spending trends, challenges and achievements: selected programmes from the 2009/10 annual report
DESCRIPTION
Presentation to the Select Committee: Land & Environment. Spending trends, challenges and achievements: selected programmes from the 2009/10 Annual Report. Presentation by Department: Water Affairs 22 March 2011. Outline. Programme 2: Water Resource Management - PowerPoint PPT PresentationTRANSCRIPT
Spending trends, challenges and achievements: selected programmes
from the 2009/10 Annual ReportPresentation by
Department: Water Affairs22 March 2011
Presentation to the Select Committee: Land & Environment
Outline• Programme 2: Water Resource Management– Strategic goal 1: Ensuring sustainable and equitable water
resources management– Strategic goal 3: Build, operate & maintain infrastructure– Strategic goal 4: Aligned and effective institutions
• Programme 3: Water services– Strategic goal 2: Ensuring universal access to safe and
affordable water services
• Overview of expenditure trends
2
STRATEGIC GOAL 1: ENSURING SUSTAINABLE AND EQUITABLE WATER RESOURCES MANAGEMENT
Programme 2: Water Resources Management
3
Branch: Policy & Regulation (P & R)Strategic Objective: Forecasting and balancing of water demand and supply
Outputs Performance indicator
Baseline Performance against targets2009/10 Target Actual
achievement
Plans on the four-river systems to reconcile Water requirements and available resources
# of strategies for priority areas/systems completed
Reconciliation strategy/studies smaller towns in the 5 planning areas initiated
Complete strategies in 3 areas
Recon strategies completed in 3 areas
4
Branch: Policy & Regulation (P & R)Strategic Objective: Ensure adequate information and knowledge to sustainably manage water resources
Outputs Performance indicator
Baseline Performance against targets2009/10 Target Actual
achievement
1 300 operational stations countrywide
# of operational monitoring stations
900 stations in good working condition
Monitor and maintain existing stations
All 900 stations are maintained and monitored
5
Strategic Objective: Improve water use efficiencyImplement water conservation and demand management (WC/WDM)
Volume of water saved
None of the metros and river systems are fully implementing WC/WDM
40 million m³/ annum saved in all WMA
40 million m³
Branch: Policy & Regulation (P & R)Strategic Objective: Improve water resource quality
Outputs Performance indicator
Baseline Performance against targets2009/10 Target Actual
achievement
River health programmes implemented in all regions (i.e. Crocodile, Olifants, Vaal & Umsunduzi)
Regulated water use as per license conditions in four polluted river systems
Target polluted river systems such as Vaal, Olifants, Crocodile West and Umsunduzi
Identify critical sources of pollution
Critical source of pollution and extent of waste discharge in various water management areas identified.
River health programme implemented in the Crocodile River and the Vaal River
6
Strategic goal 1: Key challengesKey Challenges Recommendations
Shortage of dedicated technical personnel such as climate change specialists to develop and implement climate change programmes
A directorate focusing on climate change issues has been established and personnel will be appointed to effectively perform this function in the next financial year.
Inability to successfully address all identified compliance cases due to shortage of suitable personnel to carry out the functions successfully
A directorate focusing on compliance, monitoring and enforcement has been established.
Inability to finalise all water use license backlogs due to capacity constraints
A project team that is fully resources has been established to ensure that all backlogs relating to water use license applications are eradicated during the next financial year.
The review of the National Water Resources Strategy, 2004 was not finalised, however, an inception report was completed.
This process will be carried over to the next financial year.
