3/10/2021 Honorable Mayor and City Council City of Springfield City Hall Court Street Springfield, MA 01103 ATTN: Tasheena Davis, City Clerk PROJECT NAME: Chapin Terrace - Main Replacement Ladies & Gentlemen: Eversource of Massachusetts (EGMA) hereby requests that it be granted a location for and permission to install and replace underground gas facilities within a section of the Memorial Square Neighborhoods (as seen in the attached plan). Work will extend to the following streets in varying degrees/durations:
Street Name From To Chapin Street Chestnut St. Jardine St. Jardine St Chapin Terr. Lexington St. Lexington St. 66 Lexington St. 67 Lexington St. Narragansett St. Chapin Terr. 85 Chapin Terr. Marvin St. Pratt St. Chapin Terr.
This project will introduce modernized natural gas facilities to the area and retire the aged cast iron low pressure natural gas infrastructure. All proposed work by EGMA will include such laterals and service connections as it may now or subsequently find necessary. This project is being done in order to eliminate cast iron mains and poor pressures due to water in the main. Ryan Maheu Associate Engineer Eversource Energy 2025 Roosevelt Ave. Springfield, MA 01104 Cell: 413-355-0936 Email: [email protected]
Know what'sbelow.before you dig.Call
R
TITLE SHEETT-1
DESCRIPTIONDWG.
PROJECT INCLDUES INSTALLATION OF MP MAIN ALONG CHAPIN, MARVIN, & JARDINE. LP ALONG THOSE STREETS WILLALSO BE ABANDONED
SHEET INDEX
PROJECT DESCRIPTION
O-1 OVERVIEW SHEET
SCALE: N.T.S.
VICINITY MAPPROJECT INFORMATION
DRAWING TITLE:
TITLE SHEET
DRAWING NO:
T-1
PROJECT SUMMARY TABLE
PROPOSED GAS SERVICES
ESTIMATED GAS SERVICESTIE OVERSREPLACEMENTS METER OUTSTOTAL SERVICES
PROPOSED INSTALLATION PROPOSED ABANDONMENT
LENGTH (FT) SIZE (IN) TYPE LENGTH (FT) SIZE (IN) TYPE
1,150' 2" PHMP 1,586' 4" CILP1,295' 6" PHMP 297' 6" PHLP
287' 6" CILP
2,445' TOTAL INSTALLATION (FEET) 2,170' TOTAL ABANDONMENT (FEET)
JOB TYPE: MAIN REPLACEMENT (557/558)
INSTALLATION ORDER NUMBER
CHAPIN TERRACE - MAIN REPLACEMENT
20-0825559-00ABANDONMENT ORDER NUMBERPROJECT ID 20-69640
SITE NAME:
INST#
PROJECT ID#ABAN#
CHAPIN TERRSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264
PROPOSED
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
FIELD ENGINEER/TECHNICIAN:
CITY PERMITPERMITS:
CONSTRUCTION FLL:
MAP/GRID NUMBER:
COUNTY:
TAX DISTRICT/TOWNSHIP ID:
24 HR. EMERGENCY LINE:
TCC/LOA:
RTM
LANCE HEDGE, MARK BRONNER, DAVID BAYEUR
34
HAMPDEN (013)
0000244
8200 - SPRINGFIELD, MA
20-0825558-00
L-1 - L-6 MI LAYOUT PLANS
D-1 - D-3 CONSTRUCTION DETAILS
GENERAL NOTESGN-1
#
#
#
#
#
* - IF "YES," APPROVAL AND REASON ARE REQUIRED AND SHALL BE DOCUMENTED.NOTE: IF VALVE COULD NOT BE LOCATED, MAKE APPLICABLE COMMENT IN ABOVE TABLE.
VALVES PLANNED FOR ABANDONMENT
VALVENO.
FACILITYID LOCATION DESCRIPTION
ABANDONEDVALVE
INSERTED?
DISPOSITION
VALVE REMOVED (NOBOX; ABOVE GROUND
VALVE)VALVE, VALVE BOX &
LID REMOVED
VALVE REMAINS INPLACE; BOX & LID
REMOVED
VALVE REMAINS INPLACE; BOX FILLED W
CONCRETEYES* NO
N
SYSTEM NUMBERSYSTEM NAME
MINIMUM TEST PRESSURE (PSIG)
SYSTEM MOP (PSIG)
PROPOSED FACILITIES - SYSTEM MOP AND PRESSURE TEST DATA
SEGMENT MAOP (PSIG)
MAXIMUM TEST PRESSURE (PSIG)
80003048SPRINGFIELD 60 PSIG60 PSIG98 PSIG150 PSIG197 PSIG
1-800-525-8222
1/29/2020 - 22x34
I-1 - I-2 ISOMETRIC DETAILS
SYSTEM NUMBERSYSTEM NAME
MINIMUM TEST PRESSURE (PSIG)
SYSTEM MOP (PSIG)
PROPOSED FACILITIES - SYSTEM MOP AND PRESSURE TEST DATA
SEGMENT MAOP (PSIG)
MAXIMUM TEST PRESSURE (PSIG)
80003054SPRINGFIELD LP14 IN WC98 PSIG150 PSIG197 PSIG
FOR FITTINGS INSTALLED ON CAST IRON:SEGMENT MAOP: 25 PSIGMIN. TEST PRESSURE: 90 PSIGMAX TEST PRESSURE: 100 PSIG
21 23 44 20
General Notes
1. Deviation from NiSource CAD Standards is at discretion of reviewing Professional Engineer.
2. Refer to project documentation for the associated Environmental Compliance Plan (ECP) and any project-specific documentation.
3. The proposed gas facility locations shown are approximate and is subject to change.
4. Property lines, structures, street lines, etc. were compiled using the NiSource GIS and are to be considered approximate and notto scale.
5. Existing utilities, where shown, have been compiled from above ground evidence only and are to be considered approximate.NiSource does not guarantee the location of the underground utilities shown or that all existing utilities and/or subsurfacestructures are shown.
