southern rural water2 southern rural water - annual report 2000 - 2001 a highlight of the year was...
TRANSCRIPT
Internet Copy
ANNUAL REPORT 2000/1
Internet Copy
Southern Rural Water - Annual Report 2000 - 2001
A commemorative cairn has been constructed at the Maffra office of SRW
to mark the 75th anniversary both of Lake Glenmaggie dam and of
irrigation of the Macalister Irrigation District from the lake. The cairn,
which is seen here together with one of the signs erected throughout the
district to mark the anniversaries, will display one of the two
commemorative plaques unveiled by the Minister.
HIGHLIGHTS OF THE YEARHIGHLIGHTS OF THE YEARHIGHLIGHTS OF THE YEARHIGHLIGHTS OF THE YEARHIGHLIGHTS OF THE YEAR
– Lake Glenmaggie dam 75th Birthday celebrations in May 2001
– Lerderderg weir withstands flash flood in October 2000
– Western storage levels improve during 2000/1,
Western Irrigation business supply secured for 2001/2
– Macalister Irrigation District suffers late season water supply
shortage
– First major valve refurbishment at Glenmaggie completed
successfully in August 2000
– New water quality monitoring station
commissioned in Werribee Irrigation
District
– Cowwarr weir also hit by flash flood in April
2001
– Twelve Streamflow Management Plans in
progress or completed during 2000/1
– Five draft Groundwater Management Plans
completed during the year, five more under
way
MISSIONMISSIONMISSIONMISSIONMISSION
The Mission of SRW is:
To operate, manage and develop our
core businesses of;
– irrigation supply,
– water storage management, and
– licensing of rural water use in
southern Victoria, professionally,
economically and sustainably.
ANNUAL REPORANNUAL REPORANNUAL REPORANNUAL REPORANNUAL REPOR T 2000/1T 2000/1T 2000/1T 2000/1T 2000/1
Internet Copy
1
VISIONVISIONVISIONVISIONVISION
The Vision of SRW is for our business to be
regarded:-
– By our customers, as a satisfactory and
preferred service provider;
– By Government (our shareholder), as fulfilling
its expectations and adding value to its
priorities; and
– By our peers, other stakeholders and the
community, as a professional, competent,
respected and progressive business.
OUR BUSINESS DRIVERSOUR BUSINESS DRIVERSOUR BUSINESS DRIVERSOUR BUSINESS DRIVERSOUR BUSINESS DRIVERS
To realise our Vision, we must:-
– Improve customer service;
– Charge the lowest viable prices;
– Safeguard our business;
– Build our capability; and
– Pursue our shareholder’s priorities.
VVVVVALUESALUESALUESALUESALUES
Our values are the principles which guide how
we work and operate our business. They
require that we achieve;
– Partnership with our customers, to
empower them to influence our business
direction and assist us in meeting their
needs;
– Transparent and sustainable prices, with
no cross-subsidies between our
businesses;
– Effective measurement and continuous
improvement in performance;
– Open and accountable decision making;
– Ethical and accountable corporate
governance;
– Environmental, social and economic
responsibility;
– Strong partnerships with others
– The recruitment and development of a
professional and motivated workforce;
and
– The best and most appropriate use of the
water we manage.
CONTENTSCONTENTSCONTENTSCONTENTSCONTENTS
Southern Rural Water ................ 2
What We Do
................................. 2
Authority Board
........................... 4
Corporate Governance
Statement
................................. 4
Chairman’s Report ...................... 6
Chief Executive’s Report ............ 8
Operations Report
.................... 10
Overview
................................ 10
Eastern Irrigation
.................. 12
Western Irrigation ................ 14
Licensing
................................ 18
Headworks
............................. 20
Capital Works
........................ 24
Resource Management ....... 26
Customer & Community
Consultation
...................... 28
Statutory Report
........................ 30
Tables .......................................... 32
Financial Report
........................ 35
Compliance Index
..................... 48
1
Minister for Environment and
Conservation, the Hon Sherryl
Garbutt MP, visited Maffra on 7
May 2001 to address the dinner to
celebrate the 75th anniversary of
the construction of Lake
Glenmaggie dam, and to unveil
commemorative plaques to be
displayed at the Maffra office and
at the dam.
88 Johnson Street
PO Box 153 Maffra
Victoria 3860
TTTTTelephone: (03) 5139 3100elephone: (03) 5139 3100elephone: (03) 5139 3100elephone: (03) 5139 3100elephone: (03) 5139 3100
Facsimile: (03) 5139 3150Facsimile: (03) 5139 3150Facsimile: (03) 5139 3150Facsimile: (03) 5139 3150Facsimile: (03) 5139 3150
Email: srw@srwEmail: srw@srwEmail: srw@srwEmail: srw@srwEmail: [email protected]
WWWWWebsite: wwwebsite: wwwebsite: wwwebsite: wwwebsite: www.srw.srw.srw.srw.srw.com.au.com.au.com.au.com.au.com.au
Editor:Editor:Editor:Editor:Editor:
Geoff Barry -
Director Business Services
Design:Design:Design:Design:Design:
DCP Multimedia
Printing:Printing:Printing:Printing:Printing:
DCP Printing
Internet Copy
2
WHAWHAWHAWHAWHAT WE DOT WE DOT WE DOT WE DOT WE DO
IRRIGAIRRIGAIRRIGAIRRIGAIRRIGATIONTIONTIONTIONTION
We operate the three gravity irrigation districts
in the southern half of Victoria - the Macalister
(near Maffra in Gippsland), and at Bacchus Marsh
and Werribee. Together these deliver an average
of 177,000 ML each year for irrigation and other
purposes.
Our irrigation businesses provide water for
pasture and crop irrigation to almost 1,400
customers, and stock and domestic water to 1,600
properties, with an average annual turnover of
$7.69 million (actual revenue for 2000/1 was $7.60
million).
LICENSINGLICENSINGLICENSINGLICENSINGLICENSING
We manage and control the taking and use of
water for irrigation and other purposes from rivers
and groundwater aquifers in southern Victoria.
We have 4,100 customers licensed to take water
from rivers and streams, and a further 3,000
customers licensed to use groundwater bores.
Average annual turnover for the Licensing
business excluding Government project funding
is $2.44 million (actual revenue in 2000/1 was $2.50
million).
HEADWORKSHEADWORKSHEADWORKSHEADWORKSHEADWORKS
We harvest and store water on behalf of bulk
entitlement holders - our own irrigation
customers, urban water authorities and Latrobe
Valley power generators - from four major
systems and seven large dams at Pykes Creek,
Merrimu, Gisborne, Melton, Blue Rock, Yallourn
and Glenmaggie.
Our Headworks business delivers around 300,000
ML in bulk supplies each year. Average business
turnover net of recoverable works is $4.42 million.
Actual revenue for 2000/1, including recoverable
works of $273,000, was $4.82 million.
2 Southern Rural Water - Annual Report 2000 - 2001
A highlight of the year was the series of conducted bus
tours into the Lerderderg weir on 25 March 2001. Business
Manager Headworks Pat Caruso was one of the tour guides
and is seen addressing a group of visitors at the weir.
SOUTHERNSOUTHERNSOUTHERNSOUTHERNSOUTHERN
RURAL WATERRURAL WATERRURAL WATERRURAL WATERRURAL WATER
( S R W ) i s r e s p o n s i b l e f o r r u r a l( S R W ) i s r e s p o n s i b l e f o r r u r a l
( S R W ) i s r e s p o n s i b l e f o r r u r a l( S R W ) i s r e s p o n s i b l e f o r r u r a l
( S R W ) i s r e s p o n s i b l e f o r r u r a l
w a t e r s u p p l y a n d t h e o p e r a t i o nw a t e r s u p p l y a n d t h e o p e r a t i o n
w a t e r s u p p l y a n d t h e o p e r a t i o nw a t e r s u p p l y a n d t h e o p e r a t i o n
w a t e r s u p p l y a n d t h e o p e r a t i o n
o f p r i n c i p a l r u r a l h e a d w o r k so f p r i n c i p a l r u r a l h e a d w o r k s
o f p r i n c i p a l r u r a l h e a d w o r k so f p r i n c i p a l r u r a l h e a d w o r k s
o f p r i n c i p a l r u r a l h e a d w o r k s
s t o r a g e s y s t e m s , a c r o s s t h es t o r a g e s y s t e m s , a c r o s s t h e
s t o r a g e s y s t e m s , a c r o s s t h es t o r a g e s y s t e m s , a c r o s s t h e
s t o r a g e s y s t e m s , a c r o s s t h e
e n t i r e s o u t h e r n p a r t o f V i c t o r i ae n t i r e s o u t h e r n p a r t o f V i c t o r i a
e n t i r e s o u t h e r n p a r t o f V i c t o r i ae n t i r e s o u t h e r n p a r t o f V i c t o r i a
e n t i r e s o u t h e r n p a r t o f V i c t o r i a
f r o m t h e G r e a t D i v i d e t o t h ef r o m t h e G r e a t D i v i d e t o t h e
f r o m t h e G r e a t D i v i d e t o t h ef r o m t h e G r e a t D i v i d e t o t h e
f r o m t h e G r e a t D i v i d e t o t h e
c o a s t .c o a s t .
c o a s t .c o a s t .
c o a s t .
O u r c u s t o m e r s a r eO u r c u s t o m e r s a r e
O u r c u s t o m e r s a r eO u r c u s t o m e r s a r e
O u r c u s t o m e r s a r e
p r e d o m i n a n t l y t h e f a r m e r s ,p r e d o m i n a n t l y t h e f a r m e r s ,
p r e d o m i n a n t l y t h e f a r m e r s ,p r e d o m i n a n t l y t h e f a r m e r s ,
p r e d o m i n a n t l y t h e f a r m e r s ,
g r a z i e r s a n d g r o w e r s o fg r a z i e r s a n d g r o w e r s o f
g r a z i e r s a n d g r o w e r s o fg r a z i e r s a n d g r o w e r s o f
g r a z i e r s a n d g r o w e r s o f
s o u t h e r n V i c t o r i a , b u t w e a l s os o u t h e r n V i c t o r i a , b u t w e a l s o
s o u t h e r n V i c t o r i a , b u t w e a l s os o u t h e r n V i c t o r i a , b u t w e a l s o
s o u t h e r n V i c t o r i a , b u t w e a l s o
h a r v e s t w a t e r i n b u l k o n b e h a l fh a r v e s t w a t e r i n b u l k o n b e h a l f
h a r v e s t w a t e r i n b u l k o n b e h a l fh a r v e s t w a t e r i n b u l k o n b e h a l f
h a r v e s t w a t e r i n b u l k o n b e h a l f
o f n o n - m e t r o p o l i t a n u r b a no f n o n - m e t r o p o l i t a n u r b a n
o f n o n - m e t r o p o l i t a n u r b a no f n o n - m e t r o p o l i t a n u r b a n
o f n o n - m e t r o p o l i t a n u r b a n
w a t e r a u t h o r i t i e s a n d L a t r o b ew a t e r a u t h o r i t i e s a n d L a t r o b e
w a t e r a u t h o r i t i e s a n d L a t r o b ew a t e r a u t h o r i t i e s a n d L a t r o b e
w a t e r a u t h o r i t i e s a n d L a t r o b e
V a l l e y e l e c t r i c i t y g e n e r a t o r s ,V a l l e y e l e c t r i c i t y g e n e r a t o r s ,
V a l l e y e l e c t r i c i t y g e n e r a t o r s ,V a l l e y e l e c t r i c i t y g e n e r a t o r s ,
V a l l e y e l e c t r i c i t y g e n e r a t o r s ,
w h o h o l d B u l k E n t i t l e m e n t s o rw h o h o l d B u l k E n t i t l e m e n t s o r
w h o h o l d B u l k E n t i t l e m e n t s o rw h o h o l d B u l k E n t i t l e m e n t s o r
w h o h o l d B u l k E n t i t l e m e n t s o r
o t h e r a g r e e m e n t s t o t a k e a n do t h e r a g r e e m e n t s t o t a k e a n d
o t h e r a g r e e m e n t s t o t a k e a n do t h e r a g r e e m e n t s t o t a k e a n d
o t h e r a g r e e m e n t s t o t a k e a n d
u s e w a t e r f r o m o u r s t o r a g e s .u s e w a t e r f r o m o u r s t o r a g e s .
u s e w a t e r f r o m o u r s t o r a g e s .u s e w a t e r f r o m o u r s t o r a g e s .
u s e w a t e r f r o m o u r s t o r a g e s .
W e s e r v i c e a r o u n d 1 0 , 0 0 0W e s e r v i c e a r o u n d 1 0 , 0 0 0
W e s e r v i c e a r o u n d 1 0 , 0 0 0W e s e r v i c e a r o u n d 1 0 , 0 0 0
W e s e r v i c e a r o u n d 1 0 , 0 0 0
c u s t o m e r s a n d i n 2 0 0 0 / 1c u s t o m e r s a n d i n 2 0 0 0 / 1
c u s t o m e r s a n d i n 2 0 0 0 / 1c u s t o m e r s a n d i n 2 0 0 0 / 1
c u s t o m e r s a n d i n 2 0 0 0 / 1
g e n e r a t e d $ 1 6 . 6 m i l l i o n i ng e n e r a t e d $ 1 6 . 6 m i l l i o n i n
g e n e r a t e d $ 1 6 . 6 m i l l i o n i ng e n e r a t e d $ 1 6 . 6 m i l l i o n i n
g e n e r a t e d $ 1 6 . 6 m i l l i o n i n
o p e r a t i n g t u r n o v e r f r o m a l lo p e r a t i n g t u r n o v e r f r o m a l l
o p e r a t i n g t u r n o v e r f r o m a l lo p e r a t i n g t u r n o v e r f r o m a l l
o p e r a t i n g t u r n o v e r f r o m a l l
s o u r c e s . W e e x p e n d a r o u n d $ 3s o u r c e s . W e e x p e n d a r o u n d $ 3
s o u r c e s . W e e x p e n d a r o u n d $ 3s o u r c e s . W e e x p e n d a r o u n d $ 3
s o u r c e s . W e e x p e n d a r o u n d $ 3
m i l l i o n i n c a p i t a l w o r k s e a c hm i l l i o n i n c a p i t a l w o r k s e a c h
m i l l i o n i n c a p i t a l w o r k s e a c hm i l l i o n i n c a p i t a l w o r k s e a c h
m i l l i o n i n c a p i t a l w o r k s e a c h
y e a r .y e a r .
y e a r .y e a r .
y e a r .
O u r p r i n c i p a l O f f i c e i s i nO u r p r i n c i p a l O f f i c e i s i n
O u r p r i n c i p a l O f f i c e i s i nO u r p r i n c i p a l O f f i c e i s i n
O u r p r i n c i p a l O f f i c e i s i n
M a f f r a , i n c e n t r a l G i p p s l a n d .M a f f r a , i n c e n t r a l G i p p s l a n d .
M a f f r a , i n c e n t r a l G i p p s l a n d .M a f f r a , i n c e n t r a l G i p p s l a n d .
M a f f r a , i n c e n t r a l G i p p s l a n d .
M a f f r a i s t h e h u b o f t h eM a f f r a i s t h e h u b o f t h e
M a f f r a i s t h e h u b o f t h eM a f f r a i s t h e h u b o f t h e
M a f f r a i s t h e h u b o f t h e
M a c a l i s t e r I r r i g a t i o n D i s t r i c t ,M a c a l i s t e r I r r i g a t i o n D i s t r i c t ,
M a c a l i s t e r I r r i g a t i o n D i s t r i c t ,M a c a l i s t e r I r r i g a t i o n D i s t r i c t ,
M a c a l i s t e r I r r i g a t i o n D i s t r i c t ,
w h i c h c o v e r s 5 5 , 0 0 0 h e c t a r e sw h i c h c o v e r s 5 5 , 0 0 0 h e c t a r e s
w h i c h c o v e r s 5 5 , 0 0 0 h e c t a r e sw h i c h c o v e r s 5 5 , 0 0 0 h e c t a r e s
w h i c h c o v e r s 5 5 , 0 0 0 h e c t a r e s
a n d i s o u r l a r g e s t s i n g l ea n d i s o u r l a r g e s t s i n g l e
a n d i s o u r l a r g e s t s i n g l ea n d i s o u r l a r g e s t s i n g l e
a n d i s o u r l a r g e s t s i n g l e
b u s i n e s s u n i t . W e a l s o h a v e ab u s i n e s s u n i t . W e a l s o h a v e a
b u s i n e s s u n i t . W e a l s o h a v e ab u s i n e s s u n i t . W e a l s o h a v e a
b u s i n e s s u n i t . W e a l s o h a v e a
d i s t r i c t o f f i c e a t W e r r i b e e . I nd i s t r i c t o f f i c e a t W e r r i b e e . I n
d i s t r i c t o f f i c e a t W e r r i b e e . I nd i s t r i c t o f f i c e a t W e r r i b e e . I n
d i s t r i c t o f f i c e a t W e r r i b e e . I n
o r d e r t o e n s u r e t h a t p r o m p to r d e r t o e n s u r e t h a t p r o m p t
o r d e r t o e n s u r e t h a t p r o m p to r d e r t o e n s u r e t h a t p r o m p t
o r d e r t o e n s u r e t h a t p r o m p t
a n d e f f i c i e n t s e r v i c e s a r ea n d e f f i c i e n t s e r v i c e s a r e
a n d e f f i c i e n t s e r v i c e s a r ea n d e f f i c i e n t s e r v i c e s a r e
a n d e f f i c i e n t s e r v i c e s a r e
a v a i l a b l e t o a l l o u r c u s t o m e r s ,a v a i l a b l e t o a l l o u r c u s t o m e r s ,
a v a i l a b l e t o a l l o u r c u s t o m e r s ,a v a i l a b l e t o a l l o u r c u s t o m e r s ,
a v a i l a b l e t o a l l o u r c u s t o m e r s ,
h o w e v e r r e m o t e , S R W h a s ah o w e v e r r e m o t e , S R W h a s a
h o w e v e r r e m o t e , S R W h a s ah o w e v e r r e m o t e , S R W h a s a
h o w e v e r r e m o t e , S R W h a s a
n e t w o r k o f f i e l d s t a f f l o c a t e dn e t w o r k o f f i e l d s t a f f l o c a t e d
n e t w o r k o f f i e l d s t a f f l o c a t e dn e t w o r k o f f i e l d s t a f f l o c a t e d
n e t w o r k o f f i e l d s t a f f l o c a t e d
s t r a t e g i c a l l y a c r o s s o u r r e g i o n .s t r a t e g i c a l l y a c r o s s o u r r e g i o n .
s t r a t e g i c a l l y a c r o s s o u r r e g i o n .s t r a t e g i c a l l y a c r o s s o u r r e g i o n .
s t r a t e g i c a l l y a c r o s s o u r r e g i o n .
W e a r e t h e s e c o n d l a r g e s tW e a r e t h e s e c o n d l a r g e s t
W e a r e t h e s e c o n d l a r g e s tW e a r e t h e s e c o n d l a r g e s t
W e a r e t h e s e c o n d l a r g e s t
r u r a l w a t e r a u t h o r i t y i n V i c t o r i ar u r a l w a t e r a u t h o r i t y i n V i c t o r i a
r u r a l w a t e r a u t h o r i t y i n V i c t o r i ar u r a l w a t e r a u t h o r i t y i n V i c t o r i a
r u r a l w a t e r a u t h o r i t y i n V i c t o r i a
a n d o u r s t a f f o f a r o u n d 1 0 0a n d o u r s t a f f o f a r o u n d 1 0 0
a n d o u r s t a f f o f a r o u n d 1 0 0a n d o u r s t a f f o f a r o u n d 1 0 0
a n d o u r s t a f f o f a r o u n d 1 0 0
m a n a g e s t h e S t a t e ’ s l a r g e s tm a n a g e s t h e S t a t e ’ s l a r g e s t
m a n a g e s t h e S t a t e ’ s l a r g e s tm a n a g e s t h e S t a t e ’ s l a r g e s t
m a n a g e s t h e S t a t e ’ s l a r g e s t
g r o u n d w a t e r o p e r a t i o n a n d i t sg r o u n d w a t e r o p e r a t i o n a n d i t s
g r o u n d w a t e r o p e r a t i o n a n d i t sg r o u n d w a t e r o p e r a t i o n a n d i t s
g r o u n d w a t e r o p e r a t i o n a n d i t s
s e c o n d l a r g e s t n o n -s e c o n d l a r g e s t n o n -
s e c o n d l a r g e s t n o n -s e c o n d l a r g e s t n o n -
s e c o n d l a r g e s t n o n -
m e t r o p o l i t a n h e a d w o r k sm e t r o p o l i t a n h e a d w o r k s
m e t r o p o l i t a n h e a d w o r k sm e t r o p o l i t a n h e a d w o r k s
m e t r o p o l i t a n h e a d w o r k s
b u s i n e s s .b u s i n e s s .
b u s i n e s s .b u s i n e s s .
b u s i n e s s .
Internet Copy
3
S R W c o v e r s t h e s o u t h e r n h a l fS R W c o v e r s t h e s o u t h e r n h a l f
S R W c o v e r s t h e s o u t h e r n h a l fS R W c o v e r s t h e s o u t h e r n h a l f
S R W c o v e r s t h e s o u t h e r n h a l f
o f V i c t o r i a . T h i s m a p o f o u ro f V i c t o r i a . T h i s m a p o f o u r
o f V i c t o r i a . T h i s m a p o f o u ro f V i c t o r i a . T h i s m a p o f o u r
o f V i c t o r i a . T h i s m a p o f o u r
r e g i o n h i g h l i g h t s t h e m a j o rr e g i o n h i g h l i g h t s t h e m a j o r
r e g i o n h i g h l i g h t s t h e m a j o rr e g i o n h i g h l i g h t s t h e m a j o r
r e g i o n h i g h l i g h t s t h e m a j o r
r i v e r s f l o w i n g s o u t h , o u r t h r e er i v e r s f l o w i n g s o u t h , o u r t h r e e
r i v e r s f l o w i n g s o u t h , o u r t h r e er i v e r s f l o w i n g s o u t h , o u r t h r e e
r i v e r s f l o w i n g s o u t h , o u r t h r e e
i r r i g a t i o n d i s t r i c t s a n d o u ri r r i g a t i o n d i s t r i c t s a n d o u r
i r r i g a t i o n d i s t r i c t s a n d o u ri r r i g a t i o n d i s t r i c t s a n d o u r
i r r i g a t i o n d i s t r i c t s a n d o u r
o f f i c e l o c a t i o n s .o f f i c e l o c a t i o n s .
o f f i c e l o c a t i o n s .o f f i c e l o c a t i o n s .
o f f i c e l o c a t i o n s .
Internet Copy
4
BOARD COMMITTEESBOARD COMMITTEESBOARD COMMITTEESBOARD COMMITTEESBOARD COMMITTEES
The SRW Board has established four Committees
to assist it to conduct its business effectively
and efficiently. The four committees and their
members to 30 June 2001 were:
AUDI T COMMI TTEE:AUDI T COMMI TTEE:AUDI T COMMI TTEE:AUDI T COMMI TTEE:AUDI T COMMI TTEE:
Mr Fost er ( Chai rman) , Mrs Li l ey, Mr Cri ck.
BUSINESS PLANNING COMMITTEE:BUSINESS PLANNING COMMITTEE:BUSINESS PLANNING COMMITTEE:BUSINESS PLANNING COMMITTEE:BUSINESS PLANNING COMMITTEE:
Dr Walsh (Chairman), Mrs McMillan, Mr Tilleard.
REMUNERATION AND CORPORATEREMUNERATION AND CORPORATEREMUNERATION AND CORPORATEREMUNERATION AND CORPORATEREMUNERATION AND CORPORATE
GOVERNANCE POLICY COMMITTEE:GOVERNANCE POLICY COMMITTEE:GOVERNANCE POLICY COMMITTEE:GOVERNANCE POLICY COMMITTEE:GOVERNANCE POLICY COMMITTEE:
Mr Pappin (Chairman), Dr Walsh, Mr Foster.
TECHNICAL COMMITTEE:TECHNICAL COMMITTEE:TECHNICAL COMMITTEE:TECHNICAL COMMITTEE:TECHNICAL COMMITTEE:
Mr Tilleard (Chairman), Mr Koch, Mr Nicol.
CORPORATE GOVERNANCECORPORATE GOVERNANCECORPORATE GOVERNANCECORPORATE GOVERNANCECORPORATE GOVERNANCE
STATEMENTSTATEMENTSTATEMENTSTATEMENTSTATEMENT
The SRW Board has established general princi-
ples under which it and management operate, to
ensure that the Authority fulfils its responsibilities
in the best interest of Government, customers and
the community. These principles are as follows:
ROLE OF THE BOARDROLE OF THE BOARDROLE OF THE BOARDROLE OF THE BOARDROLE OF THE BOARD– To be accountable to the Minister for the
achievement of the results and targets
required by Government
– To ensure that customers and other
stakeholders are adequately consulted by
management
– To plan the future of the Authority
– To set, review and amend policies to direct
the Authority
– To appoint the Chief Executive
– To assess the performance of the Authority
and the Chief Executive
– To avoid unacceptable actions and situations.
MANAGEMENT OF THE AUTHORITYMANAGEMENT OF THE AUTHORITYMANAGEMENT OF THE AUTHORITYMANAGEMENT OF THE AUTHORITYMANAGEMENT OF THE AUTHORITY– The Chief Executive is accountable to the
Board, not the individual members, and is
responsible to the Board for the operation of
the Authority
– The Chief Executive:
– manages the Authority
– is the connection between the Board and
the Authority
– makes recommendations to the Board
concerning the Authority and
– implements the policies of the Board.
– The Board instructs the Chief Executive
through written policies
– The Board monitors and assesses the
performance of the Authority and the Chief
Executive.
The SRW Board pictured prior to its final meeting on 5 June 2001 (L to R).
Standing: Mr Pat Foster, Mr David Koch, Mr John Tilleard, Mr John Nicol and Mr Geoff Crick.
Seated: Mrs Jennifer McMillan, Mr Allan Pappin (Chairman), Dr Greg Walsh (Deputy Chairman) and Mrs
Joan Liley.
AUTHORITY BOARDAUTHORITY BOARDAUTHORITY BOARDAUTHORITY BOARDAUTHORITY BOARD
S R W c o n t i n u e d t o b eS R W c o n t i n u e d t o b e
S R W c o n t i n u e d t o b eS R W c o n t i n u e d t o b e
S R W c o n t i n u e d t o b e
c o n t r o l l e d i n 2 0 0 0 / 1 b y a B o a r dc o n t r o l l e d i n 2 0 0 0 / 1 b y a B o a r d
c o n t r o l l e d i n 2 0 0 0 / 1 b y a B o a r dc o n t r o l l e d i n 2 0 0 0 / 1 b y a B o a r d
c o n t r o l l e d i n 2 0 0 0 / 1 b y a B o a r d
o f n i n e m e m b e r s , a p p o i n t e do f n i n e m e m b e r s , a p p o i n t e d
o f n i n e m e m b e r s , a p p o i n t e do f n i n e m e m b e r s , a p p o i n t e d
o f n i n e m e m b e r s , a p p o i n t e d
u n d e r P a r t 6 o f t h e u n d e r P a r t 6 o f t h e
u n d e r P a r t 6 o f t h e u n d e r P a r t 6 o f t h e
u n d e r P a r t 6 o f t h e Water ActWater ActWater ActWater ActWater Act
19891989198919891989, f o r a t h r e e y e a r t e r m, f o r a t h r e e y e a r t e r m
, f o r a t h r e e y e a r t e r m, f o r a t h r e e y e a r t e r m
, f o r a t h r e e y e a r t e r m
e x p i r i n g o n 3 0 J u n e 2 0 0 1 .e x p i r i n g o n 3 0 J u n e 2 0 0 1 .
e x p i r i n g o n 3 0 J u n e 2 0 0 1 .e x p i r i n g o n 3 0 J u n e 2 0 0 1 .
e x p i r i n g o n 3 0 J u n e 2 0 0 1 .
D u r i n g J u n e 2 0 0 1 t h e M i n i s t e rD u r i n g J u n e 2 0 0 1 t h e M i n i s t e r
D u r i n g J u n e 2 0 0 1 t h e M i n i s t e rD u r i n g J u n e 2 0 0 1 t h e M i n i s t e r
D u r i n g J u n e 2 0 0 1 t h e M i n i s t e r
f o r C o n s e r v a t i o n a n df o r C o n s e r v a t i o n a n d
f o r C o n s e r v a t i o n a n df o r C o n s e r v a t i o n a n d
f o r C o n s e r v a t i o n a n d
E n v i r o n m e n t a n n o u n c e d t h eE n v i r o n m e n t a n n o u n c e d t h e
E n v i r o n m e n t a n n o u n c e d t h eE n v i r o n m e n t a n n o u n c e d t h e
E n v i r o n m e n t a n n o u n c e d t h e
a p p o i n t m e n t o f a n e w B o a r d o fa p p o i n t m e n t o f a n e w B o a r d o f
a p p o i n t m e n t o f a n e w B o a r d o fa p p o i n t m e n t o f a n e w B o a r d o f
a p p o i n t m e n t o f a n e w B o a r d o f
e i g h t m e m b e r s t o t a k e e f f e c te i g h t m e m b e r s t o t a k e e f f e c t
e i g h t m e m b e r s t o t a k e e f f e c te i g h t m e m b e r s t o t a k e e f f e c t
e i g h t m e m b e r s t o t a k e e f f e c t
f r o m 1 J u l y 2 0 0 1 .f r o m 1 J u l y 2 0 0 1 .
f r o m 1 J u l y 2 0 0 1 .f r o m 1 J u l y 2 0 0 1 .
f r o m 1 J u l y 2 0 0 1 .
T h e B o a r d f o r 2 0 0 0 / 1T h e B o a r d f o r 2 0 0 0 / 1
T h e B o a r d f o r 2 0 0 0 / 1T h e B o a r d f o r 2 0 0 0 / 1
T h e B o a r d f o r 2 0 0 0 / 1
c o m p r i s e d t h e f o l l o w i n gc o m p r i s e d t h e f o l l o w i n g
c o m p r i s e d t h e f o l l o w i n gc o m p r i s e d t h e f o l l o w i n g
c o m p r i s e d t h e f o l l o w i n g
m e m b e r s :m e m b e r s :
m e m b e r s :m e m b e r s :
m e m b e r s :
A l l a n P a p p i n C V O A M ,A l l a n P a p p i n C V O A M ,
A l l a n P a p p i n C V O A M ,A l l a n P a p p i n C V O A M ,
A l l a n P a p p i n C V O A M ,
C h a i r m a n , C h a i r m a n ,
C h a i r m a n , C h a i r m a n ,
C h a i r m a n , i s a f a r m e r f r o m
C a l u l u , n e a r B a i r n s d a l e i n E a s t
G i p p s l a n d .
D r G r e g W a l s h , D e p u t yD r G r e g W a l s h , D e p u t y
D r G r e g W a l s h , D e p u t yD r G r e g W a l s h , D e p u t y
D r G r e g W a l s h , D e p u t y
C h a i r m a n , C h a i r m a n ,
C h a i r m a n , C h a i r m a n ,
C h a i r m a n , i s a b u s i n e s s
c o n s u l t a n t a n d c o m p a n y
d i r e c t o r f r o m W a r r n a m b o o l i n
s o u t h w e s t V i c t o r i a .
G e o f f C r i c k , G e o f f C r i c k ,
G e o f f C r i c k , G e o f f C r i c k ,
G e o f f C r i c k , i s a f a r m e r f r o m
B l o w h a r d , n e a r B a l l a r a t i n
c e n t r a l V i c t o r i a a n d a n
e x e c u t i v e m e m b e r o f t h e
V i c t o r i a n F a r m e r s F e d e r a t i o n .
P a t r i c k F o s t e r , P a t r i c k F o s t e r ,
P a t r i c k F o s t e r , P a t r i c k F o s t e r ,
P a t r i c k F o s t e r , i s a p u b l i c
a c c o u n t a n t w i t h p r a c t i c e s i n
W e r r i b e e a n d C o l a c .
D a v i d K o c h , D a v i d K o c h ,
D a v i d K o c h , D a v i d K o c h ,
D a v i d K o c h , i s a f a r m e r f r o m
N a r e e n , n o r t h o f C o l e r a i n e i n
w e s t e r n V i c t o r i a , a n d a B o a r d
m e m b e r o f W e s t e r n D i s t r i c t
H e a l t h S e r v i c e s .
