sourabh_jain

4
Resume Sourabh Jain Present Address: Flat No. 510, Building No.14, Discovery Garden, Dubai (U.A.E.) [email protected] Contact numbers: +971507892882, +971529058231, +97144566861 (residence) -------------------------------------------------------------------------------------- -------------------------------------------------------- Career objective : To apply all my skills and knowledge gained in academic and professional environment resulting in the growth and value addition to the organization and myself. Professional summary : Total Work experience (11 Years 10 Months) till the date From June, 2009 till date (6 years) Working with Emirates Aluminium PJSC (EMAL) - An EGA Company, since 15 th June, 2010 till date as a Senior Technician- Instrumentation for Carbon & Port Maintenance Department. Joined EMAL Phase#1 during project stage and carried out following jobs. Pre-operational verification (POV) of carbon equipments.\ Prepared Task lists and assisted Instrumentation engineer for preparing Instrumentation PM Plan. Prepared spare list for Instrumentation spares. Worked as an active team member of Phase#1 Carbon Instrumentation Maintenance Team. Actively involved in Instrumentation preventive maintenance and troubleshooting of major equipments in Carbon Plant e.g. Hydraulic Crushers, ABF Firing System, Power and free conveyor, FTA, ASC, Hot Bath Cleaner, Induction Furnace, all De- dusting unit, Belt Conveyors, Vibro Compactor, Paste Mixer-Kneader, Paste Cooler, Vertical Mill etc. Awarded as a best shifter & high performer during year 2012. Joined Carbon Phase# 2 ORP Team in January 2013 and acted as a Planning Engineer for almost 1 year. Solely processed all Spare lists for Carbon Phase#2 equipments and ordered more than three thousand spares for all packages of Carbon Phase #2. Assisted SAP implementation team in preparation of SAP Master Data with creation of Functional Locations, Equipment Lists, created PM Task lists, PM schedule for effective planning and control. Reviewed all O & M documents during project stage and submitted valuable comments for improvement. Raised Purchase Requisitions (P.R.) for workshop & office equipments like lifting tools, employees personal tools etc. Currently holds position of Senior Technician-Instrumentation (Carbon Phase#2) and involved in following activities- Conversant with all equipment and associated instruments and actively involved in instrumentation preventive maintenance & troubleshooting of Anode Rodding Shop, Anode Baking Furnace and Green Anode Plant (Paste plant) like Hydraulic Crushers, Furnaces, Power and free conveyor, FTA, ASC, Hot Bath Cleaner Induction Furnace, all De-dusting unit, Belt Conveyors, Vibro Compactor, Kneader, Paste Cooler, Vertical Mill etc. Assisting Instrumentation Engineer in Budget planning for Carbon and Port Area with the approved company Business plan.

Upload: sourabh-jain

Post on 19-Aug-2015

72 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: sourabh_jain

Resume

Sourabh JainPresent Address: Flat No. 510, Building No.14, Discovery Garden, Dubai (U.A.E.)[email protected] numbers:+971507892882, +971529058231, +97144566861 (residence) ----------------------------------------------------------------------------------------------------------------------------------------------

Career objective: To apply all my skills and knowledge gained in academic and professional environment resulting in the growth and value addition to the organization and myself.

Professional summary: Total Work experience (11 Years 10 Months) till the date

From June, 2009 till date (6 years) Working with Emirates Aluminium PJSC (EMAL) - An EGA Company, since 15th June, 2010 till date as

a Senior Technician- Instrumentation for Carbon & Port Maintenance Department. Joined EMAL Phase#1 during project stage and carried out following jobs. Pre-operational verification (POV) of carbon equipments.\ Prepared Task lists and assisted Instrumentation engineer for preparing Instrumentation PM

Plan. Prepared spare list for Instrumentation spares. Worked as an active team member of Phase#1 Carbon Instrumentation Maintenance Team. Actively involved in Instrumentation preventive maintenance and troubleshooting of major

equipments in Carbon Plant e.g. Hydraulic Crushers, ABF Firing System, Power and free conveyor, FTA, ASC, Hot Bath Cleaner, Induction Furnace, all De-dusting unit, Belt Conveyors, Vibro Compactor, Paste Mixer-Kneader, Paste Cooler, Vertical Mill etc.