6. This project will adhere to all applicable federal, state or local permitting requirements for abandonment and installation of naturalgas pipelines. All Federal, State, and Local codes and standards will be adhered including, but not limited to, the following:
Code of Federal Regulations (CFR)49 CFR 192 Pipeline Safety Regulations29 CFR 1910 Occupational Safety and Health Administration (OSHA)
American Society of Mechanical Engineers (ASME)ASME B31.8 Gas Transmission and Distribution Piping Systems
All NiSource design codes and standards will be adhered to as applicable. These standards include but are not limited to the following(note state-specific designations where applicable):
GS 1100.010(IN, KY, MA, MD, OH, PA, VA) Locating Gas FacilitiesGS 1100.040(MA and VA only) Damage Prevention When Using Conventional Excavation TechnologiesGS 1100.050(IN, OH, VA) Damage Prevention - Using Trenchless TechnologyGS 1170.010(IN) Gas Control Room ManagementGS 1210.010(MA) Nondestructive Testing And Visual InspectionGS 1300.010 Fusion And Mechanical JoiningGS 1301.010 Plastic Pipe Fusion And Mechanical Joining Qualification Of PersonnelGS 1302.010(VA) Butt Fusion JoiningGS 1304.010 Electrofusion JoiningGS 1320.010 Mechanical Coupling ConnectionsGS 1323.010 Flange ConnectionsGS 1400.010 Corrosion Control - GeneralGS 1410.010(VA) Metallic Pipeline ExposuresGS 1420.035 Coating Repair Methods For Mill Applied CoatingsGS 1420.040 Coating Methods For Girth Welds, Fittings, Risers & Other Below Grade AppurtenancesGS 1420.410 Corrosion Control - Inspection Of Steel Pipe CoatingGS 1420.510 Installation Of Galvanic AnodesGS 1420.520 Installation Of Test StationsGS 1430.320 Ultrasonic Thickness GaugeGS 1500.010(MA, OH) Pressure TestingGS 1670.020(IN, KY, MA, MD) Odor Level MonitoringGS 1670.040 Pipeline Conditioning New PipelinesGS 1680.010 Tie-Ins And Tapping Pressurized PipelinesGS 1680.020 Plastic To Steel Transition ConnectionsGS 1680.040 Squeeze Off Procedure For Plastic PipeGS 1680.050 Squeeze Off Guidelines For Steel PipeGS 1690.010 PurgingGS 1708.020(IN, KY, MA, MD, PA) Leakage SurveysGS 1740.010(MA, OH, PA, VA) Abandonment Of FacilitiesGS 1740.012(MA, PA) Abandoning Facilities - Service Tee RemovalGS 1742.010(VA) Discontinuing Gas ServiceGS 1754.010(KY, OH) Operation And Maintenance Of Pressure GaugesGS 1770.010 Prevention Of Accidental IgnitionGS 1782.010(MA) Protecting Cast Iron PipelinesGS 2100.010 Design - GeneralGS 2810.050 Stakeholder Reviews of Design Capital ProjectsGS 3000.020(VA) Inspection Of MaterialsGS 3000.900 Work Site RestorationGS 3010.030 Bends And ElbowsGS 3010.050(IN, MA) Installation Of Pipe In A DitchGS 3010.060(IN) Installation Of Plastic PipeGS 3010.080(MA, OH, VA) Underground ClearanceGS 3010.090(IN, MA, PA, VA) Transmission Lines And Distribution Mains - CoverGS 3010.100(VA) Transmission Lines And Distribution Mains - Trenchless TechnologyGS 3010.102(VA) Directional BoringGS 3010.210(MA only) Use Of End Caps On Steel PipeGS 3020.030 Service Line Connections To Main PipingHSE 4440.020 Environmental Construction Standards
7. Prior to beginning any excavation on site, the person responsible for earth moving shall notify utility owners of their intent toexcavate and to have the exact locations of the utility lines marked by contacting the one call center in their state subject to anyapplicable state advance notification requirements.
8. Proposed or completed gas facility installation location references may be indicated by a combination of the following codes:
F - FRONT CLP - CENTER OF PAVEMENT D - DRIVEWAY EDGEBK - BACK CLR - CENTER OF RIGHT-OF-WAY EP - EDGE OF PAVEMENTL - LEFT CEL - CENTER OF EASTBOUND LANE ES - EDGE OF SIDEWALKR - RIGHT CWL - CENTER OF WESTBOUND LANE PL - PROPERTY LINEB - BUILDING EDGE CNL - CENTER OF NORTHBOUND LANECU - CURB CSL - CENTER OF SOUTHBOUND LANE
Environmental Notes
1. All NiSource construction activities must be completed in accordance with the Environmental Construction Standards (HSE4440.020) and the project Environmental Compliance Plan (ECP).
2. The project ECP and any site-specific erosion control drawings, must be provided to the contractor with the project drawings forreview and planning prior to the start of construction activities. This includes any tree clearing activities required prior to the start offacility construction activities.
3. The project ECP and any associated drawings must be reviewed with construction, the contractor, and an environmentalrepresentative prior to the start of construction activities.
4. These documents must remain on site for the duration of the construction project, and any project scope changes, with thepotential to impact the requirements of the ECP or environmental drawings, must be coordinated with an environmentalrepresentative prior to completion.
