speed post tele/fax: 0364-2561749/0320 hq chief engiroor (ai) wlr of e cl… · e/guw-155(2015)...

12
SPEED POST HQ Chief Engiroor (AI) Shillong Zone Military Engineer Services Elaphant Falls Camp PO Nonglyor Shillong-793 009 Tele/Fax: 0364-2561749/0320 88011WLR/E-CLASS/ 6/E8 AOct 2020 Addl Director General (NEI) lo HQ CCE (Army) No 3 PIN-900328 Clo 99 APO QUARTERLY WORK LOAD RETURN OF CONTRACTOR CLASS 'E' CLASS AND UN-ENLISTED CONTRACTORS HAVING WORK LOAD UPTO 50 LAKHS FOR QE SEP 2020 The subject report in respect of this Zone for the Quarter Ending Sep 2020 is submitted 1. herewith as Annex - PIN (Part-l), P/2 (Part-ll) & P/3 (Part-l). The remarks in Column 6 have been approved by the Chief Engineer 2. (AR Prasad) AD (Contracts) for Chief Engineer (AF) Encls-(As above) Copy to HQ Chief Engineer, Southern Command, Pune 411001 HQ Chief Engineer, Northern Command, C/O 99 APO HQ Chief Engineer, Western Command, Chandimandir 134107 HQ Chief Engineer, Central Command, Lucknow - 226002 Ha Chief Engineer, South Western Command, PIN- 908 546, C/O 99 APO HQ CE Siliguri Zone HQ CE Shillong Zone HQ CE Kolkata Zone CWE (AF) Kalaikunda & CWE (AF) Panagarh CWE (AF) Borjhar & CWE (AF) Bagdogra CWE (AF) Jorhat GE (AF) Tezpur GE (AF) Jorhat GE (AF) Chabua GE(AF) Mohanbari GE (AF) kalaikunda 1. 2. 3. 4 . 6. 9. 10. 11. 12. 13. 14. 15. 16 17. GE (AF) Barrackpore GE(AF) Panagarh GE (AF) Bagdogra 18. 19 GE (AF) Hasimara 20 21. GE (AF) Borjhar GE (1) (AF) Shillong GE () (P) (AF) Tezpur CWE Shillong/Dinjan/HQ 137 WE 25. 22 23. 24. GE Shillong/Umroi AGE (1) AF Digaru AGE (1) AF Singharsi AGE (1) (AF) Purnea AGE (1) (AF) Kumbhirgram CWE Tezpur 26. 27. 28. 29. 30.

Upload: others

Post on 01-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SPEED POST Tele/Fax: 0364-2561749/0320 HQ Chief Engiroor (AI) WLR OF E CL… · E/GUW-155(2015) E/GUW-156/2015 E/01/CWE(AF)JOR E/02CWEAF) JOR 129.84 56 62 Yes Wk in Progress E/03/CWE(AF)

SPEED POST HQ Chief Engiroor (AI) Shillong Zone Military Engineer Services

Elaphant Falls Camp PO Nonglyor Shillong-793 009

Tele/Fax: 0364-2561749/0320

88011WLR/E-CLASS/ 6/E8 AOct 2020

Addl Director General (NEI)

lo HQ CCE (Army) No 3 PIN-900328 Clo 99 APO

QUARTERLY WORK LOAD RETURN OF CONTRACTOR CLASS 'E' CLASS AND UN-ENLISTED CONTRACTORS HAVING WORK LOAD UPTO 50 LAKHS

FOR QE SEP 2020

The subject report in respect of this Zone for the Quarter Ending Sep 2020 is submitted1. herewith as Annex - PIN (Part-l), P/2 (Part-ll) & P/3 (Part-l).

The remarks in Column 6 have been approved by the Chief Engineer 2.

(AR Prasad) AD (Contracts) for Chief Engineer (AF)

Encls-(As above)

Copyto HQ Chief Engineer, Southern Command, Pune 411001

HQ Chief Engineer, Northern Command, C/O 99 APO

HQ Chief Engineer, Western Command, Chandimandir 134107 HQ Chief Engineer, Central Command, Lucknow - 226002

Ha Chief Engineer, South Western Command, PIN- 908 546, C/O 99 APO

HQ CE Siliguri ZoneHQ CE Shillong Zone HQ CE Kolkata Zone CWE (AF) Kalaikunda & CWE (AF) Panagarh CWE (AF) Borjhar & CWE (AF) Bagdogra CWE (AF) Jorhat GE (AF) Tezpur GE (AF) Jorhat GE (AF) Chabua GE(AF) Mohanbari GE (AF) kalaikunda

1.

2.

3. 4

.

6.

9. 10. 11. 12. 13. 14. 15. 16 17. GE (AF) Barrackpore

GE(AF) Panagarh GE (AF) Bagdogra

18.

19 GE (AF) Hasimara 20

21. GE (AF) Borjhar GE (1) (AF) Shillong GE () (P) (AF) Tezpur CWE Shillong/Dinjan/HQ 137 WE

25.

22 23. 24.

GE Shillong/Umroi AGE (1) AF Digaru AGE (1) AF Singharsi AGE (1) (AF) Purnea AGE (1) (AF) Kumbhirgram CWE Tezpur

26. 27. 28. 29. 30.

Page 2: SPEED POST Tele/Fax: 0364-2561749/0320 HQ Chief Engiroor (AI) WLR OF E CL… · E/GUW-155(2015) E/GUW-156/2015 E/01/CWE(AF)JOR E/02CWEAF) JOR 129.84 56 62 Yes Wk in Progress E/03/CWE(AF)

AnnexurG PI (Part 1) HO CE

88011/WLR/I ( LE QUARTERLY WORK LOAD RETURN(QUARTER ENDING SEP 2020) PARTI LISI OF CONTRACIORS GLASS E AND UN-ENLISTED cONTRACTORS HAVING WORK LOAD

UPTO Rs. 50.00 LAKH1 SI No Name of Contractor

Class/Index No Total Approxima Whether value of | te value of| omsideteged Works in Work 3pablg of hand in completed| handliny

lakh lakh 4 E' CLASSS

M/s Rathin Enterprise M/s Sanmilan Nandi EIGUW/47/2010

E/GUW/49/2010E/GUW/51/2010 E/GUW-52(2010) EIGUW-57(2010) E/GUW/58/2010 E/GUW/59/2010

E/GUW/62/2010 E/GUW-64 (2010)

E/GUW/66/2010 E/GUW/68/2010

E/GUW/69/2010 E/GUW/70/2010

E/GUW/71 (2010) E/GUW-74/2010 E/GUW/75/2010

E/GUW-78/2010 E/GUW/79/2010

E/GUW-83/2010 E/GUW/87/2010 EIGUW- 88 (2010) E/GUW/89/2010 E/GUW/90/2010 EIGUW-92(2010) E/GUW/94/2010

E/GUW/100/2010 E/GUW/102/2010

E/GUW/103/2010 E/GUW/104/2010 E/GUW/111/2010

E/GUW/112/2010 E/GUW/115 /2010 E/GUW/116/2010 E/GUW-118/2010 E/GUW-119(2010) E/GUW-120(2010) E-IGUW-129(2010) E/GUW/134/2010 E/GUW/136/2010

