socorro isd technology plan: 2013 - 2016 isd...technology expenditures $ ... team leader of...

32

Upload: doananh

Post on 16-Mar-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,
Page 2: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

2013 - 2016

DR. JOSE ESPINOZA

SUPERINTENDENT

1 of 31

Page 3: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

DISTRICT PROFILE

ESC Region 19

City, State Zip EL PASO, TX 79929-2800

Phone (915) 937-0000

Fax (915) 860-7137

County District Number 071909

Number of Campuses 45

Total Student Enrollment 44227

District Size 25,000 - 49,999

Percent Econ. Disadvantaged 76.65%

TechnologyExpenditures

$36,676,231.00

Technology budgetsreported in plan bycategory

Teaching and Learning Budget $9,164,268.00

Educator Preparation and Development Budget $3,648,546.00

Leadership, Administration and Support Budget $2,685,717.00

Infrastructure for Technology Budget $21,177,700.00

Total: $36,676,231.00

TechnologyExpenditurePer Pupil

$829.27

Number ofCampuseswith DirectConnection toInternet

43

Percentage ofCampuseswith DirectConnection toInternet

95.56%

Number ofClassroomswith DirectConnection toInternet

2875

Percentage ofClassroomswith DirectConnection toInternet

100.00%

Computer/StudentRatio

3 student(s) for every computer

Computer/TeacherRatio

1 teacher(s) for every computer

Number ofcampuses that needtocomplete the TexasCampus STaR Chart

43

Percentage ofcampuses that havecompleted the TexasCampus STaR Chart

100.00 %

2 of 31

Page 4: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

CIPA Compliance

CIPA compliance was certified by the district on 08/17/2012.The Socorro Independent School District has the required policy in place that was addressed at a publicmeeting on April 17, 2012 in which reasonable public notice was given. SISD also uses the policy toteach students about proper technology use, personal information protection, safety, security, and cyber-bullying. The District makes use of the Olweus Bullying Prevention Program district-wide as well. SISDalso has secure technology measure and full time technology security personnel monitoring the onlineactivity of minors in conjunction with faculty and staff who also monitor during instruction. Education ofstudents about internet safety and security is a standard and requirement.

3 of 31

Page 5: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

Plan Introduction

Plan Last Edited 12/05/2012

Plan status: approved

Years Included in the Plan: 2013 - 2016

Number of years covered by the plan: 3

Years Approved for the Plan: 2013 - 2016

Number of approved years: 3

Does the district file E-Rate? yesThe district had a "written" plan before E-Rate Form 470 was filed on .

Technology Planning CommitteeRebecca O'Neill - Asst. Supt. C&I Elementary EducationDr. Cynthia I. Lopez - Asst. Supt. C&I Secondary EducationHector Reyna - Director of Technology ServicesLouisa Aguirre-Baeza - Director of Professional DevelopmentMichelle Aube-Barton - Director of Community EducationSusan C. Thompson - Coordinator of Library ServicesDenise Espinoza - Systems/Erate AdministratorJuan A. Reza - Chief Finance OfficerRudy Campoya - Director of Human ResourcesMaria G. Arias - Director of State Federal ProgramsDiane M. Flores - Director of Curriculum Proficiency LearningNellie A Ponikvar - Director of Fine ArtsGeorge C. Thomas - Director of Career & TechnologyMark W. Vechione - Director of PurchasingJohn H. Alarcon - Director of Maintenance & OperationsJennifer A. Davila - Director of Bilingual EducationLeslie S. Armbruster - Director of Special EducationKelly Mendoza - Director of Research and EvaluationBenjamin A. Ross - Team Leader of Telecom/Network/SecurityOscar Dominguez - Data Center/Systems Administration ManagerDavid Akers - Team Leader of Technology ServicesRaul Rodriguez - Team Leader of Infrastructure/ICSTrisha Dominguez - Administrative Specialist IIJose A. San Miguel - Internal AuditorMagdalena Aguilar - School Improvement OfficerLibby Tidwell - Principal of Montwood Middle SchoolJeanette Williams - Principal of Paso Del Norte SchoolIsabel Andresen - Principal of Campestre Elementary SchoolMiguel Serrano - Principal of Socorro High SchoolBrenda Chacon - Principal of Hueco Elementary SchoolMarivel N. Macias - Principal of Escontrias Elementary SchoolRay A. Flores - Teacher at Montwood High SchoolMiguel A. Moreno - Instructional Technologist at Socorro High School

4 of 31

Page 6: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

Executive Summary

Technology provides teachers, students, and faculty with the effective productivity tools and extensive resources for increasedlearning in the classroom. Across Socorro Independent School District, new technologies are being utilized in a variety of innovativeways and settings. The Technology Plan prepared by Socorro Independent School District allows teachers to increase theirproficiency levels and integrate technology into the content areas, thus, taking student learning to a higher level. The district planassists campuses in establishing their own campus level technology plan. These plans identify continued emphasis on the integrationof technology for all stakeholders.

The development of this technology plan was undertaken by a diverse group of technology users and planners representing theDistrict, students, and community. The Department of Technology and Technology Committee work hand in hand with district andcampus personnel to ensure that the district's technology plan is successfully implemented.

The planning committee has a primary goal of aligning the integration of technology with the District's goals and objectives. Thesegoals are the following:

- Socorro ISD will demonstrate sustained growth in student achievement by providing optimal learning experiences to maximizestudent successes;- Socorro ISD will implement effective student management strategies that enhance the quality of learning through support,collaboration, training, and communication;- Socorro ISD will support, maintain, and enhance an infrastructure that will optimize the management of necessary information;- Socorro ISD will foster a learning environment equipped with the necessary tools to maximize the use of resources and informationused to improve student achievement; and- Socorro ISD will improve parent/community relations by creating welcoming environments and allowing them to build technologycompetencies necessary to be active participants in their digital student(s) learning.

As Socorro ISD continues to grow, current technologies and services will be extended to new campuses and administrative locations.The District has established a technology support budget to provide for infrastructure, equipment, training, and support personnel toimplement new technologies and assure that current technologies are integrated successfully.

5 of 31

Page 7: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

Needs Assessment

Assessment Process:A comprehensive needs assessment was conducted to analyze the current status of technology in the District and to determine futureneeds. Items analyzed included: infrastructure, hardware, software, programs, courses, student achievement, technology resources,staff development, and technical support. As Socorro ISD meets the challenges of the 21st century, the district's priorities based onthe needs assessment as follows:

- Maintaining appropriate staff levels to ensure the efficient operation of district networks and technologies.- Providing additional professional development training for teachers that will promote teaching and learning.- Providing district classrooms with standardized up-to-date technology resources and tools that include computers, projectors,digital/video cameras, interactive technologies and media retrieval systems.- Purchasing, maintaining, and supporting all network related equipment by expanding the district's infrastructure.- Reviewing and standardizing all requested software applications to ensure that they meet the needs for adequate instruction.- Supporting teachers to develop and implement a TEKS-based plan to appropriately integrate technology into all curriculum areasthat will enrich each student's educational and learning experiences.

Existing Conditions:Currently, the District facilitates access to telecommunications and networking services through a WAN infrastructure based on fiber-optics and T1 lease lines district-wide. With over 22,000 desktop computers connected to the network, the following additionaltechnologies and systems are now in place:

District Level

- The Internet connects directly via broadband leased line.- District web servers are in place which host both internal and external sites to provide information to staff, teachers, students,parents, and the community.- Users, groups, and servers are managed through an active directory.- Domain controllers are in place to deliver security authentication requests (such as logging in, checking permissions, etc.) within ourdomain.- Right Fax Systems create, send, receive, and manage facsimile directly from a user's desktop.- Microsoft provides a no-cost feature–rich web accessible email system that allows all district users to communicate using an array oftools, effective communication between students, teachers, and staff.- Email archiving preserves and protects District email data to be captured and accessible for disaster recovery, backups, and legalcompliance.- Data protection offers an easy-to-use backup and recovery solution using disk, tape, and cloud-based repositories from Microsoftenvironments such as servers, desktops, and laptops.- Data storage infrastructure stores and manages the District's data using solutions such as HP EVA, and EMC VNX SAN.- HyperV virtualization solution delivers tools and services to create and manage virtual environments.- Terminal Services gives District users access to data and applications over the network using the remote desktop protocol.- Ericom Software approaches a “cloud-computing” environment to deliver technology resources including applications, files, anddesktops across different platforms.- SISD implements a disaster recovery plan to ensure the protection of the District's data by supporting onsite and off-site storagesystems.- APC air conditioners allocate room cooling for to the District's data center.- Written policies are in place on acceptable use of the district technology resources (e.g. Internet content, network management, andequipment).- School Messenger is the call out system to connect with staff, students, and parents through e-mail, SMS text, voice, and socialmedia.- SchoolWires Web Content Management System encourages communication between staff, faculty, students, parents, andcommunity members by providing the ability to create, update, and provide important information in one shared location.- MySISD portal provides a central environment for staff, faculty, and students to access a variety of useful resources and servicessuch as e-mail, custom applications, news, tools, calendar, etc.

