spe workshop for unconventional field development › binaries › content › assets › spe-events...

4
SPE Workshop: Life Cycle Asset Management for Unconventional Field Development SPE WORKSHOP Greg Owen GPO & Associates Eric Diggins Frontier Project Solutions George Brindle Ausenco Mark Conacher Suncor Energy Kyle Klam Peyto Exploration Brad Lamson Seven Generations Mirko Zatka Canadian Natural Resources Ltd. The lifecycle of an unconventional development, from reservoir characterization, through asset design, installation, optimization, and infill development to retirement will be discussed. The targeted outcome is to identify significant cost drivers that risk competitiveness, and identify opportunities for improvement through implementation of industry best practices using a continuous improvement approach. Topics will include asset development strategies; component optimization including KPI’s such as production, cash flow, Opex, NPV, IRR, $/bbl; integrated planning and execution concepts; technology integration; and consideration for wind-down and abandonment. PROGRAM COMMITTEE MEMBERS 15 June 2017 | BMO Centre at Stampede Park | Calgary, Alberta, Canada Co-Chairpersons THANK YOU TO OUR SPONSORS Notepads and Pens Networking Reception Lunch Integrated Planning Program Plan Execution Continuous Improvement Lessons Learned Reservoir Development FAC OPS Wells

Upload: others

Post on 25-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SPE WORKSHOP for Unconventional Field Development › binaries › content › assets › spe-events › 2017 › ... · 2017-06-07 · for Unconventional Field Development SPE Workshop:

SPE Workshop: Life Cycle Asset Management for Unconventional Field Development

SPE Workshop: Life Cycle Asset Management for Unconventional Field Development

SPE WORKSHOP

Greg Owen

GPO & Associates

Eric Diggins

Frontier Project Solutions

George Brindle Ausenco

Mark Conacher Suncor Energy

Kyle Klam

Peyto Exploration

Brad Lamson Seven Generations

Mirko Zatka

Canadian Natural Resources Ltd.

The lifecycle of an unconventional development, from reservoir characterization, through asset design, installation, optimization, and infill development to retirement will be discussed. The targeted outcome is to identify significant cost drivers that risk competitiveness, and identify opportunities for improvement through implementation of industry best practices using a continuous improvement approach. 

Topics will include asset development strategies; component optimization including KPI’s such as production, cash flow, Opex, NPV, IRR, $/bbl; integrated planning and execution concepts; technology integration; and consideration for wind-down and abandonment.

PROGRAM COMMITTEE MEMBERS

15 June 2017 | BMO Centre at Stampede Park | Calgary, Alberta, Canada

Co-Chairpersons

THANK YOU TO OUR SPONSORS

Notepads and Pens Networking ReceptionLunch

Integrated Planning

Program Plan Execution

ContinuousImprovement

LessonsLearned

Reservoir Development

FAC

OPS Wells

Page 2: SPE WORKSHOP for Unconventional Field Development › binaries › content › assets › spe-events › 2017 › ... · 2017-06-07 · for Unconventional Field Development SPE Workshop:

SPE Workshop: Life Cycle Asset Management for Unconventional Field Development

GENERAL INFORMATION

AccessibilityOur events and functions are accessible to all attendees with wheelchairs. If you require special arrangements, please contact our staff at the registration desk.

Alcohol PolicySPE recognizes the legitimate serving of alcoholic beverages in the process of conducting business and social activities. We also recognize that the use and consumption of alcohol carries with it the requirement for all attendees to consume those beverages responsibly.

CommercialismIn remaining consistent with workshop objectives and SPE guidelines, commercialism in presentations will not be permitted. Company logos should be used only to indicate the affiliation of the presenter(s).

Continuing Education UnitsAttendees will receive 1.0 CEUs. One CEU equals 10 contact hours of participation. CEUs will be awarded through SPE Professional Development for participation and completion of SPE workshop. A permanent record of a participant’s involvement and awarding of CEUs will be maintained by SPE.

DocumentationFollowing the workshop a URL containing released copies of the workshop presentations will be available to all attendees.

Electronic DevicesAs a courtesy to the speakers and your fellow registrants, please turn off all electronic devices during presentations.

Name BadgesPlease wear your badge at all times. It is a courtesy to your fellow registrants, speakers and sponsors.

Photography and Recording PolicySPE reserves the exclusive rights to all video/audio recording or reproductions of the workshop. Unauthorized video/audio recording is expressly prohibited in the session room(s) or poster area, whether by video, still or digital camera, mobile phone, or any other means or form of reproduction. Any person attending may be photographed or videotaped, and by your attendance, you give permission to use your image in possible future marketing publications including print, online, and video.

Workshop FormatWorkshops maximize the exchange of ideas among attendees and presenters through brief technical presentations followed by extended Q&A periods. Focused topics attract an informed audience eager to discuss issues critical to advancing both technology and best practices. Many of the presentations are in the form of case studies, highlighting engineering achievements and lessons learned. In order to stimulate frank discussion, no proceedings are published and members of the press are not invited to attend.

One application. Multiple solutions. Unlimited value.

