solution session (ge-type workout) colliding creative problem solving & 6-sigma methods duke...
TRANSCRIPT
Solution Session(GE-type Workout) Colliding Creative Problem Solving & 6-Sigma
Methods
Duke Rohe, BS, FHIMSSPerformance Improvement Specialist
Estella Woodard, the MT QweenDiagnostic Center
Duke Estella
How would you like ?
1. To engage diverse functions to fight a common problem
2. Have meetings that only allow the best and the action-ready to come
3. To accomplish in hours what traditionally took months
4. To line the dominoes up in your favor
5. To bust your culture
Project origin
– Tube system had unused capacity– 10,000 hrs/yr walking specimens to/from
Lab– Spills are too high ~ 2/month– Unable to gain consensus on a
workable tube system policy
Our Problema
Transporting specimens alongside a pneumatic tube system is dumb!
Idea! Let’s use the tube system to transport
8 functions + 3 months = 0 policies
Tip: The easy path is ALWAYS mined
GE Workout features
• Bust up the existing way• Jack Welch-driven (you will find a solution
or we will find someone who can)• Event oriented. You don’t stop til’ it’s
solved• Come prepared (available knowledge) to
change• “System Solutions” prevails over
departmental ones
Osborn-Parnes Creative Problem Solving Process
• Developed studying how geniuses think• Think two ways: Divergent and
Convergent• Migrate from Objective Finding to Problem
Finding to Solution Finding to Acceptance Finding
• Creates Ideas/Thinking threefold• Forces consensus fast
Team Leader a bulldog mentality
• Qualities: Leader, Thinker, Supporter, Robocop,
• Nothing less than SUCCESS will do• Prepares attendees for the event• Follows up on commitments• Funnel for all key information• Tough-hide, Tender-hearted
da Plan, da Plan
Team Leader: Call to Arms4 hours or BUST
Find a “Mr. Big” Jack Welch facsimile
Prepare a Shared Need
Invite the leaders impacted Prepare the “Rules of Engagement” Establish “Sensing” Sessions so they
come aware of their accountability Implied: If you don’t come with your
best equipped, you let down the team
Facilitator
• Think on their feet, energy source• Supports and prompts the Team Leader
(note: it is their show)• Thinks ahead so the dominoes fall just right• Asks great questions that lead to the right
answers• Helps draw out the greatness in others• Positive spirit of a Chihuahua on steroids
Sensing Sessionif they don’t know their role, it’s your fault
Imply this is not for the faint-hearted Amp up the importance Prepare a set of good questions for
them to answer “Fact Finding” Create a momentum for success Put them in the position of
representing their field. Be prepared for horse trading
Improvements anticipated:
– Increased revenues from patient chargeable urine vaccutainer
– Phlebotomy time freed up (6 FTEs)
– Smoother workload in the lab: smaller, more frequent batches
– Combine with implementation of blood product delivery
Preparation, preparation
We consumed a month in preparing for a 4 hour event
Details planned, yet ready to change • Beat the Communication tom-toms• Practice paranoia, surface landmines• Prepare posters, binders, slides• Oh, Make it FUN
The Workout Session
If Mr. Big comes in, Great Stress they will be pushed hard, ideas
will seem half-baked Use the Post-it Brainstorming
Process• Go with the process…or lose• Inertia is half the battle. Schedule
follow-up meeting on commitments (2 weeks)
da ProcessObjective Finding -- list significant challenges
opportunities, then isolate the main ones
Fact finding – what is known, and what has the greatest impact
Problem Finding – list of problem statements, then identify the best wording of the central problem. Start statement with “how 2”
Idea Finding – list of intriguing ideas, then isolation of the best
Solution Finding – possible solutions from the ideas, then the selection of the best one(s)
Acceptance Finding – the action steps needed for successful installation
da Right Way
da Wrong Way
Refinement/Implementation
Usually takes 2 follow-up meetings Action Finding >>> Implementation
Team Leader and Facilitator see to it sub-team sessions are conducted
Expect minor solar flares• Team Leader ultimately responsible
for output.
Plans are Nothing, Planning is Everything
Dwight Eisenhower
Well, Was it a success ?!* Kinda, Sorta
All the units send specimens via the tube system
1/3 of the units get Blood via the tube system. (working on the rest)
No spills in the tube system• The Workout has been replicated
successfully five times with similar results. • We now term it a “Solution Session”• This started a “Systems Mindset”
Any Questions Out There?
It’s what you do now when you don’t have to do anything that takes you where you want to be when it is too late to do anything about it. modifed Robert Gary