Specification Report Accompanying the Abstract Project Report
NAME OF THE WORK : CONSTRUCTION OF WATER TREATMENT PLANT, RAW
WATER PUMPING MAINS , PUMPSETS, CLEAR WATER SUMP & STAFF QUARTERS
TO CPWS SCHEME FOR PEDDAPALLY AND RAMAGUNDAM CONSTITUENCIES OF
KARIMNAGAR DISTRICT.
Est.Cost:Rs. 108.00 Crs
Administrative sanction:The work “Consruction of Water treatment plant, Raw water
pumping mains, Pumpsets, Clear water sump & Staff Quarters to CPWS Scheme for
Peddapally & Ramagundam Constituencies of Karimnagar District ” is administratively
sanctioned Vide GO.Rt No: 218 , Dt: 02-04-2015 by Principal Secretary of PR&RD,
Govt. Of Telanagana.
Scope of work:- As it has been envisaged to provide potable water to doorstep (upto Kitchen level ) , by the Government of Telangana, from the reliable and dependable source , to cover Peddapally & Ramagundam Assembly Constituencies in Karimnagar District with Protected Water Supply Scheme by drawing raw water from back water of Ellampally Project as a part of the Telangana Water Grid. Present Scope of work: It is proposed to Water treatment plant, Raw water pumping mains, Pumpsets, Clear water sump & Staff Quarters in view to complete the work to safe during the summer and before rainy season. Necessity of Present Proposal
Presently the area under the proposal of Water Grid, is partly having water supply with ground water at various Habitations in 7 mandals and the water is being supplied at a level varying from 20LPCD to 40LPCD in rural areas and in Ramagundam Muncipal Corporation the drinking water is being supllied from infiltration wells in Godavari which is not dependable as the Yellampally barraige has been constructed on the upstream side, due to which the yield has been decreased in infiltration wells. There is no dependability even for this level of supply, as the water is generally released depending upon the cropping demand and various other factors. Now it is proposed to plan for 100LPCD level of water supply, through closed conduit system, hence the other losses of Evaporation,seepage and other seepage losses can be avoided. The present drinking water project is designed to supply safe drinking water for a total population of 564722 ( 2011) in 7 Mandals and 2 Municipal Corporations of Karimnagar District which includes 228 habitations (Peddapally 49 Habs, Odela 33 Habs, Srirampur 40 Habs,
![Page 2: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/2.jpg)
Ramagudam 19 Habs (Total Habs in Ramgundam Mandal are 41 Habs & in WB grant 6 Habs covered & 4 Habs to be covered in Manthani Grid & 12 Habs are proposed in NRDWP 8.00 Crores NRDWP Estimate & balance 12 Habs are being proposed in this Grid), Eligaid 19 Habs, Julapally 18 Habs & Sulthanabad 48 Habs). Flow Chart of MVS:- MVS Scheme is designed to cover all 7 Mandals, and 1 Municipal Corporation & 1 Nagarpanchayath of Karimnagar District , as the existing DW water is not sufficient to serve the total required level of water supply of 100LPCD. Proposal plan :: Raw water pumping main from back water of Yellampally project drawing water from Existing Intake well Near Murmur village of Moulana Abdul Kalam Srujala Sravanthi water supply sheme to GHMWS of Ramagundam mandal and supplied to Head works proposed GHMWS premises and clear water will be pumped to Sump at Peddagunta which will serve Peddapally Urban branch will be pumped Ramagundam urban Population and 1 TMC of will be pumped directly to FCI Foctory using serate pumpsets. ency rural and urban habitations in Karimnagar dist. The following are the salient source features of the proposal GRID :
Water requirement per annum
Ultimate demand : 1.87 TMC
Source of supply :
INTAKE WELL
Back water of Yellampally Project at MURMUR Village of Ramagundam Mandal Existing Intake well Near Murmur village of Moulana Abdul Kalam Srujala Sravanthi water supply sheme to GHMWS
Location
:
Full resrvoir level : 148.000 m Dead storage level : 138.300 M Present water drawal level
132.855 M
Dead storage capacity : 0.69 TMC Full Capacity : 20.18 TMC
![Page 3: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/3.jpg)
INTAKEWELL CUM PUMP HOUSE: Existing Intake well Near Murmur village of Moulana Abdul Kalam Srujala Sravanthi water supply scheme to GHMWS PUMPING MACHIENERY: Providing 1090 HP each VT (1 + 1=2) from Intake well to RSF with 41.70 m head and 1,10080 LPM & Providing 780 HP each VT (1 + 1=2) from Clear Water sump to GLBR at Peddapally with 34833 lpm & 139.55 mts head and providing 310 Hp each HSC (2+1) from clear water sump to sump at Sharadanagar 47334 Lpm and 40.55 mts head Clear water sump 12500KL clear water sump has been provided to supply to Peddapally & Ramagundam Constituencies. PUMPING MAIN: C/o Pumping Main from Intake well to RSF 1100 mm dia MS with 10mm thick pipes for a length of 1100 mts & C/o Pumping Main from Clear water sump to GLBR at peddapally with 800 mm dia MS with 10mm thick pipes for a length of 18000 mts while the total length is 33460 mts. WTP: 115 MLD RSF is proposed at GHMWS Head Works at Murmur for prospective demand of 82167 LPM . STAFF QUARTERS: 10 nos of staff quarters has been provided for maintenance of water treatment plant
The Estimate is prepared with 2014-15 SSR with the provision of Intake well cum pump house, Raw water pumping main , Rapid Sand Filters and LS provisions for Unforeseen items is submitted for according Technical Sanction. Asst.Engineer Dy.Executive Engineer RWS&S Peddapally RWS&S SD Peddapally Executive Engineer Superintending Engineer RWS&S Division Manthani RWS&S Circle Karimnagar
![Page 4: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/4.jpg)
Sl.
