, BLOCK 26‐EAST PATEL NAGAR, BLOCK 30‐EAST PATEL
NAGAR, BLOCK 29‐EAST PATEL NAGAR, BLOCK 24‐EAST PATEL NAGARPNR 606 990 KVA PLANNED 16‐03‐2018 10:09:00 16‐03‐2018 13:31:50 3:22 0 MUs
2521 BLOCK T‐BALJIT NAGAR, BLOCK 33‐WEST PATEL NAGAR, BLOCK 30‐WEST PATEL NAGAR, BLOCK T‐PANJABI BASTI, BLOCK F‐PUNJABI BASTI
PNR 1604 990 KVA PLANNED 21‐03‐2018 10:10:00 21‐03‐2018 12:31:06 2:21 0 MUs
2522 BLOCK 18‐EAST PATEL NAGAR, BLOCK 16‐EAST PATEL NAGAR, BLOCK 28‐EAST PATEL NAGAR, BLOCK 27‐EAST PATEL NAGAR, BLOCK 15A‐EAST PATEL NAGAR, BLOCK 15‐EAST PATEL NAGAR
PNR 405 630 KVA PLANNED 01‐03‐2018 10:10:00 01‐03‐2018 13:51:30 3:41 0 MUs
2523 PREM NAGAR‐BALJIT NAGAR, BLOCK F‐PUNJABI BASTI PNR 942 630 KVA PLANNED 06‐03‐2018 10:05:00 06‐03‐2018 13:59:25 3:54 0 MUs
2524 MATA RAMESHWARI NEHRU NAGAR‐DEV NAGAR, BLOCK 14‐WEST PATEL NAGAR, BLOCK 8‐WEST PATEL NAGAR, BLOCK 6‐WEST PATEL NAGAR, BLOCK 13‐WEST PATEL NAGAR, BLOCK 11‐WEST PATEL NAGAR, PREM NAGAR‐BALJIT NAGAR, DAYANAND MODEL SCHOOL(SECONDARY)‐WEST PATEL NAGAR, BLOCK Z‐WEST PATEL NAGAR, BLOCK 12‐WEST PATEL NAGAR
PNR 711 990 KVA PLANNED 07‐03‐2018 10:03:00 07‐03‐2018 15:10:04 5:7 0 MUs
2525 BLOCK 33‐WEST PATEL NAGAR, BLOCK 31‐WEST PATEL NAGAR, BLOCK 29‐WEST PATEL NAGAR, BLOCK 30‐WEST PATEL NAGAR
PNR 921 630 KVA PLANNED 09‐03‐2018 10:10:00 09‐03‐2018 12:53:53 2:43 0.00054333 MUs
2526 BLOCK O‐WEST PATEL NAGAR, BLOCK J‐WEST PATEL NAGAR, BLOCK H‐WEST PATEL NAGAR, BLOCK G‐COTTAGE PNR 505 990 KVA PLANNED 10‐03‐2018 10:00:33 10‐03‐2018 14:10:53 4:10 0.00083333 MUs2527 BLOCK 35‐WEST PATEL NAGAR, BLOCK 33‐WEST PATEL NAGAR, BLOCK 31‐WEST PATEL NAGAR, BLOCK 30‐WEST
PATEL NAGAR, PROHIBITED AREA‐ANAND PARBATPNR 328 990 KVA PLANNED 23‐03‐2018 10:09:00 23‐03‐2018 12:43:36 2:34 0 MUs
2528 THAKKAR BAPA NAGAR‐BLOCK 16, BLOCK_9B‐DEV NAGAR, BLOCK A‐PUNJABI BASTI, BABA FARID PURI‐PUNJABI BASTI, BLOCK B‐PUNJABI BASTI
PNR 2500 990 KVA PLANNED 14‐03‐2018 10:18:00 14‐03‐2018 15:04:11 4:46 0 MUs
2529 KHALSA NAGAR‐DEV NAGAR, BLOCK G‐DEV NAGAR, BAPA NAGAR‐ANAND PARBAT, THAKKAR BAPA NAGAR‐DEV NAGAR, MATA RAMESHWARI NEHRU NAGAR‐DEV NAGAR
PNR 2845 990 KVA PLANNED 22‐03‐2018 10:18:00 22‐03‐2018 13:11:35 2:53 0 MUs
2530 BLOCK 2B‐DEV NAGAR, BLOCK 1B‐DEV NAGAR, BLOCK 6B‐DEV NAGAR, BLOCK 3‐DEV NAGAR, BLOCK 7B‐DEV NAGAR, KHALSA NAGAR‐DEV NAGAR
PNR 1939 990 KVA PLANNED 28‐03‐2018 10:03:00 28‐03‐2018 12:52:22 2:49 0.00056333 MUs
2531 ANAND PARBAT, NAI BASTI‐ANAND PARBAT PNR 637 630 KVA PLANNED 12‐03‐2018 10:40:00 12‐03‐2018 15:31:48 4:51 0 MUs2532 ANAND PARBAT, NAI BASTI‐ANAND PARBAT PNR 193 990 KVA PLANNED 05‐03‐2018 11:46:00 05‐03‐2018 14:13:55 2:27 0.00049 MUs db replacement and
made lt staright through joint
2533 THAN SINGH NAGAR‐ANAND PARBAT, NAI BASTI‐ANAND PARBAT PNR 170 990 KVA PLANNED 06‐03‐2018 11:32:00 06‐03‐2018 15:12:08 3:40 0.00073333 MUs db replacement and made lt staright through joint
2534 THAN SINGH NAGAR‐ANAND PARBAT PNR 566 990 KVA PLANNED 08‐03‐2018 11:03:00 08‐03‐2018 12:21:22 1:18 0.00028167 MUs db replacement and made lt staright through joint
2535 ANAND PARBAT PNR 15 990 KVA PLANNED 12‐03‐2018 13:19:00 12‐03‐2018 15:32:05 2:13 0.00051722 MUs db replacement and made lt staright through joint
2536 THAN SINGH NAGAR‐ANAND PARBAT, NAI BASTI‐ANAND PARBAT PNR 46 990 KVA PLANNED 14‐03‐2018 11:42:00 14‐03‐2018 13:25:35 1:43 0.00042917 MUs db replacement and made lt staright through joint
2537 BLOCK 26B‐AJMAL KHAN PARK, BLOCK 27B‐AJMAL KHAN PARK, THAN SINGH NAGAR‐ANAND PARBAT PNR 1505 990 KVA PLANNED 20‐03‐2018 11:03:00 20‐03‐2018 12:48:42 1:45 0 MUs2538 INDUSTRIAL AREA‐ANAND PARBHAT PNR 402 990 KVA PLANNED 05‐03‐2018 10:11:00 05‐03‐2018 14:52:54 4:41 0.00078056 MUs2539 ANAND PARBAT PNR 274 990 KVA PLANNED 08‐03‐2018 11:10:00 08‐03‐2018 14:11:53 3:1 0.00060333 MUs2540 ANAND PARBAT, THAN SINGH NAGAR‐ANAND PARBAT, BLOCK T‐FARIDPURI PNR 73 990 KVA PLANNED 26‐03‐2018 10:08:00 26‐03‐2018 12:57:51 2:49 0 MUs2541 ANAND PARBAT, THAN SINGH NAGAR‐ANAND PARBAT, NAI BASTI‐ANAND PARBAT PNR 378 630 KVA PLANNED 27‐03‐2018 10:04:00 27‐03‐2018 13:20:00 3:16 0.00065333 MUs2542 BLOCK 57‐AJMAL KHAN PARK, BLOCK 63‐AJMAL KHAN PARK, OPD. DR. N.C. JOSHI MEMORIAL HOSPITAL‐JOSHI ROAD SRD 910 990 KVA PLANNED 26‐03‐2018 11:44:00 26‐03‐2018 12:52:17 1:8 0.00028333 MUs mog work
2543 BLOCK_2A‐SAT NAGAR, BLOCK_1A‐REHAGAR PURA, BLOCK_39‐NAIWALA, BLOCK A‐JHANDEWALAN, BLOCK_1A‐REHAGAR PURA
SRD 253 400 KVA PLANNED 12‐03‐2018 11:03:00 12‐03‐2018 13:50:59 2:47 0 MUs
2544 BLOCK 57‐AJMAL KHAN PARK, MOHALLA SUBHASH NAGAR‐NAIWALA, MCD GARAGE‐ SLUM‐JHANDEWALAN, KAROL BAGH TERMINAL SLUM‐JHANDEWALAN, SLUM‐JHANDEWALAN, BLOCK T‐JHANDEWALAN
SRD 434 630 KVA PLANNED 14‐03‐2018 10:23:00 14‐03‐2018 14:00:00 3:37 0.00090417 MUs
2545 BLOCK_37J‐BEADON PURA, BLOCK_46‐BEADON PURA, BLOCK_35M‐BEADON PURA, BLOCK_24N‐BEADON PURA, BLOCK 23‐KRISHNA NAGAR, BLOCK 34P‐KRISHNA NAGAR
SRD 980 990 KVA PLANNED 15‐03‐2018 10:42:00 15‐03‐2018 13:38:26 2:56 0.00171111 MUs
2546 BLOCK_46‐BEADON PURA, BLOCK_35M‐BEADON PURA, BLOCK_34P‐KRISHNA NAGAR, BLOCK_45‐KRISHNA NAGAR SRD 778 630 KVA PLANNED 19‐03‐2018 11:25:00 19‐03‐2018 13:46:14 2:21 0.00086167 MUs
2547 BLOCK_35M‐BEADON PURA, BLOCK_24N‐BEADON PURA, BLOCK_31‐KRISHNA NAGAR, BLOCK 8‐KAROL BAGH WEST EXTENSION AREA
SRD 410 990 KVA PLANNED 21‐03‐2018 10:50:00 21‐03‐2018 13:47:26 2:57 0.00113083 MUs
2548 JHANDEWALAN FATTED FACTORY COMPLEX SRD 124 990 KVA PLANNED 10‐03‐2018 11:30:00 10‐03‐2018 13:02:47 1:32 0.00051111 MUs2549 BLOCK_37J‐BEADON PURA, BLOCK_25K‐BEADON PURA, BLOCK_24N‐BEADON PURA SRD 295 990 KVA PLANNED 24‐03‐2018 10:40:00 24‐03‐2018 12:26:24 1:46 0.00044167 MUs2550 SWAMI RAMTIRTH NAGAR‐JHANDEWALAN EXTENSION, BHARTI COLONY‐NIRMAN VIHAR, AJMAL KHAN PARK SRD‐
KAROL BAGH SRD, CINEMA‐JHANDEWALAN EXTENSION, ANARKALI BAZAR‐JHANDEWALAN EXTENSION, S.R.T. NAGAR‐JHANDEWALAN EXTENSION, BLOCK 1E‐JHANDEWALAN EXTENSION, BLOCK 4E‐JHANDEWALAN EXTENSION
SRD 390 990 KVA PLANNED 16‐03‐2018 11:10:00 16‐03‐2018 17:00:00 5:50 0.00252778 MUs
2551 SWAMI RAMTIRTH NAGAR‐JHANDEWALAN EXTENSION, BLOCK B‐OLD RAJENDRA NAGAR, BLOCK A‐JHANDEWALAN, JHANDEWALAN FATTED FACTORY COMPLEX, ANARKALI BAZAR‐JHANDEWALAN EXTENSION, S.R.T. NAGAR‐JHANDEWALAN EXTENSION, BLOCK 1E‐JHANDEWALAN EXTENSION, BLOCK 4E‐JHANDEWALAN EXTENSION
SRD 390 990 KVA PLANNED 19‐03‐2018 11:00:00 19‐03‐2018 17:46:29 6:46 0.00225556 MUs
2552 BLOCK 50‐AJMAL KHAN PARK, BLOCK_46‐BEADON PURA, BLOCK_19C‐KRISHNA NAGAR, AJMAL KHAN PARK SRD‐KAROL BAGH SRD
SRD 408 400 KVA PLANNED 28‐03‐2018 10:23:00 28‐03‐2018 13:40:00 3:17 0.00218889 MUs
2553 BLOCK 2B‐DEV NAGAR, BLOCK_6A‐SAT NAGAR, BLOCK_5A‐SAT NAGAR, BLOCK_3A‐SAT NAGAR, BLOCK_2A‐SAT NAGAR, BLOCK_12D‐KRISHNA NAGAR, BLOCK_20C‐KRISHNA NAGAR, BLOCK_21K‐KRISHNA NAGAR, BLOCK_10A‐BALMIKI COLONY, BLOCK_1A‐REHAGAR PURA, GEETA COLONY, SHAMSHAN GHAT‐SAT NAGAR, BLOCK 12‐REHGAR PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, BLOCK_1A‐REHAGAR PURA, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR LIG/MIG RES/NON COMM AREA SONIA VIHAR
SRD 8881 5580 KVA PLANNED 27‐03‐2018 11:11:00 27‐03‐2018 12:01:00 0:49 0.00070778 MUs change of ct ratio and for connection
2554 BLOCK_34P‐KRISHNA NAGAR, BLOCK_45‐KRISHNA NAGAR, BLOCK_31‐KRISHNA NAGAR, BLOCK_44O‐KRISHNA NAGAR, BLOCK 21K‐KRISHNA NAGAR, BLOCK 48‐KRISHNA NAGAR, BLOCK 54‐OLD RAJENDRA NAGAR
SRD 1093 990 KVA PLANNED 13‐03‐2018 11:00:00 13‐03‐2018 13:58:00 2:58 0.00098889 MUs
2555 BLOCK_34P‐KRISHNA NAGAR, BLOCK_45‐KRISHNA NAGAR, BLOCK_44O‐KRISHNA NAGAR, BLOCK_48‐KRISHNA NAGAR, S.R.T. NAGAR‐JHANDEWALAN EXTENSION
SRD 185 990 KVA PLANNED 16‐03‐2018 11:00:00 16‐03‐2018 12:32:52 1:32 0.00058778 MUs
2556 P & T COLONY‐SAT NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, SHAMSHAN GHAT‐SAT NAGAR, BLOCK_8A‐SANT NAGAR, BLOCK_9A‐BALMIKI COLONY, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, ALFA SPICE‐SAT NAGAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, TELEPHONE EXCHANGE‐SAT NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A BLOCK B
SRD 561 990 KVA PLANNED 14‐03‐2018 10:23:00 14‐03‐2018 16:30:00 6:7 0.00203889 MUs plinth raising work