E/54/HQ 137 E/TEZ/138/(2010) E-143/LKO/2015

E/GUW/139/2010 E/GUW/140/2010 EIGUW/141/2010 E/GUW/142/2010 E/GUW-143(2010) E/GUW/144/2010 E/GUW/145/2010 E/GUW/146/2010 E/GUW/147/2010 E/GUW-148(2010) EIGUW-149(2010) E/GUW/150/2010E/GUW-153 E/GUW E/GUW-155(2015) E/GUW-156/2015 E/01/CWE(AF)JOR E/02CWEAF) JOR 129.84 56 62 Yes Wk in Progress E/03/CWE(AF) JOR E/04 CWE(AF) JOR_ E/05 CWE(AF) JOR 27.11 10.84 E/06/(2010)/BKPE/08 CWE(AF) JOR 22.63

E/09 CWE(AF) JOR 35.00 10.50

81.8 30 01

58 20 YG 2 M/s Sarkar Electrical M/s Niranjan Roy M/s Beekey Seekey

Wk in pr W in oI

WK ornfpleted VW in Pro

W in pro

W Cornplgted |Slow Pg

|W in prog Wk in pro0

Wk in pro

|WK in pro Wk in prOG

WK compieted Wk in prog |Wk in pro9

Wk in pro09 Wk in prog

Wk in pro09 Wk in pro09 Wk in pro

Wk in prog Wk in prog Wk in pr0g

|Slow Prog Wk in Prog

|Wk in Prog Wk in Pr0g

|Wk Cormpleted Wk in pro09 Wk Completed Wk in prog Wk in prog Slow Prog Wk in Prog

Yes Wk in prog

|Wk in prog Wk in pro9 Wk in prOg

Wk in Prog Wk in pro09 Wk in Prog Wk in Progress

Wk in pro9 Wk in prog |Wk in prog Wk yet to commence

Wk in prog. |Wk completed Slow Prog Wk in pro0g Wk in prog Wk in prog Wk in prog Wk in prog Wk in prog Wk yet to commence Wk in prog. Slow Prog

28 88 111.3 78 84 YG 7 96

14 68 54.41

4 796

1174 5

M/s Rupdeep EnterprisesM/s NM Traders

M/s Sukumar Talukdar & Co M/s D P Agarwal

10 M/s Baruah Fabrication 11 M/s Trade Centre 12 M/s Rakhal Kanti Nag 13 M/s Construction Shelter 14 M/s Mathews Construction15 M/s Sardarmal Nahata 16 Mis Anil Kumar Baul 17 M/s Kiran Chandra Das 18 M/s Vimal Enterprises19 Mis Torrent INC 20 M/s Jyotibatra Chakraborty 21 M/s Nirpen Kalita 22 M/s JRS Associates 23 M/s Friends Enterprises24 M/s Subhash Arjun 25 M/s Meghalaya Engineers & Agencies

30 72

4.70 138 96 23.14 12.96

34.0 92.21 47.93 8.39 7.55

93.04

14.70 es 43.32 o

Yes 216 68 Yes

Yes Yes

Yes 129.4 16.47 16.47

125.7 Yes

100.07 42.2 29

Yes Yes Yes

86.9 2

24 26.64 58.09 23.17

37.1

Yes 11.69 19.31 Yes 20.54 Yes

19.01 9.99 Yes 53.12 13.39 Yes

27.73 20.65 9.72 9.23

146.98 47.42

50 47 5032 00 Yes 55

Yes Yes No

26 M/s Luit Construction27 M/s Vishnu Enterprise 28 M/s Swastika Engineers & Agencies 29 M/s PG Construction

30 M/s P KAganwala

18.21 76.12 49.29

13.87

Yes Yes Yes 13.87

55.20 20.35 49.37 14.93 45.09 11.72

28.65 8.80 20.29 20.19

0.00

Yes Yes 31 M/s Maa Tara Trading Yes Yes

32 M/s Majumdar Enterprise 33 M/s Ravi Enterprise

34 M/s Manoj Kumar Agarwal 35 M/s DIP Construction 36 M/s Ripan Barush 37 M/s Harshita & Co 38 M/s ND Enterprise 39 M/s Narender Kumar Garg 40 Mis Pijush Bhattachacharjee41 M/s Shri Harendra Rai 42 M/s Three Stat Cooling Corporation

|M/s IP Group

No Yes 22.26

13.28 23.34 13.50

25.39

0.00

Yes Yes 61.46

45.46 28.43 6.97

Yes 42.93 20.47 1.74 0.00

8.39

Yes Yes

Yes 9.83 6.92 Yes 43

44 M/s Surjit Sikder 45 M/s Das Construction 46 M/s Bishal Enterprise 47 M/s Pragland Abhiyanta 48 M/s Roy Enterprise

49 IMls Trio Engineers & Builders 50 M/s Dee Aar Trading

51 M/s Bhuiya Construction 52 M/s Goswami Builders53 MWs H P Agarwal54 M/s Dey Enterprises55 M/s Capital Traders56 M/s Pankaj Supply Syndicate 57 M/s BS Enterprises

58 M/s BH Enterprise 59 M/s MK Agarwalla & Sons 60 Mls Pramillabh Constructions

M/s SA Electrics

62 M/s KL Agarwalla & Co 63 M/s Raj Enterprises

64 M/s Dee Lee Singhania & Songs 65 M/s Mandeep Singh

66 M/s J.C.Nath & Sons

Yes 46.93 72.88

21 1.34

Yes Yes

50.03 31.64 64.96

12.02 53.29 30.70 7.72

Yes 0.00 15 Yes

30.70 Yes

No 5.79 58.18L 0.60 10.32 7.73 11.07

33.94 18.02 19.35 2.90 46.42 21.49 Yes

0.95

Yes Yes

138.50

12.02 29.98

55.28 57.98

Yes Yes

Yes Yes (2015) Yes

19.04 No

88 9.76 No Contract cancelled. 51

Slow Prog | Slow Prog Wk in prog Wk in prog Wk in pro09

3.98 48 No No

59.53 5.09 Yes

16.97 Yes

Yes

Page 3: SPEED POST Tele/Fax: 0364-2561749/0320 HQ Chief Engiroor (AI) WLR OF E CL… · E/GUW-155(2015) E/GUW-156/2015 E/01/CWE(AF)JOR E/02CWEAF) JOR 129.84 56 62 Yes Wk in Progress E/03/CWE(AF)

54.69 46.56 Yes Wk in prog. Yes Wk inprog9

Wk in prog9 Wk in pr09 Wk in Prog Wk completed Wk in pro0g Wk in Prog Wk in prog Wk in prOg Wk in prog Wk in prog Wk in prOg Slow Pro0g Wk in prog Wk in prog Wk in prog Wk in Pr0g Wk completed

Wk in pro0g Wk in prog Wk in pro9 Wk in prog Wk in prog |Wk in prOg Wk in prog Wk in prog Wk in pr0g Wk in Prog Wk in Pro0g

Yes Wk in prog Wk in prog.

