source: jica study team annex-f h.2.3.7 location of proposed … · 2011. 4. 14. · source: jica...

17
HF-8 T_TAL01 T_TAL02 T_TAL03 PAS0104 PAS0103 RCH0101 PAM0203 N S W E 0 4 km Bulsa River O’donel River Bambam River Rio Chico River Abacan River Proposed Balog-Balog Storage dam Bulsa dam Sumoris dam Cong Dadong dam Tarlac River T_TAL01 T_TAL02 T_TAL03 PAS0104 PAS0103 RCH0101 PAM0203 N S W E 0 4 km Bulsa River O’donel River Bambam River Rio Chico River Abacan River Proposed Balog-Balog Storage dam Bulsa dam Sumoris dam Cong Dadong dam Tarlac River Source: JICA Study Team Annex-F H.2.3.7 Location of Proposed Balog-Balog Storage Dam PAS0107 PAS0108 PAS0105 PAS0104 PAS0106 N S W E 0 4 km Proposed Gumain storage dam Gumain River Porac River Porac dam Gumain dam Pasig- Potrero River PAS0107 PAS0108 PAS0105 PAS0104 PAS0106 N S W E 0 4 km Proposed Gumain storage dam Gumain River Porac River Porac dam Gumain dam Pasig- Potrero River Source: JICA Study Team Annex-F H.2.3.8 Location of Proposed Gumain Storage Dam

Upload: others

Post on 03-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • HF-8

    T_TAL01

    T_TAL02

    T_TAL03

    PAS0104PAS0103

    RCH0101

    PAM0203

    N

    S

    W E

    0 4 km

    Bulsa River

    O’d

    onel

    Rive

    rBam

    bamRiver

    Rio Chico River

    Abacan River

    Proposed Balog-BalogStorage dam

    Bulsa dam

    Sumoris dam

    Cong Dadong dam

    Tarlac River

    T_TAL01

    T_TAL02

    T_TAL03

    PAS0104PAS0103

    RCH0101

    PAM0203

    N

    S

    W E

    0 4 km

    Bulsa River

    O’d

    onel

    Rive

    rBam

    bamRiver

    Rio Chico River

    Abacan River

    Proposed Balog-BalogStorage dam

    Bulsa dam

    Sumoris dam

    Cong Dadong dam

    Tarlac River

    Source: JICA Study Team

    Annex-F H.2.3.7 Location of Proposed Balog-Balog Storage Dam

    PAS0107

    PAS0108

    PAS0105

    PAS0104

    PAS0106

    N

    S

    W E

    0 4 km

    Proposed Gumainstorage dam

    Gumain RiverPorac River

    Porac dam

    Gumain dam

    Pasig-Potrero River

    PAS0107

    PAS0108

    PAS0105

    PAS0104

    PAS0106

    N

    S

    W E

    0 4 km

    Proposed Gumainstorage dam

    Gumain RiverPorac River

    Porac dam

    Gumain dam

    Pasig-Potrero River

    Source: JICA Study Team

    Annex-F H.2.3.8 Location of Proposed Gumain Storage Dam

  • HF-9

    PAS0107

    PAS0108

    PAS0105

    PAS0104PAS0103

    PAS0106

    PAM0203

    Santo Tomas

    Santa Rita

    Santa Ana

    San Simon

    San Luis

    Porac

    Minalin

    Mexico

    Magalang

    Mabalacat

    Guagua

    Floridablanca

    City Of San Fernando

    Cabiao

    Bamban

    Bacolor

    Arayat

    Apalit

    Angeles City

    N

    S

    W E

    0 4 km

    Bamban River

    Mar

    imla

    Rive

    r

    Marimla2 siteBangat3 site

    Bang

    atRi

    ver

    Abacan River

    Clark main zone

    Clark new frontier areaO

    ’don

    elRi

    ver

    Cong Dadong dam

    Rio Chico River

    PampangaRiver

    PAS0107

    PAS0108

    PAS0105

    PAS0104PAS0103

    PAS0106

    PAM0203

    Santo Tomas

    Santa Rita

    Santa Ana

    San Simon

    San Luis

    Porac

    Minalin

    Mexico

    Magalang

    Mabalacat

    Guagua

    Floridablanca

    City Of San Fernando

    Cabiao

    Bamban

    Bacolor

    Arayat

    Apalit

    Angeles City

    N

    S

    W E

    0 4 km

    Bamban River

    Mar

    imla

    Rive

    r

    Marimla2 siteBangat3 site

    Bang

    atRi

    ver

    Abacan River

    Clark main zone

    Clark new frontier areaO

    ’don

    elRi

    ver

    Cong Dadong dam

    Rio Chico River

    PampangaRiver

    Source: JICA Study Team

    Annex-F H.2.3.9 Location of Marimla2 and Bangat3 Sites

  • HF-10

    N

    S

    W E

    0 1 km

    Angat Storage DamAngat river

    To Bustos dam

    Ipo dam

    Main Unit(200MW)

