Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
SR 252 Section DSRPA 252 (Palmers Mill Road Bridge) over
Springton ReservoirBridge Replacement Project
Presented by
Pennsylvania Department of TransportationGannett Fleming, Inc.
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Purpose of Presentation
• Update the community on the Springton Dam Bridge Replacement
• Share response to community concerns
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Project Description• Replace bridge over spillway and roadway
barrier along NB shoulder/length of dam
• Maintain 2 lanes of traffic during construction
• Provide temporary roadway and bridge for staged construction
• Provide permanent retaining wall for construction staging and future maintenance activities
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Bridge Project Area
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Existing Bridge Approach
• View traveling Southbound
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Existing Bridge Approach
• View traveling Northbound
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Existing Bridge Elevation
BRIDGE ABUTMENT
SPILLWAYTRAININGWALL
SPILLWAYINVERT
42’ SPAN(ALONG C ROADWAY)L
22’-10” VERTICALCLEARANCE
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Bridge Area
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Existing Section
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Proposed Bridge Section
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Proposed Roadway Section
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Proposed Bridge Elevation
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Method of Construction
• Maintain one lane of vehicular traffic in each direction during construction
• Maintain access to local residences
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Utility Coordination• Aerial – Poles/wires relocated prior to, and during
construction• PECO Electric, Comcast, Crown Castle, Verizon
• Underground• PECO Gas: new future line, partially installed
during construction• Verizon: ductbank and manhole abandoned and
removed• Marple Township: traffic signal removed during
construction, new signal provided to Township for its reinstallation
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Stage 1 Construction
• Maintain one lane each way• Upgrade shoulders• Construct retaining wall, and
temporary roadway and bridge
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Stage 2 Construction• Maintain one lane each way• Shift NB traffic to temporary
bridge• Shift SB traffic to existing NB lane• Replace west side of bridge
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Stage 3 Construction• Maintain one lane each way• Shift SB and NB lanes to new portion of
bridge• Replace east side of existing bridge and
roadway barrier along length of dam
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Stage 3 Construction• Maintain one lane each way• Shift SB and NB lanes to new
portion of bridge• Replace east side of existing
bridge and roadway barrier along length of dam
• Temporary traffic signal at PA 252 and Palmers Mill Road intersection
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Aesthetics
Existing Bridge Barrier
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Aesthetics-Bridge Barrier
Stone-Faced Barrier
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Aesthetics-Bridge Barrier
Existing Bridge and Barrier
BRIDGE ABUTMENT
BRIDGE ABUTMENT
ROCK ARMORINGROCK ARMORING
EXISTINGSPILLWAYWALLS
EXISTINGSPILLWAYWALLS
EXISTINGSPILLWAYWALLS
42’ SPAN(ALONG C ROADWAY)L
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Aesthetics-Bridge Barrier
Proposed Concrete Bridge with Stone-Faced Barrier
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Retaining Wall
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Existing Condition
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Existing Condition
New Retaining Wall Rendering(Large-Scale Random Ashlar Stone)
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Project Schedule
Project Let: October 4, 2018
Contractor: JD Eckman, Inc.
Construction NTP: November 19, 2018
Construction Completion Date: Oct 18, 2021
Marple and Upper Providence Township Meetings || SR 0252, Section DSR Bridge Replacement Project || January 24, 2019
Questions?