Monday, 15 June 2015 Time Events 8.00 am Today is the first day of internship. As I enter Natural Resource and Environmental Board (NREB) office at 8.00 am, I was introduced to Mr Joseph Uyo as the person that will be my supervisor throughout this internship. He introduced me to every employees that were present at the particular time and he also brings me around the place. He then brings me to his office to discuss stuff regarding internship at NREB. 11.00 am Mr Joseph Uyo hands me my training schedule and assign me tasks that I would be doing throughout this internship. From the training schedule, I would be involved in Human Resource, Administration and Finance Department these 2 weeks. 2.00 pm I was given Natural Resource and Environmental Ordinance (NREO). I was required to read and understand the laws written on the NREO as NREB focused more on enforcing rules. Tuesday, 16 June 2015 Time Events 8.00 am Arrived at the office on time. 8.30 am A meeting was held and I was invited to join the meeting as well. The meeting is about the upcoming activities that are going to be held. 12.30 pm Lunch 2.00 pm We continue the meeting with the second part of the agenda. Like any other meeting, there were few suggestions being exchange for betterment of the event. Wednesday, 17 June 2015

Upload: flojerz

Post on 13-Dec-2015

1.239 views

Category:

Documents


42 download

DESCRIPTION

Soft Copy Internship Log Book

TRANSCRIPT

Page 1: Soft Copy Internship Log Book

Monday, 15 June 2015

Time Events8.00 am Today is the first day of internship. As I enter Natural Resource and

Environmental Board (NREB) office at 8.00 am, I was introduced to Mr Joseph Uyo as the person that will be my supervisor throughout this internship. He introduced me to every employees that were present at the particular time and he also brings me around the place. He then brings me to his office to discuss stuff regarding internship at NREB.

11.00 am Mr Joseph Uyo hands me my training schedule and assign me tasks that I would be doing throughout this internship. From the training schedule, I would be involved in Human Resource, Administration and Finance Department these 2 weeks.

2.00 pm I was given Natural Resource and Environmental Ordinance (NREO). I was required to read and understand the laws written on the NREO as NREB focused more on enforcing rules.

Tuesday, 16 June 2015

Time Events8.00 am Arrived at the office on time.

8.30 am A meeting was held and I was invited to join the meeting as well. The meeting is about the upcoming activities that are going to be held.

12.30 pm Lunch

2.00 pm We continue the meeting with the second part of the agenda. Like any other meeting, there were few suggestions being exchange for betterment of the event.

Wednesday, 17 June 2015

Time Events8.00 am Arrived at the office on time. As I continue reading the III Part of the

Ordinance at 8.00 am, I learn that the Board makes order for the conservation of natural resources to prevent injury to the natural resources and for protection

12.30 pm Lunch

2.00 pm As I continue to study Part V of the Ordinances regarding Fund and Financial Provision, I learned that the Funds given to NREB is used to pay any expenditure lawfully incurred by the Boards which includes legal fees and other fees and costs, the salaries, remuneration and allowances of members, committees, officers and servants appointed and employed by the Board,

Page 2: Soft Copy Internship Log Book

including superannuation allowances, provident fund, pensions and gratuities.

Thursday, 18 June 2015

Time Events8.00 AM Arrived at the office on time

8.15 AM On the last part of the ordinance, Part VI, is about miscellaneous provisions is according to Miss Sati is a significant part of ordinance and interrelated to NREB Miri’s line of work.

11.45 AM Lunch

2.00 PM The last part of the ordinance explains about the specific offence such as open burning of refuse or other combustible materials on any land, the penalty of any person who without the written permission of the Controller, cuts, destroys or burns vegetation in any area which is not Native Customary Land or Native Area Land. It also explains about miscellaneous offences, pollution of lands, presumption, defence, default in compliance with notice or order, power of entry and investigation, power of seizure, offence by bodies of persons, power to prosecute and legal representation, public servants, personal immunity of members, officers and employees, Public Authority Protection Act 1948, and Security for protection under laws

Friday, 19 June 2015

Time Events8.00 AM Arrived at workplace on time

8.10 AM As I finished reading the Natural Resource and Environmental Ordinance yesterday, I continue to read and study about ISO 9001:2008 as it is a part of my task later to maintain and updating the files and records the relevant section of ISO 9001:2008 Standard.

