Springettsbury TownshipWastewater Treatment Plant

Page 3: Springettsbury Upgrade 4 Web

Springettsbury Watewater Treatment Plant

Service Area

WWTP History

BNR Upgrade

UV Disinfection Upgrade

Administration Addition

Construction Costs

Page 4: Springettsbury Upgrade 4 Web

Service Area

Springettsbury Township

Windsor Borough

Red Lion Borough

Yoe Borough

Dallastown Borough

Windsor Township

And Portions of:

Manchester Township

Spring Garden Township

York Township

Approximate Population Serviced - 70,000

Page 5: Springettsbury Upgrade 4 Web

Service Area

Collection System withinSpringettsbury Includes

120 Miles of Gravity Sewer

7 Pumping Stations

20 Miles of Forcemain

Page 6: Springettsbury Upgrade 4 Web

Springettsbury Watewater Treatment Plant

Service Area

WWTP History

BNR Upgrade

UV Disinfection Upgrade

Administration Addition

Construction Costs

Page 7: Springettsbury Upgrade 4 Web

Wastewater Treatment Plant History

The Springettsbury Wastewater Treatment Plant as it appeared in 1970

The Plant was Permitted for 8 Million Gallons Per Day

Page 8: Springettsbury Upgrade 4 Web

Wastewater Treatment Plant History

In 1984 the Wastewater Treatment Plant Underwent an Upgrade and Expansion to 15 Million Gallons Per Day 

Page 9: Springettsbury Upgrade 4 Web

Springettsbury Watewater Treatment Plant

Service Area

WWTP History

BNR Upgrade

UV Disinfection Upgrade

Administration Addition

Construction Costs

Page 10: Springettsbury Upgrade 4 Web

BNR Upgrade Project

Why Upgrade in 2011?

PA DEP Bay Strategy

Biological Nutrient Removal (BNR)Reduce Nitrogen and Phosphorous discharges to the Chesapeake Bay

Page 11: Springettsbury Upgrade 4 Web

BNR Upgrade Project

2011 BNR Upgrade

BNR StrategyThe main goal of this project was to design a BNR system

that would meet the new effluent requirements without

incurring  the substantial expense of building new  tanks 

(about 25 % more expensive). 

Page 12: Springettsbury Upgrade 4 Web

BNR Upgrade Project

Integrated Fixed Film System (IFAS)

Conventional Aeration Systems – Microorganisms are suspended in tank

IFAS Systems – Microorganisms are attached to a suspended media; media offers greater surface area for microorganisms to grow

More microorganisms:

Provide higher degree of  treatment

Can offset the need for additional aeration basin capacity 

Page 13: Springettsbury Upgrade 4 Web

BNR Upgrade Project

Kruger IFAS System

Media Facts‐38% Fill ‐85,000 CF ‐ 274 SF/CF‐23M SF‐ 536 ACRES

Page 14: Springettsbury Upgrade 4 Web

BNR Upgrade Project

BNR System Site Plan

AnoxicStage #1

(N1)

OxicStage #3

(N3)

Internal Nitrate Recycle

Internal Nitrate Recycle

To 2nd Clarifiers

To 2nd Clarifiers

Sludge Digesters

(N4)

Influent

RAS

North Train

South Train

Anaerobic

Anaerobic

Anaerobic

Anaerobic

Oxic (IFAS)Stage #2

(N2)

Anaerobic

Anaerobic

AnoxicStage #1

(N1)

OxicStage #3

(N3)

Sludge Digesters

(N4)

Oxic (IFAS)Stage #2

(N2)

Page 15: Springettsbury Upgrade 4 Web

BNR Upgrade Project

‐ 50 Screens

‐16” Diameter

‐10’ Long

Media Retention Screens

Page 16: Springettsbury Upgrade 4 Web

BNR Upgrade Project

Additional Upgrades Required

New High Efficiency Diffused Air System

Blowers and Blower Building

Internal Mixed Liquor Recycle Pumps

Conversion of Primary Clarifiers to Anaerobic/ Anoxic Selectors (anaerobic portion for phosphorous removal; anoxic portion for nitrogen removal)

Page 17: Springettsbury Upgrade 4 Web

BNR Upgrade Project

Additional Plant Considerations

Motor Control Center (MCC) Upgrade

Emergency Power Upgrade

Final Clarifier Improvements

Current Density Baffles

Algae Control System

Headworks Screening System Upgrade

Relocated Septage Dump Station

Page 18: Springettsbury Upgrade 4 Web

BNR Upgrade Project

Influent Screening is CRITICAL

3 mm opening

Page 19: Springettsbury Upgrade 4 Web

Springettsbury Watewater Treatment Plant

Service Area

WWTP History

BNR Upgrade

UV Disinfection Upgrade

Administration Addition

Construction Costs

Page 20: Springettsbury Upgrade 4 Web

UV Lights do not Contact the water

UV Disinfection Upgrade

Enaqua UV Disinfection System

Page 21: Springettsbury Upgrade 4 Web

Front view

UV Lamps

Flowout

Flow in

Front view Side view

UV Lamps

Flowout

Flow in

Flow in

Flowout

Flow tubes

• Non ‐ Contact UV reactor configuration

• Contact UV reactor configuration

Enaqua UV Disinfection System

UV Disinfection Upgrade

Page 22: Springettsbury Upgrade 4 Web

UV Disinfection Upgrade

Page 23: Springettsbury Upgrade 4 Web

Springettsbury Watewater Treatment Plant

Service Area

WWTP History

BNR Upgrade

UV Disinfection Upgrade

Administration Addition

Construction Costs

Page 24: Springettsbury Upgrade 4 Web

18 MGD Unit ready for Channel Mount

Administration Addition

Enhanced Security Required Post 9/11

Added Needed Office/Storage Space

Added Multi‐Use Training Room

Existing Lab Updated

Page 25: Springettsbury Upgrade 4 Web

Administration Addition

Page 26: Springettsbury Upgrade 4 Web

Administration Addition

Use of Regional Materials for Construction

New High Efficiency Geothermal Heating/ Cooling

Energy Efficient Windows throughout Building

Passive Heating in Conference Room

Day Lighting Throughout Entire Addition  

"Green" Features

Page 27: Springettsbury Upgrade 4 Web

Springettsbury Watewater Treatment Plant

Service Area

WWTP History

BNR Upgrade

UV Disinfection Upgrade

Administration Addition

Construction Costs

Page 28: Springettsbury Upgrade 4 Web

‐ General $18M

‐ Electrical $ 4M 

‐Mechanical $ 1M

TOTAL $23M

Construction Costs

Page 29: Springettsbury Upgrade 4 Web

Questions?