  • Specification

    Painting of Structural Steelwork

    Grenfell Tower

    L01212-SPEC-005

    25th October 2013

    Painting of Structural Steelwork 2013

    (C)curtins

    Artelia_00008549

    ART00008652_ 0001 ART00008652/1

  • 52 Internal Protection (non-decorative) Protective coating system

    Performance Requirements : ISO 12944 S2.16 Environment Category: C1 & C2 1.0 General

    (C}curtins

    All materials, surface preparations, coating systems and application of coatings are to be in accordance with BSEN ISO 12944 Parts 1-8 inclusive -1998 (except part 5 revised 2007) and BCSA NSSS. Materials are to be stored, prepared and applied strictly in accordance with the manufacturer's product data sheets. All paint shall be by the same manufacturer and shall comply with the EPA (Environmental Protection Act) PG6/23 1998 Regulations. Paint thicknesses quoted are NOMINAL OFT as defined in BSEN ISO 12944-5: 2007 Where applicable, the colour of undercoats shall be compatible with the colour of top finishing coat defined by the Architect or Client. Intumescent coatings to be specified by the Architect to required OFT to achieve the period of fire resistance specified (i.e. 30, 60, 90 or 120 minutes). Intumescent coatings and sealer coats must be supplied by the same manufacturer who is supplying the corrosion protection coatings to ensure compatibility of materials. The manufacturer must supply independent certification of fire test assessments for each fire protection system. lt is recommended that intumescent paint systems are applied in-shop prior to delivery to site and erection of steelwork. Intumescent coatings which are to be externally exposed must be sealed using durable sealer coats.

    2.0 Works treatment

    2.1 Preparation Abrasive blast clean to SA2% to BSEN ISO 8501-1:2007, or SSPC-SP6, with a surface profile in the range 50-75 microns.

    2.2 Primer and intermediate coats to be applied in shop.

    3.0 Site treatment

    3.1 Inspect all steelwork and ensure that the works system is intact. Any damage from transit or erection should be repaired by abrading exposed substrate to standard BS EN ISO 8501-1:2007, followed by reapplication of the coatings specification to restore the works applied system.

    3.2 Clean all surfaces to remove dust and other dry contaminants, ensuring surfaces are free from grease and oil and thoroughly dry, before applying each further coating. Agreement shall be reached between the engineer, the paint applicator and the coatings manufacturer's representative regarding the approved standard of surface cleanliness.

    3.3 Bolts to be sheradised- All protruding portions are to be site painted (after cleaning/degreasing) to a specification approved by the Engineer and paint manufacturer to ensure similar anticorrosive properties and compatibility with the surface treatment system used on surrounding areas.

    4.0 Finishing coat. Following repairs to priming/ shop coats and cleaning, apply finishing coats as noted- see protective coating system.

    Painting of Structural Steelwork 2013

    Artelia 00008549

    ART00008652_0002 ART00008652/2

  • 52 Internal Protection (non-decorative) Protective coating system

    (C}curtins

    5.0 Health & safety Health and Safety precautions to be taken in accordance with Health and Safety Executive Regulations and manufacturers recommendations relating to the storage, transportation, preparation and application of the materials. All relevant information will be contained in the relevant product technical and safety data sheets, which shall be made available to all parties, and form part of the COSHH assessment to be prepared before commencement of any works .. lt is the Contractors responsibility to apply the relevant precautionary procedures for the safety of operators and others in the vicinity during painting.

    6.0 1. Works Coatings Following abrasive blast cleaning to SA2Yz. Primer Coating Two pack high solids high build epoxy zinc phosphate primer to 150 microns OFT.

