SNCF Infra | juin 20101

EFRTCJune 11th, 2010

Bernard SCHAER Director of Contracts & Customers Services

SNCF Infrastructure Branch

Maintenance policies

Page 2: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

1 | SNCF INFRASTRUCTURE BRANCH

Page 3: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 20103

Rail projects in France and throughout the world

Expertise and project management

Management of investments for RFF and SNCF

Timetable management

Traffic Control

Safety and punctuality of the railway system

SNCF INFRASTRUCTURE BRANCH : 3 DOMAINS

MAINTENANCE & TRAVAUX 33,000 people

€3,500 m 2009 60 local entities

Maintenance of the railway network

Management of investments for RFF and SNCF

Troubleshooting 24/7

CIRCULATION FERROVIAIRE 14,000 people

€950 m 2009

21 local entities

INGENIERIES 5,100 people

€650 m 2009

IG , INEXIA, SYSTRA

Page 4: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 20104

SNCF INFRA MANAGEMENT

FINANCE

HUMAN RESSOURCES

COMMUNICATION

STRATEGY

INFORMATION SECURITY

TRAFFIC SAFETY

X. OUINDirector

WORK & MAINTENANCE

B. SCHAERDirector

CONTRACTS & CUSTOMER SERVICES

F.DELORMEDirector

ENGINEERING

A.H. BERTRANDDirector

TRAFFIC CONTROL DCF

P. IZARDC.E.O

SNCF INFRA

Page 5: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

2 | THE FRENCH RAILWAY SYSTEM

Page 6: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 20106

ARAF

Safety bodyOther operating Companies

Infrastructure Manager

Operators

Infrastructure

Regulatory body

Maintenance contract

Operation contract

Payments for paths

FRENCH RAILWAY SYSTEM AT A GLANCE

Regional Authorities(fund local trains)

State

Stations management

Page 7: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 20107

SOME OF THE ACTORS OF THE SYSTEM

R.F.F.Réseau Ferré de France

Created in 1997

Owns the network

Took over €20.4b of historical SNCF debt (SNCF retained €7b)

A performance contract was signed with the State in November 2008

E.P.S.F.Etablissement Public de

Sécurité Ferroviaire

Created in march 2006

European directive 2004/49

Monitors safety issues on the national railway network

ARAF

Created by law in December 2009

Regulatory body for the railway sector

Should be in place before the end of 2010

ARAF Autorité de Régulation

des Activités Ferroviaires

DCF still belongs to SNCF, however has some kind of an independent status

Its director is named directly by the government.

DCF works for RFF and is responsible for Traffic Control

D.C.F Direction de la Circulation

Ferroviaire

Maintains the network

Manages investment works on behalf of RFF

A maintenance contract is signed between SNCF and RFF since 2007

SNCF Infrastructure

Page 8: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

3 | THE FRENCH RAILWAY NETWORK

Page 9: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 20109

The French Network Total track length

• UIC 1 à 4 : 19885 km ( included 3839 km HSL ) 9969 S & C ( included 754 HSL )

• UIC 5 et 6 13803 km - 7621 S & C

Regional lines

• with passengers : 11723 km - 4113 S & C• without passengers: 4417 km - 2171 S & C

Side tracks 14949 km - 46177 S & C

Level-crossings 18843Bridges 40914Tunnels 1 588 (631 km)Signal boxes 2256

Power supply

Sub-stations: 535

Overhead lines

1500 V: 12 547 Km (40%)

25 000 V :19 098 Km (60%)

Page 10: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 201010

Study of EPFL 2005

The study made by EPFL in 2005 showed

Bad conditions of the network No optimization of M/R: The share M/R was 2/3;1/3 when it was from 1/2;1/2 up to 1/3;2/3 in other europeen countries No optimization of track possession : According to the EPFL, track possession duration was too short (1h50) and no technically and economically efficient No optimization of traffic control : There were too much signalling boxes

Page 11: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 201011

What has be done so far

700899

1048

13431550

1780 1800 1800 1800

A 2005 A 2007 A 2008 A 2009 A 2010 A 2012 A 2013 A 2014 A 2015

At the end of 2005, RFF,SNCF and the French Government came to an agreement of an increasing of funding for renewal

2005 2007 2008 2009 2010 2012 2013 2014 2015

Track 450 602 740 965 997 1183 1269 1237 1231

Bridges 120 130 123 132 140 197

Sign 80 75 105 144 176 307

OHL 40 50 47 51 55 61

Page 12: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 201012

What has be done

30

35

40

45

50

55

60

2008 2009 2010 2011 2012 2013 2014 2015 2016

These figures show that the track renewal program do not allow to modernize the network