No
Description of item Qty Rate Per Amount in lakhs
1Construction of 115 MLD Rapid sand filter including
mechanical, Electrical fittings.115 MLD
As per Sub
Estimate3770.00
PUMPING Main
2C/o Pumping Main from Intake well to RSF 1100 mm dia
MS with 10mm thick pipes for a length of 1100 mts1100.00 rm
As per Sub
Estimate325.00
3
C/o Pumping Main from Clear water sump to Rajulagutta
Teo Jn with 800 mm dia MS with 10mm thick pipes for a
length of 18130 mts
15000.00 rmAs per Sub
Estimate3300.00
4
Providing 1090 HP each VT (1 + 1=2) from Intake well to
RSF with 41.70 m head and 1,10080 LPM at Murumur Head
works i.e from intake well to RSF
2180.00 HPAs per Sub
Estimate240.00
5
Providing 780 HP each Centrifugal HSC (2 + 1) from Clear
Water sump to Sump at Peddapally with 34833 lpm &
139.55 mts head
2340.00 HPAs per Sub
Estimate257.00
Providing 310 HP each Centrifugal HSC (2 + 1) from Clear
Water sump to Sump at Sump at Sharadanagar(
Ramagundam Urban) 47334 lpm & 40.55 mts head
930.00 HPAs per Sub
Estimate102.00
6Construction of Clear water sump at Murmoor with a
capacity of 12500 KL12500.00 KL
As per Sub
Estimate800.00
7 C/o Pump house at Murmur Head Works 1 no Each As per Sub
Estimate170.00
8 C/o of Staff quarters 10 Nos 10 nos per 9.00 Each 90.00
9 C/O compound wall around the RSFAs per Sub
Estimate 53.00
10 Land aquaction LS 50.00
11 Add Provision for TOT/VAT @ 5% 452.70
12 Add Provision for Labour cess @1% 91.07
13 Add Provision for QC @1% 91.07
14 Provision for tranformer yard 5450.00 HP 9000.00 490.50
15Provision for Price variation, Unforeseen Items and CED on
Pipes517.66
10800
108
Crores
Assistant Engineer Dy Executive Engineer
RWS&S Peddapally RWS&S sub divn Peddapally
Executive Engineer Superintending Engineer
RWS&S divn Manthini RWS&S Karimnagar
GRID -I
GENERAL ABSTRACT
CPWS Scheme : Providing Drinking Water to Peddapalli and Ramagundam constituencies in Karimnagar
District
GRAND TOTAL
![Page 5: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/5.jpg)
RAPID SAND FILTER
The components of the filtration plant are as per SSR 2014-
15
Civil Works
(All works of VRCC Shall be in M30 design mix)
1). Stilling Chamber and Areation cascade
2). Ventury flume channel with measuring device
3) Flash Mixer chamber
4) .Clariflucculator / tube settler & flocculation tanks
5). Filter house, chemical house, Alum store, laboratory
office room chlorination plant room, toilet etc. (All items 6). Wash water tank of suitable capacity
7) .All the doors and windows are of aluminimum make
8) .All pipes and valves in filter beds are of D.I. make &
connection from Flash mixer to Tube settler / Flocculation
tank, sludge disposal pipes are of D.I. make. The size of
sludge disposal pipe shall be minimum of 450 mm dia with
C.I pipe.
9) The bottom level of the clear water control chamber
must be above G.L so as to dispose the leakage water by
gravity.
10) . Clariflucculator bridge including sludge srcapping
arrangement shall be with stainless steel of Grade 304 for
chemical resistance and durability
11) Railing for all the components shall be provided with
Stainless steel of grade 304 for a height of 0.90mts.
12).Path ways in filter beds : Middle pathway: Minimum of
1.50mts, Side pathway: Minimum of 1.20mts.
13).Flooring in filter house shall be with 12mm thick Non-
skid tiles.
14).Back wash water tank shall be constrcuted at a
minimum height of 1.50mts above roof slab.
15).Filtration plant building ground floor level shall be
minimum of 1.20mts above height from the neary by road
crust level.
16). The minimum size of entrance hall shall be 12'x13' ,
Lab size shall be of 10'x15', Office room size shall be of
10'x15'.
Construction of Rapid Gravity Filteration plant including civil, mechanical
and electrical trial running etc. complete-M30 Grade concrete).
A)
CPWS Scheme : Providing Drinking Water to Peddapalli and Ramagundam
constituencies in Karimnagar District
![Page 6: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/6.jpg)
17). The water from the treatment plant shall be tested for
quantity and quality simultaneously.
18). Sufficient head room shall be provided at alum tank.
19). S.S railing of grade 304 shall be provided for staircase.
20). Testing of blowers as per I.S norms.
21).All cables shall be with copper, Cable drains shall be
covered with chequered plate.
22).HDPE/MDPE pipes shall be provided for water
drainage .
23).Alum storage capacity shall be for minimum period of
90 days.
24). Digital water flow meters, pressure gauges shall be
provided of standard make
25).Chemical house and chlorine storage system shall be
constructed out side of plant
26).Pneumatic tyre wheel shall be provided for the bridge
clariflocculator.
27). Min LUX levels inside the treatment plant shall be
maintained.
28). The length of sludge disposal drain shall be minimum
of 30mts.
29).Yard lighting shall be provided as per norms.
30).Chlorimeter vaccum type: Metito/Toshocow-Jesco/
Industrial devices.
B) Mechanical Equipment
1)Alum dosing equipment
2)Flash mixer equipment.
3)Sludge disposal fittings by gravity
4)Filtration plant euqipment instrumentation and piping.
5)Clarifloccualation equipment (with stainless steel blades)
with rotating bridge arrangeemnt etc.,
6)Wash water tank fittings and pumpsets with 100% stand
by.
7)Air blower with motor 100% stand by and pipe
connections.
8) Chlorination equipment and pipe connections with
chlorinator of 100% standbye,Vaccum feed Gas
Chlorination has to provided.
9)Spares & Tools for 2 years
10)Gaseous Chlorination with cylinders has to provided
with protection measures.
C) Electrical Equipment
1)Necessary power supply wiring to motors and switches
bus bar connections as per I.E. Rules
![Page 7: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/7.jpg)
2)Internal wiring and illumination and fittings and fixtures
for internal and external lighting exhaust fans, ceiling fans
etc.
3) Erecting mechanical & Electrical equipment, trial run for
90 days 23.50 hours per day testing the treated water for
efficient standards and maintenance of records and
imparting training to staff.
4)Supply of 6 - sets of completion plans and maintenance
manual and brochures.
