Summary
Mandating Authority :
Expected project CAPEX :
Main stakeholders
Social and environmental impact
Location and population
Project Type :
Introducing pay-as-you-go solar to rural Benin; Reduction in poaching of elephants in the Pendjari National Park; At scale, delivering electricity to approxi-mately 7,000 people
Solar power plant
The project aims to electrify rural localities with mini central photovoltaic solar energy, resulting in the implementation of a low voltage network.
ANADER (Benin’s rural electrification authority)
10’000’000 €
ANADER (electrification authority); SBBE (State utility company); Integrated Solar
Gdadagba, Djidja Commune, Zou Department, Benin84,590 inh.
Solar
100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016
Energy resource data
Expected type of contract :
STAGE 2 : Pre-Feasibility Studies
Pre-feasibility study :
Feasibility study :
STAGE 3 : Feasibility Studies
STAGE 4 : Permitting / Financing / Contracts
Building permits signed :
Land concession signed :
Environmental impact study :
Grid Connection :
Power Purchase Agreement
Off-Taker :
Tenor : Price of electricity :
Identified sources of fundings
Comments
Engineering, Procurement and Construction Contractor :
Operation and Maintenance Contractor :
STAGE 5 : Engineering / Construction / Commercial Operation
Project maturity ( IFC / World Bank Categories )
STAGE 1 : Concept Development, Site identification
Site identified :
Site access :
Expected installed capacity :
Adequate road Rail access Port facilities
Technology :
✓
STAGE 1 : Concept Development, Site identification
STAGE 2 : Pre-Feasibility Studies
STAGE 3 : Feasibility Studies
STAGE 4 : Permit t ing / Financing / Contracts
STAGE 5 : Engineering/Construction/Commercial Operation
No
EHCSP solar modules
Yes done by ANADER
Yes
Under Negociation
Under Negociation
We are training ANADER engineers to act as our O & M partner
Under Negociation
Under Negociation
N/A
Direct consumer
20 years convention Under Negociation
IST has an MoU with French investment group GreenWish Partners and the United Bank of Africa (UBA) and a letter of Interest from EX IM Bank
5 MW
Laboratory set up within the Smart Infrastructure Collaboration Centre at Carnegie Mellon University since 2014.
5 years Build, Own, Operate and Transfer (BOOT)
Yes