67M/s PS Enterprise 68 M/s AT Dhar & Co_ 69 M/s Gopal Roy & Co 70 M/s Nihar Enterprises 71 M/s KP Ghosh & Co 72 M/s Durga Construction & Co 73 M/s Rajen Paswan 74 M/s Kangkan S

75 M/s Annu Electronics 76 M/s Kailson

77 M/s AK Dutta Choudhury 78 M/s RK Trading 79 M/s SK Enterprise 80 M/s Keshave Construction 81 M/s Goswami Brothers 82 M/s DN Enterprise 83 M/s Ajoy Dutta Chowdhury & Co 84 M/s Digvijay Carrying Corporation 85 M/s Sandhusons 86 M/s Krishan Construction Co 87 M/s Santoshi Traders 88 M/s AM Choudhury & Co 89 M/s Jawaharlal Jaiswal & Co 90 M/s Prova Stores 91 Shri A Rahim Talukdar 92 M/s MC Baruah 93 M/s Pee Bee (India) 94 M/s RK Seha & Co 95 M/s Chandan Enterprises96 M/s Dhar & Dhar

97 Ws S P Enterprise 98 M/s Sashi Enterprise

99 Ms DD Construction100 M/s Hind Construction101 M/s NK Sai Trading 102 M/s Pintoo Construction103 M/s The Supply Agency

104 M/s KS Enterprise

105 M/s DP Berlia 106 M/s RK Chakraborty & Co

|107 M/s RG Construction108 M/s KR Construction Co

|109 M/s Deep Construction 110 M/s SR Construction 111 MWs SN Lahoty 112 MWs R B Construction 113 M/s Chakra Gohain 114 MWs DG Enterprise 115 M/s MD Construction CO 116 MWs Mahato Enterprises_ 117 M/s Rupanjal Borboruah 118 M/s Rajib and Co

119 M/s Tankswar Bora 120 M/s Phongsi Phome 121 M/s Kalpana Traders

122 MWs Bee Pee & Company 123 M/s Man Bahadur Thapa

124 M/s Neha Enterprise 125 M/s Indira Electrics |126 M/s Antara 127 M/s Subhadip Enterprise

128 M/s Sudha Enterprise 129 M/s Senco_

130 M/s Ganguly Construction 131 M/s Rakesh Roshann 132 M/s Tekcon International L 133 M/s Subhash Chandra Bahl 134 M/s Build con 135 M/s Tapan Sur 136 Mis Alam Enterprises 137 M/s Bharti electrical Point 138 M/s Green Traders 139 M/s Suman Construction

140 M/s Jamuna Traders 141 M/s Kannan Traders 142 M/s Unique Enterprise

143 Mls Radheshyam Gupta 144 MWs Majumder Construction 145 M/s Keshab Chandra Ghosh 146 M/s S Chandra Enterprises 147 M/s Santosh industrial Corporation E59/10/KK 148 M/s Suryabanshi Construction 149 IM/s SG Enterprise 150 M/s Neetu Construction

E/10 CWE(AF)JOR E/11 CWE (AF) JOR 11.08 1.66 E/12 CWE (AF)JOR 74.09 43.56

E/13 CWE(AF)JOR E/14 CWE (AF) JOR 50.45 E/17 CWE(AF) JOR E/18 CWE(AF) JOR 72.52 21.44

E/19 CWE (AF) JOR E/21 CWE(AF) JORR E/24 CWE (AF) JOR E/26 CWE (AF)JOR_ E/28 CWE (AF) JOR 41.42 34.83

E/29 CWE(AF) JOR E/30 CWE (AF) JOR E/31 CWE (AF) JOR E/33 CWE (AF) JOR 51.58 38.71

E/35 CWE (AF) JOR E/36 CWE (AF) JORR E/37 CWE(AF) JOR E/39 CWE(AF) JOR E/40 CWE (AF) JOR E/43 CWE (AF)JOR E/44 CWE (AF) JOR E/46 CWE (AF) JOR E/47 CWE (AF) JOR E/48 CWE (AF) JOR E/51 CWE (AF) JOR E/52 CWE (AF) JOR E/53 CWE (AF) JOR_ E/55 CWE (AF) JOR E/58 CWE (AF) JOR E/59 CWE (AF) JOR E/60 CWE (AF)JOR E/61 CWE (AF) JOR E/62 CWE (AF) JOR E/63 CWE (AF) JOR E/64 CWE (AF) JOR E/65 CWE (AF)JOR E/68 CWE (AF) JOR E/69 CWE (AF) JOR

E/70 CNE (AF)JOR E/73 CWE (AF) JOR E/74 CNE (AF) JOR E/75 CWE (AF) JORR E/79 CWE (AF) JOR E/81 CWE (AF) JOR E/82 CWE (AF) JOR E/83 CWE (AF) JORR E-84 CWE (AF) JORR E/85 CWE (AF) JOR

E/88 CWE (AF) JORR E/89 CWE (AF) JOR

E/90 CWE (AF) JOR E/91 CWE (AF) JOR

E-03/15/KKD E/13/10/KKD E/12/KKD/2010E-14/15/KKD

E-17/10/KKDE-18/10/KKD E-19/10/KKD_E-20/10/KKDE-21/10/KKDE-22/10/KKD

E23/KKD/15 E/25/10/KKDE-39/10 KKD_ E43//10/KKDE/46/10/KKD E-47/10/KKDE-49/2015/CWE(P) KOL E-49/10/KKDE-50/10 /KKD E-51/10/KKDE/52/10/KKDE-53/10/KKDE-54/10/KKD

E-55/KKD/2010E-56/2010/KKD E-57/10/KKD

Yes

123.32 97.03 17

Yes

Yes Yes Yes

30.49 30.49

25.72 1.19

35.4 12 361.98 191.47 Yes

25. 88

Yes

60.08 Yes

Yes Yes

28 44

48.21 Yes 5. 55

55.66 5.98

27.1 No

Yes 43.29 Yes

105.67 51.8 21.44 10.08

67.24 17.4 38.36

Yes Yes 57 24

91 Yes Yes .13

.54 24.7 73 Yes Yes 22.86 18.86

78.9 32 Yes 106.78 Yes 190.87

49.92 2/ .01

23.49 Yes 23.4 Yes

Yes Yes Yes

4.86 25.68 6 . .12

163.75 88.14 93.83 138.97

107.58 51.83 128.03

Yes Yes Wk in prog

Wk in prog. No Slow Prog9

Wk completed Wk in prog Slow Pro9

Yes Wk in prog Wk in Prog Wk in Prog Wk in pro0g |Wk in PrOg Wk in pro9 Slow Prog9 Wk in pro9 Wk in Prog Wk in pro0g Wk in Pro0g

275.56 Yes 26.85 15.60

23.41 27 .98 Yes 45.84 45.84

58.65 42.45 73.75 50.03

57.36 32.68 59.05 33.77

170.28 90.89

Yes

No

Yes

Yes

Yes 68.88 38.51

43.86 31 42 es

Yes 45.47 11.45

77.66 36.89 No Yes 101.80 64.92

0.99 9.93 Yes

175.79 60.50 Yes

18.07 15.36 Yes 85.54 22.80 Yes Wk in prog.

No Slow Prog 12.01 8.92 Yes

1.42

Wk in prog |Wk in Pr0g.