    To MWSS

    Main Pipe

    Auxiliary Unit (46MW)

    ReleaseRelease tto o IpoIpo1- HPP (Auxiliary Unit)2- Bypass3- Lower discharge pipe4- Spillway

    Release to Release to BustosBustos1- HPP (Main Unit)

    N

    S

    W E

    0 1 km

    Angat Storage DamAngat river

    To Bustos dam

    Ipo dam

    Main Unit(200MW)

    To MWSS

    Main Pipe

    Auxiliary Unit (46MW)

    ReleaseRelease tto o IpoIpo1- HPP (Auxiliary Unit)2- Bypass3- Lower discharge pipe4- Spillway

    Release to Release to BustosBustos1- HPP (Main Unit)

    PAM0503

    N

    S

    W E

    0 1 km

    PantabanganStorage Dam

    Pampanga river

    Power house-1(100MW)

    Power house-2(12MW)

    Masiway dam

    Case

    cnan

    trans

    -bas

    in

    tunn

    el

    CasecnanHydropower plant(150MW)

    PAM0503

    N

    S

    W E

    0 1 km

    PAM0503

    N

    S

    W E

    0 1 km

    PantabanganStorage Dam

    Pampanga river

    Power house-1(100MW)

    Power house-2(12MW)

    Masiway dam

    Case

    cnan

    trans

    -bas

    in

    tunn

    el

    CasecnanHydropower plant(150MW)

    Source: JICA Study Team

    Annex-F H.2.4.1 Existing Hydropower Plants in the Study Area

  • HF-11

    Annex-F H.3.1.1 Water Balance Catchments

  • HF-12

    Angat R.A0

    A1

    A2

    A3

    A4

    A5

    Bustos

    Ipo

    Angat Dam(Bayabas Dam)

    Umiray-AngatTrans-basinP1

    (Massim Dam)

    P2Cong Dadong

    Massim R.

    Penaranda

    (Balintingon Dam)

    P3

    P4

    P5 Bongabon

    Rizal

    P6

    P7

    Casecnan R.

    Aguang R.AurolaTrans-basin

    CasecnanTrans-basin

    PantabanganDam

    Umiray R.

    Masiway

    Sumacubao R.Penaranda R.

    P8

    P9

    P0

    Coronell R.

    Talavera

    Smoris

    O’Donnel R.(Balog-BalogDam)

    Bulsa

    Tarlac R.

    S0

    Abacan R.

    Pasig-Potrero R.Porac R.

    Gumain R.

    (GumainDam)

    S1

    S2

    S3S4

    S5

    S6S7

    Gumain

    Porac

    P10

    P11

    P12

    P13

    P14

    P15 P16

    P17

    P18

    T1T2

    T3

    Talavera R.

    Baliwag R.

    Rio Chico R.

    Pampanga R.Pasac R.

    C1

    R1

    U1

    290(30)

    Upper Value: Mean annual average discharge (m3/s)(Lower Value): Mean monthly minimum discharge (m3/s)

    6(0.1)

    75(13)

    9(3)

    74(13)

    64(12)

    58(12)

    3(0.1)

    5(0.2)

    2(0.1)

    243(27)

    137(19)

    105(14)

    82(13)

    48(5)

    35(4)

    34(4)

    33(4)

    105(8)

    23(1)

    29(4)

    16(3)

    31(4)

    30(4)

    20(4)

    33(8)

    3(2)

    41(20)

    10(6)

    27(12)

    5(2)

    16(7)

    8(3)

    16(1)

    30(1)

    20(1)

    LegendControl Point

    Existing Storage Dam

    Proposed Storage Dam

    Diversion Dam

    River

    Angat R.A0

    A1

    A2

    A3

    A4

    A5

    Bustos

    Ipo

    Angat Dam(Bayabas Dam)

    Umiray-AngatTrans-basinP1

    (Massim Dam)

    P2Cong Dadong

    Massim R.