Awarded as a best shifter & high performer during year 2012.

Joined Carbon Phase# 2 ORP Team in January 2013 and acted as a Planning Engineer for almost 1 year. Solely processed all Spare lists for Carbon Phase#2 equipments and ordered more than three

thousand spares for all packages of Carbon Phase #2. Assisted SAP implementation team in preparation of SAP Master Data with creation of

Functional Locations, Equipment Lists, created PM Task lists, PM schedule for effective planning and control.

Reviewed all O & M documents during project stage and submitted valuable comments for improvement.

Raised Purchase Requisitions (P.R.) for workshop & office equipments like lifting tools, employees personal tools etc.

Currently holds position of Senior Technician-Instrumentation (Carbon Phase#2) and involved in following activities- Conversant with all equipment and associated instruments and actively involved in

instrumentation preventive maintenance & troubleshooting of Anode Rodding Shop, Anode Baking Furnace and Green Anode Plant (Paste plant) like Hydraulic Crushers, Furnaces, Power and free conveyor, FTA, ASC, Hot Bath Cleaner Induction Furnace, all De-dusting unit, Belt Conveyors, Vibro Compactor, Kneader, Paste Cooler, Vertical Mill etc.

Assisting Instrumentation Engineer in Budget planning for Carbon and Port Area with the approved company Business plan.

Coordinating with the supply chain, warehouse and vendor & supplier to fulfill spare Material requirement planning.

Follow up the report on SAP Maintenance Orders & notifications for spares, RCA etc. Follow-up on warranty cases and project deficiencies Planning and effecting preventive maintenance schedules of equipment to increase equipment

reliability, thereby accomplishing planned production targets. Prepare Annual Maintenance/Calibration Plan, Monthly Maintenance plan for all equipment in

Carbon Area Closely monitoring and improving system performance through various measurements like

monthly breakdown report etc. Coordinating material / spare parts planning related activities encompassing identification of

vendors, requirement of specification and offer evaluation. Planning and executing capital procurement.

Acted for higher positions of Planning Engineer for 1 month in year 2014 and carried out planning engineer’s jobs responsibly.

Page 2: sourabh_jain

Acted for higher positions of Instrumentation Engineer for 2 month in year 2014 and carried out instrumentation engineer’s jobs responsibly.

Past Experience-

From Oct, 2003-Mar, 2006 (2 year 7 months) Worked as a sales & service engineer from Oct 2003 to March 2006 at “Tempsens Instruments

(I) Pvt. Ltd., Udaipur” A temperature sensing instrument manufacturing and supplying company. Deal with test, calibration, installation and commissioning of contact and non-contact type of temperature sensors, furnace cameras. Worked at temperature calibration laboratory (a part of Tempsens Instruments), which is the NABL accredited laboratory. Responsible for the innovation and maintenance of ISO documentation for the department. Familiar to the Uncertainty calculation & lab standards.

Direct reporting to Managing Director.

From April 2006-July 2007 (1 year 4 months)

Worked as an Assistant Engineer (E&I) at “ULTRATECH CEMENT LIMITED, SURAT” an ADITYA BIRLA GROUP COMPANY which is a 2000 tpd Cement grinding and packing unit.

Job responsibilities – youngest member of plant maintenance and production team. Maintenance and calibration of all field instruments like pressure transmitter, temperature transmitter, level sensors & transmitters etc. Maintenance and calibration of ‘EEL’ make Electronic Packing Machine/ Digitech (IPA) Bangalore make weigh feeder, Belt weigher system etc. Maintenance of 75/ 90 kW ‘YASKAWA’ makes AC drives. E&I Maintenance of 300 tph ‘HebenKraft’ make Clinker Unloader.

