sowinski sullivan architects project portfolio...

1
sparta, nj philadelphia, pa harrisburg, pa www.sowinskisullivan.com PROJECT PORTFOLIO transportation sowinski sullivan ARCHITECTS PROJECT SCOPE: Sowinski Sullivan (SSA) collaborated with a team of consultants on a new rail station for the Metro-North Railroad at Yankee Stadium. In addition to designing a new mezzanine station, the project included a new overpass, platforms, and links between parking, bus, and taxi areas, a waterfront park, and new reception facilities. As part of the team, SSA was responsible for the master plan through the design-build procurement. The overpass provides access between Yankee Stadium, the station mezzanine, and a point to the west of the ROW towards the river. The mezzanine is accessed via the overpass. The key station elements include fare lines, retail space, station supervision infrastructure, and police substation facilities. SSA designed the improvements to the NYS building code and NFPA 130 requirements. SSA also provided architectural oversight during the final design and construction of the station. The new station, which opened in 2010, has won several awards for its design. YANKEE STADIUM TRANSPORTATION CENTER Bronx, New York owner: MTA/Metro North Railroad project manager: Mari Miceli, PE, Assistant Director of Capital Projects, 914.461.0533, [email protected] construction cost: $71 million date started: 2005 date completed: 2010

Upload: others

Post on 06-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: sowinski sullivan ARCHITECTS PROJECT PORTFOLIO …sowinskisullivan.com/images/Portfolio/SSA_MNR_Yankee_Stadium.pdfPROJECT PORTFOLIO transportation sowinski sullivan ARCHITECTS PROJECT

sparta, nj • philadelphia, pa • harrisburg, pa • www.sowinskisullivan.com

PROJECT PORTFOLIOtransportation

sowinski sullivan ARCHITECTS

PROJECT SCOPE: Sowinski Sullivan (SSA) collaborated with a team of consultants on a new rail station for the Metro-North Railroad at Yankee Stadium. In addition to designing a new mezzanine station, the project included a new overpass, platforms, and links between parking, bus, and taxi areas, a waterfront park, and new reception facilities. As part of the team, SSA was responsible for the master plan through the design-build procurement. The overpass provides access between Yankee Stadium, the station mezzanine, and a point to the west of the ROW towards the river. The mezzanine is accessed via the overpass. The key station elements include fare lines, retail space, station supervision infrastructure, and police substation facilities. SSA designed the improvements to the NYS building code and NFPA 130 requirements. SSA also provided architectural oversight during the final design and construction of the station. The new station, which opened in 2010, has won several awards for its design.

YANKEE STADIUM TRANSPORTATION CENTERBronx, New Yorkowner: MTA/Metro North Railroad project manager: Mari Miceli, PE, Assistant Director of Capital Projects, 914.461.0533, [email protected] cost: $71 milliondate started: 2005date completed: 2010