Quickly generate field development scenarios and schedules for integration into long-range planning and budget

FIELD DEVELOPMENT PLANNING

Create better forecasts using traditional decline analysis methods to accurately estimate early-time production and reserves

UNCONVENTIONAL DECLINE METHODS & TYPE-WELLS

A clear view of well to corporate level capital actuals and forecast in one system

CAPITAL MANAGEMENT

www.entero.com

Page 3: SPE WORKSHOP for Unconventional Field Development › binaries › content › assets › spe-events › 2017 › ... · 2017-06-07 · for Unconventional Field Development SPE Workshop:

SPE Workshop: Life Cycle Asset Management for Unconventional Field Development

TECHNICAL AGENDA THURSDAY, 15 JUNEAll technical sessions are located in Palomino’s A-C.

0700-0800 | Registration Palomino Entrance

Breakfast Palomino D

0800-0815 | Opening Remarks

0815-0945 | Session 1: Development PlanningSession Chairs: Mark Conacher, Suncor Energy

Eric Diggins, Frontier Project SolutionsThis session discusses several elements to efficient and effective development strategies that focus on maximizing value by employing emerging best practices for unconventional assets. Examples of key enablers to achieving optimum development strategy selection will be presented.

 n  Presentation 1: Urban Planning Approach to Oil Field Development Mike Taillon, Cenovus

 n  Presentation 2: AER’s Single Decision Approach Impacts on Full Field DevelopmentMichael Hallett, Suncor Energy

 n  Presentation 3: Optimized Approach for Minimizing Oil and Gas Asset Remediation and Reclamation Liability CostNana Yaw Amponsah, Athabasca University

0945-1015 | Coffee Break Palomino Foyer

1015-1145 | Session 2: EconomicsSession Chairs: Greg Owen, GPO & Associates

George Brindle, AusencoThis session will present an economic outlook on the competitive-ness of the Unconventional Plays in Canada to attract capital as well as provide an understanding of the difference and similarities in eco-nomic drivers for different unconventional plays in Western Canada.

 n  Presentation 1: Economic Review of Unconventional Plays in CanadaGreg Owen, GPO & Associates

15 June 2017 BMO Centre at Stampede Park | Calgary, Alberta, Canada

Page 4: SPE WORKSHOP for Unconventional Field Development › binaries › content › assets › spe-events › 2017 › ... · 2017-06-07 · for Unconventional Field Development SPE Workshop:

SPE Workshop: Life Cycle Asset Management for Unconventional Field Development

 n  Presentation 2: Forecasting is Hard, How Can We Be Less Wrong?Tyler Schlosser, GLJ Petroleum Consultant

 n  Presentation 3: Effective Long Term Planning in Industrial Property TaxesSalvador Hernandez, Verus Energy

1145-1300 | Networking Lunch Sponsored by: Palomino D

1300-1430 | Session 3: Execution ExcellenceSession Chairs: Eric Diggins, Frontier Project Solutions

Kyle Klam, Peyto ExplorationExecution excellence is the achievement of deliverables which surpass expectations with consistency and reliability. Key to attaining this is the development and implementation of best practices.  In this session examples of industry best practices, their implementation, and the results attained in the cost effective monetization of assets will be presented.

 n  Presentation 1: It is Possible to Get Reliable and Accurate Real Time Pressure and Temperature in a 240°C Environment. Now what??John Graham, Suncor Ivan Mombourquette, Promore

 n  Presentation 2: Achieving Execution Excellence Through Surface / Subsurface CollaborationPeter Dimmell, Go Productivity

 n  Presentation 3: Thermal Wellpad Design Driven By The Business CaseGeorge Brindle, Ausenco Engineering, and Eric Diggins, Frontier Project Solutions

1430-1500 | Coffee Break Palomino Foyer

1500-1630 | Session 4: Continuous ImprovementsSession Chairs: George Brindle, Ausenco

Brad Lamson, Seven GenerationsThis session presents examples of actions implemented to provide feedback into the execution phase using a consistent and reliable methods of measurement. The presentations demonstrate how conducting periodic reviews and the adoption of best practices have resulted in optimization and cost efficiency whilst aiding in an improved understanding the asset.

  n  Presentation 1: Driving to the Left - Improving CSU through Planning Best Practices Kevin Hashem, Sancon Commissioning

 n  Presentation 2: Full Cycle Multi Disciplined Continuous Improvement ReviewElizabeth Chmelyk, Seven Generations

 n  Presentation 3: Making our Seniors Work: Continuous Improvement in Surveillance of a Mature Sour Gas FieldMaxime Chin and Jean-Philippe Rioux, Shell Canada

1630-1800 | Networking Reception Sponsored by: Palomino Foyer

On Behalf of all the speakers and committee members of the SPE Workshop: Life Cycle Asset Management for Unconventional Field Development and in lieu of speaker/committee gifts, SPE Canada has made a donation to Calgary Food Bank. The Calgary Food Bank is a charitable, non-profit organization dedicated to gathering and distributing quality emergency food to those in need. www.calgaryfoodbank.com

What Do You Think? Please take a quick survey to provide your thoughts and feedback on the workshop. Your input will help shape future SPE events. www.spe.org/go/SPEaca417.