spe 145562
TRANSCRIPT
SPE 145562
Life Without Barite: Ten Years of
Drilling Deep HPHT Gas Wells With
Cesium Formate Brine
John Downs
Cabot Specialty Fluids
2011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
Cesium formate brine : Drill-in, completion,
workover and suspension fluid for HPHT gas wells
• Density up to 19.2 ppg/SG 2.3
• Drill-in and completion fluid
• Non-toxic, non-hazardous – safe to handle
• Little or no risk to the environment
• Compatible with all reservoirs
• Extends the thermal stability of polymers
• Less corrosive than bromide brines
• Stabilises shales
• Inhibits hydrates
22011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
Cesium formate brine produced by Cabot in
Canada from pollucite ore
Pollucite ore
Cs0.7Na0.2Rb0.04Al0.9Si2.1O6·(H20)
• Mined at Bernic Lake, Manitoba
• Processed on site to Cs formate brine
• Cs formate brine production 8,000 bbl p.a. of 19.2 ppg
• Brine stocks > 30,000 bbl @ 19.2 ppg
• Brine supplied on leasing terms (i.e. per bbl per day)
• Currently manage 30-40 jobs per year
32011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
Leasing cesium formate brine
Green and sustainable model – recognised by United Nations
2011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
Conservation ( i.e. minimisation of cesium formate brine losses during
transport, use and reclamation) is a key and essential feature of Cabot’s
Chemical Leasing business model
4
42 deep HPHT gas fields developed using potassium
and cesium formate brines, 1995-2011
Country Fields Reservoir Description
Matrix
type
Depth, TVD
(metres)
Permeability
(mD)
Temperature
(oC)
Germany (7) Walsrode,Sohlingen
Voelkersen,I dsingen,
Kalle, Weissenmoor,
Simonswolde
Sandstone 4,450-6,500 0.1-150 150-165
Hungary (2) Mako , Vetyem Sandstone 5,692 - 235
Kazakhstan (1) Kashagan Carbonate 4,595-5,088 - 100
Norway (10) Huldra ,Njord
Kristin,Kvitebjoern
Tune, Valemon
Victoria, Morvin,
Vega, Asgard
Sandstone 4,090-7,380 50-1,000 121-200
Pakistan (2) Miano, Sawan Sandstone 3,400 10-5,000 175
Saudi Arabia (7) Andar,Shedgum
Uthmaniyah
Hawiyah,Haradh
Tinat, Midrikah
Sandstone
and
carbonate
3,963-4,572 0.1-40 132-154
UK (12) Braemar,Devenick
Dunbar,Elgin
Franklin,Glenelg
Judy, Jura, Kessog
Rhum, Shearwater
West Franklin
Sandstone 4,500-7,353 0.01-1,000 123-207
USA (1) High Island Sandstone 4,833 - 177
52011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
6
Conventional formate drilling fluid formulation -
in field use since 1993 and good to 320oF
Component Function Concentration
Formate brine
Density
Lubricity
Polymer protection
Biocide
1 bbl
XanthanViscosity
Fluid loss control0.75 - 1 ppb
Ultralow vis PAC and modified
starchFluid loss control 3 or 4 ppb of each
Sized calcium carbonate Filter cake agent 20 ppb
K2CO3/KHCO3
Buffer
Acid gas corrosion control0 – 6 ppb
Simple, effective, non-damaging reservoir drill-in fluid
Used to drill entire wells, top to bottom, in sensitive environments (e.g. Barents Sea)
7
Formate-based drilling fluids
Cesium formate brine
Where does it provide the highest value ?
