Open House Public Meeting
S.R. 0885, Section A45Boulevard of the Allies
Highway Betterment Project
City of Pittsburgh, Allegheny County
University of Pittsburgh Alumni Hall, Connolly BallroomNovember 5, 2018
![Page 2: S.R. 0885, Section A45 Boulevard of the Allies Highway ......Nov 05, 2018 · Open House Public Meeting S.R. 0885, Section A45 Boulevard of the Allies. Highway Betterment Project](https://reader036.vdocuments.us/reader036/viewer/2022081616/5fe623347c04007e731f9878/html5/thumbnails/2.jpg)
Project Team
Design Division• Douglas Seeley, P.E.• Rich Yakupkovic, P.E.• Erik Porter, P.E.• Paul Manyisha (Project Manager)• Earl Fentzel• Dominic Altieri• Nicholas Krobot, P.E.
Maintenance Division• Douglas Smith• Timothy Hann, P.E.
Construction Division• John Myler (Asst. Construction
Manager)
![Page 3: S.R. 0885, Section A45 Boulevard of the Allies Highway ......Nov 05, 2018 · Open House Public Meeting S.R. 0885, Section A45 Boulevard of the Allies. Highway Betterment Project](https://reader036.vdocuments.us/reader036/viewer/2022081616/5fe623347c04007e731f9878/html5/thumbnails/3.jpg)
Purpose of MeetingTopics of Discussion:
Project Location
Roadway Description
Structure Descriptions
Proposed Improvements
Concurrent Projects
Anticipated Traffic Control
Impacts During Construction
Anticipated Design / Construction Schedule
Project Input and Feedback
![Page 4: S.R. 0885, Section A45 Boulevard of the Allies Highway ......Nov 05, 2018 · Open House Public Meeting S.R. 0885, Section A45 Boulevard of the Allies. Highway Betterment Project](https://reader036.vdocuments.us/reader036/viewer/2022081616/5fe623347c04007e731f9878/html5/thumbnails/4.jpg)
Project Location – Uptown Section
Uptown section length = approx. 1 mileMap courtesy of Google
![Page 5: S.R. 0885, Section A45 Boulevard of the Allies Highway ......Nov 05, 2018 · Open House Public Meeting S.R. 0885, Section A45 Boulevard of the Allies. Highway Betterment Project](https://reader036.vdocuments.us/reader036/viewer/2022081616/5fe623347c04007e731f9878/html5/thumbnails/5.jpg)
Project Location – Oakland Section
Oakland section length = approx. 4,200 feetMap courtesy of Google
![Page 6: S.R. 0885, Section A45 Boulevard of the Allies Highway ......Nov 05, 2018 · Open House Public Meeting S.R. 0885, Section A45 Boulevard of the Allies. Highway Betterment Project](https://reader036.vdocuments.us/reader036/viewer/2022081616/5fe623347c04007e731f9878/html5/thumbnails/6.jpg)
Four Lane Urban Principal Arterial
One-Way Average Daily Traffic:
• 39,000 (Uptown)
• 16,000 (Oakland)
Speed Limit: 25 – 40 MPH
On the National Highway System
Roadway Description
![Page 7: S.R. 0885, Section A45 Boulevard of the Allies Highway ......Nov 05, 2018 · Open House Public Meeting S.R. 0885, Section A45 Boulevard of the Allies. Highway Betterment Project](https://reader036.vdocuments.us/reader036/viewer/2022081616/5fe623347c04007e731f9878/html5/thumbnails/7.jpg)
6 bridge structures
• Includes 3 structures along the bluff
6 overhead sign structures
Structure Descriptions
![Page 8: S.R. 0885, Section A45 Boulevard of the Allies Highway ......Nov 05, 2018 · Open House Public Meeting S.R. 0885, Section A45 Boulevard of the Allies. Highway Betterment Project](https://reader036.vdocuments.us/reader036/viewer/2022081616/5fe623347c04007e731f9878/html5/thumbnails/8.jpg)
Site Photographs
![Page 9: S.R. 0885, Section A45 Boulevard of the Allies Highway ......Nov 05, 2018 · Open House Public Meeting S.R. 0885, Section A45 Boulevard of the Allies. Highway Betterment Project](https://reader036.vdocuments.us/reader036/viewer/2022081616/5fe623347c04007e731f9878/html5/thumbnails/9.jpg)
Proposed Improvements
Bituminous resurfacing and concrete patching from the Liberty Bridge/I-579 (Crosstown Blvd) Interchange to the intersection of Bates Street/Blvd of the Allies. The portion of the Blvd of the Allies at the I-376 (Parkway) Interchange will be a separate project.
Structure preservation including replacement of asphalt overlays, deck joint repair, and concrete repair on decks, beams, walls, piers, and abutments.
Installation of Intelligent Transportation System (ITS) devices throughout the corridor including traffic-monitoring cameras and other communication systems.
Upgrades to traffic signals and pedestrian accessibility (ADA) in the Oakland section.