5)Provision towards soil investigations.
D) Automation for flow measurements
1)Automated Lab testing equipment of internationally
reputed make and consumables for one year. For filtration
plants of capacity 10 MLD and more automated online
testing equipment shall be installed.
2) Automation for flow of Conductivity, Turbdity,Ph value,
Residual Chlorine with recording & Storage facility
(Computer based) & Alaram by SMS or other methods.
3)Off - Site Supervisory and Data Accusation (OSSADA)
system for Raw water and clear water measuring, recording,
Off-Site Digital Display and data Transmission to Cell
Phone(SMS).
Note : 1) Alam tanks must be bound with corroision resistant
material (HDPE Lining, Bitumen Coating, tiles etc)
2) Mechnical equipment for alam mixing and in floculation
tank must be corrosive resistant (due to Alam)
Capacity: 115.00 MLD
Description Amount
Basic Rate Rs.2.42 per litre *115000000 2783,00,000.00
Increase/Decrese for cement(6200-4000)* 0.7/100*120*2.42*10^6/100 447,21,600.00
Increase/Decrese for Steel(43000-46500)* 2/100*120*2.42*10^6/1000 -203,28,000.00
#REF! 278,30,000.00Sub Total 3305,23,600.00
Add Contractor's Profit 462,73,304.00Unforeseen items 2,03,096.00
Total 3770,00,000.0037.70
Price variationTotal cost 37.70
Asst Engineer Dy Executive Engineer
RWS&S, Peddapally RWS&S sub division : Peddapally
![Page 8: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/8.jpg)
Executive Engineer Superintending Engineer
RWS&S Division Manthani RWS&S Circle Karimnagar
![Page 9: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/9.jpg)
Sl. Description Qty. Rate per Amount
No. (Rs) (Lakhs)
1
Supply and delivery of vertical turbine pump
sets at Intake well including cost of all
accessories and EOT crane etc as per the
specifications including cost of erection etc
complete
a
Providing 1090 HP each VT (1 + 1=2) from Intake
well to RSF with 42.39 m head and 86,445 LPM 2180.00 HP 11000.000 HP 240.00
Total in Lakhs 240.00
Asst Engineer Dy Executive Engineer
RWS Peddapally RWS&S Peddapally
Executive Engineer Superintending Engineer
RWS&S Division ; Manthani RWS&S Circle: Karimnagar
Supply and erection of Pump sets at Intake well
CPWS Scheme : Providing Drinking Water to Peddapalli and Ramagundam
![Page 10: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/10.jpg)
Sl. Description Qty. Rate per Amount
No. (Rs) (Lakhs)
1
Supply and delivery of Centrifugal HSC
pump sets at Intake well including cost of
all accessories and EOT crane etc as per the
specifications including cost of erection etc
complete
b
Providing 780 HP each Centrifugal HSC (2 + 1)
from Clear Water sump to Sump at Peddapally
with 34833 lpm & 139.55 mts head
2340.00 HP 11000.000 HP 257.00
Total in Lakhs 257.00
Asst Engineer Dy Executive Engineer
RWS Peddapally RWS&S Peddapally
Executive Engineer Superintending Engineer
RWS&S Division ; Manthani RWS&S Circle: Karimnagar
Supply and erection of Pump sets at Sump
CPWS Scheme : Providing Drinking Water to Peddapalli and Ramagundam constituencies in
![Page 11: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/11.jpg)
Sl. Description Qty. Rate per Amount
No. (Rs) (Lakhs)
1
Supply and delivery of Centrifugal HSC pump
sets at Intake well including cost of all
accessories and EOT crane etc as per the
specifications including cost of erection etc
complete
b
Providing 310 HP each Centrifugal HSC (2 + 1) from
Clear Water sump to Sump at Sump at
Sharadanagar( Ramagundam Urban) 47334 lpm &
40.55 mts head
930.00 HP 11000.000 HP 102.00
Total in Lakhs 102.00
Asst Engineer Dy Executive Engineer
RWS Peddapally RWS&S Peddapally
Executive Engineer Superintending Engineer
RWS&S Division ; Manthani RWS&S Circle: Karimnagar
CPWS Scheme : Providing Drinking Water to Peddapalli and Ramagundam
Supply and erection of Pump sets at Sump
![Page 12: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/12.jpg)
Centre line Length 65
Center line Width 50
Depth 4 13000
wall thickness 0.35 3
0.2 4.-3
raft slab 0.3
Est cost in Rs crores 8.00
Sl. Description No. Qty. Rate Amount
No. L B D (Rs) (Rs)
1
Sump 1.00 66.70 51.70 3.00 10345.17
Suction pit 2.00 9.20 5.20 1.50 143.52
For manifold 1.00 90.00 3.50 8.00 2520.00
13008.69 cum 95.29 12,39,598
2
Sump 1.00 66.70 51.70 0.30 1034.52 cum 4043.11 41,82,678
3
Raft slab m30
Sump 1.00 65.70 50.70 0.45 1498.95
Addl thick ness in Suction pit2.00 8.00 1.20 0.45 8.64
Retaining wall
between sump and
pump room
2.00 8.00 1.20 0.45
1507.59 cum 8284.40 124,89,479
Side wall in M30/750 mm thick
Retaining wall
between sump and
pump room
2.00 8.00 0.75 3.00 36.00
Suction pit wall 2.00 10.00 0.75 3.00 45.00
81.00 cum 8982.00 7,27,542
Side wall in M30
Below GL 1.00 231.40 0.35 3.00 242.97
Suction pits 2.00 16.05 0.35 3.00 33.71
Abstract cum detailed estimate for 12500 KL Sump
Measurements
Earthwork in excavation for structures as per drawing and technical specifications
Clause 305.1 including setting out, construction of shoring and bracing, removal
of stumps and other deleterious material and disposal upto a lead of 1 km,
dressing of sides and bottom and backfilling in trenches with excavated suitable
material as per Technical Specification 305 MORD / 304 MORTH
Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All
work upto plinth level.
