southall master plan
DESCRIPTION
A1 BoardsTRANSCRIPT
SOUTHALLa master plan for the community
2020getting ready
0 100 200 300 400 500mscale 1:5000
N
sustainablemobility
500 m
key:cycle pathpedestrian pathtrain stationexisting bus stopnew bus stop
environmentalframework
500 m
key:country parkgasworks parkother parkprivate gardenwaterSuDS
station redevelopment and new access
enhanced permeability and pocket parks
retrofittingthe business park
UNIVERSITY OF WESTMINSTER MA Urban Design | AURD704.2 Master Planning | Simone Gobber [1]
new activitiesenhanced permeability
2025reclaiming the site
roadnetwork
500 m
key:motorwaymain roadnew road axissecondary roadshared spaceservice roadsecondary access
publicrealm
500 m
key:public realmcommunity buildingpark feature
landmarkwater feature
0 100 200 300 400 500mscale 1:5000
N
UNIVERSITY OF WESTMINSTER MA Urban Design | AURD704.2 Master Planning | Simone Gobber [2]
soil regeneration and new landscaping
redevelopment ofthe edges
new uses andactivities
new accessnew public realm
2030a new community
uses andactivities
500 m
key:residentialcommercialofficelight industrialleisurepublic facility
buildingtypologies
500 m
key:tower, 15-20 floorsapart. block, 10 floorsapart. block, 8 floorsapart. block, 6 floorsmaisonettes, 4 floorsterrace houses, 3 floorswarehousepavilionsancillary buildings
0 100 200 300 400 500mscale 1:5000
N
UNIVERSITY OF WESTMINSTER MA Urban Design | AURD704.2 Master Planning | Simone Gobber [3]
a hub for business
a diverse newneighbourhood
landmark facilities for the community
new business parknew neighbourhood
new school
district heatingplant
spacefor events