2557 BLOCK_5A‐SAT NAGAR, BLOCK_2A‐SAT NAGAR, BLOCK_34P‐KRISHNA NAGAR, BLOCK_31‐KRISHNA NAGAR, BLOCK 10A‐BALMIKI COLONY, BLOCK 1A‐REHAGAR PURA, BLOCK 1A‐REHAGAR PURA
SRD 2020 990 KVA PLANNED 05‐03‐2018 10:20:00 05‐03‐2018 13:27:22 3:7 0.00103889 MUs
2558 BLOCK_31‐KRISHNA NAGAR, BLOCK_3H‐KRISHNA NAGAR, BLOCK_21K‐KRISHNA NAGAR, BLOCK_48‐KRISHNA NAGAR SRD 1806 630 KVA PLANNED 06‐03‐2018 10:48:00 06‐03‐2018 13:22:35 2:34 0 MUs
2559 BLOCK_8A‐SANT NAGAR, BLOCK_6‐KAROL BAGH WEST EXTENSION AREA, BLOCK_9A‐BALMIKI COLONY, GEETA COLONY, SHAMSHAN GHAT‐SAT NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, TELEPHONE EXCHANGE‐SAT NAGAR, P & T COLONY‐SAT NAGAR, ALFA SPICE‐SAT NAGAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA SONIA VIHAR
SRD 561 990 KVA PLANNED 08‐03‐2018 10:46:00 08‐03‐2018 15:40:00 4:54 0.00163333 MUs
2560 BLOCK_6A‐SAT NAGAR, BLOCK_3H‐KRISHNA NAGAR, BLOCK_21K‐KRISHNA NAGAR, BLOCK_48‐KRISHNA NAGAR, BLOCK 30B‐KRISHNA NAGAR
SRD 223 630 KVA PLANNED 09‐03‐2018 10:50:00 09‐03‐2018 13:45:00 2:55 0.00097222 MUs
2561 BLOCK_20C‐KRISHNA NAGAR, BLOCK_3H‐KRISHNA NAGAR, BLOCK_21K‐KRISHNA NAGAR, BLOCK_19C‐KRISHNA NAGAR, BLOCK 30B‐KRISHNA NAGAR, BLOCK 1A‐REHAGAR PURA
SRD 2484 990 KVA PLANNED 26‐03‐2018 10:35:00 26‐03‐2018 13:14:38 2:39 0 MUs
2562 BLOCK_3A‐SAT NAGAR, BLOCK_2A‐SAT NAGAR, GEETA COLONY, SHAMSHAN GHAT‐SAT NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
SRD 656 630 KVA PLANNED 31‐03‐2018 10:38:00 31‐03‐2018 13:28:29 2:50 0.00118056 MUs
2563 BLOCK 10‐OLD RAJENDRA NAGAR, BLOCK 14‐OLD RAJENDRA NAGAR, BLOCK 15‐OLD RAJENDRA NAGAR, BLOCK 16‐OLD RAJENDRA NAGAR, SIR GANGA RAM HOSPITAL‐CENTRAL RIDGE RESERVED FOREST, WEST KAROL BAGH‐CENTRAL RIDGE RESERVED FOREST
SRD 327 990 KVA PLANNED 21‐03‐2018 12:50:00 21‐03‐2018 15:26:27 2:36 0.00065 MUs pole maintenance work
2564 BLOCK_6‐KAROL BAGH WEST EXTENSION AREA, BLOCK 17‐OLD RAJENDRA NAGAR, BLOCK 11‐OLD RAJENDRA NAGAR, BLOCK 22‐OLD RAJENDRA NAGAR, BLOCK 15‐OLD RAJENDRA NAGAR, BLOCK 25‐OLD RAJENDRA NAGAR, BLOCK 24‐OLD RAJENDRA NAGAR, BLOCK 16‐OLD RAJENDRA NAGAR, BLOCK 4C‐OLD RAJENDRA NAGAR, BLOCK 4D‐OLD RAJENDRA NAGAR, BLOCK 26‐OLD RAJENDRA NAGAR, BLOCK 27‐OLD RAJENDRA NAGAR, BLOCK 18‐OLD RAJENDRA NAGAR, BLOCK 13‐OLD RAJENDRA NAGAR, BLOCK 12‐OLD RAJENDRA NAGAR, BLOCK 59‐OLD RAJENDRA NAGAR, BLOCK 53‐OLD RAJENDRA NAGAR, BLOCK 54‐OLD RAJENDRA NAGAR, BLOCK 8‐OLD RAJENDRA NAGAR, BLOCK B‐OLD RAJENDRA NAGAR, SALWAN PUBLIC SCHOOL‐OLD RAJENDRA NAGAR, BLOCK_1A‐REHAGAR PURA
SRD 1059 990 KVA PLANNED 17‐03‐2018 10:45:00 17‐03‐2018 13:40:00 2:55 0.00121528 MUs
2565 PART I‐ BLOCK R‐NEW RAJENDRA NAGAR, BLOCK_12D‐KRISHNA NAGAR, KRISHNA NAGAR EAST BLOCK G‐RADHEPURI SRD 101 630 KVA PLANNED 20‐03‐2018 11:00:00 20‐03‐2018 13:55:00 2:55 0.00106944 MUs
2566 PART I‐ BLOCK C‐NEW RAJENDRA NAGAR, BLOCK 10‐OLD RAJENDRA NAGAR, BLOCK 8A‐OLD RAJENDRA NAGAR SRD 667 990 KVA PLANNED 05‐03‐2018 11:15:00 05‐03‐2018 11:51:20 0:36 0.00035 MUs pd maintenance work
2567 PART I‐ BLOCK R‐NEW RAJENDRA NAGAR SRD 102 630 KVA PLANNED 05‐03‐2018 12:00:00 05‐03‐2018 13:03:00 1:3 0.0006125 MUs pd maintenance work
2568 PART I‐ BLOCK R‐NEW RAJENDRA NAGAR, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, CENTRAL RIDGE RESERVED FOREST, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
SRD 538 990 KVA PLANNED 06‐03‐2018 11:49:00 06‐03‐2018 12:03:03 0:14 0.00013611 MUs pd maintenance work
2569 PART II‐BLOCK J‐NEW RAJENDRA NAGAR, PART II‐ DDA COMPLEX‐NEW RAJENDRA NAGAR SRD 97 630 KVA PLANNED 07‐03‐2018 13:35:00 07‐03‐2018 14:11:58 0:36 0.00015 MUs pd maintenance work
2570 PART II‐BLOCK J‐NEW RAJENDRA NAGAR, PART II‐ DDA COMPLEX‐NEW RAJENDRA NAGAR, PART II‐ INDIAN AGRICULTURAL RESEARCH INSTITUTE‐NEW RAJENDRA NAGAR, PART II‐ N.P.L. QTRS.‐NEW RAJENDRA NAGAR, BLOCK 25‐OLD RAJENDRA NAGAR, BLOCK B‐OLD RAJENDRA NAGAR
SRD 668 990 KVA PLANNED 27‐03‐2018 10:30:00 27‐03‐2018 13:12:33 2:42 0.0018 MUs
2571 MAYUR VIHAR PHASE III, MAYUR VIHAR PHASE III, PKT B7‐MAYUR VIHAR PHASE III, PHASE I‐MAYUR VIHAR, PKT A3‐MAYUR VIHAR PHASE III, PKT B7 & B6‐MAYUR VIHAR PHASE III, PKT B8‐MAYUR VIHAR PHASE III, 3RD RD & PKT A 2‐MAYUR VIHAR PHASE III, PKT A 2‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III
VSE 2392 2460 KVA PLANNED 05‐03‐2018 11:56:00 05‐03‐2018 12:41:30 0:45 0.0006125 MUs
2572 KONDALI VILLAGE‐GHAROLI KONDLI, BLOCK F‐KONDALI VILLAGE VSE 983 990 KVA PLANNED 16‐03‐2018 14:30:00 16‐03‐2018 15:02:32 0:32 0.00008889 MUs2573 BLOCK A‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III VSE 1718 0 KVA PLANNED 19‐03‐2018 11:54:00 19‐03‐2018 12:08:28 0:14 0.00003889 MUs2574 BLOCK B‐AMBEDKAR AWAS KALYAN SAMITI, GHAROLI VILLAGE‐GHAROLI KONDLI, SEC C‐MAYUR VIHAR PHASE III VSE 788 990 KVA PLANNED 22‐03‐2018 11:03:00 22‐03‐2018 13:22:06 2:19 0 MUs2575 BLOCK B‐AMBEDKAR AWAS KALYAN SAMITI, SEC D‐MAYUR VIHAR PHASE III VSE 190 630 KVA PLANNED 23‐03‐2018 10:54:00 23‐03‐2018 11:44:54 0:50 0.00009722 MUs2576 BLOCK A‐MAYUR VIHAR PHASE III, SEC C‐MAYUR VIHAR PHASE III VSE 756 0 KVA PLANNED 26‐03‐2018 11:49:00 26‐03‐2018 15:02:01 3:13 0.00026806 MUs2577 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, KONDALI VILLAGE‐GHAROLI KONDLI, BLOCK B‐
AMBEDKAR AWAS KALYAN SAMITI, GHAROLI VILLAGE‐GHAROLI KONDLI, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
VSE 448 630 KVA PLANNED 27‐03‐2018 11:56:00 27‐03‐2018 14:08:14 2:12 0.00007333 MUs
2578 BLOCK C‐RAJBIR COLONY, GHAROLI VILLAGE‐GHAROLI KONDLI, BLOCK A‐KONDALI EXTN. VSE 1009 630 KVA PLANNED 28‐03‐2018 11:57:00 28‐03‐2018 13:06:35 1:9 0.00003833 MUs2579 BLOCK_G2/B‐KONDALI GHAROLI SECTOR G VSE 197 630 KVA PLANNED 13‐03‐2018 10:54:00 13‐03‐2018 14:25:40 3:31 0 MUs2580 BLOCK_G1/A‐KONDALI GHAROLI SECTOR G, BLOCK_G2/B‐KONDALI GHAROLI SECTOR G VSE 86 630 KVA PLANNED 16‐03‐2018 10:48:00 16‐03‐2018 14:51:13 4:3 0.000675 MUs2581 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, KONDALI VILLAGE‐GHAROLI KONDLI, SEC D‐
MAYUR VIHAR PHASE III, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐KONDALI VILLAGE, BLOCK A‐KONDALI VILLAGE, BLOCK C‐KONDALI VILLAGE, BLOCK F‐KONDALI VILLAGE, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA SONIA VIHAR
VSE 814 990 KVA PLANNED 05‐03‐2018 14:56:00 05‐03‐2018 15:53:00 0:56 0.00007778 MUs
2582 BLOCK C‐RAJBIR COLONY VSE 873 630 KVA PLANNED 09‐03‐2018 10:43:00 09‐03‐2018 12:36:24 1:53 0.00003139 MUs2583 BLOCK A‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III VSE 1717 0 KVA PLANNED 13‐03‐2018 14:53:00 13‐03‐2018 16:01:52 1:8 0 MUs 02584 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐AMBEDKAR AWAS KALYAN SAMITI,
GHAROLI VILLAGE‐GHAROLI KONDLI, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
VSE 448 630 KVA PLANNED 08‐03‐2018 12:29:00 08‐03‐2018 14:03:00 1:34 0.00010444 MUs
2585 BLOCK_G1/A‐KONDALI GHAROLI SECTOR G, BLOCK_G2/B‐KONDALI GHAROLI SECTOR G, BLOCK_G3/C‐KONDALI GHAROLI SECTOR G, KONDALI GHAROLI SECTOR G‐GHAROLI KONDLI, BLOCK B‐MAYUR VIHAR PHASE III, PKT A1‐MAYUR VIHAR PHASE III, KONDALI GHAROLI SECTOR G‐GHAROLI KONDLI
VSE 1425 5670 KVA PLANNED 12‐03‐2018 11:15:00 12‐03‐2018 12:09:16 0:54 0.000375 MUs
2586 MAYUR VIHAR PHASE III, PHASE I‐MAYUR VIHAR VSE 395 400 KVA PLANNED 01‐03‐2018 10:48:00 01‐03‐2018 14:38:03 3:50 0.00063889 MUs2587 MAYUR VIHAR PHASE III, PKT A3‐MAYUR VIHAR PHASE III VSE 367 630 KVA PLANNED 06‐03‐2018 11:12:00 06‐03‐2018 13:59:56 2:47 0 MUs2588 MAYUR VIHAR PHASE III VSE 155 400 KVA PLANNED 09‐03‐2018 10:43:00 09‐03‐2018 13:52:12 3:9 0.0002625 MUs2589 BLOCK A & B‐VASUNDHARA ENCLAVE VSE 105 630 KVA PLANNED 14‐03‐2018 10:50:00 14‐03‐2018 14:17:03 3:27 0.00069 MUs2590 BLOCK A & B‐VASUNDHARA ENCLAVE VSE 132 630 KVA PLANNED 21‐03‐2018 10:46:00 21‐03‐2018 17:20:15 6:34 0 MUs2591 BLOCK A & B‐VASUNDHARA ENCLAVE VSE 139 400 KVA PLANNED 07‐03‐2018 10:33:00 07‐03‐2018 15:17:53 4:44 0.00078889 MUs2592 SARASWATI KUNJ‐ EAST END APPARTMENT‐NEW ASHOK NAGAR VSE 202 630 KVA PLANNED 24‐03‐2018 14:14:00 24‐03‐2018 16:37:14 2:23 0.00039722 MUs2593 SARASWATI KUNJ‐ EAST END APPARTMENT‐NEW ASHOK NAGAR VSE 124 630 KVA PLANNED 24‐03‐2018 11:41:00 24‐03‐2018 14:12:01 2:31 0.00041944 MUs2594 SARASWATI KUNJ‐ EAST END APPARTMENT‐NEW ASHOK NAGAR VSE 150 630 KVA PLANNED 28‐03‐2018 11:34:00 28‐03‐2018 16:28:56 4:54 0.00081667 MUs2595 BLOCK D‐NEW KONDALI, BLOCK C‐NEW KONDALI, BLOCK A4‐NEW KONDALI, BLOCK B‐NEW KONDALI, GHAROLI
