solid recovered fuels - a sustainable option for spain ...combined heat and power plant stavenhagen...

25
SRF SRF - - CHP Plant CHP Plant Stavenhagen Stavenhagen Contracting Solution for Energy Contracting Solution for Energy - - Supply of a Food Supply of a Food - - Production Site Production Site Solid Recovered Fuels - a sustainable option for Spain Thomas Hegner

Upload: others

Post on 26-Jan-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

SRFSRF--CHP Plant CHP Plant StavenhagenStavenhagen

Contracting Solution for EnergyContracting Solution for Energy--Supply of a FoodSupply of a Food--Production SiteProduction Site

Solid Recovered Fuels -

a sustainable option for Spain

Thomas Hegner

Page 2: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

The Client: Unilever Production Site The Client: Unilever Production Site StavenhagenStavenhagen

Total area: 200.000 m²

Area covered: 32.600 m²

325 Employees

Procuring 150.000 t potatoes

from 100 farmers

40.000 t products

Page 3: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

TheThe SupplierSupplier: Nehlsen: Nehlsen

Nehlsen AG

Waste Management Contracting Security

Page 4: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

Nehlsen Nehlsen ContractingContracting

� 124 Employees

� 6 Locations

� Main business:

� Development of wte-projects

� MBT-plant engineering

� Site management SRF-CHP

� Site management biomass treatment plants

� Site management biomass-to-fuel plants

� Energy contracting

� Logistic services

Page 5: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

CHP Plant StavenhagenCHP Plant Stavenhagen

Page 6: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

Combined Heat and Power Plant Combined Heat and Power Plant StavenhagenStavenhagen

� Construction of plant for the power supply for the Unilever plant (Pfanni) in

Stavenhagen (Germany)

� Processing 150.000 t/a of potatoes, 14 Mio. m³/a of natural gas have

previously been needed

� Target: Lowering energy costs to ensure the competitiveness of the location

� Technology: Building a SRF-fired CHP at the location Stavenhagen

� Tool: Usage of approx. 95.000 t/a SRF to supply Pfanni with steam and

electricity

Steam

200.000 t/y

Power

12 - 14

GWh/y

Page 7: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

TheThe StavenhagenStavenhagen--ProjectProject

SRF-demand: approx. 11t/h

approx. 20 trucks daily

SRF storage capacity:

approx. 2.000 t

SRF plant

Thermal capacity: 49,5 MW

SRF throughput: 95.000 t/yr

(at 14,2 MJ/kg heating value )

Grate ash: 20.000 t/yr

Filter residues: 5.600 t/yr

Steam: 200.000 t/yr

Power: 22.500 MWh/yr(Local grid)

14.400 MWh/a(Pfanni)

Page 8: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

Food Food ProductionProduction Site of Site of PfanniPfanni

Page 9: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

SRF SRF –– OOriginrigin and Potentialand Potential

Transport MSW to MBT Rosenow

Delivery SRF from Nehlsen

MBT Rosenow – separation into refuse

with high calorific value and residue for

landfill

Landfill Rosenow, landfilling of residue

Thermal utilisate of SRF in Stavenhagen

Page 10: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

FuelFuel SpecificationSpecification II

1% by weightceramic, stones, porcelain, sand,

ferrous metals, non-ferrous-metals

Contraries

250x250mmfoilLength x Width

250x50x25mmLength x Width x Height

Size

1813 (10)MJ/kgCalorific value

Physical quality characteristics

MaximumMinimumUnitDescription

Page 11: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

FuelFuel SpecificationSpecification IIII

31,21mg/kgMercury

400250200mg/kgFluorine

1,51,00,8% by weight Chlorine

1,00,80,6% by weightSulphur

Quality characteristics of micro elements (maximum allowance)

2520% by weightAshes

2520% by weightWater

Basic composition (benchmark)

Maximum80%

Percentile

AverageUnit*Element

*dry material

Page 12: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

Basic Design of SRF Basic Design of SRF CHPCHP--PlantPlant

HIGH PRESSURESTEAM 42 bar

DELIVERY OFSRF SRF SILO

Page 13: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

FlueFlue--GasGas CleaningCleaning SystemSystem

Page 14: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

Interfaces Interfaces SteamSteam SupplySupply Nehlsen Nehlsen -- PfanniPfanni

PfanniProduction

Bleaching

75 °C

Peeling

Drying

Mashed potatoes

Drying

Boiling

11 bar

Steam

(food processing quality)16 bar

SuperheatedSteam

42 bar

Extraction Steam

16 bar

Steam-to-Steam

generators

Page 15: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

Commissioning ProceduresCommissioning Procedures

4-Apr 12-Apr 16-Apr

1-Feb

4-Apr

7-Jul

5-Jun

21-May

25-Jul

Jan-07

Mar-07

Apr-07

May-07

Jul-07

Aug-07

Sep-07

chec

ksco

ldst

art-u

pw

arm

sta

rt -u

p

test

ing

auto

mat

iccr

ane

star

t fin

al b

low

1st S

RF d

eliv

ery

end fi

nal b

low

furn

ace

igniti

onst

art t

est r

unen

d test

run

scheduled actual

Page 16: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

Performance of the plant during first quarter 2008Performance of the plant during first quarter 2008F

