sp1 230 spfl 00 dm rp 406 00_ifc design dossier

6

Upload: api-26220184

Post on 10-Apr-2015

116 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Sp1 230 Spfl 00 Dm Rp 406 00_ifc Design Dossier
Page 2: Sp1 230 Spfl 00 Dm Rp 406 00_ifc Design Dossier

R:\652027\Typing\Docs\NATIVES FILES\DOCUMENTS\SP1-230-SPFL-00-DM-xxx\SP1-230-SPFL-00-DM-RP-406-00_IFC- Design dossier.doc Page 2 of 6

TABLE OF CONTENTS

1. GENERAL .....................................................................................................................................................3 2. COMPANY DOCUMENTS TO BE ENDORSED BY CONTRACTOR .........................................................4 3. DOCUMENTS NOT TO BE ENDORSED BY CONTRACTOR ....................................................................5 4. CONTRACTOR’S EXECUTIVE SUMMARY AND METHOD STATEMENT................................................6

Page 3: Sp1 230 Spfl 00 Dm Rp 406 00_ifc Design Dossier

R:\652027\Typing\Docs\NATIVES FILES\DOCUMENTS\SP1-230-SPFL-00-DM-xxx\SP1-230-SPFL-00-DM-RP-406-00_IFC- Design dossier.doc Page 3 of 6

1. GENERAL

The DESIGN DOSSIER comprises the Documents listed in items 2 – 4 of this EXHIBIT E, and contained in separate volumes.

Page 4: Sp1 230 Spfl 00 Dm Rp 406 00_ifc Design Dossier

R:\652027\Typing\Docs\NATIVES FILES\DOCUMENTS\SP1-230-SPFL-00-DM-xxx\SP1-230-SPFL-00-DM-RP-406-00_IFC- Design dossier.doc Page 4 of 6

2 2.1 SP1 230 SPFL 00 PL BR 201 Design Brief for 18" pipeline system2 2.1 SP1 230 SPFL 00 PL DB 201 Design basis for 18" pipeline system

2 2.4 SP1 230 SPFL 00 PL AL 207 18" pipeline – Alignment sheets (4 sheets)2 2.4 SP1 230 SPFL 00 PL DR 201 Drawing List2 2.4 SP1 230 SPFL 00 PL DR 202 GENERAL NOTES2 2.4 SP1 230 SPFL 00 PL DR 227 Pipeline typical anode details (+ attachment)2 2.4 SP1 230 SPFL 00 PL DR 230 Riser Anchor Clamps - On SPP1 & SPD2 Jacket - Details2 2.4 SP1 230 SPFL 00 PL DR 231 Riser Guide Clamps - On SPP1 & SPD2 Jacket - Details2 2.4 SP1 230 SPFL 00 PL IS 215 Expansion spool piece at SPP1 - Isometric2 2.4 SP1 230 SPFL 00 PL IS 218 Expansion spool piece at SPD2 - Isometric2 2.4 SP1 230 SPFL 00 PL IS 221 Riser at SPP1 - Isometric2 2.4 SP1 230 SPFL 00 PL IS 224 Riser at SPD2 - Isometric2 2.4 SP1 230 SPFL 00 PL LY 205 18" In-field pipeline route2 2.4 SP1 230 SPFL 00 PL LY 206 18" pipeline – Survey corridor2 2.4 SP1 230 SPFL 00 PL LY 210 18" Infield - Spool Piece at SPP1 - General Arrangement2 2.4 SP1 230 SPFL 00 PL LY 211 18" Infield - Spool Piece at SPD2 - General Arrangement2 2.4 SP1 230 SPFL 00 PL LY 214 Expansion spool piece at SPP1 - Details2 2.4 SP1 230 SPFL 00 PL LY 217 Expansion spool piece at SPD2 - Details2 2.4 SP1 230 SPFL 00 PL LY 220 Riser at SPP1 (general layout + details)2 2.4 SP1 230 SPFL 00 PL LY 223 Riser at SPD2 (general layout + details)2 2.4 SP1 230 SPFL 00 PL LY 510 18'' Infield Pipeline system replacement- Pipeline only -spool piece at SPP12 2.4 SP1 230 SPFL 00 PL LY 511 18'' Infield pipeline system replacement-pipeline only - spool piece at SPD2