    Penaranda

    (Balintingon Dam)

    P3

    P4

    P5 Bongabon

    Rizal

    P6

    P7

    Casecnan R.

    Aguang R.AurolaTrans-basin

    CasecnanTrans-basin

    PantabanganDam

    Umiray R.

    Masiway

    Sumacubao R.Penaranda R.

    P8

    P9

    P0

    Coronell R.

    Talavera

    Smoris

    O’Donnel R.(Balog-BalogDam)

    Bulsa

    Tarlac R.

    S0

    Abacan R.

    Pasig-Potrero R.Porac R.

    Gumain R.

    (GumainDam)

    S1

    S2

    S3S4

    S5

    S6S7

    Gumain

    Porac

    P10

    P11

    P12

    P13

    P14

    P15 P16

    P17

    P18

    T1T2

    T3

    Talavera R.

    Baliwag R.

    Rio Chico R.

    Pampanga R.Pasac R.

    C1

    R1

    U1

    290(30)

    Upper Value: Mean annual average discharge (m3/s)(Lower Value): Mean monthly minimum discharge (m3/s)

    6(0.1)

    75(13)

    9(3)

    74(13)

    64(12)

    58(12)

    3(0.1)

    5(0.2)

    2(0.1)

    243(27)

    137(19)

    105(14)

    82(13)

    48(5)

    35(4)

    34(4)

    33(4)

    105(8)

    23(1)

    29(4)

    16(3)

    31(4)

    30(4)

    20(4)

    33(8)

    3(2)

    41(20)

    10(6)

    27(12)

    5(2)

    16(7)

    8(3)

    16(1)

    30(1)

    20(1)

    LegendControl Point

    Existing Storage Dam

    Proposed Storage Dam

    Diversion Dam

    River

    LegendControl Point

    Existing Storage Dam

    Proposed Storage Dam

    Diversion Dam

    River

    Source: JICA Study Team

    Annex-F H.3.1.2 Control Points and Discharge in Quasi-Natural Flow Condition

  • HF-13

    Angat R.A0

    A1

    A2

    A3

    A4

    A5

    Bustos

    Ipo

    Angat Dam(Bayabas Dam)

    Umiray-Angat Trans-basinP1

    (Massim Dam)

    P2Cong Dadong

    Massim R.

    Penaranda

    (Balintingon Dam)

    P3

    P4

    P5 Bongabon

    Rizal

    P6

    P7

    Aguang R.Aurola Trans-basin

    CasecnanTrans-basin

    Pantabangan Dam

    Umiray R.

    Masiway

    Penaranda R.

    P8

    P9

    P0

    Coronell R.

    Talavera

    Smoris

    O’Donnel R.(Balog-Balog Dam)

    Bulsa

    Tarlac R.

    S0

    Gumain R.

    (Gumain Dam)

    S1

    S2

    S3S4

    S5

    S6S7

    Gumain

    Porac

    P10

    P11

    P12

    P13

    P14

    P15 P16

    P17

    P18

    T1T2

    T3

    Talavera R.

    Baliwag R.

    Pampanga R.Pasac R.

    C1

    R1

    U1

    39.695.6

    111.6

    Upper Value: Quasi-Natural discharge (m3/s)Middle Value: with Existing Storage dams (m3/s)Lower Value: with Existing + Proposed Storage dams (m3/s)

    0.120.120.12

    19.364.469.6

    3.13.16.7

    19.064.269.3

    17.562.664.8

    17.062.164.3

    0.20.23.1

    0.250.250.25

    0.10.12.5

    35.591.5

    105.2

    25.081.094.7

    19.075.175.1

    16.7 72.772.7

    7.363.463.4

    5.261.261.2

    5.161.161.1

    5.061.161.1

    3.33.33.3

    1.31.31.3

    4.34.34.3

    3.53.53.5

    5.35.3

    19.0

    5.35.3

    19.0

    4.64.6

    18.3

    9.29.29.2

    1.31.31.3

    19.919.923.5

    5.35.35.3

    12.212.215.8

    2.42.42.4

    6.36.39.9

    2.92.96.5

    1.31.31.3

    2.42.4

    20.0

    1.41.4

    19.0

    LegendControl Point

    Existing Storage Dam

    Proposed Storage Dam

    Diversion Dam

    River

    Sumacubao R.