Supply and placing of the Design Mix Concrete corresponding to IS 456 using
WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite
metal (coarse aggregate) from approved quarry including cost and conveyance of
all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
site and including Seigniorage charges, sales & other taxes on all materials
including all operational, incidental and labour charges such as weigh batching,
machine mixing, laying concrete, curing etc.,complete but excluding cost of steel
and its fabrication charges for finished item of work (APSS No. 402)with
minimum cement content as per IS code from standard suppliers approved by
the department including pumping, centering, shuttering, laying concrete,
![Page 13: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/13.jpg)
Retaining wall
between sump and
pump room
2.00 8.00 0.35 4.00 22.40
299.08 cum 10364.77 30,99,895
Below GL 1.00 231.60 0.20 1.00 46.32
46.32 cum 12309.28 5,70,166
Wall at Suction pit 2.00 8.00 0.75 3.00 36.00 Cum 8982.00 3,23,352
partition wall with M30 1.00 50.00 0.30 4.00 60.00 cum 10796.88 6,47,813
Columns in M30
Columns 154.00 0.30 0.30 3.90 54.05
At Suction pits 2.00 0.30 0.30 3.00 0.54
Haunch 154.00 0.60 0.60 0.30 16.63
71.22 cum 9988.24 7,11,362
Roof beams
Long wall side SB1 11.00 65.00 0.30 0.30 64.35
Cross wall side SB2 15.00 50.00 0.30 0.30 67.50
131.85 cum 11586.52 15,27,683
Roof slab
1.00 66.20 51.20 0.125 423.68 cum 9712.28 41,14,899
4
Side wall 1.00 240.00 4.00 960.00
Partition wall 2.00 50.00 4.00 400.00
Bottom slab 1.00 65.00 50.00 3250.00
Suction pit 2.00 23.00 3.00 138.00
4748.00 sqm 198.82 9,44,002
5
567.01 MT 59701.80 338,51,219
6 Supply in and fixing of RCC Ladder
Ladders 4.00 4.00 Nos LS 60,000
7Supplying and fixing
of manholes4.00 4.00 Nos LS 20,000
8
Supplying and Laying
and Jointing of 1800
mm dia MS pipe with
epoxy coated
Manifold
1800 mm dia MS 12
mm thick1.00 50.00 50.00 RM 39266.00 19,63,300
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as
per drawings and technical specifications for Bars below 36 mm dia including
over laps and wastage, where they are not welded
Acco proof Plastering with CM (1:3) 20mm
thick with 2% accoproof material including
cost and conveyance of all material, labour
charges etc., complete
![Page 14: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/14.jpg)
1000 mm dia MS 12
mm thick4.00 10.00 40.00 RM 21174.00 8,46,960
9
Supplying and fixing
of DI Valves on MS
pipe
1000 mm dia valve
on 1800 mm MS pipe
on Out let
1.00 LS 30,00,000
1000 mm dia on 1000
MM dia ms pipe 4.00 LS 70,00,000
10
Supply delivery and
laying and jointing of
spigot and socket
type 1000 mm dia
RCC NP2 class pipes
1.00 100.00 100.00 M 4805.67 4,80,567
4 on out let + 2 on
inlet
11MS pipe 1000 mm dia
8 mm thickness
Over flow 1000 mm dia 4.00 10.00 40.00 Rm 17334.00 6,93,360
12 Supply of ladders
1800 mm LS 25,000
13 Supply and erection of Centrifugal pump set with all accessories etc complete
3.00 3.00 9.00 HP LS 8,00,000
14
Labour charges for
Supplying and fixing
of pheniels with fixing
of anti rust wire to
prevent fly menance
96.00 LS 96,000
15 Supplying and fixing of 80 mm dia Semicircular bends
96.00 96.00 Each 1611.96 1,54,748
16 Sundries LS 4,30,377
Total 800,00,000
8.00
Asst Engineer Dy Executive Engineer
RWS&S Peddapally RWS&S Peddapally
Executive Engineer Superintending Engineer
RWS&S Division Peddapally RWS&S Circle Karimnagar
![Page 15: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/15.jpg)
Est. cost.Rs Crores 3.25
SL No Description of Item Nos Length Qty Unit Rate per Amount Rs.
1 2 3 4 5 6 7 8 9
1
1100 mm Dia MS Pipe of 10 mm wall
Thick1x1 1100 1100 22,494.00 Rm 247,43,400
2
trench size 1.70x2.3 m 1 1100 4301.00 Cum 95.29 Cum 4,09,842
3 Construction of thrust blocks and
pedestals with RCC (1:1.5:3)L S 10,00,000
4 LS provision for valves on pipe line LS 40,00,000
5Provision for Bulkflow Meters and
Pressure Relief Valves and Etc ProvisionsLS 5,00,000
6 Provision for Road crossing LS 5,00,000
7 Provision for Unforseen Items LS 13,46,758
Total cost in Rs 325,00,000
Total cost in Rs crores 3.25
Asst Executive Engineer Dy Executive Engineer
RWS& S Peddapally RWS& S Sub Division Peddapally
Executive Engineer Superintending Engineer
RWS&S Division Manthani RWS&S Circle Karimnagar
SB ESTIMATE
Detailed and Abstract Estimate for Pumping main
CPWS Scheme : Providing Drinking Water to Peddapalli and Ramagundam constituencies in Karimnagar
District
Manufacturing and supply of mm dia (after inlining) using 10 mm thick Mild Steel Plate manufactured with
electric - resistance welding (ERW) or submerged arc welding (SAW) processlongitudinally or spirally welded
from MS plates confirming to IS:2062, Grade-`A'/ 'B' in suitable lengths tosuit the site conditions as directed by
the departmental officers including 10 % Radio graphic testing at factory and 100 % Ultra sonic testing at field
welded joints and Hydraulic testing at 24 Kg/Sq cm pressure at factory including inlining with cement mortar
(1:2) 15mm thick using 4 Nos.of 6mm dia MS rings at each end of the pipe and outcoating with cement mortar
(1:3) prop. 30mm. thick by shotcreting or guniting duly providing wire mesh of size 50x50x3mm including cost
of MS Plates welding rods, cement, sand, reinforcement, wire mesh and all other required materials, and
inclusive of all taxes and duties and delivery of fabricated inlined and outcoated pipes to site and including 10
% Radio graphic testing at factory and 100 % Ultra sonic testing at field welded joints and Hydraulic testing at
24 Kg/Sq cm pressure at factory including inlining with cement mortar (1:2) 15mm thick using 4 Nos.of 6mm
dia MS rings at each end of the pipe and outcoating with cement mortar (1:3) prop. 30mm. thick by
shotcreting or guniting duly providing wire mesh of size 50x50x3mm including cost of MS Plates welding rods,
cement, sand, reinforcement, wire mesh and all other required materials, and inclusive of all taxes and duties
and delivery of fabricated inlined and outcoated pipes to site and hoisting and carefully lowering the pipes into
ready made trenches or keeping in position on ready built pedestals or supports and laying them true to
alignment and gradient and perfect lining by jacking and joinitng with three run arc welding and inlining and
outcoating of field welded joints with wire mesh and cement mortar as per the above specification inclusive of
cost of all jointing materials, labour charges and hydraulic testing of pipeline to a field test pressure of 16 Kg/
Sqcm in convenient stretches and as directed by departmental officers inclusive of cost of the necessary
testing equipment and other incidental and operational charges etc., complete.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1
including setting out, construction of shoring and bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches
with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for pipe line
trenches
![Page 16: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/16.jpg)
Est. cost.Rs Crores 33.00
SL No Description of Item Nos Length Qty Unit Rate per Amount Rs.