42.82 16.25 15.03 20.28 20.28

204.27 89.35 199.74 126.68

Yes Wk completed

|Wk in Prog Wk in prog Wk in Pro9 Wk in Pro0g |Wk in Pro9

Yes

Yes Yes

/9.22 45.86

90.67 Yes

104.22 25.00 7.7.50

23. 14

Yes

Yes

43.77 28.43 12.82

43.89 38.83 48.95 46.42

169.35 96.60 42.72 19.50 74.51 52.29 17.11 0.00 | Yes

63.25 76 86 52.09 Yes

162.54 101.43 27.85 0.00

es Wk in Prog Wk in pro9 Wk in Prog Wk in Prog Wk in Prog Wk in prog Wk in Prog Wk in Prog Wk in Prog Wk in Prog Wk in prog. Wk in Prog

Yes

Yes Yes Yes

Yes

Yes

25.64 Yes

Yes Yes

16.59 5.81 Yes Wk in prog Wk in Pro9 Yes 90.28 59.32

60 82 40.73 17.57 23.23 20.06 21.69 2.60

7.28

37.62 Yes Wk in Prog

Wk in Prog Wk in prog. Wk in prog Wk in Prog

Yes Yes

Yes 23.67 Yes

Yes Wk in prog9 Yes Yes

1.50 5.01 66.82 18.18

27.5 Wk in prog. Wk in Prog

E-61/KKD/2010E-62/10/KKDE/63/10/KKD

49.86 9.25 5.66

40.86 70.90 49.98

Yes wK in prog21.27 Yes Wk in Prog_

Wk in Pro0g Yes

Page 4: SPEED POST Tele/Fax: 0364-2561749/0320 HQ Chief Engiroor (AI) WLR OF E CL… · E/GUW-155(2015) E/GUW-156/2015 E/01/CWE(AF)JOR E/02CWEAF) JOR 129.84 56 62 Yes Wk in Progress E/03/CWE(AF)

151-M/s RK Enterprise 152 |M/s Swapan Kumar Mondal 153 M/s Lotas Engineer

154 M/s Goutam Sen 155 |M/s IS Enterprises 156 M/s CC Construction 157 M/s Jeeten Enterprises 158 M/s Navyug Construction 159 M/s Sai & Siva Enterprises 160 M/s Madan Enterprise 161 M/s Biswa Construction 162 M/s Raghunath Sah 163 M/s Sharma Construction 164 M/s Dil Singh Biswa & Co 165 M/s P K Nag Choudhury 166 M/s Dwel Enterprise 167 M/s K R Dey 168 M/s RK Construction 169 Mis Hamza Construction Co 170 M/S H Shangpliang 171 M/s Lalowari Electricals 172 M/s RA Enterprise 173 M/s Singh Enterprises 174 M/s Janata Construction 175 M/s DJ Enterprise_ 176 M/s RA Enterprise 177 M/s United Builders 178 M/s Ranjit Kumar Saikia 179 MWs Kaushik Enterprise 180 M/s Freezcon 181 M/s Manoj Konwar

182 M/s Alo Electrical House 183 M/s R& RD Enterprise 184 M/s Singh Furniture Mart 185 M/s Raj Enterprises 186 M/s Super Build Corporation 187 M/s DC Biswas 188 M/s Rawat Enterprise 189 M/s Saraswati Auto Works 190 M/s A K Goswami

191 M/s Singh's Construction 192 M/s Ever Green Firm

193 M/s Jainath Singh_ 194 M/s S K Sharma

195 M/s GSW Construction 196 MWs Amarnath Agarwalla

197 M/s RK Enterprises 198 |M/s PK Construction

199 |M/s Sudha Enterprises 200 M/s Bhattacharjee Construction

201 M/s Remco 202 M/s Renuka Fero-Products203 M/s Zenith Construction204 M/s BN Chatterjee 205 Mis Narayan Builders 206 MWs Kamal Engineering 207 M/s New Builderss Corporation

208 M/s Roy Enterprise 209 |M/s Jadav Constructionn 210 M/s SC Trading Co 211 Ms Apollo Traders

212 M/s TS Enterprise 213 M/s Pioneer

214 M/s Vishal nterprise 215 IMWs Tapas Enterprise

216 M/s Raj Trancon 217 M/s Sarkar & Co 218 M/s Oenix Assocciates219 M/s Bikash Chanda Neogi 220 M/s Electro Builders 221 MWs Jagatram Construction 222 |M/s Modern Construction 223 M's Bose Enterprise

224 M/s Vivekananda Traders 225 MWs Dashmesh Builders

226 M/s NC Bose & Co 227 M/s Sitaram Construction228 M/s Das & Brothers 229 |Ms RD Constructions230 Mis RK Construction

L231 MS Oniel Sales 232 M/s PJ & Co

E/65/10/KKKDE-66/20/KKD E/67/10/KKDE/68/10/KKD E/79/10/KKDE/80/10/KKD E/81/10/KKDE/83/10/KKD E/85/10/KKD E/02/CE(AF)SZ/SHL/10 24 57 12.82 E-12/CE(AF)SZ/E-14/SHL2010 E/16/SHLI2015 E-22/SHL/2010E-26/SHL

E-32/SHL2010 E-63/SHLU/2019 E-71/SHL/2010 E-76/SHLU2010

E-83/SHL/2015E/88/SHLU2015 E-97/SH/2019

E-98/SHU2020E/DIN/04/2010E/09 CWE Dinjan E/12 CWE Dinjan E/17 CWE Dinjan E/21 CWE Dinjan

E/DIN/24/2010E/30 CWE Dinjan_ (E/DIN/14/2010) E/DIN/35/2010E/DIN/37/2010 ETEZ/102/2010 E/TEZ/115/2010E/TEZ/118/2010 ETEZ/120/2010 ETEZ/125(2010) ETEZ/148(2010) ETEZ/175/2010E/TEZ/180/2010ETEZ/200/CWE/TEZ E-202/HQ CWE/ TEZ E-221/HQ CWE/ TEZ

E/242/2010 TEZ E-06/10/(BKP)E-07/KKD/2010E-12/10/BKP E-20/10/BKPE-24/10/ BKP

E-25/10/ BKP E-31/(2010/BKP E-33/(2010)/BKP E-36/10/BKPE-42/10/BKP

E-47/10/ BKP E-49/10 (BKP) E-50/(2010)/BKP E-51/10/ BKP E-60/ (2010)/ Kolkata E-62/(2010)/BKP E-66(2010)yBKPE-68/10/ BKP E-77/10/BKPE-81/10/BKP E-88/(2010VBKP

E-92/(2010)/BKP E/94/10/BKP

E-95(2010)/BKPE-100/(2010)/BKP E-101(2010)/BKP E/102/10/BKP E-102/(2010)/BKP E-109/(2010/ BKP E-109/HQ 137 WE E-110/(2010/BKP E-112/(2010/BKP E/115/10/BKPE/117/BENG/2017 JE/118/10/BKPE125/10/BKPE-126(2010/BKP

Nk in Pro0g

Yes Wk in prog Nk in Prog Wk in Prog

Wk in Prog Wk in Prog

|Wk in Prog Wk in Prog

Wk in Prog Wk in pr0g Wk in Prog

|Wk in Prog Yes Wk in Prog

Wk in pr09 Yes Wk in pro9

95 49 6870 26 24 12.70 76 45 58 66

Yes

Yes 19 89 13 92 Yes 90 47 51 98

17 41 07

Yes

20.85 Yes Yes 29

49 34 85 Yes

60 66 29 91 Yes Yes

113 66 63 77 124.59 60 84

923

es

Yes 10.26

647 660 10.58 0.00

5.82 Yes

0.99

Yes Wk yet to commence Yes Wk in prog9.