KONDLI, KONDALI GHAROLI SECTOR G‐GHAROLI KONDLI, BLOCK B‐MAYUR VIHAR PHASE III, PKT A1‐MAYUR VIHAR PHASE III, SEWAGE TREATMENT PLANT‐GHAROLI KONDLI, BLOCK C5‐NEW KONDALI, BLOCK C1‐NEW KONDALI, BLOCK C2‐NEW KONDALI, BLOCK C4‐NEW KONDALI, BLOCK C3‐NEW KONDALI, BLOCK B1‐NEW KONDALI, BLOCK B2‐NEW KONDALI, BLOCK A1‐NEW KONDALI, BLOCK A2‐NEW KONDALI, BLOCK A3‐NEW KONDALI, BLOCK F‐KONDALI VILLAGE
VSE 4330 2920 KVA PLANNED 16‐03‐2018 13:08:00 16‐03‐2018 15:58:27 2:50 0.00047222 MUs SHIFTING OF HT CABLE
2596 DALLU PURA VSE‐VASUNDHARA ENCLAVE VSE, DHARMSHILA CANCER HOSPITAL & RESEARCH HOSPITAL‐DALLU PURA VSE, BLOCK A‐DALLU PURA VSE, BLOCK B‐DALLU PURA VSE
VSE 349 630 KVA PLANNED 27‐03‐2018 10:06:00 27‐03‐2018 15:45:25 5:39 0.00018833 MUs
2597 BLOCK C‐NEW KONDALI, BLOCK B‐NEW KONDALI, BLOCK C1‐NEW KONDALI, BLOCK C2‐NEW KONDALI, BLOCK C4‐NEW KONDALI, BLOCK C3‐NEW KONDALI, BLOCK B1‐NEW KONDALI, BLOCK B2‐NEW KONDALI
VSE 1012 630 KVA PLANNED 23‐03‐2018 15:35:00 23‐03‐2018 16:05:44 0:30 0.00004167 MUs
2598 BLOCK B‐DALLU PURA VSE, DHARMSHILA CANCER HOSPITAL & RESEARCH HOSPITAL‐DALLU PURA VSE, DALLU PURA VSE‐VASUNDHARA ENCLAVE VSE, BLOCK A‐DALLU PURA VSE
VSE 349 630 KVA PLANNED 17‐03‐2018 11:50:00 17‐03‐2018 14:22:02 2:32 0.00042222 MUs
2599 BLOCK C‐NEW KONDALI, GHAROLI KONDLI, KONDALI GHAROLI SECTOR G‐GHAROLI KONDLI, BLOCK C5‐NEW KONDALI, BLOCK C1‐NEW KONDALI, BLOCK C2‐NEW KONDALI, BLOCK C4‐NEW KONDALI, BLOCK C3‐NEW KONDALI
VSE 551 630 KVA PLANNED 22‐03‐2018 14:17:00 22‐03‐2018 16:14:47 1:57 0 MUs
2600 FANCY APPARTMENT‐VASUNDHARA ENCLAVE VSE VSE 80 630 KVA PLANNED 12‐03‐2018 10:53:00 12‐03‐2018 13:39:28 2:46 0 MUs2601 CAPITAL APPARTMENT‐VASUNDHARA ENCLAVE VSE VSE 150 630 KVA PLANNED 15‐03‐2018 12:40:00 15‐03‐2018 15:32:52 2:52 0.00047778 MUs2602 MANAVSTHALI APPARTMENT‐VASUNDHARA ENCLAVE VSE VSE 86 630 KVA PLANNED 19‐03‐2018 10:42:00 19‐03‐2018 13:31:01 2:49 0.00046944 MUs2603 PKT 6‐NEW KONDALI VSE 416 630 KVA PLANNED 05‐03‐2018 10:47:00 05‐03‐2018 14:09:27 3:22 0.00067333 MUs2604 NEW PRAGATISHEEL APARTMENT‐VASUNDHARA ENCLAVE VSE, SHANTI DOOT APPARTMENT‐VASUNDHARA ENCLAVE
VSEVSE 83 630 KVA PLANNED 08‐03‐2018 10:37:00 08‐03‐2018 14:03:59 3:26 0.00057222 MUs
2605 SULOCHANA APPARTMENT‐VASUNDHARA ENCLAVE VSE VSE 63 400 KVA PLANNED 26‐03‐2018 11:48:00 26‐03‐2018 15:36:15 3:48 0.00050667 MUs2606 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR,
BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, GHONDA PATTI CHAUHAN, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
YVR 1546 630 KVA PLANNED 17‐03‐2018 11:12:00 17‐03‐2018 13:34:45 2:22 0.00157778 MUs db repair & DB Welding & INSTALLATION new db
2607 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GHONDA PATTI CHAUHAN, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR BLOCK F‐SHIV VIHAR JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
YVR 1546 630 KVA PLANNED 21‐03‐2018 14:13:00 21‐03‐2018 17:11:42 2:58 0.00049444 MUs db repair & DB Welding & INSTALLATION new db
2608 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GHONDA PATTI CHAUHAN, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR BLOCK F‐SHIV VIHAR JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
YVR 1546 630 KVA PLANNED 24‐03‐2018 11:25:00 24‐03‐2018 17:06:47 5:41 0.00094722 MUs db repair & DB Welding & INSTALLATION new db
2609 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GHONDA PATTI CHAUHAN, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR BLOCK F‐SHIV VIHAR JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
YVR 1546 630 KVA PLANNED 28‐03‐2018 10:38:00 28‐03‐2018 13:47:43 3:9 0.000525 MUs db repair & DB Welding & INSTALLATION new db
2610 JAFFRABAD‐MAUJ PUR, GHONDA PATTI CHAUHAN, BLOCK I‐BRAHM PURI, JAFFRABAD‐MAUJ PUR YVR 965 990 KVA PLANNED 17‐03‐2018 15:12:00 17‐03‐2018 17:22:42 2:10 0.00036111 MUs db repair & DB Welding & INSTALLATION new db
2611 JAFFRABAD‐MAUJ PUR, GHONDA PATTI CHAUHAN, BLOCK I‐BRAHM PURI, JAFFRABAD‐MAUJ PUR YVR 965 990 KVA PLANNED 21‐03‐2018 11:13:00 21‐03‐2018 15:21:46 4:8 0.00068889 MUs db repair & DB Welding & INSTALLATION new db
2612 JAFFRABAD‐MAUJ PUR, GHONDA PATTI CHAUHAN, BLOCK I‐BRAHM PURI, JAFFRABAD‐MAUJ PUR YVR 965 990 KVA PLANNED 27‐03‐2018 10:57:00 27‐03‐2018 16:36:18 5:39 0.00094167 MUs db repair & DB Welding & INSTALLATION new db
2613 BLOCK B‐MANUJPUR, BLOCK B‐GARI MANDU YVR 1193 990 KVA PLANNED 19‐03‐2018 15:26:00 19‐03‐2018 17:43:09 2:17 0.00038056 MUs db repair & DB Welding & INSTALLATION new db
2614 BLOCK B‐MANUJPUR, BLOCK B‐GARI MANDU YVR 1193 990 KVA PLANNED 22‐03‐2018 11:46:00 22‐03‐2018 16:28:26 4:42 0.00156667 MUs db repair & DB Welding & INSTALLATION new db
2615 BLOCK B‐MANUJPUR, BLOCK B‐GARI MANDU YVR 1193 990 KVA PLANNED 26‐03‐2018 13:27:00 26‐03‐2018 17:40:48 4:13 0.00070278 MUs db repair & DB Welding & INSTALLATION new db
2616 BLOCK H‐GHONDA PATTI, BLOCK C‐GHONDA PATTI, BLOCK J‐KARTAR NAGAR, GHONDA PATTI, ARVIND NAGAR‐GHONDA, BLOCK C‐JAI PRAKASH NAGAR
YVR 1245 990 KVA PLANNED 16‐03‐2018 14:53:00 16‐03‐2018 17:02:36 2:9 0.00035833 MUs db repair & DB Welding & INSTALLATION new db
2617 BLOCK H‐GHONDA PATTI, BLOCK C‐GHONDA PATTI, GHONDA PATTI, ARVIND NAGAR‐GHONDA, BLOCK C‐JAI PRAKASH NAGAR
YVR 1245 990 KVA PLANNED 20‐03‐2018 14:20:00 20‐03‐2018 17:23:31 3:3 0.00203333 MUs db repair & DB Welding & INSTALLATION new db
2618 BLOCK E‐SUBHASH MOHALLA, BLOCK H‐GHONDA PATTI, BLOCK C‐GHONDA PATTI, GHONDA PATTI, ARVIND NAGAR‐GHONDA, BLOCK C‐JAI PRAKASH NAGAR
YVR 1245 990 KVA PLANNED 27‐03‐2018 10:38:00 27‐03‐2018 14:11:16 3:33 0.00059167 MUs db repair & DB Welding & INSTALLATION new db
2619 BLOCK B‐SUBHASH MOHALLA, BLOCK N‐BRAHM PURI, BLOCK B‐MANUJPUR, ARVIND NAGAR‐GHONDA, GHONDA PATTI CHAUHAN, WEST GHONDA, BLOCK C‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN
YVR 1279 990 KVA PLANNED 27‐03‐2018 13:26:00 27‐03‐2018 17:00:27 3:34 0.00059444 MUs db repair & DB Welding & INSTALLATION new db
2620 BLOCK A‐GHONDA PATTI, BLOCK H‐GHONDA PATTI, BLOCK C‐GHONDA PATTI, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D‐BHAJANPURA, BLOCK C‐BHAJANPURA, GHONDA PATTI, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
YVR 1527 630 KVA PLANNED 21‐03‐2018 11:30:00 21‐03‐2018 14:10:23 2:40 0.00044444 MUs db repair & DB Welding & INSTALLATION new db
2621 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐BHAJANPURA, BLOCK C‐GHONDA PATTI, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐GHONDA PATTI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK H‐GHONDA PATTI, BLOCK F‐SHIV VIHAR, BLOCK D‐BHAJANPURA, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
YVR 1527 630 KVA PLANNED 26‐03‐2018 11:03:00 26‐03‐2018 16:49:49 5:46 0.00096111 MUs db repair & DB Welding & INSTALLATION new db
2622 JAGJEET NAGAR‐GHONDA, YAMUNA VIHAR YAMUNA FLOOD PLAINS, YAMUNA VIHAR YAMUNA FLOOD PLAINS YVR 139 630 KVA PLANNED 20‐03‐2018 11:07:00 20‐03‐2018 14:59:29 3:52 0.00064444 MUs db repair & DB Welding & INSTALLATION new db
2623 YAMUNA VIHAR YAMUNA FLOOD PLAINS, YAMUNA VIHAR YAMUNA FLOOD PLAINS, JAGJEET NAGAR‐GHONDA YVR 139 630 KVA PLANNED 23‐03‐2018 11:29:00 23‐03‐2018 15:47:45 4:18 0.00071667 MUs db repair & DB Welding & INSTALLATION new db
2624 GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐MANUJPUR, BLOCK B‐GARI MANDU, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
YVR 657 990 KVA PLANNED 19‐03‐2018 11:10:00 19‐03‐2018 14:24:06 3:14 0.00053889 MUs db repair & DB Welding & INSTALLATION new db
2625 BLOCK B‐MANUJPUR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, BLOCK B‐GARI MANDU, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