12.30 PM Lunch

2.00 PM Continue reading and learning about ISO 9001:2008

Monday, 22 June 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Study about case study on Environmental Management Plan – Proposed Mixed

Page 3: Soft Copy Internship Log Book

Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

12.30 PM Lunch

2.00 PM Continue studying about case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

Tuesday, 23 June 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Study about case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

12.30 PM Lunch

2.00 PM Continue studying about case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

Wednesday, 24 June 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Study about case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

12.30 PM Lunch

2.00 PM Continue studying about case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

Thursday, 25 June 2015

Time Events8.00 AM Arrived at the office on time

Page 4: Soft Copy Internship Log Book

8.30 AM Followed Mdm Radziah binti Yusuf to SK Lutong for Pencinta Alam Sekitar Club’s annual report and meeting headmaster/teachers in charge for the club.

10.30 AM Followed Mdm Radziah binti Yusuf to SJK Chung Hua for Pencinta Alam Sekitar Club’s annual report and meeting headmaster/teachers in charge for the club.

12.50 PM Lunch

2.00 PM Make report about the visitation at school today

Friday, 26 June 2015

Time Events8.00 AM Arrived at the office on time

8.30 AM Followed Mdm Radziah binti Yusuf to SK Pendidikan Khas for Pencinta Alam Sekitar Club’s annual report and meeting headmaster/teachers in charge for the club.

10.30 AM Followed Mdm Radziah binti Yusuf to SK Anchi for Pencinta Alam Sekitar Club’s annual report and meeting headmaster/teachers in charge for the club.

12.00 PM Lunch

2.00 PM Make report about the visitation today

Monday, 29 June 2015

Time Events8.00 AM Arrived at the office on time

10.30 AM Collect water sample of Sg. Baram – Point NB1: Express Wharf

11.00 AM Collect water sample of Sg. Baram – Point NB 2: Miri Port

11.40 AM Collect water sample of Sg Baram – Point NB3: Asian Bridge

12.00 AM Lunch

1.30 PM Sending water sample to Bintulu (Overnight at Bintulu)

Tuesday, 30 June 2015

Page 5: Soft Copy Internship Log Book

Time Events8.00 AM Sent water sample to Jabatan Kimia Malaysia, Bintulu branch

12.30 PM Drove back to Miri (Day off for the rest of the day)

Wednesday, 1 July 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Make report regarding water sampling at Sg. Baram

12.30 PM Lunch

2.00 PM Continue with report regarding water sampling at Sg. Baram

Thursday, 2 July 2015

Time Events8.00 AM Arrived at the workplace on time.

8.30 AM Went to Marudi for inspection with 3 senior staffs which are Mdm Sati, Mr Kennedy and Mr Salleh after they received report from NREB HQ in Kuching regarding open burning. The signal was detected by satellite and we went there according to the direction by GPS tracker

10.30 AM Arrived at Marudi area (plantation/forest). The inspection began.

10.45 AM We arrived at the place according to coordinate. The forest has been burnt down and there are no longer flames. We talked to the workers and warn them that their burning licence is going to expired tomorrow so they are not allow to burn anymore forest.

1.00 PM Lunch

2.00 PM We went back using the same route as we used previously and we saw another group of people without licence is burning down forest. Thus, we immediately go there and warn them of the consequence of open burning without legal licence and the fines that we will enforce upon them if they did not put off the fire.

Friday, 3 July 2015

Time Events

Page 6: Soft Copy Internship Log Book

8.00 AM Arrived at the workplace on time

8.10 AM Make report regarding hotspot inspection at Marudi area yesterday

12.30 PM Lunch

2.00 PM Continue with report regarding hotspot inspection at Marudi area yesterday

Monday, 6 July 2015

Time Events8.00 AM Arrived at the workplace on time

8.30 AM I was invited to go along to building construction called Pull Men Hotel and Resort as a part if an inspection

8.45 AM We arrived at the building construction and we enter the building up to 22th floor to meet the manager of the construction site. He hand in Environment Inspection Assessment (EIA) to us and we make sure that the construction site is doing what was written on the report.

10.00 AM We walked around the construction site and arrived at the dumping site. We found out that their waste management is not in order and have disturbed land next to the construction site. Warning has been given to the manager of the construction site and arrived as well as the owner of the land.

12.30 PM Lunch

2.00 PM Back at the office to make report about inspection this morning.

Tuesday, 7 July 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Make report regarding hotspot inspection at Pullman Hotel yesterday

12.30 PM Lunch

2.00 PM Continue with report regarding hotspot inspection at Pullman Hotel yesterday

Wednesday, 8 July 2015

Time Events

Page 7: Soft Copy Internship Log Book

8.00 AM Arrived at the workplace on time

9.00 AM Given briefing about 5S by Mdm Pauline and was asked to arrange documents, chairs and tables according to code number.