7
STRATEGIC GOAL 3: BUILD, OPERATE & MAINTAIN INFRASTRUCTURE
Programme 2: Water Resources Management
8
Branch: National Water Resources Infrastructure (NWRI)
Strategic Objective: Develop and construct new infrastructure
Outputs Performance indicator
Baseline Performance against targets2009/10 Target Actual
achievement
Implementation of new bulk water infrastructure to meet social water needs, economic growth and development
Percentage completion as per project specification
50% Inyaka Water Treatment Works 57% complete
58%
6% Groot Letaba RWRP
4%
9
Branch: National Water Resources Infrastructure (NWRI)
Strategic Objective: Asset management
Outputs Performance indicator
Baseline Performance against targets2009/10 Target Actual
achievement
Maintenance of water resources infrastructure to meet water supply demands
% maintenance of infrastructure availability
70% 80% availability 95% availability
% of Resource Management Plans (RMPs) to ensure
0 2 RMPs completed
2 RMPs implemented but not completed (Fika Patso and Metsi Matso)
10
Branch: National Water Resources Infrastructure (NWRI)
Strategic Objective: % maintenance of infrastructure as per maintenance plan
Outputs Performance indicator
Baseline Performance against targets2009/10 Target Actual
achievement
New bulk water resources infrastructure implemented
# of projects completed
One project commissioned
Implementation of four projects under construction monitored
Six regional bulk projects were implemented – EC (2), KZN (2) and MP (2)One project
advanced to completion of project
11
Branch: National Water Resources Infrastructure (NWRI)
Strategic Objective: Rehabilitation and refurbishment of water resources infrastructure
Outputs Performance indicator
Baseline Performance against targets2009/10 Target Actual
achievement
Fully functional and sustainable schemes
% of infrastructure that meet design standards
30% of infrastructure
50% of infrastructure
70% of infrastructure
% of expenditure and number of dams in the construction phase
0% expenditure and number of dams in the construction phase
12% budget expenditure on planned projects(22)
80% budget expenditure spent on planned projects
12
Branch: RegionsStrategic Objective: Ensure the provision of regional bulk water
Outputs Performance indicator
Baseline Performance against targets2009/10 Target Actual
achievement
Fully functional and sustainable schemes
% of transferred schemes refurbished by 2012
40% of the schemes refurbished
40% of the transferred schemes refurbished
63% (Regions)
Regional bulk schemes implemented in all 9 regions to support access to water and sanitation programmes
# of regional bulk schemes initiated
45 49 49 regional bulk schemes initiated
13
Strategic goal 3: Key challengesKey Challenges Recommendations
Training of staff on dam safety issues Training of technicians regarding operating rules, operation and maintenance manuals and emergency preparedness plans
Shortage of dedicated technical personnel (e.g. Climate Change Specialists, Water Plant Superintendents, Artisans, Technicians & Engineers)
Implementation of the Occupation Specific Dispensation (OSD) and the graduate development programme
Drought situation in the Southern Cape as well as the Algoa System
The situation needs to be managed and timely interventions implemented to ensure that adequate water supply continues
Poor water quality negatively affecting irrigation farmers
Develop a two-year cleaning programme for canals
The delay in the finalisation of the strategy for the conversion of dams resulted in the delay to convert the three dams planned from single to multi-purpose use.
The available draft strategy will be finalised and implemented during the next financial year.
14
STRATEGIC GOAL 4: ALIGNED AND EFFECTIVE INSTITUTIONS
Programme 2: Water Resources Management
15
Branch: Policy & Regulation (P & R)Strategic Objective: Effective oversight of institutions
Outputs Performance indicator
Baseline Performance against targets2009/10 Target Actual
achievement
Compliance (aligned and effective institutions)
% of institutions business plans and annual reports submitted received and assessed
100% 100% 100% achieved by all water sector institutions reporting to the Minister
Implementation of the Institutional Realignment project
Number of effective water institutions established as per guidelines
- 2 CMAs- 14 water boards- WUAs
Institutional realignment project finalised2 WUAs established
2 Water User Associations established
16
Strategic goal 4: Key challengesKey Challenges Recommendations
Delay in the finalisation of the Institutional Re-alignment Project contributed largely to the slow process in establishing new CMAs and WUAs
The project will be adequately funded and supported by policy makers (Parliament, relevant democratic institutions and Minister ) carried out in the new financial year.
17
STRATEGIC GOAL 2: ENSURING UNIVERSAL ACCESS TO SAFE AND AFFORDABLE WATER SERVICES
Programme 3: Water Services
18
Branch: RegionsStrategic Objective: Ensure water service delivery through policy and regulation
Outputs Performance indicator Baseline Performance against targets2009/10 Target
Actual achievement
Effective support provided to municipalities
# of provincial plans supported
2 (Limpopo & FS)
4 5 provincial plans supported (EC, MP, NC, GP & NW)
# of feasibility studies reported
0 11 11 feasibility studies reported
# of Water Services Development Plans (WSDPs) supported
168 168 168 WSDPs supported
Improved financing model to ensure accelerated and sustainable infrastructure development
Inter-dept. consultation
Draft revised MIG & Equitable Share Policy
Inputs on the development of the Equitable Share Policy provided to COGTA
19
Strategic goal 2: Key challengesKey Challenges Recommendations
Technical capacity challenges at municipal level
Assist municipalities in adhering to the Blue Drop and Green Drop certification programmes.
Dilapidating waste water treatment plants infrastructure
Mobilise for funding for infrastructure refurbishment, operation and maintenance.
20
OVERVIEW OF SPENDING TRENDS 2008/09 TO 2009/10
Overview of financial trends
21
Overview of spending trendsProgramme 2008/09 financial year 2009/10 financial year
AllocationR 000
ExpenditureR 000
% spent
AllocationR 000
ExpenditureR 000
% spent
Programme 2: Water Resource Management
3 499 812 3 001 348 85.8 4 112 603 4 072 090 99
Programme 3: Water Services
2 348 031 2 341 817 99.7 2 814 144 2 668 556 95
TOTAL 5 847 843 5 343 165 91.4 6 926 747 6 740 646 97.3
22
END
23