YVR 657 990 KVA PLANNED 24‐03‐2018 11:06:00 24‐03‐2018 13:41:45 2:35 0.00043056 MUs db repair & DB Welding & INSTALLATION new db
2626 BLOCK P‐BRAHM PURI, BLOCK C‐GHONDA PATTI, BLOCK C‐JAI PRAKASH NAGAR, BLOCK J‐KARTAR NAGAR YVR 1375 990 KVA PLANNED 16‐03‐2018 10:41:00 16‐03‐2018 13:09:06 2:28 0.00041111 MUs db repair & DB Welding & INSTALLATION new db
2627 BLOCK C‐GHONDA PATTI, BLOCK C‐JAI PRAKASH NAGAR, BLOCK J‐KARTAR NAGAR YVR 1375 990 KVA PLANNED 19‐03‐2018 14:50:00 19‐03‐2018 17:42:49 2:52 0.00191111 MUs db repair & DB Welding & INSTALLATION new db
2628 BLOCK R‐BRAHM PURI, BLOCK Q‐BRAHM PURI, BLOCK N‐BRAHM PURI, BLOCK P‐BRAHM PURI YVR 940 990 KVA PLANNED 22‐03‐2018 10:57:00 22‐03‐2018 14:03:30 3:6 0.00155 MUs db repair & DB Welding & INSTALLATION new db
2629 BLOCK P‐BRAHM PURI, BLOCK Q‐BRAHM PURI, BLOCK N‐BRAHM PURI, BLOCK R‐BRAHM PURI YVR 940 990 KVA PLANNED 26‐03‐2018 13:59:00 26‐03‐2018 17:41:07 3:42 0.00061667 MUs db repair & DB Welding & INSTALLATION new db
2630 BLOCK B‐GARI MANDU, NAYAGAON‐NEW KATWARA, NEW USMANPUR‐NEW KATWARA, BLOCK C‐GHONDA PATTI, BLOCK H‐GHONDA PATTI, GHONDA PATTI
YVR 1225 630 KVA PLANNED 28‐03‐2018 10:57:00 28‐03‐2018 15:48:29 4:51 0.00080833 MUs db repair & DB Welding & INSTALLATION new db
2631 BLOCK B‐GARI MANDU, NAYAGAON‐NEW KATWARA, NEW USMANPUR‐NEW KATWARA, BLOCK C‐GHONDA PATTI, BLOCK H‐GHONDA PATTI, GHONDA PATTI
YVR 1225 630 KVA PLANNED 23‐03‐2018 14:02:00 23‐03‐2018 15:48:52 1:46 0.00029444 MUs db repair & DB Welding & INSTALLATION new db
2632 BLOCK C‐BHAJANPURA, JAGJEET NAGAR‐GHONDA, GHONDA PATTI, BLOCK E‐SUBHASH MOHALLA, BLOCK B‐NEW ASHOK NAGAR VSE, NAYAGAON‐NEW KATWARA, BLOCK H‐GHONDA PATTI, KACHI COLONY‐JAGJEET NAGAR, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK F‐BRAHM PURI
YVR 5800 990 KVA PLANNED 20‐03‐2018 10:48:00 20‐03‐2018 15:55:00 5:7 0.00085278 MUs db repair & DB Welding & INSTALLATION new db
2633 NAYAGAON‐NEW KATWARA, BLOCK B‐SUBHASH MOHALLA, BLOCK E‐SUBHASH MOHALLA, BLOCK F‐BRAHM PURI, KACHI COLONY‐JAGJEET NAGAR, BLOCK H‐GHONDA PATTI, BLOCK B‐NEW ASHOK NAGAR VSE, BLOCK D‐BHAJANPURA, BLOCK C‐BHAJANPURA, JAGJEET NAGAR‐GHONDA, GHONDA PATTI, BLOCK E‐SUBHASH MOHALLA
YVR 5800 990 KVA PLANNED 22‐03‐2018 10:57:00 22‐03‐2018 14:00:29 3:3 0.00050833 MUs db repair & DB Welding & INSTALLATION new db
2634 BLOCK P‐BRAHM PURI, BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, BLOCK A‐GARI MANDU, GHONDA PATTI CHAUHAN, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK B‐GARI MANDU, NEW USMANPUR‐NEW KATWARA, BLOCK D‐BHAJANPURA, VIJAY PARK‐YAMUNA VIHAR
YVR 1670 630 KVA PLANNED 20‐03‐2018 15:25:00 20‐03‐2018 17:24:26 1:59 0.00033056 MUs db repair & DB Welding & INSTALLATION new db
2635 BLOCK P‐BRAHM PURI, BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, BLOCK A‐GARI MANDU, GHONDA PATTI CHAUHAN, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK B‐GARI MANDU, NEW USMANPUR‐NEW KATWARA, BLOCK D‐BHAJANPURA, VIJAY PARK‐YAMUNA VIHAR
YVR 1670 630 KVA PLANNED 24‐03‐2018 14:06:00 24‐03‐2018 17:06:18 3:0 0.0005 MUs db repair & DB Welding & INSTALLATION new db
2636 YAMUNA VIHAR YAMUNA FLOOD PLAINS, YAMUNA VIHAR YAMUNA FLOOD PLAINS, JAGJEET NAGAR‐GHONDA YVR 139 630 KVA PLANNED 28‐03‐2018 14:43:00 28‐03‐2018 15:15:45 0:32 0.00008889 MUs db repair & DB Welding & INSTALLATION new db
2637 BLOCK J‐SILAMPUR COLONY, BLOCK J‐KARTAR NAGAR, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN YVR 1480 990 KVA PLANNED 23‐03‐2018 10:28:00 23‐03‐2018 15:46:41 5:18 0.00088333 MUs db repair & DB Welding & INSTALLATION new db
2638 BLOCK B‐SUBHASH MOHALLA, GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA, WEST GHONDA
YVR 1279 990 KVA PLANNED 17‐03‐2018 13:43:00 17‐03‐2018 15:01:34 1:18 0.00065 MUs db repair & DB Welding & INSTALLATION new db
2639 GAUTAM VIHAR‐GHONDA, GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK J‐KARTAR NAGAR, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK H‐BRAHM PURI
YVR 2396 990 KVA PLANNED 19‐03‐2018 10:48:00 19‐03‐2018 14:23:35 3:35 0.00059722 MUs db repair & DB Welding & INSTALLATION new db
2640 BLOCK H‐GHONDA PATTI, BLOCK C‐GHONDA PATTI, BLOCK J‐KARTAR NAGAR, GHONDA PATTI, ARVIND NAGAR‐GHONDA, BLOCK C‐JAI PRAKASH NAGAR
YVR 1452 990 KVA PLANNED 16‐03‐2018 11:01:00 16‐03‐2018 14:16:19 3:15 0.00054167 MUs db repair & DB Welding & INSTALLATION new db
2641 BLOCK R‐BRAHM PURI, BLOCK Q‐BRAHM PURI YVR 317 630 KVA PLANNED 27‐03‐2018 13:25:00 27‐03‐2018 16:18:42 2:53 0.00048056 MUs db repair & DB Welding & INSTALLATION new db
2642 SUBHASH PARK‐GORAKH PARK, BLOCK E‐SUBHASH MOHALLA, BLOCK O‐BRAHM PURI, BLOCK M‐BRAHM PURI, BLOCK K‐BRAHM PURI, BLOCK B‐BRAHM PURI, JAFFRABAD‐MAUJ PUR, MAUJ PUR COMPLEX 1
YVR 1223 990 KVA PLANNED 27‐03‐2018 10:37:00 27‐03‐2018 14:16:33 3:39 0.00060833 MUs db repair & DB Welding & INSTALLATION new db
2643 NAYAGAON‐NEW KATWARA, NEW USMANPUR‐NEW KATWARA, GAMRI‐GHONDA YVR 444 630 KVA PLANNED 16‐03‐2018 14:53:00 16‐03‐2018 17:03:45 2:10 0.00036111 MUs db repair & DB Welding & INSTALLATION new db
2644 BLOCK P‐BRAHM PURI, NAYAGAON‐NEW KATWARA, BLOCK L‐BRAHM PURI, BLOCK F‐BRAHM PURI YVR 2993 400 KVA PLANNED 26‐03‐2018 10:42:00 26‐03‐2018 13:39:37 2:57 0.00049167 MUs db repair & DB Welding & INSTALLATION new db
2645 NAYAGAON‐NEW KATWARA, BLOCK P‐BRAHM PURI, BLOCK F‐BRAHM PURI, JAGJEET NAGAR‐GHONDA, JAG JEEVAN NAGAR‐NEW KATWARA GHONDA
YVR 2646 630 KVA PLANNED 22‐03‐2018 14:04:00 22‐03‐2018 16:26:35 2:22 0.00039444 MUs db repair & DB Welding & INSTALLATION new db
2646 NAYAGAON‐NEW KATWARA, BLOCK I‐BRAHM PURI, BLOCK O‐BRAHM PURI, BLOCK M‐BRAHM PURI, BLOCK K‐BRAHM PURI, BLOCK N‐BRAHM PURI, BLOCK P‐BRAHM PURI, BLOCK H‐BRAHM PURI, BLOCK F‐BRAHM PURI, BLOCK E‐BRAHM PURI, BLOCK F‐BRAHM PURI, BLOCK L‐BRAHM PURI, BLOCK J‐BRAHM PURI, JAGJEET NAGAR‐GHONDA, BLOCK J‐KARTAR NAGAR, GAUTAM VIHAR‐GHONDA, ARVIND NAGAR‐GHONDA, GHONDA PATTI CHAUHAN, BLOCK V‐GHONDA PATTI CHAUHAN
YVR 8322 3600 KVA PLANNED 09‐03‐2018 10:08:00 09‐03‐2018 13:16:00 3:8 0.00156667 MUs
2647 KACHI COLONY‐JAGJEET NAGAR, NAYAGAON‐NEW KATWARA, JAGJEET NAGAR‐GHONDA YVR 1187 990 KVA PLANNED 13‐03‐2018 10:25:00 13‐03‐2018 14:11:41 3:46 0.00094167 MUs2648 BLOCK I‐BRAHM PURI, GHONDA PATTI CHAUHAN, BLOCK B‐BRAHM PURI YVR 1073 990 KVA PLANNED 17‐03‐2018 10:49:00 17‐03‐2018 13:03:44 2:14 0.00074444 MUs2649 BLOCK C‐GHONDA PATTI, BLOCK H‐GHONDA PATTI, BLOCK C‐JAI PRAKASH NAGAR, ARVIND NAGAR‐GHONDA,
GHONDA PATTIYVR 1242 990 KVA PLANNED 01‐03‐2018 12:39:00 01‐03‐2018 14:07:56 1:28 0.00073333 MUs db repair & DB
Welding & INSTALLATION new db
2650 BLOCK C‐GHONDA PATTI, BLOCK H‐GHONDA PATTI, BLOCK C‐JAI PRAKASH NAGAR, ARVIND NAGAR‐GHONDA, GHONDA PATTI
YVR 1242 990 KVA PLANNED 07‐03‐2018 11:07:00 07‐03‐2018 15:50:21 4:43 0.00235833 MUs
2651 BLOCK C‐GHONDA PATTI, BLOCK H‐GHONDA PATTI, BLOCK C‐JAI PRAKASH NAGAR, ARVIND NAGAR‐GHONDA, GHONDA PATTI
YVR 1242 990 KVA PLANNED 10‐03‐2018 10:27:00 10‐03‐2018 13:02:04 2:35 0.00043056 MUs db repair & DB Welding & INSTALLATION new db
2652 BLOCK C‐GHONDA PATTI, BLOCK H‐GHONDA PATTI, BLOCK C‐JAI PRAKASH NAGAR, ARVIND NAGAR‐GHONDA, GHONDA PATTI
YVR 1242 990 KVA PLANNED 14‐03‐2018 10:32:00 14‐03‐2018 12:53:51 2:21 0.00078333 MUs db repair & DB Welding & INSTALLATION new db
2653 JAFFRABAD‐MAUJ PUR, GHONDA PATTI CHAUHAN, BLOCK I‐BRAHM PURI, JAFFRABAD‐MAUJ PUR YVR 958 990 KVA PLANNED 01‐03‐2018 12:48:00 01‐03‐2018 14:27:14 1:39 0.000825 MUs db repair & DB Welding & INSTALLATION new db
2654 JAFFRABAD‐MAUJ PUR, GHONDA PATTI CHAUHAN, BLOCK I‐BRAHM PURI, JAFFRABAD‐MAUJ PUR YVR 958 990 KVA PLANNED 05‐03‐2018 10:43:00 05‐03‐2018 13:29:17 2:46 0.00046111 MUs db repair & DB Welding & INSTALLATION new db
2655 JAFFRABAD‐MAUJ PUR, GHONDA PATTI CHAUHAN, BLOCK I‐BRAHM PURI, JAFFRABAD‐MAUJ PUR YVR 958 990 KVA PLANNED 10‐03‐2018 10:17:00 10‐03‐2018 13:02:35 2:45 0.00045833 MUs db repair & DB Welding & INSTALLATION new db
2656 JAFFRABAD‐MAUJ PUR, GHONDA PATTI CHAUHAN, BLOCK I‐BRAHM PURI, JAFFRABAD‐MAUJ PUR YVR 958 990 KVA PLANNED 15‐03‐2018 10:37:00 15‐03‐2018 14:19:55 3:42 0.00061667 MUs db repair & DB Welding & INSTALLATION new db