DRAWING LEGEND
Fire Hydrant
Drain Manhole
Sewer Manhole
Utility Pole
Telephone Manhole
Catch BasisElectric Manhole
Regulator Station
Gas Valve
Reducer
Meter
End CapTransition
Proposed Gas MainExisting Gas Main to Be Abandoned
Gas Service ReplacementGas Service Tie-over
Meter Move Out
R
M
R Single Customer Regulator
Meter with RegulatorTest Point (Station)
MR
MMO
Existing Gas Main
Proposed Gas Main Uprate
W Test Well
Critical Gas Valve
High Volume Tapping Tee
Electronic MarkerEM
T
R
TDE
S
TP
Flush-mounted Tracer Wire StationTWS
Post Pipeline Marker with Tracer Wire
Riser
Gas Main Marker without Tracer WireMM
Gas Main Symbology Gas Facility Symbology
Swing Tie Symbology
Pressure Control Fitting - ShortStopp Tee
E
TCU
WG
WB
Water Gate
Telephone Pedestal
Water Box
Electric Pedestal
Property Marker
Unknown ManholeTelevision Pedestal
Iron PinLight Pole
IP
Pressure Control Fitting - Spherical TeePressure Control Fitting - Mueller Bottom-outPressure Control Fitting - Mueller Side-outPressure Control Fitting - Mueller Flange TeePressure Control Fitting - ShortStoppPressure Control Fitting - Mueller Stopper
x"GVx"PV
x"HVTTx"SSTx"SPHx"MF-BOx"MF-SOx"MF-FTx"SSx"MF
Polytapp Side Saddle Fittingx"x x" POLYTAP
Cast Iron Gas MainCoated Steel Gas Main
Wrought Iron Gas MainBare Steel Gas Main
High Density Polyethylene Gas Main
Gas Main Tie-in Location
(E)(P)
ExistingProposed
Gas Main Abandonment Location
Medium Density Polyethylene Gas Main
Weld Location
CI*CS*
WI*BS*
PH*PM*
Low Pressure*LPIntermediate Pressure*IPMedium Pressure*MPHigh Pressure*HP
Bridge HangerAttached
Building HangerDirectional Bore
BHAT
BLGHDB
InsertedISOpen CutOCPneumatic BorePBPlowedPLRoof TopRT
Gas Main Material/Pressure Label References
Gas Main Installation Method Label References
MATERIAL CODES
PRESSURE CODES
MISCELLANEOUS CODESService*-SERRiser*-RTransmission Class(TC)
W1
T1
A1
GENERAL NOTES
DRAWING TITLE:
DRAWING NO:
GN-1
SITE NAME:
INST#
PROJECT ID#ABAN#
CAPIN TERR - MAIN REPLACEMENTSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264X X X
PROPOSED
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
8/17/2020 - 22x34
(Gate - GV, Plug - PV, PE Ball - BP, ST Ball - BV)
4 CHAPIN TERR650656
7 CHAPIN TERR
4" CS
LP 1961
21454
8" ST (153')
24
3339
43 51 57 6369 75
83-85
3448 56 CHAPIN TERR 70-72 CHAPIN TERR 80
8490-92
249-251
253-255
735 CHESNUT ST
55 PRATT ST494535
116
111
99 CHAPIN TERR109-111
115-117
129
141
108104
9892
8882
7872
7177
8187
9197
66 JARDINE ST
67 JARDINE ST
113
119 LEXINGTON ST
133 LEXINGTON ST
137
4" CS LP(4.5'± DEPTH)
E
E
EE
E
E
E
E
E
E
E
E
4" CS LP(4.5'± DEPTH)
E
257-259
759 CHESNUT ST
130 CHAPIN TERR
132
6" CILP
6" CSLP
T1
A5
OC~402'-6" PHMP
2" PHMP
4" CILP
4" CILP
4" CILP
4" CILP
6" CILP
2" EF COUPLING
2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" LYCOFIT CAP
6"x0.5" TAPPING TEE0.5" EF COUPLING
~3'-0.5" PHMP PIPE0.5" LYCOFIT CAP
G
2"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHMP PIPE0.5" LYCOFIT CAP
G
2" PHMP
DRILLING AND VENTING EQUIPMENT4"x2" SERVI SEAL
2" S/H THREADED PLUG
DRILLING AND VENTING EQUIPMENT4"x2" SERVI SEAL2" S/H THREADED PLUG
6" CILP4" CILP
4" CILP4" CILP
0.25" THREADED GAUGE DIRECT TAPPED0.25" S/H PLUG
G
4" CILP
6"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHLP PIPE
1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY
1.25" LYCOFIT CAP
6"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHLP PIPE0.5" LYCOFIT CAP
G
4" CSLP
6" CSLP4" CILP
2"x0.5" TAPPING TEE0.5" EF COUPLING
~3'-0.5" PHMP PIPE0.5" LYCOFIT CAP
G
DRILLING AND VENTING EQUIPMENT4"X2" SERVI-SEAL (OPTIONAL)2" S/H THREADED PLUG
6" PHMP
6"x1.25" TAPPING TEE1.25" EF COUPLING
~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER
1.25" COMPLIANT VENT STACK ASSEMBLY1.25" LYCOFIT CAP
OC~1280'-6" PHMP
G
2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" LYCOFIT CAP
2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" LYCOFIT CAP
2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" LYCOFIT CAP
G
0.25" THREADED GAUGE DIRECT TAPPED0.25" S/H PLUG
G
SQUEEZE OFF UNIT
6"x2" HVTT
6" CSLP
8"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHMP PIPE0.5" LYCOFIT CAP
G
8"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" LYCOFIT CAP
DRILLING, DOUBLE STOP, VENTING EQUIPMENT2" S/H THREADED PLUG (QTY 1 - 3)
4"X2" SERVI-SEAL (QTY 1 - 3)
0.25" THREADED GAUGE DIRECT TAPPED0.25" S/H PLUG
G
DRILLING, DOUBLE STOP, VENTING EQUIPMENT2" S/H THREADED PLUG (QTY 1 - 3)
6"X2" SERVI-SEAL (QTY 1 - 3)
12" CSIP
8" PHMPDRILLING AND VENTING EQUIPMENT
6"X2" SERVI-SEAL (OPTIONAL)2" S/H THREADED PLUG
8" PHMP
12" CSIP 6" PHMP
8" PHMP
4" PHMP
6" PHLP
6" PHLP
4" CILP
6"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHXP PIPE0.5" LYCOFIT CAP
6"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHLP PIPE0.5" LYCOFIT CAP
A4
T2