11.00 AM Make a short report/summary on regarding 5S and to be given to Mdm Pauline

12.30 PM Lunch

2.00 PM Continue with the progress report regarding 5S

Thursday, 9 July 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue with case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

12.30 PM Lunch

2.00 PM Continue with case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

Friday, 10 July 2015

Time Events8.00 AM Arrived at the workplace on time

9.00 AM I went for weekly town inspection called ‘Proactive’ with Mdm Jessica and another intern, Kristie Nina. The inspection is necessary to monitor the environment and to make sure that there is no open burning done around Miri area.

11.00 AM Continue with case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

12.00 PM Lunch

2.00 PM Continue with case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

Page 8: Soft Copy Internship Log Book

Monday, 13 July 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Start on new case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

12.00 PM Lunch

2.00 PM Continue working on case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

Tuesday, 14 July 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue working on case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

12.00 PM Lunch

2.00 PM Continue working on case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

Wednesday, 15 July 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue working on case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

12.00 PM Lunch

2.00 PM Continue working on case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

Page 9: Soft Copy Internship Log Book

Thursday, 16 July 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue working on case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

12.00 PM Lunch

2.00 PM Continue working on case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

Friday, 17 July 2015 ---- Hari Raya Aidilfitri

Monday, 20 July 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue working on case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

12.00 PM Lunch

2.00 PM Continue working on case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

Tuesday, 21 July 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue working on case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

12.00 PM Lunch

2.00 PM Continue working on case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

Page 10: Soft Copy Internship Log Book

Wednesday, 22 July 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue working on case study on Environmental Management Plan – Proposed Mixed Development (Miri Waterfront Transformation) at Miri Waterfront, Miri Division

10.30 AM Site inspection at Farmrite Sdn Bhd. (Pig Farm). This inspection is conducted due to complaints received from Jabatan Alam Sekitar. The inspection was assisted by Mdm Jessica Dubah, Miss Irrwannie, Mr Cassidy and Mr Kennedy Nujong.

12.30 PM Lunch

2.00 PM Make report about inspection at Farmrite Sdn Bhd.

Thursday, 23 July 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue working on report about inspection at Farmrite Sdn. Bhd.

12.30 PM Lunch

2.00 PM Continue working on report about inspection at Farmrite Sdn. Bhd.

Friday, 24 July 2015

Time Events8.00 AM Arrived at the workplace on time

9.00 AM I went for weekly town inspection called ‘Proactive’ with Mdm Jessica and another intern, Joanna Johny. The inspection is necessary to monitor the environment and to make sure that there is no open burning done around Miri area.

11.00 AM Start working on case study on Preliminary EIA for Demolition and Restoration of Piasau Camp, Miri, Sarawak

12.00 PM Lunch

Page 11: Soft Copy Internship Log Book

2.00 PM Continue working on case study on Preliminary EIA for Demolition and Restoration of Piasau Camp, Miri, Sarawak

Monday, 27 July 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Start with new case study entitled Preliminary EIA for Demolition and Restoration of Piasau Camp, Miri, Sarawak

12.30 PM Lunch

2.00 PM Continue with case study entitled Preliminary EIA for Demolition and Restoration of Piasau Camp, Miri, Sarawak

Tuesday, 28 July 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue with case study entitled Preliminary EIA for Demolition and Restoration of Piasau Camp, Miri, Sarawak

12.30 PM Lunch

2.00 PM Continue with case study entitled Preliminary EIA for Demolition and Restoration of Piasau Camp, Miri, Sarawak

Wednesday, 29 July 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue with case study entitled Preliminary EIA for Demolition and Restoration of Piasau Camp, Miri, Sarawak

12.30 PM Lunch

2.00 PM Continue with case study entitled Preliminary EIA for Demolition and Restoration of Piasau Camp, Miri, Sarawak

Page 12: Soft Copy Internship Log Book

Thursday, 30 July 2015

Time Events7.00 AM Drive to Long Lama for Raya Aidilfitri Celebration and Officiating the

building of Long Lama Bridge

9.00 AM Arrived at the Long Lama and the ceremony started as well. Tan Sri Adenan Satem, Chief Minister of Sarawak gives speech about the project of Long Lama Bridge (more details on report)