J o a n L i l e y , J o a n L i l e y ,
J o a n L i l e y , J o a n L i l e y ,
J o a n L i l e y , i s b o t h a b e e f /
s h e e p f a r m e r a n d a s e c o n d a r y
e c o n o m i c s t e a c h e r , f r o m
W a l k e r v i l l e , n e a r W i l s o n ’ s
P r o m o n t o r y i n s o u t h G i p p s l a n d .
J e n n i f e r M c M i l l a n , J e n n i f e r M c M i l l a n ,
J e n n i f e r M c M i l l a n , J e n n i f e r M c M i l l a n ,
J e n n i f e r M c M i l l a n , i s a d a i r y
f a r m e r f r o m D e n i s o n i n t h e
M a c a l i s t e r I r r i g a t i o n D i s t r i c t i n
c e n t r a l G i p p s l a n d , a n d w a s t h e
r e c i p i e n t o f t h e y e a r 2 0 0 0 J a c k
G r e e n C h u r c h i l l F e l l o w s h i p .
J o h n N i c o l O A M , J o h n N i c o l O A M ,
J o h n N i c o l O A M , J o h n N i c o l O A M ,
J o h n N i c o l O A M , i s a n
e n g i n e e r i n g c o n s u l t a n t f r o m
W e r r i b e e .
J o h n T i l l e a r d , J o h n T i l l e a r d ,
J o h n T i l l e a r d , J o h n T i l l e a r d ,
J o h n T i l l e a r d , i s a n e n g i n e e r i n g
c o n s u l t a n t f r o m S a l e , i n c e n t r a l
G i p p s l a n d .
Internet Copy
MEMBERSHIP OF THE BOARDMEMBERSHIP OF THE BOARDMEMBERSHIP OF THE BOARDMEMBERSHIP OF THE BOARDMEMBERSHIP OF THE BOARD– Nine (9) non-executive members until 30
June 2001
– From 1 July 2001, seven (7) non-executive
members and the Chief Executive
– All members are appointed for a three year
period
– Members are appointed by the Minister in
accordance with provisions of the Water Act1989
– The Chairman is appointed by the Minister
– The Deputy Chairman is appointed by the
Board
– Board remuneration is set by the Minister.
BOARD COMMITTEESBOARD COMMITTEESBOARD COMMITTEESBOARD COMMITTEESBOARD COMMITTEES– The following Committees assist the Board in
the effective execution of its governance
responsibilities:
– Audit Committee
– Business Planning Committee
– Remuneration and Corporate Governance
Policy Committee
– Technical Committee.
– Committees have formal Terms of Reference,
report to the Board and liaise closely with the
Chief Executive and senior management to
ensure that their activities support and
enhance the governance role of the Board.
STSTSTSTSTAAAAATUS AND INDEPENDENCETUS AND INDEPENDENCETUS AND INDEPENDENCETUS AND INDEPENDENCETUS AND INDEPENDENCE– Members must disclose any conflict of
pecuniary or other interest
– Members are appointed to bring specific
skills and experience to the Board, not to
represent any constituency
– Regular formal and informal
meetings with customer,
community and government
groups and individuals.
ETHICSETHICSETHICSETHICSETHICS– The Board is committed to
compliance with the spirit and the
letter of legislation
– The safety and health of the
Authority staff is a key focus
– All Board and Authority
responsibilities and functions are
undertaken in accordance with
the following governance values:
– the expectations of itsshareholder
– the skills and experience of itsmembers
– the knowledge and expertise of itscustomers
– enhancing customer value
– strategic planning for the future
– Authority rather than individual orfactional priorities
– outward vision rather than internalpreoccupation
– encouragement of diversity inviewpoints
– strategic leadership more thanadministrative detail
– clear distinction of Board andChief Executive roles
– collective rather than individualdecisions
– future rather than past or presentand
– proactivity rather than reactivity.
– Members may access independent
professional advice subject to approval by
the Chairman.
RISK MANAGEMENTRISK MANAGEMENTRISK MANAGEMENTRISK MANAGEMENTRISK MANAGEMENT– Risk Management is recognised as a key
Board responsibility
– Formal risk assessment processes and risk
avoidance and management plans are in
place
– Regular and comprehensive reviews are
undertaken to ensure that the business risks
of the Authority are being properly and
effectively managed
– Contingency and emergency management
plans are in place for significant risks.
DUE DILIGENCEDUE DILIGENCEDUE DILIGENCEDUE DILIGENCEDUE DILIGENCE– Regular management reports to the Board
– Regular formal reviews of performance
undertaken by senior management and
Board sub-committees
– Major reviews, audits and assessments
undertaken as required according to
identified priorities or needs
– Clear review and audit responsibilities
established for Board sub-committees
– Direct sub-committee access to internal and
external audit.
ASSESSMENT AND DEVELOPMENTASSESSMENT AND DEVELOPMENTASSESSMENT AND DEVELOPMENTASSESSMENT AND DEVELOPMENTASSESSMENT AND DEVELOPMENT– A regular, annual, formal program of Board
self assessment
– A planned annual program of formal
education or training in topics identified
during the assessment process
– A planned and ongoing program of visits to
key locations in the Authority’s region
5
Internet Copy
6
CHAIRMAN’S REPORTCHAIRMAN’S REPORTCHAIRMAN’S REPORTCHAIRMAN’S REPORTCHAIRMAN’S REPORT
I t w i l l n o t b e s u f f i c i e n t f o r u s t oI t w i l l n o t b e s u f f i c i e n t f o r u s t o
I t w i l l n o t b e s u f f i c i e n t f o r u s t oI t w i l l n o t b e s u f f i c i e n t f o r u s t o
I t w i l l n o t b e s u f f i c i e n t f o r u s t o
m e r e l y a c h i e v e a p p r o p r i a t em e r e l y a c h i e v e a p p r o p r i a t e
m e r e l y a c h i e v e a p p r o p r i a t em e r e l y a c h i e v e a p p r o p r i a t e
m e r e l y a c h i e v e a p p r o p r i a t e
f i n a n c i a l o u t c o m e s . W e m u s tf i n a n c i a l o u t c o m e s . W e m u s t
f i n a n c i a l o u t c o m e s . W e m u s tf i n a n c i a l o u t c o m e s . W e m u s t
f i n a n c i a l o u t c o m e s . W e m u s t
d e m o n s t r a t e c l e a r l y t h a t o u rd e m o n s t r a t e c l e a r l y t h a t o u r
d e m o n s t r a t e c l e a r l y t h a t o u rd e m o n s t r a t e c l e a r l y t h a t o u r
d e m o n s t r a t e c l e a r l y t h a t o u r
b u s i n e s s d e c i s i o n s a n db u s i n e s s d e c i s i o n s a n d
b u s i n e s s d e c i s i o n s a n db u s i n e s s d e c i s i o n s a n d
b u s i n e s s d e c i s i o n s a n d
o u t c o m e s a l s o b e n e f i t s o c i e t yo u t c o m e s a l s o b e n e f i t s o c i e t y
o u t c o m e s a l s o b e n e f i t s o c i e t yo u t c o m e s a l s o b e n e f i t s o c i e t y
o u t c o m e s a l s o b e n e f i t s o c i e t y
a n d t h e e n v i r o n m e n t .a n d t h e e n v i r o n m e n t .
a n d t h e e n v i r o n m e n t .a n d t h e e n v i r o n m e n t .
a n d t h e e n v i r o n m e n t .
In my final Report as Chairman of SRW I would
like to focus on three things:
• the uncertainty inherent in our industry;
• the challenges confronting it; and
• the colleagues with whom I have been
privileged to work.
Uncertainty was demonstrated during 2000/1 by
the varied fortunes of our irrigation district
customers. In Bacchus Marsh and Werribee
there were good supplies of water in storage at
the start of the year and customers had no
difficulty accessing required volumes throughout
the year. Moderate weather conditions meant
that sales revenues were down in both districts
as the water was simply not needed.
By contrast the Macalister Irrigation District
effectively ran out of water in April, despite
beginning the irrigation season with ample
volume available. Lake Glenmaggie was full three
months into the season and stayed that way up
until 27 November. Indeed, off-quota water was
available to customers throughout the period from
13 September to 26 November.
From then onwards, however, prolonged dry and
hot weather in combination with heavy usage
drained Glenmaggie at an alarming rate during
December and January. Rain late in January was
only a brief respite before the cycle of high usage
and low or no inflows recommenced in February.
As a consequence SRW was forced to impose
severe restrictions on irrigators during April. An
initial cap at water right plus 50% sales quickly
dropped to water right only. This meant that there
were few opportunities for farmers to trade water
or to make alternative plans to accommodate the
restrictions. Initially some 130 farmers were
subject to withdrawal of supply due to the 150%
restrictions, with the majority of customers being
affected by the eventual 100% cap.
Change and challenge are ever-present realities,
even in an efficient and successful business such
as ours, and SRW, together with our peer RWAs
and our metropolitan colleagues, faces
formidable challenges in 2001/2 and beyond. We
must not only continue to provide the excellent
customer service and maintain the clear
customer focus that we have developed over the
last decade, but must also respond to changing
and emerging Government and community
expectations, particularly in respect of the best
use of the valuable resource we manage, on
behalf of all beneficiaries - including the
environment.
In this context the expectations of triple bottom
line accounting will become more and more
important in measuring our operational success
in coming years. It will not be sufficient for us to
merely achieve appropriate financial outcomes.
We must demonstrate clearly that our business
decisions and outcomes also benefit society and
the environment.
This will be particularly the case in respect of our
Licensing business, as we continue to address
complex problems associated with the
management of Groundwater and Surface Water.
The key to success will lie in our ability to engage
the various groups and individuals on whom these
resources impact - our customers, other
stakeholders, Government and, of course the
wider community.
Allan J Pappin CVO AM, Chairman SRW.
Internet Copy
7
That engagement will be a challenge for our
processes of communication, especially in the
south west of the State, where the majority of our
Licensing customers are located. We must ensure
that we can communicate ideas, plans and
information clearly, widely, understandably and
accurately. Only by doing so will we adequately
engage and involve those affected by
developments in these areas. That engagement
must take place; without it the achievement of
essential and desirable triple bottom line reforms
and outcomes will be impossible.
In relation to the governance and management
of SRW, the term of office of the current SRW
Board expires on 30 June 2001. The Minister for
Environment and Conservation has announced
the membership of the new Board, which will be
substantially changed both in structure and
membership. The Minister has invited me to
remain as Chairman of the new Board until 31
December 2001.
In all, three of the current Board members have
been re-appointed and my congratulations go to
Mrs Jennifer Macmillan and Mr Geoff Crick. To
my retiring colleagues I offer my heartfelt thanks
and appreciation for your efforts on behalf of
SRW, our customers and our communities
throughout your tenure. In particular I would like
to acknowledge Dr Greg Walsh, Mr John Tilleard,
Mr Pat Foster and Mr John Nicol who, as
foundation members of the SRW Board in 1995,
have shared with me the experience - sometimes
frustrating, sometimes exhilarating, but always
rewarding - of building the Authority into the
progressive, respected and professional
organisation it is today.
Mrs Joan Liley and Mr David Koch also retire at
30 June and to them too I offer my thanks for their
enthusiasm, involvement and contribution during
their appointments. It is a daunting task to join a
Board such as this “ mid-stream”. The learning
curve is steep and the challenges are great. Joan
and David have mastered those challenges and
made enduring contributions to the governance
of SRW.
Chief Executive Martin Kent, his management
team and all the staff of SRW have, for yet another
year, worked professionally and productively to
meet the needs of our customers, our shareholder
and our stakeholders. In amongst the challenges
of a rapidly emptying Glenmaggie, the establish-
ment and implementation of Groundwater and
Surface Water Management Plans, flash floods
in both our eastern and western districts and the
usual round of operational surprises, the staff
made time to organise the celebration of the 75th
anniversary of Lake Glenmaggie Dam and to
conduct open days at Glenmaggie and Lerderderg
weir. Additionally, the usual diverse range of
capital works projects was commenced and/or
completed and we continued to lead the State in
the fields of Groundwater and Streamflow
Management planning. The efforts of the staff
deserve our respect and admiration.
Finally, as a farmer utilising both Groundwater and
the Mitchell River to irrigate our property, I expect
to maintain a long, close and fruitful customer
relationship with SRW. As Chairman - of SRW,
Gippsland Rural Water and the Gippsland
Regional Board of Management of the Rural
Water Corporation - I look back with great
satisfaction and pride on the achievements of the
7
last ten years. Those achievements
could not have taken place without the
dedicated support and involvement of
past and current Board members,
management and staff, our customers,
Government and the communities
which we serve.
Thank you all.
Internet Copy
8
CHIEF EXECUTIVE’SCHIEF EXECUTIVE’SCHIEF EXECUTIVE’SCHIEF EXECUTIVE’SCHIEF EXECUTIVE’S
REPORTREPORTREPORTREPORTREPORT
I a m p l e a s e d t h a t S R W h a sI a m p l e a s e d t h a t S R W h a s
I a m p l e a s e d t h a t S R W h a sI a m p l e a s e d t h a t S R W h a s
I a m p l e a s e d t h a t S R W h a s
a c h i e v e d m u c h , b u t r e c o g n i s ea c h i e v e d m u c h , b u t r e c o g n i s e
a c h i e v e d m u c h , b u t r e c o g n i s ea c h i e v e d m u c h , b u t r e c o g n i s e
a c h i e v e d m u c h , b u t r e c o g n i s e
t h a t t h e r e i s s t i l l m u c h t o d o .t h a t t h e r e i s s t i l l m u c h t o d o .
t h a t t h e r e i s s t i l l m u c h t o d o .t h a t t h e r e i s s t i l l m u c h t o d o .
t h a t t h e r e i s s t i l l m u c h t o d o .
O u r t h r e e - w a y c h a l l e n g e i s t oO u r t h r e e - w a y c h a l l e n g e i s t o
O u r t h r e e - w a y c h a l l e n g e i s t oO u r t h r e e - w a y c h a l l e n g e i s t o
O u r t h r e e - w a y c h a l l e n g e i s t o
m a i n t a i n o u r p a s tm a i n t a i n o u r p a s t
m a i n t a i n o u r p a s tm a i n t a i n o u r p a s t
m a i n t a i n o u r p a s t
a c h i e v e m e n t s , t o b ea c h i e v e m e n t s , t o b e
a c h i e v e m e n t s , t o b ea c h i e v e m e n t s , t o b e
a c h i e v e m e n t s , t o b e
e n v i r o n m e n t a l l y a n d s o c i a l l ye n v i r o n m e n t a l l y a n d s o c i a l l y
e n v i r o n m e n t a l l y a n d s o c i a l l ye n v i r o n m e n t a l l y a n d s o c i a l l y
e n v i r o n m e n t a l l y a n d s o c i a l l y
r e s p o n s i b l e ; a n d t o w o r k i nr e s p o n s i b l e ; a n d t o w o r k i n
r e s p o n s i b l e ; a n d t o w o r k i nr e s p o n s i b l e ; a n d t o w o r k i n
r e s p o n s i b l e ; a n d t o w o r k i n
p a r t n e r s h i p f o r s u s t a i n a b l ep a r t n e r s h i p f o r s u s t a i n a b l e
p a r t n e r s h i p f o r s u s t a i n a b l ep a r t n e r s h i p f o r s u s t a i n a b l e
p a r t n e r s h i p f o r s u s t a i n a b l e
r e s o u r c e m a n a g e m e n t ,r e s o u r c e m a n a g e m e n t ,
r e s o u r c e m a n a g e m e n t ,r e s o u r c e m a n a g e m e n t ,
r e s o u r c e m a n a g e m e n t ,
r e g i o n a l c o m m u n i t i e s a n dr e g i o n a l c o m m u n i t i e s a n d
r e g i o n a l c o m m u n i t i e s a n dr e g i o n a l c o m m u n i t i e s a n d
r e g i o n a l c o m m u n i t i e s a n d
e n v i r o n m e n t s .e n v i r o n m e n t s .
e n v i r o n m e n t s .e n v i r o n m e n t s .
e n v i r o n m e n t s .
As the SRW Board’s second three-year term
comes to a close, and at the end of a decade of
fundamental change in the rural water sector
arising from the publication and adoption of the
McDonald Report, now is a good time to take
stock of our achievements and to give some
thought to the future direction of the Authority and
the rural water sector in Victoria.
At 30 June 2001, SRW stands poised for a post-
McDonald future. We have achieved the key
McDonald goals - a viable, regionally-based
authority; core businesses which are self funded
and financially sustainable; and close
collaboration and consultation with our
customers. Importantly, we have strengthened
our understanding of our four businesses -
Eastern Irrigation, Headworks, Licensing and
Western Irrigation - and of the social,
environmental and economic priorities and
policies of Government.
This will provide a springboard for SRW in the
coming decade, when we foresee the key
challenges revolving around our core resource -
the water that we harvest and supply, or whose
extraction from rivers or bores we license - and
the breadth of benefit it can bring to rural
communities in southern Victoria. The sustainable
management of that water as both a crucial
business input and an environmental and com-
munity resource can be expected to exercise all
agencies with an interest in it.
I believe that this will require SRW to focus in
three areas:
– maintaining its financial viability - either within
the existing financial framework or in accor-
dance with any future expectations which might
succeed this;
– ensuring and demonstrating that it performs
well against Government and community
environmental and social requirements and
measures; and
– collaborating actively and successfully with
regional stakeholders (especially those directly
charged with other pastoral responsibilities
with respect to catchments and water) to
ensure the sustainability of the resource, the
environment it nurtures and the communities
which depend upon it.
More specifically, this will require our involve-
ment in:
– improvement in both our and our customers’
operational efficiency to create improved
environmental outcomes both on- and off-farm;
Dr Martin Kent, Chief Executive.
Internet Copy
9
– collaboration with other agencies and stake-
holders, to achieve improved environmental
outcomes whilst maintaining and sustaining the
existing economic and social fabric of our region;
– creating beneficial long term environmental
outcomes for all Victorian rivers and
groundwater aquifers through community
driven and supported local management plans;
– further reform of the water trading system to
explicitly address environmental sustainability
whilst facilitating sustainable regional
development;
– improved customer service and risk
management to support best practice irrigation,
maintain prices at viable levels and achieve
desirable environmental outcomes; and
– continuing collaboration with Government and
all stakeholders in rural water, aimed at building,
sustaining and enhancing mutually beneficial
water resource management frameworks and
regimes which deliver balanced and beneficial
outcomes to all users.
SRW is already deeply committed to and involved
in many of these. We are active participants in
remedial and preventative activities such as the
Gippsland Lakes Rescue Package, and nutrient
and salinity management programs. We have key
management responsibilities as storage
operators and resource managers to monitor and
maintain environmental flows in waterways
across region. We are leaders in the development
of Streamflow and Groundwater Management
Plans aimed at securing the long term
sustainability of our rivers and aquifers.
Increasingly, our future challenges will involve
the twin, but complementary, targets of water
efficiency and good environmental management.
This is already the purpose of elements of the
Gippsland Lakes Rescue Package, which aims to
utilise greater on-farm water efficiency to reduce
nutrient run-off from the Macalister Irrigation
District.
Lake Glenmaggie at the end of the 2000/1
irrigation season.
I am pleased that SRW has achieved
much, but recognise that there is still
much to do. Our three-way challenge
is to maintain our past achievements,
to be environmentally and socially
responsible; and to work in
partnership for sustainable resource
management, regional communities
and environments.
The decade post-McDonald has been
an exciting journey. It is clear that the
next decade looks to be equally
challenging, rewarding and exciting.
Internet Copy
10
OVERVIEWOVERVIEWOVERVIEWOVERVIEWOVERVIEW
The year in our irrigation districts was
characterised by polarised fortunes for
customers. The Western Irrigation business
experienced good rains and gradual improvement
in its water supply and storage situation during
the year, with demand for irrigation water
generally below expectations as a consequence.
The Macalister Irrigation District, however, found
itself desperately short of water late in the
irrigation season, following a very dry summer
and autumn which resulted in the level of Lake
Glenmaggie falling dramatically after Christmas
2000.
These contrasting outcomes resulted in sales
revenue for the Irrigation businesses being down
for the third year running.
All three irrigation districts fell short of long term
average expectations, with total sales down by
$238,000.
Our Headworks business was also impacted for
the second year by low offtakes from Rosslynne
reservoir by Western Water. This caused a drop
in revenue for that storage system of $142,000.
This was offset, however, by a reduction in the
Authority’s dividend payment to Government,
which dropped from $418,000 to $380,000 for
2000/1 only.
Activity in the Licensing business fluctuated both
above and below expectations. Revenues for
Groundwater and Surface Water diversion were
above forecasts by a total of $134,000 and
operating results improved by $42,000. Demand
for Bore Construction Licences, however, was
down on previous years, although this had no
impact on the overall result for the Licensing
business.
The renewals-based operating result for the
Authority (before dividend payments) was a
surplus of $2.854 million for the year, generated
predominantly by Headworks operations and Rate
of Return charges, and by the receipt of
Government funds to support the substantial
metering program being undertaken in support of
the Groundwater and Streamflow Management
Planning activities currently being undertaken by
SRW.
When reviewing the business results quoted in
this Operations Report and if comparing them with
the financial statements appearing later in the
report, it is important to note the effect of
renewals on our accounts.
Pipelining of the Nuntin Channel in the
Macalister Irrigation District will create
significant resource management benefits, in
the form of water use efficiency and water
savings, by eliminating leaks and other in-
system losses from this section of the
infrastructure. The first stage has been
completed during the 2001 winter shutdown
period. Here, lengths of pipe have been joined
and then mounted on trolleys to facilitate
installation.
OP
ER
AT
IO
NS
R
EP
OR
TO
PE
RA
TI
ON
S
RE
PO
RT
OP
ER
AT
IO
NS
R
EP
OR
TO
PE
RA
TI
ON
S
RE
PO
RT
OP
ER
AT
IO
NS
R
EP
OR
T
Internet Copy
11
SRW uses a 100 year Renewals Annuity
calculation to determine the annual provision
necessary for replacement of its infrastructure
assets (dams, irrigation channels, pipelines etc.).
It uses traditional depreciation calculations only
for its non-infrastructure assets (buildings,
computers, motor vehicles etc.).
All price setting and budgeting is based on the
Renewals Annuity, which has been accepted by
customers and Government as a fair and
equitable mechanism for allocating the cost of our
long lived infrastructure assets in use.
Renewals Annuities, however, are not an
acceptable basis for calculating this cost for
purposes of preparing published financial
accounts.
In our financial statements appearing later in this
Annual Report, therefore, standard depreciation
calculations have been substituted. The table at
the end of this section illustrates the financial
impact of the substitution for 2000/1 and
preceding years.
RECONCILIATION OF RENEWALS AND DEPRECIATION BASED RESULTSRECONCILIATION OF RENEWALS AND DEPRECIATION BASED RESULTSRECONCILIATION OF RENEWALS AND DEPRECIATION BASED RESULTSRECONCILIATION OF RENEWALS AND DEPRECIATION BASED RESULTSRECONCILIATION OF RENEWALS AND DEPRECIATION BASED RESULTS
2000/12000/12000/12000/12000/1 1999/01999/01999/01999/01999/0 1998/91998/91998/91998/91998/9 1997/81997/81997/81997/81997/8 1996/71996/71996/71996/71996/7$’000$’000$’000$’000$’000 $’000$’000$’000$’000$’000 $’000$’000$’000$’000$’000 $’000$’000$’000$’000$’000 $’000$’000$’000$’000$’000
Net Surplus (Deficit) for year
including Depreciation expense 528 (7,667) 615 1,393 2,745
Add back Depreciation Expense 5,283 4,228 4,084 4,007 3,781
5,811 (3,439) 4,699 5,400 6,526
Deduct Renewals Annuity expense 2,957 3,074 2,811 2,870 2,705
Net Surplus (Deficit) for year
including Renewals Annuity expense 2,854 (6,513) 1,888 2,530 3,821
During 2000/1 SRW has also
conducted a major review of its
Renewals Annuity program and, as
a consequence, will be moving to an
annuity period of 40 years for its
irrigation distribution infrastructure
from 2001/2. This has no effect on
the financial results for 2000/1.
SRW was the recipient of a grant from the Office of
Public Employment under the “ Managing Fairly”
category of the OPE Annual Awards program, for our
EEO program “ Building a ‘Fair Go’ Culture at Work”.
Pictured receiving the grant at the Awards
Presentation Conference are (L to R); Commissioner for
Public Employment Mr Peter Salway, SRW EEO team
members Vicki Lanigan, Noula Antonopoulos and Tim
Purton, and SRW Manager Human Resources, Jim
Watt.
Internet Copy
12
EASTERN IRRIGATIONEASTERN IRRIGATIONEASTERN IRRIGATIONEASTERN IRRIGATIONEASTERN IRRIGATION
MACALISTERMACALISTERMACALISTERMACALISTERMACALISTER
IRRIGATIONIRRIGATIONIRRIGATIONIRRIGATIONIRRIGATION DISTRICTDISTRICTDISTRICTDISTRICTDISTRICT
FINANCIAL PERFORMANCEFINANCIAL PERFORMANCEFINANCIAL PERFORMANCEFINANCIAL PERFORMANCEFINANCIAL PERFORMANCE
In the latter part of the irrigation
season, commencing in early March
2001, it became necessary to place
stringent restrictions on customers to
protect remaining unused water right.
Initially an overall limit of water right
plus 50% was set but, in April, it was
necessary to cut this back further to
water right only. This caused an
inevitable drop in water sales revenue,
although the final impact was less
than expected. Total sales were 34,232
ML, the highest in the last three years,
although still 14.4% down on the long
term average expectation of 40,000
ML.
This shortfall caused a drop in sales
revenue of $178,000. Total revenues of
$5.569 million were within $7,000 of
budget, but were boosted by high
interest earnings and by the receipt of
$100,000 from the State Government to
fund a channel leak sealing project on
the Main Southern concrete flume, as
part of the Gippsland Lakes Rescue
Package funding.
Lower Operations costs during the
year were more than offset by
increases in Maintenance and other
expenditure. A further $50,000 of non-
capital investment activity was also
charged against revenue. As a result,
total expenditure was $511,000 over
budget (including the non-capital
investment and expenditure of the
Lakes Rescue funds) and the final
deficit of $198,000 was $518,000 worse
than projected.
This restriction was imposed on 3 April but, less
than a week later, a further restriction to only
water right was formally announced by the MCCC
Chairman on 9 April, with effect from 11 April, as
Glenmaggie continued to fall alarmingly and with
no prospect of meaningful inflows. On that date
it held only 18,000 ML.
By 17 April the lake had fallen to less than 12,000
ML and was rapidly approaching empty (up to
9,000 ML cannot be released without pumping,
as it is below the level of the offtake pipes). Three
days later, however, rains finally fell, eventually
resulting in a flash flood event at Cowwarr on the
22nd, when flow rates rose from 3,500 ML/day at
8 am to 21,650 ML/day one hour later and peaked
at 11 am at 24,850 ML/day.
All restrictions were lifted on 23 April and the
season closed on 15 May with no further incident
and no demand for post-season supply. By 30
June Glenmaggie had recovered from its
seasonal low of 10,420 ML (on 22 April) to 32,118
ML - still only 16.9% full.
This extraordinary season posed a number of
questions regarding restriction and allocation
policies and practices. These will be addressed
as planning priorities during 2001/2.
DELIVERY PERFORMANCEDELIVERY PERFORMANCEDELIVERY PERFORMANCEDELIVERY PERFORMANCEDELIVERY PERFORMANCE
Total deliveries for the season of 151,539 ML were
marginally down on the previous year, although
sales deliveries - and, as a consequence, sales
revenue - were higher. The principal difference
between the two years resulted from the extent
to which water right remained unused. In 1999/
2000 over 99% was utilised but last year this fell
to just under 95%.
The level of in-system losses against storage
offtakes (23.3% as against only 20.8% the previous
year) has raised significant concerns about the
accuracy of measurement of offtakes at Lake
Glenmaggie, following recent valve replacement
works. There is a concern that actual volumes
released are lower than the measured totals and
this possibility is being examined by technical
experts. It had been expected that in-system
delivery performance should have been at least
maintained in 2000/1, as the district was operated
to achieve maximum efficiency in this respect.
OPERATIONAL PERFORMANCEOPERATIONAL PERFORMANCEOPERATIONAL PERFORMANCEOPERATIONAL PERFORMANCEOPERATIONAL PERFORMANCE
A year of contrasting fortunes began quietly with
very low early season demand (in contrast to the
previous year, when 4,660 ML were delivered prior
to the official commencement of the irrigation
period).
At this stage inflows to Lake Glenmaggie were
excellent and, in mid-September, the Lake was full
and the dam began spilling. As a consequence, and
in accordance with normal practice, off-quota
supply was offered to customers. Off quota water
supply is paid for at the normal rate but is not
deducted from the customer’s water right.
This situation lasted until late November. Only
three days later the onset of dry conditions had
resulted in irrigation demand across the district
reaching full capacity. It remained that way
throughout December and January. Through
December Glenmaggie dropped from full to only
70%. Deliveries for the month totalled 38,620 ML
- 55% higher than the 12 year average for this
month. It was necessary also to begin calling up
supply from our share of the Thomson dam
storage to supplement deliveries.
Heavy rains in the last week of January 2001 gave
some hope that the demand pressures would
ease. By early March, however, the Macalister
Customer Consultative Committee in
collaboration with management determined that
some form of restriction could become necessary.
Letters were sent out to high use customers
during March warning of the possibility that
supply could be limited to water right plus sales
of 50%.
A panoramic view of a typical channel section
and collection of offtake and regulating
structures in the Macalister Irrigation District.
Maffra weir is a vital
regulating structure which
controls the offtake of water
from the lower Macalister
River into the Main Eastern
Channel of the MID.
Internet Copy
13
DescriptionDescriptionDescriptionDescriptionDescription 2000/12000/12000/12000/12000/1 1999/01999/01999/01999/01999/0 1998/91998/91998/91998/91998/9MLMLMLMLML MLMLMLMLML MLMLMLMLML
Water brought intothe system
..................... 224,308 223,368 232,995
Water rightsand entitlementsdelivered
........................ 117,307 122,489 112,797
Seasonal salesdelivered
........................ 34,232 31,629 32,353
%%%%% %%%%% %%%%%Water delivered tocustomers ...................... 68.6 69.6 65.4
Water lost within thedelivery system ............ 23.3 20.8 25.3
Water passed asoutfalls from system .... 8.1 9.6 9.3
MAINTENANCE PERFORMANCEMAINTENANCE PERFORMANCEMAINTENANCE PERFORMANCEMAINTENANCE PERFORMANCEMAINTENANCE PERFORMANCE
Recurrent maintenance in the MID is now focused
increasingly on proactive rather than reactive
activity, and new initiatives were introduced or
further developed during 2000/1 to ensure that we
are able to maintain this direction.
The A s s e t I n s p e c t i o n P r o g r a m began in winter
2000 and is estimated to take another two years.
It comprises the physical assessment by trained
staff of every asset that forms part of the irrigation
system. Its purpose is to determine the quality and
remaining life of the system infrastructure, to
determine a current condition rating for all
component elements and to identify preventative
maintenance. This work will also enable the
further refinement of future renewals annuity
requirements for the district.
The C r i t i c a l A s s e t s P r o g r a m has been developed
during 2000/1 to begin in 2001/2, and will identify
and correct components of the system which may
be vulnerable to failure and difficult to rectify
quickly. It aims to further reduce the risk of a major
interruption to supply. Major supply channels
located in confined and logistically prohibitive
terrain are the first targets. New or improved
accesses will be created to allow regular
surveillance, remedial works and practical
contingency procedures. An initial annual budget
of $200,000 for the next five years has been
allocated to this initiative.
We have continued to address the ever growing
and difficult problem of E u r o p e a n C a r p E r o s i o n
in our earthen channels. Repairs were made
during the year to sections where damage was
most prolific. The exorbitant cost of such works,
however, has prompted a study into eliminating
further problems by preventing the fishes’ initial
entry into the system. Preventative barriers are
in the planning stages and are expected to be
introduced in the near future.
As part of our E n v i r o n m e n t a l a n d C o m m u n i t y
A w a r e n e s s program the following projects were
undertaken throughout the year, supporting
Landcare Groups, Quality Assurance schemes
and pollution control:
– Developing parts of the Central Gippsland No.