A6
T3
A7
4" CILP
6" CILP
4" CILP
OC~1280'-6" PHMP
OC~365-2" PHMP
OC~183'-2" PHMP
OC~150'-2" PHMP
OC~1280'-6" PHMP
OC~50'-2" PHMP
OC~365-2" PHMP
6"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHLP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" LYCOFIT CAP
(1) 6" BP #22197
OC~402'-6" PHMP
(1) 6" PH FULL TEE
(1) 8" EF COUPLING(1) 8"x6" REDUCER
(1) 6" CI LINE CAP(1) 6" CS LINE CAP
6"x2" HVTT
6" PH END CAP
T3
(1) 6" PH END CAP
(1) 6" BP #22198
(2) 4" CI LINE CAPS
(1) 2" BP #22199
(1) 2" BP #22200(1) 2" BP #22201
(1) 2" BP #22202
2" PH END CAP
2" PH END CAP
(2) 2" FULL TEES
0.25" THREADED GAUGE DIRECT TAPPED0.25" S/H PLUG
G
8" EF COUPLING
DRILLING, DOUBLE STOP, VENTING EQUIPMENT2" S/H THREADED PLUG (QTY 1 - 3)
6"X2" SERVI-SEAL (QTY 1 - 3)
2" EF COUPLING
0.25" THREADED GAUGE DIRECT TAPPED0.25" S/H PLUG
G
DRILLING, DOUBLE STOP, VENTING EQUIPMENT2" S/H THREADED PLUG (QTY 1 - 3)
4"X2" SERVI-SEAL (QTY 1 - 3)
CHAPIN TERR
6" CI END CAP6" PH END CAP
CHAPIN TERRACE
NA
RR
AG
AN
SE
TT ST
JAR
DIN
E S
T
CHAPIN TERRACE
CHAPIN TERRACE
CHAPIN TERRACE
JAR
DIN
E S
T
JAR
DIN
E S
TJA
RD
INE
ST
LEXINGTON STLEXINGTON ST
PRATT ST
ME
DIC
AL C
EN
TER
DR
MA
RV
IN S
T
CHAPIN TERRACE
CH
ES
TNU
T ST
CH
ES
TNU
T ST
CALHOUN ST
JAR
DIN
E S
T
CHAPIN TERRACE
CH
ES
TNU
T ST
PRATT ST
MA
RV
IN S
T
MA
RV
IN S
T
HO
SPIT
AL S
ERVI
CE
ROAD
FIELD BEND
OC~365-2" PHMP
13'±
5'±
3'±
2" EF COUPLING
6" PHLP
6" PH END CAP
13'±2'±
6'±2'±
5'±
7'±2'±
5'±
5'±
8'±
CHAPIN TERR
11'±11'±
3'±
6'±
3'±
3'± 3'±3'±
7'±
3'±
3'±
(2) 6" 45° ELBOWS
5'±(2) 6" 45° ELBOWS(2) 6" 45° ELBOWS
6"x2" HVTT
6"x2" HVTT
5'±
FIELD BEND
2'±
(2) 6" 45° ELBOWS
6"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHLP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" LYCOFIT CAP
2" FULL TEE
G
OC~150'-2" PHMP
6"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHMP PIPE0.5" LYCOFIT CAPOC~1280'-6" PHMP
OC~150'-2" PHMP
OC~183'-2" PHMP
4" CILP
4" CILP
OC~402'-6" PHMP6" CSLP
OVERVIEW SHEET
DRAWING TITLE:
DRAWING NO:
O-1
SITE NAME:
INST#
PROJECT ID#ABAN#
CAPIN TERR - MAIN REPLACEMENTSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264
PROPOSED
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
1/29/2020 - 22x34
Know what'sbelow.before you dig.Call
R
4 CHAPIN TERR650656
7 CHAPIN TERR
4" CS
LP 1961
SS
S
S
24
3339
34
36" WATER MAIN
15" COMBINED STORM/SEWER MAIN
8" WATER MAINS
12" CO
MB
INE
D S
TOR
M/S
EW
ER
MA
IN
12" WA
TER
MA
IN
12" CO
MB
INE
D S
TOR
M/S
EW
ER
MA
IN
12" WA
TER
MA
IN
E
E
E
8" VCP5.5'± COVER
8" VCP3.5'± COVER
15" VCP2.5'± COVER
15" VCP3'± COVER
10" VCP3.5'± COVER
10" VCP2.5'± COVERINVERT ANGLEDDOWNWARD
12" VCP3'± COVER
LIP ABOVE INVERTPIPE CBD(04/2020)
15" VCP2.5'± COVER
E
E
20" WA
TER
MA
IN (D
EA
D)
4" CILP4" CILP
4" CILP
4" CSLP
6" CSLP4" CILP
6" PHMPA4
4" CILP12" VCP3'± COVER
OC~1280'-6" PHMP(1) 6" BP #22197(1) 6" PH END CAP
(2) 4" CI LINE CAPS
CH
ES
TNU
T ST
CH
ES
TNU
T ST
CALHOUN ST
CHAPIN TERRACE
CH
ES
TNU
T ST
6'±
3'±
3'± 3'±3'±
LAYOUT SHEET
Feet
0 20 40
N
DRAWING TITLE:
DRAWING NO:
L-1
SITE NAME:
INST#
PROJECT ID#ABAN#
CAPIN TERR - MAIN REPLACEMENTSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264
PROPOSED
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
1/29/2020 - 22x34
Know what'sbelow.before you dig.Call
R
MAT
CH
LIN
E - S
HEE
T L-
2M
ATC
HLI
NE
- SH
EET
L-2
L-3
L-2L-1
L-6
KEY PLAN
L-4
L-5
MATERIAL INFORMATION -- (TO BE COMPLETED DURING CONSTRUCTION)
FITTING INSTALLATION DATAFITTING TYPE SIZE (IN) STORES ITEM NUMBER
(PO NUMBER IF NON-STOCK)MATERIAL
(MDPE, HDPE, STEEL) JOINT TYPE MANUFACTURER LOT NUMBER LOCATION 1 LOCATION 2 COMMENTS
PIPELINE INSTALLATION DATAPIPE SEGMENT SIZE (IN) MATERIAL
(MDPE, HDPE, STEEL)STORES ITEM NUMBER(PO NUMBER IF NON-STOCK) MANUFACTURER
PIPE DATAPLASTIC - SDR/STRAIGHT OR COIL
STEEL - WALL/GRADE/SEAM TYPE/COATINGLOCATION COMMENTS
CONTROLLABLE FITTINGS
NONCONTROLLABLE FITTINGS
FITTING TYPEBOTTOM OUT MUELLER FITTINGHIGH VOLUME TEESHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPP TEESIDE OUT MUELLER FITTINGSPHERICAL TEEMUELLER STOPPERSHORTSTOPP TEE
LABEL4" MF-BO4x2 HVTT4" SS4" SS-FE4" SST-FE4" MF-SO4" SPH4" MF-ST4" SST
FITTING TYPEBLOW-DOWNBLOW-OFFCHECK VALVECOUPLINGELLEND CAPLAUNCHER-RECEIVERPUMPKINREDUCERRELIEFSADDLETEETRANSITIONWELD INSULATORRISER
^ - "FITTING" TO BE REPRESENTED WITH DETAILED SKETCH OF FACILITY* - FITTING INDICATED BY CHANGE IN DIRECTION (ELBOW) OR
INTERSECTION OF FACILITIES (INLINE TEE, BRANCH SADDLE)
LABELBLOW-DOWNBLOW-OFF4" CHECK VALVE4" COUPLING4" 90° ELL/45° ELL4" DE CAPLAUNCHER-RECEIVERPUMPKIN4x2 REDUCERRELIEF8x4 BRANCH SADDLE4" INLINE TEE4" TRANSITION4" WELD INSULATOR4" PMMP-R/CSMP-R
SYMBOLN/A^N/A^
N/A*
N/A^
N/A^N/A*N/A*
SYMBOL
FITTING LEGEND
VALVE INSTALLATION DATA
VALVE TYPE SIZE (IN) STORES ITEM NUMBER(PO NUMBER IF NON-STOCK)