12.00 PM Ceremony ended and drive back to Miri. Given rest for the day

Friday, 31 July 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue with case study entitled Preliminary EIA for Demolition and Restoration of Piasau Camp, Miri, Sarawak

12.30 PM Lunch

2.00 PM Continue with case study entitled Preliminary EIA for Demolition and Restoration of Piasau Camp, Miri, Sarawak

Monday, 3 August 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue with case study entitled Preliminary EIA for Demolition and Restoration of Piasau Camp, Miri, Sarawak

12.30 PM Lunch

2.00 PM Continue with case study entitled Preliminary EIA for Demolition and Restoration of Piasau Camp, Miri, Sarawak

Tuesday, 4 August 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Start on new case study called Environmental Impact Assessment (EIA) for

Page 13: Soft Copy Internship Log Book

Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

12.30 PM Lunch

2.00 PM Continue with case study called Environmental Impact Assessment (EIA) for Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

Wednesday, 5 August 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue with case study called Environmental Impact Assessment (EIA) for Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

12.30 PM Lunch

2.00 PM Continue with case study called Environmental Impact Assessment (EIA) for Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

Thursday, 6 August 2015 (Visitation trip to Zha Environmental Sdn Bhd)

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue working on case study entitled ___

11.00 AM Visitation Zha Environment Sdn Bhd with Mr Joseph Uyo, Miss Sati anak Bandat, Mr Kemri bin Punut, Mr Seman bin Haji Ali and two other interns which is Karenza Peter and Corina Irish. This company gathers all used tyres and to be sent to Kuching to be break down.

1.00 PM Lunch

2.00 PM Make report about visitation at Zha Environmental Sdn Bhd

Friday, 7 August 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Setting up the place for Raya Aidilfitri celebration

9.30 AM Raya Aidilfitri celebration

Page 14: Soft Copy Internship Log Book

2.00 PM Continue to make report about visitation at ZHA Environmental Sdn Bhd

Monday, 10 August 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue with case study called Environmental Impact Assessment (EIA) for Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

12.30 PM Lunch

2.00 PM Continue with case study called Environmental Impact Assessment (EIA) for Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

Tuesday, 11 August 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue with case study called Environmental Impact Assessment (EIA) for Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

12.30 PM Lunch

2.00 PM Continue with case study called Environmental Impact Assessment (EIA) for Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

Wednesday, 12 August 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue with case study called Environmental Impact Assessment (EIA) for Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

12.30 PM Lunch

2.00 PM Accompanying Mdm Jessica to give speech about Environmental Issues and NREB’s Part to Tackle The Issues at Parkcity Hotel, Miri.

Page 15: Soft Copy Internship Log Book

Thursday, 13 August 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue with case study called Environmental Impact Assessment (EIA) for Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

12.30 PM Lunch

2.00 PM Continue with case study called Environmental Impact Assessment (EIA) for Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

Friday, 14 August 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue with case study called Environmental Impact Assessment (EIA) for Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

12.30 PM Lunch

2.00 PM Continue with case study called Environmental Impact Assessment (EIA) for Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

Monday, 17 August 2015

Time Events8.00 AM Arrived at the workplace on time

8.05 AM Start preparing for the arrival of lecturer

9.00 AM Arrival of lecturer from Faculty of Science

11.00 AM Continue working on case study called Environmental Impact Assessment (EIA) for Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

12.30 PM Lunch

2.00 PM Continue working on case study called Environmental Impact Assessment (EIA) for Marajuta Quarry at Sungai Sekaloh, Suai, Niah, Miri Division, Sarawak

Page 16: Soft Copy Internship Log Book

Tuesday, 18 August 2015

Time Events8.00 AM Arrived at the office on time

8.10 AM Start working new case study called Environmental Monitoring Report: Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II), Miri Division, Sarawak, Malaysia

12.30 PM Lunch

2.00 PM Continue working on case study entitled Environmental Monitoring Report: Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II), Miri Division, Sarawak, Malaysia

Wednesday, 19 August 2015

Time Events8.00 AM Arrived at the office on time

8.10 AM Start working new case study called Environmental Monitoring Report: Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II), Miri Division, Sarawak, Malaysia

12.30 PM Lunch

2.00 PM Continue working on case study entitled Environmental Monitoring Report: Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II), Miri Division, Sarawak, Malaysia

Thursday, 20 August 2015

Time Events8.00 AM Arrived at the office on time

9.00 AM I went for Lambir Sanitary Landfill site search with Mr Joseph Uyo, Mr Kemri bin Punut, and Miss Monisavily Ongan Gak. The site search involved other departments such as LAKU, MCC, Land Survey and Majlis Daerah Subis.

