Hydrographic Services and Standards Committee

Report of the

Standardization of Nautical Publication Working

Group

to HSSC6, Viña del Mar, Nov 2014

Presented by Mr. Jens Schröder-Fürstenberg (SNPWG Chair)

Page 2: SNPWG report at HSSC6

Principal activities and achievements

Engagement

– 17 Member States, 3 commercial companies,

1 training institute

Meetings

– April 2014, Rostock, Germany

NPUB Product Specs Developments

Page 3: SNPWG report at HSSC6

IHO Registry- we sawno progress

http://blogs.r.ftdata.co.uk/photo-diary/files/2013/07/RUSH-HOUR.jpg

Page 4: SNPWG report at HSSC6

S-122 – developmentmade progress

http://www.businesskorea.co.kr/sites/default/files/field/image/HyundaiShipYard.jpeg

Page 5: SNPWG report at HSSC6

S-122 Dependancies

DQWG; Quality Data section, November 2014

S-100 Edition2; at the earliest by April 2015

DIPWG; portrayal section, optimistically by

summer 2015

SNPWG; test data sample extension, by

summer 2015

S-101 DCEG Sub-WG; data harmonisation,

optimistically by summer 2015

Page 6: SNPWG report at HSSC6

Your most unhappy customers are your greatest source of learning.

(Bill Gates)

TS10_8_ENC_Consistenny.doc (IC_ENC 2003)

http://www.brainyquote.com/quotes/quotes/b/billgates161558.html

Page 7: SNPWG report at HSSC6

Harmonisation is essential

http://hqwallbase.com/images/bigest/1680x1050_dolphins-1485667.jpg

Page 8: SNPWG report at HSSC6

Do we need an arbitrationbody?

http://www.greenpeace.org/international/Global/international/photos/iPad/ARCTIC%2030%20NEW/GP04XK4.jpg

Page 9: SNPWG report at HSSC6

http://www.blogcdn.com/slideshows/images/slides/263/655/5/S2636555/slug/l/f1-grand-prix-of-monaco-1.jpg

Completion schedule

Page 10: SNPWG report at HSSC6

NPUB ProdSpecs Development

S-123 (Radio Service)

– Test data sample

– Application schema

S-124 (Navigational Service)

– Postponed indefinitely

S-126 (Physical Environment) and S-127

(Traffic Management)

– Test data samples

Page 11: SNPWG report at HSSC6

Sharing components isappropriate

http://thecoolgadgets.com/wp-content/uploads/2010/01/Multi-Amphibious-Vehicle.jpg

Page 12: SNPWG report at HSSC6

http://westcountyexplorersclub.com.s182622.gridserver.com/wpwuwei/wp-content/uploads/2012/01/overloaded_truck.jpg

SNPWG Mediawiki removed

Page 13: SNPWG report at HSSC6

http://www.jauntycamera.com/wp-content/uploads/2012/07/7-IMG_7023-Engine-Room-control-board.jpg

NPUB supports IMO e-Nav

Page 14: SNPWG report at HSSC6

Terms of Reference

“Objective

a) To develop guidelines for the preparation of nautical publications, in a format compatible with digital information

systems including but not limited to ECDIS.

b) To develop and maintain the IHO publications for which it is responsible.Procedures

a) The WG should:

(i) Investigate the data format specifications, content and display requirements of digital nautical publications

intended for use in ECDIS and other information display devices.

(ii) Draft guidance document(s) and/or revised technical resolutions, as appropriate.

(iii) Liaise with relevant IHO Technical WG’s to ensure, technical feasibility and compatibility of any developed

proposals.”

b) Keep under continuous review the following IHO publications or the parts related to

Nautical Publications in order to advise the IHO on their updating:

(i) M-3 ‘Resolutions of the IHO’ (parts relating to Nautical Publications)

(ii) S-12 ‘Standardization of List of Lights and Fog Signals’

c) The WG should liaise with other HSSC WG's and other IHO and international bodies as appropriate and as

instructed by HSSC.

The WG should work primarily by correspondence. The WG should attempt to meet at least once every two years,

normally in connection with another convenient IHO forum. When meetings are scheduled, and in order to allow any

WG submissions and reports to be submitted to HSSC on time, WG meetings should not normally occur later than

nine weeks before a meeting of the HSSC.

d) The WG should identify a work programme for each year, including expected time frame.”

Page 15: SNPWG report at HSSC6

How is the NPUB integratedin future ECDIS?

http://www.likeateam.com/wp-content/uploads/2012/10/demands-of-your-Vision.jpg

Page 16: SNPWG report at HSSC6

Action requested of HSSC

Note Chairman‘s report: HSSC6-05.4A

Confirm the development schedule for

– S-122 Marine Protected Area

– S-123 Radio Services (see HSSC6-05.4A)

Endorse the continuance of the Work Plan

Endorse the new Terms of Reference