MATERIAL(MDPE, HDPE, STEEL) MANUFACTURER CLOCKWISE TO CLOSE? TURNS TO CLOSE PRESSURE RATING DEPTH TO NUT LOCATION 1 LOCATION 2 COMMENTS
Y or N
MATERIAL INFORMATION
DRAWING TITLE:
DRAWING NO:
L-1 MI
SITE NAME:
INST#
PROJECT ID#ABAN#
CAPIN TERR - MAIN REPLACEMENTSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264
PROPOSED
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
1/29/2020 - 22x34
Know what'sbelow.before you dig.Call
R
S SS
S
S
S
39
43 51 57 6369 75
83-85
48 56 CHAPIN TERR 70-72 CHAPIN TERR 80
8490-92
116
4" CS LP(4.5'± DEPTH)
36" WATER MAIN
8" WATER MAIN
12" COMBINED STORM/SEWER MAIN
8" WATER MAIN
28" COMBINED STORM/SEWER MAIN
6" WA
TER
MA
IN
8" WA
TER
MA
IN
S
E
VENTED TOPOF FRAME
E
4" CS LP(4.5'± DEPTH)
2" PHMP
6" CILP4" CILP OC~1280'-6" PHMP
6" CSLP
T2
6" CILP
OC~50'-2" PHMP
OC~402'-6" PHMP
(1) 6" PH FULL TEE
CHAPIN TERRACE
NA
RR
AG
AN
SE
TT ST
CHAPIN TERRACE
CHAPIN TERRACE
MA
RV
IN S
T
5'±
2" EF COUPLING
8'±
CHAPIN TERR
11'±11'±
3'±3'±
7'±
3'±
3'±
(2) 6" 45° ELBOWS6"x2" HVTT
(2) 6" 45° ELBOWS
LAYOUT SHEET
Feet
0 20 40
N
DRAWING TITLE:
DRAWING NO:
L-2
SITE NAME:
INST#
PROJECT ID#ABAN#
CAPIN TERR - MAIN REPLACEMENTSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264
PROPOSED
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
1/29/2020 - 22x34
Know what'sbelow.before you dig.Call
R
MATCHLINE - SHEET L-3 MATCHLINE - SHEET L-3
MAT
CH
LIN
E - S
HEE
T L-
1M
ATC
HLI
NE
- SH
EET
L-1
MAT
CH
LIN
E - S
HEE
T L-
4M
ATC
HLI
NE
- SH
EET
L-4
L-3
L-2L-1
L-6
KEY PLAN
L-4
L-5
MATERIAL INFORMATION -- (TO BE COMPLETED DURING CONSTRUCTION)
FITTING INSTALLATION DATAFITTING TYPE SIZE (IN) STORES ITEM NUMBER
(PO NUMBER IF NON-STOCK)MATERIAL
(MDPE, HDPE, STEEL) JOINT TYPE MANUFACTURER LOT NUMBER LOCATION 1 LOCATION 2 COMMENTS
PIPELINE INSTALLATION DATAPIPE SEGMENT SIZE (IN) MATERIAL
(MDPE, HDPE, STEEL)STORES ITEM NUMBER(PO NUMBER IF NON-STOCK) MANUFACTURER
PIPE DATAPLASTIC - SDR/STRAIGHT OR COIL
STEEL - WALL/GRADE/SEAM TYPE/COATINGLOCATION COMMENTS
CONTROLLABLE FITTINGS
NONCONTROLLABLE FITTINGS
FITTING TYPEBOTTOM OUT MUELLER FITTINGHIGH VOLUME TEESHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPP TEESIDE OUT MUELLER FITTINGSPHERICAL TEEMUELLER STOPPERSHORTSTOPP TEE
LABEL4" MF-BO4x2 HVTT4" SS4" SS-FE4" SST-FE4" MF-SO4" SPH4" MF-ST4" SST
FITTING TYPEBLOW-DOWNBLOW-OFFCHECK VALVECOUPLINGELLEND CAPLAUNCHER-RECEIVERPUMPKINREDUCERRELIEFSADDLETEETRANSITIONWELD INSULATORRISER
^ - "FITTING" TO BE REPRESENTED WITH DETAILED SKETCH OF FACILITY* - FITTING INDICATED BY CHANGE IN DIRECTION (ELBOW) OR
INTERSECTION OF FACILITIES (INLINE TEE, BRANCH SADDLE)
LABELBLOW-DOWNBLOW-OFF4" CHECK VALVE4" COUPLING4" 90° ELL/45° ELL4" DE CAPLAUNCHER-RECEIVERPUMPKIN4x2 REDUCERRELIEF8x4 BRANCH SADDLE4" INLINE TEE4" TRANSITION4" WELD INSULATOR4" PMMP-R/CSMP-R
SYMBOLN/A^N/A^
N/A*
N/A^
N/A^N/A*N/A*
SYMBOL
FITTING LEGEND
VALVE INSTALLATION DATA
VALVE TYPE SIZE (IN) STORES ITEM NUMBER(PO NUMBER IF NON-STOCK)
MATERIAL(MDPE, HDPE, STEEL) MANUFACTURER CLOCKWISE TO CLOSE? TURNS TO CLOSE PRESSURE RATING DEPTH TO NUT LOCATION 1 LOCATION 2 COMMENTS
Y or N
MATERIAL INFORMATION
DRAWING TITLE:
DRAWING NO:
L-2 MI
SITE NAME:
INST#
PROJECT ID#ABAN#
CAPIN TERR - MAIN REPLACEMENTSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264
PROPOSED
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
1/29/2020 - 22x34
Know what'sbelow.before you dig.Call
R
21454
8" ST (153')
S
S
S
S
S
S
S
249-251
253-255
735 CHESNUT ST
55 PRATT ST494535
18" SEWER MAIN
10" SE
WE
R M
AIN
6" WATER MAIN
6" WA
TER
MA
IN
S
SSE
12" VCP3'± COVER
12" VCP3'± COVER
E
E
E
S 15" SEWER MAIN
257-259
759 CHESNUT ST
6" CILP
6" CSLP
T1
A5
OC~402'-6" PHMP
12" CSIP
8" PHMP
8" PHMP
12" CSIP 6" PHMP
8" PHMP
4" PHMP
(1) 8" EF COUPLING(1) 8"x6" REDUCER
(1) 6" CI LINE CAP(1) 6" CS LINE CAP
PRATT ST
MA
RV
IN S
T
PRATT ST
MA
RV
IN S
T
HO
SPIT
AL S
ERVI
CE
ROAD
3'±
5'±(2) 6" 45° ELBOWS(2) 6" 45° ELBOWS
LAYOUT SHEET
Feet
0 20 40
N
DRAWING TITLE:
DRAWING NO:
L-3
SITE NAME:
INST#
PROJECT ID#ABAN#
CAPIN TERR - MAIN REPLACEMENTSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264
PROPOSED
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
1/29/2020 - 22x34
Know what'sbelow.before you dig.Call
R
MATCHLINE - SHEET L-2 MATCHLINE - SHEET L-2
L-3
L-2L-1
L-6
KEY PLAN
L-4
L-5
MATERIAL INFORMATION -- (TO BE COMPLETED DURING CONSTRUCTION)
FITTING INSTALLATION DATAFITTING TYPE SIZE (IN) STORES ITEM NUMBER
(PO NUMBER IF NON-STOCK)MATERIAL
(MDPE, HDPE, STEEL) JOINT TYPE MANUFACTURER LOT NUMBER LOCATION 1 LOCATION 2 COMMENTS
PIPELINE INSTALLATION DATAPIPE SEGMENT SIZE (IN) MATERIAL
(MDPE, HDPE, STEEL)STORES ITEM NUMBER(PO NUMBER IF NON-STOCK) MANUFACTURER
PIPE DATAPLASTIC - SDR/STRAIGHT OR COIL
STEEL - WALL/GRADE/SEAM TYPE/COATINGLOCATION COMMENTS
CONTROLLABLE FITTINGS
NONCONTROLLABLE FITTINGS