3 Drain reserve for the planting of many
thousands of non-invasive native trees, in
support of the K i l m a n y L a n d c a r e G r o u p and
involving extensive earth moving, fencing and
drainage works.
– Co-operation and support to milk companies
in their quality assurance schemes in relation
to SRW herbicide usage
– Monitoring drainage water to detect
undesirable levels of chemical residues as
part of our aquatic weed control program
– Provision of labour and mechanical plant to
assist T a r g e t 1 0 Pasture Development Group
field studies
– Participation in nutrient reduction and water
reuse programs
– Investigation into submerged
aquatic weed control
alternatives and
– Staff training in the safe storage,
transport and use of
environmentally hazardous
substances.
A v e r y s u c c e s s f u lA v e r y s u c c e s s f u l
A v e r y s u c c e s s f u lA v e r y s u c c e s s f u l
A v e r y s u c c e s s f u l
m a i n t e n a n c e s e a s o n w a sm a i n t e n a n c e s e a s o n w a s
m a i n t e n a n c e s e a s o n w a sm a i n t e n a n c e s e a s o n w a s
m a i n t e n a n c e s e a s o n w a s
p r o l o n g e d f o r s o m e f o u rp r o l o n g e d f o r s o m e f o u r
p r o l o n g e d f o r s o m e f o u rp r o l o n g e d f o r s o m e f o u r
p r o l o n g e d f o r s o m e f o u r
m o n t h s b y e a r l y a n d l a t e r a i n s .m o n t h s b y e a r l y a n d l a t e r a i n s .
m o n t h s b y e a r l y a n d l a t e r a i n s .m o n t h s b y e a r l y a n d l a t e r a i n s .
m o n t h s b y e a r l y a n d l a t e r a i n s .
T h i s e n a b l e d e a r l y c o m p l e t i o nT h i s e n a b l e d e a r l y c o m p l e t i o n
T h i s e n a b l e d e a r l y c o m p l e t i o nT h i s e n a b l e d e a r l y c o m p l e t i o n
T h i s e n a b l e d e a r l y c o m p l e t i o n
o f t h e 2 0 0 0 / 1 p r o g r a m a n do f t h e 2 0 0 0 / 1 p r o g r a m a n d
o f t h e 2 0 0 0 / 1 p r o g r a m a n do f t h e 2 0 0 0 / 1 p r o g r a m a n d
o f t h e 2 0 0 0 / 1 p r o g r a m a n d
e n a b l e d e x t r a w o r k s t o b ee n a b l e d e x t r a w o r k s t o b e
e n a b l e d e x t r a w o r k s t o b ee n a b l e d e x t r a w o r k s t o b e
e n a b l e d e x t r a w o r k s t o b e
b r o u g h t f o r w a r d . S o m e o f t h eb r o u g h t f o r w a r d . S o m e o f t h e
b r o u g h t f o r w a r d . S o m e o f t h eb r o u g h t f o r w a r d . S o m e o f t h e
b r o u g h t f o r w a r d . S o m e o f t h e
m o r e n o t a b l e a c h i e v e m e n t sm o r e n o t a b l e a c h i e v e m e n t s
m o r e n o t a b l e a c h i e v e m e n t sm o r e n o t a b l e a c h i e v e m e n t s
m o r e n o t a b l e a c h i e v e m e n t s
i n c l u d e d :i n c l u d e d :
i n c l u d e d :i n c l u d e d :
i n c l u d e d :
··
··
·
A c o m p r e h e n s i v eA c o m p r e h e n s i v e
A c o m p r e h e n s i v eA c o m p r e h e n s i v e
A c o m p r e h e n s i v e
t e c h n i c a l r e v i e w o f t h et e c h n i c a l r e v i e w o f t h e
t e c h n i c a l r e v i e w o f t h et e c h n i c a l r e v i e w o f t h e
t e c h n i c a l r e v i e w o f t h e
M I D m a i n t e n a n c e r e g i m e .M I D m a i n t e n a n c e r e g i m e .
M I D m a i n t e n a n c e r e g i m e .M I D m a i n t e n a n c e r e g i m e .
M I D m a i n t e n a n c e r e g i m e .
··
··
·
C o m p l e t i o n o f t h e M a i nC o m p l e t i o n o f t h e M a i n
C o m p l e t i o n o f t h e M a i nC o m p l e t i o n o f t h e M a i n
C o m p l e t i o n o f t h e M a i n
S o u t h e r n F l u m e j o i n tS o u t h e r n F l u m e j o i n t
S o u t h e r n F l u m e j o i n tS o u t h e r n F l u m e j o i n t
S o u t h e r n F l u m e j o i n t
r e h a b i l i t a t i o n p r o j e c t .r e h a b i l i t a t i o n p r o j e c t .
r e h a b i l i t a t i o n p r o j e c t .r e h a b i l i t a t i o n p r o j e c t .
r e h a b i l i t a t i o n p r o j e c t .
··
··
·
C o m p l e t i o n o f p h a s e 1 o f aC o m p l e t i o n o f p h a s e 1 o f a
C o m p l e t i o n o f p h a s e 1 o f aC o m p l e t i o n o f p h a s e 1 o f a
C o m p l e t i o n o f p h a s e 1 o f a
r o a d c r o s s i n g s u p g r a d er o a d c r o s s i n g s u p g r a d e
r o a d c r o s s i n g s u p g r a d er o a d c r o s s i n g s u p g r a d e
r o a d c r o s s i n g s u p g r a d e
a n d p r o t e c t i o n p r o g r a m i na n d p r o t e c t i o n p r o g r a m i n
a n d p r o t e c t i o n p r o g r a m i na n d p r o t e c t i o n p r o g r a m i n
a n d p r o t e c t i o n p r o g r a m i n
c o n j u n c t i o n w i t h t h ec o n j u n c t i o n w i t h t h e
c o n j u n c t i o n w i t h t h ec o n j u n c t i o n w i t h t h e
c o n j u n c t i o n w i t h t h e
W e l l i n g t o n S h i r e .W e l l i n g t o n S h i r e .
W e l l i n g t o n S h i r e .W e l l i n g t o n S h i r e .
W e l l i n g t o n S h i r e .
··
··
·
E x t e n s i v e e r o s i o n c o n t r o lE x t e n s i v e e r o s i o n c o n t r o l
E x t e n s i v e e r o s i o n c o n t r o lE x t e n s i v e e r o s i o n c o n t r o l
E x t e n s i v e e r o s i o n c o n t r o l
i n b o t h c h a n n e l s a n di n b o t h c h a n n e l s a n d
i n b o t h c h a n n e l s a n di n b o t h c h a n n e l s a n d
i n b o t h c h a n n e l s a n d
d r a i n s a n dd r a i n s a n d
d r a i n s a n dd r a i n s a n d
d r a i n s a n d
··
··
·
S i g n i f i c a n t p r o g r e s s i n t h eS i g n i f i c a n t p r o g r e s s i n t h e
S i g n i f i c a n t p r o g r e s s i n t h eS i g n i f i c a n t p r o g r e s s i n t h e
S i g n i f i c a n t p r o g r e s s i n t h e
r e g u l a t o r a u t o m a t i o nr e g u l a t o r a u t o m a t i o n
r e g u l a t o r a u t o m a t i o nr e g u l a t o r a u t o m a t i o n
r e g u l a t o r a u t o m a t i o n
p r o g r a m , w i t h n i n e m a j o rp r o g r a m , w i t h n i n e m a j o r
p r o g r a m , w i t h n i n e m a j o rp r o g r a m , w i t h n i n e m a j o r
p r o g r a m , w i t h n i n e m a j o r
s i t e s p r e p a r e d f o rs i t e s p r e p a r e d f o r
s i t e s p r e p a r e d f o rs i t e s p r e p a r e d f o r
s i t e s p r e p a r e d f o r
c o n v e r s i o n a n d e l e v e nc o n v e r s i o n a n d e l e v e n
c o n v e r s i o n a n d e l e v e nc o n v e r s i o n a n d e l e v e n
c o n v e r s i o n a n d e l e v e n
c r i t i c a l l o c a t i o n s f i t t e d w i t hc r i t i c a l l o c a t i o n s f i t t e d w i t h
c r i t i c a l l o c a t i o n s f i t t e d w i t hc r i t i c a l l o c a t i o n s f i t t e d w i t h
c r i t i c a l l o c a t i o n s f i t t e d w i t h
o v e r f l o w e s c a p e s .o v e r f l o w e s c a p e s .
o v e r f l o w e s c a p e s .o v e r f l o w e s c a p e s .
o v e r f l o w e s c a p e s .
MID Operations Supervisor Ken Bates and
Planner David Rodaughan share a lighter
moment amidst the bustle of another
demanding irrigation season.
Internet Copy
14
WESTERN IRRIGATIONWESTERN IRRIGATIONWESTERN IRRIGATIONWESTERN IRRIGATIONWESTERN IRRIGATION
BACCHUS MARSHBACCHUS MARSHBACCHUS MARSHBACCHUS MARSHBACCHUS MARSH
IRRIGATIONIRRIGATIONIRRIGATIONIRRIGATIONIRRIGATION DISTRICTDISTRICTDISTRICTDISTRICTDISTRICT
FINANCIAL PERFORMANCEFINANCIAL PERFORMANCEFINANCIAL PERFORMANCEFINANCIAL PERFORMANCEFINANCIAL PERFORMANCE
A 7% revenue shortfall, caused mainly by sales
$57,000 below budget, resulted in the BMID
posting a $50,000 operating shortfall on revenue
turnover of $541,000, against a budgeted
expectation of a $3,000 surplus. Expenditure was
contained within $13,000 of estimates, mainly due
to economies in Operations costs.
Prospects for the future are brighter for the
district however, following the transfer of a key
water entitlement which has been unused for
more than three years to a new owner at the end
of the year. Whilst this will not increase water
right revenue, it raises the possibility of additional
sales.
OPERATIONAL PERFORMANCEOPERATIONAL PERFORMANCEOPERATIONAL PERFORMANCEOPERATIONAL PERFORMANCEOPERATIONAL PERFORMANCE
At the start of the year the storages in the
Werribee system held 33% of capacity. Good
winter and spring rains quickly filled them to 80%
and, by the end of October, both Melton and Pykes
Creek reservoirs were spilling. This allowed an
initial allocation of water right plus 50% sales to
be made to BMID irrigators.
Demand for water through the summer months
was the highest for three years. Heavy rains in
autumn, however, resulted in greatly reduced
demand for the remainder of the season.
The performance target for 95% of customers to
receive water on or before the requested day was
exceeded, with 96.2% of orders actually delivered
on time.
Average delivery volumes increased on previous
years, with 2.3 Ml delivered per order compared
to the long term norm of 1.9 Ml.
The early announcement of a high allocation, and
the low late season demand for water, resulted
in a decrease in water trading during 2000/1. Only
18 temporary transfers were processed within the
BMID totalling 1,049 ML, compared to 58 transfers
in 1999/2000.
DELIVERY PERFORMANCEDELIVERY PERFORMANCEDELIVERY PERFORMANCEDELIVERY PERFORMANCEDELIVERY PERFORMANCE
Total water delivered for 2000/1 was 3,450 Ml, 18%
higher than the previous year’s 2,919 ML, but still
19% down on the 10-year average of 4,260 Ml.
The improvement derived from increases in sales
and deliveries outside the district. Sales of 600
ML were more than double the 1999/2000 total
(although again significantly down on the long
term average of 980 Ml on which budgets and
prices are set). Outside district deliveries of 342
Ml represented a 50% rise on the previous year.
Delivery efficiency within the system improved
markedly in 2000/1 to 77%. This was achieved
through significant reductions in outfall wastage
and improved efficiency within the system.
Although total outfalls for the season were 377
ML, this represents a better than 50%
improvement on two years ago.
D e m a n d f o r w a t e r t h r o u g h t h eD e m a n d f o r w a t e r t h r o u g h t h e
D e m a n d f o r w a t e r t h r o u g h t h eD e m a n d f o r w a t e r t h r o u g h t h e
D e m a n d f o r w a t e r t h r o u g h t h e
s u m m e r m o n t h s w a s t h es u m m e r m o n t h s w a s t h e
s u m m e r m o n t h s w a s t h es u m m e r m o n t h s w a s t h e
s u m m e r m o n t h s w a s t h e
h i g h e s t f o r t h r e e y e a r s . H e a v yh i g h e s t f o r t h r e e y e a r s . H e a v y
h i g h e s t f o r t h r e e y e a r s . H e a v yh i g h e s t f o r t h r e e y e a r s . H e a v y
h i g h e s t f o r t h r e e y e a r s . H e a v y
r a i n s i n a u t u m n , h o w e v e r ,r a i n s i n a u t u m n , h o w e v e r ,
r a i n s i n a u t u m n , h o w e v e r ,r a i n s i n a u t u m n , h o w e v e r ,
r a i n s i n a u t u m n , h o w e v e r ,
r e s u l t e d i n g r e a t l y r e d u c e dr e s u l t e d i n g r e a t l y r e d u c e d
r e s u l t e d i n g r e a t l y r e d u c e dr e s u l t e d i n g r e a t l y r e d u c e d
r e s u l t e d i n g r e a t l y r e d u c e d
d e m a n d f o r t h e r e m a i n d e r o fd e m a n d f o r t h e r e m a i n d e r o f
d e m a n d f o r t h e r e m a i n d e r o fd e m a n d f o r t h e r e m a i n d e r o f
d e m a n d f o r t h e r e m a i n d e r o f
t h e s e a s o n .t h e s e a s o n .
t h e s e a s o n .t h e s e a s o n .
t h e s e a s o n .
Economical and effective spray irrigation of
vegetables in the WID.
Internet Copy
15
DescriptionDescriptionDescriptionDescriptionDescription 2000/12000/12000/12000/12000/1 1999/01999/01999/01999/01999/0 1998/91998/91998/91998/91998/9MLMLMLMLML MLMLMLMLML MLMLMLMLML
Water brought intothe system
..................... 4,481 4,034 3,908
Water rightsand entitlementsdelivered
........................ 2,508 2,469 2,384
Seasonal salesdelivered
........................ 600 232 108
%%%%% %%%%% %%%%%Water delivered tocustomers ...................... 77.0 72.4 68.8
Water lost within thedelivery system ............ 14.5 15.5 13.7
Water passed asoutfalls from system .... 8.4 12.1 17.5
SYSTEM MAINTENANCE:SYSTEM MAINTENANCE:SYSTEM MAINTENANCE:SYSTEM MAINTENANCE:SYSTEM MAINTENANCE:
The main areas of works for 2000/1 included;
– flow meter outlet repairs;
– channel patching and sealing;
– structure maintenance; and
– channel desilting.
As in previous years it was necessary to carry
out repair maintenance on valve and flow meter
outlets. A total of 19 meter outlets had repairs
carried out on various components.
Two lengths of butyl rubber liner were installed
on the main channel in sections of badly cracked
and leaking channel. These rubber liners have
been used to great effect over the past three
years to seal leaks. Spot sealing was also
undertaken, with 14 separate leaks repaired.
A range of structural and general maintenance
was carried out through the year, notably to
address hazards identified during the Public
Safety Risk Review program undertaken during
15
Following high rainfall and flood damage in November 2000, urgent repairs were necessary at Werribee weir.
Here replacement rock gabions are being placed on the northern bank of the river immediately below the weir wall.
the year. This entailed repairing holes
in security fencing, repair or addition
of handrails, prevention of
unauthorised access and rectification
of a range of potential hazards to the
public. A key task was the
construction of 1200 metres of
security fencing on the main channel
through the Bacchus Marsh township.
As part of the general works program
the old mild steel off-take door, which
controls supply from Bacchus Marsh
weir into the Main Channel, was
replaced with a more durable and
longer lasting stainless steel door.
The entire 14 kilometre length of the
concrete lined Main Channel was de-
silted during the year by SRW staff.
Contractors with specialist cleaning
equipment were engaged to de-silt 4
culverts and siphons.
Internet Copy
16
WERRIBEE IRRIGATION DISTRICTWERRIBEE IRRIGATION DISTRICTWERRIBEE IRRIGATION DISTRICTWERRIBEE IRRIGATION DISTRICTWERRIBEE IRRIGATION DISTRICT
FINANCIAL PERFORMANCEFINANCIAL PERFORMANCEFINANCIAL PERFORMANCEFINANCIAL PERFORMANCEFINANCIAL PERFORMANCE
Low sales were the principal cause of a $42,000
revenue shortfall (2.7% on turnover of $1.535
million) for the year. All direct cost expenditure
categories exceeded budget and, with the
inclusion of $39,000 of non-capital investment
charged against revenue, total expenditure was
$1.571 million, $98,000 over the budget of $1.473
million. These outcomes together created a
$78,000 operating shortfall for the year, exactly
$140,000 worse than projected.
OPERATIONAL PERFORMANCE:OPERATIONAL PERFORMANCE:OPERATIONAL PERFORMANCE:OPERATIONAL PERFORMANCE:OPERATIONAL PERFORMANCE:
Low storage levels (33% full) in the Werribee
system at the start of July resulted in an initial
allocation of 100% of water right within the WID.
Good rainfall throughout the catchment in
October and November saw both Pykes Creek
and Melton reservoirs spill with minor flooding
occurring downstream of Melton Reservoir. This
enabled an increase in the allocation to water
right plus 50%.
Significant rainfall events in March and April saw
the system shut down on each occasion for a
week due to lack of demand. The allocation to
customers was also lifted to water right plus 100%
late in the season.
Despite the eventual abundance of water, early
season conditions posed the prospect of low
seasonal allocations, as was the case in 1999/
2000. This prompted irrigators into the market,
with brisk water trading undertaken early in the
season. As the year progressed and allocations
were raised, trading activity reduced significantly.
By year end 50 temporary transfers had been
processed for a total of 1,535 Ml - 16% of total
water right. This was well short of the 140
applications to transfer 2,310 ML received for the
previous season. There were two permanent
transfers during the season, involving a total
volume of 46 ML.
Over the season 6,920 orders were delivered in
the district, around 200 less than the previous
year. Average irrigation volumes were up slightly,
with 1.5 ML per order delivered compared to the
1999/2000 average of 1.4 ML.
The performance target of 95% for customers to
receive water on or before requested day, was
achieved, with 96.8% of all orders supplied within
the target period.
SYSTEM PERFORMANCE:SYSTEM PERFORMANCE:SYSTEM PERFORMANCE:SYSTEM PERFORMANCE:SYSTEM PERFORMANCE:
A total volume of 10,458 ML was delivered in the
WID during the 2000/1 season, surpassing last
year’s 10,213 Ml, but still well short of budgeted
expectations of 12,471 ML. The total for the year
included 2,013 ML of sales, up 80% on last year
but similarly almost 20% below the 10 year
average of 2,500 ML.
Delivery efficiency within the system was 81% in
2000/1 compared with 79.5 % in 1999/2000. Outfall
losses remained constant, but in-system losses
of 16.9% represented an improvement over the
previous two years.
O v e r t h e s e a s o n 6 , 9 2 0 o r d e r sO v e r t h e s e a s o n 6 , 9 2 0 o r d e r s
O v e r t h e s e a s o n 6 , 9 2 0 o r d e r sO v e r t h e s e a s o n 6 , 9 2 0 o r d e r s
O v e r t h e s e a s o n 6 , 9 2 0 o r d e r s
w e r e d e l i v e r e d i n t h e d i s t r i c t ,w e r e d e l i v e r e d i n t h e d i s t r i c t ,
w e r e d e l i v e r e d i n t h e d i s t r i c t ,w e r e d e l i v e r e d i n t h e d i s t r i c t ,
w e r e d e l i v e r e d i n t h e d i s t r i c t ,
a r o u n d 2 0 0 l e s s t h a n t h ea r o u n d 2 0 0 l e s s t h a n t h e
a r o u n d 2 0 0 l e s s t h a n t h ea r o u n d 2 0 0 l e s s t h a n t h e
a r o u n d 2 0 0 l e s s t h a n t h e
p r e v i o u s y e a r . A v e r a g ep r e v i o u s y e a r . A v e r a g e
p r e v i o u s y e a r . A v e r a g ep r e v i o u s y e a r . A v e r a g e
p r e v i o u s y e a r . A v e r a g e
i r r i g a t i o n v o l u m e s w e r e u pi r r i g a t i o n v o l u m e s w e r e u p
i r r i g a t i o n v o l u m e s w e r e u pi r r i g a t i o n v o l u m e s w e r e u p
i r r i g a t i o n v o l u m e s w e r e u p
s l i g h t l y , w i t h 1 . 5 M L p e r o r d e rs l i g h t l y , w i t h 1 . 5 M L p e r o r d e r
s l i g h t l y , w i t h 1 . 5 M L p e r o r d e rs l i g h t l y , w i t h 1 . 5 M L p e r o r d e r
s l i g h t l y , w i t h 1 . 5 M L p e r o r d e r
d e l i v e r e d c o m p a r e d t o t h ed e l i v e r e d c o m p a r e d t o t h e
d e l i v e r e d c o m p a r e d t o t h ed e l i v e r e d c o m p a r e d t o t h e
d e l i v e r e d c o m p a r e d t o t h e
1 9 9 9 / 2 0 0 0 a v e r a g e o f 1 . 4 M L .1 9 9 9 / 2 0 0 0 a v e r a g e o f 1 . 4 M L .
1 9 9 9 / 2 0 0 0 a v e r a g e o f 1 . 4 M L .1 9 9 9 / 2 0 0 0 a v e r a g e o f 1 . 4 M L .
1 9 9 9 / 2 0 0 0 a v e r a g e o f 1 . 4 M L .
T h e p e r f o r m a n c e t a r g e t o f 9 5 %T h e p e r f o r m a n c e t a r g e t o f 9 5 %
T h e p e r f o r m a n c e t a r g e t o f 9 5 %T h e p e r f o r m a n c e t a r g e t o f 9 5 %
T h e p e r f o r m a n c e t a r g e t o f 9 5 %
f o r c u s t o m e r s t o r e c e i v e w a t e rf o r c u s t o m e r s t o r e c e i v e w a t e r
f o r c u s t o m e r s t o r e c e i v e w a t e rf o r c u s t o m e r s t o r e c e i v e w a t e r
f o r c u s t o m e r s t o r e c e i v e w a t e r
o n o r b e f o r e r e q u e s t e d d a y ,o n o r b e f o r e r e q u e s t e d d a y ,
o n o r b e f o r e r e q u e s t e d d a y ,o n o r b e f o r e r e q u e s t e d d a y ,
o n o r b e f o r e r e q u e s t e d d a y ,
w a s a c h i e v e d , w i t h 9 6 . 8 % o f a l lw a s a c h i e v e d , w i t h 9 6 . 8 % o f a l l
w a s a c h i e v e d , w i t h 9 6 . 8 % o f a l lw a s a c h i e v e d , w i t h 9 6 . 8 % o f a l l
w a s a c h i e v e d , w i t h 9 6 . 8 % o f a l l
o r d e r s s u p p l i e d w i t h i n t h eo r d e r s s u p p l i e d w i t h i n t h e
o r d e r s s u p p l i e d w i t h i n t h eo r d e r s s u p p l i e d w i t h i n t h e
o r d e r s s u p p l i e d w i t h i n t h e
t a r g e t p e r i o d .t a r g e t p e r i o d .
t a r g e t p e r i o d .t a r g e t p e r i o d .
t a r g e t p e r i o d .
Werribee Irrigation District farmer Romano Mason installing
a line of spray irrigation heads into his newly acquired
vegetable property in Werribee South.
Internet Copy
17
DescriptionDescriptionDescriptionDescriptionDescription 2000/12000/12000/12000/12000/1 1999/01999/01999/01999/01999/0 1998/91998/91998/91998/91998/9MLMLMLMLML MLMLMLMLML MLMLMLMLML
Water brought intothe system
..................... 12,906 12,842 11,330
Water rightsand entitlementsdelivered
........................ 8,445 9,094 8,240
Seasonal salesdelivered
........................ 2,013 1,119 768
%%%%% %%%%% %%%%%Water delivered tocustomers ...................... 81.0 79.5 79.5
Water lost within thedelivery system ............ 16.9 18.3 18.3
Water passed asoutfalls from system .... 2.1 2.2 2.2
SYSTEM MAINTENANCE:SYSTEM MAINTENANCE:SYSTEM MAINTENANCE:SYSTEM MAINTENANCE:SYSTEM MAINTENANCE:
A maintenance priority for the year was weed
control on channel and drain reserves. Other key
maintenance activities included extensive
drainage de-silting works, channel patching and
channel de-silting.
District drains were filled to capacity for a number
of days as a result of heavy rains. Additional de-
silting works were undertaken by SRW staff, in
order to maintain flow capacities, along a total of
13 kilometres of drainage channels. Contractors
were engaged to de-silt an additional 400 metres
of larger drains.
Channel patching was undertaken during the
winter irrigation period. A total of 32 separate
leaks were repaired, ranging from small cracks
in concrete channel lining to replacement of
panels and capping of channels where supply
constraints were identified. A trial of a liquid
sealant product sprayed onto the concrete was
encouraging.
Contractors slashed 12.5 kilometres of wild
aniseed which had infested channel and drain
banks, using an excavator with a slashing
attachment to reach difficult access locations.
Herbicide was then applied to control further
regrowth.
General weed control involved spraying 180
kilometres of channel banks and 106 kilometres
of drainage channels with a non-residual
herbicide to control weeds and grasses in and
around system infrastructure.
At the beginning of the year the channel-desilting
program cleaned 50 kilometres of concrete lined
channels over a 5 week period. This represented
all of the open channel distribution system.
Desilting was undertaken using both SRW and
hired small plant. Specialist cleaning contractors
were engaged to de-silt 12 culverts and siphons
throughout the district.
Internet Copy
18
LICENSINGLICENSINGLICENSINGLICENSINGLICENSING
FINANCIAL PERFORMANCEFINANCIAL PERFORMANCEFINANCIAL PERFORMANCEFINANCIAL PERFORMANCEFINANCIAL PERFORMANCEAbove average revenues for both Surface Water
and Groundwater Licensing functions resulted in
a better than budgeted result for the Licensing
business. Bore Construction Licensing activity
was below previous years as demand for stock
and domestic bores fell, especially in the south
west. The fall in revenue from this activity, was
matched by a corresponding drop in expenditure,
so that there was no bottom line impact on results.
Overall the Licensing business earned revenue
of $2.501 million against budget of $2.445 million.
Against this was booked total expenditure of
$2.663 million, resulting in an operating shortfall
of $162,000. This was accounted for entirely by
the Farm Dam Licensing function, for which no
fees are currently set. The core functions of the
business broke exactly even on the year.
OPERATIONAL PERFORMANCE -OPERATIONAL PERFORMANCE -OPERATIONAL PERFORMANCE -OPERATIONAL PERFORMANCE -OPERATIONAL PERFORMANCE -
GROUNDWATERGROUNDWATERGROUNDWATERGROUNDWATERGROUNDWATERAs indicated, a key feature of the year was the
reduction in bore construction activity and
licensing of new bores. In 1999/2000 1,334 Bore
Construction licences were issued, including 870
for stock and domestic bores of which 755 were
located in south west Victoria. This year the total
fell to 976 (down 27%), including only 571 stock
and domestic bores of which 462 were in the
south west, a drop of 39%.
In the south east of the state there was continuing
interest in Groundwater as an alternative water
source, although the establishment of Ground-
water Management Areas (GMAs) and the
imposition of Permissible Annual Volumes (PAVs)
in them has reduced potential access for some
customers where the aquifer concerned has been
defined as fully/overcommitted.
Declining water levels and the impacts of lack of
recharge and higher demand were key concerns
during the year. A roster was implemented in the
Moe GMA in order to overcome the problem.
Metering of bores, in connection with the
development of Groundwater Management Plans,
was completed in the Sale, Denison, Wy Yung,
Lang Lang and Wandin Yallock GMAs and
commenced in Seacombe and Rosedale.
Groundwater sustainability continues to be the
major concern in the south west. Good rains in
November and April assisted farmers to survive
but were insufficient to recharge some aquifers.
Metering of bores was completed in the Condah,
Warrion, Nullawarre and Yangery GMAS and
Groundwater Management Plans have been
completed for Nullawarre and Yangery. The
Groundwater Management Planning process
continues in Warrion, and will be commenced for
Condah and Bungaree in the near future.
Compliance surveys were completed in the
Bungaree, Glenormiston, Colangulac, Heywood,
and Cut Paw Paw GMAs, totalling in excess of
250 licences.
A k e y f e a t u r e o f t h e y e a r w a sA k e y f e a t u r e o f t h e y e a r w a s
A k e y f e a t u r e o f t h e y e a r w a sA k e y f e a t u r e o f t h e y e a r w a s
A k e y f e a t u r e o f t h e y e a r w a s
t h e r e d u c t i o n i n b o r et h e r e d u c t i o n i n b o r e
t h e r e d u c t i o n i n b o r et h e r e d u c t i o n i n b o r e
t h e r e d u c t i o n i n b o r e
c o n s t r u c t i o n a c t i v i t y a n dc o n s t r u c t i o n a c t i v i t y a n d
c o n s t r u c t i o n a c t i v i t y a n dc o n s t r u c t i o n a c t i v i t y a n d
c o n s t r u c t i o n a c t i v i t y a n d
l i c e n s i n g o f n e w b o r e s . I nl i c e n s i n g o f n e w b o r e s . I n
l i c e n s i n g o f n e w b o r e s . I nl i c e n s i n g o f n e w b o r e s . I n
l i c e n s i n g o f n e w b o r e s . I n
1 9 9 9 / 2 0 0 0 1 , 3 3 4 B o r e1 9 9 9 / 2 0 0 0 1 , 3 3 4 B o r e
1 9 9 9 / 2 0 0 0 1 , 3 3 4 B o r e1 9 9 9 / 2 0 0 0 1 , 3 3 4 B o r e
1 9 9 9 / 2 0 0 0 1 , 3 3 4 B o r e
C o n s t r u c t i o n l i c e n c e s w e r eC o n s t r u c t i o n l i c e n c e s w e r e
C o n s t r u c t i o n l i c e n c e s w e r eC o n s t r u c t i o n l i c e n c e s w e r e
C o n s t r u c t i o n l i c e n c e s w e r e
i s s u e d , i n c l u d i n g 8 7 0 f o r s t o c ki s s u e d , i n c l u d i n g 8 7 0 f o r s t o c k
i s s u e d , i n c l u d i n g 8 7 0 f o r s t o c ki s s u e d , i n c l u d i n g 8 7 0 f o r s t o c k
i s s u e d , i n c l u d i n g 8 7 0 f o r s t o c k
a n d d o m e s t i c b o r e s o f w h i c ha n d d o m e s t i c b o r e s o f w h i c h
a n d d o m e s t i c b o r e s o f w h i c ha n d d o m e s t i c b o r e s o f w h i c h
a n d d o m e s t i c b o r e s o f w h i c h
7 5 5 w e r e l o c a t e d i n s o u t h w e s t7 5 5 w e r e l o c a t e d i n s o u t h w e s t
7 5 5 w e r e l o c a t e d i n s o u t h w e s t7 5 5 w e r e l o c a t e d i n s o u t h w e s t
7 5 5 w e r e l o c a t e d i n s o u t h w e s t
V i c t o r i a . T h i s y e a r t h e t o t a l f e l lV i c t o r i a . T h i s y e a r t h e t o t a l f e l l
V i c t o r i a . T h i s y e a r t h e t o t a l f e l lV i c t o r i a . T h i s y e a r t h e t o t a l f e l l
V i c t o r i a . T h i s y e a r t h e t o t a l f e l l
t o 9 7 6 ( d o w n 2 7 % ) , i n c l u d i n gt o 9 7 6 ( d o w n 2 7 % ) , i n c l u d i n g
t o 9 7 6 ( d o w n 2 7 % ) , i n c l u d i n gt o 9 7 6 ( d o w n 2 7 % ) , i n c l u d i n g
t o 9 7 6 ( d o w n 2 7 % ) , i n c l u d i n g
o n l y 5 7 1 s t o c k a n d d o m e s t i co n l y 5 7 1 s t o c k a n d d o m e s t i c
o n l y 5 7 1 s t o c k a n d d o m e s t i co n l y 5 7 1 s t o c k a n d d o m e s t i c
o n l y 5 7 1 s t o c k a n d d o m e s t i c
b o r e s o f w h i c h 4 6 2 w e r e i n t h eb o r e s o f w h i c h 4 6 2 w e r e i n t h e
b o r e s o f w h i c h 4 6 2 w e r e i n t h eb o r e s o f w h i c h 4 6 2 w e r e i n t h e
b o r e s o f w h i c h 4 6 2 w e r e i n t h e
s o u t h w e s t , a d r o p o f 3 9 % .s o u t h w e s t , a d r o p o f 3 9 % .
s o u t h w e s t , a d r o p o f 3 9 % .s o u t h w e s t , a d r o p o f 3 9 % .
s o u t h w e s t , a d r o p o f 3 9 % .
