sncf infra | juin 2010 1 efrtc june 11th, 2010 bernard schaer director of contracts & customers...
TRANSCRIPT
SNCF Infra | juin 20101
EFRTCJune 11th, 2010
Bernard SCHAER Director of Contracts & Customers Services
SNCF Infrastructure Branch
Maintenance policies
1 | SNCF INFRASTRUCTURE BRANCH
SNCF Infra | juin 20103
Rail projects in France and throughout the world
Expertise and project management
Management of investments for RFF and SNCF
Timetable management
Traffic Control
Safety and punctuality of the railway system
SNCF INFRASTRUCTURE BRANCH : 3 DOMAINS
MAINTENANCE & TRAVAUX 33,000 people
€3,500 m 2009 60 local entities
Maintenance of the railway network
Management of investments for RFF and SNCF
Troubleshooting 24/7
CIRCULATION FERROVIAIRE 14,000 people
€950 m 2009
21 local entities
INGENIERIES 5,100 people
€650 m 2009
IG , INEXIA, SYSTRA
SNCF Infra | juin 20104
SNCF INFRA MANAGEMENT
FINANCE
HUMAN RESSOURCES
COMMUNICATION
STRATEGY
INFORMATION SECURITY
TRAFFIC SAFETY
X. OUINDirector
WORK & MAINTENANCE
B. SCHAERDirector
CONTRACTS & CUSTOMER SERVICES
F.DELORMEDirector
ENGINEERING
A.H. BERTRANDDirector
TRAFFIC CONTROL DCF
P. IZARDC.E.O
SNCF INFRA
2 | THE FRENCH RAILWAY SYSTEM
SNCF Infra | juin 20106
ARAF
Safety bodyOther operating Companies
Infrastructure Manager
Operators
Infrastructure
Regulatory body
Maintenance contract
Operation contract
Payments for paths
FRENCH RAILWAY SYSTEM AT A GLANCE
Regional Authorities(fund local trains)
State
Stations management
SNCF Infra | juin 20107
SOME OF THE ACTORS OF THE SYSTEM
R.F.F.Réseau Ferré de France
Created in 1997
Owns the network
Took over €20.4b of historical SNCF debt (SNCF retained €7b)
A performance contract was signed with the State in November 2008
E.P.S.F.Etablissement Public de
Sécurité Ferroviaire
Created in march 2006
European directive 2004/49
Monitors safety issues on the national railway network
ARAF
Created by law in December 2009
Regulatory body for the railway sector
Should be in place before the end of 2010
ARAF Autorité de Régulation
des Activités Ferroviaires
DCF still belongs to SNCF, however has some kind of an independent status
Its director is named directly by the government.
DCF works for RFF and is responsible for Traffic Control
D.C.F Direction de la Circulation
Ferroviaire
Maintains the network
Manages investment works on behalf of RFF
A maintenance contract is signed between SNCF and RFF since 2007
SNCF Infrastructure
3 | THE FRENCH RAILWAY NETWORK
SNCF Infra | juin 20109
The French Network Total track length
• UIC 1 à 4 : 19885 km ( included 3839 km HSL ) 9969 S & C ( included 754 HSL )
• UIC 5 et 6 13803 km - 7621 S & C
Regional lines
• with passengers : 11723 km - 4113 S & C• without passengers: 4417 km - 2171 S & C
Side tracks 14949 km - 46177 S & C
Level-crossings 18843Bridges 40914Tunnels 1 588 (631 km)Signal boxes 2256
Power supply
Sub-stations: 535
Overhead lines
1500 V: 12 547 Km (40%)
25 000 V :19 098 Km (60%)
SNCF Infra | juin 201010
Study of EPFL 2005
The study made by EPFL in 2005 showed
Bad conditions of the network No optimization of M/R: The share M/R was 2/3;1/3 when it was from 1/2;1/2 up to 1/3;2/3 in other europeen countries No optimization of track possession : According to the EPFL, track possession duration was too short (1h50) and no technically and economically efficient No optimization of traffic control : There were too much signalling boxes
SNCF Infra | juin 201011
What has be done so far
700899
1048
13431550
1780 1800 1800 1800
A 2005 A 2007 A 2008 A 2009 A 2010 A 2012 A 2013 A 2014 A 2015
At the end of 2005, RFF,SNCF and the French Government came to an agreement of an increasing of funding for renewal
2005 2007 2008 2009 2010 2012 2013 2014 2015
Track 450 602 740 965 997 1183 1269 1237 1231
Bridges 120 130 123 132 140 197
Sign 80 75 105 144 176 307
OHL 40 50 47 51 55 61
SNCF Infra | juin 201012
What has be done
30
35
40
45
50
55
60
2008 2009 2010 2011 2012 2013 2014 2015 2016
These figures show that the track renewal program do not allow to modernize the network
A model of the network’s evolution has be done
Courbes d'évolution de la substance UIC 1-4
30
35
40
45
50
55
60
2008 2009 2010 2011 2012 2013 2014 2015 2016
Courbes d'évolution de la substance UIC 5-6
30
35
40
45
50
55
60
2008 2009 2010 2011 2012 2013 2014 2015 2016
Courbes d'évolution de la substance UIC 1-6
Without renewal
With Perfomance Contract
SNCF Infra | juin 201013
What is going on
RFF has defined his strategic vision of the network Definition of freight corridors with high level of availability More accurate definition of the performance of the network according to the different routes, eg:
Axel load Speed Gauge Availability
Increasing of the slots for TOCs and FOCs Decreasing of maintenance and renewal costs
So SNCF has to improve the maintenance policies, in order to have more trains, more availability, as all Infra Managers do.