Wk in pro09

Wk Completed Slow Progress

|Wk in Pro9 Wk in prog

|Wk in pro9 Wk in Prog Wk in prog Wk in prog Wk in prog Wk in prog Slow Prog Wk in prog Wk in prog Wk in Prog

Yes Wk in prog Wk in prog

Yes VWk in prog Wk Completed Wk in prog Wk in prog Wk in Pr0g

Wk in pro0g

14 68 13.40 174.17 30.69

551 0.69

Yes Yes

12.60 11.97 No

59 98 32.56 Yes 7.10 4.62

14.90 Yes

8.64 Yes 12.51 8.13 Yes

14.05 24.25 19.89

99.88

14.34 Yes Yes

Yes 30 .70

115.88 35.33 Yes

58.04 28.46 No

64.71 9.04 Yes24.34 2.43 Yes

23.10 66 08

7.71

.54 34.91 35.51

Yes

Yes 8.75 35.35

14.45 14.45 42.82 29.43

35.63

Yes Yes

8 Yes 32 5.81 3.40 Yes

138.31 75.71 163.52 72.60

0.13

Yes Yes Wk in prog

Wk in pr0g Wk in prog Wk in prog. Wk Completed Wk in prOg. Wk in Prog

No Slow Pr0g

Wk in prog Wk in pro0g Wk in prog Wk in prog Wk in Pr09 Wk in pro9

Wk Completed Wk in pro9. Wk in prog Wk in prog Wk in pro9 Wk in prog Wk in prog Slow prog9 Wk in prog Wk in Prog Wk in Prog Wk in PrOg Wk in prog

41.96 Yes

70.65 21.32

28.37 27.48

18.01 18.01 85.05 72.16 48.60

Yes Yes

Yes Yes

16.70 43.76 26.26 16.33

Yes

13.88 Yes

44.81 14.01 Yes 12.91 9.04 Yes

15.00 6.00 32.33 19.40

44.15

Yes Yes

48.52 Yes

31.71 31.12

26.46

31.71 Yes 24.90

15.61 Yes

Yes 7.56 35.57 Yes

69.42 56.27 Yes 35.06 30.16 31.01 20.55 26.14

Yes

28.22 Yes 18.50 No

19.19.61 20.48 3.48 48.65

Yes

Yes

27.90 9.78

Yes 30.95 Yes

2.33 6. 28.03 14.02

1981

Yes Yes Wk in Prog

0.00 |Wk yet to start Yes Yes Wk in Prog 24.44 22.00

21.73 2 21.20 21.20

7.59 11.34 35.64

Wk in prog Yes Yes Wk Completed

21.68 Wk in Prog Yes Yes Wk in Prog No

20.62 67.24 Slow Prog.

Wk in Prog |Wk in Pro0g Wk in Prog

Yes Wk in Prog Wk in Prog Wk in Prog.

Yes Wk in Prog

20.49 0.00 16.41 2.46 14.93

Yes

Yes 4 48

59.00 26.42 Yes

31.21 38.08 34.65 Yes

21.70 2.1/

17.71 Yes

Page 5: SPEED POST Tele/Fax: 0364-2561749/0320 HQ Chief Engiroor (AI) WLR OF E CL… · E/GUW-155(2015) E/GUW-156/2015 E/01/CWE(AF)JOR E/02CWEAF) JOR 129.84 56 62 Yes Wk in Progress E/03/CWE(AF)

Yes Wk in Prog Wk in Prog Wk in Prog Wk in prog Wk in prog Wk in prog Wk yet to commence Wk in prog Wk in prog Wk in Prog

Wk in prog Slow Prog Wk in prog

Yes Wk in Prog Wk in prog Wk yet to commence

Wk in prOg Wk Completed |Wk in prog Wk in prog Wk in pro0g Wk in prog Wk in Prog

Wk in prog. Wk in prog Wk in prog Wk in Prog Wk in prog Wk in Prog Wk in prog Wk in Prog Wk in prog Wk in pro0g Wk in pr0g Wk in pro09 Wk in prOg Wk in Prog

Wk in prog Wk in Prog Wk Completed. Slow Prog

Slow Prog Slow Prog Slow Prog.

12.64 147.45 62.80

2

21 07 233 M/s Kazi Enterprise 234 M/s MBS Trading Co. 235 |M/s Biswas & kundu Construction 236 M/s Shanti Udyog 237 M/s Biswas Construction 238 M/s Mohan Enterprises 239 M/s Ansh Construction 240 M/s JK Trading 241 M/s Kumar Enterprise

242 M/s Debnath Mondal 243 M/s Chandra Construction244 M/s Furlec & Co 245 M/s Ramunuj Singh & Sons 246 M/s Lakpa Lama 247 M/s Alpha Beta Construction

248 M/s Saha Construction 249 M/s PK Roy & Co_ 250 M/s Chakraborty Enterprises 251 M/s Builders Associate 252 M/s Arun Chanda sarkar & Sons 253 M/s Sunil Das & Co_ 254 M/s Rabi Bank 255 M/s Swapan Kumar Ghosh 256 M/s PKMajumder 257 |M/s Halder Enteprises 258 M/s Satish Kumar Singh & Sons 259 M/s Shashi Bhushan Gupta

260 M/s BKEnterprises261 M/s Electro Tech System 262 M/s DS Enterprises 263 M/s ldeal Construction 264 M/s Niranjan Sarkar 265 M/s Mohan Ghosh 266 M/s Swapan Kundu

267 M/s Manas Mitra 268 M/s Rajeev Kumar

269 M/s BCL 270 M/s PKRoy & Sons

271 M/s Anita Roy & Sons 272 M/s Shiva Technical Enterprise 273 M/s Shanti Enterprises 274 M/s Paresh Chandra Paul 275 Ms Excel Enterprises 276 M/s Abida Enterprises

E-129/(2010)/BKP E-140/10/ (BKP) E-148/(2010)/BKP E/162/(2010)/BKP E-163/(2010) BKP E-165/2015 BKP E-167/2015/BKPE-168/2015/BKPE-175/(2015)/BKP E-177/(2015)/BKP E-10/(2010)/ BKP E/189/15//BKPE-1523/2010 E-19/Beng/2010

E-22/Beng/2010E-24/Beng/2010 E-26/Beng/2010E-27/Beng/2010E-28/Beng/2005E-30/Beng/2010E-34/Beng/2010E/37/Beng/2010E-38/Beng/2010

E-40/Beng/2010

E-45/Beng/2010E-52/BENG/2010

E-53/BENG/2010E-92/Beng/2010E-127 CWE Delhi Cantt E-131/Beng/2010

E-/136/102(2010) E/136/121 (2015) E-136/Beng/2010 E-137/Beng/2010 E-154/Beng/2015

E-156 (BENG) (2019) ETEZ/173 (2010) Tez 33.65 0.35

E-41(HQ 137WE) E-57(HQ 137WE) EI75 CWE Dinjan E-38(2012)/CWE Lohogaon

E-181 CWE TEZ E-1573/ 2010/CWE

E-07 (2010/CWE Army) Mumbai E-01/2020/CWE(AF) PAN| 24.98

E-136/124 (2015)

Yes

Yes 39 3 83

85

98 Yes 24.82

Yes 28 21 09

0.00

24 22.54

54 28.16

65 9.26

YesYes

YesYes Yes

82 20 28.80

70 24.61 Yes 60

No 000 7. 53

23 .950.62

5.20 Yes 36.8 3/

54.9 90 30.88 Yes

Yes 0.7 24.64

24.9 94.27 Yes

Yes 8 52.74 33.15

31 75

45.91 9. Yes

58.91 Yes 30.21 Yes 51 1.64

106.94 52.59 23.90

118.75 55.64 32.83 20.68

4.39

Yes Yes 11.95

82.18 Yes Yes 8.63 Yes

Yes 2.63 12.00 Yes 56.04

2.80 64.71 22.28

11 .19 Yes Yes

14.20 Yes 8. 2.91 3.93 1.81

135.31 49.89

32.57

19.42 Yes 10.51 Yes

14.88 es

Yes

23.44 es Yes

8.42 5.81 Yes ).41 Yes 8.