Campus Level

- Campuses are directly connected to the Internet via a 1000 MB/s fiber-optic WAN.- There is at least one computer and two network drops in every classroom.- There are at least two computer labs at each campus.- Teachers have access to peripherals (e.g. printers, digital cameras, scanners, and projectors).- The campus instructional coach is available daily to support both faculty and students through on-going professional development.- Additional computer research stations are available in the campus library.- District-supported software includes: Microsoft Web Access, C-Scope, ACTIVprimary/studio/inspire, SchoolWires, iStation, Read &Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK, eBooks, Compass Learning, Agile Mind, A+, eBooks, Read 180,and Syllabus Maker.

6 of 31

Page 8: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

Technology Needs:In our efforts to create an engaging educational environment, we are embracing 21st Century learning and transforming theclassroom by providing emerging and interactive technologies wherever possible. The classroom of the future is now here and ismaking a remarkable difference in how teachers teach and students learn. The Socorro ISD technology philosophy is not aboutlearning to use technology but about using technology to learn. Technology has now become integral to the teaching and learningexperience in the sense that it defines and enhances the teaching and learning experience. Technology plays a vital role to betterprepare our students in continuing their education and to assist teachers in implementing curriculum in new and exciting ways. Infollowing this learning methodology, we are creating positive effects on teaching and learning. The following are the elements whichwe are providing for the 21st century classroom.

As the district proceeds to outfit and maintain classrooms with interactive technologies, we need to do the following:

- When a projector in a classroom malfunctions, it will be replaced with a similar model.- When an interactive white board malfunctions, we will replace it with a metallic board and replace the projector with an interactiveprojector. The replaced projector will be kept for re-use.- Any other place where an interactive setup is required, a new installation with an interactive projector and a white metallic board willbe installed.- Portables that need to use interactive boards may check out an interactive projector from the library and use their white boards forprojection.- In new construction, we will be using interactive projectors and new 15 foot metallic boards. These boards will take the place of thebulletin board, the marker board and the interactive white board. This will reduce the amount of components for classroominteractivity which will also reduce the cost of providing technology for these classrooms.

In the year 2012-2013, we will be building an elementary school, a middle school and creating 120 new classrooms for two highschools. We expect that the savings in using the new interactive projectors will be substantial.

Additionally, campuses have interactive devices in each of the classrooms. In a computer lab setting,each elementary school iscomprised of two to three labs with up to 25 computers. For each K-8 and middle school, a computer lab is comprised of three to fourlabs with up to 30 computers. Each high school is comprised of four to five labs with up to 80 computers. The computer labs alsohave network printers and interactive technology for use.

7 of 31

Page 9: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

Goals, Objectives, and Strategies

GOAL 1: SISD students will demonstrate improved academic achievement through the use of challenging anddevelopmentally appropriate instructional technologies.

OBJECTIVE 1.1:

Students will use 21st Century technology to communicate, create and collaborate with other students and the globalcommunity.

Budget Amount $3,054,756.00LRPT category: Teaching and Learning

E-Rate Correlates: ER01NCLB Correlates: 01, 02, 03, 04a, 05, 06, 07, 08, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

1.1.1: Ensure TEKS integration intoactivities and projects to implementinstructional resources in allcurricular areas to improveacademic achievement andfacilitate the mastery of TEKS.

LEA LRPT Correlates: I01, LAS05,LAS10, LAS12, LAS13, TL01,TL04, TL05, TL06, TL08, TL09,TL10, TL11, TL13

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Specialty Teachers,Special EducationDepartment, Library MediaServices, Library MediaSpecialists, Career &Technical Education,Department AcademicDirectors

Student Performance, StateAssessment Results, LessonPlans (TEKS), Benchmarks,Student Projects, TeacherSTaRChart, CSCOPEPerformance IndicatorsProjects

1.1.2: Provide student-centered learningopportunities with national,international, business, industry,university and communities ofinquiry.

LEA LRPT Correlates: I09, LAS12,LAS13, TL08, TL09, TL12, TL13,TL15

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, TechnologyServices, Career & TechnicalEducation Teachers, LibraryMedia Services, LibraryMedia Specialists,Counselors, SpecialEducation Department,Career & Technical EducationDepartment

Student Performance,Project Assessment, StudentPresentations, Rubrics,Lesson Plans, Science FairProjects, Gifted andTalented Projects, CSCOPEPerformance Indicators,Projects

1.1.3: Provide student opportunities fordistance, distributed and onlinelearning.

LEA LRPT Correlates: LAS05,LAS10, LAS12, LAS15, TL08,TL09, TL11, TL13

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, DepartmentAcademic Directors

Student Performance, CreditHours, Purchase Orders,Learning Plans, UsageReports, Correspondence,Student LearningAgreements

1.1.4: Provide equitable learningresources to all students, to includevirtual classrooms.

LEA LRPT Correlates: EP09,LAS05, LAS12, TL03, TL09, TL10,TL13

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Department AcademicDirectors, Financial Services

Student Performance,Budget Allocations,Inventories, PurchaseOrders, Contracts,Computer: Student Ratios

1.1.5: Work collaboratively incommunities of inquiry to propose,assess, and implement solutions toreal world problems with a varietyof audiences.

LEA LRPT Correlates: LAS10,LAS12, LAS13, TL04, TL08, TL09,TL10, TL12, TL13

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Specialty Teachers,Library Media Services,Library Media Specialists,Career & Technical EducationTeachers, Special EducationDepartment, FinancialServices

Project Assessment, StudentPerformance,Correspondence,Internships, Lesson Plans,Student Projects, CSCOPEPerformance Indicators,Project, Student LearningAgreements

8 of 31

Page 10: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

1.1.6: Use available facilities andtechnology to provide digitalcollaboration at each campus tofacilitate student-centered learningactivities.

LEA LRPT Correlates: I05, LAS05,LAS10, TL09

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Library MediaSpecialists, Special EducationDepartment, Career &Technical Education

Open Lab Schedule, MobileCart Schedule, LibrarySchedule, StudentPerformance

1.1.7: Provide curriculum and/orresources for teachers,administrators, students andparents that foster digitalcitizenship, modeling safecomputing and district expectationsas outlined in Acceptable UsePolicies embedded in the StudentCode of Conduct and Children'sInternet Protection Act (CIPA).

LEA LRPT Correlates: LAS12,TL14, TL15

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Specialty Teachers,Library Media Services,Library Media Specialists,Career & Technical EducationTeachers, Special EducationDepartment, Department ofTechnology Services, SecurityAdministrator, Counselors

Sign-in Sheets, LessonPlans, Website Hit Counter,Usage Logs, Cyberbullying/Internet SafetyDistrict Website, DistrictTechnology Grants,Curriculum and InstructionWebsite, Olweus Program

OBJECTIVE 1.2:

Students will have equitable access and use of technology and information resources to meet their learning and productivityneeds within and beyond the school day.

Budget Amount $3,054,756.00LRPT category: Teaching and Learning

E-Rate Correlates: ER01NCLB Correlates: 01, 02, 03, 04a, 05, 06, 07, 08, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

1.2.1: Continue to ensure TEKSintegration into activities andprojects to implement instructionalresources in all curricular areas toimprove academic achievementand facilitate the mastery ofSTAAR.

LEA LRPT Correlates: EP01,EP02, LAS05, LAS10, LAS12,TL01, TL05, TL06, TL09, TL10,TL11

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Department AcademicDirectors

Student Performance, TAKSResults, Lesson Plans,Teacher STaRChart, StateAssessment Results,CSCOPE PerformanceIndicators, Projects

1.2.2: Provide equitable technology,instructional and learningresources to all students includingappropriate adaptive, assistivedevices for those with specialneeds.

LEA LRPT Correlates: EP05, I05,LAS05, LAS12, TL09, TL10, TL11

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Special EducationDepartment, Library MediaServices, Library MediaSpecialists, Department ofTechnology Services, Career& Technical EducationDepartment

Student Performance,Budget Allocations,Individual Educ. Plans(IEPs), Lesson Plans,Purchase Orders,Inventories, TeacherSTaRChart

1.2.3: Provide opportunities for studentsto access technology resourcesbeyond school hours.

