1 Solar Power for Egypt - ISCC Kuraymat Arabian Power & Water Summit Abu Dhabi, 29 – 31 March 2010 Georg Brakmann Fichtner Solar GmbH www.fichtnersolar.com

Upload: others

Post on 07-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Solar Power for Egypt - ISCC Kuraymat - SolEngCo · • Orascom with Flagsol for Solar Island • Iberdrola with Mitsui for Combined Cycle Island • FichtnerSolar for Project Construction

1

Solar Power for Egypt - ISCC KuraymatArabian Power & Water SummitAbu Dhabi, 29 – 31 March 2010

Georg BrakmannFichtner Solar GmbHwww.fichtnersolar.com

Page 2: Solar Power for Egypt - ISCC Kuraymat - SolEngCo · • Orascom with Flagsol for Solar Island • Iberdrola with Mitsui for Combined Cycle Island • FichtnerSolar for Project Construction

2

History

1999 Discussion on ISCC technology,  World Bank to sponsor four ISCC projects (Egypt, Morocco, India and Mexico) by grant of 50 Million USD each.

2001 FichtnerSolar awarded the Planning and Engineering (Technical Design Report, Specifications)

2004  Planning modified and decided tender in two lots (Solar Island and Combined Cycle Island). 

2007 Bidding, Negotiations and Contract Awards: • Orascom with Flagsol for Solar Island• Iberdrola with Mitsui for Combined Cycle Island• FichtnerSolar for Project Construction Management

2008  February: Start of Construction

Page 3: Solar Power for Egypt - ISCC Kuraymat - SolEngCo · • Orascom with Flagsol for Solar Island • Iberdrola with Mitsui for Combined Cycle Island • FichtnerSolar for Project Construction

3

Technical Concept

Gas turbine74 MW

Exhaust600°C

Steam turbineNo Sun: 36 MWSun: 59 MW

Condenser

Steam540°C, 100bar

393°C

Electricityto the gridNo Sun: 104 MWSun: 126 MW

ParabolicTrough Field

293°C

Air and vapour

Air Air

G ~

HRSG

CoolingTower

G ~

Stack Exhaust100°C

Solar Island Combined Cycle Island

Solar HX50 MJ/s

Page 4: Solar Power for Egypt - ISCC Kuraymat - SolEngCo · • Orascom with Flagsol for Solar Island • Iberdrola with Mitsui for Combined Cycle Island • FichtnerSolar for Project Construction

4

Design: Solar Island

• Solar Collectors– 160  SKAL‐ET 150 based parabolic trough collectors, reinforced 

or regular depending on position in solar field. 

• HTF System– 40 loops, thereof each 9 West and East of the Power Block and 

22 in the South

– 3x50% HTF main pumps, 2x50% freeze protection pumps

• HTF Area Concrete Building– HTF System Control Equipment, Electrical Systems Solar Island

• Workshop and Warehouse

Page 5: Solar Power for Egypt - ISCC Kuraymat - SolEngCo · • Orascom with Flagsol for Solar Island • Iberdrola with Mitsui for Combined Cycle Island • FichtnerSolar for Project Construction

5

Design: Combined Cycle Island• Gas Turbine

– General Electric Type MS 6111 FA , 74 MW at 20°C ambient temperature 

• Steam Turbine– Siemens SST 900, 60 MW at 50 MJ/s Solar Heat Input, 36 MW 

without Solar Heat Input

• Heat Recovery Steam Generator and Solar Heat Exchangers– Steam generated by Solar Heat Exchangers (Pre‐heater + 

Evaporator) and fed into high pressure steam drum

• Cooling Towers

– Evaporative cooling with make‐up water from Nile

Page 6: Solar Power for Egypt - ISCC Kuraymat - SolEngCo · • Orascom with Flagsol for Solar Island • Iberdrola with Mitsui for Combined Cycle Island • FichtnerSolar for Project Construction

6

Site and Plant Arrangement

• 87 km South of Cairo

• 3 km East of Nile

• 4 Collector Areas

• Power Block in the North

• Non‐Plant Area and

Access Road in West

• Balance of Plant in North

• Gas Pipeline and Gridline passing in the North

• In the South cultivated Land, in the West small Wadi

Page 7: Solar Power for Egypt - ISCC Kuraymat - SolEngCo · • Orascom with Flagsol for Solar Island • Iberdrola with Mitsui for Combined Cycle Island • FichtnerSolar for Project Construction