    2. Finishing Coatings Following repair to priming/ shop coats and cleaning. Finishing Coating None required.

    3. Cavity Steelwork Coatings Following repair to priming/ shop coats . A) Cavity steel with 40mm separation from outer leaf. Epoxy I PU to 200 microns OFT or

    Epoxy I Zinc to 60 microns OFT and Epoxy I PU to 140 microns OFT

    B) Cavity Steel in contact with outer leaf. Epoxy I PU to 280 microns OFT or

    Epoxy I Zinc to 60 microns OFT and Epoxy I PU to 180 microns OFT

    Painting of Structural Steelwork 2013

    Total OFT 150 Microns

    Total OFT 350 Microns

    Total OFT 390-430 Microns.

    Artelia 00008549

    ART00008652_0003 ART00008652/3

  • 52 Internal Protection (non-decorative) Protective coating system

    7.0 Approved paint suppliers

    (C}curtins

    The following manufacturers are known to be able to comply with this specification though other companies may be used subject to the approval of Curtins.

    Crosbie Casco Wood Lane Partington Manchester M31 4ND

    Sherwin-Williams Tower Works Kestor Street Bolton BL2 2AL

    International Paint Ltd Stoneygate Lane Felling Gateshead NE10 JY

    PPG Protective & Unit 3 Maisies The Village, South Normanton, DE 55

    Marine Coatings Way Carter Lane Derbyshire 2DS

    8.0 Inspection reports

    Inspection reports on the standard of surface preparation, measurements of Dry Film thickness of each coat in accordance with BSEN ISO 12944 Part 8, EN ISO 19840:2000 are to be provided for all steelwork. The dry film thickness per coating shall be within the limits provided by these standards.

    The condition of paint skin as erected on site must be stated in the inspection report, together with the nature and extent of any remedial works required.

    Painting of Structural Steelwork 2013

    Artelia 00008549

    ART00008652_0004 ART00008652/4

  • 54 Internal Protection (decorative) Protective coating system

    Performance Requirement: ISO 12944 S2.16 Environment Category: C1 and C2

    1.0 General

    CC}curtins

    All materials, surface preparations, coating systems and application of coatings are to be in accordance with BSEN ISO 12944 Parts 1-8 inclusive -1998 (except part 5 revised 2007) and BCSA NSSS. Materials are to be stored, prepared and applied strictly in accordance with the manufacturer's product data sheets. All paint shall be by the same manufacturer and shall comply with the EPA (Environmental Protection Act) PG6/23 1998 Regulations. Paint thicknesses quoted are NOMINAL OFT as defined in BSEN ISO 12944-5: 2007 Where applicable, the colour of undercoats shall be compatible with the colour of top finishing coat defined by the Architect or Client. Intumescent coatings to be specified by the Architect to required OFT to achieve the period of fire resistance specified (i.e. 30, 60, 90 or 120 minutes). Intumescent coatings and sealer coats must be supplied by the same manufacturer who is supplying the corrosion protection coatings to ensure compatibility of materials. The manufacturer must supply independent certification of fire test assessments for each fire protection system. lt is recommended that intumescent paint systems are applied in-shop prior to delivery to site and erection of steelwork. Intumescent coatings which are to be externally exposed must be sealed using durable sealer coats.

    2.0 Works treatment

    2.1 Preparation Abrasive blast clean to SA2Yz to BSEN ISO 8501-1:2007, or SSPC-SP6, with a surface profile in the range 50-75 microns.

    2.2 Primer and intermediate coats to be applied in shop.

    3.0 Site treatment

    3.1 Inspect all steelwork and ensure that the works system is intact. Any damage from transit or erection should be repaired by abrading exposed substrate to standard BS EN ISO 8501-1:2007, followed by reappl ication of the coatings specification to restore the works applied system.

    3.2 Clean all surfaces to remove dust and other dry contaminants, ensuring surfaces are free from grease and oil and thoroughly dry, before applying each further coating. Agreement shall be reached between the engineer, the paint applicator and the coatings manufacturer's representative regarding the approved standard of surface cleanliness.