FITTING TYPEBOTTOM OUT MUELLER FITTINGHIGH VOLUME TEESHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPP TEESIDE OUT MUELLER FITTINGSPHERICAL TEEMUELLER STOPPERSHORTSTOPP TEE
LABEL4" MF-BO4x2 HVTT4" SS4" SS-FE4" SST-FE4" MF-SO4" SPH4" MF-ST4" SST
FITTING TYPEBLOW-DOWNBLOW-OFFCHECK VALVECOUPLINGELLEND CAPLAUNCHER-RECEIVERPUMPKINREDUCERRELIEFSADDLETEETRANSITIONWELD INSULATORRISER
^ - "FITTING" TO BE REPRESENTED WITH DETAILED SKETCH OF FACILITY* - FITTING INDICATED BY CHANGE IN DIRECTION (ELBOW) OR
INTERSECTION OF FACILITIES (INLINE TEE, BRANCH SADDLE)
LABELBLOW-DOWNBLOW-OFF4" CHECK VALVE4" COUPLING4" 90° ELL/45° ELL4" DE CAPLAUNCHER-RECEIVERPUMPKIN4x2 REDUCERRELIEF8x4 BRANCH SADDLE4" INLINE TEE4" TRANSITION4" WELD INSULATOR4" PMMP-R/CSMP-R
SYMBOLN/A^N/A^
N/A*
N/A^
N/A^N/A*N/A*
SYMBOL
FITTING LEGEND
VALVE INSTALLATION DATA
VALVE TYPE SIZE (IN) STORES ITEM NUMBER(PO NUMBER IF NON-STOCK)
MATERIAL(MDPE, HDPE, STEEL) MANUFACTURER CLOCKWISE TO CLOSE? TURNS TO CLOSE PRESSURE RATING DEPTH TO NUT LOCATION 1 LOCATION 2 COMMENTS
Y or N
MATERIAL INFORMATION
DRAWING TITLE:
DRAWING NO:
L-3 MI
SITE NAME:
INST#
PROJECT ID#ABAN#
CAPIN TERR - MAIN REPLACEMENTSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264
PROPOSED
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
1/29/2020 - 22x34
Know what'sbelow.before you dig.Call
R
S
S
S
S
SS
S
111
99 CHAPIN TERR109-111
115-117
129
18" CO
MB
INE
D S
TOR
M/S
EW
ER
MA
IN
18" COMBINED STORM/SEWER MAIN (6'± COVER)
36" WATER MAIN8" WATER MAIN
S
E
LIP ABOVE INVERTPIPE CBD4' TO DEBRIS(04/2020)
FILLED WITH DEBRIS4' TO DEBRIS(04/2020)
18" VCP2.5'± COVER
8" VCP3'± COVER
8" VCP3.5'± COVER
8" VCP2.5'± COVER
6" VCP2.5'± COVER
15" COMBINED STORM/SEWER MAIN
8" WATER MAIN
36" WA
TER
MA
IN (5'±
CO
VE
R)
8" WA
TER
MA
IN
10" CO
MB
INE
D S
TOR
M/S
EW
ER
MA
IN (4'±
CO
VE
R)
8" WA
TER
MA
IN
E
130 CHAPIN TERR
132
6" CILP
6" PHLP
6" PHLP
4" CILP
A6
A7
OC~1280'-6" PHMP
OC~365-2" PHMP
6"x2" HVTT
6" PH END CAP
T3
(1) 6" BP #22198
(1) 2" BP #22199
CHAPIN TERR
6" CI END CAP6" PH END CAP
JAR
DIN
E S
T
CHAPIN TERRACE
CHAPIN TERRACE
JAR
DIN
E S
T
ME
DIC
AL C
EN
TER
DR
13'±
6" PHLP
6" PH END CAP
13'±2'±
6"x2" HVTT
LAYOUT SHEET
Feet
0 20 40
N
DRAWING TITLE:
DRAWING NO:
L-4
SITE NAME:
INST#
PROJECT ID#ABAN#
CAPIN TERR - MAIN REPLACEMENTSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264
PROPOSED
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
1/29/2020 - 22x34
Know what'sbelow.before you dig.Call
R
MAT
CH
LIN
E - S
HEE
T L-
2M
ATC
HLI
NE
- SH
EET
L-2
L-3
L-2L-1
L-6
KEY PLAN
L-4
L-5
MATCHLINE - SHEET L-5 MATCHLINE - SHEET L-5
MATERIAL INFORMATION -- (TO BE COMPLETED DURING CONSTRUCTION)
FITTING INSTALLATION DATAFITTING TYPE SIZE (IN) STORES ITEM NUMBER
(PO NUMBER IF NON-STOCK)MATERIAL
(MDPE, HDPE, STEEL) JOINT TYPE MANUFACTURER LOT NUMBER LOCATION 1 LOCATION 2 COMMENTS
PIPELINE INSTALLATION DATAPIPE SEGMENT SIZE (IN) MATERIAL
(MDPE, HDPE, STEEL)STORES ITEM NUMBER(PO NUMBER IF NON-STOCK) MANUFACTURER
PIPE DATAPLASTIC - SDR/STRAIGHT OR COIL
STEEL - WALL/GRADE/SEAM TYPE/COATINGLOCATION COMMENTS
CONTROLLABLE FITTINGS
NONCONTROLLABLE FITTINGS
FITTING TYPEBOTTOM OUT MUELLER FITTINGHIGH VOLUME TEESHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPP TEESIDE OUT MUELLER FITTINGSPHERICAL TEEMUELLER STOPPERSHORTSTOPP TEE
LABEL4" MF-BO4x2 HVTT4" SS4" SS-FE4" SST-FE4" MF-SO4" SPH4" MF-ST4" SST
FITTING TYPEBLOW-DOWNBLOW-OFFCHECK VALVECOUPLINGELLEND CAPLAUNCHER-RECEIVERPUMPKINREDUCERRELIEFSADDLETEETRANSITIONWELD INSULATORRISER
^ - "FITTING" TO BE REPRESENTED WITH DETAILED SKETCH OF FACILITY* - FITTING INDICATED BY CHANGE IN DIRECTION (ELBOW) OR
INTERSECTION OF FACILITIES (INLINE TEE, BRANCH SADDLE)
LABELBLOW-DOWNBLOW-OFF4" CHECK VALVE4" COUPLING4" 90° ELL/45° ELL4" DE CAPLAUNCHER-RECEIVERPUMPKIN4x2 REDUCERRELIEF8x4 BRANCH SADDLE4" INLINE TEE4" TRANSITION4" WELD INSULATOR4" PMMP-R/CSMP-R
SYMBOLN/A^N/A^
N/A*
N/A^
N/A^N/A*N/A*
SYMBOL
FITTING LEGEND
VALVE INSTALLATION DATA
VALVE TYPE SIZE (IN) STORES ITEM NUMBER(PO NUMBER IF NON-STOCK)
MATERIAL(MDPE, HDPE, STEEL) MANUFACTURER CLOCKWISE TO CLOSE? TURNS TO CLOSE PRESSURE RATING DEPTH TO NUT LOCATION 1 LOCATION 2 COMMENTS
Y or N
MATERIAL INFORMATION
DRAWING TITLE:
DRAWING NO:
L-4 MI
SITE NAME:
INST#
PROJECT ID#ABAN#
CAPIN TERR - MAIN REPLACEMENTSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264
PROPOSED
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
1/29/2020 - 22x34
Know what'sbelow.before you dig.Call
R
S
S
111
141
108104
9892
8882
78
7781
8791
97S
10" CO
MB
INE
D S
TOR
M/S
EW
ER
MA
IN
8" WA
TER
MA
IN
10" CPP3'± COVER
8" PVC2.5'± COVER
4" CILP
4" CILP
OC~365-2" PHMP
JAR
DIN
E S
T
6'±2'±
2'±
LAYOUT SHEET
Feet
0 20 40
N
DRAWING TITLE:
DRAWING NO:
L-5
SITE NAME:
INST#
PROJECT ID#ABAN#
CAPIN TERR - MAIN REPLACEMENTSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264
PROPOSED
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