High flows in the Thomson River at Cowwarr Weir. This is the
old course of the river which diverges above the weir from
Rainbow Creek, the new course. Management and
maintenance of environmental flows on streams such as this
are ongoing challenges for SRW.
The Minister for Environment and Conservation has now
accepted the recommendations of the Farm Dams Review.
SRW made significant inputs to the Review and will play a
key role in 2001/2 and beyond in the implementation of the
recommendations.
Internet Copy
19
OPERATIONAL PERFORMANCE -OPERATIONAL PERFORMANCE -OPERATIONAL PERFORMANCE -OPERATIONAL PERFORMANCE -OPERATIONAL PERFORMANCE -
SURFACE WATERSURFACE WATERSURFACE WATERSURFACE WATERSURFACE WATERAcross our region Licensing staff were involved
in compliance and pre-metering surveys
throughout the year.
South east Victoria experienced another very dry
year with below average rainfall. Good rains fell
in Spring, but there was little follow up rain during
the season.
By mid December 2000, irrigation restrictions
were in place on the Albert, Tarra River and
Bruthen Creek systems.
Irrigation demand on the Morwell River was low
this year compared to 1999/2000. Nonetheless
rostering was introduced from mid-January to
mid-March. Middle Creek and Billy’s Creek
stopped flowing between the end of February and
mid-March. Flows in Traralgon Creek were low
from early January.
By March 2001, every river system in South Gipps-
land had been subject to an irrigation ban and it
was not until April that all restrictions were lifted.
Gippsland Water implemented low level
restrictions at Thorpdale through summer, due to
low flows in the Little Narracan Creek. SRW staff
undertook daily surveillance and monitoring of the
stream to ensure that river diverters complied
with licence conditions and to safeguard flows
for urban use.
Upper Latrobe River usage was low and no
rosters were implemented, even though there
were only minimal environmental flows evident
in early March. Water usage on the Latrobe River
decreased by 30% on last year.
Water restrictions were introduced on the
Mitchell River on 22 January, which was two
months earlier than last year. The stream
struggled to cope with irrigation demands and
environmental flows. By 11 March irrigators were
on stage 9 of a 10 stage roster. Fortunately the
area received good rainfall and a drop in demand
enabled the lifting of all restrictions on 22 March.
Most other streams in this area, whilst
experiencing low flows coped well due to a lack
of irrigation. The dramatic price rise of diesel has
also been a factor in the decline in irrigation
activity.
All active irrigators on the Snowy River and its
tributaries were metered in January 2001.
On the Avon River irrigation commenced in late
October. Low rainfalls led to the implementation
of rosters on 17 December. These remained in
place until late April when the area received good
rainfall. Valencia Creek was subject to a total
irrigation ban from 19 December 2000 until April
2001.
There was no requirement for rostering on
streams in the Koo-Wee-Rup area. Releases from
Tarago Reservoir and tributaries resulted in good
flows and irrigation requirements were met.
Throughout south west Victoria, below average
rainfall continued to be of concern all year.
Restrictions were imposed throughout the region
between November and May, with total bans on
some streams between January and May.
However, good rains in April allowed the winterfill
season to commence on time this year.
Flows into the Moorabool River reached critically
low levels by mid December.
Restrictions were imposed at that
time, with irrigation being totally
banned by late December. The river
did not recover sufficiently to allow
the bans to be lifted until May. The
Barwon River was also stressed by
low flows during the year.
The Merri River roster was again
placed on a message bank service,
and the Gellibrand River roster was
added to the service for the first time.
This service has operated very
successfully and will be extended to
other rosters during 2001/2 as
appropriate. Irrigators on the Merri
were subject to restriction between
January and May. Consultation with
the Merri River Customer Consultative
Committee assisted greatly in
managing rosters and restrictions
throughout the year.
The Gellibrand River was placed on
restrictions from February to April.
Improved communication of the roster
by way of the message bank service
and ongoing consultation with the
local Customer group and South West
Water ensured that environmental
flows were maintained throughout the
year.
Continuing dry conditions in the early
part of the season placed the
Maribyrnong and Werribee River
systems under stress. Irrigators on
unregulated sections of the rivers
were subjected to total bans between
January and May. Those on the
regulated sections were initially
offered only 50% of their allocation,
but good rains in March allowed this
to be increased to 100%.
The rivers in the far west were greatly
stressed, with the Glenelg and the
Wannon drying out completely. Total
bans were imposed on all streams
between January and May.
Internet Copy
20
HEADWORKSHEADWORKSHEADWORKSHEADWORKSHEADWORKS
FINANCIAL PERFORMANCEFINANCIAL PERFORMANCEFINANCIAL PERFORMANCEFINANCIAL PERFORMANCEFINANCIAL PERFORMANCE
The principal financial objective of our
Headworks business is to harvest and store water
on behalf of bulk entitlement holders - both
internal and external - on a full cost recovery
basis, in accordance with the Bulk Entitlement
Orders which confer those entitlements. Pending
the finalisation of remaining Orders, interim
arrangements and agreements are in place with
appropriate external customers.
Current Government policy also provides for SRW
to charge a 4% rate of return to non-metropolitan
urban water suppliers on the assets employed to
harvest and store their entitlements.
This activity was budgeted to generate total
revenues for 2000/1 of $4.418 million and an
operating surplus of $1.297 million.
Revenues for the Maribyrnong system were
adversely affected by low demand for water from
Western Water and by reduced recoveries
pending finalisation of Bulk Entitlement Orders.
Conversely, revenues for the Werribee and
Yallourn Storages systems were above budget.
The actual total revenues from all sources of
$4.817 million were thus able to more than
overcome increases in expenditure ($3.334 million
actual against $3.121 million budget. This,
together with a reduction in the dividend payment
to Government, resulted in an actual surplus of
$1.482 million, up $213,000 on the budget forecast.
OPERATIONAL PERFORMANCEOPERATIONAL PERFORMANCEOPERATIONAL PERFORMANCEOPERATIONAL PERFORMANCEOPERATIONAL PERFORMANCE
Lake Glenmaggie filled quickly during the 1999/
2000 winter and spilled from mid October until the
beginning of December. There was a heavy
demand for irrigation water from the beginning
of the season and releases were carefully
monitored in order to optimise the available
resources. The absence of replenishing in-
season rains meant that, by the end of the
irrigation period, Glenmaggie was reduced to
about 9% of capacity.
Following the end of the season the storage
commenced filling slowly and held just over
32,000 ML by 30 June. Given normal patterns of
inflow it is hoped that supply levels should be
restored in good time for the 2001/2 season.
Normal daily operational routines during the year
were supplemented by special works during 2000/
1, preparatory to implementing the rehabilitation
programs for several of the valves which release
water to the Northern and Southern Channels and
the Macalister River.
L a k e G l e n m a g g i e f i l l e d q u i c k l yL a k e G l e n m a g g i e f i l l e d q u i c k l y
L a k e G l e n m a g g i e f i l l e d q u i c k l yL a k e G l e n m a g g i e f i l l e d q u i c k l y
L a k e G l e n m a g g i e f i l l e d q u i c k l y
d u r i n g t h e 1 9 9 9 / 2 0 0 0 w i n t e rd u r i n g t h e 1 9 9 9 / 2 0 0 0 w i n t e r
d u r i n g t h e 1 9 9 9 / 2 0 0 0 w i n t e rd u r i n g t h e 1 9 9 9 / 2 0 0 0 w i n t e r
d u r i n g t h e 1 9 9 9 / 2 0 0 0 w i n t e r
a n d s p i l l e d f r o m m i d O c t o b e ra n d s p i l l e d f r o m m i d O c t o b e r
a n d s p i l l e d f r o m m i d O c t o b e ra n d s p i l l e d f r o m m i d O c t o b e r
a n d s p i l l e d f r o m m i d O c t o b e r
u n t i l t h e b e g i n n i n g o fu n t i l t h e b e g i n n i n g o f
u n t i l t h e b e g i n n i n g o fu n t i l t h e b e g i n n i n g o f
u n t i l t h e b e g i n n i n g o f
D e c e m b e r . T h e r e w a s a h e a v yD e c e m b e r . T h e r e w a s a h e a v y
D e c e m b e r . T h e r e w a s a h e a v yD e c e m b e r . T h e r e w a s a h e a v y
D e c e m b e r . T h e r e w a s a h e a v y
d e m a n d f o r i r r i g a t i o n w a t e rd e m a n d f o r i r r i g a t i o n w a t e r
d e m a n d f o r i r r i g a t i o n w a t e rd e m a n d f o r i r r i g a t i o n w a t e r
d e m a n d f o r i r r i g a t i o n w a t e r
f r o m t h e b e g i n n i n g o f t h ef r o m t h e b e g i n n i n g o f t h e
f r o m t h e b e g i n n i n g o f t h ef r o m t h e b e g i n n i n g o f t h e
f r o m t h e b e g i n n i n g o f t h e
s e a s o n a n d r e l e a s e s w e r es e a s o n a n d r e l e a s e s w e r e
s e a s o n a n d r e l e a s e s w e r es e a s o n a n d r e l e a s e s w e r e
s e a s o n a n d r e l e a s e s w e r e
c a r e f u l l y m o n i t o r e d i n o r d e r t oc a r e f u l l y m o n i t o r e d i n o r d e r t o
c a r e f u l l y m o n i t o r e d i n o r d e r t oc a r e f u l l y m o n i t o r e d i n o r d e r t o
c a r e f u l l y m o n i t o r e d i n o r d e r t o
o p t i m i s e t h e a v a i l a b l eo p t i m i s e t h e a v a i l a b l e
o p t i m i s e t h e a v a i l a b l eo p t i m i s e t h e a v a i l a b l e
o p t i m i s e t h e a v a i l a b l e
r e s o u r c e s . T h e a b s e n c e o fr e s o u r c e s . T h e a b s e n c e o f
r e s o u r c e s . T h e a b s e n c e o fr e s o u r c e s . T h e a b s e n c e o f
r e s o u r c e s . T h e a b s e n c e o f
r e p l e n i s h i n g i n - s e a s o n r a i n sr e p l e n i s h i n g i n - s e a s o n r a i n s
r e p l e n i s h i n g i n - s e a s o n r a i n sr e p l e n i s h i n g i n - s e a s o n r a i n s
r e p l e n i s h i n g i n - s e a s o n r a i n s
m e a n t t h a t , b y t h e e n d o f t h em e a n t t h a t , b y t h e e n d o f t h e
m e a n t t h a t , b y t h e e n d o f t h em e a n t t h a t , b y t h e e n d o f t h e
m e a n t t h a t , b y t h e e n d o f t h e
i r r i g a t i o n p e r i o d , G l e n m a g g i ei r r i g a t i o n p e r i o d , G l e n m a g g i e
i r r i g a t i o n p e r i o d , G l e n m a g g i ei r r i g a t i o n p e r i o d , G l e n m a g g i e
i r r i g a t i o n p e r i o d , G l e n m a g g i e
w a s r e d u c e d t o a b o u t 9 % o fw a s r e d u c e d t o a b o u t 9 % o f
w a s r e d u c e d t o a b o u t 9 % o fw a s r e d u c e d t o a b o u t 9 % o f
w a s r e d u c e d t o a b o u t 9 % o f
c a p a c i t y .c a p a c i t y .
c a p a c i t y .c a p a c i t y .
c a p a c i t y .
An early view of Lake Glenmaggie dam, prior
to the installation of the fourteen radial gates
which increased its capacity to the current
level of 190,000 ML.
Internet Copy
21
The 75th birthday of the Lake Glenmaggie dam and
of water delivery from it to the Macalister
irrigation District was also a major event during
the year. This milestone was highlighted by a very
successful open day that offered an opportunity
for all stakeholders to view and gain an insight
into the operation and functions of such things
as the hydroelectric generators, the floodgates
and various valves. It is hoped that similar events
will be held in the future.
The Yallourn Storages (Lake Narracan dam and
Yallourn weir) underwent exhaustive expert
reviews and feasibility studies during the year,
whilst staff continued to upgrade and improve site
safety and security. These works are preparatory
to major works projects on both structures in the
coming two years. Careful inspections were
carried out on both dams, following several minor
earthquakes, in order to ensure that no structural
damage had occurred and that all equipment and
machinery was unaffected. The telephone service
which is utilised for remote monitoring and
operation of the site, was re-laid underground to
ensure more reliable operations, particularly
during storm events.
Blue Rock Dam continued to supply bulk water
for the Power Industry and downstream irrigators
but this demand was less than that experienced
at other storages. Consequently the storage
emptied only to about 65 % of capacity and began
filling rapidly after the summer demand ended.
Water from Blue Rock Lake augments the
Gippsland Water storages and during the
extended dry period water was pumped from Blue
Rock to the Moondarra storage.
Blue Rock again played host to a large number of
recreational visitors to its extensive park areas.
The Blue Rock Classic (which is an annual team
based sporting event) also attracted many visitors
to the dam.
The year was uneventful at Cowwarr weir until
late April when the failure of an electronic
component resulted in the main gates failing to
open automatically during a local severe
rainstorm and flash flood which saw inflows jump
during a one hour period from a rate of about 2,000
ML/day to in excess of 8,000 ML. This caused the
pool level to increase rapidly and prompt action
was required by staff to restore it to a safe level.
Routine technical surveillance monitoring was
carried out by the SMEC consulting group, which
confirmed that all eastern Headworks storages
were operating and performing within the
industry guidelines and standards.
Likewise the annual Dam safety Management
audit identified only one deficiency, namely that
skilled operational staffing levels were at a
minimum and may not have been adequate to
manage a major emergency. Action has been
implemented to correct this situation, including
employment of an additional staff member.
The Werribee system storages, with the
exception of Melton, began the year relatively
empty, as a result of the continuing low rainfall
patterns of recent years. On 1 July 2000 Merrimu
held only 23% of capacity, Melton 61 % and Pykes
Creek 27%.
Western Headworks staff take a break between
bus tours on the occasion of the Lerderderg weir
Open Day on .
(L to R); Pat Caruso, Gary Madden, Tim Kay, Ray
Dohnt, David Hall and Stephen Peter.
Internet Copy
22
Low to moderate inflows were occurred until mid-
October, when heavy rainfalls throughout the
catchment resulted in very high inflows that saw
Melton and Pykes Creek fill to capacity, and
Merrimu increase significantly to a peak of 74.2%.
The storages finished the year in a much better
state than has been experienced in recent years,
with Merrimu holding 61%, Pykes Creek 78% and
Melton 53% of capacity at 30 June 2001.
In the Maribyrnong system, Rosslynne reservoir
held an all time low of just 7.9% of capacity on 1
July 2000. Here also the October rains provided
considerable relief. The reservoir held 42.6% of
capacity at the end of October, before demand
again exceeded inflows causing the reservoir to
end the year at 32.4% full.
The Lerderderg catchment experienced one of
the highest rainfalls recorded in a twenty four
hour period during the heavy October rains. This
resulted in record stream flows in the Lerderderg
River system. Staff were immediately put on alert
to monitor and carry out routine flood surveillance
of structures throughout this period and ensure
continuity of inflows to the tunnels and Merrimu
Reservoir.
The river recorded a rapid rise in flow rate, from
100 ML/day to 10,000 ML/day in less than four
hours. As a consequence, massive volumes of
debris were washed downstream and suddenly
deposited against the weir gates. Their great
weight resulted in all three radial gates
malfunctioning and the obstruction of the
automatic pool control function that controls the
gate opening. This caused the gates to be over-
topped for a short period, until the initial flow
subsided and manual operation of the gates was
possible. Full functionality of the gates was
returned within three days of the flood event.
Following the event a complete mechanical/
electrical inspection and recommissioning of the
structure and equipment was performed. As a
result of this process, further works will be
conducted throughout this year to ensure the
ongoing integrity of the structure and associated
systems.
In light of the extent of flows, the levels of debris
deposited against the structure and the
subsequent malfunction, a full design review of
the structure will be undertaken to assess the
capability of the structure under severe flood
situations and to consider improvements to the
structure to minimise impacts from flooding.
Later in the year one of the main attractions of
2000/1 on the western storages was a series of
guided tours of the Lerderderg Weir and tunnels
offered to the local community on Sunday 25
March 2001.
The feature of the day was the guided bus tours
into the Lerderderg Diversion Weir site. For safety
reasons general access to the site by the public
is normally restricted. The tours provided the
opportunity for the public to view the Lerderderg
Diversion Weir first hand and to explain to them
the purpose of the weir and the mechanics of
filling Merrimu Reservoir. The day was an
outstanding success, with around 300 people
from local and distant communities attending.
T h e L e r d e r d e r g c a t c h m e n tT h e L e r d e r d e r g c a t c h m e n t
T h e L e r d e r d e r g c a t c h m e n tT h e L e r d e r d e r g c a t c h m e n t
T h e L e r d e r d e r g c a t c h m e n t
e x p e r i e n c e d o n e o f t h e h i g h e s te x p e r i e n c e d o n e o f t h e h i g h e s t
e x p e r i e n c e d o n e o f t h e h i g h e s te x p e r i e n c e d o n e o f t h e h i g h e s t
e x p e r i e n c e d o n e o f t h e h i g h e s t
r a i n f a l l s r e c o r d e d i n a t w e n t yr a i n f a l l s r e c o r d e d i n a t w e n t y
r a i n f a l l s r e c o r d e d i n a t w e n t yr a i n f a l l s r e c o r d e d i n a t w e n t y
r a i n f a l l s r e c o r d e d i n a t w e n t y
f o u r h o u r p e r i o d d u r i n g t h ef o u r h o u r p e r i o d d u r i n g t h e
f o u r h o u r p e r i o d d u r i n g t h ef o u r h o u r p e r i o d d u r i n g t h e
f o u r h o u r p e r i o d d u r i n g t h e
h e a v y O c t o b e r r a i n s . T h i sh e a v y O c t o b e r r a i n s . T h i s
h e a v y O c t o b e r r a i n s . T h i sh e a v y O c t o b e r r a i n s . T h i s
h e a v y O c t o b e r r a i n s . T h i s
r e s u l t e d i n r e c o r d s t r e a mr e s u l t e d i n r e c o r d s t r e a m
r e s u l t e d i n r e c o r d s t r e a mr e s u l t e d i n r e c o r d s t r e a m
r e s u l t e d i n r e c o r d s t r e a m
f l o w s i n t h e L e r d e r d e r g R i v e rf l o w s i n t h e L e r d e r d e r g R i v e r
f l o w s i n t h e L e r d e r d e r g R i v e rf l o w s i n t h e L e r d e r d e r g R i v e r
f l o w s i n t h e L e r d e r d e r g R i v e r
s y s t e m . S t a f f w e r es y s t e m . S t a f f w e r e
s y s t e m . S t a f f w e r es y s t e m . S t a f f w e r e
s y s t e m . S t a f f w e r e
i m m e d i a t e l y p u t o n a l e r t t oi m m e d i a t e l y p u t o n a l e r t t o
i m m e d i a t e l y p u t o n a l e r t t oi m m e d i a t e l y p u t o n a l e r t t o
i m m e d i a t e l y p u t o n a l e r t t o
m o n i t o r a n d c a r r y o u t r o u t i n em o n i t o r a n d c a r r y o u t r o u t i n e
m o n i t o r a n d c a r r y o u t r o u t i n em o n i t o r a n d c a r r y o u t r o u t i n e
m o n i t o r a n d c a r r y o u t r o u t i n e
f l o o d s u r v e i l l a n c e o f s t r u c t u r e sf l o o d s u r v e i l l a n c e o f s t r u c t u r e s
f l o o d s u r v e i l l a n c e o f s t r u c t u r e sf l o o d s u r v e i l l a n c e o f s t r u c t u r e s
f l o o d s u r v e i l l a n c e o f s t r u c t u r e s
t h r o u g h o u t t h i s p e r i o d a n dt h r o u g h o u t t h i s p e r i o d a n d
t h r o u g h o u t t h i s p e r i o d a n dt h r o u g h o u t t h i s p e r i o d a n d
t h r o u g h o u t t h i s p e r i o d a n d
e n s u r e c o n t i n u i t y o f i n f l o w s t oe n s u r e c o n t i n u i t y o f i n f l o w s t o
e n s u r e c o n t i n u i t y o f i n f l o w s t oe n s u r e c o n t i n u i t y o f i n f l o w s t o
e n s u r e c o n t i n u i t y o f i n f l o w s t o
t h e t u n n e l s a n d M e r r i m ut h e t u n n e l s a n d M e r r i m u
t h e t u n n e l s a n d M e r r i m ut h e t u n n e l s a n d M e r r i m u
t h e t u n n e l s a n d M e r r i m u
R e s e r v o i r .R e s e r v o i r .
R e s e r v o i r .R e s e r v o i r .
R e s e r v o i r .
Internet Copy
23
At Rosslynne, extensive water quality monitoring
was undertaken due to outbreaks of blue green
algae. Western Water also designed and installed
a water aeration system to combat high
manganese levels in stored water.
The serrated tussock eradication program
continued at Melton, using both contractors and
SRW staff. Blue green algae monitoring was also
essential during the summer. All boating control
signage and buoys were upgraded during the year
to comply with Marine Board regulations. Melton
was also the venue for stage 1 of a proposed 3
stage joint program with Greening Australia (Vic),
to replant native vegetation on Authority marginal
lands.
The principal activities at Merrimu were the
serrated tussock program, concentrating on the
northern and eastern areas of the storage within
the Authority’s boundary, and monitoring and
testing for Blue Green Algae.
Not surprisingly, repairs, testing and recommis-
sioning of the structure following the October
flood was the main works activity for 2000/1 at
Lerderderg.
At Pykes Creek both blackberry and serrated
tussock were targeted. Important modifications
were also made to the Upper Werribee diversion
weir structure, to enhance our ability to accu-
rately meet the requirements of the Werribee Bulk
Entitlement whilst maintaining efficiency in the
diversion of flows into Pykes Creek Reservoir. The
Werribee River diversion tunnel downstream
measuring station was also upgraded to ensure
the maintenance of accurate and reliable data.
Pykes Creek also received new boating control
signage.
On the staffing front, an opportunity has been
provided for two traineeships in Water Resource
Management in the Headworks business. An
extensive review was also carried out on the
training needs of the Headworks group and a
comprehensive training program has been
developed to ensure staff are well qualified to
manage our complex and essential structures in
a safe and efficient manner.
SRW staff climb down and prepare to tackle the
huge debris pile which washed up against
Lerderderg weir during the October 2000 flash
flood, jamming the gates and preventing their
operation.
Internet Copy
24
CAPITAL WORKSCAPITAL WORKSCAPITAL WORKSCAPITAL WORKSCAPITAL WORKS
SRW set a capital works budget for 2000/1 of $2.88
million comprising:
– $970,000 for Headworks projects:
– $310,000 for works at Lake Narracan Dam
and Yallourn Weir, the cost of which is
recovered from the power generating
companies; and
– $1.6 million for works on irrigation
infrastructure including $1 million in the
Macalister Irrigation District.
A major Headworks project for the year was the
completion of the Dam Design Review Program,
which comprised thorough technical assessment
of the design of all SRW dams against current day
standards.
The reviews of the remaining two high hazard
dams at Melton and Merrimu were commenced,
together with a review of Yallourn Weir, which is
our highest risk diversion weir. In addition further
work was commissioned on specific design
aspects of Blue Rock and Glenmaggie dams.
At Lake Narracan dam foundation investigations
were completed and a structural analysis of gates
commenced, as the first step in a major program
of upgrading. The emergency power generator
at the dam, which was 40 years old, was also
replaced.
A major rehabilitation and remedial works
program commenced at Lake Glenmaggie dam.
Work was commenced on the Erosion Control
Program at sites around Sandy point and the
Munjara camp. Bank reshaping and wave
protection measures were completed in these
areas. Further works are programmed for next
year at priority spots around the lake, including
Kelly Cove.
The rehabilitation of the first of the two major
control valves on the southern outlet at Lake
Glenmaggie dam was completed during the 1999/
2000 winter shut down period. The valve was
recommissioned by mid August, and has operated
satisfactorily during the season. The second of
the two valves was removed for rehabilitation in
May 2001 and will also be re-installed and re-
commissioned by early August.
The northern outlet at Glenmaggie consists of
three vertical sleeve valves that date back to the
original construction. These valves showed signs
of deterioration, and were unsuitable for modern
control adaptation. They will be replaced with
modern stainless steel and delivery of the three
new valves took place in April. A contract to
install the valves over two winter periods has
been let and the first should be operational by
the end of July 2001.
T h e r e h a b i l i t a t i o n o f t h e f i r s t o fT h e r e h a b i l i t a t i o n o f t h e f i r s t o f
T h e r e h a b i l i t a t i o n o f t h e f i r s t o fT h e r e h a b i l i t a t i o n o f t h e f i r s t o f
T h e r e h a b i l i t a t i o n o f t h e f i r s t o f
t h e t w o m a j o r c o n t r o l v a l v e st h e t w o m a j o r c o n t r o l v a l v e s
t h e t w o m a j o r c o n t r o l v a l v e st h e t w o m a j o r c o n t r o l v a l v e s
t h e t w o m a j o r c o n t r o l v a l v e s
o n t h e s o u t h e r n o u t l e t a t L a k eo n t h e s o u t h e r n o u t l e t a t L a k e
o n t h e s o u t h e r n o u t l e t a t L a k eo n t h e s o u t h e r n o u t l e t a t L a k e
o n t h e s o u t h e r n o u t l e t a t L a k e
G l e n m a g g i e d a m w a sG l e n m a g g i e d a m w a s
G l e n m a g g i e d a m w a sG l e n m a g g i e d a m w a s
G l e n m a g g i e d a m w a s
c o m p l e t e d d u r i n g t h ec o m p l e t e d d u r i n g t h e
c o m p l e t e d d u r i n g t h ec o m p l e t e d d u r i n g t h e
c o m p l e t e d d u r i n g t h e
1 9 9 9 / 2 0 0 0 w i n t e r s h u t d o w n1 9 9 9 / 2 0 0 0 w i n t e r s h u t d o w n
1 9 9 9 / 2 0 0 0 w i n t e r s h u t d o w n1 9 9 9 / 2 0 0 0 w i n t e r s h u t d o w n
1 9 9 9 / 2 0 0 0 w i n t e r s h u t d o w n
p e r i o d . T h e v a l v e w a sp e r i o d . T h e v a l v e w a s
p e r i o d . T h e v a l v e w a sp e r i o d . T h e v a l v e w a s
p e r i o d . T h e v a l v e w a s
r e c o m m i s s i o n e d b y m i dr e c o m m i s s i o n e d b y m i d
r e c o m m i s s i o n e d b y m i dr e c o m m i s s i o n e d b y m i d
r e c o m m i s s i o n e d b y m i d
A u g u s t , a n d h a s o p e r a t e dA u g u s t , a n d h a s o p e r a t e d
A u g u s t , a n d h a s o p e r a t e dA u g u s t , a n d h a s o p e r a t e d
A u g u s t , a n d h a s o p e r a t e d
s a t i s f a c t o r i l y d u r i n g t h es a t i s f a c t o r i l y d u r i n g t h e
s a t i s f a c t o r i l y d u r i n g t h es a t i s f a c t o r i l y d u r i n g t h e
s a t i s f a c t o r i l y d u r i n g t h e
s e a s o n . T h e s e c o n d o f t h e t w os e a s o n . T h e s e c o n d o f t h e t w o
s e a s o n . T h e s e c o n d o f t h e t w os e a s o n . T h e s e c o n d o f t h e t w o
s e a s o n . T h e s e c o n d o f t h e t w o
v a l v e s w a s r e m o v e d f o rv a l v e s w a s r e m o v e d f o r
v a l v e s w a s r e m o v e d f o rv a l v e s w a s r e m o v e d f o r
v a l v e s w a s r e m o v e d f o r
r e h a b i l i t a t i o n i n M a y 2 0 0 1 a n dr e h a b i l i t a t i o n i n M a y 2 0 0 1 a n d
r e h a b i l i t a t i o n i n M a y 2 0 0 1 a n dr e h a b i l i t a t i o n i n M a y 2 0 0 1 a n d
r e h a b i l i t a t i o n i n M a y 2 0 0 1 a n d
w i l l a l s o b e r e - i n s t a l l e d a n d r e -w i l l a l s o b e r e - i n s t a l l e d a n d r e -
w i l l a l s o b e r e - i n s t a l l e d a n d r e -w i l l a l s o b e r e - i n s t a l l e d a n d r e -
w i l l a l s o b e r e - i n s t a l l e d a n d r e -
c o m m i s s i o n e d b y e a r l y A u g u s t .c o m m i s s i o n e d b y e a r l y A u g u s t .
c o m m i s s i o n e d b y e a r l y A u g u s t .c o m m i s s i o n e d b y e a r l y A u g u s t .
c o m m i s s i o n e d b y e a r l y A u g u s t .
Lerderderg weir.
Internet Copy
Equipment to enable spillway gates to be
operated during a power blackout or electric
motor failure at Cowwarr and Maffra Weirs will
be installed before the onset of Spring rains.
At Lerderderg Weir, the generator which supplies
electricity for the operation of the site is to be
replaced. Following the flash flood in October
2000, the requirements of the replacement were
re-assessed and additional capabilities added.
Installation will be completed by Spring. Other
In the Macalister Irrigation District the main
projects were:
– Tendering the “design and construct”
contract for the replacement of Little Weir,
which is a dam wall which forms part of the
of the Main Northern channel where it
crosses a gully immediately downstream of
Lake Glenmaggie. The replacement works
include constructing a new structure across
the gully, stabilising the tunnels either side of
the dam wall, and site rehabilitation and
revegetation of the area currently inundated.
The project will be the main works
undertaken during the 2002 winter shutdown
period.
– Commencement of Stage 1 of the Nuntin
Pipelining project, which involves the
replacement of old concrete lined channels
with pipe. This first stage involves
construction of approximately half a
kilometre of pipeline.
– Continuation of the footbridge replacement
and upgrade program to provide safe access
for SRW operators
– Continuation of the main channel regulator
upgrade program, replacing drop-bar
regulators with automated doors to improve
operator safety and service
– Commencement of erosion control on
sections of the Main Northern channel
– Investigation of sections of the channel
system that have service delivery problems.
These resulted in works on the Bundalaguah
2/2 and Sale 1/3 channels prior to the start of
the 2001/02 irrigation season
– Repair of joints on the Main Northern siphon
No 2.
In the W estern Irrigation business
(W erribee and Bacchus Marsh
Irrigation Districts) the main projects
undertaken during the year were:
– Commencement of the “design
and construct” contract to
replace Flume 6, which is an
eighty-year old elevated concrete
flume in Bacchus Marsh. The
works will be undertaken during
the winter period, and are
scheduled to avoid disruption to
winter irrigation supply
requirements.
– Continuation of the fencing
program in the urban areas of
Bacchus Marsh
– Securing of funds from the State
“Water for Growth” program to
partly fund a feasibility study for
piping all of the Werribee
Irrigation District
– Undertaking repairs to the
Werribee Diversion weir, damaged
during a flood event in November
2000
– Replacement of three minor
crossings on the channel and
drain systems.
The first refurbished control valve onthe southern outlet of Lake
Glenmaggie dam has been returnedand lowered in place; the crane
dogman has climbed onto the valveand waits for the lifting chains to be
slackened, so that he can releasethem.
SRW engineers Phil Dijs (centre) and MarcGrunow (right) discuss progress on the first
stage of the Nuntin pipelining program in theMID with contractor Ian Smith.
minor works were undertaken at the site, some
resulting from flood damage.
The principal Irrigation infrastructure projects for
2000/1 comprised works to:
– replace poor-condition infrastructure;
– improve service;
– improve safety; and
– address environmental issues.
25
Internet Copy
26
RESOURCERESOURCERESOURCERESOURCERESOURCE
MANAGEMENTMANAGEMENTMANAGEMENTMANAGEMENTMANAGEMENT
ENVIRONMENTAL MANAGEMENTENVIRONMENTAL MANAGEMENTENVIRONMENTAL MANAGEMENTENVIRONMENTAL MANAGEMENTENVIRONMENTAL MANAGEMENTSRW is developing an Environmental
Management System that will ensure it is aware
of statutory obligations, and the range of
environmental risks that it potentially faces as a
result of its activities, and identifies measures to
address these. This will include its obligations
under the Victorian Biodiversity Strategy.