    3.3 Bolts to be sheradised- All protruding portions are to be site painted (after cleaning/degreasing) to a specification approved by the Engineer and paint manufacturer to ensure similar anticorrosive properties and compatibility with the surface treatment system used on surrounding areas.

    4.0 Finishing coat. Following repairs to priming/ shop coats and cleaning, apply finishing coats as noted- see protective coating system.

    Painting of Structural Steelwork 2013

    Artelia 00008549

    ART00008652_0005 ART00008652/5

  • 54 Internal Protection (decorative) Protective coating system

    5.0 Health & safety

    CC}curtins

    Health and Safety precautions to be taken in accordance with Health and Safety Executive Regulations and manufacturers recommendations relating to the storage, transportation, preparation and application of the materials. All relevant information will be contained in the relevant product technical and safety data sheets, which shall be made available to all parties, and form part of the COSHH assessment to be prepared before commencement of any works .. lt is the Contractors responsibility to apply the relevant precautionary procedures for the safety of operators and others in the vicinity during painting.

    6.0 1. Works Coatings Following abrasive blast cleaning to SA2%. Primer Coating Two pack high solids high build epoxy zinc phosphate primer to 100 microns OFT.

    2. Finishing Coatings Following repair to priming/ shop coats and cleaning. Finishing Coating (Workshop or site applied.) Two pack modified acrylic finish to specified colour to 50 microns OFT.

    3. Cavity Steelwork Coatings Following repair to priming/ shop coats . A) Cavity steel with 40mm separation from outer leaf. Epoxy I PU to 200 microns OFT or

    Epoxy I Zinc to 60 microns OFT and Epoxy I PU to 140 microns OFT

    B) Cavity Steel in contact with outer leaf. Epoxy I PU to 280 microns OFT or

    Epoxy I Zinc to 60 microns OFT and Epoxy I PU to 180 microns OFT

    Painting of Structural Steelwork 2013

    Total OFT 150 Microns

    Total OFT 300 Microns

    Total OFT 340-380 Microns.

    Artelia 00008549

    ART00008652_0006 ART00008652/6

  • 54 Internal Protection (decorative) Protective coating system

    7.0 Approved paint suppliers

    CC}curtins

    The following manufacturers are known to be able to comply with this specification though other companies may be used subject to the approval of Curtins.

    Crosbie Casco Wood Lane Partington Manchester M31 4ND

    Sherwin-Williams Tower Works Kestor Street Bolton BL2 2AL

    International Paint Ltd Stoneygate Lane Felling Gateshead NE10 JY

    PPG Protective & Unit 3 Maisies The Village, South Normanton, DE 55

    Marine Coatings Way Carter Lane Derbyshire 2DS

    8.0 Inspection reports Inspection reports on the standard of surface preparation, measurements of Dry Film thickness of each coat in accordance with BSEN ISO 12944 Part 8, EN ISO 19840:2000 are to be provided for all steelwork. The dry film thickness per coating shall be within the limits provided by these standards.

    The condition of paint skin as erected on site must be stated in the inspection report, together with the nature and extent of any remedial works required.