LEA LRPT Correlates: I05, LAS05,LAS10, LAS12

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Department AcademicDirectors

Open Lab Schedule, Sign-inSheet/Log, Usage Reports

1.2.4: Integrate computer technologiesand peripherals by usingmultimedia presentations in all

State:Original

July 2013- 2016

Campus Administration,Department AcademicDirectors, Specialty Teachers

Student Performance,District/Campus Inventories,Teacher STaRChart,

9 of 31

Page 11: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

curricular areas.

LEA LRPT Correlates: I06, LAS05,LAS10, TL01, TL06, TL09

Status:Planned

Student Projects, EquipmentCheckout Sheets

1.2.5: Afford electronic discussion forums,blogs, wikis and podcasts forcurricular subjects and tutorialneeds.

LEA LRPT Correlates: LAS05,LAS10, LAS12, TL08, TL09

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, DistrictWebmasters, Teachers, CTETeachers, Library MediaSpecialists, Special EducationDepartment, Curriculum andIntervention Coaches

Student Performance,District Network,District/Campus Web Pages,Lesson Plans, Wiki &Podcasts Sites

1.2.6: Assure each student has individualaccess to a workstation orhandheld device.

LEA LRPT Correlates: I05, LAS05,TL01, TL05, TL09

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Library MediaServices, Library MediaSpecialists, Special EducationDepartment, Department ofTechnology Services, Career& Technical Education

Student Performance,District/Campus Inventories,Purchase Orders, MobileCart Schedule

1.2.7: Use distance learning and digitalcontent services for expandingcurricular offerings and meeting theneeds of all students.

LEA LRPT Correlates: I09, LAS05,LAS10, LAS12, LAS15, TL01,TL05, TL08, TL09, TL13

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Department AcademicDirectors, 21st CenturyLearning Dept.

Student Performance,Course Credit, Agenda &Sign-in Sheets, DistrictNetwork, Purchase Orders,Usage Reports, LessonPlans, Teacher STaRChart,Project Share

1.2.8: Provide curriculum and/orresources for teachers,administrators, students andparents that foster digitalcitizenship, modeling safecomputing and district expectationsas outlined in Acceptable UsePolicies embedded in the StudentCode of Conduct and Children'sInternet Protection Act (CIPA).

LEA LRPT Correlates: I03, I05,LAS05, LAS10, LAS12, LAS13,TL03, TL05, TL14, TL15

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Library MediaSpecialists, Library MediaServices, Career & TechnicalEducation Teachers, SpecialEducation Department,Department of TechnologyServices, Parent Liaisons,Security Administrator

Sign-in Sheets, LessonPlans, Website Hit Counter,Usage Logs, Cyberbullying/Internet SafetyDistrict Website, CommunityOutreach Labs(SOCRATES) Schedule

OBJECTIVE 1.3:

Students will use technologies effectively to access, analyze, evaluate, and utilize information between and among others in theglobal community.

Budget Amount $3,054,756.00LRPT category: Teaching and Learning

E-Rate Correlates: ER01NCLB Correlates: 01, 02, 03, 04a, 04b, 05, 06, 07, 08, 11, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

1.3.1: Ensure TEKS integration intoactivities and projects to implementinstructional resources in allcurricular areas to improveacademic achievement andfacilitate the mastery of TEKS.

LEA LRPT Correlates: EP09, I09,LAS05, LAS10, LAS12, TL01,TL03, TL05, TL06, TL08, TL09,TL10, TL11, TL12, TL13

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Department AcademicDirectors

Student Performance, StateAssessment Results, LessonPlans (TEKS), CSCOPEPerformance Indicators,Projects

10 of 31

Page 12: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

1.3.2: Provide student-centered learningopportunities with national,international, business, industry,university and communities ofinquiry.

LEA LRPT Correlates: I02, I03, I09,LAS05, LAS10, LAS12, LAS13,TL05, TL08, TL10, TL11, TL13

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, CurriculumCoaches, Library MediaServices, Library MediaSpecialists, Department ofTechnology Services, SpecialEducation Department,Career & Technical EducationTeachers

Student Performance,Lesson Plans, StudentProjects, TeacherSTaRChart, CSCOPEPerformance Indicators,Projects

1.3.3: Implement innovative practices inthe use of technology applicationsto meet or exceed standards.

LEA LRPT Correlates: EP02,LAS05, LAS10, LAS12, TL01,TL05, TL08, TL09, TL10, TL11,TL13

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Library MediaServices, Library MediaSpecialists, Special EducationDepartment, Career &Technical EducationDepartment

Student Performance,Lesson Plans, StudentProjects, Purchase Orders,Teacher STaRChart,CSCOPE PerformanceIndicators, Projects

1.3.4: Provide seamless opportunities tocreate/demonstrate interdisciplinarytechnology-based projects.

LEA LRPT Correlates: EP02,LAS05, LAS10, LAS12, TL01,TL05, TL06, TL09, TL10, TL11

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Library MediaServices, Library MediaSpecialists, SpecialtyTeachers, Special EducationTeachers, Career & TechnicalEducation Department

Student Performance,Project Assessment,Rubrics, Lesson Plans, WebPages, Equipment CheckoutSheets, Student Projects,CSCOPE PerformanceIndicators, Career &Technical StudentOrganization Rosters

1.3.5: Employ appropriate strategies forstudents to effectively use and citecopyrighted and other materials tobecome information literate.

LEA LRPT Correlates: EP05, I05,I09, LAS05, LAS12, TL09, TL10,TL11

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Curriculum &Intervention Coaches, LibraryMedia Specialists, SpecialtyTeachers, Special EducationDepartment, Career &Technical EducationDepartment

Student Performance,Lesson Plans, LibraryDatabase, Usage Reports,Teacher STaRChart,CSCOPE PerformanceIndicators, Projects,Cengage Online LibrariesUsage

1.3.6: Demonstrate increasedproficiencies and implementationacross all areas measured by theTexas STAR Chart to facilitatestudent learning.

LEA LRPT Correlates: I01, I05, I09,LAS03, LAS05, LAS10, LAS12,TL01, TL04, TL05, TL06, TL09,TL11, TL14

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Library MediaServices, Library MediaSpecialists, SpecialtyTeachers, Special EducationDepartment, Curriculum &Instructional Coaches

Teacher STaR Chart,Training Agendas & Sign-inSheets, StudentPerformance, StudentProjects

1.3.7: Give students the opportunity toexperience technology’s role in theworkplace through internships withthe public/private sector.

LEA LRPT Correlates: I05, I09,LAS05, LAS13, TL12

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Library MediaServices, Library MediaSpecialists, Department ofTechnology Services, CTETeachers, Special EducationDepartment, Career &Technical EducationDepartment

Job Evaluations, StudentParticipation, InternTimesheets, Mobile CartSchedule, Work Orders,Teacher STaRChart,Intership Rosters, WorkBased Learning Plans

1.3.8: Work collaboratively in the creationand communication of student-centered projects supported byemerging technologies.

LEA LRPT Correlates: I01, I05, I09,LAS05, LAS10, LAS12, LAS13,TL01, TL05, TL08, TL09, TL10,TL11, TL12

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Library MediaServices, Library MediaSpecialists, CTE Teachers,Special EducationDepartment, Curriculum &Intervention Coaches,Specialty Teachers

Student Performance,Project Assessment,Purchase Orders, LessonPlans, Student Projects,Teacher STaRChart,CSCOPE PerformanceIndicators, Projects

11 of 31

Page 13: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

1.3.9: Provide curriculum and/orresources for teachers, studentsand parents that foster digitalcitizenship, and modeling safecomputing and district expectationsas outlined in Acceptable UsePolicies embedded in the StudentCode of Conduct and Children'sInternet Protection Act (CIPA).

LEA LRPT Correlates: LAS13,TL14, TL15

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Library MediaServices, Library MediaSpecialists, Career &Technical EducationTeachers, Special EducationDepartment, Department ofTechnology Services, ParentLiaisons, Career & TechnicalEducation Department,Curriculum & Instruction

Sign-in Sheets, LessonPlans, Website Hit Counter,Usage Logs, OlweusProgram

12 of 31

Page 14: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

GOAL 2: All SISD personnel will integrate technologies to meet instructional and productivity goals.

OBJECTIVE 2.1:

SISD staff will design educator professional development that integrates technology into teaching and learning, instructionalmanagement, and administration.

