TENDER DOCUMENT FOR NIT NO. 06 /2014 15 VOL-IV PRICE SCHEDULE RWSS HOTIGAON-SiLOOSAN
1
GOVERNMENT OF RAJASTHAN
PUBLIC HEALTH ENGINEERING DEPARTMENT (RAJASTHAN)Tender Document for
{ksf=; tyiznk; ;kstuk gksrhxkao&flywlu ds vUrxZr izskj fQYVj IykaV ] ikbZi ykbZu ] DyksjhusVj ] LoPN tykk; ] ifEiax LVsku dk fuekZ.k dk;Z e; 5 okZ dk lapkyu o la/kkj.k
dk dk;Z NIT No 06 /2014 15
Estimated Cost: Rs. 61.29 lacs
VOLUME Iv
(PRICE BID)
Executive Engineer
Public Health Engineering Department,
Division Sanchore
Tel: 02979 283624
-
EE PHED Dn. SANCHORE TENDER DOCUMENT FOR NIT NO. 06 /2014 15 VOL-I SPECIAL CONDITIONS PART B WSS HOTIGOVE SILUSAN
2
PREAMBLE TO PRICE SCHEDULES
1.0 PRICE SCHEDULE FOR WORK
1.1 The Contract is of Lump sum turnkey nature on single responsibility basis for
conceptualization, design, manufacturing, construction, commissioning, testing, trial
run and operation & maintenance during defect liability period of 12 months after
completion.
1.2 The tenderer is advised to examine all instructions, forms, terms, specifications and
other information in the tender documents and consider and evaluate fully the price
implications therein contained before filling the Lump sum contract amount.
1.3 The Tenderer should acquaint himself with the site conditions including the access to
Work site. The successful Tenderer shall have to make suitable access to work sites at
his own cost.
1.4 Tenderer has to quote lump sum price/ item rate for the construction, testing and trial
run for the entire work as per the detailed scope of work and specifications in the
Tender Form. However, these lump sum rates quoted shall be adjusted for the
variation in the length of pipeline by logical addition or deduction in these lump sum
rates, as detailed below.
For this purpose, the rates payable / deductible for increase / decrease in lengths as
compared to those given in schedule, shall be same as quoted for the respective pipe
sizes and numbered items for pipeline in schedule B.
1.5 The Tenderer is to quote one lump sum price for the entire work including Operation &
Maintenance in defect liability period of 12 months in the Tender Form. The Tenderer
shall also fill up price breakup under major components in Schedule A & sub breakup
in Schedule A 1 to A 5 for intermediate payments. And percentage above/below rate
quoted in part B. The major items envisaged in the contract are given in the scope of
work and are also stipulated in the breakup of schedule of prices. There are, however,
several minor items not specifically mentioned in the break up but shall be required to
complete the job on turnkey basis as per scope and specification of works stipulated in
the tender document. The cost of such items/ works shall be deemed to have been
included in the lump sum cost quoted and no separate payment shall be admissible for
such items.
1.6 Each item is to be individually priced and no column in the Schedule of prices shall be
left blank. The prices shall allow for all the works covered under the Tender and all
liabilities and contractual obligations whether separately specified or not.
1.7 The Tenderer shall be deemed to have allowed in his price, provision for, designs, field
investigations, site clearance and final removal of all temporary works of whatsoever
nature required for construction including temporary bunds, diverting water, pumping,
dewatering, availability of material of required quality etc. for the proper execution of
works. The rates shall also be deemed to include any works and setting out that may be
required to be carried out for laying out of all the works involved in the scope of work.
1.8 However in consideration of providing clubbed rates in the Schedule A 1 to A 5 and part
B its further breakup for intermediate payments with stages of work shall be got
approved by competent authority, whose decision shall be final and binding for the
contractor. In case of illogical rates in different Schedules A 1 to A 5 and part B, the
Engineer Incharge or competent authority can make re appropriation of rates for
different schedules and its sub items so as to have total payment as per the approved
-
EE PHED Dn. SANCHORE TENDER DOCUMENT FOR NIT NO. 06 /2014 15 VOL-I SPECIAL CONDITIONS PART B WSS HOTIGOVE SILUSAN
3
contract sum and to facilitate logical intermittent payments during execution. Such
decision taken by the competent authority shall be final and binding on the contractor.
1.9 As per Central Government notification No. 12/2012 dated 17.03.2012 (amended up to
date), excise duty exemption of materials used in water supply project is available for
specified components of water supply projects. If the notification benefits are available,
the department shall arrange necessary certificates on the request of the contractor.
The Bidders shall have to quote the rates keeping in view of the Probable rebate
available to them as per the above Circulars of Government of India. Department
assumes that bidder has considered exemption of excise duties applicable for analyzing
his financial offer for approval. The bidder shall submit an affidavit on Rs 100/ stamp
paper with an oath that he has considered excise exemption as per Central
Governments notification while quoting his offer for this work. No statutory variations
towards any taxes, duties, levies etc. will be payable to contractor.
1.10 It will be entirely at the discretion of the department to accept or reject the Tenderers
proposals without giving any reasons whatsoever. The Tenderer must carefully go
through the provisions laid down in the ITB regarding the deviations allowed, and the
likely reasons, which may lead to the rejection of Tenders and / or forfeiture of the
earnest money.
1.11 For calculation of pipe length for payment purposes, the laying length of sluice valve &
dismantling joints and any other length of pipe in scope of work of items other than
pipeline shall be deducted from overall length, as the same are being paid separately.