1/29/2020 - 22x34
Know what'sbelow.before you dig.Call
R
MATCHLINE - SHEET L-4 MATCHLINE - SHEET L-4
MATCHLINE - SHEET L-6 MATCHLINE - SHEET L-6
L-3
L-2L-1
L-6
KEY PLAN
L-4
L-5
MATERIAL INFORMATION -- (TO BE COMPLETED DURING CONSTRUCTION)
FITTING INSTALLATION DATAFITTING TYPE SIZE (IN) STORES ITEM NUMBER
(PO NUMBER IF NON-STOCK)MATERIAL
(MDPE, HDPE, STEEL) JOINT TYPE MANUFACTURER LOT NUMBER LOCATION 1 LOCATION 2 COMMENTS
PIPELINE INSTALLATION DATAPIPE SEGMENT SIZE (IN) MATERIAL
(MDPE, HDPE, STEEL)STORES ITEM NUMBER(PO NUMBER IF NON-STOCK) MANUFACTURER
PIPE DATAPLASTIC - SDR/STRAIGHT OR COIL
STEEL - WALL/GRADE/SEAM TYPE/COATINGLOCATION COMMENTS
CONTROLLABLE FITTINGS
NONCONTROLLABLE FITTINGS
FITTING TYPEBOTTOM OUT MUELLER FITTINGHIGH VOLUME TEESHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPP TEESIDE OUT MUELLER FITTINGSPHERICAL TEEMUELLER STOPPERSHORTSTOPP TEE
LABEL4" MF-BO4x2 HVTT4" SS4" SS-FE4" SST-FE4" MF-SO4" SPH4" MF-ST4" SST
FITTING TYPEBLOW-DOWNBLOW-OFFCHECK VALVECOUPLINGELLEND CAPLAUNCHER-RECEIVERPUMPKINREDUCERRELIEFSADDLETEETRANSITIONWELD INSULATORRISER
^ - "FITTING" TO BE REPRESENTED WITH DETAILED SKETCH OF FACILITY* - FITTING INDICATED BY CHANGE IN DIRECTION (ELBOW) OR
INTERSECTION OF FACILITIES (INLINE TEE, BRANCH SADDLE)
LABELBLOW-DOWNBLOW-OFF4" CHECK VALVE4" COUPLING4" 90° ELL/45° ELL4" DE CAPLAUNCHER-RECEIVERPUMPKIN4x2 REDUCERRELIEF8x4 BRANCH SADDLE4" INLINE TEE4" TRANSITION4" WELD INSULATOR4" PMMP-R/CSMP-R
SYMBOLN/A^N/A^
N/A*
N/A^
N/A^N/A*N/A*
SYMBOL
FITTING LEGEND
VALVE INSTALLATION DATA
VALVE TYPE SIZE (IN) STORES ITEM NUMBER(PO NUMBER IF NON-STOCK)
MATERIAL(MDPE, HDPE, STEEL) MANUFACTURER CLOCKWISE TO CLOSE? TURNS TO CLOSE PRESSURE RATING DEPTH TO NUT LOCATION 1 LOCATION 2 COMMENTS
Y or N
MATERIAL INFORMATION
DRAWING TITLE:
DRAWING NO:
L-5 MI
SITE NAME:
INST#
PROJECT ID#ABAN#
CAPIN TERR - MAIN REPLACEMENTSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264
PROPOSED
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
1/29/2020 - 22x34
Know what'sbelow.before you dig.Call
R
SSS
72
71
66 JARDINE ST
67 JARDINE ST
113
119 LEXINGTON ST
133 LEXINGTON ST
137
S
S
S
15" CO
MB
INE
D S
TOR
M/S
EW
ER
MA
IN
8" WA
TER
MA
IN
18" COMBINED STORM/SEWER MAIN18" COMBINED STORM/SEWER MAIN
8" WATER MAIN
8" WATER MAIN
8" WA
TER
MA
IN
8" SE
WE
R M
AIN
(5'± C
OV
ER
)
6" VCP2.5'± COVER
12" VCP3'± COVER
15" VCP2'± COVER
18" STO
RM
MA
IN (6' ±
CO
VE
R)
4" CILP
4" CILP
4" CILP
2" PHMP
T3
OC~183'-2" PHMP
OC~150'-2" PHMP
(1) 2" BP #22200(1) 2" BP #22201
(1) 2" BP #22202
2" PH END CAP
2" PH END CAP
(2) 2" FULL TEES
JAR
DIN
E S
T
LEXINGTON STLEXINGTON ST
JAR
DIN
E S
T
FIELD BEND
OC~365-2" PHMP
5'±
7'±2'±
5'±
5'±
5'±
FIELD BEND
2" FULL TEE
OC~150'-2" PHMP
LAYOUT SHEET
Feet
0 20 40
N
DRAWING TITLE:
DRAWING NO:
L-6
SITE NAME:
INST#
PROJECT ID#ABAN#
CAPIN TERR - MAIN REPLACEMENTSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264
PROPOSED
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
1/29/2020 - 22x34
Know what'sbelow.before you dig.Call
R
MATCHLINE - SHEET L-5 MATCHLINE - SHEET L-5
L-3
L-2L-1
L-6
KEY PLAN
L-4
L-5
MATERIAL INFORMATION -- (TO BE COMPLETED DURING CONSTRUCTION)
FITTING INSTALLATION DATAFITTING TYPE SIZE (IN) STORES ITEM NUMBER
(PO NUMBER IF NON-STOCK)MATERIAL
(MDPE, HDPE, STEEL) JOINT TYPE MANUFACTURER LOT NUMBER LOCATION 1 LOCATION 2 COMMENTS
PIPELINE INSTALLATION DATAPIPE SEGMENT SIZE (IN) MATERIAL
(MDPE, HDPE, STEEL)STORES ITEM NUMBER(PO NUMBER IF NON-STOCK) MANUFACTURER
PIPE DATAPLASTIC - SDR/STRAIGHT OR COIL
STEEL - WALL/GRADE/SEAM TYPE/COATINGLOCATION COMMENTS
CONTROLLABLE FITTINGS
NONCONTROLLABLE FITTINGS
FITTING TYPEBOTTOM OUT MUELLER FITTINGHIGH VOLUME TEESHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPPFULL ENCIRCLEMENT SHORTSTOPP TEESIDE OUT MUELLER FITTINGSPHERICAL TEEMUELLER STOPPERSHORTSTOPP TEE
LABEL4" MF-BO4x2 HVTT4" SS4" SS-FE4" SST-FE4" MF-SO4" SPH4" MF-ST4" SST
FITTING TYPEBLOW-DOWNBLOW-OFFCHECK VALVECOUPLINGELLEND CAPLAUNCHER-RECEIVERPUMPKINREDUCERRELIEFSADDLETEETRANSITIONWELD INSULATORRISER
^ - "FITTING" TO BE REPRESENTED WITH DETAILED SKETCH OF FACILITY* - FITTING INDICATED BY CHANGE IN DIRECTION (ELBOW) OR
INTERSECTION OF FACILITIES (INLINE TEE, BRANCH SADDLE)
LABELBLOW-DOWNBLOW-OFF4" CHECK VALVE4" COUPLING4" 90° ELL/45° ELL4" DE CAPLAUNCHER-RECEIVERPUMPKIN4x2 REDUCERRELIEF8x4 BRANCH SADDLE4" INLINE TEE4" TRANSITION4" WELD INSULATOR4" PMMP-R/CSMP-R
SYMBOLN/A^N/A^
N/A*
N/A^
N/A^N/A*N/A*
SYMBOL
FITTING LEGEND
VALVE INSTALLATION DATA
VALVE TYPE SIZE (IN) STORES ITEM NUMBER(PO NUMBER IF NON-STOCK)
MATERIAL(MDPE, HDPE, STEEL) MANUFACTURER CLOCKWISE TO CLOSE? TURNS TO CLOSE PRESSURE RATING DEPTH TO NUT LOCATION 1 LOCATION 2 COMMENTS
Y or N
MATERIAL INFORMATION
DRAWING TITLE:
DRAWING NO:
L-6 MI
SITE NAME:
INST#
PROJECT ID#ABAN#
