spring 2003 1 cs-ee 481 university of portland school of engineering project eagle 01/28/03 project...

9
Spring 2003 1 CS-EE 481 University of Portland School of Engineering Project Eagle 01/28/03 Project Eagle Scott Davis Alison Hawkins Anthony Waliser

Upload: aron-blake

Post on 18-Jan-2018

214 views

Category:

Documents


0 download

DESCRIPTION

Spring CS-EE 481 Project Eagle 01/28/03 University of Portland School of Engineering Description GPS Pressure Sensor Micro-controller Transmitter Mobile Transmitter Wireless transmission Receiver Micro-controller Receiver Station Serial Cable Computer GPS Board Software Interface

TRANSCRIPT

Page 1: Spring 2003 1 CS-EE 481 University of Portland School of Engineering Project Eagle 01/28/03 Project Eagle Scott Davis Alison Hawkins Anthony Waliser

Spring 2003

1

CS-EE 481

University of Portland School of Engineering

Project Eagle01/28/03

Project Eagle

Scott DavisAlison HawkinsAnthony Waliser

Page 2: Spring 2003 1 CS-EE 481 University of Portland School of Engineering Project Eagle 01/28/03 Project Eagle Scott Davis Alison Hawkins Anthony Waliser

Spring 2003

Project Eagle01/28/03

2University of Portland School of Engineering

CS-EE 481

Overview

• Description• Milestones• Accomplishments• Plans• Issues

Page 3: Spring 2003 1 CS-EE 481 University of Portland School of Engineering Project Eagle 01/28/03 Project Eagle Scott Davis Alison Hawkins Anthony Waliser

Spring 2003

Project Eagle01/28/03

3University of Portland School of Engineering

CS-EE 481

DescriptionGPS

Pressure Sensor

Micro-controller

Transmitter

Mobile Transmitter

Wireless transmission Receiver

Micro-controller

Receiver Station

Serial Cable

Computer

GPS Board

Software Interface

Page 4: Spring 2003 1 CS-EE 481 University of Portland School of Engineering Project Eagle 01/28/03 Project Eagle Scott Davis Alison Hawkins Anthony Waliser

Spring 2003

Project Eagle01/28/03

4University of Portland School of Engineering

CS-EE 481

MilestonesNumber Description Original

DatePrevious

DatePresent

Date

1 Product Approval 10/04/02 10/04/02 10/04/02

2 Plan Approval 10/25/02 -- 10/25/02

3 Design Review 12/06/02

4 TOP’s approval Projected 02/14/03

5 Prototype Release Projected 04/04/03

6 Founders Day Projected 04/08/03

7 Final Report Projected 04/25/03

12/06/02 --

Page 5: Spring 2003 1 CS-EE 481 University of Portland School of Engineering Project Eagle 01/28/03 Project Eagle Scott Davis Alison Hawkins Anthony Waliser

Spring 2003

Project Eagle01/28/03

5University of Portland School of Engineering

CS-EE 481

Accomplishments

• Completed Framework of Program• Researched MapInfo• Reviewed GPS Data “Sheet”• Ordered Parts• Started Theory of Operations

Page 6: Spring 2003 1 CS-EE 481 University of Portland School of Engineering Project Eagle 01/28/03 Project Eagle Scott Davis Alison Hawkins Anthony Waliser

Spring 2003

Project Eagle01/28/03

6University of Portland School of Engineering

CS-EE 481

Plans

• Research Unknown Programming Functions– Serial Port– Altitude Display

• Begin Assembling Hardware Sections– Altimeter– GPS– Transmitter– Receiver

• Program PICs for Altimeter/Transmitter, GPS, Receiver

Page 7: Spring 2003 1 CS-EE 481 University of Portland School of Engineering Project Eagle 01/28/03 Project Eagle Scott Davis Alison Hawkins Anthony Waliser

Spring 2003

Project Eagle01/28/03

7University of Portland School of Engineering

CS-EE 481

Issues

• PARTS!!!!– Transmitter on Backorder Until March 6th– Receiver No Longer Available

• Technology– Programming– GPS

• Time

Page 8: Spring 2003 1 CS-EE 481 University of Portland School of Engineering Project Eagle 01/28/03 Project Eagle Scott Davis Alison Hawkins Anthony Waliser

Spring 2003

Project Eagle01/28/03

8University of Portland School of Engineering

CS-EE 481

Description (again)GPS

Pressure Sensor

Microcontroller

Transmitter

Mobile Transmitter

Wireless transmission Receiver

Microcontroller

Receiver Station

Serial Cable

Computer

GPS Board

Software Interface

Page 9: Spring 2003 1 CS-EE 481 University of Portland School of Engineering Project Eagle 01/28/03 Project Eagle Scott Davis Alison Hawkins Anthony Waliser

Spring 2003

Project Eagle01/28/03

9University of Portland School of Engineering

CS-EE 481

Conclusion

• Milestones• Accomplishments• Plans• Issues