1 2 3 4 5 6 7 8 9
1
800 mm Dia MS Pipe of 10 mm wall Thick 1x1 18000 18000 Rm 16,447.00 Rm 2960,46,000
Detailed and Abstract Estimate for Pumping main
CPWS Scheme : Providing Drinking Water to Peddapalli and Ramagundam constituencies in
Karimnagar District
Manufacturing and supply of 800 mm dia (after inlining) using 10 mm thick Mild Steel Plate
manufactured with electric - resistance welding (ERW) or submerged arc welding (SAW)
processlongitudinally or spirally welded from MS plates confirming to IS:2062, Grade-`A'/ 'B' in suitable
lengths tosuit the site conditions as directed by the departmental officers including 10 % Radio graphic
testing at factory and 100 % Ultra sonic testing at field welded joints and Hydraulic testing at 24 Kg/Sq
cm pressure at factory including inlining with cement mortar (1:2) 15mm thick using 4 Nos.of 6mm dia
MS rings at each end of the pipe and outcoating with cement mortar (1:3) prop. 30mm. thick by
shotcreting or guniting duly providing wire mesh of size 50x50x3mm including cost of MS Plates
welding rods, cement, sand, reinforcement, wire mesh and all other required materials, and inclusive of
all taxes and duties and delivery of fabricated inlined and outcoated pipes to site and including 10 %
Radio graphic testing at factory and 100 % Ultra sonic testing at field welded joints and Hydraulic
testing at 24 Kg/Sq cm pressure at factory including inlining with cement mortar (1:2) 15mm thick
using 4 Nos.of 6mm dia MS rings at each end of the pipe and outcoating with cement mortar (1:3)
prop. 30mm. thick by shotcreting or guniting duly providing wire mesh of size 50x50x3mm including
cost of MS Plates welding rods, cement, sand, reinforcement, wire mesh and all other required
materials, and inclusive of all taxes and duties and delivery of fabricated inlined and outcoated pipes to
site and hoisting and carefully lowering the pipes into ready made trenches or keeping in position on
ready built pedestals or supports and laying them true to alignment and gradient and perfect lining by
jacking and joinitng with three run arc welding and inlining and outcoating of field welded joints with
wire mesh and cement mortar as per the above specification inclusive of cost of all jointing materials,
labour charges and hydraulic testing of pipeline to a field test pressure of 16 Kg/ Sqcm in convenient
stretches and as directed by departmental officers inclusive of cost of the necessary testing equipment
and other incidental and operational charges etc., complete.
![Page 17: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/17.jpg)
2
800 mm Dia MS Pipe of 10 mm wall Thick 1x1 130 130 Rm 14,553.00 Rm 18,91,890
3
trench size 1.40x2.0 m 1 18000 50400.00 Cum 95.29 Cum 48,02,616
4Provision for Construction of thrust blocks
and pedestals with RCC (1:1.5:3 )L S 40,00,000
5 LS provision for valves on pipe line LS 200,00,000
6Provision for Bulkflow Meters and Pressure
Relief Valves etcLS 5,00,000
7 Provision for Road crossing LS 10,00,000
8Provision for Unforseen Items, Expansion
joints etc 17,59,494
Total cost in Rs 3300,00,000
Total cost in Rs crores 33.00
Asst Executive Engineer Dy Executive Engineer
RWS& S Peddapally RWS& S Sub Division Peddapally
Executive Engineer Superintending Engineer
RWS&S Division Manthani RWS&S Circle Karimnagar
Manufacturing and supply of 700mm dia (after inlining) Mild Steel Pipes using 10mm thick
MS plate manufactured with electric - resistance welding (ERW) or submerged arc welding
(SAW) process longitudinally or spirally welded follwoing MS plates conforming to IS:2062,
Grade-`A'/ 'B' in suitable lengths to suit the site conditions as directed by the departmental
officers, including 10% Radio graphic testing and 100% Ultra sonic testing at factory and field
welded joints respectively and Hydraulic testing at 30 Kg/Sq cm test pressure at factory,
including inlining with cement mortar (1:2) 15mm thick using 6 numbers of 6mm dia MS rings
at each end of the pipe and outcoating with polyurethene coating of approved brand and
colour for a minimum thickness of 400 microns after surface preparation by sand blasting,
including cost of MS Plates, welding rods, cement, sand, reinforcement, wire mesh,
polyurethene coating and all other required materials, inclusive of all taxes and duties and
delivery of fabricated inlined and outcoated pipes to site and hoisting and carefully lowering
the pipes into ready made trenches or keeping in position on ready built pedestals or
supports and laying them true to alignment and gradient and perfect lining by jacking and
jointing with three run arc welding and inlining and outcoating of field welded joints as per
the above specification, inclusive of cost of all jointing materials, labour charges and
hydraulic testing of pipeline to a field test pressure of 20 Kg/ Sq cm in convenient stretches
and as directed by departmental officers inclusive of cost of the necessary testing equipment
and all other incidental and operational charges etc., complete for the pipeline laid above
ground level.
Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and
backfilling in trenches with excavated suitable material as per Technical Specification 305
MORD / 304 MORTH for pipe line trenches
![Page 18: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/18.jpg)
S.No Description No Length Width Depth Quantity Unit Rate Amount
1
Length 800 M
No of
columns293
Columns 293 0.96 0.90 0.90 227.84
Total 227.84 Cum 95.29 21,711.00
2
PCC M10 / CC(1:4:8)
Columns 293 0.90 0.90 0.15 35.60
Total 35.60 Cum 4043.11 1,43,933.00
3
RCC
(1:1.5:3)
Footing/ Piers 264 0.90 0.90 0.23 49.18
Wedge portion264 1.14 0.08 23.07
Total 72.25 Cum 7850.30 5,67,218.00
COLUMNS
Columns Upto GL293 0.23 0.34 0.29 6.64 Cum 9519.10 63,251.00
Columns Above GL
0-3 m 293 0.23 0.34 1.50 34.37 Cum 9519.10 3,27,161.00
BEAMS
Plingth beams
at GL 1 800.00 0.34 0.30 81.60
81.60 Cum 10045.60 8,19,721.00
4
1 15.59 MT 59701.80 9,30,717.00
5
Compound walls1 800.00 0.23 1.80 331.20
Brick Pillers 293 0.34 0.11 1.80 19.72
Coping 1 800.00 0.34 0.11 29.92
380.84 Sqm 4988.10 18,99,692.00
6
Compoun
d walls1 800.00 2.10 1680.00
Coping bottom 1 800.00 0.11 88.00
Coping top 1 800.00 0.34 272.00
Brick piller offsets586 0.11 1.80 116.03
2156.03 Sqm 270.73 58,369.00
Brick masonry with 2nd class ground mouled well burn bricks
Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5)
TOTAL
Telanagana water grid at Peddapally segmentCompound wall to RSF
Earthwork in excavation for structures as per drawing and technical
Plain Cement concrete Grade M10 - Nominal Mix upto Plinth level
Supply and placing of the VRCC(1:1.5:3) Concrete corresponding to IS 456
Supplying, fitting and placing HYSD bar reinforcement in
![Page 19: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/19.jpg)
7
Qty as per plastering 2156.03 Sqm 97.03 2,09,195.00
8 Main gate with pillers L S 1,20,000.00
9 Unforseen items L S 1,39,032.00
Grand Total 53,00,000.00
Say in crores 0.53
Asst Engineer Dy Executive Engineer
RWS&S Water grid Sircilla RWS&S sub division : Sircilla
Executive Engineer Superintending Engineer
RWS&S Division Karimnagar RWS&S Circle Karimnagar
Painting Walls with Snowcem or other equal and approved
![Page 20: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/20.jpg)
Detailed estimate Cost in Rs lakhs 170.00
Sno Description No L B D Quantity Unit Rate Amount
Center line 41.50 12.50
1
Ramp
(10x5 m)1 25.00 0.60 0.30 4.50
Pump room 1 46.50 17.50 5.00 4068.754073.25 Cum 95.29 3,88,140
2
Ramp 1 25.00 0.60 0.15 2.25Main Buildg 1 42.60 13.60 0.15 86.90Ramp flooring sub grade1 9.70 4.40 0.15 6.40
95.55 Cum 4043.11 3,86,319
3
FootingsRaft slab 1 42.60 13.60 0.45 260.71 Cum 7850.30 20,46,652
ColumnsUp to loading bay level38 0.50 1.20 7.60 173.28For electrical room12 0.45 0.34 6.00 11.02Crane room 12 0.50 1.20 9.00 64.80
249.10 Cum 9519.10 23,71,208
Brace beams/ Lintel beamsAt lintel Level LW3 41.00 0.23 0.30 8.49CW 2 12.00 0.23 0.30 1.66Crane room 2 124.00 0.23 0.30 17.11
27.26 Cum 10045.60 2,73,843Sun shadesover windows 26 2.10 0.60 0.0625 2.05Ventilators 36 2.10 0.60 0.0625 2.84
4.89 Cum 13509.00 66,059
Roof beamsAt loading Bay 2 6.75 0.50 0.50 3.38Electrical Room Long wall side 2 42.50 0.50 0.50 21.25Cross wall side 12 5.50 0.50 0.50 16.50Slab of crane room Long wall side 2 42.50 0.50 0.50 21.25Cross wall side 12 5.50 0.50 0.50 16.50Bracket beams 20 0.50 0.45 0.60 2.70
81.58 Cum 12768.00 10,41,613
Roof slabElectrical room 1 43.30 5.50 0.15 35.72 Cum 9111.60 3,25,466
Crane /Pumps room1 43.30 7.50 0.20 64.95Landing bay slab1 5.50 7.50 0.20 8.25
73.20 Cum 8454.20 6,18,847
Side walls below GL
Name of the work : Constrcution of Pump room at head works
Earthwork in excavation for structures as per
PCC (1:4:8) using 40 mm HBG metal
RCC (1:1.5:3) using 20mm HBG metal
![Page 21: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/21.jpg)
Long wall side 2 42.50 0.50 7.00 297.50Cross wall side 2 13.50 0.50 7.00 94.50Deduct for columns26 0.50 0.50 7.00 45.50
437.50 Cum 9117.78 39,89,029
Walking platformAlround 1 104.40 0.90 0.10 9.40 Cum 6663.30 62,635
Cantiliver
beams
for
walking
platform 20 0.90 0.23 0.23 0.93 Cum 10045.60 9,342
RCC Pedestals for the pumpsPumps 6 2.50 2.50 1.20 45.00 cum 8194.60 3,68,757
4 CC (1:3:6)with 40 mm metal with C&C of all the materials and LC etc completeBasementLong wall side 2 41.95 0.45 0.60 22.65Cross wall side 2 12.05 0.45 0.60 6.51Deduct for columns26 0.50 0.45 0.60 -3.51
25.65 Cum 4453.00 1,14,219.00
5 Construction of super stucture with brick masonary in (1:6) using 2nd class bricks including
cost and conveyance of all materials,labour charges and seign. charges etc. complete.