2657 YAMUNA VIHAR YAMUNA FLOOD PLAINS, YAMUNA VIHAR YAMUNA FLOOD PLAINS, JAGJEET NAGAR‐GHONDA YVR 139 630 KVA PLANNED 08‐03‐2018 11:14:00 08‐03‐2018 13:58:40 2:44 0.00136667 MUs db repair & DB Welding & INSTALLATION new db
2658 YAMUNA VIHAR YAMUNA FLOOD PLAINS, YAMUNA VIHAR YAMUNA FLOOD PLAINS, JAGJEET NAGAR‐GHONDA YVR 139 630 KVA PLANNED 15‐03‐2018 11:14:00 15‐03‐2018 16:03:01 4:49 0.00080278 MUs db repair & DB Welding & INSTALLATION new db
2659 BLOCK J‐KARTAR NAGAR, ARVIND NAGAR‐GHONDA, GHONDA PATTI CHAUHAN, BLOCK V‐GHONDA PATTI CHAUHAN YVR 1470 990 KVA PLANNED 05‐03‐2018 13:44:00 05‐03‐2018 17:24:06 3:40 0.00061111 MUs db repair & DB Welding & INSTALLATION new db
2660 CHANDER NAGAR‐KRISHNA NAGAR, BLOCK A‐GARI MANDU, BLOCK B‐MANUJPUR, TANKI ROAD‐C‐BLOCK BHAJANPURA
YVR 1345 630 KVA PLANNED 07‐03‐2018 11:03:00 07‐03‐2018 14:41:14 3:38 0.00121111 MUs db repair & DB Welding & INSTALLATION new db
2661 BLOCK B‐MANUJPUR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, BLOCK B‐GARI MANDU, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
YVR 655 990 KVA PLANNED 13‐03‐2018 14:43:00 13‐03‐2018 17:16:29 2:33 0.001275 MUs db repair & DB Welding & INSTALLATION new db
2662 CHAUHAN BANGAR‐JAFFRABAD, NEW USMANPUR‐NEW KATWARA, BLOCK P‐BRAHM PURI, VIJAY PARK‐YAMUNA VIHAR, BLOCK A‐GARI MANDU, BLOCK D‐BHAJANPURA, BLOCK C‐BHAJANPURA, BLOCK B‐MANUJPUR, BLOCK B‐GARI MANDU, GHONDA PATTI CHAUHAN, BLOCK V‐GHONDA PATTI CHAUHAN
YVR 1667 630 KVA PLANNED 14‐03‐2018 10:44:00 14‐03‐2018 13:36:11 2:52 0.00191111 MUs db repair & DB Welding & INSTALLATION new db
2663 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GHONDA PATTI CHAUHAN, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR BLOCK F‐SHIV VIHAR JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
YVR 1541 630 KVA PLANNED 08‐03‐2018 11:06:00 08‐03‐2018 14:01:21 2:55 0.00194444 MUs db repair & DB Welding & INSTALLATION new db
2664 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GHONDA PATTI CHAUHAN, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR BLOCK F‐SHIV VIHAR JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
YVR 1546 630 KVA PLANNED 12‐03‐2018 11:11:00 12‐03‐2018 16:25:58 5:14 0.00087222 MUs db repair & DB Welding & INSTALLATION new db
2665 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GHONDA PATTI CHAUHAN, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR BLOCK F‐SHIV VIHAR JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
YVR 1541 630 KVA PLANNED 15‐03‐2018 11:28:00 15‐03‐2018 15:25:13 3:57 0.00065833 MUs db repair & DB Welding & INSTALLATION new db
2666 BLOCK C‐BHAJANPURA, JAGJEET NAGAR‐GHONDA, GHONDA PATTI, BLOCK E‐SUBHASH MOHALLA, BLOCK B‐NEW ASHOK NAGAR VSE, NAYAGAON‐NEW KATWARA, BLOCK H‐GHONDA PATTI, KACHI COLONY‐JAGJEET NAGAR, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK F‐BRAHM PURI
YVR 5779 990 KVA PLANNED 06‐03‐2018 14:25:00 06‐03‐2018 16:03:52 1:38 0.00027222 MUs db repair & DB Welding & INSTALLATION new db
2667 BLOCK C‐BHAJANPURA, JAGJEET NAGAR‐GHONDA, GHONDA PATTI, BLOCK E‐SUBHASH MOHALLA, BLOCK B‐NEW ASHOK NAGAR VSE, NAYAGAON‐NEW KATWARA, BLOCK H‐GHONDA PATTI, KACHI COLONY‐JAGJEET NAGAR, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK F‐BRAHM PURI
YVR 5779 990 KVA PLANNED 09‐03‐2018 13:36:00 09‐03‐2018 16:21:21 2:45 0.001375 MUs
2668 BLOCK C‐BHAJANPURA, JAGJEET NAGAR‐GHONDA, GHONDA PATTI, BLOCK E‐SUBHASH MOHALLA, BLOCK B‐NEW ASHOK NAGAR VSE, NAYAGAON‐NEW KATWARA, BLOCK H‐GHONDA PATTI, KACHI COLONY‐JAGJEET NAGAR, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK F‐BRAHM PURI
YVR 5779 990 KVA PLANNED 14‐03‐2018 13:48:00 14‐03‐2018 16:39:27 2:51 0.000475 MUs db repair & DB Welding & INSTALLATION new db
2669 BLOCK B‐MANUJPUR, BLOCK B‐GARI MANDU YVR 1186 990 KVA PLANNED 06‐03‐2018 11:23:00 06‐03‐2018 15:36:25 4:13 0.00070278 MUs db repair & DB Welding & INSTALLATION new db
2670 BLOCK D‐BHAJANPURA, BLOCK B‐MANUJPUR, BLOCK B‐GARI MANDU YVR 1186 990 KVA PLANNED 09‐03‐2018 11:05:00 09‐03‐2018 15:06:29 4:1 0.00066944 MUs db repair & DB Welding & INSTALLATION new db
2671 BLOCK B‐MANUJPUR, BLOCK B‐GARI MANDU, GAMRI‐GHONDA YVR 1186 990 KVA PLANNED 13‐03‐2018 10:55:00 13‐03‐2018 15:54:48 4:59 0.00083056 MUs db repair & DB Welding & INSTALLATION new db
2672 BLOCK B‐SUBHASH MOHALLA, GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA, WEST GHONDA
YVR 1274 990 KVA PLANNED 07‐03‐2018 13:22:00 07‐03‐2018 16:38:34 3:16 0.00163333 MUs db repair & DB Welding & INSTALLATION new db
2673 BLOCK B‐SUBHASH MOHALLA, GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA, WEST GHONDA
YVR 1274 990 KVA PLANNED 10‐03‐2018 10:26:00 10‐03‐2018 12:22:31 1:56 0.00032222 MUs db repair & DB Welding & INSTALLATION new db
2674 BLOCK B‐SUBHASH MOHALLA, GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA, WEST GHONDA
YVR 1274 990 KVA PLANNED 14‐03‐2018 13:31:00 14‐03‐2018 16:38:51 3:7 0.00051944 MUs db repair & DB Welding & INSTALLATION new db
2675 YAMUNA VIHAR YAMUNA FLOOD PLAINS, YAMUNA VIHAR YAMUNA FLOOD PLAINS, JAGJEET NAGAR‐GHONDA YVR 139 630 KVA PLANNED 05‐03‐2018 11:30:00 05‐03‐2018 13:58:11 2:28 0.00123333 MUs db repair & DB Welding & INSTALLATION new db
2676 YAMUNA VIHAR YAMUNA FLOOD PLAINS, YAMUNA VIHAR YAMUNA FLOOD PLAINS, JAGJEET NAGAR‐GHONDA YVR 139 630 KVA PLANNED 12‐03‐2018 11:00:00 12‐03‐2018 13:24:55 2:24 0.0004 MUs db repair & DB Welding & INSTALLATION new db
2677 BLOCK P‐BRAHM PURI, BLOCK Q‐BRAHM PURI, BLOCK N‐BRAHM PURI, BLOCK R‐BRAHM PURI YVR 937 990 KVA PLANNED 06‐03‐2018 13:40:00 06‐03‐2018 16:24:08 2:44 0.00136667 MUs db repair & DB Welding & INSTALLATION new db
2678 BLOCK P‐BRAHM PURI, BLOCK Q‐BRAHM PURI, BLOCK N‐BRAHM PURI, BLOCK R‐BRAHM PURI YVR 937 990 KVA PLANNED 09‐03‐2018 11:20:00 09‐03‐2018 13:16:00 1:56 0.00096667 MUs db repair & DB Welding & INSTALLATION new db
2679 BLOCK P‐BRAHM PURI, BLOCK Q‐BRAHM PURI, BLOCK N‐BRAHM PURI, BLOCK R‐BRAHM PURI YVR 937 990 KVA PLANNED 13‐03‐2018 14:42:00 13‐03‐2018 17:16:03 2:34 0.00128333 MUs db repair & DB Welding & INSTALLATION new db
2680 BLOCK P‐BRAHM PURI, BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, BLOCK A‐GARI MANDU, GHONDA PATTI CHAUHAN, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK B‐GARI MANDU, NEW USMANPUR‐NEW KATWARA, BLOCK D‐BHAJANPURA, VIJAY PARK‐YAMUNA VIHAR
YVR 1667 630 KVA PLANNED 01‐03‐2018 12:35:00 01‐03‐2018 14:06:44 1:31 0.00075833 MUs db repair & DB Welding & INSTALLATION new db
2681 BLOCK P‐BRAHM PURI, BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, BLOCK A‐GARI MANDU, GHONDA PATTI CHAUHAN, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK B‐GARI MANDU, NEW USMANPUR‐NEW KATWARA, BLOCK D‐BHAJANPURA, VIJAY PARK‐YAMUNA VIHAR
YVR 1667 630 KVA PLANNED 07‐03‐2018 15:07:00 07‐03‐2018 16:12:48 1:5 0.00018056 MUs db repair & DB Welding & INSTALLATION new db
2682 BLOCK P‐BRAHM PURI, BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, BLOCK A‐GARI MANDU, GHONDA PATTI CHAUHAN, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK B‐GARI MANDU, NEW USMANPUR‐NEW KATWARA, BLOCK D‐BHAJANPURA, VIJAY PARK‐YAMUNA VIHAR
YVR 1667 630 KVA PLANNED 10‐03‐2018 10:40:00 10‐03‐2018 13:03:00 2:23 0.00119167 MUs db repair & DB Welding & INSTALLATION new db
2683 NAYAGAON‐NEW KATWARA, NEW USMANPUR‐NEW KATWARA, BLOCK H‐GHONDA PATTI, BLOCK C‐GHONDA PATTI, JAFFRABAD‐MAUJ PUR, BLOCK B‐GARI MANDU, GHONDA PATTI
YVR 1221 630 KVA PLANNED 05‐03‐2018 11:25:00 05‐03‐2018 13:57:41 2:32 0.00126667 MUs db repair & DB Welding & INSTALLATION new db
2684 NAYAGAON‐NEW KATWARA, NEW USMANPUR‐NEW KATWARA, BLOCK H‐GHONDA PATTI, BLOCK C‐GHONDA PATTI, BLOCK B‐GARI MANDU, GHONDA PATTI, ARVIND NAGAR‐GHONDA
YVR 1221 630 KVA PLANNED 08‐03‐2018 10:56:00 08‐03‐2018 13:59:42 3:3 0.001525 MUs db repair & DB Welding & INSTALLATION new db
2685 BLOCK B‐GARI MANDU, NAYAGAON‐NEW KATWARA, NEW USMANPUR‐NEW KATWARA, BLOCK C‐GHONDA PATTI, BLOCK H‐GHONDA PATTI, GHONDA PATTI
YVR 1221 630 KVA PLANNED 12‐03‐2018 10:59:00 12‐03‐2018 13:53:15 2:54 0.00048333 MUs db repair & DB Welding & INSTALLATION new db