A model of the network’s evolution has be done

Courbes d'évolution de la substance UIC 1-4

30

35

40

45

50

55

60

2008 2009 2010 2011 2012 2013 2014 2015 2016

Courbes d'évolution de la substance UIC 5-6

30

35

40

45

50

55

60

2008 2009 2010 2011 2012 2013 2014 2015 2016

Courbes d'évolution de la substance UIC 1-6

Without renewal

With Perfomance Contract

Page 13: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 201013

What is going on

RFF has defined his strategic vision of the network Definition of freight corridors with high level of availability More accurate definition of the performance of the network according to the different routes, eg:

Axel load Speed Gauge Availability

Increasing of the slots for TOCs and FOCs Decreasing of maintenance and renewal costs

So SNCF has to improve the maintenance policies, in order to have more trains, more availability, as all Infra Managers do.

Page 14: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 201014

Maintenance policies

These huge requirements lead to

An optimization of maintenance and renewal, that means an assessment of the policies on each route based on LCC

More efficiency of the renewal Longer zones Uniformization Planning

The necessity of planning and reducing maintenance costs; the best way is to move from an « on condition » based maintenance to a predictive maintenance

Page 15: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 201015

Predictive maintenance

To do that,it is necessary: To have a good knowledge of the conditions of the network To know the parameters which have an impact on the behaviour of the components of the infrastructure To know the degradation’s laws of these components according to the sollicitations they have to support

In order to plan the interventions

Page 16: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 201016

Predictive maintenance

The knowledge of the degradation’s laws,eg:Track circuits components

Page 17: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 201017

Tools

Development and implementation of measurement cars IRIS 320 already in operation Purchase of new measurement cars for conventional lines

Development and implementation of tools in order to modelize the degradation’s laws and so to define « what to do » and « when to do » eg: Contact wire wear measurement and planning of replacement (with « Catalyse ») Track geometry quality measurement and planning of tamping (with « TIMON »)

Page 18: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 201018

Contact wire wear measurement

Page 19: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 201019

Contact wire wear analyse CATALYSE

Affichage des courbes sur différentes années de mesures

avec les couleurs correspondantes.

Bleu= année 2005Orange= année 2007Vert= année 2009

Affichage N° support

Résultats des différents calculs (% inexploitable, section moyenne des FC, point le plus bas, homogénéité,….) des différentes années de mesures

Tableaux de synthèse classés par ligneTableau de prévision de remplacementTableau de suivi baguettesTableau de suivi des périodicités de mesures préconisées dans les référentiels Seuil d’alarme

Page 20: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 201020

CATALYSE

Sélection des fichiers de mesures de référence et choix de la date de projection

Différents traits de couleur suivant les années de mesures.Bleu=2007Orange=2009Vert= Projection 2013

Page 21: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 201021

TIMON HSL 1

Page 22: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 201022

TIMON Conventional Line Paris-Le Havre

Page 23: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 201023

Remote control

Development and implementation of remote control for level crossings Signalling and S & C in 3 Supervision Centers (Paris, Lyon,Pagny/Moselle)

Curve of translation of a switch

Page 24: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 201024

Maintenance methods

Implementation of new methods of maintenance for a higher durability of the interventions eg: Tamping in BAS Grinding Tamping and grinding

Page 25: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 201025

Optimization Maintenance/Renewal

Y(T) = Coûts cumulés d’entretien de 0 à la date T

X = Coûts de régénération à la date 0

Ymax(T)/T

Niveau de saturation de «nuit»

Niveau de saturation de «jour»

Ymin(T)/T

To To

X/T

T (âge de renouvellement)

Page 26: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 201026

Models of maintenance costs

57

911

13

15

17

19

0

2

4

6

8

10

12

14

Nombre de périodes

Age Voie

Y

D = 25km

12-14

10-12

8-10

6-8

4-6

2-4

0-2

Maintenance costs are modelized according to track possession and distances between stations

Page 27: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 201027

Models of maintenance costs

57

911

13

15

17

19

0

5

10

15

20

25

Nombre de périodes

Age Voie

Y

D = 50km

20-25

15-20

10-15

5-10

0-5

Page 28: SNCF Infra | juin 2010 1 EFRTC June 11th, 2010 Bernard SCHAER Director of Contracts & Customers Services SNCF Infrastructure Branch Maintenance policies

SNCF Infra | juin 201028

Thank you for your attentionQ&A