ull

loa

d o

pera

ting h

ours

Page 17: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

ScheduledScheduled and and ActualActual Power Power SupplySupply to EEXto EEX

Fahrplan / Ausspeisung I/2008

0,00

1.000,00

2.000,00

3.000,00

4.000,00

5.000,00

6.000,00

7.000,00

8.000,00

01.

Mrz

02.

Mrz

02.

Mrz

03.

Mrz

04.

Mrz

05.

Mrz

06.

Mrz

07.

Mrz

08.

Mrz

09.

Mrz

10.

Mrz

11.

Mrz

12.

Mrz

13.

Mrz

14.

Mrz

15.

Mrz

16.

Mrz

17.

Mrz

18.

Mrz

19.

Mrz

20.

Mrz

21.

Mrz

22.

Mrz

23.

Mrz

24.

Mrz

25.

Mrz

25.

Mrz

26.

Mrz

27.

Mrz

28.

Mrz

29.

Mrz

30.

Mrz

31.

Mrz

Datum

kW

h

Messwerte

Fahrplanactual

scheduled

Page 18: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

ProjectProject abstractabstract

waste

water

elect

ricity

heat

cold

heat

stea

m

800,000 liter fuel oil per year

1,000,000 m³ natural gas pro year

1,000,000 kWh electricity per year

CO2 - reduction

4,000 t/a

Page 19: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

⇒ As a result of the good fuel efficiency, the combined

process steam and power generation reduces CO2 emissions

⇒ CO2 saving > 10,000 – 15,000 t/a

⇒ Protection of fossil resources

GHGGHG--EffectsEffects

Supported by the EU promotional

programme:

„EFRE - Europäischer Fonds

für regionale Entwicklung“

Supported by the EU promotional Supported by the EU promotional

programme:programme:

„„EFRE EFRE -- EuropEuropääischerischer FondsFonds

ffüürr regionaleregionale EntwicklungEntwicklung““

Page 20: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

RecentRecent Facts and Facts and FiguresFigures

• In approx. 15.000 operating hours (availability almost 90 %)

since commissioning (end of July 2007)

• 360.000 t steam and 25 GWh electric power have been

delivered

• approx. 27 million m³ natural gas have been substituted

• about 25 non planned shut downs had to be managed

(most of them caused by failures in the supply network)

• first revision showed no problems in the furnace

• waste composition impacts on furnace and boiler

performance

• emissions well below 17. BImSchV (German Immission

Regulation, factor 5 to 10)

• District heating and another client will be supplied with steam

and heat (according to current schedule as of July 2010)

Page 21: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

Nehlsen Heizkraftwerke GmbH & Co. KG

Schultetusstraße 43b

17153 Stavenhagen

Tel.: +49-39954-2462-20

Fax: +49-39954-2462-16

[email protected]

www.nehlsen.com

ThanksThanks forfor listeninglistening

Thomas Hegner

Karl-Heinz Plepla

Page 22: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

Nehlsen

WZV

Pfanni

Immergut

WVS

process heating Pfanni

network heating WZV

process heating IG

network heating WVS

600 kW

45 t/h

6 t/h1800 kW

Page 23: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

Typical Annual Performance Heat Supply Typical Annual Performance Heat Supply -- StavenhagenStavenhagen

provision of base load by Nehlsen

5.200 MWh

3.500 MWh 2.300 MWh

Page 24: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

COCO22--balance > balance > IncinerationIncineration of SRF in CHPof SRF in CHP

Pfanni

production

SRF-CHP-plant regional

power grid

200.000 t steam

131.100 MWh/a14.400 MWh/a

power supply367.000 MWh/a

out of 95.000 t/a SRF

10.000 MWh/a

fuel oil

23.500 MWh/a

feed

Page 25: Solid Recovered Fuels - a sustainable option for Spain ...Combined Heat and Power Plant Stavenhagen Construction of plant for the power supply for the Unilever plant (Pfanni) in Stavenhagen

www.nehlsen.com

International SRF Conference, Madrid, November 17th 2009

SRFSRF--ProductionProduction

Waste

Organic

Fraction (16%)SRF (54%)

Secondary Raw

Material (10%)

MBT

Composting Plastics Glass Metals

Water

(20%)