Planning and implementation of Time Base maintenance, preventive maintenance, breakdown maintenance using SAP PM Modules.

Involved in spare material management/ Indenting using SAP R/3 PM /MM Module. Liaison with contractor and also handling the expansion and up gradation project in plant itself. Exposure of ISO 9001, ISO 14001, OHSAS 18001, 5S, TPM, WCM, KAIZEN etc.

From 06 August, 2007 to 31st May, 2009 (1 year 9 months)

Worked as an Asst. Engineer (Instrumentation) with “BINANI CEMENT LIMITED, PINDWARA” (A BRAJ BINANI GROUP COMPANY) which is a 5.3 Million TPA Capacity Modern Dry Process Cement Plant supplied by F.L.Smidth, Denmark). It is an ISO9001:2000, ISO14001 & OHSAS18001:1999 certified Company and having its own 50 MW Thermal Power Plant.

Worked as a section engineer at cement mill section and actively involved in carrying out preventive / breakdown maintenance.

Working experience of ABB DCS (AC 450 & AC800), PLC, AC Drives (ABB ACS 550, 600 & 800), Solid Flow Feeder (Schenck Process), Weigh Feeders (Transweigh, PBL), ESP Rectifier Controller & Rapping Panels (Hind Rectifier Ltd.), Roto packer Double discharge (Enexco), Siemens Radar level sensor etc, ‘Kana’ make Electronic Ear (mill level sensor), and Indutherm make Mill Diaphragm sensor.

Working experience of field instruments like Pneumatic control valves & gates, motorized control valves & actuators, Emergency shut off valves, Radiation pyrometers, Dust monitors, Tachogenerators, Smart-transmitters/Transducer/Controllers/Switches for temperature, pressure, flow, level, position, speed, Vibration etc.

Involved in spare material management/ Indenting using SAP R/3 PM /MM Module. Programming & working experience of PLCs like Siemens (LOGO), Omron etc. Exposure of ISO 9001, ISO 14001, OHSAS 18001, 5S etc. Involved in upgradation projects like weighing systems etc.

Technical Trainings

ALLEN BRADLEY CONTROL LOGIX 5000, CONTROLNET, DEVICENET & PANELVIEW PLUS 1500, SCADA

PID & WEIGHING EQUIPMENTS/ FEEDERS: Three days training program attended at Regional Training Center (North), J.K.Cement Works, Nimbahera (Raj.).

Educational background:

Having Diploma in Instrumentation Engineering from the Board of technical education, Rajasthan, Jodhpur with 62.08% marks.

Page 3: sourabh_jain

Senior secondary from the Rajasthan Board of secondary education with 56.31% marks Matriculation from the Rajasthan Board of secondary education with 73.09% marks.

Professional /Computer Skills & Trainings:

SAP ERP- Maintenance processing & planning. Having Good knowledge of PM & MM module. IHS- Struxure a Web-based software application for managing maintenance, repair and

operations (MRO) catalogs Smart Plant Foundation (SPF), Outlook, Microsoft Office. Lean Certification course. 7 QC Tools TOTAL Quality Management (TQM): One day training program on TQM at Ahmadabad by CII. Team Work Primavera P6- in progress

Extra Curricular Activities:

Participated in under college tournaments (Cricket, volley ball, etc.) Directed and acted in stage shows and dramas at college level cultural programs. Member of Kota Blood Bank Society, Rajasthan.

Language Proficiency:

Hindi and English

Personal details:

Father’s Name : Late Mr. Vimal Chand Jain Date of Birth : December 06, 1982 Marital status : Married Permanent add. : 94, Rang Vihar Yojana (U.I.T. colony), near Mahaveer Nagar – III circle,

Post Dadabari, Kota – 324 009, Rajasthan (India)

Passport details:

Passport No. : F7965250 Date of Issue : 16/06/2006 Expiry date : 15/06/2016 Place of issue : JAIPUR (INDIA)

Declaration:

I hereby declare that the above information is true to my knowledge and concern.

Place: Date: Signature