software dev brief pack

Upload: aakash-khanna

Post on 07-Apr-2018

236 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/6/2019 Software Dev Brief Pack

    1/20

    VSN/VSR Vendor BriefingVSN Implementation Team

    Updated 16 February, 2009

  • 8/6/2019 Software Dev Brief Pack

    2/20

    Agenda

    VSN/VSR Background

    VSR System Overview

    VSN Implementation Status

    VSN Business Model

    VSN/VSR Design Goals

    VSR-Provider Integration Business Requirements

    VSR-SIS Integration Options Documentation

    Implementation

    Implementation Timeline

    Catholic Sector co-ordination

    SIS Acceptance Testing

    Contact Information and Further information

  • 8/6/2019 Software Dev Brief Pack

    3/20

    VSN Basics

    Compulsory for all Victorian school students and students aged up to 24 enrolled in all other sectors, excepting Universities (for now)

    The VSN will be issued at a students first point of enrolment within the

    Victorian education sector

    The VSN will be known to the parent/student

    It will co-exist with other existing provider identifiers such as CASES 21 StudentNumber

    Some providers may elect to use the VSN as their primary identifier, or for use in a

    particular application

    All student movements to be notified to the Victorian Student Register

    using the VSN

    It is not proposed that a student card, or similar physical item, be issuedto link the student with the VSN

  • 8/6/2019 Software Dev Brief Pack

    4/20

    VSN Components

    A unique student identifier, to be known as theVictorian Student Number (VSN) A VSN is number assigned to a student, from which no inferences may be drawn in

    respect to the students identity, ethnicity, gender or other characteristics

    Issuance of a VSN will require presentation of evidence of identity

    It is intended that a student is issued with only one VSN.

    A central registry of Victorian students, to be known as the Victorian

    Student Register (VSR) Maintains basic and minimalist identifying information relating to a student; name,

    date-of-birth, gender

    Maintains history of enrolment in Victorian providers - provider identifier, dateentered, date left,

    The VSR is not a repository or aggregation point for other student information suchas achievements, results, health or pastoral information

    Through linkages maintained in the VSR, it supports the drawing together of

    individual student information from multiple providers, subject to policy and accesscontrols

  • 8/6/2019 Software Dev Brief Pack

    5/20

    Provider Responsibilities

    Legislation requires all providers to:

    Maintain an accurate record of the VSN for all students enrolling withinprovider.

    Enrolment

    Exit

    Change of key details (e.g. name change)

    During student enrolment:

    Through reference to the VSR verify a presented VSN, or

    If a VSN is not presented,

    check with the VSR for the existence of a previously assigned VSN for the student, or Register Student, and cause the generation of a VSN for the student where one does not already exist.

  • 8/6/2019 Software Dev Brief Pack

    6/20

    VSR System Overview

    Victorian

    Student Register

    Government

    Schools

    Non

    Government

    Schools

    TAFEs

    RTOs

    ACE

    Providers

    PROVIDERS

    DOWNSTREAM APPLICATIONS

    Provider

    Register

    Student Movement

    Application(s)

    Research Data

    Extraction

  • 8/6/2019 Software Dev Brief Pack

    7/20

    VSR System Overview

    Terminology

    VSN 9 Digit number including check digit

    Active or suspended

    Registration Record Student registration details when

    student is first enrolled and allocated

    a VSN. Date of birth, gender, deceased

    indicator, access restrictions, currentfirst name and current surname.

    Participation Record Student participation at particular

    provider including: enrolled first

    name, enrolled surname,middlename, provider, providerstudent identifier.

    VSN

    Registration Record

    Participation Records

    Access Records

  • 8/6/2019 Software Dev Brief Pack

    8/20

    VSN Implementation Status

    VSN LegislativeA

    mendment passed Ongoing program to be managed and operated by VCAA

    VSR Central System under development (Jan 2009)

    Government School SMS (CASES21) modifications under

    way (Feb 2009)

    May to September 2009 roll-out for Government Schools

    June to September 2009 roll-out for Catholic Schools

    June to December 2009 roll-out for Independent Schools

  • 8/6/2019 Software Dev Brief Pack

    9/20

    VSN Business Operating Model

    Business Operations

    Providers notify enrolment, change details, exits and enrolment cancellation.

    During student enrolment: Through reference to the VSR verify a presented VSN, or

    If a VSN is not presented, Indicate whether the student has been enrolled at a Victorian Education Provider previously the VSR will

    attempt to locate the student

    Exceptions may occur during processing: EG. A student does not present their VSN on enrolment and the lookup performed by

    the VSR does not return 1 exact match (eg. more than 1 exact match).

    Exceptions managed centrally by VSR team, who contact providers to confirmstudent details.

    Data integrity under control of VSR

    Addresses privacy concerns

    Less impact on school administration processes at time of enrolment.