    Painting of Structural Steelwork 2013

    Artelia 00008549

    ART00008652_0007 ART00008652/7

  • 58 Internal or external protection (non-decorative) Protective coating system

    Performance Requirements : ISO 12944 S4.21 Environment Category: C3 & C4

    1.0 General

    Ccurtins

    All materials, surface preparations, coating systems and application of coatings are to be in accordance with BSEN ISO 12944 Parts 1-8 inclusive- 1998 (except part 5 revised 2007) and BCSA NSSS. Materials are to be stored, prepared and applied strictly in accordance with the manufacturer's product data sheets. All paint shall be by the same manufacturer and shall comply with the EPA (Environmental Protection Act) PG6/23 1998 Regulations. Paint thicknesses quoted are NOMINAL OFT as defined in BSEN ISO 12944-5: 2007 Where applicable, the colour of undercoats shall be compatible with the colour of top finishing coat defined by the Architect or Client. Intumescent coatings to be specified by the Architect to required OFT to achieve the period of fire resistance specified (i.e. 30, 60, 90 or 120 minutes). Intumescent coatings and sealer coats must be supplied by the same manufacturer who is supplying the corrosion protection coatings to ensure compatibility of materials. The manufacturer must supply independent certification of fire test assessments for each fire protection system. lt is recommended that intumescent paint systems are applied in-shop prior to delivery to site and erection of steelwork. Intumescent coatings which are to be externally exposed must be sealed using durable sealer coats.

    2.0 Works treatment

    2.1 Preparation Abrasive blast clean to SA2% to BSEN ISO 8501-1:2007, or SSPC-SP6, with a surface profile in the range 50 - 75 microns.

    2.2 Primer and intermediate coats to be applied in shop.

    3.0 Site treatment

    3.1 Inspect all steelwork and ensure that the works system is intact. Any damage from transit or erection should be repaired by abrading exposed substrate to standard BS EN ISO 8501-1:2007, followed by reapplication of the coatings specification to restore the works applied system.

    3.2 Clean all surfaces to remove dust and other dry contaminants, ensuring surfaces are free from grease and oil and thoroughly dry, before applying each further coating. Agreement shall be reached between the engineer, the paint applicator and the coatings manufacturer's representative regarding the approved standard of surface cleanliness.

    3.3 Bolts to be sheradised- All protruding portions are to be site painted (after cleaning/degreasing) to a specification approved by the Engineer and paint manufacturer to ensure similar anticorrosive properties and compatibility with the surface treatment system used on surrounding areas.

    4.0 Finishing coat. Following repairs to priming/ shop coats and cleaning, apply finishing coats as noted- see protective coating system.

    Painting of Structural Steelwork 2013

    Artelia 00008549

    ART00008652_0008 ART00008652/8

  • 58 Internal or external protection (non-decorative) Protective coating system

    Ccurtins

    5.0 Health & safety Health and Safety precautions to be taken in accordance with Health and Safety Executive Regulations and manufacturers recommendations relating to the storage, transportation, preparation and application of the materials. All relevant information will be contained in the relevant product technical and safety data sheets, which shall be made available to all parties, and form part of the COSHH assessment to be prepared before commencement of any works .. lt is the Contractors responsibility to apply the relevant precautionary procedures for the safety of operators and others in the vicinity during painting.

    6.0 1. Works Coatings Following abrasive blast cleaning to SA2Yz. Primer Coating Two pack high solids high build epoxy zinc phosphate primer to 80 microns DFT.

    2. Finishing Coatings Following repair to priming/ shop coats and cleaning. Finishing Coating (Workshop applied.) Two pack high solids high build epoxy micaceous iron oxide to 170microns DFT.

    3. Cavity Steelwork Coatings Following repair to priming/ shop coats. A) Cavity steel with 40mm separation from outer leaf. No additional coating required

    B) Cavity Steel in contact with outer leaf (on top of Primer Coating) Epoxy I PU to 280 microns DFT or

    Epoxy I Zinc to 60 microns DFT and Epoxy I PU to 180 microns DFT

    Painting of Structural Steelwork 2013

    Total OFT 250 Microns

    Total OFT 250 Microns

    Total OFT 320-360 Microns.

    Artelia 00008549

    ART00008652_0009 ART00008652/9

  • 58 Internal or external protection (non-decorative) Protective coating system

    7.0 Approved paint suppliers

    Ccurtins

    The following manufacturers are known to be able to comply with this specification though other companies may be used subject to the approval of Curtins.