SRW is also developing Reservoir Management
Plans for each storage to draw together the
research into impacts of storage releases on the
downstream environment, management of
releases, blue green algae management and the
risks to our storage water quality from upper
catchment in-flows. It has completed a review of
the water quality information collected from our
storages and initiated a risk assessment to
identify where the water quality related hazards
lie from both upper catchment inflows and
releases from our storage to the downstream
environment.
SRW monitors its storages for potentially toxic
blue green algae so that when a bloom occurs it
can respond quickly and accurately by informing
our customers, urban suppliers and environ-
mental agencies of the situation. Last year SRW
commissioned CSIRO to prepare a report of the
risks blue green algae poses in our storages so
that we can better inform our business, other
stakeholders and our customers of the risks.
GIPPSLAND LAKESGIPPSLAND LAKESGIPPSLAND LAKESGIPPSLAND LAKESGIPPSLAND LAKES
RESCUE PACKAGERESCUE PACKAGERESCUE PACKAGERESCUE PACKAGERESCUE PACKAGESRW is supporting the Gippsland Lakes Rescue
Package through a range of initiatives – imple-
mentation of the Thomson Macalister bulk
entitlements, completion of joint sealing on the
MID Main Southern Channel, and our involvement
in the MID Nutrient Reduction Plan.
SRW is responsible, in conjunction with other
stakeholders, for implementing the MID Nutrient
Reduction Plan. The Plan outlines the expected
contributions to and outcomes from initiatives
aimed at reducing the discharge of nutrients from
the MID. Last year SRW supported landholder
extension, water monitoring, nutrient research
and investigation activities, as well as processing
“ whole farm plans” and continuing development
of drain management plans.
Improved drain management is a continuing
priority, since reducing drainage outflows is a
principal means of reducing nutrient export.
SRW’s current Prime Development Zones project
promises further diversion from the drains,
coupled with the development of higher value
irrigated enterprises operating on a sustainable
basis.
In salinity management, SRW implements the
groundwater pumping component of the
Wellington Salinity Plan (18 groundwater pumps
extracting over 4,500 ML of groundwater
annually) on behalf of the Wellington Salinity
Group. Saline groundwater is pumped out of the
shallow aquifers to lower water tables and
therefore decrease soil salinity. The program is
recognised as one of the most effective in the
State.
WATER MONITORINGWATER MONITORINGWATER MONITORINGWATER MONITORINGWATER MONITORINGSRW has a water quality monitoring program
designed to indicate the potential impacts from
water supplies and irrigation district discharges
on the beneficial uses to customers, recreational
users and the environment.
S R W i s r e s p o n s i b l e , i nS R W i s r e s p o n s i b l e , i n
S R W i s r e s p o n s i b l e , i nS R W i s r e s p o n s i b l e , i n
S R W i s r e s p o n s i b l e , i n
c o n j u n c t i o n w i t h o t h e rc o n j u n c t i o n w i t h o t h e r
c o n j u n c t i o n w i t h o t h e rc o n j u n c t i o n w i t h o t h e r
c o n j u n c t i o n w i t h o t h e r
s t a k e h o l d e r s , f o r i m p l e m e n t i n gs t a k e h o l d e r s , f o r i m p l e m e n t i n g
s t a k e h o l d e r s , f o r i m p l e m e n t i n gs t a k e h o l d e r s , f o r i m p l e m e n t i n g
s t a k e h o l d e r s , f o r i m p l e m e n t i n g
t h e M I D N u t r i e n t R e d u c t i o nt h e M I D N u t r i e n t R e d u c t i o n
t h e M I D N u t r i e n t R e d u c t i o nt h e M I D N u t r i e n t R e d u c t i o n
t h e M I D N u t r i e n t R e d u c t i o n
P l a n . T h e P l a n o u t l i n e s t h eP l a n . T h e P l a n o u t l i n e s t h e
P l a n . T h e P l a n o u t l i n e s t h eP l a n . T h e P l a n o u t l i n e s t h e
P l a n . T h e P l a n o u t l i n e s t h e
e x p e c t e d c o n t r i b u t i o n s t o a n de x p e c t e d c o n t r i b u t i o n s t o a n d
e x p e c t e d c o n t r i b u t i o n s t o a n de x p e c t e d c o n t r i b u t i o n s t o a n d
e x p e c t e d c o n t r i b u t i o n s t o a n d
o u t c o m e s f r o m i n i t i a t i v e so u t c o m e s f r o m i n i t i a t i v e s
o u t c o m e s f r o m i n i t i a t i v e so u t c o m e s f r o m i n i t i a t i v e s
o u t c o m e s f r o m i n i t i a t i v e s
a i m e d a t r e d u c i n g t h ea i m e d a t r e d u c i n g t h e
a i m e d a t r e d u c i n g t h ea i m e d a t r e d u c i n g t h e
a i m e d a t r e d u c i n g t h e
d i s c h a r g e o f n u t r i e n t s f r o m t h ed i s c h a r g e o f n u t r i e n t s f r o m t h e
d i s c h a r g e o f n u t r i e n t s f r o m t h ed i s c h a r g e o f n u t r i e n t s f r o m t h e
d i s c h a r g e o f n u t r i e n t s f r o m t h e
M I D . L a s t y e a r S R W s u p p o r t e dM I D . L a s t y e a r S R W s u p p o r t e d
M I D . L a s t y e a r S R W s u p p o r t e dM I D . L a s t y e a r S R W s u p p o r t e d
M I D . L a s t y e a r S R W s u p p o r t e d
l a n d h o l d e r e x t e n s i o n , w a t e rl a n d h o l d e r e x t e n s i o n , w a t e r
l a n d h o l d e r e x t e n s i o n , w a t e rl a n d h o l d e r e x t e n s i o n , w a t e r
l a n d h o l d e r e x t e n s i o n , w a t e r
m o n i t o r i n g , n u t r i e n t r e s e a r c hm o n i t o r i n g , n u t r i e n t r e s e a r c h
m o n i t o r i n g , n u t r i e n t r e s e a r c hm o n i t o r i n g , n u t r i e n t r e s e a r c h
m o n i t o r i n g , n u t r i e n t r e s e a r c h
a n d i n v e s t i g a t i o n a c t i v i t i e s , a sa n d i n v e s t i g a t i o n a c t i v i t i e s , a s
a n d i n v e s t i g a t i o n a c t i v i t i e s , a sa n d i n v e s t i g a t i o n a c t i v i t i e s , a s
a n d i n v e s t i g a t i o n a c t i v i t i e s , a s
w e l l a s p r o c e s s i n g “ w h o l ew e l l a s p r o c e s s i n g “ w h o l e
w e l l a s p r o c e s s i n g “ w h o l ew e l l a s p r o c e s s i n g “ w h o l e
w e l l a s p r o c e s s i n g “ w h o l e
f a r m p l a n s ” a n d c o n t i n u i n gf a r m p l a n s ” a n d c o n t i n u i n g
f a r m p l a n s ” a n d c o n t i n u i n gf a r m p l a n s ” a n d c o n t i n u i n g
f a r m p l a n s ” a n d c o n t i n u i n g
d e v e l o p m e n t o f d r a i nd e v e l o p m e n t o f d r a i n
d e v e l o p m e n t o f d r a i nd e v e l o p m e n t o f d r a i n
d e v e l o p m e n t o f d r a i n
m a n a g e m e n t p l a n s .m a n a g e m e n t p l a n s .
m a n a g e m e n t p l a n s .m a n a g e m e n t p l a n s .
m a n a g e m e n t p l a n s .
Inspecting the new monitoring station
installed during 2000/1 to measure nutrient
loads on one of the major drains in the
Werribee Irrigation District are (L to R); Dean
Jones (DNRE), Brian Seaton (Thiess), Patrick
Ylloh (VGA), Alec Berias (WID CCC), Bill
Barham (Thiess) and Pat Caruso, SRW
Manager Western Irrigation.
Internet Copy
27
SRW has monitoring on five major storages to
indicate microbiology, nutrients and blue green
algae. SRW also carries out water quality monitor-
ing for nutrients discharging from the drains in
the Macalister Irrigation District, and contributes
to Waterwatch programs to undertake additional
water monitoring and community education
activities. Overall, SRW has 69 flow monitoring
sites on waterways and drains it manages and
contributes to a further 67 sites in the State
network.
RESEARCHRESEARCHRESEARCHRESEARCHRESEARCHSRW commits well over $200,000 to research
annually, with the aim of being informed of issues
that arise from its business and could potentially
impact on the environment. It has established
links and co-operative partnerships with Arthur
Rylah Institute, Macalister Research Farm, CRC
for Catchment Hydrology, CSIRO and RMIT.
WATER EFFICIENCYWATER EFFICIENCYWATER EFFICIENCYWATER EFFICIENCYWATER EFFICIENCYSRW recognises that improved water efficiency
will enable better environmental outcomes whilst
recognising the social and economic needs of
local communities.
In our Irrigation Districts, a priority is to improve
customer understanding of water security, since
a lack of information can retard the take-up of
better irrigation practices. SRW also continues
to encourage all customers to use the oppor-
tunities provided by water trading to improve their
returns from water efficiency improvements.
Cost-effective reduction in water losses from
earthen channels remains a challenge, with
current treatments very expensive. However,
pipelining is cost-effective in some circum-
stances, and further pipelining is proceeding in
the Werribee and Macalister Irrigation Districts.
In 2001/2, a Water for Growth project on the Avon
River will explore opportunities for better water
use - with the water savings being directed into
flow regimes which provide better environmental
outcomes.
WATER RESOURCE MANAGEMENTWATER RESOURCE MANAGEMENTWATER RESOURCE MANAGEMENTWATER RESOURCE MANAGEMENTWATER RESOURCE MANAGEMENTSRW is responsible for managing diversions of
water from streams and aquifers and ensuring
sufficient supply is retained in these resources
to maintain and improve natural aquatic
ecosystems. The objective is to ensure that our
management of water resources is sustainable
and equitable and optimises the usage for
beneficial social, environmental and economic
outcomes.
SRW plays a key role in formulating streamflow
regimes in collaboration with other stakeholders,
through the ongoing development of Streamflow
Management Plans (SFMPs) which include the
establishment of appropriate environmental flows
for all stream conditions. SRW is developing
SFMPs for twelve priority streams in southern
Victoria.
In 2000/1 the Upper Latrobe and Upper Maribyr-
nong Plans were completed, adding to those
previously done for the Merri and Gellibrand
systems. Planning continued on the Avon and
Moorabool rivers. Progress on these was slow,
however, because of dry conditions and due to
strategies being developed to improve river
health without unacceptable impacts on agri-
cultural production. Work on both plans will
continue in 2001/2 and it is expected that planning
will begin in respect of the Barwon and Tarra
systems.
While SFMPs will be put in place to manage major
waterways there are many other streams that
have no plan in place but have significant
environmental and productive value. SRW has
capped any further diversions from summer flows
on all streams.
Our principal management strategies for rivers
in southern Victoria centre on control by formal
rostering and restriction programs which are
introduced progressively in response to changes
in flow conditions. These programs have been
well tested in the last four years and refinements
have been made to a number in order to ensure
equitable and practical supply conditions for
customers. Several of the programs have been
upgraded and some less formal
programs have been reviewed and
formalised in consultation with local
customer groups. In addition, monitor-
ing and alarm systems have been
strengthened to ensure compliance
with agreed environmental flows.
SRW is also working with the Govern-
ment and stakeholder groups to
implement Groundwater Management
Plans (GMPs) to protect and improve
the management of the resource. We
have established ten Groundwater
Supply Protection Areas (GSPAs)
across our region, for which GMPs are
completed, commenced or planned.
SRW has implemented the most
substantial monitoring program for
groundwater resources in the State,
incorporating metering of all licensed
irrigation bores in heavily committed
areas and the installation of two
hundred groundwater monitoring
bores.
GMPs are developed by a Ministerial
appointed committee made up of
representatives from such bodies as
DNRE, the relevant Catchment
Management Authority, the Australian
Drilling Industry Association, local
Shires, SRW and an equal number of
licence holders in the area. Generally
a licence holder has chaired the
committee.
GMPs have been completed for
Nullawarre and Yangery (East and West
of Warrnambool respectively), Wy Yung
near Bairnsdale and Sale and Denison
in central Gippsland. Plans have also
been commenced for Deutgam near
Werribee and Warrion near Colac. In
2001/2 planning will begin
for Condah in
the Hamilton area, Bungaree in the
Ballarat area, Wandin Yallock in the
Dandenongs and Koo-Wee-Rup.
Although this typical blue water meter looks fairly insignificant,
SRW has installed 1,030 such meters on groundwater bores
in GSPAs across our region during the last two years, at a
total cost of around $1.5 million. Metering of bores is a key
element of the Groundwater Management Planning Program
currently being undertaken to safeguard the long term
sustainability of groundwater in our region.
Internet Copy
28
CUSTOMER ANDCUSTOMER ANDCUSTOMER ANDCUSTOMER ANDCUSTOMER AND
COMMUNITY CONSULTATIONCOMMUNITY CONSULTATIONCOMMUNITY CONSULTATIONCOMMUNITY CONSULTATIONCOMMUNITY CONSULTATION
SRW is founded on a fundamental principle of
maximising customer influence on its operations,
particularly with regard to price and service
levels in their part of the business. This means
ensuring not only that our operations are open
and transparent, but also that we have structures
in place which make both transparency and
genuine customer influence a reality.
In order to give effect to this principle, we have
established a comprehensive process of cus-
tomer consultation. Each of our three irrigation
districts has its own Customer Consultative
Committee (CCC). These committees have been
encouraged by the Authority to develop a very
significant role in business planning and policy
development for each district. They play a key role
in the development of annual Business Plans and
pricing proposals for our Eastern Irrigation and
Western Irrigation businesses.
In the Licensing business SRW currently has
some 33 committees involved in the operation of
local stream or groundwater management areas,
or the preparation of Streamflow and Ground-
water Management Plans. To date their emphasis
has tended to be more local and these commit-
tees have become important vehicles for ensuring
that the management of their local systems has
regard to local views and is accepted by local
water user communities. As a precursor to the
establishment of a Licensing CCC, SRW has
established a high level Licensing Forum, which
has begun to address more strategic issues
relating to Surface water and Groundwater
management. It is expected that this Forum will
be translated into a CCC for the Licensing
Business during 2001/2.
In our Headworks business, whose customers are
predominantly the holders of bulk entitlements to
water harvested in our four major storage systems,
the focus has been on establishing strong bilateral
arrangements between SRW and individual
customers. This entails consideration of wide
ranging issues of significance and urgency, such
as drought planning, infrastructure development
and enhancement, and water quality.
Our various consultative committees involve more
than a hundred of our customers in an ongoing
round of consultation, feedback, advice and
recommendation. In addition, however, SRW also
utilises other processes to ensure that the Board,
management and staff are familiar with customer
and community issues, priorities and opinions.
These range from briefings on current topics to
the policy of regularly and frequently holding up
to half of each year’s formal Board meetings in
various locations across our region.
O u r v a r i o u s c o n s u l t a t i v eO u r v a r i o u s c o n s u l t a t i v e
O u r v a r i o u s c o n s u l t a t i v eO u r v a r i o u s c o n s u l t a t i v e
O u r v a r i o u s c o n s u l t a t i v e
c o m m i t t e e s i n v o l v e m o r e t h a nc o m m i t t e e s i n v o l v e m o r e t h a n
c o m m i t t e e s i n v o l v e m o r e t h a nc o m m i t t e e s i n v o l v e m o r e t h a n
c o m m i t t e e s i n v o l v e m o r e t h a n
a h u n d r e d o f o u r c u s t o m e r s i na h u n d r e d o f o u r c u s t o m e r s i n
a h u n d r e d o f o u r c u s t o m e r s i na h u n d r e d o f o u r c u s t o m e r s i n
a h u n d r e d o f o u r c u s t o m e r s i n
a n o n g o i n g r o u n d o fa n o n g o i n g r o u n d o f
a n o n g o i n g r o u n d o fa n o n g o i n g r o u n d o f
a n o n g o i n g r o u n d o f
c o n s u l t a t i o n , f e e d b a c k , a d v i c ec o n s u l t a t i o n , f e e d b a c k , a d v i c e
c o n s u l t a t i o n , f e e d b a c k , a d v i c ec o n s u l t a t i o n , f e e d b a c k , a d v i c e
c o n s u l t a t i o n , f e e d b a c k , a d v i c e
a n d r e c o m m e n d a t i o n . I na n d r e c o m m e n d a t i o n . I n
a n d r e c o m m e n d a t i o n . I na n d r e c o m m e n d a t i o n . I n
a n d r e c o m m e n d a t i o n . I n
a d d i t i o n , h o w e v e r , S R W a l s oa d d i t i o n , h o w e v e r , S R W a l s o
a d d i t i o n , h o w e v e r , S R W a l s oa d d i t i o n , h o w e v e r , S R W a l s o
a d d i t i o n , h o w e v e r , S R W a l s o
u t i l i s e s o t h e r p r o c e s s e s t ou t i l i s e s o t h e r p r o c e s s e s t o
u t i l i s e s o t h e r p r o c e s s e s t ou t i l i s e s o t h e r p r o c e s s e s t o
u t i l i s e s o t h e r p r o c e s s e s t o
e n s u r e t h a t t h e B o a r d ,e n s u r e t h a t t h e B o a r d ,
e n s u r e t h a t t h e B o a r d ,e n s u r e t h a t t h e B o a r d ,
e n s u r e t h a t t h e B o a r d ,
m a n a g e m e n t a n d s t a f f a r em a n a g e m e n t a n d s t a f f a r e
m a n a g e m e n t a n d s t a f f a r em a n a g e m e n t a n d s t a f f a r e
m a n a g e m e n t a n d s t a f f a r e
f a m i l i a r w i t h c u s t o m e r a n df a m i l i a r w i t h c u s t o m e r a n d
f a m i l i a r w i t h c u s t o m e r a n df a m i l i a r w i t h c u s t o m e r a n d
f a m i l i a r w i t h c u s t o m e r a n d
c o m m u n i t y i s s u e s , p r i o r i t i e sc o m m u n i t y i s s u e s , p r i o r i t i e s
c o m m u n i t y i s s u e s , p r i o r i t i e sc o m m u n i t y i s s u e s , p r i o r i t i e s
c o m m u n i t y i s s u e s , p r i o r i t i e s
a n d o p i n i o n s . T h e s e r a n g ea n d o p i n i o n s . T h e s e r a n g e
a n d o p i n i o n s . T h e s e r a n g ea n d o p i n i o n s . T h e s e r a n g e
a n d o p i n i o n s . T h e s e r a n g e
f r o m b r i e f i n g s o n c u r r e n tf r o m b r i e f i n g s o n c u r r e n t
f r o m b r i e f i n g s o n c u r r e n tf r o m b r i e f i n g s o n c u r r e n t
f r o m b r i e f i n g s o n c u r r e n t
t o p i c s t o t h e p o l i c y o f r e g u l a r l yt o p i c s t o t h e p o l i c y o f r e g u l a r l y
t o p i c s t o t h e p o l i c y o f r e g u l a r l yt o p i c s t o t h e p o l i c y o f r e g u l a r l y
t o p i c s t o t h e p o l i c y o f r e g u l a r l y
a n d f r e q u e n t l y h o l d i n g u p t oa n d f r e q u e n t l y h o l d i n g u p t o
a n d f r e q u e n t l y h o l d i n g u p t oa n d f r e q u e n t l y h o l d i n g u p t o
a n d f r e q u e n t l y h o l d i n g u p t o
h a l f o f e a c h y e a r ’ s f o r m a lh a l f o f e a c h y e a r ’ s f o r m a l
h a l f o f e a c h y e a r ’ s f o r m a lh a l f o f e a c h y e a r ’ s f o r m a l
h a l f o f e a c h y e a r ’ s f o r m a l
B o a r d m e e t i n g s i n v a r i o u sB o a r d m e e t i n g s i n v a r i o u s
B o a r d m e e t i n g s i n v a r i o u sB o a r d m e e t i n g s i n v a r i o u s
B o a r d m e e t i n g s i n v a r i o u s
l o c a t i o n s a c r o s s o u r r e g i o n .l o c a t i o n s a c r o s s o u r r e g i o n .
l o c a t i o n s a c r o s s o u r r e g i o n .l o c a t i o n s a c r o s s o u r r e g i o n .
l o c a t i o n s a c r o s s o u r r e g i o n .
Internet Copy
29
The Board’s custom on these occasions is to meet
with local customers or other stakeholders over
a meal on the evening prior to the meeting, in
order to informally discuss issues of the day and
to gain a clearer focus and understanding of local
conditions and of community and customer needs
and concerns. It is also the practice of the SRW
Board to follow all its monthly meetings, wherever
held, with tours of local farms, SRW infrastructure
or other relevant venues of interest.
SRW has more than 8,000 customers, the great
majority of whom are holders of groundwater or
surface water take-and-use licences, and who
are scattered widely across southern Victoria.
We also influence the daily lives of all the local
communities in our region. Communication and
real customer influence and participation can be
hard targets to achieve with such a diverse and
dispersed target group. It has been and remains
a priority for SRW, however, to ensure that our
customers and other stakeholders can
communicate their concerns and issues, and that
their opinions and priorities are properly
acknowledged and considered by the Board and
the Authority.
The local community has always taken a close interest in the
Lerderderg River system and its role in the harvesting of water
into Merrimu. The Lerderderg Open Day held in March 2001
gave more than 200 visitors the chance to view and learn about
the system more closely. One of the tour parties is seen here
at the Lerderderg weir.
Internet Copy
30
CHARTER AND PURPOSECHARTER AND PURPOSECHARTER AND PURPOSECHARTER AND PURPOSECHARTER AND PURPOSEThe Gi ppsl and and Sout her n Rur al Wat er Aut hor i t y, t r adi ng asSout hern Rural Wat er ( SRW) , was est abl i shed by Mi ni st er i al Orderon 1 Jul y 1995.
SRW i s an Aut hor i t y est abl i shed under t he Wat er Act 1989. I t i saccount abl e t o t he Mi ni st er f or Envi ronment and Conservat i on andi t s f ormal f unct i ons and powers are cont ai ned i n Sect i on 7 of t heWat er Act .
The busi ness act i vi t i es of SRW are out l i ned i n det ai l el sewhere i nt hi s Report .
SRW pr i mari l y servi ces t he rural communi t i es of sout hern Vi ct or i ai n a regi on whi ch encompasses t he ent i re St at e sout h of t he GreatDi vi de, wi t h t he except i on of met ropol i t an Mel bourne. Through i t sbul k wat er st orage operat i ons i t i ndi rect l y provi des wat er t o urbanusers i n Cent ral Gi ppsl and and t he dormi t ory communi t i es nort h westof Mel bourne. I t al so harvest s, st ores and del i vers as requi red bul kwat er t o maj or power generat i ng compani es i n t he Lat robe Val l eyand t o t wo pr i vat el y owned hydro-el ect r i c power st at i ons l ocat edon SRW st or ages.
MANAGEMENT AND STRUCTUREMANAGEMENT AND STRUCTUREMANAGEMENT AND STRUCTUREMANAGEMENT AND STRUCTUREMANAGEMENT AND STRUCTURESRW is governed by a Board of nine members appointed by theMinister for a three year term expiring on 30 June 2001.
The Chairman is Mr Allan J Pappin CVO AM and the Deputy Chairmanis Dr Greg Walsh.
The other members are: Mr Geoff Crick, Mr Patrick Foster, Mr DavidKoch, Mrs Joan Liley, Mrs Jennifer McMillan, Mr John Nicol OAM,Mr John Tilleard.
The Chairman of the Audit Committee is Mr Patrick Foster. Themembers of the Audit Committee are Mrs Liley and Mr Crick.
The Chief Executive is Dr Martin Kent.
SRW is organised into four principal operating businesses and aCorporate group. The four businesses are; Eastern Irrigation,Headworks, Licensing and Western Irrigation.
The Director Business Services is Mr Geoff Barry. Mr Graham Hawkeis the Director Technical Services and the Business ManagerLicensing. Mr Pat Caruso is the Business Manager Headworks andBusiness Manager Western Irrigation. Mr Matthew Youell is theBusiness Manager Eastern Irrigation.
The structure of the Authority and the principal functions undertakenby each unit are shown in the Organisational Chart which appearselsewhere in this Report.
FINANCIAL AND OTHER INFORMATIONFINANCIAL AND OTHER INFORMATIONFINANCIAL AND OTHER INFORMATIONFINANCIAL AND OTHER INFORMATIONFINANCIAL AND OTHER INFORMATIONOn 30 June 2001, which was the reference date for collection ofworkforce statistics, SRW employed 103 permanent and 3 temporarystaff. The following chart summarises relevant workforce data for2000/1 with comparative figures for 1999/2000 and 1998/9:
F E MAL EF E MAL EF E MAL EF E MAL EF E MAL E
CAT E GORYCAT E GORYCAT E GORYCAT E GORYCAT E GORY 2000/ 12000/ 12000/ 12000/ 12000/ 1 1999/ 01999/ 01999/ 01999/ 01999/ 0 1998/ 91998/ 91998/ 91998/ 91998/ 9Permanent Full Time 10 9 9Permanent Part Time 2 2 2Temporary Full Time 1 1 1Temporary Part Time - - 1TOTALTOTALTOTALTOTALTOTAL 1313131313 1212121212 1313131313
MALEMALEMALEMALEMALE
CATEGORYCATEGORYCATEGORYCATEGORYCATEGORY 2000/12000/12000/12000/12000/1 1999/01999/01999/01999/01999/0 1998/91998/91998/91998/91998/9Permanent Full Time 89 86 81Permanent Part Time 2 2 2Temporary Full Time 1 2 2Temporary Part Time 1 - 1TOTALTOTALTOTALTOTALTOTAL 9393939393 9090909090 8686868686
TOTALTOTALTOTALTOTALTOTAL
CATEGORYCATEGORYCATEGORYCATEGORYCATEGORY 2000/12000/12000/12000/12000/1 1999/01999/01999/01999/01999/0 1998/91998/91998/91998/91998/9Permanent Full Time 99 95 90Permanent Part Time 4 4 4Temporary Full Time 2 3 3Temporary Part Time 1 - 2TOTALTOTALTOTALTOTALTOTAL 106106106106106 102102102102102 9999999999
All appointments to positions in 2000/1 were undertaken on the basisof merit and equity principles.
Five requests were received in 2000/1 for access to documents underthe provisions of the Freedom of Information Act 1982. Three of theseresulted in release of the requested documents and one in partialrelease (deletion of certain information). Partial release was alsooffered in respect of the fifth application but this was rejected by
the applicant. As a result of subsequent review by VCAT of those decisions, thedecision of partial access was confirmed. An application incomplete at 1 July 2000was determined by VCAT, with partial access being agreed by consent.
Members of the public may access the documents of SRW, subject to the provisionsof the Freedom of Information Act 1982, by applying in writing to the FOI Officer ofthe Authority. Published information is available from the Head Office at 88 JohnsonStreet Maffra, between 8.00 am and 4.45 pm Monday - Friday excepting publicholidays. The FOI Officer is Mr Geoff Barry.
During 2000/1 SRW complied with the building and maintenance provisions of theBuilding Act 1993. Consultants are engaged to manage Certificate of Occupancyconditions for the Maffra head office.
SRW operates on a full cost recovery basis in accordance with National CompetitionPolicy. Prices are set in collaboration and consultation with customers to ensurethat all costs of operation are met, together with a provision for replacement ofassets used in provision of the supply or services provided. SRW is in the processof implementing a Tax Equivalent regime as the next step in Competition Policycompliance.
SRW manages its OHS responsibilities in accordance with the provisions of relevantlegislation, through two regional OHS Committees and a comprehensive network ofworkplace safety representatives. The following statistics summarise OHSperformance during 2000/1.
PARTICULARSPARTICULARSPARTICULARSPARTICULARSPARTICULARS 2000/12000/12000/12000/12000/1 1999/01999/01999/01999/01999/0
NUMBER OF LOST TIME INJURIES
........................... 7 5
TOTAL LOST TIME ( h o u r s )
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
492 772NUMBER OF NO LOST TIME INJURIES( M e d i c a l e x p e n s e s o n l y )
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5 11NUMBER OF INCIDENTS/NEAR MISSES
................. 21 15
Continuous improvement in OHS performance has resulted in SRW achieving a netdecrease in its Workcover premiums for 2001/2.
RELATED PARTY INFORMATIONRELATED PARTY INFORMATIONRELATED PARTY INFORMATIONRELATED PARTY INFORMATIONRELATED PARTY INFORMATIONRelated Party Information appears as note 25 “ Responsible Persons Disclosure” inthe financial statements section of this Report.
DIRECTIONS OF THE MINISTER FORDIRECTIONS OF THE MINISTER FORDIRECTIONS OF THE MINISTER FORDIRECTIONS OF THE MINISTER FORDIRECTIONS OF THE MINISTER FOR
ENVIRONMENT AND CONSERVATIONENVIRONMENT AND CONSERVATIONENVIRONMENT AND CONSERVATIONENVIRONMENT AND CONSERVATIONENVIRONMENT AND CONSERVATIONOn 28 July 2000 the Minister for Environment and Conservation directed that theAuthority transfer and surrender to the Crown all the freehold land purchased forthe proposed Mitchell River dam. The intention of the direction is to enable the landto be incorporated into the Mitchell River National Park.
As at 30 June 2001, the transfer processes were incomplete and so the land remainsas an asset in the books of account of the Authority as at that date.
DIRECTIONS OF THE MINISTER FOR FINANCEDIRECTIONS OF THE MINISTER FOR FINANCEDIRECTIONS OF THE MINISTER FOR FINANCEDIRECTIONS OF THE MINISTER FOR FINANCEDIRECTIONS OF THE MINISTER FOR FINANCEThe information in this section has been provided to comply with those requirementsof Part 9 of the Directions of the Minister for Finance under the Financial Manage-ment Act 1994, which have not been already met elsewhere in this Annual Report.
Additionally, in accordance with section 9.1.3(ii)(I) of the Directions, informationlisted in section 9.1.3(iv) thereof has been prepared and is available to the relevantMinister, Members of Parliament and the public on request.
BULK ENTITLEMENTSBULK ENTITLEMENTSBULK ENTITLEMENTSBULK ENTITLEMENTSBULK ENTITLEMENTSThe following information is provided in accordance with section 16.3 of the BulkThe following information is provided in accordance with section 16.3 of the BulkThe following information is provided in accordance with section 16.3 of the BulkThe following information is provided in accordance with section 16.3 of the BulkThe following information is provided in accordance with section 16.3 of the BulkEntitlement (Latrobe - Southern Rural) Conversion Order 1996.Entitlement (Latrobe - Southern Rural) Conversion Order 1996.Entitlement (Latrobe - Southern Rural) Conversion Order 1996.Entitlement (Latrobe - Southern Rural) Conversion Order 1996.Entitlement (Latrobe - Southern Rural) Conversion Order 1996.
– at 30 June 2001 Blue Rock reservoir contained 154,694 ML of water. This is 74.3% ofthe capacity of the reservoir (208,188 ML)
– at 30 June 2001 the amount of water in the Authority’s share of Blue Rock reservoirwas 4,065 ML or 1.95% of the total capacity.
– the annual amount of water taken by licence holders from the system waterwaywas:
– upstream of Yallourn weir 23 ML;
– downstream of Yallourn weir 4,511 ML.
– the amount of annual losses debited to the Authority’s share of Blue Rock reservoirwas 33 ML.
– the amount of internal spill of water into the Authority’s share of storage in BlueRock was nil.
– there were no periods of rationing for any licence holders during 2000-2001.
– The Authority has provided for passing flow requirements as specified in the BulkEntitlement Order for most of the year, but there were several occasions where therequirement was not maintained.
– there were no temporary or permanent transfers of all or part of the bulkentitlement.
– there was no bulk entitlement or licence in respect of the system waterwaytemporarily or permanently transferred to the Authority.
– there was no amendment to this Bulk Entitlement. Modelling is continuing,however, to confirm natural flow indicators and to review passing flowrequirements, in particular at Sale.