Upto electrical room topLong wall side 2 41.73 0.23 6.00 115.17Cross wall side 4 12.96 0.23 6.00 71.54
DeductionsDeduct for ventilators13 1.80 0.23 0.45 -2.42Windows 14 1.80 0.23 1.20 -6.96Doors 8 1.05 0.23 2.10 -4.06Rolling shutter 1 4.00 0.23 4.00 -3.68Columns junctions26 0.45 0.23 6.00 -16.15
Crane room TopLong wall side 2 41.87 0.23 3.00 57.77Cross wall side 2 12.27 0.23 3.00 16.93DeductionsVentilators 10 1.80 0.23 0.45 -1.86
226.28 cum 4993.86 11,30,011.00
6
Inside Long wall side 2 41.00 7.00 574.00Cross wall side 2 12.00 7.00 168.00Elelctrical room 11 81.77 6.00 490.62Elelctrical room 21 51.77 6.00 310.62Crane room 1 96.27 9.00 866.43
Out sideUpto Electrical room 1 111.00 6.00 666.00Above Electrical room 1 99.00 9.00 891.00
Plastering with CM 2 coats, 12
![Page 22: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/22.jpg)
SunshadesOver Windows 52 2.10 0.60 65.52
Over ventilators
72 2.10 0.6090.72
Rolling shutter
2 5.30 0.606.36
Sides of the sunshades
126 0.60 0.0625
4.73Deductionswindows -10 1.80 1.20 -21.60Opening/ Rollling shutter-1 4.55 4.00 -18.20ventilator -10 0.90 0.45 -4.05
4090.15 Sqm 270.73 1,10,731.00
7
Electrical room 1 43.30 5.50 238.15Crane /Pumps room1 43.30 7.50 324.75
562.90 sqm 198.82 1,11,916.00
7Electrical room11 30.52 4.77 145.58Electrical room11 20.75 4.77 98.98Crane room 1 41.00 6.89 282.29
526.85 Sqm 178.71 9,416.00
7Rolling
shutter 1 4.00 4.00 2.40 9.60 Sqm 3261.54 31,311.00
8
Doors of 1.20x 2.10 m size8 1.05 2.10 8.00 Nos LS 44,000.00Windows 1.8x1.2 m10 1.80 1.20 10.00 Nos LS 50,000.00Ventilators 1.8mX.45m18 1.80 0.45 18.00 Nos LS 63,000.00
9Rolling shutter 2.25 4.00 2.40 21.60
Windows 27.5 1.801.20 59.40
Ventilator
s
49.5 1.800.45 40.10
121.10 Sqm 85.90 1,040.00
10
181.82 MT 59701.80 10,85,486.00
11Flooring in ramp Slab1 41.00 12.00 492.00Electrical room 1 56.00 7.14 399.56
1 46.00 12.00 552.001443.56 Sqm 457.10 6,59,851.00
11IN side pump room8 1.20 MT 62814.00 75,377.00
12
Qty as per plastering 4617.00 Sqm 97.03 44,798.00
Acco proof Plastering with CM
Plastering to ceiling with CM (1:3)
Supply and fixing of Rolling shutter made of
Supplying and fixing of steel doors and
Painting with approved colour ready mixed
Supplying, fitting and placing HYSD bar
Granolithic flooring with CM (1:3) 20 mm
Supply and Delivery of Steel fabricated ready made
Painting Walls with Snowcem or other equal and
![Page 23: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/23.jpg)
13 Electrical filltings LS 1000000 10,00,000.00
14 LS For Unforeseen items LS 5,20,934.00
Total 170,00,000.00
Asst Engineer Dy Executive Engineer
RWS&S Water grid Sircilla RWS&S sub division : Sircilla
Executive Engineer Superintending Engineer
RWS&S Division Karimnagar RWS&S Circle Karimnagar
![Page 24: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/24.jpg)
![Page 25: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/25.jpg)
Est.Cost Rs 9.00 lakhs
Nos L B D
1
column footings 12.0 1.2 1.2 1.50 25.92
alround 1.0 31.72 0.9 0.60 17.13
long wall 1.0 9.53 0.9 0.60 5.15
cross walls 4.0 2.27 0.9 0.60 4.90
platform 1.0 7 0.6 0.60 2.52
deduction 12.0 1.2 1.2 0.60 -10.37
Total 45.25 95.29 4312.00
2
column footings 12.0 1.2 1.2 0.20 3.46
alround 1.0 31.72 0.9 0.20 5.71
long wall 1.0 9.53 0.9 0.20 1.72
cross walls 4.0 2.27 0.9 0.20 1.63
platform 1.0 7 0.6 0.20 0.84
deduction 12.0 1.2 1.2 0.20 -3.46
Total 9.90 773.65 7659.00
3
column footings 12.0 1.2 1.2 0.30 5.18
alround 1.0 31.72 0.9 0.30 8.56
long wall 1.0 9.53 0.9 0.30 2.57
cross walls 4.0 2.27 0.9 0.30 2.45
platform 1.0 7 0.6 0.15 0.63
deduction 12.0 1.2 1.2 0.30 -5.18
14.21 4043.11 57453.00
4
first footing 1.0 28.96 0.6 0.60 10.43
second footing 1.0 28.96 0.45 0.45 5.86
third footing 1.0 28.96 0.3 0.30 2.61
long wall first footing1.0 8.84 0.6 0.60 3.18
long wall second footing1.0 8.84 0.45 0.45 1.79
long wall third footing1.0 8.84 0.3 0.30 0.80
cross walls first footing4.0 2.04 0.6 0.60 2.94
cross walls second footing4.0 2.04 0.45 0.45 1.65
cross walls third footing4.0 2.04 0.3 0.30 0.73
platform 7.0 0.6 0.6 0.45 1.13
platform 7.0 0.3 0.45 0.30 0.28
31.40 2908.60 91330.00
5
12 0.4305 5.166 7850.30 40555.00
6
Door 1 2.0 2.25 0.23 0.23 0.24
Door 2 4.0 2.1 0.23 0.23 0.44
Door 3 2.0 1.65 0.23 0.23 0.17
Window 1 2.0 2.1 0.23 0.23 0.22
Detailed cum abstract Estimate