2686 NAYAGAON‐NEW KATWARA, BLOCK N‐BRAHM PURI, BLOCK P‐BRAHM PURI, BLOCK F‐BRAHM PURI, BLOCK L‐BRAHM PURI
YVR 2983 400 KVA PLANNED 06‐03‐2018 11:54:00 06‐03‐2018 15:37:57 3:43 0.00309722 MUs db repair & DB Welding & INSTALLATION new db
2687 NAYAGAON‐NEW KATWARA, BLOCK I‐BRAHM PURI, BLOCK B‐BRAHM PURI, BLOCK P‐BRAHM PURI, BLOCK F‐BRAHM PURI, BLOCK L‐BRAHM PURI
YVR 2983 400 KVA PLANNED 09‐03‐2018 10:37:00 09‐03‐2018 13:17:16 2:40 0.00044444 MUs db repair & DB Welding & INSTALLATION new db
2688 BLOCK P‐BRAHM PURI, NAYAGAON‐NEW KATWARA, BLOCK L‐BRAHM PURI, BLOCK F‐BRAHM PURI YVR 2983 400 KVA PLANNED 13‐03‐2018 10:56:00 13‐03‐2018 12:25:30 1:29 0.00024722 MUs db repair & DB Welding & INSTALLATION new db
2689 BLOCK N‐BRAHM PURI, JAGJEET NAGAR‐GHONDA YVR 308 630 KVA PLANNED 22‐03‐2018 11:17:00 22‐03‐2018 14:14:52 2:57 0.00196667 MUs2690 BLOCK B‐SUBHASH MOHALLA, GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI
CHAUHAN, BLOCK C‐GHONDA, WEST GHONDAYVR 1274 990 KVA PLANNED 08‐03‐2018 10:25:00 08‐03‐2018 14:29:43 4:4 0.00135556 MUs
2691 BLOCK A‐GHONDA PATTI, BLOCK C‐GHONDA PATTI, BLOCK A‐GARI MANDU, BLOCK B‐MANUJPUR, BLOCK B‐GARI MANDU, YAMUNA VIHAR YAMUNA FLOOD PLAINS
YVR 1128 630 KVA PLANNED 09‐03‐2018 11:18:00 09‐03‐2018 14:19:48 3:1 0.00100556 MUs
2692 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD YVR 3783 990 KVA PLANNED 17‐03‐2018 12:56:00 17‐03‐2018 15:02:03 2:6 0.00105 MUs db repair & DB Welding & INSTALLATION new db
2693 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD YVR 3783 990 KVA PLANNED 19‐03‐2018 11:27:00 19‐03‐2018 16:47:12 5:20 0.00266667 MUs db repair & DB Welding & INSTALLATION new db
2694 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD YVR 3783 990 KVA PLANNED 20‐03‐2018 12:45:00 20‐03‐2018 14:19:17 1:34 0.00078333 MUs db repair & DB Welding & INSTALLATION new db
2695 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD YVR 3783 990 KVA PLANNED 21‐03‐2018 16:03:00 21‐03‐2018 16:51:31 0:48 0.0004 MUs db repair & DB Welding & INSTALLATION new db
2696 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD YVR 3783 990 KVA PLANNED 22‐03‐2018 13:54:00 22‐03‐2018 14:48:35 0:54 0.00045 MUs db repair & DB Welding & INSTALLATION new db
2697 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD YVR 3783 990 KVA PLANNED 24‐03‐2018 12:56:00 24‐03‐2018 17:08:48 4:12 0.0021 MUs db repair & DB Welding & INSTALLATION new db
2698 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD YVR 3783 990 KVA PLANNED 26‐03‐2018 11:21:00 26‐03‐2018 16:50:05 5:29 0.00274167 MUs db repair & DB Welding & INSTALLATION new db
2699 CHAUHAN BANGAR‐JAFFRABAD, BLOCK E‐BRAHM PURI, JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR YVR 3783 990 KVA PLANNED 28‐03‐2018 15:40:00 28‐03‐2018 16:39:58 0:59 0.00049167 MUs db repair & DB Welding & INSTALLATION new db
2700 BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK
YVR 569 990 KVA PLANNED 17‐03‐2018 11:51:00 17‐03‐2018 16:02:06 4:11 0.00139444 MUs db repair & DB Welding & INSTALLATION new db
2701 BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK
YVR 569 990 KVA PLANNED 20‐03‐2018 14:20:00 20‐03‐2018 17:23:56 3:3 0.00101667 MUs db repair & DB Welding & INSTALLATION new db
2702 BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK
YVR 569 990 KVA PLANNED 21‐03‐2018 13:40:00 21‐03‐2018 17:05:33 3:25 0.00113889 MUs db repair & DB Welding & INSTALLATION new db
2703 BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK
YVR 569 990 KVA PLANNED 22‐03‐2018 16:54:00 22‐03‐2018 17:58:51 1:4 0.00035556 MUs db repair & DB Welding & INSTALLATION new db
2704 BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK
YVR 569 990 KVA PLANNED 23‐03‐2018 16:38:00 23‐03‐2018 17:25:13 0:47 0.00039167 MUs db repair & DB Welding & INSTALLATION new db
2705 BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK
YVR 569 990 KVA PLANNED 26‐03‐2018 11:04:00 26‐03‐2018 16:42:41 5:38 0.00093889 MUs db repair & DB Welding & INSTALLATION new db
2706 BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK, BLOCK E‐NEW SILAMPURI PHASE II, BLOCK D‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II
YVR 569 990 KVA PLANNED 27‐03‐2018 11:57:00 27‐03‐2018 17:00:48 5:3 0.00168333 MUs db repair & DB Welding & INSTALLATION new db
2707 SUBHASH PARK‐GORAKH PARK YVR 290 630 KVA PLANNED 19‐03‐2018 14:52:00 19‐03‐2018 16:36:34 1:44 0.00086667 MUs db repair & DB Welding & INSTALLATION new db
2708 SUBHASH PARK‐GORAKH PARK YVR 1056 400 KVA PLANNED 20‐03‐2018 14:19:00 20‐03‐2018 17:16:57 2:57 0.00098333 MUs db repair & DB Welding & INSTALLATION new db
2709 SUBHASH PARK‐GORAKH PARK YVR 1056 400 KVA PLANNED 22‐03‐2018 16:53:00 22‐03‐2018 17:58:08 1:5 0.00036111 MUs db repair & DB Welding & INSTALLATION new db
2710 SUBHASH PARK‐GORAKH PARK YVR 325 630 KVA PLANNED 17‐03‐2018 15:33:00 17‐03‐2018 17:22:59 1:49 0.00060556 MUs db repair & DB Welding & INSTALLATION new db
2711 SUBHASH PARK‐GORAKH PARK YVR 299 630 KVA PLANNED 27‐03‐2018 11:45:00 27‐03‐2018 16:39:08 4:54 0.00163333 MUs db repair & DB Welding & INSTALLATION new db
2712 SUBHASH PARK‐GORAKH PARK, JAFFRABAD‐MAUJ PUR YVR 1233 990 KVA PLANNED 17‐03‐2018 14:58:00 17‐03‐2018 16:17:24 1:19 0.00043889 MUs db repair & DB Welding & INSTALLATION new db
2713 JAFFRABAD‐MAUJ PUR YVR 1215 990 KVA PLANNED 27‐03‐2018 14:42:00 27‐03‐2018 16:04:47 1:22 0.00045556 MUs db repair & DB Welding & INSTALLATION new db
2714 CHAUHAN BANGAR‐JAFFRABAD, JAFFRABAD‐MAUJ PUR YVR 1143 990 KVA PLANNED 22‐03‐2018 15:22:00 22‐03‐2018 16:17:32 0:55 0.00015278 MUs db repair & DB Welding & INSTALLATION new db
2715 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR YVR 1550 990 KVA PLANNED 26‐03‐2018 14:31:00 26‐03‐2018 15:18:11 0:47 0.00013056 MUs db repair & DB Welding & INSTALLATION new db
2716 SUBHASH PARK‐GORAKH PARK YVR 299 630 KVA PLANNED 23‐03‐2018 16:39:00 23‐03‐2018 17:25:34 0:46 0.00012778 MUs db repair & DB Welding & INSTALLATION new db
2717 SUBHASH PARK‐GORAKH PARK YVR 221 630 KVA PLANNED 19‐03‐2018 14:52:00 19‐03‐2018 16:39:02 1:47 0.00059444 MUs db repair & DB Welding & INSTALLATION new db
2718 SUBHASH PARK‐GORAKH PARK YVR 278 630 KVA PLANNED 21‐03‐2018 13:40:00 21‐03‐2018 17:05:19 3:25 0.00056944 MUs db repair & DB Welding & INSTALLATION new db
2719 CHAUHAN BANGAR‐JAFFRABAD YVR 211 990 KVA PLANNED 21‐03‐2018 16:54:00 21‐03‐2018 17:18:32 0:24 0.00006667 MUs db repair & DB Welding & INSTALLATION new db
2720 BLOCK E‐NEW SILAMPURI PHASE II, BLOCK D‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II YVR 11 100 KVA PLANNED 12‐03‐2018 14:11:00 12‐03‐2018 16:29:20 2:18 0.00076667 MUs2721 BLOCK M‐BRAHM PURI, JAFFRABAD‐MAUJ PUR, BLOCK K‐BRAHM PURI, BLOCK O‐BRAHM PURI, JAFFRABAD‐MAUJ
PUR, BLOCK B‐BRAHM PURI, CHAUHAN BANGAR‐JAFFRABADYVR 5006 1980 KVA PLANNED 13‐03‐2018 11:38:00 13‐03‐2018 12:33:50 0:55 0.00076389 MUs
2722 CHAUHAN BANGAR‐JAFFRABAD, JAFFRABAD‐MAUJ PUR YVR 388 630 KVA PLANNED 14‐03‐2018 10:16:00 14‐03‐2018 13:25:17 3:9 0.00105 MUs2723 BLOCK E‐NEW SILAMPURI PHASE II, BLOCK D‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II YVR 11 100 KVA PLANNED 19‐03‐2018 11:02:00 19‐03‐2018 16:49:21 5:47 0.00096389 MUs2724 BLOCK U‐WELCOME COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK Z‐
WELCOME COLONY, BLOCK A‐WELCOME COLONY, BLOCK S‐WELCOME COLONY, BLOCK P‐NEW SILAMPURI PHASE III, BLOCK W‐WELCOME COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI TRANSPORT‐WELCOME COLONY, BLOCK C‐WELCOME COLONY, NEW SILAMPURI PHASE III, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK I‐WELCOME COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK T‐WELCOME COLONY, BLOCK F‐SHIV VIHAR JHILMIL INDUSTRIAL AREA JHILMIL COLONY PKT A BLOCK B
YVR 2661 990 KVA PLANNED 20‐03‐2018 11:15:00 20‐03‐2018 14:03:00 2:48 0.00093333 MUs
2725 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD YVR 3758 990 KVA PLANNED 01‐03‐2018 15:20:00 01‐03‐2018 16:52:46 1:32 0.00076667 MUs db repair & DB Welding & INSTALLATION new db