STA
TUTO
RY
RE
PO
RT
STA
TUTO
RY
RE
PO
RT
STA
TUTO
RY
RE
PO
RT
STA
TUTO
RY
RE
PO
RT
STA
TUTO
RY
RE
PO
RT
Internet Copy
31
– there were no amounts supplied to any licence holders other than those specifiedin Schedule 1 of the Order.
– The Authority met the passing flow requirements 98.1% of the time. There hasbeen no other failure of which the Authority is aware to comply with any provisionof the bulk entitlement.
– Difficulties were experienced by the Authority in relation to:
– modified natural flow indicators at designated passing points. Modelling offlows is under review by DNRE.
The following information is published in accordance with section 12.3 of the BulkThe following information is published in accordance with section 12.3 of the BulkThe following information is published in accordance with section 12.3 of the BulkThe following information is published in accordance with section 12.3 of the BulkThe following information is published in accordance with section 12.3 of the BulkEntitlement (Yallourn Energy for Gippsland and Southern Rural Water Authority)Entitlement (Yallourn Energy for Gippsland and Southern Rural Water Authority)Entitlement (Yallourn Energy for Gippsland and Southern Rural Water Authority)Entitlement (Yallourn Energy for Gippsland and Southern Rural Water Authority)Entitlement (Yallourn Energy for Gippsland and Southern Rural Water Authority)
Conversion Order 1996.Conversion Order 1996.Conversion Order 1996.Conversion Order 1996.Conversion Order 1996.
– The annual amount of water designated as taken by the Authority from thewaterway at its pumping station was 16,119 ML.
– In accordance with clause 11.4, the Authority has a network of metering installedwithin its low quality water system that enables it to determine the low qualitywater usage by both the Loy Yang A and Loy Yang B power stations. Theequipment is checked monthly for validity and annually for signal integrity.
– there were no temporary or permanent transfers of all or part of the bulkentitlement.
– there was no bulk entitlement or licence in respect of the system waterwaytemporarily or permanently transferred to the Authority.
– there was no amendment to this bulk entitlement.
– there has been no failure of which the Authority is aware to comply with anyprovision of the bulk entitlement.
– there are no existing or anticipated difficulties experienced by the Authority incomplying with the bulk entitlement.
The following information is provided in accordance with section 20.3 of the BulkThe following information is provided in accordance with section 20.3 of the BulkThe following information is provided in accordance with section 20.3 of the BulkThe following information is provided in accordance with section 20.3 of the BulkThe following information is provided in accordance with section 20.3 of the BulkEntitlement (Thomson/Macalister - Southern Rural Water) Conversion Order 2001.Entitlement (Thomson/Macalister - Southern Rural Water) Conversion Order 2001.Entitlement (Thomson/Macalister - Southern Rural Water) Conversion Order 2001.Entitlement (Thomson/Macalister - Southern Rural Water) Conversion Order 2001.Entitlement (Thomson/Macalister - Southern Rural Water) Conversion Order 2001.
– at 30 June the status of SRW’s entitlement in Thomson Reservoir was;
– Releases made from Thomson Reservoir to supply primary entitlements were8,583 ML.
– The volume of SRW’s share of storage capacity under clause 9 was 8,245 ML.
– The volume of inflows attributed to SRW under clauses 10.1 and 10.2 was 11,976ML.
– the annual amounts of water taken by SRW from the waterway were:
– Main Northern Channel 55,556 ML
– Main Southern Channel 117,310 ML
– Main Eastern Channel 34,397 ML;
– Cowwarr Channel 17,045 ML.
– The volume of water held in Lake Glenmaggie at 30 June 2001 was 32,118 ML.
– The annual amount of water taken by the primary entitlement holders under thisorder was 173,048 ML.
– There were no credits granted under clause 17 of the order.
– There were no temporary or permanent transfers of a bulk entitlement or any otherentitlement to SRW.
– There were no alterations made to Schedules 1 or 2 under sub-clause 8.1 of theorder.
– Permanent transfers of primary entitlements took place as follows:
– MID to MID — 2 transfers totalling 60.0 ML
– River to River — 2 transfers totalling 65.0 ML
– MID to River — 2 transfers totalling 88.0 ML
– Temporary transfers of primary entitlements took place as follows:
– MID to MID — 76 transfers totalling 2,818.8 ML
– River to MID — 2 transfers totalling 120.0 ML
– River to River — 6 transfers totalling 488.6 ML
– MID to River — 6 transfers totalling 498.0 ML
– There were no amendments to this Bulk Entitlement.
– There were no new bulk entitlements granted to SRW with respect to the supply ofprimary entitlements under this order.
– There has been no program approved under sub-clause 18.2 to date.
– There has been no program approved under sub-clause 19.3 to date.
– There has been no other failure of which the Authority is aware to comply with anyprovision of the bulk entitlement other than the maintenance of environmentalflows on the Thomson River. On isolated occasions during the year flows droppedbelow the minimum and remedial action was required.
– Difficulties were experienced by the Authority in relation to environmental flows asindicated above. Remedial action has included improvements to procedures,additional monitoring of the river and modifications to the Thomson river Siphonoutfall to maintain flows at that point.
The following information is published in accordance with section 18.1 of the BulkThe following information is published in accordance with section 18.1 of the BulkThe following information is published in accordance with section 18.1 of the BulkThe following information is published in accordance with section 18.1 of the BulkThe following information is published in accordance with section 18.1 of the BulkEntitlement (Werribee System - Irrigation) Conversion Order 1997.Entitlement (Werribee System - Irrigation) Conversion Order 1997.Entitlement (Werribee System - Irrigation) Conversion Order 1997.Entitlement (Werribee System - Irrigation) Conversion Order 1997.Entitlement (Werribee System - Irrigation) Conversion Order 1997.
– There have been no transfers from Merrimu Reservoir to Melton Reservoir.
– Water taken from:
– Bacchus Marsh Diversion Weir — 4,481 ML
– Werribee Diversion Weir — 12,906 ML
– Maddingley Pumps — 0 ML
– Volume of water taken from the waterway by primary entitlement holders includingoutfalls:
– Bacchus Marsh — 3,849.6 ML
– Werribee — 10,729.8 ML
– River Diverters — 455.8 ML
– Myrniong — 47 ML
– There have been no internal spills.
– As at 30 June 2001 capacity shares were :
– Western Water — 13,808 ML
– SRW — 2,915 ML
– Unallocated — 4,699 ML
– Share of passing flows:
– Western Water — 219 ML
– SRW — 73 ML
– Unallocated — 73 ML
– SRW has not received any credits. For the year 2000/1 a total of 377.7 ML wasreturned to the system waterway via the main channel outfall.
– Seven (7) temporary transfers have taken place as follows:
– 856.6 ML SRW (BMID) to Western Water (Merrimu Reservoir).
– 150.0 ML SRW (WID) to Western Water (Merrimu Reservoir.
– No transfers to SRW have taken place.
– No restrictions were implemented in 2000/1. Initial allocation on 1 July 2000 was100% of water right, from October 120%, from December 150%, from February 2001175% and from April 200% allocation.
– There are no changes to Schedule 1
– There are no changes to schedule 2.
– Permanent Transfers:
– 2 Transfer, 45.7 ML, WID to WID
– 1 Transfer, 86.0 ML, River to River.
– Temporary Transfers:
– 8 Transfers, 116.2 ML, from BMID to BMID.
– 44 Transfers, 1,194.8 ML, from WID to WID.
– 4 Transfers, 76.4 ML, from BMID to WID.
– 5 Transfers, 190.7 ML, from WID to Werribee River.
– 1 Transfer, 13.0 ML, from Werribee River to WID.
– 2 Transfers, 55.0 ML, from Werribee River to Werribee River.
– 1 Transfer, 150 ML, from WID to Merrimu
– 6 Transfers, 856.6 ML, from BMID to Merrimu.
– The annual volume supplied to:
– Bacchus Marsh — 3,471.9 ML
– Werribee — 10,457.7 ML
– There are no amendments to this Bulk Entitlement order.
– There have been no new Bulk Entitlements granted.
– No environmental management programs have been implemented at this stage.SRW has continued with the same metering program as before the BulkEntitlement was signed. Some sites have been upgraded with new equipment.
– SRW has provided as far as possible for passing flow requirements as specified inthe Bulk Entitlement order.
– At present SRW has experienced no significant difficulties to date in complyingwith the Bulk Entitlement.
The following information is published in accordance with section 18.1 of the BulkThe following information is published in accordance with section 18.1 of the BulkThe following information is published in accordance with section 18.1 of the BulkThe following information is published in accordance with section 18.1 of the BulkThe following information is published in accordance with section 18.1 of the BulkEntitlement (Maribyrnong - Southern Rural Water) Conversion Order 1999.Entitlement (Maribyrnong - Southern Rural Water) Conversion Order 1999.Entitlement (Maribyrnong - Southern Rural Water) Conversion Order 1999.Entitlement (Maribyrnong - Southern Rural Water) Conversion Order 1999.Entitlement (Maribyrnong - Southern Rural Water) Conversion Order 1999.
– 222 ML was released to supply licence entitlements.
– SRW’s share of Rosslynne Reservoir at 30 June 2001 was 249 ML.
– Taking into account evaporation and measurement discrepancies SRW hadinflows of 415 ML.
– SRW allowed up to 50% for transfer and operating losses.
– SRW has had 19 ML deducted for passing flow requirements.
– SRW has provided as far as possible for passing flow requirements as detailed inthe Bulk Entitlement order.
– Primary entitlement holders have taken 119.7 ML from the waterway.
– There have been no temporary or permanent transfers from this Bulk Entitlement.
– A total of 270.3 ML was transferred from Western Water’s Macedon system intotheir share of Rosslynne Reservoir.
– There have been no alterations to Schedule 1 or 2 of this Bulk Entitlement.
– There has been 1 Temporary Transfer within the system of 38 Ml.
– There have been no amendments to this Bulk Entitlement.
– There have been no new Bulk Entitlements granted.
– No environmental management programs have been implemented at this stage.SRW has continued with the same metering program as before the BulkEntitlement was signed. Some sites have been upgraded with new equipment.
– To SRW’s knowledge it has not failed to comply with any provisions of the BulkEntitlement.
– SRW has experienced no significant difficulties to date in complying with the BulkEntitlement.
Internet Copy
32
TAB
LES
TAB
LES
TAB
LES
TAB
LES
TAB
LES
TABLE 1.1: PERMANENT TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYTABLE 1.1: PERMANENT TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYTABLE 1.1: PERMANENT TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYTABLE 1.1: PERMANENT TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYTABLE 1.1: PERMANENT TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYDURING YEAR ENDED 30 JUNE 2001
TRANSFERS FROM AND TO DISTRICTS/AREAS AND WATERWAYS WITHIN SOUTHERN RURAL WATERTRANSFERS FROM AND TO DISTRICTS/AREAS AND WATERWAYS WITHIN SOUTHERN RURAL WATERTRANSFERS FROM AND TO DISTRICTS/AREAS AND WATERWAYS WITHIN SOUTHERN RURAL WATERTRANSFERS FROM AND TO DISTRICTS/AREAS AND WATERWAYS WITHIN SOUTHERN RURAL WATERTRANSFERS FROM AND TO DISTRICTS/AREAS AND WATERWAYS WITHIN SOUTHERN RURAL WATER
Macalister Werribee Bacchus Marsh Thomson River Maribyrnong Werribee River Other
TO FROM District District District Waterway River Waterway Waterway Waterways
Totals
DISTRICTDISTRICTDISTRICTDISTRICTDISTRICT No. ML No. ML No. ML No. ML No. ML No. ML No. ML No. ML
Macalister
.............................. 2 60.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 1 14.0 3 74.0
Werribee ................................. 0 0.0 2 45.7 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 2 45.7
Bacchus Marsh
..................... 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0
WATERWAYSWATERWAYSWATERWAYSWATERWAYSWATERWAYS
Thomson River ....................... 1 50.0 0 0.0 0 0.0 2 98.0 0 0.0 0 0.0 1 40.0 4 188.0
Macalister River
................... 1 38.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 1 38.0
Maribyrnong River
................ 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0
Werribee River
...................... 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 1 86.0 0 0.0 1 86.0
Other
........................................ 0 0.0 0 0.0 0 0.0 1 5.0 0 0.0 0 0.0 8 245.5 9 250.5
Totals ....................................... 4
148.0 2 45.7 0 0.0 3 103.0 0 0.0 1 86.0 10 299.5 20 682.2
TABLE 2 TEMPORARY TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYTABLE 2 TEMPORARY TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYTABLE 2 TEMPORARY TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYTABLE 2 TEMPORARY TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYTABLE 2 TEMPORARY TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYDURING YEAR ENDED 30 JUNE 2001
SUMMARYSUMMARYSUMMARYSUMMARYSUMMARYTotal transfers from other Total transfers to other Total transfers from Total transfers to Net increase/
districts/areas and districts/areas and districts/areas and districts/areas and decrease for
Internal transfers within waterways within waterways within waterways of other waterways of other district/area
District/area or waterway district/area or waterway Southern Rural Water Southern Rural Water Water Authorities Water Authorities or waterway
DISTRICTSDISTRICTSDISTRICTSDISTRICTSDISTRICTS No. ML No. ML No. ML No. ML No. ML ML
Macalister
....................................... 73 2802.0 6 204.0 6 348.0 0 0.0 0 0.0 -144.0
Werribee .......................................... 31 964.6 11 945.8 4 160.0 0 0.0 0 0.0 785.8
Bacchus Marsh
.............................. 3 75.0 0 0.0 10 932.8 0 0.0 0 0.0 -932.8
WATERWAYSWATERWAYSWATERWAYSWATERWAYSWATERWAYS
Thomson River
................................ 4 581.0 3 261.0 5 119.0 0 0.0 0 0.0 142.0
Maribyrnong River
......................... 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0.0
Werribee River
............................... 1 5.0 4 160.0 1 13.0 0 0.0 0 0.0 147.0
Other
................................................. 15 985.0 8 624.0 6 622.0 0 0.0 0 0.0 2.0
Totals ................................................ 127
5412.6 32 2194.8 32 2194.8 0 0.0 0 0.0 0.0
TABLE 2.1: TEMPORARY TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYTABLE 2.1: TEMPORARY TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYTABLE 2.1: TEMPORARY TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYTABLE 2.1: TEMPORARY TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYTABLE 2.1: TEMPORARY TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYDURING YEAR ENDED 30 JUNE 2001
TRANSFERS FROM AND TO DISTRICTS/AREAS AND WATERWAYS WITHIN SOUTHERN RURAL WATERTRANSFERS FROM AND TO DISTRICTS/AREAS AND WATERWAYS WITHIN SOUTHERN RURAL WATERTRANSFERS FROM AND TO DISTRICTS/AREAS AND WATERWAYS WITHIN SOUTHERN RURAL WATERTRANSFERS FROM AND TO DISTRICTS/AREAS AND WATERWAYS WITHIN SOUTHERN RURAL WATERTRANSFERS FROM AND TO DISTRICTS/AREAS AND WATERWAYS WITHIN SOUTHERN RURAL WATER
Macalister Werribee Bacchus Marsh Thomson River Maribyrnong Werribee River Other
TO FROM District District District Waterway River Waterway Waterway Waterways
Totals
DISTRICTDISTRICTDISTRICTDISTRICTDISTRICT No. ML No. ML No. ML No. ML No. ML No. ML No. ML No. ML
Macalister
.............................. 73 2802.0 0 0.0 0 0.0 4 79.0 0 0.0 0 0.0 2 125.0 79 3006.0
Werribee ................................. 0 0.0 31
964.6 10 932.8 0 0.0 0 0.0 1 13.0 0 0.0 42 1910.4
Bacchus Marsh
..................... 0 0.0 0 0.0 3 75.0 0 0.0 0 0.0 0 0.0 0 0.0 3 75.0
WATERWAYSWATERWAYSWATERWAYSWATERWAYSWATERWAYS
Thomson River ....................... 3 261.0 0 0.0 0 0.0 4 581.0 0 0.0 0 0.0 0 0.0 7 842.0
Maribyrnong River
................ 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0
Werribee River
...................... 0 0.0 4 160.0 0 0.0 0 0.0 0 0.0 1 5.0 0 0.0 5 165.0
Other
........................................ 3 87.0 0 0.0 0 0.0 1 40.0 0 0.0 0 0.0 19 1482.0 23 1609.0
Totals ....................................... 79
3150.0 35 1124.6 13 1007.8 9 700.0 0 0 2 18 21 1607 159 7607.4
TABLE 1: PERMANENT TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYTABLE 1: PERMANENT TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYTABLE 1: PERMANENT TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYTABLE 1: PERMANENT TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYTABLE 1: PERMANENT TRANSFERS OF WATER RIGHTS AND DIVERSION LICENCES PROCESSED BY THE AUTHORITYDURING YEAR ENDED 30 JUNE 2001
SUMMARYSUMMARYSUMMARYSUMMARYSUMMARYTotal transfers from other Total transfers to other Total transfers from Total transfers to Net increase/
districts/areas and districts/areas and districts/areas and districts/areas and decrease for
Internal transfers within waterways within waterways within waterways of other waterways of other district/area
District/area or waterway district/area or waterway Southern Rural Water Southern Rural Water Water Authorities Water Authorities or waterway
DISTRICTSDISTRICTSDISTRICTSDISTRICTSDISTRICTS No. ML No. ML No. ML No. ML No. ML ML
Macalister
....................................... 2 60.0 1 14.0 2 88.0 0 0.0 0 0.0 -74.0
Werribee .......................................... 2 45.7 0 0.0 0 0.0 0 0.0 0 0.0 0.0
Bacchus Marsh
.............................. 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0.0
WATERWAYSWATERWAYSWATERWAYSWATERWAYSWATERWAYS
Thomson River
................................ 2 98.0 2 90.0 1 5.0 0 0.0 0 0.0 85.0
Macalister River
............................ 0 0.0 1 38.0 1 14.0 0 0.0 0 0.0 24.0
Latrobe River
.................................. 2 51.0 0 0.0 0 0.0 0 0.0 0 0.0 0.0
Maribyrnong River
......................... 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 0.0
Werribee River
............................... 1 86.0 0 0.0 0 0.0 0 0.0 0 0.0 0.0
Other
................................................. 6 194.5 1 5.0 1 40.0 0 0.0 0 0.0 -35.0
Totals ................................................ 15
535.2 5 147.0 5 147.0 0 0.0 0 0.0 0.0
Internet Copy
33
TAB
LES
TAB
LES
TAB
LES
TAB
LES
TAB
LES TABLE 3: IRRIGATION WATER USAGE FOR THE YEAR ENDED 30 JUNE 2001TABLE 3: IRRIGATION WATER USAGE FOR THE YEAR ENDED 30 JUNE 2001TABLE 3: IRRIGATION WATER USAGE FOR THE YEAR ENDED 30 JUNE 2001TABLE 3: IRRIGATION WATER USAGE FOR THE YEAR ENDED 30 JUNE 2001TABLE 3: IRRIGATION WATER USAGE FOR THE YEAR ENDED 30 JUNE 2001
Total
Gross supply
water rights at offtakes Under Users
alloted to (excl. volume water rights/ outside
Total Usage under
District and passed to domestic
Total district from delivered entitlements Total
District/Area or Waterway diversion other & stock Sales of delivered district from and stock Sales irrigation
(District) licences Districts) allowance water in district channels district & domestic usage usage
ML ML ML ML ML ML ML ML ML
Macalister
....................................... 117044.4 224308.0 117307.0 34232.0 151539.0 0.0 151539.0 0.0 0.0 151539.0
Werribee ..........................................
9344.6 14405.9 8445.0 2012.7 10457.7 0.0 10457.7 0.0 0.0 10457.7
Bacchus Marsh
.............................. 3692.4 6667.6 2520.7 608.9 3129.6 342.3 3471.9 0.0 0.0 3471.9
Gippsland Diverters .......
................ 94196.9 0.0 0.0 0.0 0.0 0.0 0.0 29990.9 7413.4 37404.3
Maribyrnong System
..................... 1971.2 1109.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Werribee System
........................... 1598.6 0.0 0.0 0.0 0.0 0.0 0.0 593.3 123.5 716.8
Bunyip/Tarago System
.................. 12549.5 0.0 0.0 0.0 0.0 0.0 0.0 2160.8 399.8 2560.6
Other
................................................. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1297.1 9.0 1306.1
Totals ................................................
240397.6 246490.5 128272.7 36853.6 165126.3 342.3 165468.6 34042.1 7945.7 207456.4
Users in DistrictUsers in DistrictUsers in DistrictUsers in DistrictUsers in District Diversions fromDiversions fromDiversions fromDiversions fromDiversions from
rivers, streams, lakesrivers, streams, lakesrivers, streams, lakesrivers, streams, lakesrivers, streams, lakes
and main channelsand main channelsand main channelsand main channelsand main channels
TABLE 4: PRIVATE DIVERSIONS FROM WATERWAYSTABLE 4: PRIVATE DIVERSIONS FROM WATERWAYSTABLE 4: PRIVATE DIVERSIONS FROM WATERWAYSTABLE 4: PRIVATE DIVERSIONS FROM WATERWAYSTABLE 4: PRIVATE DIVERSIONS FROM WATERWAYSAS AT 30 JUNE 2001
REGULATEDREGULATEDREGULATEDREGULATEDREGULATEDIrrigationIrrigationIrrigationIrrigationIrrigation Stock & DomesticStock & DomesticStock & DomesticStock & DomesticStock & Domestic OtherOtherOtherOtherOther TotalTotalTotalTotalTotal
Authorised Authorised Authorised Authorised Authorised
Drainage Basin Licence Volume Area Licence Volume Licence Volume Volume
No. ML HA No. ML No. ML ML
BUNYIP RIVER
.......................................................................... 85 4677.5 721.1 122 311.8 30 153.4 5142.7
LATROBE RIVER
....................................................................... 89 11121.8 1860.5 17 44.0 8 20046.4 31212.2
LATROBE RIVER TRIBUTARIES
............................................. 0 0.0 0.0 1 4.4 0 0.0 4.4
MARIBYRNONG RIVER
........................................................... 8 222.6 38.7 7 15.4 3 6.6 244.6
MOORABOOL RIVER
................................................................ 66 1337.8 180.2 13 30.4 9 2288.3 3656.5
THOMSON COWWARR CHANNEL
....................................... 3 332.0 87.5 1 66.0 1 2.2 400.2
THOMSON MACALISTER
....................................................... 48 3572.2 624.9 18 42.1 5 3383.8 6998.1
THOMSON RIVER
..................................................................... 133 16594.1 2759.8 20 46.2 11 35.2 16675.5
WERRIBEE RIVER
.................................................................... 36 940.9 308.6 38 109.8 11 119.8 1170.5
Total
............................................................................................ 468 38798.9 6581.3 237 670.0 78 26035.7 65504.65
UNREGULATEDUNREGULATEDUNREGULATEDUNREGULATEDUNREGULATEDIrrigationIrrigationIrrigationIrrigationIrrigation Stock & DomesticStock & DomesticStock & DomesticStock & DomesticStock & Domestic OtherOtherOtherOtherOther TotalTotalTotalTotalTotal
Authorised Authorised Authorised Authorised Authorised
Drainage Basin Licence Volume Area Licence Volume Licence Volume Volume
No. ML HA No. ML No. ML ML
AVON RIVER
.............................................................................. 66 6129.7 1020.1 15 33.0 7 188.4 6351.1
BEMM RIVER
............................................................................ 12 715.0 135.6 5 17.6 5 11.0 743.6
BUNYIP RIVER
.......................................................................... 252 7872.0 810.2 168 441.8 62 240.6 8554.4
BUNYIP RIVER WEIRS
............................................................ 1 6.0 2.0 0 0.0 0 0.0 6.0
GLENELG RIVER
....................................................................... 15 940.2 120.2 28 68.2 8 20.0 1028.4
HOPKINS RIVER
....................................................................... 121 9763.8 1676.1 31 77.5 19 127.8 9969.1
LAKE COLAC
............................................................................. 17 835.3 130.6 3 6.6 4 62.2 904.1
LATROBE RIVER
....................................................................... 20 539.5 46.7 12 30.8 8 100.8 671.1
LATROBE RIVER TRIBUTARIES
............................................. 417 15807.6 3912.7 116 325.8 123 1190.6 17324.0
MARIBYRNONG RIVER
........................................................... 56 1748.6 164.5 56 205.6 15 35.3 1989.5
MITCHELL RIVER
..................................................................... 145 12670.7 2122.0 56 154.0 16 50.6 12875.3
MITCHELL RIVER TRIBUTARIES
........................................... 47 1906.2 322.5 16 37.4 9 78.4 2022.0
MOORABOOL RIVER
................................................................ 59 1572.7 405.3 12 28.6 6 107.6 1708.9
NICHOLSON RIVER
.................................................................. 1 24.0 4.0 7 15.4 1 2.2 41.6
OTWAY SYSTEM
...................................................................... 168 7778.7 1180.1 105 255.2 77 1124.3 9158.2
PORTLAND
................................................................................ 26 1130.9 202.1 17 37.4 8 25.4 1193.7
SNOWY RIVER
.......................................................................... 27 2537.8 447.0 8 17.6 1 4.4 2559.8
SNOWY RIVER TRIBUTARIES
................................................ 16 1211.5 195.5 9 26.4 5 26.4 1264.3
SOUTH GIPPSLAND
................................................................ 219 9892.3 1712.7 263 759.0 263 926.0 11577.3
TAMBO RIVER
........................................................................... 15 702.2 115.3 30 68.2 9 58.6 829.0
TAMBO RIVER LOWER
............................................................ 35 2770.2 451.2 19 60.2 3 8.8 2839.2
TAMBO RIVER TRIBUTARIES
................................................ 19 259.7 74.0 22 70.5 9 25.9 356.1
THOMSON MACALISTER
....................................................... 75 4369.0 731.5 15 37.4 10 67.7 4474.1
THOMSON RIVER
..................................................................... 25 3041.4 409.3 8 17.6 1 4.4 3063.4
WERRIBEE RIVER
.................................................................... 21 657.7 69.7 14 30.8 5 195.4 883.9
WESTERN PORT BAY TRIBUTARIES
.................................... 3 462.7 0.0 0 0.0 1 2.2 464.9
YARRA RIVER
............................................................................ 1 7.4 1.2 1 2.2 0 0.0 9.6
Total
............................................................................................ 1879 95352.7 16462.1 1036 2824.8 675 4684.9 102862.5
Internet CopyTTTT T A
BLE
SA
BLE
SA
BLE
SA
BLE
SA
BLE
S TABLE 5: GROUNDWTABLE 5: GROUNDWTABLE 5: GROUNDWTABLE 5: GROUNDWTABLE 5: GROUNDWAAAAATER EXTRACTIONS AS ATER EXTRACTIONS AS ATER EXTRACTIONS AS ATER EXTRACTIONS AS ATER EXTRACTIONS AS AT 30 JUNE 2001T 30 JUNE 2001T 30 JUNE 2001T 30 JUNE 2001T 30 JUNE 2001
IrrigationIrrigationIrrigationIrrigationIrrigation OtherOtherOtherOtherOther TTTTTotalotalotalotalotal
Authorised Authorised Authorised Authorised
Groundwater Management Areas Licences Volume Area Licences Volume Volume
BUNGAREE ................................................................................ 84 4719.9 1436.6 6 268.5 4988.4
CONDAH .................................................................................... 31 5931.1 930.0 4 97.4 6028.5
CORINELLA ............................................................................... 2 73.0 13.0 12 395.6 468.6
CUT PAW PAW ......................................................................... 2 169.0 28.0 1 342.0 511.0
DENISON ................................................................................... 67 12757.0 2037.7 58 753.8 13510.8
DEUTGAM ................................................................................. 144 5003.7 1553.2 4 539.5 5543.2
FRANKSTON ............................................................................. 24 891.2 267.9 6 247.1 1138.3
GERANGAMETE ....................................................................... 0 0.0 0.0 1 8000.0 8000.0
GIFFARD 2 .................................................................................. 0 0.0 0.0 1 4.0 4.0
GIFFARD ..................................................................................... 1 1440.0 240.0 0 0.0 1440.0
GIFFARD 1 .................................................................................. 12 4330.4 795.0 2 52.0 4382.4
GLENORMISTON ...................................................................... 11 2292.1 366.4 24 106.3 2398.4
HEYWOOD ................................................................................. 53 5154.2 945.4 35 262.1 5416.3
JAN JUC .................................................................................... 0 0.0 0.0 1 4000.0 4000.0
KOO WEE RUP DALMORE 1 ................................................... 52 995.5 898.3 13 141.6 1137.1
KOO WEE RUP DALMORE 2A ................................................ 38 797.2 380.7 8 47.0 844.2
KOO WEE RUP DALMORE 2B ................................................ 71 3049.9 1844.7 21 124.4 3174.3
KOO WEE RUP DALMORE 3 ................................................... 22 1389.2 572.3 8 32.6 1421.8
KOO WEE RUP DALMORE 4 ................................................... 28 1677.1 654.3 19 110.3 1787.4
KOO WEE RUP DALMORE 5 ................................................... 10 491.7 186.5 10 90.6 582.3
KOO WEE RUP DALMORE 6 ................................................... 13 445.6 167.8 2 118.0 563.6
LAKE MUNDI ............................................................................ 46 21455.2 4016.6 2 215.0 21670.2
LANCEFIELD .............................................................................. 11 979.2 226.8 1 208.0 1187.2
LANG LANG ............................................................................... 19 1935.6 466.8 55 2116.6 4052.2
LEONGATHA .............................................................................. 12 1020.3 226.3 22 532.7 1553.0
MERRIMU .................................................................................. 9 411.5 134.2 0 0.0 411.5
MOE ............................................................................................ 18 2167.1 372.1 54 401.1 2568.2
MOORABBIN ............................................................................ 26 1863.2 469.3 2 162.5 2025.7
NEPEAN 1 .................................................................................. 5 254.0 54.2 3 17.0 271.0
NEPEAN 2 .................................................................................. 55 4825.7 1225.1 3 22.0 4847.7
NON GMA .................................................................................. 562 40786.2 8848.9 534 10453.0 51239.3
NULLAWARRE .......................................................................... 104 21221.6 3464.9 106 793.5 22015.1
ORBOST ..................................................................................... 2 1200.0 202.0 0 0.0 1200.0
PAARATTE ................................................................................. 0 0.0 0.0 3 1009.0 1009.0
PORTLAND ................................................................................ 3 230.1 64.1 3 1374.0 1604.1
ROSEDALE 1 .............................................................................. 27 9246.5 1600.2 5 189.4 9435.9
ROSEDALE 2 .............................................................................. 17 5932.1 989.5 6 1675.7 7607.8
SALE ........................................................................................... 84 16983.6 4079.5 11 4040.2 21023.8
SEACOMBE ............................................................................... 34 11661.7 2047.6 6 2887.2 14548.9
TARWIN ..................................................................................... 1 2.0 0.3 1 38.0 40.0
WA-DE-LOCK 1 ......................................................................... 57 10368.1 1729.5 54 387.1 10755.2
WA-DE-LOCK 2 ......................................................................... 68 11726.0 2006.5 44 267.2 11993.2
WA-DE-LOCK 3 ......................................................................... 4 779.7 148.3 1 160.0 939.7
WANDIN YALLOCK .................................................................. 158 2607.2 811.7 5 70.2 2677.4
WARRION .................................................................................. 98 13820.6 2315.8 28 347.2 14167.8
WY YUNG 1 ................................................................................ 7 689.0 127.7 0 0.0 689.0
WY YUNG 2 ................................................................................ 48 5331.2 1069.7 0 0.0 5331.2
WY YUNG 3 ................................................................................ 11 893.3 139.4 0 0.0 893.3
YANGERY ................................................................................... 114 11382.9 2364.1 53 3105.0 14487.9
AWAITING GMA ASSESSMENT ........................................... 6 448.2 94.50 5 49268.0 49716.2
Other Areas ............................................................................... 19 3150.8 510.2 21 2026.3 5177.1
Total ............................................................................................ 22902290229022902290 254980.4254980.4254980.4254980.4254980.4 53123.653123.653123.653123.653123.6 12641264126412641264 97498.897498.897498.897498.897498.8 352479.3352479.3352479.3352479.3352479.3
34
Internet Copy
35
FIN
AN
CIA
L R
EP
OR
TFI
NA
NC
IAL
RE
PO
RT
FIN
AN
CIA
L R
EP
OR
TFI
NA
NC
IAL
RE
PO
RT
FIN
AN
CIA
L R
EP
OR
T
GIPPSLAND & SOUTHERN RURAL WATER AUTHORITYGIPPSLAND & SOUTHERN RURAL WATER AUTHORITYGIPPSLAND & SOUTHERN RURAL WATER AUTHORITYGIPPSLAND & SOUTHERN RURAL WATER AUTHORITYGIPPSLAND & SOUTHERN RURAL WATER AUTHORITY
STATEMENT OF FINANCIAL PERFORMANCESTATEMENT OF FINANCIAL PERFORMANCESTATEMENT OF FINANCIAL PERFORMANCESTATEMENT OF FINANCIAL PERFORMANCESTATEMENT OF FINANCIAL PERFORMANCE
FOR THE YEAR ENDED 30 JUNE 2001FOR THE YEAR ENDED 30 JUNE 2001FOR THE YEAR ENDED 30 JUNE 2001FOR THE YEAR ENDED 30 JUNE 2001FOR THE YEAR ENDED 30 JUNE 2001NOTESNOTESNOTESNOTESNOTES 2000-20012000-20012000-20012000-20012000-2001 1999-20001999-20001999-20001999-20001999-2000
$’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’s
REVENUEREVENUEREVENUEREVENUEREVENUE
OPERATING REVENUEOPERATING REVENUEOPERATING REVENUEOPERATING REVENUEOPERATING REVENUE
Water Rates & Charges 2 9,724 9,313
Storage Operator Charges 3 3,422 3,463
Government Grants for Services 1.3, 4 2,683 801
Other Revenue 6 207 326
External Services Contracts 109 150
Interest on Overdue Accounts 77 66
NON-OPERATING REVENUENON-OPERATING REVENUENON-OPERATING REVENUENON-OPERATING REVENUENON-OPERATING REVENUE
Interest on Investments 649 576
Government Contribution for Capital Purposes 1.3, 4 ----- 137
Proceeds from Sale of Fixed Assets 5 335 500
Revenues from Ordinary ActivitiesRevenues from Ordinary ActivitiesRevenues from Ordinary ActivitiesRevenues from Ordinary ActivitiesRevenues from Ordinary Activities 17,20617,20617,20617,20617,206 15,33215,33215,33215,33215,332
LESS OPERATING EXPENSESLESS OPERATING EXPENSESLESS OPERATING EXPENSESLESS OPERATING EXPENSESLESS OPERATING EXPENSESOperations 4,750 5,583
Depreciation of Fixed Assets 1.5, 12 5,283 4,228
Administration 3,332 2,815
Maintenance 2,494 1,895
Written Down Value of Disposed Assets 5 819 721
Transfer of Assets 7 ----- 7,339
Expenses from Ordinary ActivitiesExpenses from Ordinary ActivitiesExpenses from Ordinary ActivitiesExpenses from Ordinary ActivitiesExpenses from Ordinary Activities 16,67816,67816,67816,67816,678 22,58122,58122,58122,58122,581
Profit (Loss) Attributable to the AuthorityProfit (Loss) Attributable to the AuthorityProfit (Loss) Attributable to the AuthorityProfit (Loss) Attributable to the AuthorityProfit (Loss) Attributable to the Authority 528528528528528 (7,249)(7,249)(7,249)(7,249)(7,249)
Increase in Asset Revaluation ReserveIncrease in Asset Revaluation ReserveIncrease in Asset Revaluation ReserveIncrease in Asset Revaluation ReserveIncrease in Asset Revaluation Reserve 15(c) 2,7542,7542,7542,7542,754 69,04169,04169,04169,04169,041
Total Changes in Equity Other than those resulting fromTotal Changes in Equity Other than those resulting fromTotal Changes in Equity Other than those resulting fromTotal Changes in Equity Other than those resulting fromTotal Changes in Equity Other than those resulting from
transactions with owners as ownerstransactions with owners as ownerstransactions with owners as ownerstransactions with owners as ownerstransactions with owners as owners 3,2823,2823,2823,2823,282 61,79261,79261,79261,79261,792
The accompanying notes form part of these financial statements.