Name of the Sub work : Construction of Watch man and Operator Quarter
Sl.NoDescripti
on
DimensionsQty Rate Amount
Earth work excavation in all type of soils
with intial lead and lift etc complete
Filling the Foundation with sand including
cost,conveyance ,watering and ramming etc
CC(1:4:8)using 40 mm HBG metal icluding
Cost and conveyance of the all materials etc
RR Masonary with CM(1:6) using rough stone
(HBG) including cost and conveyance of all
VRCC(1:1.5:3) using 20 mm HBG metal
including cost and conveyance of all the
VRCC(1:1.5:3) using 20 mm HBG metal
including cost and conveyance of all the
![Page 26: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/26.jpg)
Window 2 2.0 1.8 0.23 0.23 0.19
ventilator 2.0 1 0.23 0.23 0.11
1.37 10045.60 13762.00
7
Columns 12.0 0.23 0.23 5.03 3.19 9519.10 30366.00
8
Beams(F) 1.0 27.515 0.23 0.30 1.90
Beams(R) 1.0 27.515 0.23 0.30 1.90
3.80 10045.60 38173.00
9Door 1 2.0 1.05 0.6 0.0625 0.08
Window 1 2.0 1.2 0.6 0.0625 0.09
Window 2 2.0 0.9 0.6 0.0625 0.07
0.24 13509.00 3242.00
10
1.0 9.76 6.56 0.125 8.00 9687.70 7750.00
11
out side 1.0 50.78 0.23 3.15 36.79
inside 2.0 6 0.1 3.15 3.78
inside 2.0 2.5 0.1 3.15 1.58
Deductions
Door 1 2.0 1.05 2 0.23 -0.97
Door 2 4.0 0.9 2 0.10 -0.72
Door 3 2.0 0.75 2 0.10 -0.30
Window 1 2.0 1.2 1.2 0.23 -0.66
Window 2 2.0 0.9 1.2 0.23 -0.50
out side Coulmns10.0 0.23 0.23 3.00 -1.59
Ventilators 2.0 0.6 0.23 0.23 -0.06
37.35 4993.86 186521.00
12Door 1 of 2.00 x 1.05 mts2 LS 10000.00 20000.00
Door 2 of 2.00 x 0.90 mts4 LS 7000.00 28000.00
Door 3 of 2.00 x 0.75 mts2 LS 6000.00 12000.00
13 Window 1 of size 1.20 X 1.20 mts2 LS 6000.00 12000.00
Window 2 of size 0.90 X 1.20 mts2 LS 4000.00 8000.00
14
Hall 2 2.94 2.94 17.29
bed room 2 3.47 2.94 20.40
Kitchen 2 2.44 1.57 7.66
Toilets 2 2.44 1.14 5.56
Platform 1 7.00 0.6 4.20
55.11 457.10 25191.00
15
Inside & out side A/R1 114.64 3.15 361.12
Deductions
Door 1 2 1.05 2 -4.20
Door 2 4 0.90 2 -7.20
Door 3 2 0.75 2 -3.00
VRCC(1:1.5:3) using 20 mm HBG metal
including cost and conveyance of all the
VRCC(1:1.5:3) using 20 mm HBG metal
including cost and conveyance of all the
VRCC(1:1.5:3) using 20 mm HBG metal for
Sun Shades of Size 75 mm thick at one end
VRCC(1:1.5:3) using 20 mm HBG metal
including cost and conveyance of all the
Brick Msaonary with CM(1:6) using Second
Class Bricks including cost and conveyance of
Supply and fixing of the Sal Wood Door With
angular frame CR Sheet including fixtures ,
Supply and fixing of the Sal Wood Windows
of Size 0.9 X 1.20m With angular frame CR
Flooring with CC(1:4:8) using 40mm HBG
metal for 50 mm thick and Top plastering
Plastering with CM 2 coats, 12 mm thick,
![Page 27: Specification Report Accompanying the Abstract Project Report › tgrwss › downloads › Karimnagar_IW › ... · safe during the summer and before rainy season. Necessity of Present](https://reader035.vdocuments.us/reader035/viewer/2022081402/5f19d34e8470e44a5533093b/html5/thumbnails/27.jpg)
Window 1 2 1.20 1.2 -2.88
Window 2 2 0.90 1.2 -2.16
Ventilators 2 0.60 0.23 -0.28
341.40 270.73 92426.00
16
Roof slab 1 9.76 6.56 64.03 136.54 8743.00
17
In side alround 1 82.00 3.15 258.30
Deductions
Door 1 2 1.05 2 -4.20
Door 2 4 0.90 2 -7.20
Door 3 2 0.75 2 -3.00
Window 1 2 1.20 1.2 -2.88
Window 2 2 0.90 1.2 -2.16
Ventilators 2 0.60 0.23 -0.28
Ceiling 1 9.76 6.56 64.03
302.61 24.78 7499.00
18
Outside 1 32.64 3.15 102.82
Deductions
Door 1 2 1.05 2 -4.20
Door 2 4 0.90 2 -7.20
Door 3 2 0.75 2 -3.00
Window 1 2 1.20 1.2 -2.88
Window 2 2 0.90 1.2 -2.16
Ventilators 2 0.60 0.23 -0.28
83.10 97.03 8063.00
19Door 1 2 1.05 2 4.20
Door 2 4 0.90 2 7.20
Door 3 2 0.75 2 3.00
Window 1 2 1.20 1.2 2.88
Window 2 2 0.90 1.2 2.16
19.44 85.90 1670.00
20
1.77 59701.80 105968.00
21 2.00 LS 300.00 600.00
22 88717.00
� 9,00,000
Snowcem painting including cost and
conveyance of all the materials ect complete.
Synthatic Enamel painting over primary coat
and Enamel painting in two caots including
Supply and placing of the HYSD bars,
fabrication including cost and conveyance of
Supply and fixing of the Ready made
Ventilaters of Size 0.9x0.23including csot and Unforeseen items and Electrification etc
Accoproof plastering with CM(1:3),12mm
thick including cost and conveyance of all the
White washing with white cement two coats including