  • Slide 1
  • Slide 2
  • Smart Substation Transport Services for the Distribution Grid Operator Josco C.P. Kester [email protected]
  • Slide 3
  • Introduction TNO connects people and knowledge to create innovations that boost the sustainable competitive strength of industry and well-being of society public / private independent industrial innovation information society ICT energy mobility research and development The Netherlands turnover 600M applied physics measurements & control technology hiking Energie Delfland electric power systems consultancy research & development ECN 2 power electronic technology
  • Slide 4
  • IOP-EMVT 06101 intelligent distributie station 3 [email protected] Smart Substation A 10/0.4 kV distribution substation that supports LV grids with distributed generation and demand peaks 3
  • Slide 5
  • IOP-EMVT 06101 intelligent distributie station 4 [email protected] How will our energy supply look in 2050? 4 Power grid operators face new requirements
  • Slide 6
  • IOP-EMVT 06101 intelligent distributie station 5 [email protected] Smart Substation Requirements Functional Design Detailed Design Prototype Assembly Laboratory tests Field demonstration (May 2007- December 2010) 5
  • Slide 7
  • IOP-EMVT 06101 intelligent distributie station 6 [email protected] Inside the prototype LV Cabinet 6 MV Cabinet
  • Slide 8
  • IOP-EMVT 06101 intelligent distributie station 7 [email protected] LV cabinet 7 3. Monitoring and control 2. Sensors 1. Electric energy storage
  • Slide 9
  • IOP-EMVT 06101 intelligent distributie station 8 [email protected] MV cabinet 8 Switchgear indicators Smart Trafo - trafo Smart Trafo control unit
  • Slide 10
  • IOP-EMVT 06101 intelligent distributie station 9 [email protected] Smart Substation by improving load profile reliability power quality A 10/0.4 kV distribution substation that supports LV grids with distributed generation and demand peaks 9
  • Slide 11
  • IOP-EMVT 06101 intelligent distributie station 10 [email protected] Lab tests in FPG-Lab May 2009 February 2010 10
  • Slide 12
  • IOP-EMVT 06101 intelligent distributie station 11 [email protected] Field demonstration Apeldoorn, Het Kasteel (Jun 2010 - ) 11
  • Slide 13
  • IOP-EMVT 06101 intelligent distributie station 12 [email protected] Load profile Peak load: - 30% (simulation) PowerMatcher Supply Demand Matching 12
  • Slide 14
  • IOP-EMVT 06101 intelligent distributie station 13 [email protected] Reliability Decrease peak loads Coordination of local supply* Intentional islanding* * not yet fully tested 13
  • Slide 15
  • IOP-EMVT 06101 intelligent distributie station 14 [email protected] FPG-Lab: islanding ESI System operating in islanding mode after removal of MV supply (passive resistive load of 20kW applied) 14
  • Slide 16
  • IOP-EMVT 06101 intelligent distributie station 15 [email protected] Power Quality Resonances: - 70% (simulation) Harmonic Compensation with Virtual Resistive Harmonic Dampening (VRHD) 15
  • Slide 17
  • IOP-EMVT 06101 intelligent distributie station 16 [email protected] Smart Substation: results field demonstration Tested in an operational grid (easy circumstances) stable operation harmonic compensation voltage stability flicker reduction Not yet tested controlling microCHPs active power control (in preparation) rough conditions Duration test ongoing 16
  • Slide 18
  • IOP-EMVT 06101 intelligent distributie station 17 [email protected] Field demo: Reference harmonics (wk20) THD 3rd 5th 7th 11th 13th All PQ characteristics within limits 17 very good sufficient very bad
  • Slide 19
  • IOP-EMVT 06101 intelligent distributie station 18 [email protected] Field demo: THD (May - October 2010) THD3rd 5th 7th 11th 13th 17-19 prep 20 ref 21-26 V 29 harm 30 ref 35-36 V 42-43 flicker 18
  • Slide 20
  • IOP-EMVT 06101 intelligent distributie station 19 [email protected] Field demo: Harmonic Compensation (THD) Off On THD reduced by 15% 2.5 0.0 19
  • Slide 21
  • IOP-EMVT 06101 intelligent distributie station 20 [email protected] Field demo: Harmonic Compensation (5th) Off On 5th harmonic reduced by 20% 20 2.5 0.0 2.5 0.0
  • Slide 22
  • IOP-EMVT 06101 intelligent distributie station 21 [email protected] Field demo: Reference PQ (wk20) V (dips) freq flicker THD unbalance Not applicable Connection. error 21 very good sufficient very bad
  • Slide 23
  • IOP-EMVT 06101 intelligent distributie station 22 [email protected] Field demo: PQ (May - October 2010) V(dips) freq. Flicker THD Unb. 17-19 prep 20 ref 21-26 V 29 harm 30 ref 35-39 V 42-43 flicker 22 Not applicable Connection. error
  • Slide 24
  • IOP-EMVT 06101 intelligent distributie station 23 [email protected] Field demonstration: Flicker reduction OffOn Flicker reduced from max 0.4 to max 0.2 23 1.0 0.0 1.0 0.0
  • Slide 25
  • IOP-EMVT 06101 intelligent distributie station 24 [email protected] Field demonstration: Voltage stability OffOn Voltage excursions reduced from +/- 4 V to +/- 0.8 V 24
  • Slide 26
  • IOP-EMVT 06101 intelligent distributie station 25 [email protected] Smart Trafo Voltage distribution at input Voltage distribution at output 25
  • Slide 27
  • IOP-EMVT 06101 intelligent distributie station 26 [email protected] 26 Flex Power Grid Lab (FPGLab) offers services for development and testing of SmartGrids and power electronics for industrial high voltage (24kV), power up to 1MVA by offering a predefined bad grid or load independent laboratory, operated by KEMA, Arnhem (Netherlands) www.flexpowergridlab.com Applications
  • Slide 28
  • IOP-EMVT 06101 intelligent distributie station 27 [email protected] 27 Key figures make test facility unique Voltage level up to 24 kV DC to 75 Hz frequency range Continuous power up to 1 MVA Up to >25 th harmonics 4 Quadrant operation Synchronization with other source Controllable power exchange Adjustable loads (0.5MW, 1MVAr) A freely programmable nightmare grid 1 MVA 2.4 kHz 24 kV 1 MVA
  • Slide 29
  • IOP-EMVT 06101 intelligent distributie station 28 [email protected] Spin-off Alfen: ESI Imtech: Smart Trafo 2.0 KEMA: FPG-Lab Alliander: test environment TNO : PowerMatcher Eaton: equipment for sustainable electricity supply, home automation 28
  • Slide 30
  • IOP-EMVT 06101 intelligent distributie station 29 [email protected] Recommendations Continue monitoring Test active power control Perform test including microCHPs Demonstrations take more time than one expects even when one takes that into account Significant cost reduction possible Significant volume reduction possible Consider mobile applications 29
  • Slide 31
  • IOP-EMVT 06101 intelligent distributie station 30 [email protected] Conclusions Lab tests anti-islanding and islanding tested and approved specifications tested and documented approved for field operation Field demonstration tests with microCHPs not possible active power control not yet working smart substation has operated without incidents since June 2010 voltage stability improved THD improved flicker improved International interest in Smart Substation 30 Questions? [email protected] +31-88-866 7392