Budget Amount $912,136.50LRPT category: Educator Preparation and Development

E-Rate Correlates: ER02NCLB Correlates: 01, 02, 03, 04a, 04b, 05, 06, 07, 08, 11, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

2.1.1: Designate technology resourcepersonnel at each campus whoare responsible for promoting,modeling, teaching, and trainingall campus teachers in the use oftechnology integration strategiesas per district policy.

LEA LRPT Correlates: EP09,TL11

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Instructional Services, LibraryServices

State & Local Assessments

2.1.2: Expand staff development for alldistrict employees to include howto access just-in-time assistance.

LEA LRPT Correlates: EP01,EP02, EP03, EP04, EP05, EP06,EP07, EP08, EP09, LAS06,LAS10, TL13

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, CampusAdministration, DistrictOperational Services,Administrative Services,Business Services, HumanResources Department,Instructional Services,Campus and DistrictInstructional Coaches andFacilitators

Agenda and Sign-in Sheets,Employee Evaluations,Teacher STaR Chart Results,District Technology Rubric,TAC Work Orders, OutsideContracts, ClassroomWalk-through, StaffDevelopment Evaluations

2.1.3: Facilitate online learningopportunities for staff andadministrators.

LEA LRPT Correlates: EP01,EP05, EP08, LAS03, LAS15

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, CampusAdministration, InstructionalServices, District OperationalServices, AdministrativeServices

Agenda and Sign-in Sheets,Completion Certificates,Teacher STaRChart, WebinarLogins, Webinar EvaluationForms

2.1.4: Ensure all campus and districtimprovement plans integrate richtechnology that is grounded inresearch and aligned with districtstrategies focused on studentsuccess.

LEA LRPT Correlates: LAS01,LAS02, TL01, TL03

State:Original

Status:Planned

July 2013- 2016

Department of Technology,Campus Administration,District Operational Services,Administrative Services,Human ResourcesDepartment, Teachers,Instructional Services,Campus and DistrictInstructional Coaches andFacilitators

Copies of Plans and Agendas,PDAS, Teacher STaRChart,Planning Meeting Miutes,District TechnologyPerformance IndicatorAssessment, DistrictImprovement Plan, CampusImprovement Plans, CSCOPEPerformance Indicators

2.1.5: Use technology evaluation toolsto determine, design, andimplement staff development.

LEA LRPT Correlates: EP01,EP02, EP04, EP05, EP06, EP09,I01, I06, I09, LAS03, LAS05,LAS08, LAS10, LAS12, TL04,TL07

State:Original

Status:Planned

July 2013- 2016

Instructional Services,Campus Administrators,Computer Lab Teachers,Career and TechnicalEducation Department,Campus & District Coaches

Staff DevelopmentEvaluations, TeacherSTaRChart, DistrictTechnology PerformanceIndicator Assessment

13 of 31

Page 15: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

2.1.6: Provide managerial technologytrainings to new instructionalstaff.

LEA LRPT Correlates: EP03,EP04

State:Original

Status:Planned

July 2013- 2016

Human ResourcesDepartment, InformationServices, CampusAdministation, CampusDesignated TechnologyPersonnel, CampusInstructional Coaches

New Teacher OrientationSessions, Sign-in Sheets,Staff DevelopmentEvaluations

2.1.7: Provide curriculum and resourcesfor SISD personnel that fosterdigital citizenship, and model safecomputing and districtexpectations as outlined in theAcceptable Use Policy (AUP).

LEA LRPT Correlates: EP03,TL14

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, CampusAdministration, InstructionalServices, SecurityAdministrator, CTEDepartment, AcademicDepartments, CampusDesignated TechnologyPersonnel

SISD Staff DevelopmentWebsite, CyberBullying/Internet SafetyDistrict Website, Website HitCounter

2.1.8: Provide highly qualified staff at allcomprehensive high schools toteach Technology Applicationscourses.

LEA LRPT Correlates: EP02,TL02

State:Original

Status:Planned

July 2013- 2016

Career and TechnicalEducation Department,Human ResourcesDepartment, CampusAdministrators

Personnel Action Forms,PDAS, Lesson Plans, IndustryCertifications

OBJECTIVE 2.2:

SISD staff will provide professional development that integrates technology into the curriculum, instructional management andadministration to improve student achievement performance.

Budget Amount $912,136.50LRPT category: Educator Preparation and Development

E-Rate Correlates: ER02NCLB Correlates: 01, 02, 03, 04a, 04b, 05, 06, 07, 08, 09, 10, 11, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

2.2.1: Designate technology resourcepersonnel at each campus whoare responsible for promoting,modeling, teaching, and trainingall campus teachers in the use oftechnology integration strategiesas per district policy.

LEA LRPT Correlates: EP09,LAS10

State:Original

Status:Planned

July 2013- 2016

Instructional Services,Campus Administration,Human ResourcesDepartment, Library Services

State & Local Assessments,Job Descriptions, Sign-inSheets, Evaluations

2.2.2: Increase professional training toinclude on-line learning, distancelearning, web-based instructionand local university opportunitiesto include educational blogs, wiki,forums and podcasting.

LEA LRPT Correlates: EP06,EP07, EP08

State:Original

Status:Planned

July 2013- 2016

Instructional Services,Department of TechnologyServices, CampusAdministration, LibraryServices, Campus & DistrictInstructional Coaches

Special Agenda and Sign-inSheets, Web Log Reports,SISD Staff DevelopmentWebsite, Library Websites,Staff DevelopmentEvaluations, Wiki and PodcastSites

2.2.3: Expand and provide district levelstaff development.

LEA LRPT Correlates: EP01,EP02, EP03, EP04, EP09,LAS03, LAS06, LAS10

State:Original

Status:Planned

July 2013- 2016

Instructional Services,Department of TechnologyServices, CampusAdministration, AdministrativeServices, Career andTechnical EducationDepartment, DistrictInstructional Facilitators

Sign-in Sheets, SISD StaffDevelopment Website, StaffDevelopment Evaluations

14 of 31

Page 16: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

2.2.4: Ensure that teachers will meetthe Target Level, minimum of 30hours, of technology basedprofessional developmentannually.

LEA LRPT Correlates: EP01,EP04, EP05, EP07, EP08, EP09,LAS03, LAS06, LAS12

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Region 19, InstructionalCoaches, Teachers, Careerand Technical EducationDepartment

Staff Development Certificate,Course Offerings, PDAS,Training Certificates, Sign-inSheets, STaR Chart

OBJECTIVE 2.3:

SISD staff will maximize the use of technology to meet instructional and productivity goals on an ongoing basis.

Budget Amount $912,136.50LRPT category: Educator Preparation and Development

E-Rate Correlates: ER01, ER02NCLB Correlates: 01, 02, 03, 04a, 04b, 05, 07, 11

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

2.3.1: Provide a variety of learningopportunities through differentdelivery systems on a timelybasis for all employees.

LEA LRPT Correlates: EP01,EP02, EP03, EP04, EP06, EP07,EP08, EP09, I01, I05, I06, I09,LAS03, LAS05, LAS06, LAS10,TL04, TL07, TL16

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, CampusAdministration, AdministrativeServices, Library Services,Community Services,Instructional Services,Campus & DistrictInstructional Coaches

Agendas, Lesson Plans,Sign-in Sheets, PDAS,Professional DevelopmentWebsite Evaluations,Completion Certificates

2.3.2: Use and interpret disaggregateddata to improve studentachievement.

LEA LRPT Correlates: EP03, I01,I05, I06, I09, LAS05, LAS08,LAS10, TL04, TL07

State:Original

Status:Planned

July 2013- 2016

Instructional Services,Department of TechnologyServices, Director ofResearch and Evaluation,Campus Administration,Teachers, Campus & DistrictInstructional Coaches, DistrictLeadership Team

Student Academic Data,PDAS, Lesson Plans,Benchmarks, iStation Reports,At-Risk Reports, StateAssessment Results, CollegeReadiness AssessmentReports, CSCOPE PI andUnits, Eduphoria

2.3.3: Ensure constant integration ofappropriate resources to createcore curriculum, student centeredprojects.

LEA LRPT Correlates: EP01,EP07, EP08, EP09, I01, I05, I06,I09, LAS05, LAS09, LAS10,TL01, TL03, TL05, TL08, TL09,TL10, TL11, TL12, TL13, TL16

State:Original

Status:Planned

July 2013- 2016

Instructional Services,Department of TechnologyServices, CampusAdministration, Library MediaSpecialists, Campus & DistrictInstructional Coaches

Agenda and Sign-in Sheets,Student Projects, TeacherLesson Plans, Benchmarks,Library Collaboration Forms,CSCOPE PI and Units

2.3.4: Follow vertically-alignedintegration of evolvingtechnologies in support of allTEKS.