SNCF Infra | juin 201014
Maintenance policies
These huge requirements lead to
An optimization of maintenance and renewal, that means an assessment of the policies on each route based on LCC
More efficiency of the renewal Longer zones Uniformization Planning
The necessity of planning and reducing maintenance costs; the best way is to move from an « on condition » based maintenance to a predictive maintenance
SNCF Infra | juin 201015
Predictive maintenance
To do that,it is necessary: To have a good knowledge of the conditions of the network To know the parameters which have an impact on the behaviour of the components of the infrastructure To know the degradation’s laws of these components according to the sollicitations they have to support
In order to plan the interventions
SNCF Infra | juin 201016
Predictive maintenance
The knowledge of the degradation’s laws,eg:Track circuits components
SNCF Infra | juin 201017
Tools
Development and implementation of measurement cars IRIS 320 already in operation Purchase of new measurement cars for conventional lines
Development and implementation of tools in order to modelize the degradation’s laws and so to define « what to do » and « when to do » eg: Contact wire wear measurement and planning of replacement (with « Catalyse ») Track geometry quality measurement and planning of tamping (with « TIMON »)
SNCF Infra | juin 201018
Contact wire wear measurement
SNCF Infra | juin 201019
Contact wire wear analyse CATALYSE
Affichage des courbes sur différentes années de mesures
avec les couleurs correspondantes.
Bleu= année 2005Orange= année 2007Vert= année 2009
Affichage N° support
Résultats des différents calculs (% inexploitable, section moyenne des FC, point le plus bas, homogénéité,….) des différentes années de mesures
Tableaux de synthèse classés par ligneTableau de prévision de remplacementTableau de suivi baguettesTableau de suivi des périodicités de mesures préconisées dans les référentiels Seuil d’alarme
SNCF Infra | juin 201020
CATALYSE
Sélection des fichiers de mesures de référence et choix de la date de projection
Différents traits de couleur suivant les années de mesures.Bleu=2007Orange=2009Vert= Projection 2013
SNCF Infra | juin 201021
TIMON HSL 1
SNCF Infra | juin 201022
TIMON Conventional Line Paris-Le Havre
SNCF Infra | juin 201023
Remote control
Development and implementation of remote control for level crossings Signalling and S & C in 3 Supervision Centers (Paris, Lyon,Pagny/Moselle)
Curve of translation of a switch
SNCF Infra | juin 201024
Maintenance methods
Implementation of new methods of maintenance for a higher durability of the interventions eg: Tamping in BAS Grinding Tamping and grinding
SNCF Infra | juin 201025
Optimization Maintenance/Renewal
Y(T) = Coûts cumulés d’entretien de 0 à la date T
X = Coûts de régénération à la date 0
Ymax(T)/T
Niveau de saturation de «nuit»
Niveau de saturation de «jour»
Ymin(T)/T
To To
X/T
T (âge de renouvellement)
SNCF Infra | juin 201026
Models of maintenance costs
57
911
13
15
17
19
0
2
4
6
8
10
12
14
Nombre de périodes
Age Voie
Y
D = 25km
12-14
10-12
8-10
6-8
4-6
2-4
0-2
Maintenance costs are modelized according to track possession and distances between stations
SNCF Infra | juin 201027
Models of maintenance costs
57
911
13
15
17
19
0
5
10
15
20
25
Nombre de périodes
Age Voie
Y
D = 50km
20-25
15-20
10-15
5-10
0-5
SNCF Infra | juin 201028
Thank you for your attentionQ&A