As a combined drill-in and completion fluid - enabling operators to construct high-angle open hole screen completions in HPHT tight gas reservoirs
• Combined drilling and completion fluid (“one filtrate”)
• Non-damaging to reservoir and screens
• Cleans-up naturally during start-up (10-20 hours)
• Low skins
• No well stimulation required
Perhaps the only fluid that can do this in an HPHT environment
8
Advantages of open hole screen completions in
high-angle HPHT wells*
Improved economics and lower risk
• Maximise reservoir contact and production- Larger inflow areas in contact with reserves
- Allow higher flow rates with lower flow resistance
- Good results (low skins) with stand-alone screens
• Lower cost- Quicker and easier to install, less NPT
- 10% lower tangibles cost
• More robust than cased holes- Less affected by formation compaction over time
• Lower HSE risk than cased holes - No explosives , no live well work, fewer lifts, etc
* From “HPHT Wells Best Practices Course” by Think Well Ltd
92011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
Cesium formate brine used by BP and Statoil as
combined HPHT drill-in and completion fluid in N. Sea
28 high-angle development* wells drilled and completed in 6 HPHT offshore gas fields
• Huldra (6 )
• Devenick (1)
• Kvitebjoern (8 O/B and 5 MPD)
• Valemon (1)
• Kristin (2)
• Vega (5)
* Except Devenick and Valemon (appraisal wells)
Mostly open hole stand-alone sand screen completions
Also Tune field : drilled with 13.3 ppg K formate brine , completed in K/Cs formate brine and
suspended in K/Cs formate brine for 6-12 months
102011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
Tune field – semi-HP/HT gas reservoir in the North
Sea drilled and completed with formate brines
11
4 wells : 1,100-2,950 ft (350-900 m) horizontal reservoir sections. Suspended for 6-12
months in K/Cs formate brine after completion
2011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
HPHT gas fields in northern North Sea drilled
and completed with cesium formate brine
Almost every field development (oil and gas) on this map has used formate brines as well
construction fluids . Zinc bromide brine no longer used in Europe – too hazardous and damaging
122011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
HPHT gas fields in the Norwegian Sea drilled
and completed with cesium formate brine
Formate brines also used as well construction fluids in Asgard, Draugen, Morvin and Njord fields
132011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
• Offshore Norway
• Gas condensate field
• 6 wells
• BHST: 297oF (147oC)
• TVD : 12,795 ft (3,900 m)
• Fluid density: 15.76- 16.34 ppg (SG1.89-1.96)
• 754-1,125 ft (230-343 m) x 81/2” reservoir sections
• Hole angle : 45-55o
• 1–2 Darcy sandstone
• Open hole completions, 6 5/8” wire wrapped screens
Cesium formate brine first used as a combined
drill-in and completion fluid in the Huldra field,
2001
142011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
Huldra – drill-in, logging and completion times
(days) with cesium formate brine in well
A-4
(189 m )
A-5
(263 m)
A-6
(344 m)
A-8
(257 m)
A-9
(230 m)
A-11
(336 m)
Average
(231 m)
Drill-in 5 8 20 15 7 11 11
Logging 0 3 1 7 3 2 2.7
Lower
completion 11 6 5 6 5 5 6.3
Upper
completion 4 5 4 4 9 4 5
Total 20 22 30 32 24 22 25
152011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
Drill, log and run lower completion in drilling fluid. Then displace to clean cesium
formate brine and run upper completion. Finally displace to packer fluid
Huldra – Fluid losses while drilling (cubic metres)
A-4
(189 m )
A-5
(263 m)
A-6
(344 m)
A-8
(257 m)
A-9
(230 m)
A-11
(336 m)
Average
(231 m)
With cuttings 2.6 16.4 48 9.6 23.8 17.7 19.7
Other surface 1.5 3.3 10.1 2.2 12 17.1 7.7
Downhole 7.6 10.8 46.4 0 0 0 10.8
Well
displacements 5.6 28.3 12.8 24.3 11 15.7 16.3
Tripping 6.5 7.2 6.3 3.6 1.6 2.8 4.7
TOTAL 23.8 66 123.6 39.7 48.4 53.3 59.1
162011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
Huldra – Production of recoverable gas and
condensate reserves since 2001 (NPD data)
17
0.00
20.00
40.00
60.00
80.00
100.00
120.00
0 2 4 6 8 10
Reco
very
of
Reserv
es (
% o
f o
rig
inal
esti
mate
)
Time since start-up (years)
Gas
Condensate
Plateau production from first 3 wells
- 10 MM m3 gas /day
- 30,000 bbl/day condensate
80% of hydrocarbon reserves produced
by Year 6
2011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
Gas production from Tune and Huldra fields drilled
and completed with K/Cs formate brine
90% recovery of gas reserves (16-18 billion m3) produced in 7 to 8 years
0
10
20
30
40
50
60
70
80
90
100
0 5 10 15
Rec
ove
ry o
f G
as
Res
erv
es
(%
)
Time since start-up (years)
Huldra
Tune
Source : Norwegian Petroleum Directorate- Fact Pages - November 2009
182011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
Condensate production from Tune and Huldra fields
drilled and completed with K/Cs formate brine
90% recovery of condensate reserves (3-5 million m3) produced in 5 to 7
years
Source : Norwegian Petroleum Directorate- Fact Pages - November 2009
192011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
0