2726 SUBHASH PARK‐GORAKH PARK, JAFFRABAD‐MAUJ PUR YVR 1228 990 KVA PLANNED 01‐03‐2018 15:19:00 01‐03‐2018 16:53:09 1:34 0.00026111 MUs db repair & DB Welding & INSTALLATION new db
2727 BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK
YVR 564 990 KVA PLANNED 01‐03‐2018 11:22:00 01‐03‐2018 14:05:20 2:43 0.00135833 MUs db repair & DB Welding & INSTALLATION new db
2728 JAFFRABAD‐MAUJ PUR, BLOCK G‐SILAMPUR COLONY, BLOCK E‐NEW SILAMPURI PHASE II YVR 1260 990 KVA PLANNED 01‐03‐2018 15:17:00 01‐03‐2018 16:53:30 1:36 0.00026667 MUs db repair & DB Welding & INSTALLATION new db
2729 JAFFRABAD‐MAUJ PUR, BLOCK G‐SILAMPUR COLONY, BLOCK E‐NEW SILAMPURI PHASE II YVR 1260 990 KVA PLANNED 05‐03‐2018 13:20:00 05‐03‐2018 15:33:08 2:13 0.00147778 MUs db repair & DB Welding & INSTALLATION new db
2730 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD YVR 3758 990 KVA PLANNED 06‐03‐2018 11:53:00 06‐03‐2018 16:04:34 4:11 0.00069722 MUs db repair & DB Welding & INSTALLATION new db
2731 BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK
YVR 564 990 KVA PLANNED 07‐03‐2018 15:15:00 07‐03‐2018 17:18:55 2:3 0.00136667 MUs db repair & DB Welding & INSTALLATION new db
2732 SUBHASH PARK‐GORAKH PARK, JAFFRABAD‐MAUJ PUR YVR 1228 990 KVA PLANNED 07‐03‐2018 11:45:00 07‐03‐2018 13:02:07 1:17 0.00064167 MUs db repair & DB Welding & INSTALLATION new db
2733 CHAUHAN BANGAR‐JAFFRABAD YVR 242 630 KVA PLANNED 07‐03‐2018 11:03:00 07‐03‐2018 15:48:55 4:45 0.00079167 MUs db repair & DB Welding & INSTALLATION new db
2734 CHAUHAN BANGAR‐JAFFRABAD, JAFFRABAD‐MAUJ PUR YVR 1128 990 KVA PLANNED 07‐03‐2018 11:02:00 07‐03‐2018 13:26:51 2:24 0.0012 MUs db repair & DB Welding & INSTALLATION new db
2735 JAFFRABAD‐MAUJ PUR, BLOCK G‐SILAMPUR COLONY, BLOCK E‐NEW SILAMPURI PHASE II YVR 1260 990 KVA PLANNED 07‐03‐2018 13:05:00 07‐03‐2018 17:05:56 4:0 0.00266667 MUs db repair & DB Welding & INSTALLATION new db
2736 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD YVR 3758 990 KVA PLANNED 08‐03‐2018 10:33:00 08‐03‐2018 15:31:40 4:58 0.00082778 MUs db repair & DB Welding & INSTALLATION new db
2737 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR YVR 1347 990 KVA PLANNED 08‐03‐2018 11:45:00 08‐03‐2018 13:37:53 1:52 0.00093333 MUs db repair & DB Welding & INSTALLATION new db
2738 CHAUHAN BANGAR‐JAFFRABAD YVR 242 630 KVA PLANNED 08‐03‐2018 11:43:00 08‐03‐2018 16:23:22 4:40 0.00233333 MUs db repair & DB Welding & INSTALLATION new db
2739 SUBHASH PARK‐GORAKH PARK YVR 298 630 KVA PLANNED 09‐03‐2018 12:47:00 09‐03‐2018 15:15:16 2:28 0.00082222 MUs db repair & DB Welding & INSTALLATION new db
2740 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD YVR 3758 990 KVA PLANNED 09‐03‐2018 16:20:00 09‐03‐2018 17:15:07 0:55 0.00015278 MUs db repair & DB Welding & INSTALLATION new db
2741 JAFFRABAD‐MAUJ PUR, BLOCK G‐SILAMPUR COLONY, BLOCK E‐NEW SILAMPURI PHASE II YVR 1260 990 KVA PLANNED 09‐03‐2018 14:42:00 09‐03‐2018 16:13:52 1:31 0.00101111 MUs db repair & DB Welding & INSTALLATION new db
2742 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR YVR 1347 990 KVA PLANNED 10‐03‐2018 11:34:00 10‐03‐2018 17:03:26 5:29 0.00274167 MUs db repair & DB Welding & INSTALLATION new db
2743 SUBHASH PARK‐GORAKH PARK, JAFFRABAD‐MAUJ PUR YVR 1228 990 KVA PLANNED 10‐03‐2018 11:05:00 10‐03‐2018 17:03:57 5:58 0.00099444 MUs db repair & DB Welding & INSTALLATION new db
2744 BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK
YVR 564 990 KVA PLANNED 10‐03‐2018 15:08:00 10‐03‐2018 17:12:59 2:4 0.00034444 MUs db repair & DB Welding & INSTALLATION new db
2745 CHAUHAN BANGAR‐JAFFRABAD YVR 242 630 KVA PLANNED 10‐03‐2018 15:07:00 10‐03‐2018 17:12:46 2:5 0.00034722 MUs db repair & DB Welding & INSTALLATION new db
2746 SUBHASH PARK‐GORAKH PARK YVR 325 630 KVA PLANNED 10‐03‐2018 15:08:00 10‐03‐2018 17:13:14 2:5 0.00034722 MUs db repair & DB Welding & INSTALLATION new db
2747 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD YVR 3758 990 KVA PLANNED 12‐03‐2018 15:18:00 12‐03‐2018 15:54:18 0:36 0.0001 MUs db repair & DB Welding & INSTALLATION new db
2748 BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK
YVR 564 990 KVA PLANNED 12‐03‐2018 14:25:00 12‐03‐2018 15:18:15 0:53 0.00058889 MUs db repair & DB Welding & INSTALLATION new db
2749 CHAUHAN BANGAR‐JAFFRABAD, JAFFRABAD‐MAUJ PUR YVR 1128 990 KVA PLANNED 12‐03‐2018 11:49:00 12‐03‐2018 14:19:52 2:30 0.00125 MUs db repair & DB Welding & INSTALLATION new db
2750 JAFFRABAD‐MAUJ PUR, BLOCK G‐SILAMPUR COLONY, BLOCK E‐NEW SILAMPURI PHASE II YVR 1260 990 KVA PLANNED 12‐03‐2018 14:27:00 12‐03‐2018 15:19:02 0:52 0.00043333 MUs db repair & DB Welding & INSTALLATION new db
2751 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD YVR 3758 990 KVA PLANNED 13‐03‐2018 12:42:00 13‐03‐2018 16:48:48 4:6 0.00068333 MUs db repair & DB Welding & INSTALLATION new db
2752 SUBHASH PARK‐GORAKH PARK YVR 404 630 KVA PLANNED 13‐03‐2018 12:11:00 13‐03‐2018 13:45:35 1:34 0.00026111 MUs db repair & DB Welding & INSTALLATION new db
2753 SUBHASH PARK‐GORAKH PARK YVR 325 630 KVA PLANNED 13‐03‐2018 12:11:00 13‐03‐2018 16:48:20 4:37 0.00076944 MUs db repair & DB Welding & INSTALLATION new db
2754 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD YVR 3758 990 KVA PLANNED 14‐03‐2018 12:13:00 14‐03‐2018 16:37:47 4:24 0.00073333 MUs db repair & DB Welding & INSTALLATION new db
2755 CHAUHAN BANGAR‐JAFFRABAD YVR 209 990 KVA PLANNED 14‐03‐2018 15:16:00 14‐03‐2018 16:40:32 1:24 0.00046667 MUs db repair & DB Welding & INSTALLATION new db
2756 CHAUHAN BANGAR‐JAFFRABAD, JAFFRABAD‐MAUJ PUR YVR 1128 990 KVA PLANNED 14‐03‐2018 12:13:00 14‐03‐2018 16:38:18 4:25 0.00073611 MUs db repair & DB Welding & INSTALLATION new db
2757 CHAUHAN BANGAR‐JAFFRABAD, JAFFRABAD‐MAUJ PUR YVR 1128 990 KVA PLANNED 15‐03‐2018 14:37:00 15‐03‐2018 17:15:43 2:38 0.00043889 MUs db repair & DB Welding & INSTALLATION new db
2758 JAFFRABAD‐MAUJ PUR, BLOCK G‐SILAMPUR COLONY, BLOCK E‐NEW SILAMPURI PHASE II YVR 1260 990 KVA PLANNED 15‐03‐2018 11:03:00 15‐03‐2018 15:13:48 4:10 0.00069444 MUs db repair & DB Welding & INSTALLATION new db
2759 SUBHASH PARK‐GORAKH PARK YVR 325 630 KVA PLANNED 15‐03‐2018 11:46:00 15‐03‐2018 16:08:51 4:22 0.00145556 MUs db repair & DB Welding & INSTALLATION new db
2760 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR YVR 1347 990 KVA PLANNED 09‐03‐2018 14:51:00 09‐03‐2018 17:14:04 2:23 0.00119167 MUs2761 BLOCK E‐NEW SILAMPURI PHASE II, BLOCK D‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II YVR 10 100 KVA PLANNED 01‐03‐2018 11:26:00 01‐03‐2018 12:14:48 0:48 0.0004 MUs2762 SUBHASH PARK‐GORAKH PARK YVR 288 630 KVA PLANNED 05‐03‐2018 10:35:00 05‐03‐2018 16:07:16 5:32 0.00138333 MUs
2763 BLOCK A‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK YVR 404 630 KVA PLANNED 23‐03‐2018 10:46:00 23‐03‐2018 14:48:15 4:2 0.00100833 MUs2764 BLOCK E‐NEW SILAMPURI PHASE II, JAFFRABAD‐MAUJ PUR, CHAUHAN BANGAR‐JAFFRABAD, BLOCK C‐NEW
SILAMPURI PHASE IIYVR 843 990 KVA PLANNED 24‐03‐2018 11:06:00 24‐03‐2018 13:28:30 2:22 0.00118333 MUs
2765 BLOCK E‐NEW SILAMPURI PHASE II, BLOCK D‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II YVR 11 100 KVA PLANNED 26‐03‐2018 10:32:00 26‐03‐2018 14:28:53 3:56 0.00262222 MUs2766 BLOCK A‐SILAMPUR COLONY, BLOCK F‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, BLOCK J‐SILAMPUR
COLONY, BLOCK B‐NEW SILAMPURI PHASE IIYVR 1622 990 KVA PLANNED 19‐03‐2018 11:57:00 19‐03‐2018 14:34:11 2:37 0.00043611 MUs db repair & DB
Welding & INSTALLATION new db
2767 BLOCK A‐SILAMPUR COLONY, BLOCK F‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, BLOCK J‐SILAMPUR COLONY, BLOCK B‐NEW SILAMPURI PHASE II
YVR 1622 990 KVA PLANNED 27‐03‐2018 11:33:00 27‐03‐2018 16:33:20 5:0 0.00083333 MUs db repair & DB Welding & INSTALLATION new db
2768 GOVT SARVODAY SCHOOL‐ZERO PUSTA, GEETA COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT R‐BLOCK D, BHAGAT NAGAR‐DAYALPUR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI VIDHYUT BROAD‐ZERO PUSTA, BLOCK U‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK D‐HARIJAN BASTI, PKT A‐BLOCK B, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR
YVR 290 400 KVA PLANNED 23‐03‐2018 14:54:00 23‐03‐2018 17:23:09 2:29 0.00041389 MUs db repair & DB Welding & INSTALLATION new db
2769 LIG/MIG RES/NON COMM AREA‐SHASTRI PARK YVR 1155 630 KVA PLANNED 19‐03‐2018 10:56:00 19‐03‐2018 12:20:06 1:24 0.00023333 MUs db repair & DB Welding & INSTALLATION new db
2770 BLOCK J‐SILAMPUR COLONY YVR 184 630 KVA PLANNED 17‐03‐2018 15:34:00 17‐03‐2018 17:30:22 1:56 0.00032222 MUs db repair & DB Welding & INSTALLATION new db
2771 BLOCK F‐ZERO PUSTA, BLOCK E‐ZERO PUSTA, ZERO PUSTA‐USMAN PUR, LIG/MIG RES/NON COMM AREA‐ZERO PUSTA, BLOCK G‐ZERO PUSTA
YVR 1748 990 KVA PLANNED 17‐03‐2018 15:33:00 17‐03‐2018 17:30:39 1:57 0.000325 MUs db repair & DB Welding & INSTALLATION new db
2772 KAILASH NAGAR YVR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, LIG/MIG RES/NON COMM AREA‐SHASTRI PARK, BLOCK D‐OLD MUSTAFABAD, BLOCK A‐SHASTRI PARK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, YAMUNA VIHAR YAMUNA FLOOD PLAINS, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐SHASTRI PARK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK G‐SILAMPUR COLONY, BLOCK D‐SHASTRI PARK, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, YAMUNA RIVER‐BLOCK 9
YVR 4194 4605 KVA PLANNED 16‐03‐2018 13:45:00 16‐03‐2018 14:10:15 0:25 0.00034722 MUs
2773 BLOCK A‐SILAMPUR COLONY, BLOCK F‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, BLOCK J‐SILAMPUR COLONY, BLOCK B‐NEW SILAMPURI PHASE II
YVR 1617 990 KVA PLANNED 08‐03‐2018 13:30:00 08‐03‐2018 15:12:41 1:42 0.00028333 MUs making of st. thought joint
2774 BLOCK A‐SILAMPUR COLONY, BLOCK F‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, BLOCK J‐SILAMPUR COLONY, BLOCK B‐NEW SILAMPURI PHASE II
YVR 1617 990 KVA PLANNED 12‐03‐2018 14:57:00 12‐03‐2018 16:29:41 1:32 0.00076667 MUs making of st. thought joint
2775 BLOCK A‐SILAMPUR COLONY, BLOCK F‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, BLOCK G‐SILAMPUR COLONY
YVR 718 630 KVA PLANNED 09‐03‐2018 12:37:00 09‐03‐2018 15:05:55 2:28 0.00123333 MUs db revamping work
2776 BLOCK J‐SILAMPUR COLONY YVR 183 630 KVA PLANNED 10‐03‐2018 15:06:00 10‐03‐2018 17:12:13 2:6 0.00035 MUs db repair & DB Welding & INSTALLATION new db
2777 BLOCK J‐SILAMPUR COLONY YVR 183 630 KVA PLANNED 13‐03‐2018 12:12:00 13‐03‐2018 17:02:18 4:50 0.00080556 MUs db repair & DB Welding & INSTALLATION new db
2778 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, GOVT SARVODAY SCHOOL‐ZERO PUSTA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, DELHI VIDHYUT BROAD‐ZERO PUSTA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY PKT A‐BLOCK B
YVR 289 400 KVA PLANNED 09‐03‐2018 10:45:00 09‐03‐2018 13:27:30 2:42 0.00045 MUs db repair & DB Welding & INSTALLATION new db
2779 BLOCK T‐GAUTAM PURI, MCD COLONY‐NEW KATWARA, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, BLOCK R‐BRAHM PURI, ZERO PUSTA‐USMAN PUR
YVR 2451 3010 KVA PLANNED 15‐03‐2018 11:51:00 15‐03‐2018 14:02:15 2:11 0.00181944 MUs MAINTENANCE WORK
2780 BLOCK C‐SHASTRI PARK YVR 153 400 KVA PLANNED 10‐03‐2018 10:03:00 10‐03‐2018 14:38:49 4:35 0.00038194 MUs2781 GEETA COLONY, YAMUNA RIVER‐BLOCK 9, YAMUNA VIHAR YAMUNA FLOOD PLAINS YVR 7 100 KVA PLANNED 24‐03‐2018 11:17:00 24‐03‐2018 14:42:44 3:25 0.00056944 MUs2782 KACHI COLONY‐JAGJEET NAGAR, VIJAY PARK‐YAMUNA VIHAR, BLOCK C12‐YAMUNA VIHAR, JAFFRABAD‐MAUJ PUR,
MAUJ PUR COMPLEX 1, BLOCK C‐BHAJANPURA, BLOCK B‐MANUJPUR, JAGJEET NAGAR‐GHONDA, ADARSH MOHALLA‐MAUJPUR
YVR 5311 4360 KVA PLANNED 05‐03‐2018 10:36:00 05‐03‐2018 13:18:00 2:42 0.002475 MUs
2783 BLOCK V‐GHONDA PATTI CHAUHAN, GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA YVR 639 630 KVA PLANNED 21‐03‐2018 14:11:00 21‐03‐2018 17:06:01 2:55 0.00048611 MUs db repair & DB Welding & INSTALLATION new db
2784 BLOCK V‐GHONDA PATTI CHAUHAN, GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA YVR 639 630 KVA PLANNED 24‐03‐2018 10:50:00 24‐03‐2018 13:44:32 2:54 0.00048333 MUs db repair & DB Welding & INSTALLATION new db
2785 BLOCK V‐GHONDA PATTI CHAUHAN, GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA YVR 639 630 KVA PLANNED 17‐03‐2018 10:58:00 17‐03‐2018 13:34:21 2:36 0.0013 MUs db repair & DB Welding & INSTALLATION new db
2786 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JAFFRABAD‐MAUJ PUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
YVR 2609 990 KVA PLANNED 17‐03‐2018 11:38:00 17‐03‐2018 15:59:49 4:21 0.002175 MUs db repair & DB Welding & INSTALLATION new db
2787 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JAFFRABAD‐MAUJ PUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
YVR 2609 990 KVA PLANNED 20‐03‐2018 10:20:00 20‐03‐2018 16:39:11 6:19 0.00105278 MUs db repair & DB Welding & INSTALLATION new db
2788 BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JAFFRABAD‐MAUJ PUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B
YVR 2609 990 KVA PLANNED 27‐03‐2018 10:40:00 27‐03‐2018 16:33:50 5:53 0.00098056 MUs db repair & DB Welding & INSTALLATION new db
2789 BLOCK D‐BHAJANPURA, BLOCK C‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK D‐BHAJANPURA YVR 1153 900 KVA PLANNED 16‐03‐2018 10:44:00 16‐03‐2018 13:14:42 2:30 0.00041667 MUs db repair & DB Welding & INSTALLATION new db
2790 BLOCK C‐GHONDA PATTI, VIJAY PARK‐YAMUNA VIHAR, BLOCK C6‐YAMUNA VIHAR, JAFFRABAD‐MAUJ PUR, MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR, ADARSH MOHALLA‐MAUJPUR
YVR 2295 990 KVA PLANNED 16‐03‐2018 11:48:00 16‐03‐2018 17:04:10 5:16 0.00175556 MUs db repair & DB Welding & INSTALLATION new db
2791 BLOCK B‐SUBHASH MOHALLA, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK E‐SUBHASH MOHALLA, WEST GHONDA
YVR 2470 630 KVA PLANNED 12‐03‐2018 10:05:00 12‐03‐2018 13:16:31 3:11 0.00106111 MUs
2792 BLOCK E‐SUBHASH MOHALLA, BLOCK B4‐YAMUNA VIHAR YVR 1728 990 KVA PLANNED 16‐03‐2018 10:20:00 16‐03‐2018 13:14:11 2:54 0.000725 MUs2793 MAUJ PUR COMPLEX 1, NORTH GHONDA YVR 897 990 KVA PLANNED 19‐03‐2018 10:00:02 19‐03‐2018 13:25:51 3:25 0.00056944 MUs2794 BLOCK B‐SUBHASH MOHALLA YVR 937 630 KVA PLANNED 21‐03‐2018 10:06:00 21‐03‐2018 13:27:53 3:21 0 MUs2795 BLOCK V‐GHONDA PATTI CHAUHAN, GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA YVR 635 630 KVA PLANNED 01‐03‐2018 12:50:00 01‐03‐2018 14:08:45 1:18 0.00065 MUs db repair & DB
Welding & INSTALLATION new db
2796 BLOCK V‐GHONDA PATTI CHAUHAN, GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA YVR 635 630 KVA PLANNED 08‐03‐2018 10:21:00 08‐03‐2018 13:56:53 3:35 0.00059722 MUs db repair & DB Welding & INSTALLATION new db
2797 BLOCK V‐GHONDA PATTI CHAUHAN, GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA YVR 635 630 KVA PLANNED 12‐03‐2018 13:32:00 12‐03‐2018 16:28:33 2:56 0.00048889 MUs db repair & DB Welding & INSTALLATION new db
2798 BLOCK C4‐YAMUNA VIHAR YVR 895 990 KVA PLANNED 01‐03‐2018 10:18:00 01‐03‐2018 13:49:31 3:31 0.00058611 MUs2799 PKT 3‐PHASE I, BLOCK 36‐HIMMATPURI, BLOCK 35‐HIMMATPURI, NEW JAFFRABAD‐GORAKH PARK, BLOCK H‐GHONDA
PATTI, JAFFRABAD‐MAUJ PUR, BLOCK D‐BHAJANPURA, BLOCK B‐GARI MANDU, GHONDA PATTIYVR 1993 990 KVA PLANNED 03‐03‐2018 10:08:00 03‐03‐2018 14:23:40 4:15 0 MUs
2800 BLOCK B‐MANUJPUR, TANKI ROAD‐C‐BLOCK BHAJANPURA, WAZIRABAD ROAD‐C‐BLOCK BHAJANPURA, BLOCK C‐BHAJANPURA, BLOCK D‐BHAJANPURA
YVR 1525 990 KVA PLANNED 07‐03‐2018 10:19:00 07‐03‐2018 14:05:44 3:46 0.00251111 MUs
2801 MAUJ PUR COMPLEX 1 YVR 1623 990 KVA PLANNED 26‐03‐2018 10:43:00 26‐03‐2018 13:48:08 3:5 0.00102778 MUs2802 BLOCK B‐SUBHASH MOHALLA, BLOCK B5‐YAMUNA PUR (GONDA) BLOCK B, BLOCK E‐SUBHASH MOHALLA, BLOCK E‐
SUBHASH MOHALLAYVR 2614 990 KVA PLANNED 27‐03‐2018 11:11:00 27‐03‐2018 14:10:09 2:59 0 MUs
2803 BLOCK J‐BRAHM PURI, VIJAY PARK‐YAMUNA VIHAR, JAFFRABAD‐MAUJ PUR, MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR
YVR 2304 990 KVA PLANNED 28‐03‐2018 10:46:00 28‐03‐2018 13:51:33 3:5 0.00051389 MUs