![Page 10: S.R. 0885, Section A45 Boulevard of the Allies Highway ......Nov 05, 2018 · Open House Public Meeting S.R. 0885, Section A45 Boulevard of the Allies. Highway Betterment Project](https://reader036.vdocuments.us/reader036/viewer/2022081616/5fe623347c04007e731f9878/html5/thumbnails/10.jpg)
The intersection of Bates Street and the Blvd of the Allies (pictured)
The intersection of Zulema Street/Halket Street and the Blvd of the Allies
Traffic Signal & Pedestrian Facility Upgrade Locations
Courtesy of Google
![Page 11: S.R. 0885, Section A45 Boulevard of the Allies Highway ......Nov 05, 2018 · Open House Public Meeting S.R. 0885, Section A45 Boulevard of the Allies. Highway Betterment Project](https://reader036.vdocuments.us/reader036/viewer/2022081616/5fe623347c04007e731f9878/html5/thumbnails/11.jpg)
Concurrent ProjectsS.R. 2108 – Section A12 (under construction)
• Forbes Avenue
UPMC Mercy Hospital Construction Project (under construction)
S.R. 0376 – Section A64 (anticipated completion late 2019)
S.R. 8004 – Section A02 (anticipated completion late 2019)
• Ramp from Blvd of the Allies to I-376W (Parkway)
S.R. 8002 – Section A04 (anticipated completion late 2020)
• Ramp from I-579 (Crosstown Blvd) to the Blvd of the Allies
S.R. 0837 – Section A42 (anticipated completion late 2020)
• W. Carson Street (from Smithfield Street to West End Bridge)
S.R. 0579 – Section A10 (anticipated completion 2022)
• “Cap” Project
![Page 12: S.R. 0885, Section A45 Boulevard of the Allies Highway ......Nov 05, 2018 · Open House Public Meeting S.R. 0885, Section A45 Boulevard of the Allies. Highway Betterment Project](https://reader036.vdocuments.us/reader036/viewer/2022081616/5fe623347c04007e731f9878/html5/thumbnails/12.jpg)
Concurrent Projects
![Page 13: S.R. 0885, Section A45 Boulevard of the Allies Highway ......Nov 05, 2018 · Open House Public Meeting S.R. 0885, Section A45 Boulevard of the Allies. Highway Betterment Project](https://reader036.vdocuments.us/reader036/viewer/2022081616/5fe623347c04007e731f9878/html5/thumbnails/13.jpg)
Anticipated Traffic ControlNo detours
Preliminary analysis has concluded that proposed work can be completed using off-peak, single-lane restrictions
• Limited to nights and weekends.
• Number of weekend restrictions will be limited
![Page 14: S.R. 0885, Section A45 Boulevard of the Allies Highway ......Nov 05, 2018 · Open House Public Meeting S.R. 0885, Section A45 Boulevard of the Allies. Highway Betterment Project](https://reader036.vdocuments.us/reader036/viewer/2022081616/5fe623347c04007e731f9878/html5/thumbnails/14.jpg)
Impacts During Construction
There will be no Right-of-Way acquisitions associated with this project.• Access will be maintained to all adjacent properties during
construction.
Lane restrictions will be during off-peak hours to minimize congestion.
Longer weekend timeframe lane restrictions will be required, but will be limited.
![Page 15: S.R. 0885, Section A45 Boulevard of the Allies Highway ......Nov 05, 2018 · Open House Public Meeting S.R. 0885, Section A45 Boulevard of the Allies. Highway Betterment Project](https://reader036.vdocuments.us/reader036/viewer/2022081616/5fe623347c04007e731f9878/html5/thumbnails/15.jpg)
Anticipated Schedule
The construction schedule will be developed in final design, actual dates have not been established.
Anticipated construction duration is 6-8 months.
Estimated construction cost: $7 Million
S.R. 0885, SECTION A45Boulevard of the AlliesPROJECT SCHEDULE
OPEN HOUSE PUBLIC MEETINGPreliminary Design 2018
Final Design 2018
Construction 2019
![Page 16: S.R. 0885, Section A45 Boulevard of the Allies Highway ......Nov 05, 2018 · Open House Public Meeting S.R. 0885, Section A45 Boulevard of the Allies. Highway Betterment Project](https://reader036.vdocuments.us/reader036/viewer/2022081616/5fe623347c04007e731f9878/html5/thumbnails/16.jpg)
Project Input/Feedback
Plan sheets are located on front table for viewing.
Comment forms (located on the sign-in table) may be completed this evening or mailed/e-mailed in at later date.
![Page 17: S.R. 0885, Section A45 Boulevard of the Allies Highway ......Nov 05, 2018 · Open House Public Meeting S.R. 0885, Section A45 Boulevard of the Allies. Highway Betterment Project](https://reader036.vdocuments.us/reader036/viewer/2022081616/5fe623347c04007e731f9878/html5/thumbnails/17.jpg)
Blue bar at the upper portion of the screen, click on “Regional Offices”
Go to the map and click on 11
Right side column, click on “Public Meetings”
Look for “SR 0885 Boulevard of the Allies Highway Betterment Project”
www.penndot.gov
Project Input/Feedback
![Page 18: S.R. 0885, Section A45 Boulevard of the Allies Highway ......Nov 05, 2018 · Open House Public Meeting S.R. 0885, Section A45 Boulevard of the Allies. Highway Betterment Project](https://reader036.vdocuments.us/reader036/viewer/2022081616/5fe623347c04007e731f9878/html5/thumbnails/18.jpg)
Questions?
Project Input/Feedback