20
40
60
80
100
120
0 5 10
Rec
ove
ry o
f C
on
de
nsa
te R
es
erv
es
(%
)
Time since start-up (years)
Huldra
Tune
• Offshore Norway, 190 m water depth
• Gas condensate field, 775 bar
• 13 wells to date – 8 O/B, 5 in MPD
• BHST: 311oF (155oC)
• TVD : 13,120 ft (4,000 m)
• Fluid density: 16.8 ppg (SG 2.02) for O/B
• 914 -1,910 ft (279-583 m) x 81/2” reservoir sections
• Hole angle : 20-40o
• 100 mD sandstone, long interbedded shale and coal sequences
• 6 wells completed in open hole : 300-micron single wire-wrapped
screens. Remainder cased
Seven years of cesium formate brine use as
combined drill-in and completion fluid in Kvitebjoern
field, 2004 -present
202011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
A few of the highlights from Kvitebjoern
Kvitebjoern
well
Completion
time
(days)
A-4 17.5
A-5 17.8
A-15 14.8
A-10 15.9
A-6 12.7 *
Fastest HPHT well completion
in the North Sea
21
“The target well PI was 51,000 Sm3/day/bar This target
would have had a skin of 7”
“A skin of 0 would have given a PI of 100,000”
“THE WELL A-04 GAVE A PI OF 90,000 Sm3/day/bar
(ANOTHER FANTASTIC PI)”
Operator comments after well testing (Q3 2004 )
The Well PI was almost double the target
2011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
Economic benefits from the use of cesium
formate brine in HPHT gas field developments
Improved HPHT well control and safety
• No well control incidents in 28 HPHT drilling and completion ops
over 10 years (maybe 800 days in HPHT high-angle open hole ?)
• Factors contributing to improved well security and safety:
- Elimination of barite and its sagging problems
- Elimination of oil and its gas solubility problem
- Low solids brine Low ECD* and swab pressures
- Inhibition of hydrates
- Ready/rapid surface detection of well influx
- No hazardous zinc bromide !
* ECD in Huldra, Kvitebjoern and Kristin wells : 0.33-0.50 ppg (SG 0.04-0.06)
222011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
Economic benefits from the use of cesium
formate brine in HPHT gas field developments
Improved well performance and recovery of reserves
• “High production rates with low skin” *
• “ We selected cesium formate to minimise well control problems
and maximise well productivity”*
* Quotes by Statoil relating to Kvitebjoern wells (SPE 105733)
232011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
Economic benefits from use of cesium
formate brine in HPHT gas field developments
Faster completions
- Drill-in and completing with cesium
formate allows open hole completion
with screens
- Clean well bores mean no tool/seal
failures or blocked screens
- Completion time 50% lower than wells
drilled with OBM
Time saved per well: 25 days
Quote by operator:“ fastest HPHT completion operation ever performed in North Sea (12.7 days)”
242011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
Economic benefits from use of cesium
formate brine in deep gas field developments
Operational efficiencies Lower NPT Lower costs
• No differential sticking
• No well bore instability*
• Pipe and casing running speeds are fast
• Mud conditioning and flow-check times are short
• Displacements simplified, sometimes eliminated
Formate drilling fluid = formate completion fluid
* Quote by operator : “ No washouts were experienced in any of the wells during drilling through long sections of
interbedded shales in the Kvitebjoern reservoir (50/50 shale and sand ) with cesium/potassium formate fluid”
Duration of
flow back
(minutes)
Fluid Gain
(bbl)
30 0.8
15 0.56
20 0.44
30 0.56
252011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
Flow check fingerprint
for a Huldra well
Economic benefits from the use of cesium
formate brine in HPHT gas field developments
Good reservoir definition
26
• High density filtrate and no barite
• Filtrate Pe up to 259 barns/electron
• Unique Cs feature - makes filtrate invasion
highly visible against formation Pe of 2-3 b/e
• Ideal for defining permeable sands
• Consistent and reliable net reservoir definition
from LWD
“Using photoelectric factor and bulk density data, combined with resistivity measurements from both
the LWD drill pass and the ream pass, produces a very reliable and consistent net reservoir
definition.” (SPE 105733)
2011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
Economic benefits from the use of cesium
formate brine in HPHT gas field developments
Good reservoir definition
27
• Highly conductive fluid
• Clear resistivity images
• Information provided:
- structural dip
- depositional environment
- geological correlations
2011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
Summary
10 years of field use has demonstrated that cesium formate brine
can improve the economics of HPHT gas field developments by:
• Enabling long high-angle well constructions completed in
open hole with screens
• Making the well construction process faster and easier
• Improving well/operational safety and reducing risk
• Delivering unimpaired wells with high production rates
• Enhancing reservoir definition
282011 SPE/IADC Middle East Drilling Technology Conference, Muscat, 24-26 October
www.formatebrines.com
29