12.30 PM Lunch

2.00 PM Make report regarding the Lambir Sanitary Landfill site search

Page 17: Soft Copy Internship Log Book

Friday, 21 August 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue working on report regarding the Lambir Sanitary Landfill site search

11.45 AM Lunch

2.15 PM Continue working on case study entitled Environmental Monitoring Report: Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II), Miri Division, Sarawak, Malaysia

Monday, 24 August 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue working on case study entitled Environmental Monitoring Report: Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II), Miri Division, Sarawak, Malaysia

10.00 AM Mr Joseph Uyo taught Miss Monisavily Ongan Gak and I about transferring raw data regarding air pollution around Miri area. The software used are called __

12.30 PM Lunch

2.00 PM Continue working on case study entitled Environmental Monitoring Report: Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II), Miri Division, Sarawak, Malaysia

Tuesday, 25 August 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue working on case study entitled Environmental Monitoring Report: Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II), Miri Division, Sarawak, Malaysia

12.30 PM Lunch

2.00 PM Continue working on case study entitled Environmental Monitoring Report: Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II),

Page 18: Soft Copy Internship Log Book

Miri Division, Sarawak, Malaysia

Wednesday, 26 August 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue working on case study entitled Environmental Monitoring Report: Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II), Miri Division, Sarawak, Malaysia

12.30 PM Lunch

2.00 PM Continue working on case study entitled Environmental Monitoring Report: Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II), Miri Division, Sarawak, Malaysia

Thursday, 27 August 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue working on case study entitled Environmental Monitoring Report: Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II), Miri Division, Sarawak, Malaysia

12.30 PM Lunch

2.00 PM Continue working on case study entitled Environmental Monitoring Report: Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II), Miri Division, Sarawak, Malaysia

Friday, 28 August 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Continue working on case study entitled Environmental Monitoring Report: Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II), Miri Division, Sarawak, Malaysia

12.30 PM Lunch

2.00 PM Continue working on case study entitled Environmental Monitoring Report:

Page 19: Soft Copy Internship Log Book

Proposed Eastwood Valley Golf Course Development (18 Holes) (Phase II), Miri Division, Sarawak, Malaysia

Monday, 31 August 2015 – National Day

Tuesday, 1 September 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Start working final report

12.30 PM Lunch

2.00 PM Continue working on final report

Wednesday, 2 September 2015

Time Events8.00 AM Arrived at the workplace on time

8.10 AM Start working final report

12.30 PM Lunch

2.00 PM Continue working on final report

Thursday, 3 September 2015

Time Events8.00 AM Arrived at the workplace on time

9.00 AM I followed Mdm Radziah binti Yusuf, Miss Monisavily Ongan Gak and Miss Karenza Patrick to SK Agama for Pencinta Alam Sekitar Club’s annual report and meeting headmaster/teachers in charge for the club.

10.30 AM I followed Mdm Radziah binti Yusuf, Miss Monisavily Ongan Gak and Miss Karenza Patrick to SK Temenggung Datuk Muip for Pencinta Alam Sekitar Club’s annual report and meeting headmaster/teachers in charge for the club.

12.30 PM Lunch

2.30 PM I followed Mdm Radziah binti Yusuf, Miss Monisavily Ongan Gak and Miss Karenza Patrick to SM Sains for Pencinta Alam Sekitar Club’s annual report and meeting headmaster/teachers in charge for the club.

Page 20: Soft Copy Internship Log Book

Friday, 4 September 2015

Time Events8.00 AM Arrived at the workplace on time

9.00 AM I followed Mdm Radziah binti Yusuf, Miss Joanna Johny and Miss Corina Irish Jennis to SMK Lopeng Tengah for Pencinta Alam Sekitar Club’s annual report and meeting headmaster/teachers in charge for the club.

10.30 AM I followed Mdm Radziah binti Yusuf, Miss Joanna Johny and Miss Corina Irish Jennis to Kolej Tun Datu Tuanku Haji Bujang for Pencinta Alam Sekitar Club’s annual report and meeting headmaster/teachers in charge for the club.

12.00 PM Lunch

2.30 PM I followed Mdm Radziah binti Yusuf, Miss Joanna Johny and Miss Corina Irish Jennis to SMK Riam for Pencinta Alam Sekitar Club’s annual report and meeting headmaster/teachers in charge for the club.