  • 8/6/2019 Software Dev Brief Pack

    10/20

    Design Goals

    Simplicity of operation Minimal change to provider administrative procedures

    Well integrated solution

    Central responsibility for VSR data integrity

    Improved data entry standards and conventions

    Centrally managed roll-out

    Just-in-time training

  • 8/6/2019 Software Dev Brief Pack

    11/20

    VSR Provider Integration Business Requirements

    B

    R1 - Capture a students VSN status upon enrolment. BR2 - Notify the VSR when a student enrols at the provider.

    BR3 - Notify the VSR when a students details change.

    BR4 - Notify the VSR when a student exits the provider.

    BR5 - Notify the VSR when a students enrolment is

    cancelled.

  • 8/6/2019 Software Dev Brief Pack

    12/20

    VSR Provider Integration Business Requirements

    B

    R6 - Notify a student of their VSN on confirmation ofenrolment communications.

    BR7 - Notify a student of their VSN on their academic

    transcript/student report card.

    BR8 - Notify a student of their VSN on their exit

    notifications.

    BR9 - Include a students VSN on their student transfer

    documentation.

    BR10 - Ability to generate a VSN notification for a student

    on request.

  • 8/6/2019 Software Dev Brief Pack

    13/20

    VSR Provider Business Requirements

    B

    R11 - Process communications from the VSR that indicatethe status of processed notifications and include the VSNs

    allocated to students.

    BR12 - Ability to update student details as requested by

    VSR Analysts as part of exception resolution.

    BR13 - Process communications from the VSR that indicatethe status of processed exceptions and include the VSNs

    allocated to students. (i.e. in case of batch processing -

    process response and reconciliation batch files).

    BR14 - Upon initial implementation of the VSR, the provider

    must provide details about all currently enrolled students to

    the VSR.

  • 8/6/2019 Software Dev Brief Pack

    14/20

    VSR Provider Business Requirements

    B

    R15A

    bility to securely maintain VSR user id andpassword

    BR16 Ability to generate a report to list student names

    that may not conform with VSR name consistency

    guidelines (optional)

    BR17 Ability to notify the VSR if a VSN is manuallyupdated by a user by issuing a Change transaction

    (optional)

  • 8/6/2019 Software Dev Brief Pack

    15/20

    VSR SIS Integration Options

    Web Service incl. Batch file based communication, automated by Student Information

    System (SIS) RequestBatch sent by SIS containing enrol, change details, exit and cancel enrolment tx.

    ReturnBatch retrieved by SIS from VSR containing a response to each tx in the RequestBatch. Response may be Success indicator + VSN OR exception indicator.

    Reconciliation Batch retrieved by SIS from VSR containing response to each tx in exception Response will be Success indicator + VSN

    Resolution Batch retrieved by SIS from VSR containing information about tx that the VSR hasperformed relating to students at the provider eg. VSN links and suspensions.

    VSR Web Batch file upload As per above, but batch file upload and retrieval are manual tasks performed by a school based

    operator.

    VSR Web pages direct, manual data entry School operator notifies information for each student individually via web pages

    School operator receives indication of success or exception at time of entering information.

    If there is an exception, a VSR central team member contacts school at a later date/time toresolve the exception

  • 8/6/2019 Software Dev Brief Pack

    16/20

    VSR SIS Integration Documentation

    Provider Integration Business Requirements VSR API

  • 8/6/2019 Software Dev Brief Pack

    17/20

    Implementation Timeline

    End of Term 2, 2009 Government Schools Pilot. Pilot lasts for 6 weeks.

    Term 2-3, 2009

    Government Schools implementation

    Term 3, 2009

    Catholic Schools implementation.

    Term 3 and 4, 2009

    Independent Schools implementation

  • 8/6/2019 Software Dev Brief Pack

    18/20

    Catholic Sector Implementation

    Implementation co-ordination Need to schedule specific school + implementation type (50 schools

    per week).

    Co-ordination between CEO, DEECD/VSR, Schools, Vendors

    Schools must be ready and have applied data consistency guidelines

    Vendors/SIS must be ready and have a system that has passed acceptance

    testing. VSR must be ready and setup schools and allocate staff to resource exception

    handling.

    Monitoring and tracking of implementation

  • 8/6/2019 Software Dev Brief Pack

    19/20

    SIS Acceptance Testing

    DEECD will implement and manage an acceptance testingprocess.

    Tests implementation of key business requirements by SIS that wish

    to implement automated interchange.

    Business scenario based + input data

    Check the generated request batch

    Provide a return batch

    Provide input data to simulate exception handling

    Provide a reconciliation batch

    Process to be available from March 2009 onwards.

  • 8/6/2019 Software Dev Brief Pack

    20/20

    Further information

    [email protected]

    Yahoo developer discussion group:

    Please contact us at the above email and we will send you an invitation to

    the Victorian Student Register Group.