    Crosbie Casco Wood Lane Partington Manchester M31 4ND

    Sherwin-Williams Tower Works Kestor Street Bolton BL2 2AL

    International Paint Ltd Stoneygate Lane Felling Gateshead NE10 JY

    PPG Protective & Unit 3 Maisies The Village, South Normanton, DE 55

    Marine Coatings Way Carter Lane Derbyshire 2DS

    8.0 Inspection reports

    Inspection reports on the standard of surface preparation, measurements of Dry Film thickness of each coat in accordance with BSEN ISO 12944 Part 8, EN ISO 19840:2000 are to be provided for all steelwork. The dry film thickness per coating shall be within the limits provided by these standards.

    The condition of paint skin as erected on site must be stated in the inspection report, together with the nature and extent of any remedial works required.

    Painting of Structural Steelwork 2013

    Artelia 00008549

    ART00008652_001 0 ART00008652/10

  • 510 Internal or external protection (decorative) Protective coating system

    Performance Requirements : ISO 12944 S4.21 Environment Category : C3 & C4

    1.0 General

    Ccurtins

    All materials, surface preparations, coating systems and application of coatings are to be in accordance with BSEN ISO 12944 Parts 1-8 inclusive- 1998 (except part 5 revised 2007) and BCSA NSSS. Materials are to be stored, prepared and applied strictly in accordance with the manufacturer's product data sheets. All paint shall be by the same manufacturer and shall comply with the EPA (Environmental Protection Act) PG6/23 1998 Regulations. Paint thicknesses quoted are NOMINAL OFT as defined in BSEN ISO 12944-5: 2007 Where applicable, the colour of undercoats shall be compatible with the colour of top finishing coat defined by the Architect or Client. Intumescent coatings to be specified by the Architect to required OFT to achieve the period of fire resistance specified (i.e. 30, 60, 90 or 120 minutes). Intumescent coatings and sealer coats must be supplied by the same manufacturer who is supplying the corrosion protection coatings to ensure compatibility of materials. The manufacturer must supply independent certification of fire test assessments for each fire protection system. lt is recommended that intumescent paint systems are applied in-shop prior to delivery to site and erection of steelwork. Intumescent coatings which are to be externally exposed must be sealed using durable sealer coats.

    2.0 Works treatment

    2.1 Preparation Abrasive blast clean to SA2% to BSEN ISO 8501-1 :2007, or SSPC-SP6, with a surface profile in the range 50 - 75 microns.

    2.2 Primer and intermediate coats to be applied in shop.

    3.0 Site treatment

    3.1 Inspect all steelwork and ensure that the works system is intact. Any damage from transit or erection should be repaired by abrading exposed substrate to standard BS EN ISO 8501-1:2007, followed by reapplication of the coatings specification to restore the works applied system.

    3.2 Clean all surfaces to remove dust and other dry contaminants, ensuring surfaces are free from grease and oil and thoroughly dry, before applying each further coating. Agreement shall be reached between the engineer, the paint applicator and the coatings manufacturer's representative regarding the approved standard of surface cleanliness.

    3.3 Bolts to be sheradised- All protruding portions are to be site painted (after cleaning/degreasing) to a specification approved by the Engineer and paint manufacturer to ensure similar anticorrosive properties and compatibility with the surface treatment system used on surrounding areas.

    4.0 Finishing coat. Following repairs to priming/ shop coats and cleaning, apply finishing coats as noted- see protective coating system.

    Painting of Structural Steelwork 2013

    Artelia 00008549

    ART00008652_0011 ART00008652/11

  • 510 Internal or external protection (decorative) Protective coating system

    Ccurtins

    5.0 Health & safety

    6.0

    Health and Safety precautions to be taken in accordance with Health and Safety Executive Regulations and manufacturers recommendations relating to the storage, transportation, preparation and application of the materials. All relevant information will be contained in the relevant product technical and safety data sheets, which shall be made available to all parties, and form part of the COSHH assessment to be prepared before commencement of any works .. lt is the Contractors responsibility to apply the relevant precautionary procedures for the safety of operators and others in the vicinity during painting.