LEA LRPT Correlates: EP01,EP05, EP09, I01, I04, I05, I09,LAS01, LAS02, LAS03, LAS05,LAS10, TL01, TL03, TL05, TL06,TL08, TL10, TL11, TL13

State:Original

Status:Planned

July 2013- 2016

Instructional Services,Department of TechnologyServices, CampusAdministration, Teachers,District and Campus CTEPersonnel

PDAS, Student Performance,State & Local AssessmentReports, Benchmarks,CSCOPE PI and Units,Industry Certifications,Coherent Course EnrollmentData

2.3.5: Provide opportunities for librarymedia specialists, instructionalcoaches and teachercollaboration that will integratethe use of technology into all

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Library Media Specialists,Teachers, CampusInstructional Coaches, LibraryServices Coordinator

Library Schedule, LibraryUsage Report, DatabaseUsage Report, CollaborativeLesson Plans, StudentProjects, Collaboration and

15 of 31

Page 17: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

curriculum areas.

LEA LRPT Correlates: EP04,EP09, I01, I05, I06, I09, LAS01,LAS03, LAS05, LAS10, TL07,TL10, TL11

PLC Agendas and Sign-inSheets, Online LibraryResources

2.3.6: Model exemplary use oftechnology in daily work incommunications, presentations,online collaborations, andstudent-centered projects.

LEA LRPT Correlates: EP04,EP09, I01, I05, I06, I09, LAS05,LAS10, TL04, TL07, TL08, TL09,TL10, TL11, TL12, TL14, TL16

State:Original

Status:Planned

July 2013- 2016

Instructional Services,Department of TechnologyServices, CampusAdministration, Teachers,Library Media Specialists,Career & Technical EducationTeachers, Gifted & TalentedCoordinators

Lesson Plans, PDAS,CSCOPE, StudentPerformance, STAAR/EOC,Career & Technical EducationCompetitions, CampusTechnology Presentations

2.3.7: Encourage participation incampus and district events toshowcase and integrate a varietyof student technology projects.

LEA LRPT Correlates: LAS10,TL06, TL08

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Library MediaSpecialists, Department ofTechnology Services, Career& Technical EducationTeachers, Gifted & TalentedCoordinators, UIL and otherAcademic Sponsors

Lesson Plans, PDAS,CSCOPE, State & LocalAssessment Reports, WebPages, Career & TechnicalEducation Competitions,Campus and DistrictCompetitions

OBJECTIVE 2.4:

All teachers will be competent and highly qualified in technology applications as defined by the SBEC standards for all beginningteachers.

Budget Amount $912,136.50LRPT category: Educator Preparation and Development

E-Rate Correlates: ER02NCLB Correlates: 01, 02, 03, 04a, 04b, 08, 11, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

2.4.1: Ensure all teachers usetechnology related terms,concepts, data input strategies,and ethical practices to makeinformed decisions about currenttechnologies and theirapplications.

LEA LRPT Correlates: EP03,EP04, EP05, LAS02, LAS08,TL03, TL05, TL07

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Library MediaSpecialists, Campus & DistrictInstructional Coaches

Lesson Plans, StudentProjects, Walk-Throughs,PDAS, Electronic BulletinBoard, Library Schedules,Teacher STaRChart, DistrictTechnology PerformanceIndicator Assessment,CSCOPE PI

2.4.2: Ensure all teachers identify taskrequirements, apply searchstrategies, and use currenttechnology to efficiently acquire,analyze, evaluate, and cite avariety of electronic information.

LEA LRPT Correlates: EP03,EP04, LAS08

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Library MediaSpecialists, Campus & DistrictInstructional Coaches

Lesson Plans, StudentProjects, Walk-Through,PDAS, Library Schedule,District TechnologyPerformance IndicatorAssessment, CSCOPE PI's,Online Library Resources

2.4.3: Ensure all teachers usetask-appropriate tools in a waythat supports the work ofindividuals and groups.

LEA LRPT Correlates: EP03,EP04, EP05, I09, LAS08, TL04,

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Library MediaSpecialists, Career &Technical EducationPersonnel

Walk-Through, PDAS,Equipment Check-Out, LabSchedules, Library Schedule,Teacher STaR Chart, Blooms& Webb's EvaluationInstruments of lesson artifacts

16 of 31

Page 18: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

TL08

2.4.4: Ensure all teachers communicateinformation in different formatsand for diverse audiences.

LEA LRPT Correlates: EP05,TL03, TL09, TL16

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Library MediaSpecialists, Campus & DistrictCoaches

Lesson Plans, StudentProjects, Walk-Throughs,PDAS, Teacher Web Pages,Library Schedule, TeacherSTaRChart, Teacher WikiPages, Blogs, and Websites

2.4.5: Ensure all teachers know how toplan, organize, deliver, andevaluate instruction for allstudents that incorporates theeffective use of technology forteaching and integrating theTechnology Applications TexasEssential Knowledge and Skills(TEKS) into the curriculum.

LEA LRPT Correlates: EP01,EP02, EP05, EP07, LAS03,LAS06, LAS10, LAS12, TL01,TL03, TL04

State:Original

Status:Planned

July 2013- 2016

Campus Administration,Teachers, Library MediaSpecialists, Campus & DistrictCoaches

Lesson Plans, StudentProjects, Walk-Throughs,PDAS, Teacher Web Pages,Library Schedule, TeacherSTaRChart, Teacher WikiPages, Blogs, and Websites

2.4.6: Provide highly qualified staff at allcomprehensive high schools toteach Technology Applicationscourses.

LEA LRPT Correlates: EP02,TL02

State:Original

Status:Planned

July 2013- 2016

Career and TechnicalEducation Department,Human ResourcesDepartment, CampusAdministration

Personnel Action Forms,PDAS, Lesson Plans, IndustryCertifications

17 of 31

Page 19: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

GOAL 3: SISD community members will be provided opportunities to acquire the technology competencies necessaryto be active participants in the digital age.

OBJECTIVE 3.1:

SISD community members will be involved in the planning and partnerships in the technology competencies.

Budget Amount $493,200.00LRPT category: Leadership, Administration and Support

E-Rate Correlates: ER01, ER02NCLB Correlates: 01, 02, 05, 06, 07, 08, 09, 10, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

3.1.1: Involve parents andcommunity members inappropriate planningcommittees.

LEA LRPT Correlates: I03,I09, LAS01, LAS05, LAS07,LAS09, LAS13, TL15

State:Original

Status:Planned

July 2013- 2016

Campus & DistrictAdministrators, SchoolImprovement Teams,Department of TechnologyServices, PlanningCommittees, Educator'sProfessional AdvisoryCommittee (EPAC)

Technology Agendas, AttendanceSign-in sheets, PlanningDocuments, Campus Action Plan,District Improvement Plan

3.1.2: Seek to find partnershipswith technological andeducational entities locally,nationally and globallywhere possible.

LEA LRPT Correlates: I03,LAS07, LAS09, LAS13,TL15

State:Original

Status:Planned

July 2013- 2016

Director of Public Relations,District Grant Writers,District/Campus Administration,SISD Community Education,Administrative Services, LibraryServices Coordinator,Community in Schools (CIS)

Partner in Education Agreements,Grants, CollaborationMemorandum of Understanding(MOU), Enrollment in CommunityEducation classes, List ofApproved Curricula, CIS Sign-inSheets, El Civics Grant, El PasoArea Libraries (EPAL),

3.1.3: Disseminate information toparents and communityregarding technologyinitiatives, expectations andTEKS through the districtwebsite.

LEA LRPT Correlates: I03,I08, LAS02, LAS04, LAS05,LAS07, LAS09, LAS11,TL15

State:Original

Status:Planned

July 2013- 2016

Director of Public Relations,Department of TechnologyServices, Webmasters,District/Campus Administration,SISD Community Education,Assistive Technology Team,Administrative Services

District/ Campus websites,Hyperlinks on district websites tovarious sources, Salary forWebmaster

OBJECTIVE 3.2:

SISD community members will increase the community’s awareness and access to technology and information.

Budget Amount $228,900.00LRPT category: Leadership, Administration and Support

E-Rate Correlates: ER01, ER02NCLB Correlates: 01, 02, 05, 06, 07, 08, 09, 10, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

3.2.1: Work with existing adultliteracy service providers tomaximize the use oftechnology and provideInternet links to promoteparental involvement.

