spring 2012 devon taylor home energy management & smart grid technology
TRANSCRIPT
Spring 2012Devon Taylor
Home Energy Management & Smart Grid Technology
Smart Grid Technology in the HomeSmart meteringFault detectionIncreased energy quality and efficiency
High load appliances such as water heaters can be turned off by the power company during peak load
Data is transmitted over power lines using BPL(Broadband over Power Line)
ObjectivesImplement a small scale home electrical
systemUse current transformers to sense current Use mechanical relays to switch lines on/offCollect data from the current transformers
using a microcontrollerSwitch lines on/off using microcontroller
and relay circuits
Objectives (Continued)Program the microcontroller to perform A-D
conversion and exchange data with the PCDevelop a web interface
Provide power consumption dataAllow switching control over each individual
relayNetwork the PC to the LAN/Internet
Overall Design
240 Volt Wall Receptacle(Simulates power lines coming into house)
Breaker Box
120 Volt Receptacles/Appliances
240 Volt Appliance (e.g. Water Heater)
DPDT Relay (Normally Closed)
Current Transformer
Power Transistor Circuit Board
Microcontroller board
Low voltage signal line
High Voltage line
SPDT Relay
Serial Communication
Server
BPL Modem
Not implemented
Time Table - MilestonesTask Estimated Time
Consumption
Order/purchase required components
1 – 2 Weeks
Design and implement home electrical system with current transformers and relays
2 Weeks
Wire inputs/outputs to microcontroller and PC
1 Week
Program microcontroller to collect data/control relays and program PC to receive data/transmit control signal to microcontroller
2 Weeks
Develop web interface with Apache/MySQL to display data and provide control
3 Weeks
Network PC using BPL 1 – 2 Weeks
Total Time 9 – 10 Weeks
Project DeliverablesDrawings of home electrical circuits/sensorsDocumentation of microcontroller programDocumentation of PC->microcontroller
communications program/web interfaceDemonstration of how the system is used
Project BudgetItem Estimated CostBreaker box & Breakers(Used/New) $50 - $100
25’ 10 AWG Romex $18
120 Volt Receptacles $10-$20
OSB/Wall Board for mounting $5
240 Volt Power Plug/Cable $20-$50 (Depends on amp rating)
SPDT Relays $40-$60
Din Rail (mounting for Relays) $5
Current Transformers $100-$200
Power Transistors/Misc. Electronic Components/Wire/Boards
$10-$20
Microcontroller $40-$60
PC Free - $100
Serial cable Free
Software Free
Total $300 - $500
Applicability and UsefulnessHelp to provide more reliable and efficient
energyLessen power company expenses with
smart meteringRaise awareness to electricity users as to
how they are using energy