    1. Works Coatings Following abrasive blast cleaning to SA2Yz Primer Coating Two pack high solids high build epoxy zinc rich primer to 80 microns OFT. plus Two pack high solids epoxy micaceous iron oxide to 110 microns OFT. 2. Finishing Coatings Following repair to priming/ shop coats and cleaning. Finishing Coating (Workshop or site applied.) Two pack modified acrylic finish to 50 microns OFT.

    3. Cavity Steelwork Coatings Following repair to primer. A) Cavity steel with 40mm separation from outer leaf. No additional coating required

    Total OFT 240 Microns

    Total OFT 240 Microns

    B) Cavity Steel in contact with outer leaf. (on top of Primer Coating).----------. Epoxy I PU to 280 microns OFT or

    Epoxy I Zinc to 60 microns OFT and Epoxy I PU to 180 microns OFT

    Total OFT 430- 470 Microns.

    Painting of Structural Steelwork 2013

    Artelia 00008549

    ART00008652_0012 ART00008652/12

  • 510 Internal or external protection (decorative) Protective coating system

    7.0 Approved paint suppliers

    Ccurtins

    The following manufacturers are known to be able to comply with this specification though other companies may be used subject to the approval of Curtins.

    Crosbie Casco Wood Lane Partington Manchester M31 4ND

    Sherwin-Williams Tower Works Kestor Street Bolton BL2 2AL

    International Paint Ltd Stoneygate Lane Felling Gateshead NE10 JY

    PPG Protective & Unit 3 Maisies The Village, South Normanton, DE 55

    Marine Coatings Way Carter Lane Derbyshire 2DS

    8.0 Inspection reports

    Inspection reports on the standard of surface preparation, measurements of Dry Film thickness of each coat in accordance with BSEN ISO 12944 Part 8, EN ISO 19840:2000 are to be provided for all steelwork. The dry film thickness per coating shall be within the limits provided by these standards.

    The condition of paint skin as erected on site must be stated in the inspection report, together with the nature and extent of any remedial works required.

    Painting of Structural Steelwork 2013

    Artelia 00008549

    ART00008652_0013 ART00008652/13

  • 511 Internal or external protection (non- Ccurtins decorative) Protective coating system

    PROTECTION OF INTERNAL OR EXTERNAL STEEL IN AGGRESSIVE AND COASTAL ENVIRONMENT (NON-DECORATIVE)

    Performance Requirement/Environment Category: ISO 12944 CS-1 & CS-M

    1.0 General All materials, surface preparations, coating systems and application of coatings are to be in accordance with BSEN ISO 12944 Parts 1-8 inclusive -1998 (except part 5 revised 2007) and BCSA NSSS. Materials are to be stored, prepared and applied strictly in accordance with the manufacturer's product data sheets. All paint shall be by the same manufacturer and shall comply with the EPA (Environmental Protection Act) PG6/23 1998 Regulations. Paint thicknesses quoted are NOMINAL OFT as defined in BSEN ISO 12944-5: 2007 Where applicable, the colour of undercoats shall be compatible with the colour of top finishing coat defined by the Architect or Client. Intumescent coatings to be specified by the Architect to required OFT to achieve the period of fire resistance specified (i.e. 30, 60, 90 or 120 minutes). Intumescent coatings and sealer coats must be supplied by the same manufacturer who is supplying the corrosion protection coatings to ensure compatibility of materials. The manufacturer must supply independent certification of fire test assessments for each fire protection system. lt is recommended that intumescent paint systems are applied in-shop prior to delivery to site and erection of steelwork. Intumescent coatings which are to be externally exposed must be sealed using durable sealer coats.

    2.0 Works treatment

    2.1 Preparation Abrasive blast clean to SA2% to BSEN ISO 8501-1 :2007, or SSPC-SP6, with a surface profile in the range 50 - 75 microns.