59.73 59.73

5.28 Yes

No 8.13 17.83 10.33

12.66 No

19.48 No

28.4 0.00 No

Yes VWk in Progress|Wk in ProgWk in Prog Slow prog. Banned by E-in-C's Branch

Slow Prog Slow Prog Wk in pro9.

Yes Wk in prog9 Wk in prog

|Wk in pro0g |Wk in prog

Wk in prog. Wk in Prog Wk in prog

277 M/s Karmakar & Company 278 M/s Development Construction

279 M/s Krishna Construction 280 M/s Super Dynamic Systems

0.00 .00

34.73 Yes Yes

83.9

68.1 11.49

U/E

U/E 11. 38 No

29.30 263 8.83

No U/E U/E

281 M/s Tech Mech International (P) Ltd 282 M/s Daj Construction

283 M/s Singh Construction284 M/s Om Builders

285 M/s Roy Mintra Entrprise 286 Ms Ray Enterprise

287 M/s Classic Construction & Suppliers

288 Ms Sabitri Jhunu Entrerprise 289 M/s Siva Enterprises

290 M/s Okiyang Pertin 291 MWs Laxmi Cooling Centre 292 M/s Kuntalbij Engineers Pvt Ltd

293 M/s Arunachal Enterprises 294 M/s P KB Construction

295 M/s Smit Consulting Engineering 296 M/s Concept Engineers297 M/s Puskar Builders Pvt Ltd

298 M/s PKbuilders 299 M/s Kundan Engineers& Builders

13.80 No

Yes 11.83 20.30

.65 19.69

U/E

U/E U/E 40.57 14.6 Yes

U/E 22.62 9.22 Yes U/E 102.8 17.07 Yes

4.99

19.74 8.80 36.04 Yes 0.00 10.09 2.00 8.25 1.46

U/E 9.08 Yes Yes 35

57 U/E 30

U/E Yes 4 49.43

.50 20.1

U/E Wk in prog

Contract cancelled Slow Prog Wk in Prog Wk in prog.

No U/E U/E No 8

.99 U/E Yes Yes U/E 00

U/E 16.2 Yes U/E 45.7 0.00 Yes Wk order being placed

U/E Wk in Prog

De- Enlisted due to change in

constitution

18.04 14.43 Yes

UIE 681 6.81 No

w (Arbind Kumar, IDSE) Chief Engineer

Page 6: SPEED POST Tele/Fax: 0364-2561749/0320 HQ Chief Engiroor (AI) WLR OF E CL… · E/GUW-155(2015) E/GUW-156/2015 E/01/CWE(AF)JOR E/02CWEAF) JOR 129.84 56 62 Yes Wk in Progress E/03/CWE(AF)

AinezurG P/3 (Part HO CE (AF) Ghillong Zorns Letter No 8011WLRIE Dated Oct 2020

PARTI LIST OF WORKING CONTRACTORS CONSIDERED NOT CAPABLE OF HANDLING MORE LOAD (E- CLASS CONTRACTORS& UN-ENLISTED CONTRACTORS FOR QUARTER ENDING SEP 2020

SI Name of Contractor/ firm Index No

Rernarks Total value

of work

Total Whether No value of

work considere d capable of handing in hand Completed

in lakhs in lakhs more work oad M/s Sukumar Talukdar & E/GUW/62/2010 Co

01 138.96 43.32 No Slow Progres

M/s Meghalaya

Engineers & Agencies 03 M/s Manoj Kumar Agarwal

M/s Dee Aar Trading 05 M/s MK Agarwalla & Sons

M/s SA Electrics

02 E/GUW/94/2010, BOR

146.98 |

47.42 No Slow Progress

E/GUW-118/2010 E/GUW/146/2010 E/01/CWE(AF)JOR E/03/CWE(AF) JOR

Slow Progress Slow Progress Slow Progress Contract

20.29 20.19 No 04 7.72

19.04 .79 No

0.95 No 06 24.88 9.76 No

cancelled E/04 CWE(AF) JOR E/05 CWE(AF) JOR

E/30 CWE (AF) JOR E/62 CNE (AF) JOR E/65 CWE (AF)JOR

E/79 CWE (AF) JOR E/83/SHL/2015 E/88 CWVE (AF) JOR E/DIN/24/2010 E-12/10/BKP E-66(2010/BKP E-109/HQ 137 WE

M/s KL Agarwalla & Co 07 08 M/s Raj Enterprises 09 M/s Keshave Construction

M/s NK Sai Trading 11 M/s KS Enterprise 12 M/s SN Lahoty 13 M/s H Shangpliang14 M/s Rupanjal Borboruah 15 M/s Kaushik Enterprise

M/s PK Construction

97.48 Slow Progress Slow Progress Slow Progress Slow Progress Slow Progress Slow Progress Slow Progress Slow Progress Slow Progress Slow Progress Slow Progress Slow Progress Slow Progress Slow Progress Slow Progress Slow Progress

123.98 No 27.11 10.84 No 55.66 27.98 73.75

.98 No 10 23.41 No 50.03 No

77.66 36.89 No 12.6 .60 11.97 No 41.42 12.01 No 58.0 28.46 No 43. .76 26.26 No

16 17 M/s TS Enterprise 18 M/s Dashmesh Builders 19 M/s Furlec & Co 20 M/s Shanti Enterprises 1 M/s Paresh Chandra Paul 22 M/s Excel Enterprises

20 .55 18.50 No 67.24 35.64 No

E/189/15//BKPE-38(2012)/CWE Lohogaon E-181 CWE Tezpur

5.20 0.00 No 8.13 28 No

No 83 19.48

10.33 E-1573/ 2010/CWE 12.66 No Ranchi E-07 (2010/CWE (Army) Mumbai E-07(2010/CWE(Army) Mumbai

U/E

23 M/s Abida Enterprises 28.40 0.00 No Slow Progress 24 M/s Abida Enterprises 28.40 0.00 No Slow Progress

No 25 M/s Super Dynamic

Systems 11.49 Slow prog.