LEA LRPT Correlates: I01,I08, LAS01, LAS04, LAS05,

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, SISD CommunityEducation, Communities inSchools, Instructional Services,District/Campus Administrators,Counselors, Library ServicesCoordinator, Parent Liaisons

Agenda and Sign-in Sheets,Webpage visitor logs, Resourcelinks to ESL/GED Websites,District Campus Websites, Flyers,School Messenger System,Online Library Resources

18 of 31

Page 20: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

LAS07, LAS09, LAS13,TL15

3.2.2: Provide parents andcommunity members accessto district technologyfacilities and resources.

LEA LRPT Correlates: I08,LAS09, LAS11, LAS13,TL15

State:Original

Status:Planned

July 2013- 2016

SISD Community Education,Communities in Schools,Counselors, District/CampusAdministrators, Department ofTechnology Services, LibraryServices Coordinator

Network Design, District/Campuswebsites, Community Educationclasses, Agenda and Sign-insheets, Webpage visitor logs,Schedule of facility availability,Online Library Resources

3.2.3: Use distance online learningand webinars to provideincreased services andeducational opportunities forparents and community.

LEA LRPT Correlates: I03,I08, LAS02, LAS04, LAS05,LAS07, LAS09, LAS10,LAS11, TL13, TL15

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, SISD CommunityEducation, District Campuses

Schedule of Classes, WebConferencing Meetings, Agendaand Sign-in Sheets, List ofapproved Distance LearningCurricula

OBJECTIVE 3.3:

SISD community members will expand technology classes and training opportunities for parents and community members tobecome active participants in the digital age.

Budget Amount $1,858,617.00LRPT category: Leadership, Administration and Support

E-Rate Correlates: ER01, ER02NCLB Correlates: 08, 09

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

3.3.1: Provide various communityclasses in technologyliteracy.

LEA LRPT Correlates: I03,I08, LAS05, LAS09, LAS13,TL15

State:Original

Status:Planned

July 2013- 2016

SISD Community Education,District/Campus Administrators,Parent Liaisons, LibraryServices Coordinator

Attendance Sign-in Sheets, LabSchedules, Flyers, Media Stories,Agendas, Texas Educating AdultManagement Systems (TEAMS)Reports, BEST Plus ESL TestResults

3.3.2: Provide information toparents regarding digitalcitizenship, safe computing,and district expectations asoutlined in the GuestAccount Acceptable UsePolicy and Children’sInternet Protection Act(CIPA).

LEA LRPT Correlates: I03,LAS09, LAS11, LAS13,TL15

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, SISD CommunityEducation, District/CampusAdministrators, LibraryServices Coordinator, OlweusBullying Prevention CommitteeMembers, Parent Liaison

Post policy on District Website,Lesson plans, signed AcceptableUse Policy forms

3.3.3: Increase technology literacyby continuously exploringopportunities for additionalfunding from grants andfoundations for communitytraining.

LEA LRPT Correlates: I03,I08, LAS09, TL15

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, SISD CommunityEducation, District GrantWriters, Instructional Services,Research and EvaluationDepartment

Grant Applications, Notification ofGrant Award (NOGA),

19 of 31

Page 21: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

OBJECTIVE 3.4:

SISD community members will assess the technology needs of the community as appropriate.

Budget Amount $105,000.00LRPT category: Leadership, Administration and Support

E-Rate Correlates: ER01NCLB Correlates: 09, 11

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

3.4.1: Conduct a skills assessmentsurvey of communitymembers.

LEA LRPT Correlates: I03,I08, LAS07, LAS09, TL15

State:Original

Status:Planned

July 2013- 2016

SISD Community Education,Parent Liaisons, Communitiesin Schools, Counselors,District/Campus Administration,Web Master, Department ofTechnology Services

Skills Assessment Survey, UsageReports, Course Offerings,District Website, Beginning ofyear survey by Parent Liaisons,Family Frameworks Survey

3.4.2: Revise plan annually basedon needs assessmentevaluations and collectivedata.

LEA LRPT Correlates:LAS02, LAS07

State:Original

Status:Planned

July 2013- 2016

SISD Community Education,Department of TechnologyServices, Library ServicesCoordinator, DistrictTechnology Committee

Survey Questionnaires, UsageReports, Course Offerings, SISDTechnology Plan, District/CampusImprovement Plans

20 of 31

Page 22: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

GOAL 4: SISD will support a safe and secure technology infrastructure that maximizes the use of resources andinformation to foster student achievement.

OBJECTIVE 4.1:

SISD Technology Department will support an infrastructure that is accessible by all district entities.

Budget Amount $4,512,000.00LRPT category: Infrastructure for Technology

E-Rate Correlates: ER01NCLB Correlates: 03, 05, 06, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

4.1.1: Maintain and enhancethe district-wide networkwith high speed accesswhich includesdistrict-wide wireless tothe Internet for studentsand staff.

LEA LRPT Correlates:EP08, I01, I02, I05, I06,I07, I09, LAS01, LAS04

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, Financial Services,Operational Services

District Network, Purchase Orders,Inventories, eRateExpenditures,Bond Reports,Contract's, Bids/RFP's, PurchaseOrders.

4.1.2: Ensure secure andcompatible databases foradministrativeapplications onstudent/financialinformation systems.

LEA LRPT Correlates:I01, I08, LAS08, LAS14,TL07

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, Information Services,Financial Services

Programs and Applications, BondReports, Contracts, Work Orders,Bids/RFP's, Purchase Orders

4.1.3: Investigate multiplefinancial arrangementsfor securing andmaintaining computingdevices, infrastructureand other technologies.

LEA LRPT Correlates:I01, I02, I04, I05, I09,LAS15

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, District Grant Writers,Financial Services

Grant Reports,Department/Campus Budget Rep,Erate Expenditures

4.1.4: Meet the technologyequipment target of astudent to workstationratio of 1:1 to ensure thataccess is available asappropriate.

LEA LRPT Correlates:I04, I05, LAS15

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, Campus Administration,School ImprovementTeam/Technology Committees,Construction Department,Operational Services

Inventory of Student WorkstationTechnology vs. StudentPopulation, Construction Reports,Bond Reports, Purchase Orders,Campus STaRChart

4.1.5: Sustain the technologyequipment target of allprofessional educationalstaff to a workstationratio of 1:1.

LEA LRPT Correlates:I01, I04, I05

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, Campus Administration,School Improvement TeamCommittees, ConstructionDepartment, Operational Services

Inventory of Staff WorkstationTechnology vs. Total Number ofStaff, Bond Reports, PurchaseOrders, Campus STaRChart

21 of 31

Page 23: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

4.1.6: To maintain and enhancethe district networkoperations center whichincludes core networktechnologies, server andstorage technologies,power and environmentalsystems to meet thedistrict needs.

LEA LRPT Correlates:EP08, I01, I02, I05, I07,I08, I09

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, Operational Services,Financial Services

Purchase Orders, Contracts, UtilityBills

OBJECTIVE 4.2:

SISD Technology Department will ensure that policies and procedures align with state and federal guidelines.

Budget Amount $357,100.00LRPT category: Infrastructure for Technology

E-Rate Correlates: ER01NCLB Correlates: 03, 05, 06, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

4.2.1: Provide for confidentialityand security onelectronic data.

LEA LRPT Correlates:I01, LAS05, LAS09,LAS14

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, All District Employees

Acceptable Use Policies, Firewalls,User-based Security Policies,User-awareness Training & Sign-inSheets, IntrusionDetection/Prevention System,Employee Handbook, Third PartyMonitoring

4.2.2: Provide access,according to ADAguidelines, to ensureaccessibility to disabledstudents and staff totechnologies in all districtlocations.

LEA LRPT Correlates:I01, I05, I07

State:Original

Status:Planned

July 2013- 2016

Building Construction Committee,Operational Services, At-RiskManagement Department, SpecialEducation Department,Department of TechnologyServices, Campus Administration

Work Orders, Construction Plans,District Compliance Documents,PBMAS Reports

4.2.3: Provide curriculumand/or resources fordistrict personnel,students and parentsthat foster digitalcitizenship, model safecomputing and districtexpectations as outlinedin Acceptable UsePolicies and the StudentCode of Conduct.