    Source: JICA Study Team

    Annex-F H.3.1.3 Surface Water Resources Potential (Equivalent to 80% Reliability) with Existing and Proposed Storage Dams at Control Points

  • HF-14

    Annex-F H.3.1.4 Sub-Areas for Groundwater Availability in the Provinces of Bulacan, Pampanga, Nueva Ecijia and Tarlac

  • HF-15

    UPRIISDiv-V

    (16,879ha)

    UPRIISDiv-I

    (16,400ha)

    UPRIISDiv-II

    (22,591ha)

    AMRISLeft Bank

    (10,128ha)

    AMRISRight Bank(16,663ha)

    Pantabangan Dam

    Masiway Dam

    Rizal Dam

    Angat DamBustos Dam

    Super Diversion Canal

    UPRIISDiv-I

    (4,120ha)

    Talavera Dam

    Pam

    pang

    a R

    iver

    Maasim River

    Manila bay

    PDRIS(6,604ha)

    Angat River

    TASMORIS(4,200ha)

    Tarla

    c R

    iver

    O'D

    onne

    l Riv

    er Smoris Dam

    Taris Dam

    Porlac RIS(1,458ha)

    Gumain RIS(1,629ha)

    Gumain Dam

    Solib Dam

    Porlac Dam

    Gumain River

    Porlac River

    Chi

    co R

    iver

    Tala

    vera

    Riv

    er

    UPRIISDiv-III

    (25,881ha) AuloSRIP

    (810ha)

    UPRIISDiv-IV

    (19,924ha)

    Aulo Dam

    Aulo River

    Penaranda River

    PenarandaDam

    Bongabon (Atate) Dam

    Cong Dadong Dam

    Source : JICA Study Team

    Annex-F H.3.2.1 Schematic Flow Diagram of Existing NIS

  • HF-16

    UPRIISDiv-V

    (37,200ha)

    UPRIISDiv-I

    (16,400ha)UPRIIS

    Div-II(22,591ha)

    UPRIISDiv-III

    (25,881ha) AuloSRIP

    (810ha)

    AMRISLeft Bank

    (10,128ha)

    AMRISRight Bank(16,663ha)

    UPRIISDiv-IV

    (19,924ha)

    Pantabangan Dam

    Masiway Dam

    Rizal Dam

    Aulo Dam

    Angat DamBustos Dam

    Super Diversion Canal

    Aulo River

    Penaranda River

    UPRIISDiv-I

    (4,120ha)

    Talavera Dam

    Pam

    pang

    a R

    iver

    Maasim River

    PenarandaDam

    Bongabon (Atate) Dam

    Manila bay

    PDRIS(6,604ha)

    Angat River

    TASMORIS(39,150ha)

    Tar

    lac

    Riv

    er

    O'D

    onne

    l Riv

    er

    Smoris Dam

    Taris Dam

    Porlac-Gumain

    (16,750ha)

    Gumain Dam

    Solib Dam

    Porlac Dam

    Gumain River

    Porlac River

    Chi

    co R

    iver

    Tal

    aver

    a R

    iver

    Balog-Balog Dam

    Gumain Reservoir

    Balintingon Dam

    Balintingon(14,900ha)

    Diversion Dam

    Cong Dadong Dam

    Existing Dam

    Proposed Dam

    Source : JICA Study Team

    Annex-F H.3.2.2 Schematic Flow Diagram of Projected NIS

  • HF-17

    Annex-F H.3.3.1 Evaluation of Groundwater Usage Condition in Present Condition (2008)

  • HF-18

    Annex-F H.3.3.2 Evaluation of Groundwater Usage Condition in Future Condition (2025)

  • HF-7-19

    Source: JICA Study Team

    Annex-F H.3.3.3 MODSIM Model Setup for Water Balance Simulation for Present Condition (2008)

  • HF-7-20

    Source: JICA Study Team

    Annex-F H.3.3.4 MODSIM Model Setup for Water Balance Simulation for Future Condition (2025)

  • HF-21

    0.0

    5.0

    10.0

    15.0

    20.0

    25.0

    30.0

    35.0

    40.0

    45.0

    Jan Feb May Apr Mar Jun Jul Aug Sep Oct Nov Dec

    Total Deficit

    Total Demand

    Dis

    char

    ge(m

    3 /s)