    2.2 Primer and intermediate coats to be applied in shop.

    3.0 Site treatment

    3.1 Inspect all steelwork and ensure that the works system is intact. Any damage from transit or erection should be repaired by abrading exposed substrate to standard BS EN ISO 8501-1:2007, followed by reapplication of the coatings specification to restore the works applied system.

    3.2 Clean all surfaces to remove dust and other dry contaminants, ensuring surfaces are free from grease and oil and thoroughly dry, before applying each further coating. Agreement shall be reached between the engineer, the paint applicator and the coatings manufacturer's representative regarding the approved standard of surface cleanliness.

    3.3 Bolts to be sheradised- All protruding portions are to be site painted (after cleaning/degreasing) to a specification approved by the Engineer and paint manufacturer to ensure similar anticorrosive properties and compatibility with the surface treatment system used on surrounding areas.

    4.0 Finishing coat. Following repairs to priming/ shop coats and cleaning, apply finishing coats as noted- see protective coating system.

    Painting of Structural Steelwork 2013

    Artelia 00008549

    ART00008652_0014 ART00008652/14

  • 511 Internal or external protection (non- Ccurtins decorative) Protective coating system

    5.0 Health & safety Health and Safety precautions to be taken in accordance with Health and Safety Executive Regulations and manufacturers recommendations relating to the storage, transportation, preparation and application of the materials. All relevant information will be contained in the relevant product technical and safety data sheets, which shall be made available to all parties, and form part of the COSHH assessment to be prepared before commencement of any works . . lt is the Contractors responsibility to apply the relevant precautionary procedures for the safety of operators and others in the vicinity during painting.

    6.0 1. Works Coatings Following abrasive blast cleaning to SA2%. Primer Coating Two pack high solids high build epoxy zinc rich primer to 80 microns OFT. plus Two pack high solids epoxy micaceous iron oxide to 120 microns OFT.

    2. Finishing Coatings Following repair to priming/ shop coats and cleaning. Finishing Coating (Workshop or site applied.) Two pack high solids high build epoxy micaceous iron Oxide to 120 microns OFT.

    7.0 Approved paint suppliers

    Total DFT 320 Microns

    The following manufacturers are known to be able to comply with this specification though other companies may be used subject to the approval of Curtins.

    Crosbie Casco Wood Lane Partington Manchester M31 4ND

    Sherwin-Williams Tower Works Kestor Street Bolton BL2 2AL

    International Paint Ltd Stoneygate Lane Felling Gateshead NE10 JY

    PPG Protective & Unit 3 Maisies The Village, South Normanton, DE 55

    Marine Coatings Way Carter Lane Derbyshire 2DS

    8.0 Inspection reports

    Inspection reports on the standard of surface preparation, measurements of Dry Film thickness of each coat in accordance with BSEN ISO 12944 Part 8, EN ISO 19840:2000 are to be provided for all steelwork. The dry film thickness per coating shall be within the limits provided by these standards.

    The condition of paint skin as erected on site must be stated in the inspection report, together with the nature and extent of any remedial works required.

    Painting of Structural Steelwork 2013

    Artelia 00008549

    ART00008652_0015 ART00008652/15

  • 512 Internal or External Protection (decorative) Protective coating system

    (Ccurtins

    PROTECTION OF INTERNAL OR EXTERNAL STEEL IN AGGRESSIVE AND COASTAL ENVIRONMENT (DECORATIVE)