2 2.4 SP1 230 SPFL 00 PL MR 201 Requisition - Risers and Spool Piece - Line Pipe2 2.4 SP1 230 SPFL 00 PL MR 202 Requisition - Risers and Spool Piece - Bend Pipe2 2.4 SP1 230 SPFL 00 PL MR 203 Requisition - Flanges (including Gaskets, Bolts and Nuts)2 2.4 SP1 230 SPFL 00 PL MR 204 Requisition - Pipeline Concrete Coating2 2.4 SP1 230 SPFL 00 PL MR 205 Requisition - Sacrificial anodes2 2.4 SP1 230 SPFL 00 PL MR 206 Requisition - Coal Tar Eramel2 2.4 SP1 230 SPFL 00 PL MR 207 Requisition - Riser anti-corrosion coating

2 2.4 SP1 230 SPFL 00 PL SP 201 Specification - Risers and Spool Piece - Line Pipe2 2.4 SP1 230 SPFL 00 PL SP 202 Specification - Risers and Spool Piece - Bend Pipe2 2.4 SP1 230 SPFL 00 PL SP 203 Specification - Flanges (including Gaskets, Bolts and Nuts)2 2.4 SP1 230 SPFL 00 PL SP 204 Specification - welding and NDT for Clad Line Pipe2 2.4 SP1 230 SPFL 00 PL SP 205 Specification - Pipeline Concrete Coating2 2.4 SP1 230 SPFL 00 PL SP 206 Specification - Pipeline Field Joint Coating2 2.4 SP1 230 SPFL 00 PL SP 207 Specification - Sacrificial anodes2 2.4 SP1 230 SPFL 00 PL SP 208 Specification - Coal Tar Eramel2 2.4 SP1 230 SPFL 00 PL SP 209 Specification Riser anti-corrosion coating

4 4.1 SP1 230 SPFL 00 PL MR 306 Requisition for structural steel4 4.1 SP1 230 SPFL 00 PL MR 307 Requisition for bolts, nuts, & miscellaneous items4 4.1 SP1 230 SPFL 00 PL SP 305 Construction and Installation Specification - Pipeline4 4.1 SP1 230 SPFL 00 PL SP 314 Anodes installation specification4 4.1 SP1 230 SPFL 00 PL SP 315 Construction and Installation Specification- Risers & Spools

WP WUDOCUMENTREFERENCE TITLE

ENDORSABLE DOCUMENTS

Work Package : Detailed Engineering - 18" Pipeline, Spool, Pieces & RisersWork Unit : Design Documentation Review

Work Package : Detailed Engineering - 18" Pipeline, Spool, Pieces & RisersWork Unit : MTO's, Specs, Datasheets & Drawings for Pipeline and Risers

Work Package : Construction and Installation EngineeringWork Unit : General documentation

2. COMPANY DOCUMENTS TO BE ENDORSED BY CONTRACTOR As provided in Article XX of the AGREEMENT, by his signature of the “Certificate of Endorsement of the Design Dossier”, Annex XX of the AGREEMENT, CONTRACTOR is deemed to have formally endorsed the following documents.

Page 5: Sp1 230 Spfl 00 Dm Rp 406 00_ifc Design Dossier

R:\652027\Typing\Docs\NATIVES FILES\DOCUMENTS\SP1-230-SPFL-00-DM-xxx\SP1-230-SPFL-00-DM-RP-406-00_IFC- Design dossier.doc Page 5 of 6

4 4.1 SP1 230 SPFL 00 SA ST 302 Risk Assessment Analysis (installation w/o shut down)