Banned by E-in-C's Branch

11.38

26 M/s Tech Mech U/E 29.30 26.37 No Slow Progress International (P) Ltd M/s Daj Construction

Slow Progress Contract

27 8.83 U/E

U/E 13.80 19.50

No 28 M/s Kuntalbij Engineers Pvt Ltd

29 M/s Arunachal Enterprises 0.00 No

cancelled U/E U/E

20.18 6.81

10.09 6.81

Slow Progress De-Enlisted

No 30 M/s Kundan Engineers& Builders No

due to change in constitution

(Arbind Kumar, IDSE) Chief Engineer Chiof oain

Page 7: SPEED POST Tele/Fax: 0364-2561749/0320 HQ Chief Engiroor (AI) WLR OF E CL… · E/GUW-155(2015) E/GUW-156/2015 E/01/CWE(AF)JOR E/02CWEAF) JOR 129.84 56 62 Yes Wk in Progress E/03/CWE(AF)

Annexure P/2 (Part-ll)

Ha CE (AF) Shillong Zone Letter No. 88011/WLR/E/(S/E8

Dated 2 Oct 2020

PART-I

LIST OF WORKING CONTRACTORS HAVING NO LOAD BUT BAN FOR ISSUE OF TENDER

DUE TO REASONS MENTIONED AGAINST THEM (E CLASS CONTRACTORS & UN-ENLISTED

CONTRACTORS FOR QUARTER ENDING SEP 2020

Present status of firm Remarks/Reasonss Class No

Index No E/GUW/96/ The Firm enlisted with De-enlisted due to change in

2010 E-15, CWVE

(AF) Jorhat E-32, CWE (AF) Jorhat

SI Name of Contractor

No 1. M/s Trade & Co constitution of firm CWE(AF) Borjhar_

The firm is enlisted with De-enlisted due to death of

CWE (AF) Jorhat The firm is enlisted with De-enlisted due to change in

CWE(AF) Jorhat

2. M/s Blue Star proprietor Construction

3. M/s Prasanna Kumar Sharma constitution. Can participate in

tendering by submitting EMD

E-80, CWE

(AF) Jorhat CWE (AF) Jorhat E-66, CWE (AF) Jorhat

4. Shri Khagen Borbora The firm is enlisted with De-enlisted due to death of

proprietor. 5. M/s Dhruba Ram Ghosh

& Co The firm is enlisted with De-enlisted due to change in

CWE(AF) Jorhat constitution. Can participate in

tendering by submitting EMDD The firm is enlisted with Disciplinary action initiated.

CWE (AF) Borjhar 6. M/s GD Enterprises E/GUW/80

(2010) E/GUW/131/ The firm is enlisted with De-enlisted due to change in

2010 7. M/s Usha Enterprises

constitution of firm. CWE (AF) Borjhar The firm is enlisted with De-enlisted due to death of 8. M/s Jorhat Refrigeration

Works 9. M/s Assam Refrigeration

E-57, CWE (AF) Jorhat CWE (AF) Jorhat E-07,CWE The firm is enlisted with De-enlisted due to change in

(AF) Jorhat

proprietor

constitution. Can participate in

tendering by submitting EMD CWE(AF) Jorhat

w (Arbind Kumar, IDSE) Chief Engineer Chief Engineer (AF)SZ

Page 8: SPEED POST Tele/Fax: 0364-2561749/0320 HQ Chief Engiroor (AI) WLR OF E CL… · E/GUW-155(2015) E/GUW-156/2015 E/01/CWE(AF)JOR E/02CWEAF) JOR 129.84 56 62 Yes Wk in Progress E/03/CWE(AF)

566- 255050 O3566-256380

Aal [email protected] Y POSI Garrisorn Eng1ncer it Hasimara Post Hasimara Dist Alpurduar PIN 752150VE) S326/ ES 29 Aug 2020

M/S Manoj Kumar Aganwal Malangi T G PO Hasimara Dist Alipurduar

GA NO GE/HAS/35 OF 2019-20: PROVN OF GREASE AT TRAP CERTAIN LOCATON OE OESTC AREA, SPECIAL REPAIR/REPLACEMENT OF LIGHTENING ARRESOK AIECH AREA AND E/M FITTINGS/FIXTURE IN CERTAIN BLDGS AND PROYR DE CHEMICAL EARTHING WITH CONNECTED WORK IN CERTAIN TECH BLDG UNDER GE (AF) HASIMARA

Dear Sir(s),

Reference the following

(a) This office WO No 01 dated 13 Nov 2019 (b) This ofice letter No 8326/20/EB dated 17 Mar 2020 (c) (d) This office letter No 8326/27/E8 dated 06 Jun 2020. (e

This office letter No 8326/25/E8 dated 30 Apr 2020

This office letter No 8326/29/E8 dated 09 Jul 2020 This office letter No 8326/30/E8 dated 20 Jul 2020.

2 In spite of notice by the undersigned asking you to put in your best efforts to accelerate the progress of work. no activity is reported on the site of work in the last two weeks You have also not brought ouf any reasons for not proceeding with the work and the present progress of

the work is 99.50%

In view of the above, please show cause as to why your fim should not be debarred from participating in future tender Please furnish your reply so as to reach the undersigned within 15 days from issue of this letter, faling which it will be presumed that you have nothing to submit in this conncetion, therefore further appropriate action as deemed fit under the prevailing circumstances shall be taken without any further reference to you in the matter

This is without any prejudice and remedy available to the Govt. please

Your's faithíully.

H

Abhishek Gupta. It?St) EE

YJGarrison Engincor {A Copy t0

HQ CWE(AF) Bagdogra for info W.rtabove

AGE E/M (AF) Hasimara for info w,.r.t abovi

Page 9: SPEED POST Tele/Fax: 0364-2561749/0320 HQ Chief Engiroor (AI) WLR OF E CL… · E/GUW-155(2015) E/GUW-156/2015 E/01/CWE(AF)JOR E/02CWEAF) JOR 129.84 56 62 Yes Wk in Progress E/03/CWE(AF)

3566 255050 03566-256380

ail geafhasiara@gmail com

BY REGD 9DS/POST GIAISOn rnginOnr 1AF) Hasimare Post l lasimar Diat Abpurduar PIN 730215V/

8326/ 11ES p 2020

MS Manoj Kumar Agarwal Maiangi TG PO Hasimara Dist Aipurduar

CANO: GE/HAS/35 OF 2019.20: PROVN OF GREASE AT TRAP CERTAIN LOCATION O ESlC AREA, SPECIAL REPAIRIREPLACEMENT OF LIGHTENING ARRESTOR ALTECH AREA AND EM FITTINGS/FIXTURE IN CERTAIN BLOGS AND PROVN OFE

CHEMICAL EARTHING WITH CONNECTED WORK IN CERTAIN TECH BLDG UNDER GE (AF) HASIMARA Dear Sirs).

Reference the following -This office WO No 01 dated 13 Nov 2019 This office letter No 8326/20/E8 dated 17 Mar 2020 This office letter No 8326/25/E8 dated 30 Apr 2020 This office letter No 8326/27/E8 dated 06 Jun 2020 This office letter No 8326/29/E8 dated 09 Jul 2020 This office letter No 8326/30/E8 dated 20 Jul 2020 This office letter No 8326/31/E8 dated 29 Aug 2020

(a) ()

(e)

(g) 2 The defects as intimated to you vide this office letter mentioned at para 1(i) above hav not been rectified by you till date

3 In spite of notice by the undersigned asking you to put in your best efforts to accelerate the progress of work, no activity is reported on the site of work since long time You have als not brought out any reasons for not proceeding with the work

In view of the above, I hereby give you this FINAL NOTICE to accelerate the progress of work and armend the CPM chart in consultation with the undersigned Please note that if the

present state of affairs continues for a period of 15 days from this notice, I shall cancet the contract on your default in terms of powers vested in me vide condition 54 of lAFW-2249 and also put your firm ban from participating in future tendering

4

5. This is without prejudice

Your's faithfully

(Abhisffek Gupta, IDSE) EE

Garrison Engineer (Af Copy to:

HO CE(AF) Shiliong Zone HQ CWE(AF) Bagdogra for into W.r.tabove pleasee AGE B/R-IN (AF) Hasimara ACE E/M (AF) Hasimara

