    Project : 4-Laning of Chapra - Hazipur Section of NH - 19 in the state of Bihar (from Km. 143.200 to km.207.200)

    Subject: Status of Geo technical reports for structures on the project road

    S.

    No.

    Existing

    Chainage

    Design

    Chainage

    Type Span arrangement as

    per schedules

    Span arrangement

    proposed by MELTECH

    Status as on 11.10.2010 Remarks

    13Shittalpur

    byepass185.921 MNB 1 x 10 1 x 10 Soil report is submitted on 20-09-2010

    Awaiting for final soil report with corrections as per the

    discussions had with soil consultant

    14Shittalpur

    byepass187.037 MNB 1 x 40 4x10 Soil report is submitted on 20-09-2010

    Awaiting for final soil report with corrections as per the

    discussions had with soil consultant

    15Shittalpur

    byepass194.718 MNB 1 x 20 2x10 Soil report is submitted on 20-09-2010

    Awaiting for final soil report with corrections as per the

    discussions had with soil consultant

    16 200.400 203.175 MNB 1x46.67 4x11.2

    Soil report for pile foundation system is submitted on 07-09-

    2010 Soil report is required for raft foundation system

    17 201.750 204.535 MNB 1x43.65 8.3+25+8.3 Soil report is submitted on 20-09-2010Awaiting for final soil report with corrections as per the

    discussions had with soil consultant

    1Chappra

    bye pass143.974 ROB 3x26.230 3x26.230 Soil report is submitted on29-09-2010 Closed

    2Chappra

    bye pass150.984 ROB 13.230+26.230+13.230 13.230+26.230+13.230 Soil report is submitted on29-09-2010 Closed

    3Chappra

    bye pass157.860 ROB 26.23+31.23+26.23 26.23+31.23+26.23 Soil report is submitted on29-09-2010 Closed

    4

    Digwara

    byepass 177.182 ROB 26.23+31.23+26.23 26.23+31.23+26.23 Soil report is submitted on 07-09-2010 Closed

    5 206.555 209.318 ROB 6x26.230 6x26.230 Soil report is submitted on 14-08-2010Meltech Expressed doubt on Lateral capacity and asked to

    submit revised soil soil report with increased lateral capacity