source:chair, editor contact: alex gogic – tsg-s wg1 [email protected] mike dolan –...
TRANSCRIPT
![Page 1: SOURCE:Chair, Editor CONTACT: Alex Gogic – TSG-S WG1 Chairagogic@qualcomm.com Mike Dolan – Editormfdolan@alcatel-lucent.com ABSTRACT: This contribution](https://reader036.vdocuments.us/reader036/viewer/2022082817/56649e125503460f94afe1f7/html5/thumbnails/1.jpg)
SOURCE: Chair, Editor
CONTACT: Alex Gogic – TSG-S WG1 Chair [email protected] Dolan – Editor [email protected]
ABSTRACT: This contribution provides the current status of femto cell requirements work in TSG-S WG1.
TITLE: Status of 3GPP2 Femto Cell Requirements Work
3GPP2 Femto Cell Workshop
RECOMMENDATION: FYI
The contributors grant a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text or other copyrightable material contained in the contribution and any modifications thereof in the creation of 3GPP2 publications; to copyright and sell in Organizational Partner's name any Organizational Partner's standards publication even though it may include all or portions of this contribution; and at the Organizational Partner's sole discretion to permit others to reproduce in whole or in part such contribution or the resulting Organizational Partner's standards publication. The contributors are also willing to grant licenses under such contributor copyrights to third parties on reasonable, non-discriminatory terms and conditions for purpose of practicing an Organizational Partner’s standard which incorporates this contribution.This document has been prepared by the contributors to assist the development of specifications by 3GPP2. It is proposed to the Committee as a basis for discussion and is not to be construed as a binding proposal on the contributors. The contributors specifically reserves the right to amend or modify the material contained herein and to any intellectual property of the contributors other than provided in the copyright statement above.
S10-20071008-005S00-FEMTO-20071015-003
3GPP2 Femto Cell Requirements Status
![Page 2: SOURCE:Chair, Editor CONTACT: Alex Gogic – TSG-S WG1 Chairagogic@qualcomm.com Mike Dolan – Editormfdolan@alcatel-lucent.com ABSTRACT: This contribution](https://reader036.vdocuments.us/reader036/viewer/2022082817/56649e125503460f94afe1f7/html5/thumbnails/2.jpg)
2 | October 15-16, 2007 | S00-FEMTO-20071015-003 | FEMTO CELL REQUIREMENTS STATUS IN TSG-S WG1
Schedule for S.P0126-0 v1.0 May 2007: Work Item Initiated July 2007: Document number S.P0126 assigned,
editor appointed May – October 2007: Review inputs, refine drafts October 15-16: Workshop in Boston, forge cross-
TSG consensus on femto development November 2007: Finalize draft, begin TSG Review
Cycle Expedited comments by TSGs due January 2008
January 2008: Resolve TSG Comments, begin V&V March/April 2008: Complete V&V, Approve for SC
Review and publication April 2008: SC Review complete, S.P0126-0 v1.0
published
![Page 3: SOURCE:Chair, Editor CONTACT: Alex Gogic – TSG-S WG1 Chairagogic@qualcomm.com Mike Dolan – Editormfdolan@alcatel-lucent.com ABSTRACT: This contribution](https://reader036.vdocuments.us/reader036/viewer/2022082817/56649e125503460f94afe1f7/html5/thumbnails/3.jpg)
3 | October 15-16, 2007 | S00-FEMTO-20071015-003 | FEMTO CELL REQUIREMENTS STATUS IN TSG-S WG1
Status of Femto Cell Requirements in 3GPP2
Deliberation of input requirements started May 2007 Full draft containing sum of input was put together August
2007 An interim TSG-S WG1 teleconference held September 13,
with good progress:Approximately 33% of the requirements at least
discussed;Approximately 25% of the total proposed text accepted.
At the close of the TSG-S WG1 meeting in Long Beach last week:
Approximately 75% of the requirements has been discussed.
Approximately 70% of the total proposed text has been accepted.
![Page 4: SOURCE:Chair, Editor CONTACT: Alex Gogic – TSG-S WG1 Chairagogic@qualcomm.com Mike Dolan – Editormfdolan@alcatel-lucent.com ABSTRACT: This contribution](https://reader036.vdocuments.us/reader036/viewer/2022082817/56649e125503460f94afe1f7/html5/thumbnails/4.jpg)
4 | October 15-16, 2007 | S00-FEMTO-20071015-003 | FEMTO CELL REQUIREMENTS STATUS IN TSG-S WG1
High Level View of Proposed Requirements
Introductory text, descriptions, definitions, references System (general) requirements (9 proposed) Radio Requirements (14 proposed) Mobility Requirements (21 proposed) Security Requirements (13 proposed) Operations, Administration and Maintenance (OA&M)
Requirements(41 proposed)
Regulatory Requirements (2 proposed) Performance Requirements (7 proposed) Accounting Requirements (1 proposed) System Goals (2 proposed)
![Page 5: SOURCE:Chair, Editor CONTACT: Alex Gogic – TSG-S WG1 Chairagogic@qualcomm.com Mike Dolan – Editormfdolan@alcatel-lucent.com ABSTRACT: This contribution](https://reader036.vdocuments.us/reader036/viewer/2022082817/56649e125503460f94afe1f7/html5/thumbnails/5.jpg)
5 | October 15-16, 2007 | S00-FEMTO-20071015-003 | FEMTO CELL REQUIREMENTS STATUS IN TSG-S WG1
Scope and Direction
Femto Cell System is envisioned to support a common OAM&P, a common femto system architecture, and a common core network
Femto cells will provide ease of installation and subscriber support Device procured as a commodity item in general electronics store Installed by the user at home according to operator guidelines After connection to the fixed broadband network, it starts operation
Initial goal is to have femto cells support existing HRPD and 1x terminals Improvements in “femto-aware” terminals to be considered after
Phase 1 Femto cells co-exist and interwork with the macrocellular system
Minimize interference, support handoff Femto cell systems use existing standard RAN and core network
interfaces It is possible to either restrict access of a terminal to a femto cell, or to
allow unrestricted access by any terminal
![Page 6: SOURCE:Chair, Editor CONTACT: Alex Gogic – TSG-S WG1 Chairagogic@qualcomm.com Mike Dolan – Editormfdolan@alcatel-lucent.com ABSTRACT: This contribution](https://reader036.vdocuments.us/reader036/viewer/2022082817/56649e125503460f94afe1f7/html5/thumbnails/6.jpg)
6 | October 15-16, 2007 | S00-FEMTO-20071015-003 | FEMTO CELL REQUIREMENTS STATUS IN TSG-S WG1
Phase 1: 1x Circuit-Switched Voice HRPD Connected State one-way handoff: femto macro Existing 1x cell selection Basic OA&M requirements HRPD rev A high speed data and VoIP (HRPD rev B support is
implicit) Phase 2:
Femto-aware terminals HRPD Connected State 2-way handoff : macro femto Connected State handoffs of VoIP Connected State handoffs of VoIP to 1x Circuit-Switched Voice
when transitioning from femto to macro Post Phase 2:
Enhanced OA&M requirements
Expected Phasing
S.P0126-0 will focus primarily on Phase 1 to meet the schedule shown on slide 2
Phase 2 will follow afterwards, probably in S.P0126-A