Internet Copy
36
GIPPSLAND & SOUTHERN RURAL WATER AUTHORITYGIPPSLAND & SOUTHERN RURAL WATER AUTHORITYGIPPSLAND & SOUTHERN RURAL WATER AUTHORITYGIPPSLAND & SOUTHERN RURAL WATER AUTHORITYGIPPSLAND & SOUTHERN RURAL WATER AUTHORITY
STATEMENT OF FINANCIAL POSITIONSTATEMENT OF FINANCIAL POSITIONSTATEMENT OF FINANCIAL POSITIONSTATEMENT OF FINANCIAL POSITIONSTATEMENT OF FINANCIAL POSITION
AS AT 30 JUNE 2001AS AT 30 JUNE 2001AS AT 30 JUNE 2001AS AT 30 JUNE 2001AS AT 30 JUNE 2001NOTESNOTESNOTESNOTESNOTES 2000-20012000-20012000-20012000-20012000-2001 1999-20001999-20001999-20001999-20001999-2000
$’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’s
CURRENT ASSETSCURRENT ASSETSCURRENT ASSETSCURRENT ASSETSCURRENT ASSETSCash Assets 1.12, 23 6,811 3,666
Receivables 9 2,659 2,394
Other Financial Assets 1.6, 10 5,000 1,500
Inventories 1.7 144 179
Other 147 63
Total Current AssetsTotal Current AssetsTotal Current AssetsTotal Current AssetsTotal Current Assets 14,76114,76114,76114,76114,761 7,8027,8027,8027,8027,802
NON-CURRENT ASSETSNON-CURRENT ASSETSNON-CURRENT ASSETSNON-CURRENT ASSETSNON-CURRENT ASSETSOther Financial Assets 1.6, 10 1,208 6,208
Property, Plant & Equipment 1.4, 11 425,653 425,328
Total Non-Current AssetsTotal Non-Current AssetsTotal Non-Current AssetsTotal Non-Current AssetsTotal Non-Current Assets 426,861426,861426,861426,861426,861 431,536431,536431,536431,536431,536
Total AssetsTotal AssetsTotal AssetsTotal AssetsTotal Assets 441,622441,622441,622441,622441,622 439,338439,338439,338439,338439,338
CURRENT LIABILITIESCURRENT LIABILITIESCURRENT LIABILITIESCURRENT LIABILITIESCURRENT LIABILITIESPayables 13 1,417 2,044
Advances for capital and other works 118 68
Provision for employee entitlements 14 570 745
Total Current LiabilitiesTotal Current LiabilitiesTotal Current LiabilitiesTotal Current LiabilitiesTotal Current Liabilities 2,1052,1052,1052,1052,105 2,8572,8572,8572,8572,857
NON-CURRENT LIABILITIESNON-CURRENT LIABILITIESNON-CURRENT LIABILITIESNON-CURRENT LIABILITIESNON-CURRENT LIABILITIESProvision for employee entitlements 14 862 727
Total Non-Current LiabilitiesTotal Non-Current LiabilitiesTotal Non-Current LiabilitiesTotal Non-Current LiabilitiesTotal Non-Current Liabilities 862862862862862 727727727727727
Total LiabilitiesTotal LiabilitiesTotal LiabilitiesTotal LiabilitiesTotal Liabilities 2,9672,9672,9672,9672,967 3,5843,5843,5843,5843,584
Net AssetsNet AssetsNet AssetsNet AssetsNet Assets 438,655438,655438,655438,655438,655 435,754435,754435,754435,754435,754
EQUITYEQUITYEQUITYEQUITYEQUITYContributed capital 15(a) 363,157 370,496
Asset revaluation reserve 15(c) 71,795 69,041
Retained profits 15(b) 3,703 (3,783)
Total EquityTotal EquityTotal EquityTotal EquityTotal Equity 438,655438,655438,655438,655438,655 435,754435,754435,754435,754435,754
The accompanying notes form part of these financial statements.
Internet Copy
37
GIPPSLAND & SOUTHERN RURAL WATER AUTHORITYGIPPSLAND & SOUTHERN RURAL WATER AUTHORITYGIPPSLAND & SOUTHERN RURAL WATER AUTHORITYGIPPSLAND & SOUTHERN RURAL WATER AUTHORITYGIPPSLAND & SOUTHERN RURAL WATER AUTHORITY
STATEMENT OF CASH FLOWSSTATEMENT OF CASH FLOWSSTATEMENT OF CASH FLOWSSTATEMENT OF CASH FLOWSSTATEMENT OF CASH FLOWS
FOR THE YEAR ENDED 30 JUNE 2001FOR THE YEAR ENDED 30 JUNE 2001FOR THE YEAR ENDED 30 JUNE 2001FOR THE YEAR ENDED 30 JUNE 2001FOR THE YEAR ENDED 30 JUNE 2001NOTESNOTESNOTESNOTESNOTES 2000-20012000-20012000-20012000-20012000-2001 1999-20001999-20001999-20001999-20001999-2000
$’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’s
CASH FLOWS FROM OPERATING ACTIVITIESCASH FLOWS FROM OPERATING ACTIVITIESCASH FLOWS FROM OPERATING ACTIVITIESCASH FLOWS FROM OPERATING ACTIVITIESCASH FLOWS FROM OPERATING ACTIVITIESReceipts from customers 13,623 13,251
Receipts from Government 2,293 938
Payments to suppliers and employees (11,208) (8,773)
Interest and bill discount received 655 576
Net Cash provided by Operating ActivitiesNet Cash provided by Operating ActivitiesNet Cash provided by Operating ActivitiesNet Cash provided by Operating ActivitiesNet Cash provided by Operating Activities 24 5,3635,3635,3635,3635,363 5,9925,9925,9925,9925,992
CASH FLOWS FROM INVESTING ACTIVITIESCASH FLOWS FROM INVESTING ACTIVITIESCASH FLOWS FROM INVESTING ACTIVITIESCASH FLOWS FROM INVESTING ACTIVITIESCASH FLOWS FROM INVESTING ACTIVITIESPayment for property, plant and equipment (3,674) (6,339)
Proceeds from (Payment for) investment - term deposit 1,501 (1,442)
Proceeds from sale of property, plant and equipment 335 500
Net Cash used in Investing ActivitiesNet Cash used in Investing ActivitiesNet Cash used in Investing ActivitiesNet Cash used in Investing ActivitiesNet Cash used in Investing Activities (1,838)(1,838)(1,838)(1,838)(1,838) (7,281)(7,281)(7,281)(7,281)(7,281)
CASH FLOWS FROM FINANCING ACTIVITIESCASH FLOWS FROM FINANCING ACTIVITIESCASH FLOWS FROM FINANCING ACTIVITIESCASH FLOWS FROM FINANCING ACTIVITIESCASH FLOWS FROM FINANCING ACTIVITIESDividend Payment to Government (380) (418)
Net Cash used in Financing ActivitiesNet Cash used in Financing ActivitiesNet Cash used in Financing ActivitiesNet Cash used in Financing ActivitiesNet Cash used in Financing Activities (380)(380)(380)(380)(380) (418)(418)(418)(418)(418)
Net Increase/(Decrease) in Cash HeldNet Increase/(Decrease) in Cash HeldNet Increase/(Decrease) in Cash HeldNet Increase/(Decrease) in Cash HeldNet Increase/(Decrease) in Cash Held 3,1453,1453,1453,1453,145 (1,707)(1,707)(1,707)(1,707)(1,707)
Cash Held at the Beginning of the YearCash Held at the Beginning of the YearCash Held at the Beginning of the YearCash Held at the Beginning of the YearCash Held at the Beginning of the Year 3,6663,6663,6663,6663,666 5,3735,3735,3735,3735,373
Cash Held at the End of the YearCash Held at the End of the YearCash Held at the End of the YearCash Held at the End of the YearCash Held at the End of the Year 23 6,8116,8116,8116,8116,811 3,6663,6663,6663,6663,666
The accompanying notes form part of these financial statements.
Internet Copy
38
Note
s to
and
for
ming
Par
t of
the
Fin
anci
al S
tate
ment
s
11111 STATEMENT OF SIGNIFICANT ACCOUNTING POLICIESSTATEMENT OF SIGNIFICANT ACCOUNTING POLICIESSTATEMENT OF SIGNIFICANT ACCOUNTING POLICIESSTATEMENT OF SIGNIFICANT ACCOUNTING POLICIESSTATEMENT OF SIGNIFICANT ACCOUNTING POLICIES
1 . 11 . 11 . 11 . 11 . 1 Est abl i shment of t he Aut hor i t yEst abl i shment of t he Aut hor i t yEst abl i shment of t he Aut hor i t yEst abl i shment of t he Aut hor i t yEst abl i shment of t he Aut hor i t yGippsland and Southern Rural Water Authority (SRW) was established on 1 July 1995, by a Ministerial Order under section 98 of the WaterAct 1989, dated 30 June 1995.
1.21.21.21.21.2 Accounting basisAccounting basisAccounting basisAccounting basisAccounting basisThe Financial Statements are a general purpose financial report that has been prepared in accordance with applicable Accounting Standardsand other mandatory professional reporting requirements (Urgent Issues Group Consensus Views), and provisions of the Financial ManagementAct 1994.
The Financial Statements have been prepared on an accrual basis and in accordance with historical cost convention, except for the valuationof infrastructure assets, which are recorded at current written down replacement value. The accounting policies adopted in preparing theFinancial Statements are consistent with those of the previous year.
1.31.31.31.31.3 Government GrantsGovernment GrantsGovernment GrantsGovernment GrantsGovernment GrantsPrograms such as state water assessment, groundwater investigations, salinity investigations, establishment of groundwater managementareas, and water resource management, are performed under agreements with the Victorian Government. The reimbursement of the cost ofthese services for recurrent purposes is included as “ Government Grants for Services” and for capital purposes as “ Government Contributionfor Capital Purposes” in the Statement of Financial Performance. The cost of the provision of these services is included in the “ OperatingExpenses”.
1.41.41.41.41.4 Property, Plant & EquipmentProperty, Plant & EquipmentProperty, Plant & EquipmentProperty, Plant & EquipmentProperty, Plant & EquipmentFixed assets of the Authority are recorded in the books of account as follows;
(a) Fixed assets, other than infrastructure assets, which were acquired prior to 1 July 1994, are shown at estimated written downhistorical cost; those acquired since 1 July 1994 are shown at cost.
(b) Infrastructure assets acquired prior to 30 June1999 were revalued during 1999/2000 and are shown at estimated current writtendown replacement value. Those acquired after 1 July 1999 are shown at cost.
(c) In the case of assets constructed by the Authority, on-site overheads are included in the cost of the assets.
(d) Individual items of plant costing less than $1000 are expensed in the year of purchase.
(e) As the Authority is a not-for-profit entity, it has not reviewed the carrying amount of its non-current assets in accordance with theprovisions of Australian Accounting Standard AAS10 “ Recoverable Amount of Non-Current Assets”.
(f) In accordance with the Authority’s policy of revaluing assets every five years, a revaluation of infrastructure assets as at 1 July 1999was undertaken during 1999/2000.
Headworks infrastructure assets were revalued by the Snowy Mountains Engineering Corporation (Mr T Reid B Eng (Civil), Dip Civil Eng,FIEA, MAGS and Mr Colin Rudd B Eng(Civil),Grad Cert Water Eng, Grad Dip Mgmt, MIEA).
Irrigation distribution infrastructure assets were revalued by SRW officers (Mr Paul Byrnes B Eng (Ag)(Hons), Grad Cert Water Eng, Grad DipGIS and Remote Sensing and Ms Lucy Hluszko B Eng (Civil & Computing)).
1.51.51.51.51.5 DepreciationDepreciationDepreciationDepreciationDepreciationDepreciation, using the straight line method, is provided on depreciable assets and charged against revenue on the basis of allocating thecost of the assets over their estimated useful life.
Depreciation is provided for six months in the year the asset comes into service and for six months in the final year of useful life. Majorclasses of assets and their values are included in note 11
Depreciation rates depend on life expectancy. In general the rates used are:
Item RateStorages 0-1% } Variable, depending uponChannels 1-2% } the condition basedPipelines 1-2% } remaining useful life of the asset.Buildings 2.5%Plant and equipment 10%Office furniture and equipment 5% to 33.3%Motor Vehicles 12.5%
1.61.61.61.61.6 InvestmentsInvestmentsInvestmentsInvestmentsInvestmentsAuthority funds are invested in accordance with Treasury and Investment powers granted to the Authority under the Borrowing and InvestmentPowers Act 1987. All investments with a maturity date within 12 months of balance date are classified as current assets, unless there existsa probable intention to reinvest the full amount of the investment beyond that period. All other investments are classified as non current.
1.71.71.71.71.7 InventoriesInventoriesInventoriesInventoriesInventoriesInventories consist of materials and supplies for asset construction, system operation and general maintenance and are valued at the lowerof cost or net realisable value.
1.81.81.81.81.8 Employee entitlementsEmployee entitlementsEmployee entitlementsEmployee entitlementsEmployee entitlementsEmployee entitlements consist of provisions for long service leave and annual leave.
Long service leave provision is recognised and is measured as the present value of expected future payments to be made in respect ofservices provided by employees up to reporting date. Consideration is given to expected future wage and salary levels, experience ofemployee departures and periods of service.
Expected future payments are discounted using interest rates on national Government guaranteed securities with terms to maturity thatmatch, as closely as possible, the estimated future cash flows.
The current liability for long service leave represents the estimated amount of leave to be taken in the next twelve months, with the remainderof the provisions being considered as non-current.
A provision for sick leave was not necessary as it is not likely that sick leave in future periods would exceed entitlements expected to accruein those periods.
Internet Copy
39
1.91.91.91.91.9 InsuranceInsuranceInsuranceInsuranceInsuranceThe Authority is covered by policies obtained through a number of underwriters for both property and legal liabilities. The Authority selfinsures for any amounts below policy deductible limits.
No provision is made for potential claims. They are expensed as they occur. Any unsettled claims have been disclosed as contingent liabilitiesin the notes to the financial statements.
1.101.101.101.101.10 Operating LeasesOperating LeasesOperating LeasesOperating LeasesOperating LeasesWhere the Authority has a lease, but does not assume, substantially, all the risks and benefits associated with the ownership of the asset, thelease payments are expensed in the year they are incurred.
1.111.111.111.111.11 SuperannuationSuperannuationSuperannuationSuperannuationSuperannuationThe Authority contributes in respect of its employees to a number of superannuation schemes administered by the Government SuperannuationOffice, Local Authorities Super Pty Ltd and other authorised Superannuation Funds. The amounts of these contributions are determined byeach scheme’s actuary in accordance with statutory requirements or in accordance with Superannuation Guarantee Legislation.
The Authority’s statutory contributions to these schemes are recorded as a superannuation expense. (Note 20)
1.121.121.121.121.12 Cash at Bank and on HandCash at Bank and on HandCash at Bank and on HandCash at Bank and on HandCash at Bank and on HandCash at bank and on hand includes petty cash on hand and SRW bank account balance at year end.
1.131.131.131.131.13 Bad and Doubtful DebtsBad and Doubtful DebtsBad and Doubtful DebtsBad and Doubtful DebtsBad and Doubtful DebtsA provision is made for any doubtful debts based on a review of all receivables at balance date. Bad debts are written off in the period inwhich they are identified.
1.141.141.141.141.14 RevenueRevenueRevenueRevenueRevenueRevenue is brought into account when services have been provided or when a rate is levied or determined.
Charges for water delivered are either charged progressively during the year or accrued at 30 June based on actual meter readings.
Interest revenue is recognised on a proportional basis taking into account the interest rates applicable to the financial assets.
The value of goods and services provided free of charge would be recognised as revenue when the Authority gained control of them. Nogoods or services were provided free during 2000-2001.
Government grants for service are recognised as revenue at the earlier of the grant being received or invoiced.
In Accounting for the sale of fixed assets, gross proceeds from the sales of fixed assets are included as non operating revenue and writtendown value of the assets sold is disclosed as an operating expense. Details of the gains and losses on disposal of fixed assets are shown innote 5.
All revenue is stated net of the amount of goods and services tax (GST).
1.151.151.151.151.15 Comparative FiguresComparative FiguresComparative FiguresComparative FiguresComparative FiguresWhere required by Accounting Standards comparative figures have been adjusted to conform with changes in presentation for the currentfinancial year.
2000-20012000-20012000-20012000-20012000-2001 1999-20001999-20001999-20001999-20001999-2000
$’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’s
22222 WATER RATES & CHARGESWATER RATES & CHARGESWATER RATES & CHARGESWATER RATES & CHARGESWATER RATES & CHARGESRates & Charges - Irrigation, Diversions & Groundwater ...................................................... 7,624 7,640Sales - Irrigation & Diversions ....................................................................................................
1,618 1,149
Other Charges - Bores, Drilling & Grazing Licences ............................................................... 482 5249,724 9,313
33333 STORAGE OPERATOR CHARGESSTORAGE OPERATOR CHARGESSTORAGE OPERATOR CHARGESSTORAGE OPERATOR CHARGESSTORAGE OPERATOR CHARGESTotal charges ...................................................................................................................................
4,778 4,721
Charges to retail business ............................................................................................................ (1,356) (1,258)Charges to other organisations ................................................................................................... 3,422 3,463
44444 GOVERNMENT GRANTSGOVERNMENT GRANTSGOVERNMENT GRANTSGOVERNMENT GRANTSGOVERNMENT GRANTS
For ServicesFor ServicesFor ServicesFor ServicesFor ServicesState Government - Salinity Projects ........................................................................................ 189 50State Government - People Management ................................................................................. 3 -State Government - Tree Planting ............................................................................................... 3 -State Government - Youth Employment Scheme
...................................................................... 28 -
State Government - Establishment of Groundwater Management Areas ........................... 1,666 748State Government - Water for Growth Initiative ....................................................................... 681 -State Government - Water Savings Plan for Macalister Irrigation District ........................ 100 -State Government - Recreational Water Safety Initiative ...................................................... 13 -State Government - Latrobe REALM Model .............................................................................. - 3
2,683 801
For Capital PurposesFor Capital PurposesFor Capital PurposesFor Capital PurposesFor Capital PurposesState Government - Salinity Projects - Capital ........................................................................ - 137
55555 PROFIT / (LOSS) FROM SALE OF FIXED ASSETSPROFIT / (LOSS) FROM SALE OF FIXED ASSETSPROFIT / (LOSS) FROM SALE OF FIXED ASSETSPROFIT / (LOSS) FROM SALE OF FIXED ASSETSPROFIT / (LOSS) FROM SALE OF FIXED ASSETSProceeds from Sale of Fixed Assets ........................................................................................... 335 500Written Down Value of Disposed Assets ................................................................................... (819) (721)Profit / (Loss) from Sale of Fixed Assets .................................................................................... (484) (221)
66666 OTHER REVENUEOTHER REVENUEOTHER REVENUEOTHER REVENUEOTHER REVENUERoyalties
...............................................................................................................................
............ 108 66Other ................................................................................................................................................. 99 260
207 326
Internet Copy
40
2000-20012000-20012000-20012000-20012000-2001 1999-20001999-20001999-20001999-20001999-2000
$’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’s
77777 TRANSFER OF ASSETSTRANSFER OF ASSETSTRANSFER OF ASSETSTRANSFER OF ASSETSTRANSFER OF ASSETSTransfer of Assets for the Woady Yaloak Diversion Scheme, transferred to theCorangamite Catchment Management Authority as at 1 July 1999, in accordancewith a Ministerial Order dated 19 August 1999. Operation and maintenance of thescheme is now the statutory responsibility of the Corangamite CMA.Refer to Note 15. . - (7,339)
88888 AUDIT FEESAUDIT FEESAUDIT FEESAUDIT FEESAUDIT FEESFinancial Statements Audit .......................................................................................................... 21 20
21 20
99999 RECEIVABLESRECEIVABLESRECEIVABLESRECEIVABLESRECEIVABLESWater consumers and other external clients. .......................................................................... 2,689 2,42Less Provision for Doubtful Debts (refer note1.13) .................................................................. (30) (30)
2,659 2,394Most debts of the Authority are secured against property. For this reason theAuthority has only a $30,000 provision for doubtful debts for general business debtors.
9.19.19.19.19.1 BAD & DOUBTFUL DEBTSBAD & DOUBTFUL DEBTSBAD & DOUBTFUL DEBTSBAD & DOUBTFUL DEBTSBAD & DOUBTFUL DEBTSBad Debts Expense
........................................................................................................................
- -No amounts have been written off as unrecoverable during the reporting period.
1010101010 OTHER FINANCIAL ASSETSOTHER FINANCIAL ASSETSOTHER FINANCIAL ASSETSOTHER FINANCIAL ASSETSOTHER FINANCIAL ASSETS
CurrentCurrentCurrentCurrentCurrentInterest bearing deposit - current .............................................................................................. 5,000 1,500
5,000 1,500
Non CurrentNon CurrentNon CurrentNon CurrentNon Current*Interest bearing deposit - non-current .................................................................................... 1,208 6,208Total
...............................................................................................................................
.................... 6,208 7,708* This investment has been established to offset a bank guarantee toMelbourne Water Corporation, for water supplied from the Thomson Reservoir.The guarantee is exercisable only if SRW are unable to redeem the water usedfrom future water allocations (refer note 26).
1111111111 PROPERTY, PLANT & EQUIPMENT PROPERTY, PLANT & EQUIPMENT PROPERTY, PLANT & EQUIPMENT PROPERTY, PLANT & EQUIPMENT PROPERTY, PLANT & EQUIPMENT (Refer notes: 1.4, 1.5)
LandLandLandLandLandAt Cost .............................................................................................................................................. 5,466 5,466
Infrastructure AssetsInfrastructure AssetsInfrastructure AssetsInfrastructure AssetsInfrastructure AssetsAt Cost ..............................................................................................................................................
4,473 3,638
At Valuation ** ................................................................................................................................
415,170 412,880
Accumulated Depreciation ........................................................................................................... (4,891) -
414,752 416,518
BuildingsBuildingsBuildingsBuildingsBuildingsAt Cost ..............................................................................................................................................
1,197 1,197
Accumulated Depreciation ........................................................................................................... (192) (161)
1,005 1,036
Furniture, Fittings and Computer EquipmentFurniture, Fittings and Computer EquipmentFurniture, Fittings and Computer EquipmentFurniture, Fittings and Computer EquipmentFurniture, Fittings and Computer EquipmentAt Cost ..............................................................................................................................................
2,193 2,079
Accumulated Depreciation ........................................................................................................... (1,445) (1,281)
748 798
Plant and MachineryPlant and MachineryPlant and MachineryPlant and MachineryPlant and MachineryAt Cost .............................................................................................................................................. 652 609Accumulated Depreciation ........................................................................................................... (351) (323)
301 286
Motor VehiclesMotor VehiclesMotor VehiclesMotor VehiclesMotor VehiclesAt Cost ..............................................................................................................................................
1,508 1,492
Accumulated Depreciation ........................................................................................................... (289) (268)...........................................................................................................................................................
1,219 1,224
Total Property, Plant & EquipmentTotal Property, Plant & EquipmentTotal Property, Plant & EquipmentTotal Property, Plant & EquipmentTotal Property, Plant & Equipment .............................................................................................. 423,491423,491423,491423,491423,491 425,328425,328425,328425,328425,328
Capital WIP
...............................................................................................................................
.......
2,162 -
425,653425,653425,653425,653425,653 425,328425,328425,328425,328425,328A revaluation of infrastructure assets has been undertaken as at 30 June 1999.
** Refer note1.4(f)
Internet Copy
41
11.111.111.111.111.1 Movements in Fixed AssetsMovements in Fixed AssetsMovements in Fixed AssetsMovements in Fixed AssetsMovements in Fixed AssetsFurniture,Furniture,Furniture,Furniture,Furniture,
Infra-Infra-Infra-Infra-Infra- Fittings &Fittings &Fittings &Fittings &Fittings &structurestructurestructurestructurestructure ComputerComputerComputerComputerComputer Plant &Plant &Plant &Plant &Plant & MotorMotorMotorMotorMotor
LandLandLandLandLand AssetsAssetsAssetsAssetsAssets Equip.Equip.Equip.Equip.Equip. MachineryMachineryMachineryMachineryMachinery VehiclesVehiclesVehiclesVehiclesVehicles BuildingsBuildingsBuildingsBuildingsBuildings TotalTotalTotalTotalTotal
$’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’s
Balance at Beginning
.............................. 5,466 416,518 798 286 1,224 1,036 425,328
Additions .................................................... - 835 114 47 515 - 1,511Disposals
.................................................... - 465 - - 354 - 819
Revaluation Increments .......................... - 2,754
- - - - 2,754
Depreciation Expense ............................. - 4,891 164 31 166 31 5,283Carrying Amountat the end of the Year ............................... 5,466 414,752 748 301 1,219 1,005 423,491
2000-20012000-20012000-20012000-20012000-2001 1999-20001999-20001999-20001999-20001999-2000
$’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’s
1212121212 DEPRECIATIONDEPRECIATIONDEPRECIATIONDEPRECIATIONDEPRECIATIONInfrastructure Assets .....................................................................................................................
4,891 3,663
Buildings .......................................................................................................................................... 31 37Furniture, Fittings and Computer Equipment ............................................................................. 164 304Plant and Machinery
..................................................................................................................... 31 41
Motor Vehicles ................................................................................................................................ 166 183
5,283 4,228
1313131313 PAYABLESPAYABLESPAYABLESPAYABLESPAYABLESTrade Creditors & Accrued Expenses ........................................................................................ 1,277 1,932Payroll Related Accruals .............................................................................................................. 140 112
1,417 2,044
1414141414 PROVISION FOR EMPLOYEE ENTITLEMENTSPROVISION FOR EMPLOYEE ENTITLEMENTSPROVISION FOR EMPLOYEE ENTITLEMENTSPROVISION FOR EMPLOYEE ENTITLEMENTSPROVISION FOR EMPLOYEE ENTITLEMENTSCurrent
........................................................................................................... Long Service Leave 95 294
.................................................................................................................................. Annual Leave 475 451
570 745
Non-current .................................................................................................. Long Service Leave 862 727
Total
...............................................................................................................................
.................... 1,432 1,472
Number of Employees at year end
.............................................................................................. 110 109
1515151515 EQUITYEQUITYEQUITYEQUITYEQUITY
15(a)15(a)15(a)15(a)15(a) Contributed CapitalContributed CapitalContributed CapitalContributed CapitalContributed CapitalBalance 1 July 2000
....................................................................................................................... 370,496 370,496
Transfer to Retained Profits .......................................................................................................... (7,339) -
Balance 30 June 2001 .................................................................................................................... 363,157 370,496
On 1st July 1999 the Woady Yaloak Diversion Scheme was transferred to theCorangamite Catchment Management Authority in accordance with a MinisterialOrder dated 19 August 1999. This transfer was processed through the Statement ofFinancial Performance as Abnormal Expenditure at 30 June 2000.This amount has now been transferred to Retained Profits as at 30 June 2001.
15(b)15(b)15(b)15(b)15(b) Retained ProfitsRetained ProfitsRetained ProfitsRetained ProfitsRetained ProfitsRetained Profits at the beginning of the financial year .......................................................... (3,783) 3,884Net Profit Attributable to the Authority ...................................................................................... 528 (7,249)Dividends Paid to Government .................................................................................................... (380) (418)Transfer from Contributed Capital - see note 15 ....................................................................... 7,339 -
Retained Profits at the end of the financial year ...................................................................... 3,703 (3,783)
15(c)15(c)15(c)15(c)15(c) Asset Revaluation ReserveAsset Revaluation ReserveAsset Revaluation ReserveAsset Revaluation ReserveAsset Revaluation ReserveOpening Balance
............................................................................................................................ 69,041 -
Revaluation increment in infrastructure assets ....................................................................... - 69,041Adjustment to Reserve ** .............................................................................................................
2,754 -
Closing Balance
..............................................................................................................................
71,795 69,041
The asset revaluation reserve records revaluations of non-current assets.** The Authority has made an adjustment of $2,753,683 against the Asset RevaluationReserve. This amount relates to an error in the original asset revaluation exercise,and is included in the value of the Authority’s Infrastructure Assets at Valuation.This entry has been processed in accordance with AAS38, and is one of the fewinstances where Retained Earnings is not directly adjusted.