CAPIN TERR - MAIN REPLACEMENTSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264
PROPOSED
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
1/29/2020 - 22x34
Know what'sbelow.before you dig.Call
R
253-255
55 PRATT ST
8"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHMP PIPE0.5" LYCOFIT CAP
G
8"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" LYCOFIT CAP
0.25" THREADED GAUGE DIRECT TAPPED0.25" S/H PLUG
GDRILLING, DOUBLE STOP, VENTING EQUIPMENT
2" S/H THREADED PLUG (QTY 1 - 3)6"X2" SERVI-SEAL (QTY 1 - 3)
12" CSIP
8" PHMPDRILLING AND VENTING EQUIPMENT
6"X2" SERVI-SEAL (OPTIONAL)2" S/H THREADED PLUG
8" PHMP
12" CSIP 6" PHMP
8" PHMP
0.25" THREADED GAUGE DIRECT TAPPED0.25" S/H PLUG
G
8" EF COUPLING
DRILLING, DOUBLE STOP, VENTING EQUIPMENT2" S/H THREADED PLUG (QTY 1 - 3)
6"X2" SERVI-SEAL (QTY 1 - 3)
PRATT ST
MA
RV
IN S
T
OC~402'-6" PHMP6" CSLP
119 LEXINGTON ST
2"x0.5" TAPPING TEE0.5" EF COUPLING
~3'-0.5" PHMP PIPE0.5" LYCOFIT CAP
G
2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" LYCOFIT CAP
SQUEEZE OFF UNIT
2" EF COUPLING
LEXINGTON STLEXINGTON ST
JAR
DIN
E S
T
0.25" THREADED GAUGE DIRECT TAPPED0.25" S/H PLUG
G
DRILLING AND VENTING EQUIPMENT4"X2" SERVI-SEAL (OPTIONAL)2" S/H THREADED PLUG
6"x1.25" TAPPING TEE1.25" EF COUPLING
~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER
1.25" COMPLIANT VENT STACK ASSEMBLY1.25" LYCOFIT CAP
DRILLING, DOUBLE STOP, VENTING EQUIPMENT2" S/H THREADED PLUG (QTY 1 - 3)
4"X2" SERVI-SEAL (QTY 1 - 3)
0.25" THREADED GAUGE DIRECT TAPPED0.25" S/H PLUG
G
DRILLING, DOUBLE STOP, VENTING EQUIPMENT2" S/H THREADED PLUG (QTY 1 - 3)
4"X2" SERVI-SEAL (QTY 1 - 3)
CH
ES
TNU
T ST
2" EF COUPLING
2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" LYCOFIT CAP
6"x0.5" TAPPING TEE0.5" EF COUPLING
~3'-0.5" PHMP PIPE0.5" LYCOFIT CAP
G
2"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHMP PIPE0.5" LYCOFIT CAP
G
NA
RR
AG
AN
SE
TT ST
CHAPIN TERRACE 6"x2" HVTT
CONSTRUCTION DETAILS
CONSTRUCTIONDETAILS
DRAWING TITLE:
DRAWING NO:
D-1
SITE NAME:
INST#
PROJECT ID#ABAN#
CAPIN TERR - MAIN REPLACEMENTSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264
PROPOSED
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
1/29/2020 - 22x34
Know what'sbelow.before you dig.Call
R
T1 T2
T3 A4
A5 A6
T1
A6
115-117
130 CHAPIN TERR
6"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHLP PIPE
1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY
1.25" LYCOFIT CAP
6"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHLP PIPE0.5" LYCOFIT CAP
G
G
G
0.25" THREADED GAUGE DIRECT TAPPED0.25" S/H PLUG
G
6"x2" HVTT
6"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHXP PIPE0.5" LYCOFIT CAP
6"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHLP PIPE0.5" LYCOFIT CAP
6"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHLP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" LYCOFIT CAP
CHAPIN TERR
6"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHLP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" LYCOFIT CAP
G
6"x0.5" TAPPING TEE0.5" EF COUPLING~3'-0.5" PHMP PIPE0.5" LYCOFIT CAPOC~1280'-6" PHMP
DRILLING AND VENTING EQUIPMENT4"x2" SERVI SEAL
2" S/H THREADED PLUG
2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" LYCOFIT CAP
1.25" COMPLIANT VENT STACK ASSEMBLY
LEXINGTON ST
OC~150'-2" PHMP
4" CILP
66 JARDINE ST
DRILLING AND VENTING EQUIPMENT4"x2" SERVI SEAL2" S/H THREADED PLUG
2"x1.25" TAPPING TEE1.25" EF COUPLING~3'-1.25" PHMP PIPE1.25" SERVICE HEAD ADAPTER1.25" COMPLIANT VENT STACK ASSEMBLY1.25" LYCOFIT CAP
LEXINGTON ST
OC~183'-2" PHMP
4" CILP
CONSTRUCTION DETAILS
CONSTRUCTIONDETAILS
DRAWING TITLE:
DRAWING NO:
D-2
SITE NAME:
INST#
PROJECT ID#ABAN#
CAPIN TERR - MAIN REPLACEMENTSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264
PROPOSED
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
1/29/2020 - 22x34
Know what'sbelow.before you dig.Call
R
A6 A7
T1
T3
T3 A7
A7
CONSTRUCTION DETAILS
CONSTRUCTIONDETAILS
DRAWING TITLE:
DRAWING NO:
D-3
SITE NAME:
INST#
PROJECT ID#ABAN#
CAPIN TERR - MAIN REPLACEMENTSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264
PROPOSED
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
1/29/2020 - 22x34
Know what'sbelow.before you dig.Call
R
ISOMETRIC DETAILS
DRAWING TITLE:
DRAWING NO:
I-1
SITE NAME:
INST#
PROJECT ID#ABAN#
CAPIN TERR - MAIN REPLACEMENTSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
1/29/2020 - 22x34
Know what'sbelow.before you dig.Call
R
ISOMETRIC DETAILS
DRAWING TITLE:
DRAWING NO:
I-2
SITE NAME:
INST#
PROJECT ID#ABAN#
CAPIN TERR - MAIN REPLACEMENTSPRINGFIELD, HAMPDEN (013)
20-0825558-0020-0825559-00
20-69640
DESIGNED BY
NAME DATE PHONE #
DRAWN BYCHECKED BYAS-BUILT BY
RTM 02/08/21413-355-0936RTM 02/08/21413-355-0936JTF 02/19/21413-310-4264
0
REVISIONS
REV. # DATE DESCRIPTION02/08/21 DRAWING CREATED
1/29/2020 - 22x34
Know what'sbelow.before you dig.Call
R