    Source: JICA Study Team

    Annex-F H.3.3.5 Total Demand and Average Total Deficit for CISs and Other Agricultural Water Use such as Fresh Water Aquaculture in Present Condition

    0.0

    100.0

    200.0

    300.0

    400.0

    500.0

    600.0

    700.0

    Jan Feb May Apr Mar Jun Jul Aug Sep Oct Nov Dec

    Present Condition

    Quasi-Natural Flow Condition

    Dis

    char

    ge(m

    3 /s)

    Source: JICA Study Team

    Annex-F H.3.3.6 Simulated Average Monthly Flow Pattern in Present Condition and Quasi-Natural Condition at around the Intake of Cong Dadong dam in the Pampanga River

  • HF-22

    Annex-F H.4.2.1(1/2) Location of Projects in Water Resources Development, Allocation and Distribution

  • HF-23

    Annex-F H.4.2.1(2/2) Location of Projects in Water Resources Development, Allocation and Distribution

  • HF-24

    Angat R.A0

    A1

    A2

    A3

    A4

    A5

    Bustos

    Ipo

    Angat Dam(Bayabas Dam)

    Umiray-Angat Trans-basinP1

    (Massim Dam)

    P2Cong Dadong

    Massim R.

    Penaranda

    (Balintingon Dam)

    P3

    P4

    P5 Bongabon

    Rizal

    P6

    P7

    Aguang R.Aurola Trans-basin

    CasecnanTrans-basin

    Pantabangan Dam

    Umiray R.

    Masiway

    Sumacubao R.Penaranda R.

    P8

    P9

    P0

    Coronell R.

    Talavera

    Smoris

    O’Donnel R.(Balog-Balog Dam)

    Bulsa

    Tarlac R.

    S0

    Gumain R.

    (Gumain Dam)

    S1

    S2

    S3S4

    S5

    S6S7

    Gumain

    Porac

    P10

    P11

    P12

    P13

    P14

    P15 P16

    P17

    P18

    T1T2

    T3

    Talavera R.

    Baliwag R.

    Pampanga R.Pasac R.

    C1

    R1

    U1

    LegendControl Point

    Existing Storage Dam

    Proposed Storage Dam

    Diversion Dam

    River

    3116

    Pantabanganstorage dam

    NIA-UPRIIS

    NIA-AMRIS

    MWSS Angatstorage dam

    NIA-PDRIS

    Key HMS

    NIA-TASMORIS

    NIA-Porac-Gumain

    Source: JICA Study Team

    Annex-F H.4.3.1 Tentatively Proposed Monitoring Stations for Surface Water

    Sector H Water Resources Development and ManagementAnnex-FiguresAnnex-F H.2.3.8 Location of Proposed Gumain Storage DamAnnex-F H.2.3.9 Location of Marimla2 and Bangat3 SitesAnnex-F H.2.4.1 Existing Hydropower Plants in the Study AreaAnnex-F H.3.1.2 Control Points and Discharge in Quasi-Natural Flow ConditionAnnex-F H.3.1.3 Surface Water Resources Potential (Equivalent to 80% Reliability)with Existing and Proposed Storage Dams at Control PointsAnnex-F H.3.1.4 Sub-Areas for Groundwater Availability in the Provinces of Bulacan, Pampanga,Nueva Ecijia and TarlacAnnex-F H.3.2.1 Schematic Flow Diagram of Existing NISAnnex-F H.3.2.2 Schematic Flow Diagram of Projected NISAnnex-F H.3.3.1 Evaluation of Groundwater Usage Condition in Present Condition (2008)Annex-F H.3.3.2 Evaluation of Groundwater Usage Condition in Future Condition (2025)Annex-F H.3.3.3 MODSIM Model Setup for Water Balance Simulation for Present Condition (2008)Annex-F H.3.3.4 MODSIM Model Setup for Water Balance Simulation for Future Condition (2025)Annex-F H.3.3.5 Total Demand and Average Total Deficit for CISs and Other Agricultural Water Usesuch as Fresh Water Aquaculture in Present ConditionAnnex-F H.3.3.6 Simulated Average Monthly Flow Pattern in Present Condition and Quasi-NaturalCondition at around the Intake of Cong Dadong dam in the Pampanga RiverAnnex-F H.4.2.1(1/2) Location of Projects in Water Resources Development, Allocation and DistributionAnnex-F H.4.3.1 Tentatively Proposed Monitoring Stations for Surface Water