LEA LRPT Correlates:LAS10, LAS13, TL14,TL15

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, Campus Administration,Library Media Specialists,Teachers, Security Administrator

CyberSafety Curriculum & Sign-inSheets, Lesson Plans, SignedCode of Conduct, SignedAcceptable Use Policies,Instructional TechnologyCyberbullying/Internet SafetyDistrict Website, Website HitCounter, Olweaus Program andwebsite

OBJECTIVE 4.3:

SISD Technology Department will make recommendations for the purchase, refreshing, and repositioning of technologies basedon cost effectiveness and emerging technologies.

Budget Amount $3,624,000.00LRPT category: Infrastructure for Technology

22 of 31

Page 24: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

E-Rate Correlates: ER01NCLB Correlates: 03, 04a, 05, 06, 07, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

4.3.1: Integrate technology intoall classrooms, libraries,campus and districtplanning for newfacilities.

LEA LRPT Correlates:EP03, EP08, I01, I02,I05, I08, LAS01, LAS02,LAS04, LAS05, TL08,TL10, TL11

State:Original

Status:Planned

July 2013- 2016

District Technology Committee,Campus Technology Committees,Department of TechnologyServices, Library Media Services,Construction Department,Operational Services, Campusand District Administration,Financial Services, Educator'sProfessional Advisory Committee(EPAC), School ImprovementTeam (SIT)

Campus/District Technology Plans,Construction Reports, BondReports, eRate ExpenditureReports, Purchase Orders

4.3.2: Identify, review, andrecommend current andemerging technologies.

LEA LRPT Correlates:I02, I06, LAS01, LAS02,LAS15

State:Original

Status:Planned

July 2013- 2016

District Technology Committee,Campus Technology Committees,Department of TechnologyServices, Library MediaServices,ConstructionDepartment, OperationalServices,Campus and DistrictAdministration, Financial Services,Educator's Professional AdvisoryCommittee (EPAC), SchoolImprovement Team (SIT)

TechnologyRecommendation/Support List,District Inventory, Bond Reports,Construction Reports

4.3.3: Facilitate theimplementation of currentand emergingtechnologies.

LEA LRPT Correlates:I01, I02, I04, I05, I08,LAS01, LAS02, LAS05,LAS08, LAS15, TL09,TL10, TL13

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, District TechnologyCommittee, Library MediaServices, Instructional Services,Construction Department,Operational Services, Campusand District Administration,Financial Services, Educator'sProfessional Advisory Committee(EPAC), School ImprovementTeam (SIT)

Board Approved Minutes, DistrictInventory, Bond Reports, PurchaseOrders, Work Orders, TrainingSign-in Sheets

4.3.4: Establish a life cyclepolicy for repositioningand support of districttechnologies such asinfrastructure, wireless,telephony, wireless anddesktop computing, etc.

LEA LRPT Correlates:I07, LAS05

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, Campus TechnologyCommittees, Board of Trustees,Business Services, OperationalServices, Financial Services,Operational Services

District Inventory, Board ApprovedMinutes, Work Orders, SurplusEquipment, Established DistrictPolicy

4.3.5: Develop a list ofsupported andcompatible technologiesand software.

LEA LRPT Correlates:I07

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, Instructional Services,Financial Services, Career &Technical Education(CTE)

Technology Recommendation,Quotes, District Awarded Bids

4.3.6: Allocate internal/externalfunds for technologypurchases.

LEA LRPT Correlates:I02, I03, LAS01, LAS02,LAS04, LAS05

State:Original

Status:Planned

July 2013- 2016

Board of Trustees, Department ofTechnology Services, DistrictAdministrators, District GrantWriter, Business Services,Financial Services

Purchase Orders, BudgetAllocations, Grant Applications,Grant Awards, Board ApprovedMinutes

23 of 31

Page 25: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

4.3.7: Develop a process ofconducting preventivemaintenance oftechnologies.

LEA LRPT Correlates:I07, LAS14

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices

Work Orders, MaintenanceSchedule, eRate ExpenditureReports

4.3.8: Maintain highly qualifieddistrict personnel toorchestrate cost effectivetechnology solutions.

LEA LRPT Correlates:I01, I07, LAS01, LAS02,LAS03, LAS04, LAS05,LAS14, TL10

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, Human ResourcesDepartment, DepartmentAdministration, Educator'sProfessional Advisory Committee(EPAC), School ImprovementTeam (SIT)

Department Organization Chart,Evaluations, Agendas and Sign-inSheets, CertificationDocumentation, ProfessionalDevelopment

4.3.9: Replace existing wirelessinfrastructure withtechnology capable ofsupporting new wirelesscurriculum initiatives,Bring Your Own Device(BYOD), and efficientlysupport getting closer tostudent 1:1 initiative.

LEA LRPT Correlates:I05, I09, LAS15

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, Campus Administration,Financial Services

Purchase Orders, Contracts,inventory

OBJECTIVE 4.4:

SISD Technology Department will support an infrastructure that enhances student academic achievement and communityinvolvement.

Budget Amount $12,434,600.00LRPT category: Infrastructure for Technology

E-Rate Correlates: ER01NCLB Correlates: 03, 05, 06, 09, 11, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

4.4.1: Maintain a database ofessential information, i.e.inventory, demographics,TAKS/STAAR scores,attendance, etc.

LEA LRPT Correlates:I06, I08, I09, LAS05,LAS08, LAS11, LAS14

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, Information Services,Research and EvaluationsDepartment, CampusAdministration

Student Data Records, WebsiteUsage Reports, Parent InformationPortal Reports, Purchase Orders,Student/Finance InformationSystem

4.4.2: Allocate funds toautomate administrativefunctions.

LEA LRPT Correlates:I02

State:Original

Status:Planned

July 2013- 2016

Board of Trustees, Department ofTechnology Services, InstructionalServices, Business Services,Financial Services

District Budgets, Purchase Orders,Payroll Records, Board ApprovedMinutes

4.4.3: Maintain and expandintra-district electroniccommunication.

LEA LRPT Correlates:I01, I05, I06, I07, LAS14

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, Public RelationsDepartment, District/CampusPersonnel

Web Log Files, District Budgets,Purchase Orders, eRateExpenditure Reports, BandwidthUtilization

24 of 31

Page 26: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

4.4.4: Maintain and expandaccess to publicinformation for the SISDcommunity.

LEA LRPT Correlates:I01, I06, I08, LAS09,LAS11, LAS13, TL15,TL16

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, Public RelationsDepartment, District/CampusPersonnel

Web Log Files, District Budgets,Purchase Orders, EffectiveSchools Survey, eRateExpenditure Reports

4.4.5: Provide and maintain aninfrastructure forcommunications withparents and communitymembers, includingaccess to school news,educational resources,data, and personnel.

LEA LRPT Correlates:I01, I06, I08, LAS09,LAS13, LAS14, TL14,TL15, TL16

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, Public RelationsDepartment, Campus and DistrictAdministration

Web Log Files, District Budgets,Purchase Orders, EffectiveSchools Survey, eRateExpenditure Reports, ParentInformation Portal Reports

4.4.6: Support libraryautomation systemadequate to the needs ofthe District's LibraryProgram.

LEA LRPT Correlates:I01, I07, LAS01, LAS02,LAS03, LAS04, LAS05,LAS14, TL10

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices, Library Media Services

Library Automation Program, WorkOrders

4.4.7: Implement distance andbroadcast technologiesto enhance classroominstruction.

LEA LRPT Correlates:I03, I09, LAS15

State:Original

Status:Planned

July 2013- 2016

Department of TechnologyServices,Campus Administration

Purchase Orders, Inventories

OBJECTIVE 4.5:

SISD Technology Department will develop a disaster recovery plan to provide business and instructional continuity.

Budget Amount $250,000.00LRPT category: Infrastructure for Technology

E-Rate Correlates: ER01NCLB Correlates: 03, 06, 11, 12

Strategies State/Status: Timeline: Person(s) Responsible: Evidence:

4.5.1: Develop plans fordisaster recovery in caseof natural or man-madedisasters.

LEA LRPT Correlates:LAS13, LAS14

State:Original

Status:Planned

July 2013- 2016

Information Services, Departmentof Technology Services,Operational Services

Off-site Storage for backup ofCritical Data Implemented,Published Technology DisasterPlan

4.5.2: Develop a businesscontinuity plan in case ofnatural or man-madedisasters. Specialconsideration taken forweather-related

State:Original

Status:Planned

July 2013- 2016

Operational Services, Board ofTrustees, Financial Services,Human Resources Department,Information Services Department,Public Relations Department,Department of Technology

Business Continuity ProcessMapped

25 of 31

Page 27: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

disasters.