Page 10: SPEED POST Tele/Fax: 0364-2561749/0320 HQ Chief Engiroor (AI) WLR OF E CL… · E/GUW-155(2015) E/GUW-156/2015 E/01/CWE(AF)JOR E/02CWEAF) JOR 129.84 56 62 Yes Wk in Progress E/03/CWE(AF)

Tele 03712-259160

na lD atezp4-mes@gov n

REGISTE REO POSTIAD Minustry of DeteCe Military ngieer Services GE (AF) iezpur Post Saloniban Dystt Sonitpur Assam 784 104

s213VEs VSep 2020

MS Paresh Chandra Paui Ex Police Line, Tezpur Distt Sonitpur Assam- 784001

CA NO GE/AF/TEZ/28 OF 2019-20: REPAIR AND POLISH OF WOODEN FURNITURE AT AF STATION TEZPUR UNDER GE (AF) TEZPUR

Dear Sir (s)

Refer this office following letters

(a) Work order No 1 issued vide this office letter No 8424/18/E8 dt 22 Aug 2019

(b Letter No 8424/29/E8 dated 15 Nov 2019

c) Letter No 8A24142/E8 dt 06 Jul 2020

d) Letter No 8424/43/E8 dt 27 Aug 2020

It has been noticed that extended date of completion said contract has been expired and

work is still incomplete. Please note that work 1s running under compensation and same shall be

charged in term of CA provision

2

inspite of several notices given by the undersigned asking you to put in your best efforts

to accelerate the progress of work, no activity is reported on the site of work in the last 20 days

You have also not broughB out any reasons for not proceeding with the work

3

In view of above, I hereby give you this FINAL NOTICE to accelerate the progress of

work in consultation with the undersigned. Please note that if the present state of affairs

continues for a period of 15 days from this notice, I shall cancel the contract on your defauit in

terms of powers vested in me vide Condition 54 of lAFW-2249

4

This is without prejudice

6 Please acknowledge receipt

Yours' faithfully,

PR Prasad, IDSE) EE (SG) Garrison Engireer (AF)

Copy to For info and intimate the progress of work as on 25 Sep 2020 for our

further necessary action. BSO AF) Tezpur

Page 11: SPEED POST Tele/Fax: 0364-2561749/0320 HQ Chief Engiroor (AI) WLR OF E CL… · E/GUW-155(2015) E/GUW-156/2015 E/01/CWE(AF)JOR E/02CWEAF) JOR 129.84 56 62 Yes Wk in Progress E/03/CWE(AF)

23) REGISTERED POST Military Engineer Services Garrison Engineer (AF) Jorhat-785 005 (Assam)

ele AF/4884 0376-2333125 ax

770/A/ JE8 24 Sep 2020

Vi/s Keshave Constructions JPR Road, Jorhat Assam-785001

CA NO: GE(AFYJOR/63 OF 2019-20: IMPROVEMENT OF ILLUMINATION IN DIFFERENT WATCH TOWER OTHER MISC NORKS AT AFS

JORHAT UNDER GE (AF) JORHAT

Dear Sir (s)

References

(a) (b) (c)

Work Order No 1 issued vide this office letter No 8770IA/18/E8 dt 07 Feb 2020. This office letter No 8770/A/28/E8 dt 25 Jul 2020 This office letter No 8770/A/32/E8 dated 08 Sep 2020.

Site for the work to be executed under the above contract was handed over to you on 11 Feb 2020. The undersigned has noticed that you are not proceeding with the work with due diligence and the progress of the work is far from satisfactory, despite the fact that date of completion has already expired on 09 Aug 2020

2.

hereby draw your attention to the fact that time is of the essence of your contract and unless you proceed with the work with more diligence and accelerate your progress you are not likely to complete the work in near future. Please note that you have become liable to the payments of the damages provided for in the contract in this respect and/ or any other remedy available to the Govt under the said contract.

3.

You are hereby accordingly called upon to put in your best effort to accelerate the progress of the work

so as to complete it at the earliest 4.

5 If the present state of affairs continues for the further period of 02 (two) weeks inspite this notice, I shall be constrained to recommend the cancellation of the contract in terms of condition 54 of IAFW-2249 on your default.

In view of above you are hereby called upon to "SHOW CAUSE as to why your firm shall not be recommended for imposing the ban for further issue of tenders by the competent authority. Your reply shall

reach within 10 days (i.e 05 Oct 2020) from this letter, failing which it shall presumed that you have nothing to state in this regard and action shall be initiated accordingly.

6.

7. Please acknowledge receipt.

Yours faithfully,

(Ajay Agrawal, IDSE) EE

Sarrison Engineer (AF) Copy to:

AGE EM-I (AF) Jorhat Please intimate the present progress of the work as on date.

Page 12: SPEED POST Tele/Fax: 0364-2561749/0320 HQ Chief Engiroor (AI) WLR OF E CL… · E/GUW-155(2015) E/GUW-156/2015 E/01/CWE(AF)JOR E/02CWEAF) JOR 129.84 56 62 Yes Wk in Progress E/03/CWE(AF)

(-3 Tele AF-4884 Fax

REGISTERED POST Military Engineer Services

Garrison Engineer (AF) Jorhat-785005 (Assam)

0376-2333050 8745/AN1) Sep 2020 /E8

M/s Rupanjal Borboruah RRL Tiniali, AT Road Jorhat, Assam, PIN-785006

CA NO: GE (AFVJOR/43 OF 2019-20: REPAIRS TO ROOFING, PLASTERING, PLUMBING, WATER TANK, FLOORING, JOINERY ETC AT DJ, OMQ, OFFRS MESS, 16 P&SU,

R/BLOK AT AFS UNDER GE (AF) JORHAT Dear Sir(s).

1 References

(a) (b) (c)

Work Order No 1 issued vide this office letter No 8745/A/24/E8 dt 06 Dec 2019 This office letter No 8745/A/31/E8 dated 29 Jul 2020. This office letter No 8745/A/32/E8 dated 07 Sep 2020.

Site for the work to be executed under the above contract was handed over to you on 10 Dec 2019 The undersigned has noticed that you are not proceeding with the work with due diligence and the progress of

the work is far from satisfactory.

2.

I hereby draw your attention to the fact that time is of the essence of your contract and unless you proceed with the work with more diligence and accelerate your progress you are not likely to complete the work in near future. Please note that you have become liable to the payments of the damages provided for in the

contract in this respect and / or any other remedy available to the Govt under the said contract.

3.

4 You are hereby accordingly called upon to put in your best effort to accelerate the progress of the work so as to complete it at the earliest.

If the present state of affairs continues for the further period of 02 (Two) weeks inspite this notice shall be constrained to consider cancellation of the contract in terms condition 54 of IAFW-2249. 5.

In view of above you are hereby called upon to "SHOW CAUSE" as to why your firm shall not be recommended for imposing the ban for further issue of tenders by the competent authority. Your reply sha reach within 10 days (i.e 05 Oct 2020) from this letter, failing which it shall presumed that you have nothing t state in this regard and action shall be initiated açcordingly.

.

7. Please acknowledge receipt.

Yours faithfully,

Ajay Agrawal, IDSE) EE

JGarrison Engineer (AF) Copy to:- AGE B/R-II (AF) Jorhat Please monitor the prog of wk closely