space information & intelligence system · agi commercial product, satellite tool kit (stk) •...

17
Pg 1 of 17 Space Information & Intelligence System RAF Fylingdales

Upload: vandiep

Post on 01-Jul-2018

234 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many

Pg 1 of 17

Space Information & Intelligence System

RAF Fylingdales

Page 2: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many

Pg 2 of 17AGI www.agi.com

AGI overview

• A software product company

• Industry standard for analysis & visualization

• Offices in US, Europe and Asia

• Founded in 1989• 32,000+ registered

installations• 500+ buying organizations• STK 7.1 released May 2006• STK 8 October 2006

Page 3: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many

Pg 3 of 17AGI www.agi.com

Background: RAF Fylingdales

• Phased-array radar located in North York Moors, England

• Part of the Ballistic Missile Early warning System – UK and US

• Secondary role is the detection and tracking of orbiting objects– Project focus area – What can see what & when?

Page 4: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many

Pg 4 of 17AGI www.agi.com

Problem

• Aging legacy software (~30 years)• Replacement hardware difficult to

find (eBay)• Original development team retiring• Complicated to use

– Extensive training required

• Two prior unsuccessful upgrade attempts– 100% custom software– 2-year project lifecycle– $6 million over - budget

Page 5: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many

Pg 5 of 17AGI www.agi.com

Key derived requirements

Manage database of space objects

Given a point or area on ground, calculate when in view from tracked space objects

Generate actionable reports

Easy-to-use by entry-level operational staff

Page 6: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many

Pg 6 of 17AGI www.agi.com

How am I oriented?What is my SNR?Can we all “see” each other?

Who can I “see”?Where am I now?Are there any obstructions?Lighting & weather conditions?Who can “see” me?

Relationships among objects and areasTime-dynamic position and attitude

Where will I be? Where have I been?

Quality of relationships

STK basics

Page 7: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many

Pg 7 of 17AGI www.agi.com

Off-the shelf solution?

• All functional requirements met by AGI commercial product, Satellite Tool Kit (STK)

• Operational requirements not met due to learning curve– 400+ panels– Too many choices

Page 8: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many

Pg 8 of 17AGI www.agi.com

Solution architecture

• Embed STK geometry engine & 3D/2D displays

• Custom code supports specialized workflow

• Use 80% COTS & 20% custom– COTS portion does all of the

work– Custom code supports

workflows

Custom code (VB)

3D 2D

STK

Embedded technology marketed as “4DX”

Page 9: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many

Pg 9 of 17AGI www.agi.com

RAF Technical Analysis Prototype

Page 10: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many

Pg 10 of 17AGI www.agi.com

RAFTAP Features

• Manage terrain & imagery

• Search, sort, group & propagate objects

• Generate actionable reports

Page 11: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many

Pg 11 of 17AGI www.agi.com

Project Timeline

Q1Q2 Q4 Q2 Q3 Q4Q1

2004 2005 20052006

RAFTAP Operational

Test

RAFTAP Development

& DeliveryProof of concept

Q3

Initial exposure &

testing of STK

Page 12: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many

Pg 12 of 17AGI www.agi.com

Obstacles/Risks

• Long-distance deliverable– Atlantic ocean prevents frequent site visits– Time zones discourage spontaneous communication

• Language– Oxford vs. Webster

• Trust– Previous unsuccessful attempts– RAF contracting with a foreign country

• Mutual Ignorance

Page 13: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many

Pg 13 of 17AGI www.agi.com

Mitigations

• Solid face-to-face relationship – Local AGI rep, UK national– Regular interactions with RAF

technical staff

• Early prototypes– Static and functional– Reduced mutual ignorance

• AGI willingness to invest– Free initial proofs of concept– Firm, fixed-pricing

Page 14: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many

Pg 14 of 17AGI www.agi.com

What went right

• Rapid, iterative UI prototyping via Webex• Frequent, interim code drops• Customer participation

– Willing to accept partial deliverables– Not afraid to work hands-on with AGI

• Customer accepted the unknown– Customers shouldn’t be expected to have all the

answers– Experimenting with prototypes revealed unknown

requirements

Page 15: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many

Pg 15 of 17AGI www.agi.com

Result

• Provided a customized application using COTS as core– User documentation– Source code for custom gui

• Training– User training– RAF developer training

• Classroom• Code walk-through

“With AGI’s software technology, [our mission] has been propelled into the 21st century.“-SSgt. Alan Reeves, RAF

Page 16: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many

Pg 16 of 17AGI www.agi.com

Benefits

• Higher-fidelity analysis, less time– Collection, analysis & dissemination

reduced from 48 hours to 2 hours.• 95% reduction

• Simplified for novice user– Training: 30 min. vs. weeks– 1.5 hrs. to test vs. 2-days

• Affordable– < 10% of previous budget overrun

• Sustainable– Supported, COTS software– VB developers readily available

Page 17: Space Information & Intelligence System · AGI commercial product, Satellite Tool Kit (STK) • Operational requirements not met due to learning curve – 400+ panels – Too many

Pg 17 of 17AGI www.agi.com

Contact Info

D. Peter SardellaVice President, Services

[email protected]