Microsoft Word - FONTANA LEISURE PARK FUNCTION HALL

June 28, 2013 Thru:Subject : Gentleman: Following your request, we are pleased to submit herewith our proposal to undertake subsoil investigation at the above-mentioned project, as follows: 1. Scope of Work 1.1 Soil Boring As required, we shall drill an aggregate total depth of One Hundred Twenty (120.0) meters for Six (6.0) boreholes. Each hole shall be drilled at an average depth of Twenty (20.0) meters. A hole may be terminated at a shallower depth if it indicates thick and sound rock formation at such depth. Soil samples will be obtained at an interval not exceeding 1.5 meters using standard split spoon sampler, and double tube core barrel for rock cores. Simultaneously, standard penetration test will be performed with each sampling. In soft cohesive layer, undisturbed samples will be obtained by shelby tube sampler. Where rock, boulder or gravelly layer formation are encountered, coring shall be performed to obtain at least an NQ core size. Complete log of the boring shall be made by our Field Engineer and this will include the depth and identification of samples obtained, SPT values, percent recovery water level measurement during the time and at the end of drilling. 1.2 Laboratory Testing Laboratory testing in accordance with the standard requirements and procedures shall be performed on the soil samples obtained to ascertain the type of soil encountered and to determine a sound economic design criteria for the proposed structure. 1.3 Report Three (3) bound copies of geotechnical report shall be submitted to the Client after the completion of field works and laboratory testing. The report shall contain among other things the description of the work, subsoil findings, laboratory test results, and other soil data required for the design, including liquefaction and pile analysis. 2.0 Cost Our cost includes salaries, per diems, equipment depreciation and other incidental expenses relative to this investigation. Unit Qty. Unit Amount Cost

2.1 Soil Boring 1.Mobilization/demobilization L/S P 20,000.00of drilling equipment and personnel

2. Hole to hole transfer ea. 5 1,600 P 8,000.00

3.Drilling thru soil w/ SPT. m. 120 1,700 P 204, 000.00

Sub-total P 232, 000.00

2.2 Laboratory testing Natural Moisture Content ea 38 P 120P 4,560 Atterberg Limits ea 30 285 8,550 Sieve Analysis ea 38 255 9,690

Sub-total P 22,800 2.3 Evaluation Report L/S 30,000.00GRAND TOTAL P 284, 800.00

Say P 280,000.003. Terms of Payment 3.1 Fifty percent (50%) Down payment upon receipt of Notice to Proceed and prior to mobilization. 3.2 Balance upon submittal of report. 4. Performance Period

4.1 Mobilization of drilling Within one (1) day upon equipment and personnel receipt of Notice to Proceed and Downpayment 4.2 Soil Boring including sampling Eighteen (18) days upon arrival on the jobsite. 4.3 Laboratory Testing Ten (10) days after completion of field work 4.4 Report Eight (8) days after completion of laboratory testing. 5. Other Conditions 5.1 Location of boreholes shall be jointly staked out by the Clients and Contractors duly designated representative. 5.2 Necessary permits for the occupancy of the project area shall be arranged by the Client and shall assist us in securing such permits. 5.3 The Client shall assign an inspector duly authorized to acknowledge the accomplishment of the Contractor. As much as possible, the designated inspector shall be present at all times to witness and duly certify to the accomplishment. 5.4 Delays caused by adversed weather conditions, such as typhoons, heavy rains and other unforseen events shall not be applied to our stipulated performance period. 5.5 The Client shall provide water during the entire drilling operation Should you agree with the above terms and conditions, kindly signify the same by signing on the space provided for below, and return to us a signed copy and this will serve as our Working Agreement. Very truly yours, CONFORME/ ACCEPTED BY: For: Principal Architect

_______________________ Name & Signature

________________________ Date