    Performance Requirements/Environment Category: ISO 12944 CS-1 & CS-M

    1.0 General All materials, surface preparations, coating systems and application of coatings are to be in accordance with BSEN ISO 12944 Parts 1-8 inclusive- 1998 (except part 5 revised 2007) and BCSA NSSS. Materials are to be stored, prepared and applied strictly in accordance with the manufacturer's product data sheets. All paint shall be by the same manufacturer and shall comply with the EPA (Environmental Protection Act) PG6/23 1998 Regulations. Paint thicknesses quoted are NOMINAL OFT as defined in BSEN ISO 12944-5: 2007 Where applicable, the colour of undercoats shall be compatible with the colour of top finishing coat defined by the Architect or Client. Intumescent coatings to be specified by the Architect to required OFT to achieve the period of fire resistance specified (i.e. 30, 60, 90 or 120 minutes). Intumescent coatings and sealer coats must be supplied by the same manufacturer who is supplying the corrosion protection coatings to ensure compatibility of materials. The manufacturer must supply independent certification of fire test assessments for each fire protection system. lt is recommended that intumescent paint systems are applied in-shop prior to delivery to site and erection of steelwork. Intumescent coatings which are to be externally exposed must be sealed using durable sealer coats.

    2.0 Works treatment

    2.1 Preparation Abrasive blast clean to SA2% to BSEN ISO 8501-1 :2007, or SSPC-SP6, with a surface profile in the range 50 - 75 microns.

    2.2 Primer and intermediate coats to be applied in shop.

    3.0 Site treatment

    3.1 Inspect all steelwork and ensure that the works system is intact. Any damage from transit or erection should be repaired by abrading exposed substrate to standard BS EN ISO 8501-1:2007, followed by reapplication of the coatings specification to restore the works applied system.

    3.2 Clean all surfaces to remove dust and other dry contaminants, ensuring surfaces are free from grease and oil and thoroughly dry, before applying each further coating. Agreement shall be reached between the engineer, the paint applicator and the coatings manufacturer's representative regarding the approved standard of surface cleanliness.

    3.3 Bolts to be sheradised- All protruding portions are to be site painted (after cleaning/degreasing) to a specification approved by the Engineer and paint manufacturer to ensure similar anticorrosive properties and compatibility with the surface treatment system used on surrounding areas.

    4.0 Finishing coat. Following repairs to priming/ shop coats and cleaning, apply finishing coats as noted- see

    protective coating system.

    Painting of Structural Steelwork 2013

    Artelia 00008549

    ART00008652_0016 ART00008652/16

  • 512 Internal or External Protection (decorative) Protective coating system

    (Ccurtins

    5.0 Health & safety Health and Safety precautions to be taken in accordance with Health and Safety Executive Regulations and manufacturers recommendations relating to the storage, transportation, preparation and application of the materials. All relevant information will be contained in the relevant product technical and safety data sheets, which shall be made available to all parties, and form part of the COSHH assessment to be prepared before commencement of any works. lt is the Contractors responsibility to apply the relevant precautionary procedures for the safety of operators and others in the vicinity during painting.

    6.0 I Following abrasive blast cleaning to SA2% Primer Coating Two pack high solids high build epoxy zinc rich primer to 80 microns OFT. plus Two pack high solids epoxy micaceous iron oxide to 165 microns OFT 2. Finishing Coatings Following repair to priming/ shop coats and cleaning . Finishing Coating Apply one coat of two pack modified acrylic finish to 75 Microns OFT.

    7.0 Approved paint suppliers

    Total OFT 320 Microns

    The following manufacturers are known to be able to comply with this specification though other companies may be used subject to the approval of Curtins.

    Crosbie Casco Wood Lane Partington Manchester M31 4ND

    Sherwin-Williams Tower Works Kestor Street Bolton BL2 2AL

    International Paint Ltd Stoneygate Lane Felling Gateshead NE10 JY

    PPG Protective & Unit 3 Maisies The Village, South Normanton, DE 55

    Marine Coatings Way Carter Lane Derbyshire 2DS

    8.0 Inspection reports

    Inspection reports on the standard of surface preparation, measurements of Dry Film thickness of each coat in accordance with BSEN ISO 12944 Part 8, EN ISO 19840:2000 are to be provided for all steelwork. The dry film thickness per coating shall be within the limits provided by these standards.

    The condition of paint skin as erected on site must be stated in the inspection report, together with the nature and extent of any remedial works required .