Internet Copy
2000-20012000-20012000-20012000-20012000-2001 1999-20001999-20001999-20001999-20001999-2000
$’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’s
1616161616 CONSULTANTSCONSULTANTSCONSULTANTSCONSULTANTSCONSULTANTSConsultants were engaged by the Authority in 2000-2001 to assist with: OccupationalHealth and Safety, Workcover Management, IT Systems Development andGeneral Public Relations.Consultancies let 2000-2001 ......................................................................................................... 119 156There were no individual consultancies in excess of $100,000.
1717171717 LEASE COMMITMENTSLEASE COMMITMENTSLEASE COMMITMENTSLEASE COMMITMENTSLEASE COMMITMENTSOperating Lease CommitmentsOperating Lease CommitmentsOperating Lease CommitmentsOperating Lease CommitmentsOperating Lease CommitmentsBeing for leases of motor vehicles payable:— not later than 1 year ................................................................................................................. 122 143— later than 1 year but not later than 5 years .......................................................................... 49 33— later than 5 years ...................................................................................................................... - -
171 176The motor vehicle leases are non-cancellable leases with two year term, withrent payable monthly in advance.
1818181818 CAPITAL COMMITMENTSCAPITAL COMMITMENTSCAPITAL COMMITMENTSCAPITAL COMMITMENTSCAPITAL COMMITMENTSCapital expenditure contracts outstanding:— not later than 1 year .................................................................................................................
1,468 517
— later than 1 year but not later than 5 years .......................................................................... - -— later than 5 years ...................................................................................................................... - -This represents commitments outstanding on contracts for Capital Works.All outstanding works will be completed during 2001-2002.There is no actual liability for this amount at 30 June 2001.
1919191919 TRANSACTIONS WITH OTHER VICTORIAN GOVERNMENT CONTROLLED ENTITIESTRANSACTIONS WITH OTHER VICTORIAN GOVERNMENT CONTROLLED ENTITIESTRANSACTIONS WITH OTHER VICTORIAN GOVERNMENT CONTROLLED ENTITIESTRANSACTIONS WITH OTHER VICTORIAN GOVERNMENT CONTROLLED ENTITIESTRANSACTIONS WITH OTHER VICTORIAN GOVERNMENT CONTROLLED ENTITIESDuring the 2000-2001 financial year transactions were undertaken with otherVictorian Governement controlled entites.These transactions are summarised as follows: ...................................................................... 2000-20012000-20012000-20012000-20012000-2001 1999-20001999-20001999-20001999-20001999-2000
$’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’sIntraIntraIntraIntraIntra InterInterInterInterInter IntraIntraIntraIntraIntra InterInterInterInterInter
Assets ............................................................................................................................................... 745 26 738 1Liabilities .......................................................................................................................................... 13 3 149 27Revenues .........................................................................................................................................
5,342 371 3,522 383
Expenses
...............................................................................................................................
........... 186 734 353 750‘Intra’ Transactions are between entities within the Natural Resources and Environment portfolio.‘Inter’ Transactions are with entities outside the portfolio and controlled by the Victorian Government.
2020202020 SUPERANNUATIONSUPERANNUATIONSUPERANNUATIONSUPERANNUATIONSUPERANNUATION 2000-20012000-20012000-20012000-20012000-2001 1999-20001999-20001999-20001999-20001999-2000
$’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’sEmployees of the Authority contribute to a number of superannuation funds. Details are as follows:(a) State Superannuation Fund - New Scheme .............................. Employer Contribution 121 111(Defined Benefit Scheme) .............................................................................. Contribution Rate 9.3% Various 9.3% Various
(b) State Superannuation Fund - Revised Scheme. ........................ Employer Contribution 85 89(Defined Benefit Scheme) .............................................................................. Contribution Rate 14.00% 14.00%
(c) SSF - State Employees Retirement Benefits Fund. ................... Employer Contribution 21 21(Defined Benefit Scheme) .............................................................................. Contribution Rate 12.10% 12.10%The Victorian Government holds the responsibility for any unfunded liability for StateSuperannuation Fund Schemes and is therefore responsible for reporting that liability.
(d) Local Authorities Superannuation Board (LASPLAN) .............. Employer Contribution 210 140(Accumulation Scheme) ................................................................................. Contribution Rate 7.00% 7.00%
(e) Local Authorities Superannuation Board (LASB) ...................... Employer Contribution 41 11(Accumulation Scheme) ................................................................................. Contribution Rate 9.25% 9.25%
(f) Other Superannuation Schemes ................................................... Employer Contribution 206 20(Accumulation Schemes) ............................................................................... Contribution Rate 8.00% 8.00%No loans have been provided to the Authority from any of the above schemes.There are no contributions outstanding as at 30th June 2001.
Unfunded Superannuation LiabilitiesUnfunded Superannuation LiabilitiesUnfunded Superannuation LiabilitiesUnfunded Superannuation LiabilitiesUnfunded Superannuation LiabilitiesUnfunded Liabilities are defined as the difference between the present value of members’ accrued benefits and the net market value of asuperannuation scheme’s assets at the reporting date. The Authority is responsible for any unfunded liabilities arising from 1 July 1992 ondefined benefits superannuation schemes which it sponsors in respect of its employees.
* Local Authorities Superannuation Schemes* Local Authorities Superannuation Schemes* Local Authorities Superannuation Schemes* Local Authorities Superannuation Schemes* Local Authorities Superannuation SchemesAs at 30 June 1999, the Authority had discharged its liability in respect of this scheme and has been informed that, at 30 June 2001, thescheme remains fully funded.
* State Superannuation Fund* State Superannuation Fund* State Superannuation Fund* State Superannuation Fund* State Superannuation FundThe Authority has no unfunded liability in respect of its employees who are members of schemes in this fund. This liability has been assumedby the State Government and is disclosed in its financial statements.
42 Southern Rural Water - Annual Report 2000 - 2001
Internet Copy
2121212121 FINANCIAL INSTRUMENTSFINANCIAL INSTRUMENTSFINANCIAL INSTRUMENTSFINANCIAL INSTRUMENTSFINANCIAL INSTRUMENTS
21(a)21(a)21(a)21(a)21(a) Terms, Conditions and Accounting PolicyTerms, Conditions and Accounting PolicyTerms, Conditions and Accounting PolicyTerms, Conditions and Accounting PolicyTerms, Conditions and Accounting PolicyThe Authority’s accounting policy including the terms and conditions of each class of financial asset, liability and equity instruments, bothrecognised and unrecognised as the balance date, is as follows:
Statement ofStatement ofStatement ofStatement ofStatement ofRecognised FinancialRecognised FinancialRecognised FinancialRecognised FinancialRecognised Financial Financial PositionFinancial PositionFinancial PositionFinancial PositionFinancial PositionInstrumentsInstrumentsInstrumentsInstrumentsInstruments NotesNotesNotesNotesNotes Accounting PoliciesAccounting PoliciesAccounting PoliciesAccounting PoliciesAccounting Policies Terms and ConditionsTerms and ConditionsTerms and ConditionsTerms and ConditionsTerms and Conditions
FINANCIAL ASSETSFINANCIAL ASSETSFINANCIAL ASSETSFINANCIAL ASSETSFINANCIAL ASSETSCash at bank and on handCash at bank and on handCash at bank and on handCash at bank and on handCash at bank and on hand 23 Cash is stated at its nominal amount. The Authority does not have an overdraft
Surplus Authority funds are held in the facility but has access to TCV funds. Thebank account. Bank accounts attracted an average 4.5%
interest rate for the year.
Term DepositsTerm DepositsTerm DepositsTerm DepositsTerm Deposits 10 Term deposit is stated at its nominal The Authority has two term deposits foramount. Interest revenue is recognised $1.207 and $5 million with a fixed interestin the operating statement when it is term for a 15 month maturity, currentearned. interest rate 6.5%.
DebtorsDebtorsDebtorsDebtorsDebtors 9 Debtors are stated at their nominal For rates and charges debtors outstandingamounts due less any provision for as at 30th June 2001, payment is overdue.doubtful debts. A doubtful debts Normal terms are 30 days from date ofprovision is made for any amounts which invoice.are considered unlikely to be collectable.
FINANCIAL LIABILITIESFINANCIAL LIABILITIESFINANCIAL LIABILITIESFINANCIAL LIABILITIESFINANCIAL LIABILITIESCreditors and AccrualsCreditors and AccrualsCreditors and AccrualsCreditors and AccrualsCreditors and Accruals 13 Creditors and accruals are recognised Terms for the payment of creditors are 30
for future amounts to be paid in respect days after the end of the month in whichof goods and services received, the goods and services are received orwhether or not billed to the Authority. services rendered or within 30 days from
the receipt of invoice, whichever is thelater.
21(b)21(b)21(b)21(b)21(b) Interest Rate RiskInterest Rate RiskInterest Rate RiskInterest Rate RiskInterest Rate RiskThe Authority’s exposure to interest rate risk and the effective interest rates of financial assets and liabilities, both recognised and unrecognisedat the balance date, are as follows:
RecognisedRecognisedRecognisedRecognisedRecognised Total CarryingTotal CarryingTotal CarryingTotal CarryingTotal Carrying Weighted AverageWeighted AverageWeighted AverageWeighted AverageWeighted AverageFinancialFinancialFinancialFinancialFinancial FloatingFloatingFloatingFloatingFloating FixedFixedFixedFixedFixed Non-InterestNon-InterestNon-InterestNon-InterestNon-Interest amount as per theamount as per theamount as per theamount as per theamount as per the effectiveeffectiveeffectiveeffectiveeffectiveInstrumentsInstrumentsInstrumentsInstrumentsInstruments Interest RateInterest RateInterest RateInterest RateInterest Rate Interest RateInterest RateInterest RateInterest RateInterest Rate BearingBearingBearingBearingBearing Balance SheetBalance SheetBalance SheetBalance SheetBalance Sheet interest rateinterest rateinterest rateinterest rateinterest rate
2000- 20012000- 20012000- 20012000- 20012000- 2001 1999- 20001999- 20001999- 20001999- 20001999- 2000 2000- 20012000- 20012000- 20012000- 20012000- 2001 1999- 20001999- 20001999- 20001999- 20001999- 2000 2000- 20012000- 20012000- 20012000- 20012000- 2001 1999- 20001999- 20001999- 20001999- 20001999- 2000 2000- 20012000- 20012000- 20012000- 20012000- 2001 1999- 20001999- 20001999- 20001999- 20001999- 2000 2000- 20012000- 20012000- 20012000- 20012000- 2001 1999- 20001999- 20001999- 20001999- 20001999- 2000
$ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s $ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s $ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s $ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s $ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s $ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s $ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s $ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s %%%%% %%%%%
FINANCIAL ASSETSFINANCIAL ASSETSFINANCIAL ASSETSFINANCIAL ASSETSFINANCIAL ASSETSCash
......................................... 6,811 3,666 - - - - 6,811 5,373 5.43% 4.73%
Term Deposit- Investment .. - - 6,208 7,708 - - 6,208 6,266 6.41% 5.50%Debtors
.................................... - - - - 2,659 2,394 2,659 2,328
Total Financial AssetsTotal Financial AssetsTotal Financial AssetsTotal Financial AssetsTotal Financial Assets .......... 6,8116,8116,8116,8116,811 3,6663,6663,6663,6663,666 6,2086,2086,2086,2086,208 7,7087,7087,7087,7087,708 2,6592,6592,6592,6592,659 2,3942,3942,3942,3942,394 15,67815,67815,67815,67815,678 13,96713,96713,96713,96713,967
FINANCIAL LIABILITIESFINANCIAL LIABILITIESFINANCIAL LIABILITIESFINANCIAL LIABILITIESFINANCIAL LIABILITIESCreditors and Accruals ........ - - - - 1,417 2,044 1,417 2,044 - -Advances for Capital & Other Works - - - - 118 68 118 68 - -
Total Financial LiabilitiesTotal Financial LiabilitiesTotal Financial LiabilitiesTotal Financial LiabilitiesTotal Financial Liabilities ..... ----- ----- ----- ----- 1,535 1,535 1,535 1,535 1,535 2,1222,1222,1222,1222,122 1,535 1,535 1,535 1,535 1,535 2,112 2,112 2,112 2,112 2,112
21(c)21(c)21(c)21(c)21(c) Net Fair ValuesNet Fair ValuesNet Fair ValuesNet Fair ValuesNet Fair ValuesThe aggregate net fair values of financial assets and liabilities, both recognised and unrecognised at the balance date, are as follows:
Total Carrying amount perTotal Carrying amount perTotal Carrying amount perTotal Carrying amount perTotal Carrying amount perRecognised Financial InstrumentsRecognised Financial InstrumentsRecognised Financial InstrumentsRecognised Financial InstrumentsRecognised Financial Instruments Statement of Financial PositionStatement of Financial PositionStatement of Financial PositionStatement of Financial PositionStatement of Financial Position Aggregate Fair ValueAggregate Fair ValueAggregate Fair ValueAggregate Fair ValueAggregate Fair Value
2000-20012000-20012000-20012000-20012000-2001 1999-20001999-20001999-20001999-20001999-2000 2000-20012000-20012000-20012000-20012000-2001 1999-20001999-20001999-20001999-20001999-2000
$ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s $ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s $ ‘000’$ ‘000’$ ‘000’$ ‘000’$ ‘000’sssss $ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s$ ‘000’s
FINANCIAL ASSETSFINANCIAL ASSETSFINANCIAL ASSETSFINANCIAL ASSETSFINANCIAL ASSETSCash
................................................................................... 6,811 3,666 6,811 3,666
Term Deposit - Investment ............................................ 6,208 6,266 7,708 6,266Debtors
.............................................................................. 2,659 2,394 2,659 2,394
Total Financial AssetsTotal Financial AssetsTotal Financial AssetsTotal Financial AssetsTotal Financial Assets .................................................... 15,67815,67815,67815,67815,678 12,32612,32612,32612,32612,326 17,17817,17817,17817,17817,178 12,32612,32612,32612,32612,326
FINANCIAL LIABILITIESFINANCIAL LIABILITIESFINANCIAL LIABILITIESFINANCIAL LIABILITIESFINANCIAL LIABILITIESCreditors and Accruals .................................................. 1,417 2,044 1,417 2,044Advances for Capital & Other Works .......................... 118 68 118 68
Total Financial liabilitiesTotal Financial liabilitiesTotal Financial liabilitiesTotal Financial liabilitiesTotal Financial liabilities ................................................ 1,5351,5351,5351,5351,535 2,1122,1122,1122,1122,112 1,5351,5351,5351,5351,535 2,1122,1122,1122,1122,112
Carrying amounts reflect fair value for all recognised financial instruments identified.
21(d)21(d)21(d)21(d)21(d) Credit risk exposureCredit risk exposureCredit risk exposureCredit risk exposureCredit risk exposureThe Authority’s maximum exposure to credit risk at balance date for each class of recognised financial assets is the carrying amount of thoseassets as disclosed in the Statement of Financial Position.
43
Internet Copy
44
21(e)21(e)21(e)21(e)21(e) Concentration of credit riskConcentration of credit riskConcentration of credit riskConcentration of credit riskConcentration of credit riskThe Authority’s exposure to credit risk is low, as most of the revenue transactions represent a charge on the property or are under a BulkEntitlements Order. Credit risk is managed in the following ways:
— Payment is 30 days or instalments for some customers.
— Overdue payments are referred to debt collector approximately 6 weeks after becoming over due.
2222222222 RETAIL AND WHOLESALE OPERATIONSRETAIL AND WHOLESALE OPERATIONSRETAIL AND WHOLESALE OPERATIONSRETAIL AND WHOLESALE OPERATIONSRETAIL AND WHOLESALE OPERATIONSWholesale OperationsWholesale OperationsWholesale OperationsWholesale OperationsWholesale Operations Retail OperationsRetail OperationsRetail OperationsRetail OperationsRetail Operations
2000-20012000-20012000-20012000-20012000-2001 1999-20001999-20001999-20001999-20001999-2000 2000-20012000-20012000-20012000-20012000-2001 1999-20001999-20001999-20001999-20001999-2000
$’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’s
Storage Operator Charges .......................................................................... 4,750 4,591 28 130
Retail Usage Charges
................................................................................... - - 9,724 9,313
Other Revenue
............................................................................................... 67 110 4,005 2,446
TOTAL REVENUETOTAL REVENUETOTAL REVENUETOTAL REVENUETOTAL REVENUE ............................................................................................ 4,8174,8174,8174,8174,817 4,7014,7014,7014,7014,701 13,75713,75713,75713,75713,757 11,88911,88911,88911,88911,889
Operating & Maintenance Expenses
........................................................ 1,691 1,773 6,384 6,438
Depreciation
.................................................................................................. 1,649 937 3,635 3,291
Administration, Finance & Other Expenses ............................................. 706 562 2,625 2,241
Internal Storage Operator Costs* .............................................................. - - 1,356 1,258
Other Bulk Supply Charges ......................................................................... - - - -
TOTAL EXPENSESTOTAL EXPENSESTOTAL EXPENSESTOTAL EXPENSESTOTAL EXPENSES ......................................................................................... 4,0464,0464,0464,0464,046 3,2723,2723,2723,2723,272 14,00014,00014,00014,00014,000 13,22813,22813,22813,22813,228
Total Profit/(Loss) for the yearTotal Profit/(Loss) for the yearTotal Profit/(Loss) for the yearTotal Profit/(Loss) for the yearTotal Profit/(Loss) for the year .................................................................... 771771771771771 1,4291,4291,4291,4291,429 (243)(243)(243)(243)(243) (1,339)(1,339)(1,339)(1,339)(1,339)
* Internal Charge eliminated in Operating Statement
Investments .................................................................................................... - - 5,000 7,708
Other Assets
................................................................................................... 7,466 6,003 2,296 299
Fixed Assets
................................................................................................... 289,799 287,940 135,854 137,387
Total AssetsTotal AssetsTotal AssetsTotal AssetsTotal Assets .................................................................................................... 297,265297,265297,265297,265297,265 293,943293,943293,943293,943293,943 143,150143,150143,150143,150143,150 145,394145,394145,394145,394145,394
C a s h F l o w i n f o r m a t i o n ;
Cash Used in Investing Activities .............................................................. (753) (3,637) (1,085) (3,644)
Cash From Finance Activities ..................................................................... (380) (418) - -
Wholesale operations account for the harvesting and storage of water on behalf of external and internal customers who hold bulk water entitlementsin that storage.
The internal Storage Operator Charges are included in the revenue of the Wholesale Business and the expense of the Retail Business above and areeliminated in the Operating Statement. To reconcile this Note to the Authority Operating Statement, subtract $1356 from the Storage Operator Chargesabove of $4750 + $28, which results in the Storage Operator Charges figure of $3422 in the Operating Statement. The corresponding internal expenditureelimination is already shown above.
Transfer pricing to internal customers is based on full cost recovery with zero rate of return.
2323232323 RECONCILIATION OF CASHRECONCILIATION OF CASHRECONCILIATION OF CASHRECONCILIATION OF CASHRECONCILIATION OF CASH 2000-20012000-20012000-20012000-20012000-2001 1999-20001999-20001999-20001999-20001999-2000
$’000’s$’000’s$’000’s$’000’s$’000’s $’000’s$’000’s$’000’s$’000’s$’000’sFor the purposes of the statement of cash flows, cash includes cash on hand and at bank, andinvestments in money market instruments. Cash at the end of the financial year as shown in theStatement of Cash Flows is reconciled to the related item in the Statement of Financial Position as follows:
Cash on hand and at bank
............................................................................................................................ 6,8
11 3,666
2424242424 RECONCILIATION OF NET CASH PROVIDED BY OPERATING ACTIVITIESRECONCILIATION OF NET CASH PROVIDED BY OPERATING ACTIVITIESRECONCILIATION OF NET CASH PROVIDED BY OPERATING ACTIVITIESRECONCILIATION OF NET CASH PROVIDED BY OPERATING ACTIVITIESRECONCILIATION OF NET CASH PROVIDED BY OPERATING ACTIVITIES
TO PROFIT FROM ORDINARY ACTIVITIES FOR THE YEARTO PROFIT FROM ORDINARY ACTIVITIES FOR THE YEARTO PROFIT FROM ORDINARY ACTIVITIES FOR THE YEARTO PROFIT FROM ORDINARY ACTIVITIES FOR THE YEARTO PROFIT FROM ORDINARY ACTIVITIES FOR THE YEARProfit / (loss) from Ordinary Activities ........................................................................................................ 528 (7,249)
Depreciation
...............................................................................................................................
....................
5,283 4,228
Increase/(Decrease) in provision for employee entitlement ................................................................. (41) 34
Change in operating assets and liabilities:
Decrease/(Increase) in inventories ............................................................................................ 35 (21)
Decrease / (Increase) in trade receivables .............................................................................. (265) (65)
Decrease / (Increase) in other assets ........................................................................................ (84) (10)
Increase / (Decrease) in advances for capital ......................................................................... 50 8
Increase/(Decrease) in trade creditors ..................................................................................... (627) 1,507
Loss / (Gain) on sale of fixed assets .......................................................................................................... 484 221
Loss on abnormal transfer of Woady Yaloak Scheme
............................................................................ 7,339 -
Net Cash Provided by Operating ActivitiesNet Cash Provided by Operating ActivitiesNet Cash Provided by Operating ActivitiesNet Cash Provided by Operating ActivitiesNet Cash Provided by Operating Activities ............................................................................................... 5,3635,3635,3635,3635,363 5,9925,9925,9925,9925,992
2525252525 RESPONSIBLE PERSONS DISCLOSURERESPONSIBLE PERSONS DISCLOSURERESPONSIBLE PERSONS DISCLOSURERESPONSIBLE PERSONS DISCLOSURERESPONSIBLE PERSONS DISCLOSUREThe names of the Responsible Persons of Gippsland and Southern Rural Water Authority during 2000-2001 are: Minister for Environment and Conservation- Hon. Sherryl Garbutt MP.
Members of Authority Board: Mr A Pappin (Chairman); Dr G Walsh (Deputy Chairman); Mr G Crick; Mr P Foster; Mr D Koch; Mrs J Liley; Mrs JMcMillan; Mr J Nicol; Mr J Tilleard.
The Chief Executive is Dr Martin Kent (Accountable Officer).
Remuneration received, or due and receivable by Responsible Persons from the Authority, amounted to $177,889 (1999-2000 $177,889).
Internet Copy
45
Number of Responsible Persons from the Authority are shown below in their relevant remuneration bands:
2000-20012000-20012000-20012000-20012000-2001 1999-20001999-20001999-20001999-20001999-2000
$0 - $9,999 ........................................................................................................................................ - -
$10,000-$19,999 ............................................................................................................................... 7 7
$20,000-$29,999 ............................................................................................................................... 1 1
$30,000-$39,999 ............................................................................................................................... 1 1
There were no retirement benefits paid in conjunction with the retirement of Responsible Persons, nor were there any transactions between theAuthority and any Responsible Person other than those which occurred within the normal arms length transaction between the Authority and itscustomers.
The number of Executive Officers whose total remuneration exceeds $100,000 during 2000-2001 are shown below in their relevant income bands:
2000-20012000-20012000-20012000-20012000-2001 1999-20001999-20001999-20001999-20001999-2000
$100,000-$109,999 ........................................................................................................................... - 1$120,000-$129,999 ........................................................................................................................... 1 1
$130,000-$139,999 ........................................................................................................................... 1 -
The total remuneration for the year of the above Executive Officers amounted to $253,622 (1999-2000 $230,000).
2626262626 CONTINGENT LIABILITIESCONTINGENT LIABILITIESCONTINGENT LIABILITIESCONTINGENT LIABILITIESCONTINGENT LIABILITIESThe Authority has a contingent liability for water obtained from Melbourne Water Corporation from the Thomson Reservoir in accordance with anAgreement signed on 6 June 2000.
The Bank Guarantee may be exercised in accordance with clause 13 of the Agreement if SRW is unable to repay water volumes owed by it as detailedin Schedule 1 of the Agreement, which provides for repayment over a nominal five year period.
The total value of the Bank Guarantee is $1,207,500.
SRW has established an interest bearing deposit (see note10) as security against the Bank Guarantee, which remains in place until the above obligationshave been met.
Internet Copy
46
STATUTORY CERTIFICATE
Internet Copy
47
AUDITOR GENERALS REPORT
Internet Copy
48
CO
MP
LIA
NC
E I
ND
EX
COMPLIANCE INDEXCOMPLIANCE INDEXCOMPLIANCE INDEXCOMPLIANCE INDEXCOMPLIANCE INDEXThe Annual Report of the entity is prepared in accordance with the Financial Management Act 1994 Financial Management Act 1994 Financial Management Act 1994 Financial Management Act 1994 Financial Management Act 1994 and the Directions of the Minister for Finance.This index has been prepared to facilitate identification of compliance with statutory disclosure and other requirements.
CLAUSECLAUSECLAUSECLAUSECLAUSE DISCLOSUREDISCLOSUREDISCLOSUREDISCLOSUREDISCLOSURE PAGEPAGEPAGEPAGEPAGE
REPORT OF OPERATIONSREPORT OF OPERATIONSREPORT OF OPERATIONSREPORT OF OPERATIONSREPORT OF OPERATIONS
Charter & PurposeCharter & PurposeCharter & PurposeCharter & PurposeCharter & Purpose9.1.3 (i) (a) Manner of establishment and Relevant Minister
................................................................................................. 30
9.1.3 (i) (b) Objectives, functions, powers and duties
.............................................................................................................. 2, 30
9.1.3 (i) (c) Services provided and persons or sections of community served
.................................................................. 2, 3, 30
Management & StructureManagement & StructureManagement & StructureManagement & StructureManagement & Structure9.1.3 (i) (d) (i) Names of governing board members, audit committee and chief executive officer
.................................. 30
9.1.3 (i) (d) (ii) Names of senior offic holders and brief description of each office
................................................................ 30
9.1.3 (i) (d) (iii) Chart setting out organisational structure
............................................................................................................. 3
9.1.3 (i) (e) Workforce data and application of merit and equity principles
....................................................................... 30
9.1.3 (i) (f) Application and operation of FOI Act 1982
............................................................................................................. 30
Financial and Other InformationFinancial and Other InformationFinancial and Other InformationFinancial and Other InformationFinancial and Other Information9.1.3 (ii) (a) Summary of financial results with previous four year comparatives
.............................................................. 11
9.1.3 (ii) (b) Summary of significant changes in financial position
........................................................................................ NA
9.1.3 (ii) (c) Operational and budgetary objectives for the year and performance against those objectives
............. 10-29
9.1.3 (ii) (d) Major changes or factors affecting achievement of objectives
...................................................................... 10-29
9.1.3 (ii) (e) Events subsequent to balance date
......................................................................................................................... NA
9.1.3 (ii) (g) Consultancies <$100,000 — Number and total cost of consulting engagements
........................................ 42
9.1.3 (ii) (h) Extent of compliance with Building Act 1993
........................................................................................................ 30
9.1.3 (ii) (i) Statement that information listed in Part 9.1.3 (iv) is available on request
.................................................... 30
9.1.3 (ii) (k) Statement on implentation and compliance with National Competition Policy
............................................ 30
9.8.2 (i) A statement of Occupational health and Safety (OHS) matters
........................................................................ 30
9.8.2 (ii) OHS performance measures
...............................................................................................................................
....... 30
FINANCIAL STATEMENTSFINANCIAL STATEMENTSFINANCIAL STATEMENTSFINANCIAL STATEMENTSFINANCIAL STATEMENTS
PreparationPreparationPreparationPreparationPreparation9.2.2 (ii) (a) Statement of preparation on an accrual basis
..................................................................................................... 38
9.2.2 (ii) (b) Statement of compliance with Australian Accounting Standards and associated pronouncements
.... 38
9.2.2 (ii) (c) Statement of compliance with accounting policies issued by the Minister for Finance
........................... 38
Statement of Financial OperationsStatement of Financial OperationsStatement of Financial OperationsStatement of Financial OperationsStatement of Financial Operations9.2.2 (i) (a) A statement of financial operations for the year
.................................................................................................. 35
9.2.3 (ii) (a) Operating revenue by class
...............................................................................................................................
........
35, 39
9.2.3 (ii) (b) Investment income by class
...............................................................................................................................
....... 359.2.3 (ii) (c) Other material revenue by class including sale of non-goods assets and contributions of assets
........ 35, 39
9.2.3 (ii) (d) Material revenues arising from exchanges of goods or services
................................................................... NA
9.2.3 (ii) (e) Depreciation, amortisation or diminution in value
............................................................................................... 40, 41
9.2.3 (ii) (f) Bad and doubtful debts
...............................................................................................................................
................ 409.2.3 (ii) (g) Financing costs
...............................................................................................................................
.............................. NA9.2.3 (ii) (h) Net increment or decrement on the revaluaiton of each category of assets
............................................... 41
9.2.3 (ii) (i) Auditor-General’s fees
...............................................................................................................................
.................. 40
Statement of Financial PositionStatement of Financial PositionStatement of Financial PositionStatement of Financial PositionStatement of Financial Position9.2.2 (i) (b) A statement of financial position for the year
....................................................................................................... 36
AssetsAssetsAssetsAssetsAssets9.2.3 (iii) (a) (i) Cash at bank or in hand
...............................................................................................................................
...............
36, 44
9.2.3 (iii) (a) Iii) Inventories by class
...............................................................................................................................
......................
36, 38
9.2.3 (iii) (a) (iii) Receivables, including trade debtors, loans and other debtors
....................................................................... 36, 40
9.2.3 (iii) (a) (iv) Other assets, including prepayments
...................................................................................................................... 36
9.2.3 (iii) (a) (v) Investments by class
...............................................................................................................................
....................
36, 40
9.2.3 (iii) (a) (vi) Property, plant and equipment
...............................................................................................................................
... 40, 419.2.3 (iii) (a) (vii) Intangible assets
...............................................................................................................................
........................... NALiabilitiesLiabilitiesLiabilitiesLiabilitiesLiabilities9.2.3 (iii) (b) (iii) Trade and other creditors
...............................................................................................................................
............
36, 41
9.2.3 (iii) (b) (v) Provisions, including employee entitlements
........................................................................................................ 36, 41
EquityEquityEquityEquityEquity9.2.3 (iii) (c) (i) Authorised capital
...............................................................................................................................
......................... NA9.2.3 (iii) (c) (ii) Issued capital
...............................................................................................................................
.................................
36, 41
9.2.3 (iii) (d) Reserves, and transfers to and from reserves (shown separately)
................................................................. 36, 41
Statement of Cash FlowsStatement of Cash FlowsStatement of Cash FlowsStatement of Cash FlowsStatement of Cash Flows9.2.2 (i) (c) A statement of cash flows for the year
................................................................................................................... 37
Notes to the Financial StatementsNotes to the Financial StatementsNotes to the Financial StatementsNotes to the Financial StatementsNotes to the Financial Statements9.2.3 (iv) (b) Contingent liabilities
...............................................................................................................................
..................... 459.2.3 (iv) (c) Commitments for expenditure
...............................................................................................................................
.... 429.2.3 (iv) (d) Government grants received or receivable and source
..................................................................................... 39
9.2.3 (iv) (e) Employee superannuation funds
.............................................................................................................................. 4
29.4.2 Transactions with responsible persons and their related parties
................................................................... 44, 45
9.7.2 Motor vehicle lease commitments
........................................................................................................................... 42
21(e)21(e)21(e)21(e)21(e) Concentration of credit riskConcentration of credit riskConcentration of credit riskConcentration of credit riskConcentration of credit riskThe Authority’s exposure to credit risk is low, as most of the revenue transactions represent a charge on the property or are under a BulkEntitlements Order. Credit risk is managed in the following ways:
— Payment is 30 days or instalments for some customers.
— Overdue payments are referred to debt collector approximately 6 weeks after becoming over due.
Internet Copy
Internet Copy
Southern Rural Water - Annual Report 2000 - 2001
Southern Rural WSouthern Rural WSouthern Rural WSouthern Rural WSouthern Rural Wateraterateraterater
88 Johnson Street
PO Box 153 Maffra
Victoria 3860
TTTTTelephone: (03) 5139 3100elephone: (03) 5139 3100elephone: (03) 5139 3100elephone: (03) 5139 3100elephone: (03) 5139 3100
Facsimile: (03) 5139 3150Facsimile: (03) 5139 3150Facsimile: (03) 5139 3150Facsimile: (03) 5139 3150Facsimile: (03) 5139 3150
Email: srw@srwEmail: srw@srwEmail: srw@srwEmail: srw@srwEmail: [email protected]
WWWWWebsite: wwwebsite: wwwebsite: wwwebsite: wwwebsite: www.srw.srw.srw.srw.srw.com.au.com.au.com.au.com.au.com.au