Page 1: SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013

SPOC meeting:Trans European Replacement

Reserve Exchange

Amine Abada (RTE) 07th Nov 2013

Page 2: SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013

Agenda2

ContextContext

Project - DesignProject - Design

Status of the projectStatus of the project

Working axesWorking axes

Plan of the Design PhasePlan of the Design Phase

Preparation of the future phasesPreparation of the future phases

Page 3: SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013

Context

Page 4: SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013

TSOs = 80% of TSOs using RR4

RENREN

NGETNGET

TERNATERNA

RTERTE

REEREE

Page 5: SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013

The Design of TERRE solution will be compliant with the

requirements of: The FW guidelines on Electricity Balancing The NC on Electricity Balancing

Centralised and automatic management of XB capacity Offer based on “cheapest” internal bids Improved matching process…

Context5

The TERRE solution will enhance the experience of current

Balit solution used between NG and RTE being extended to the

SWE region by the beginning of 2014

The TERRE project will use as an input the previous work of

REN, REE and RTE on enduring solution for the exchange of

balancing energy between TSOs

Page 6: SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013

Context6

Total volume activated during this period = 205GWh

Overview of Balit SO-SO exchanges

Dec 2011 to August 2012

Page 7: SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013

Project-Design

Page 8: SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013

MoU and NDA which cover the design phase

In signature process

Status of the project8

Working axes defined and shared between TSOs…

Page 9: SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013

Definition of the standard TERRE products

RR offer

RR need

Working axes9

Definition of matching process and settlement procedure

TSOs RR needs Netting

«FCFS» or «Algorithmic optimization»

Marginal price or Pay as bid

Financial issues

Definition of Financial settlement between the TSOs

Study of the potential financial benefit

2

1

3

Page 10: SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013

Timing and scheduling

Working axes10

ATC management

Centralized ATC managementInteraction between the Intra-day market and the TERRE

process

Governance issues

Preparation of the NRAs approval process

Preparation of the Implementation Phase

4

5

6

Page 11: SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013

11

High level plan of the Design Phase

11

Implementation : May 2014 April 2015

Implementation : May 2014 April 2015

Deployment :From May 2015

Deployment :From May 2015

Extension:2016

Extension:2016

Future steps : Expected plan

Compliant with FW EB timelines

11

OctoberOctober NovemberNovember DecemberDecember JanuaryJanuary

Axe

sA

xes

20132013

TERRE - Design

20142014FebruaryFebruary MarchMarch AprilApril

GovernanceGovernance

ATC management

Timing and schedulingTiming and scheduling

Financial issuesFinancial issues

Matching processMatching process

TERRE productsTERRE products

End of the design phase

MayMay JuneJune

Page 12: SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013

Preparation of the future phases

12

High level Business Process and the result of the TERRE solution design March 2014

Functional and Non-Functional specifications April 2014

Detailed project implementation plan April 2014

Drafting of NDA agreement of implementation phase (to be confirmed) May 2014

Drafting of Cooperation agreement of implementation phase May 2014

Drafting of PMO procuring process for implementation phase May 2014

Launching of regulatory approval June 2014

Page 13: SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013