4 4.1 SP1 230 SPFL 00 PL DR 350 Installation drawing list4 4.3 SP1 230 SPFL 00 PL DR 351 SPP1 - Riser Installation - Base Case Riser Connections by bolted flanges4 4.3 SP1 230 SPFL 00 PL DR 352 SPP1 - Riser Installation - Alternative 1 - Riser connectoin by Welding4 4.3 SP1 230 SPFL 00 PL DR 353 SPP1 Riser Installation - Alternative 2 Riser installed in one piece4 4.3 SP1 230 SPFL 00 PL DR 354 SPP1 Riser Installation - Base case and alternative - Riser at Bottom of Jac4 4.3 SP1 230 SPFL 00 PL DR 361 SPD2 Riser Installation - Base Case - Riser connections by bolted Flanges4 4.3 SP1 230 SPFL 00 PL DR 362 SPD2 riser Installation - Alternative 1 - Riser Connections by welding4 4.3 SP1 230 SPFL 00 PL DR 363 SPD2 Riser Installation - Alternative 2 - Riser installed in one piece4 4.3 SP1 230 SPFL 00 PL DR 364 SPD2 Riser Installation - Base case and alternative 1 - Riser at Bottom of J4 4.3 SP1 230 SPFL 00 PL DR 381 Spool removal sequences4 4.3 SP1 230 SPFL 00 PL DR 382 Spool removal aids4 4.3 SP1 230 SPFL 00 PL DR 383 Spool rigging arrangement & Details4 4.3 SP1 230 SPFL 00 PL DR 384 Spool installation sequences4 4.3 SP1 230 SPFL 00 PL DR 385 Spool installation aids4 4.3 SP1 230 SPFL 00 PL DR 391 Riser removal sequences4 4.3 SP1 230 SPFL 00 PL DR 392 Riser removal aids4 4.3 SP1 230 SPFL 00 PL DR 393 Riser installation sequences4 4.3 SP1 230 SPFL 00 PL DR 394 Risers installation aids

4 4.3 SP1 230 SPFL 00 PL PR 321 Outline spool fabrication procedure4 4.3 SP1 230 SPFL 00 PL PR 322 Outline Riser fabrication procedure4 4.3 SP1 230 SPFL 00 PL PR 323 Outline Riser & Spool removal & installation procedure

4 4.4 SP1 230 SPFL 00 PL PR 330 Pipeline system pre-comissionning Outline procedure

4 4.2 SP1 230 SPFL 00 PL DR 372 Typical deadman anchor GA drawing4 4.2 SP1 230 SPFL 00 PL DR 373 Typical pulling head GA drawing4 4.2 SP1 230 SPFL 00 PL DR 374 Pipeline rigging arrangement sketches4 4.2 SP1 230 SPFL 00 PL DR 375 Pipeline installation sequences sketches4 4.2 SP1 230 SPFL 00 PL PR 320 Outline pipeline installation procedure4 4.2 SP1 230 SPFL 00 PL PR 324 Outline procedure for floading, Cleaning and gauging

WP WUDOCUMENTREFERENCE TITLE

NON ENDORSABLE DOCUMENTS

Work Package : Construction and Installation EngineeringWork Unit : Installation of risers and spools

Work Package : Construction and Installation EngineeringWork Unit : Installation of pipeline

3. DOCUMENTS NOT TO BE ENDORSED BY CONTRACTOR

As provided in Article XX of the AGREEMENT, the following documents are not required to be formally endorsed by CONTRACTOR.

These docs are provided for information only.

Page 6: Sp1 230 Spfl 00 Dm Rp 406 00_ifc Design Dossier

R:\652027\Typing\Docs\NATIVES FILES\DOCUMENTS\SP1-230-SPFL-00-DM-xxx\SP1-230-SPFL-00-DM-RP-406-00_IFC- Design dossier.doc Page 6 of 6

4. CONTRACTOR’S EXECUTIVE SUMMARY AND METHOD STATEMENT

CONTRACTOR’S Executive Summary and Method Statement, is a summarised description of his technical proposal for the performance of the WORK as at EFFECTIVE DATE and prior to the commencement of the detailed engineering phase of the WORK.

Should, as the result of the evolution in CONTRACTOR’S design during the performance of the detailed engineering WORK, a change(s) take place in the methodology, means, design assumptions and criteria, or any other aspect, compared with the proposal set out in the Executive Summary and Method Statement, CONTRACTOR shall not be entitled to any adjustment of the CONTRACT PRICE nor WORK TIME SCHEDULE in respect of such change(s).

{Whilst this section will be finalised prior to the EFFECTIVE DATE, CONTRACTOR is requested to advise its draft wording for initial consideration by COMPANY}