7

Solar Collector Loop~300m

Page 8: Solar Power for Egypt - ISCC Kuraymat - SolEngCo · • Orascom with Flagsol for Solar Island • Iberdrola with Mitsui for Combined Cycle Island • FichtnerSolar for Project Construction

8

Solar Collector Skal‐Et 150

Structure Torque Box

GeometricConcentration

82

Aperture area 817,5 m²/SCA

Length per SCA ~150 m

Peak opticalefficiency

80%

Page 9: Solar Power for Egypt - ISCC Kuraymat - SolEngCo · • Orascom with Flagsol for Solar Island • Iberdrola with Mitsui for Combined Cycle Island • FichtnerSolar for Project Construction

9

Absorber Tube Schott PTR 70

• Improved reliability • Improved match between glass and metal

coefficients of thermal expansion • 100% testing of glass-to-metal seal • Improved performance • New bellows configuration that compresses

when tube is hot • Improved getter mounting to keep getters cool to

increase hydrogen absorption capacity • More durable anti-reflective coating on glass • Reduced hydrogen permeation • Selective coating

Page 10: Solar Power for Egypt - ISCC Kuraymat - SolEngCo · • Orascom with Flagsol for Solar Island • Iberdrola with Mitsui for Combined Cycle Island • FichtnerSolar for Project Construction

10

Sun tracking of the Solar Collectors by a sensor

• Photovoltaic cell causing two currents

Page 11: Solar Power for Egypt - ISCC Kuraymat - SolEngCo · • Orascom with Flagsol for Solar Island • Iberdrola with Mitsui for Combined Cycle Island • FichtnerSolar for Project Construction

11

Wind breakers

Task: Reduce wind loads on the collectors

Page 12: Solar Power for Egypt - ISCC Kuraymat - SolEngCo · • Orascom with Flagsol for Solar Island • Iberdrola with Mitsui for Combined Cycle Island • FichtnerSolar for Project Construction

12

Collector Assembly: Finished

Daily production: 8 SCE (average)

Page 13: Solar Power for Egypt - ISCC Kuraymat - SolEngCo · • Orascom with Flagsol for Solar Island • Iberdrola with Mitsui for Combined Cycle Island • FichtnerSolar for Project Construction

13

Construction Works ProgressSolar Collector Erection

Currently erected SCE‘s: 1900 of total 1920 ≈ 99%

Page 14: Solar Power for Egypt - ISCC Kuraymat - SolEngCo · • Orascom with Flagsol for Solar Island • Iberdrola with Mitsui for Combined Cycle Island • FichtnerSolar for Project Construction

14

Construction Works Progress Latest Pictures

Solar Field Area 1 and 3, Currently: Precommissioning

Page 15: Solar Power for Egypt - ISCC Kuraymat - SolEngCo · • Orascom with Flagsol for Solar Island • Iberdrola with Mitsui for Combined Cycle Island • FichtnerSolar for Project Construction

15

Construction Works Progress Latest Pictures

Solar FieldCurrently: PrecommissioningLoop by Loop

Page 16: Solar Power for Egypt - ISCC Kuraymat - SolEngCo · • Orascom with Flagsol for Solar Island • Iberdrola with Mitsui for Combined Cycle Island • FichtnerSolar for Project Construction

16

Construction Works Progress Latest Pictures

Solar Field: Tared Roads and Gravel against Dust

Page 17: Solar Power for Egypt - ISCC Kuraymat - SolEngCo · • Orascom with Flagsol for Solar Island • Iberdrola with Mitsui for Combined Cycle Island • FichtnerSolar for Project Construction

17

Construction Works Progress Latest Pictures

HTF Area ConcreteBuilding

Page 18: Solar Power for Egypt - ISCC Kuraymat - SolEngCo · • Orascom with Flagsol for Solar Island • Iberdrola with Mitsui for Combined Cycle Island • FichtnerSolar for Project Construction

18

Construction Works Progress Latest Pictures

Combined Cycle: Solar Heat Exchangersafter Delivery to Site

Page 19: Solar Power for Egypt - ISCC Kuraymat - SolEngCo · • Orascom with Flagsol for Solar Island • Iberdrola with Mitsui for Combined Cycle Island • FichtnerSolar for Project Construction

19

Construction Works Progress Latest Pictures

Collector Area 3 and Gas Turbine