LEA LRPT Correlates:I01, I02, LAS14

Services

26 of 31

Page 28: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

Budget

Total amount of Title II, Part D formula funds received for the current year of this plan: $0.00

Method of application for formula funds: Local Application

Budget year 2013

Budget item Cost Funding Sources with amount per source

Staff Development $1,850,721.00 Community Local: $616,539CTE Local: $25,000C&I Federal: $834,913C&I Local: $374,269

Telecommunications & Internet Access $964,000.00 Local: $144,600eRate: $819,400

Materials & Supplies $2,466,666.00 Local: $3,000CTE Local: $1,435,727C&I Federal: $320,325C&I Local: $707,614

Equipment $6,266,990.00 Local: $913,900eRate: $4,700,000Community Local: $80,000CTE Local: $204,000C&I Federal: $6,110C&I Local: $362,980

Maintenance $308,000.00 Local: $308,000

Miscellaneous Expenses $195,700.00 Community Local: $43,700Community Federal: $152,000

Total $12,052,077.00

Budget year 2014

Budget item Cost Funding Sources with amount per source

Staff Development $1,850,721.00 Community Local: $616,539CTE Local: $25,000C&I Federal: $834,913C&I Local: $374,269

Telecommunications & Internet Access $964,000.00 Local: $144,600eRate: $819,400

Materials & Supplies $2,466,666.00 Local: $3,000CTE Local: $1,435,727C&I Federal: $320,325C&I Local: $707,614

Equipment $7,166,990.00 Local: $813,900eRate: $5,700,000Community Local: $80,000CTE Local: $204,000C&I Federal: $6,110C&I Local: $362,980

Maintenance $308,000.00 Local: $308,000

Miscellaneous Expenses $195,700.00 Community Local: $43,700Community Federal: $152,000

Total $12,952,077.00

27 of 31

Page 29: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

Budget year 2015

Budget item Cost Funding Sources with amount per source

Staff Development $1,850,721.00 Community Local: $616,539CTE Local: $25,000C&I Federal: $834,913C&I Local: $374,269

Telecommunications & Internet Access $964,000.00 Local: $144,600eRate: $819,400

Materials & Supplies $2,466,666.00 Local: $3,000CTE Local: $1,435,727C&I Federal: $320,325C&I Local: $707,614

Equipment $5,886,990.00 Local: $933,900eRate: $4,300,000Community Local: $80,000CTE Local: $204,000C&I Federal: $6,110C&I Local: $362,980

Maintenance $308,000.00 Local: $308,000

Miscellaneous Expenses $195,700.00 Community Local: $43,700Community Federal: $152,000

Total $11,672,077.00

28 of 31

Page 30: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

Evaluation

Evaluation Process:Currently, technology usage by students and teachers is increasing. Socorro ISD will complete a comprehensive evaluation of thetechnology plan annually. Key performance indicators will be evaluated quarterly. Reporting of the outcomes will be provided to thesuperintendent of schools, assistant superintendents, and the technology bond committee. In addition, all district campuses will berequired to submit a campus technology plan annually that includes an evaluation element.

According to the Texas STaR Chart, the district is only at the Developing Tech Level in the areas of Teaching and Learning andEducator Preparation and Development. The district will enhance technology trainings for teachers and staff in order to enable themto learn how to integrate technology into curriculum by utilizing project-based activities and collaborative learning. The district hasprovided the STaR Chart results for all district campuses that will be used to assist these campuses and the school district towardmeeting the goals of the District's Long Range Plan for Technology.

Evaluation of the technology plan will be a systematic ongoing process. All aspects of the Plan will be evaluated formally two timeseach year.

The intention of the evaluation will be to make decisions on the impact that technology has on teaching and learning process for allstudents and staff. A report will be given to the Superintendent and the Board of Trustees after each formal evaluation occurs.

Both the Director for Technology Services and the Technology Bond Committee will be actively responsible for updating thetechnology plan in accordance to the Texas Education Code, Section 32.001 and as required by the NCLB Act of 2001, Title II, PartD, Enhancing Education through Technology. The district will continue to submit a revised Technology Plan electronically yearly viathe Texas e-Plan system.

Evaluation Method:Through school administration and well-prepared teachers, the technology initiatives will provide opportunities for students tosucceed in the global workforce through the availability, reliability, and effectiveness of technology use in the classroom. Twenty firstcentury technology such as mobile carts, computers for teachers, libraries, and computer labs, and printers/copiers will enhance theeducational opportunities for students. Through the use of current and cutting edge technology, Socorro ISD must support newlearning opportunities for 21st century learners. Socorro ISD is committed to maintaining its reputation for innovation and forwardthinking, while also maintaining a focus on rigor and differentiation, practices that will create self-directed lifelong learners.

Socorro ISD envisions 21st century learning that will allow students to engage interactively and teach them to think critically andcreatively. Technology will assist all teachers to actively engage all students in the process of learning on a daily basis. Socorro ISDpromotes technological transformation from using paper and pencil, mounted devices such as TVs and telephones, to digital mediaand environments accessed via laptops, desktops, mobile devices, and interactive technologies. Yet, at the heart of it all, remain theindispensable relationships of teacher to student and home to school. Therefore, it is in the context of these relationships that we setout our vision for the next three to five years based on the following premises:

- Effective integration of technology within the curriculum is directly affected by the level of educator preparation, development, andsupport.- Educators training, including face-to-face, online, self-paced, distance learning, community sources (i.e. ESC 19, UTEP, EPCC,conferences), and learning communities (cadres).- Career and Technical Education supports teachers to attain industry-recognized certifications.- The long-term objective partnerships with Career and Technical Education will provide new and existing training opportunities forteachers locally through in-house and contracted vendors.- Instructional support will include District Title I Instructional Coach of Excellence (DICE), Campus State Compensators EducationIntervention Coaches (SCEIC), Teacher on Special Assignment (TSA), Instructional Technologist, and/or Library Media Specialist.- SISD is committed to 100% of teachers and campuses reaching the target level of the Texas STaR Chart assessment to ensureeffective implementation of innovative practices within the classroom.- Additional training will be provided during nine weeks and summer intersessions. Training that requires travel will be provided whenample funding is available and skill attainment/industry certification is required.

Community Education is based on the philosophy that learning is a lifelong process. Socorro Independent School District will providethe opportunities to support the community's engagement into the digital age to encourage parental involvement, increasetechnological accessibility and, in turn, enable the community to become full partners in their children's education. Socorro ISDCommunity members will be provided the opportunities to acquire the technology competencies necessary to be active participants inthe digital age through the following objectives:

- Socorro ISD Community members will be involved in the planning and partnership in the technology competencies.- Increase the community access and awareness of technology and information.- Expand technology classes and training opportunities for parent and community members.- Assess the technology needs of the community twice a year.- Acquire the technology competencies necessary to be active participants in the digital age.

29 of 31

Page 31: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

- Maximize the community's educational and personal goals and showcase Socorro ISD as a builder of community learners.

Technology accessibility has been enhanced by the District in the form of high speed wired internet andwireless internet access district wide. The district is currently at a 3:1 computer ratio. Upcoming initiatives such as mobile devices,virtual desktops, and the ability to utilize personal wireless devices will facilitate the District's goal to achieve a 1:1 computer ratio.

With the implementation of these new technologies, a comprehensive network and data security is in place to help ensureconfidentiality, integrity, and availability of district data. Socorro ISD operates a hybrid security management system while abiding bystate and local federal laws. There are also comprehensive disaster recovery measures in place to help support availability andintegrity of district data.

As the district continues to grow, Socorro ISD's objective is to revitalize current legacy systems to utilize new innovative technologiesthrough virtualization and private cloud infrastructure. In addition, Socorro I.S.D is incorporating the use of various Microsoft productssuch as Microsoft System Center Configuration Manager which will standardize desktop images with Microsoft Windows and Officeapplications.

Socorro ISD maintains the district database systems and provides web services including database driven web applications,middle-ware, and content management systems. These are designed to support district initiatives to improve education and make apositive difference in students' lives, enhancing interaction between the community and the district as well.

30 of 31

Page 32: SOCORRO ISD Technology Plan: 2013 - 2016 ISD...Technology Expenditures $ ... Team Leader of Telecom/Network ... Write, Lexia, Eduphoria, Destination Math/Reading, Ignite, ScanTEK,

Appendix

Attachment item A:Information on STaR Chart

Web site: http://www.sisd.net/page/393

SOCORRO ISD does not discriminate on the basis of sex, disability, race, color, age, or national origin in its educational programs,activities, or employment as required by Title IX, Section 504 and Title VI.

31 of 31